HomeMy WebLinkAbout112 Central Park 00-3948 New construction fire inspection�/R ezwzom. P,+tx
60,-34741?
10 0'�e--
CITY OF SANFOPJD
PLANS REVIEW COMMENT SHEET DATE: R - 3 k - 06
-Log Zy—
PROJECT. i L
ADDRESS:
CONTRACTOR:
OWNER:
PLANS REVIEWED BY:
PERSON NOTIFED:- A 4 DATE
PHONE: FAX:
NO ONE NOTIFIED:.
• DATE RESPONSE RECEIVED:
F__
,Whole Building Performance Method for Commercial Buildings
i ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
Florida Department of Community Affairs
FLA/COM-97 Version 2.2
PROJECT NAME_Offices/Warehouse
-ADDRESS: _Lot 17 Sanford Central Park
_Sanford
OWNER: _Weather Masters
'AGENT:
Form 40OA-97
PERMITTING OFFICE:
_Sanford
CLIMATE ZONE
PERMIT NO:
Q'URISDICTION
BUILDING TYPE: _Service Establishments
CONSTRUCTION CONDITION: New construction
DESIGN COMPLETION: _Finished Building
CONDITIONED FLOOR AREA: _3735.9
MAX. TONNAGE OF EQUIPMENT PER SYSTEM:
5
COMPLIANCE CALCULATION:
METHOD A
-----------------
A• WHOLE BUILDING
PRESCRIPTIVE REQUIREMENTS:
LIGHTING
LIGHTING CONTROL REQUIREMENTS
HVAC EQUIPMENT
COOLING EQUIPMENT
1. SEER
HEATING EQUIPMENT
1. Et
AIR DISTRIBUTION SYSTEM INSULATION
1. Unconditioned Space
2. No Ducts
REHEAT SYSTEM TYPES USED
NO REHEAT SYSTEM is USED
WATER HEATING EQUIPMENT
PIPING INSULATION REQUIREMENTS
DESIGN
54.36
10.00
1.00
REQUIREMENTS
6.00
0.00
_5
NO: 691500
NUMBER OF ZONES
CRITERIA
100.00
10.00
2
RESULT
PASSES
PASSES
PASSES
N/A
4.20 PASSES
0.00 N/A
------------- _______________
COMPLIANCE CERTIFICATION: ----------------
I hereby certify that the plans and
specifications covered by this calcu- Review of the plans and specifica-
lation are in compliance with the Lions covered pl this calculation
Florida Ener indicates compliance with the
9Y ficie cy, Co Co3,6,� orida Energy Efficiency Code.
PREPARED BY: �
DATE: Before construction is completed,
04 this building will be inspected
I hereby certify Pthe
for compliance in accor ce with
Yis building is Section 553.908, Flo St tutes.
.n compliance w't orida Energy BUILDING _OFFICIAL:
Efficiency C �`
OWNER/AGEN ��� DATE :'� �c[-- 1
DATE:
IF
I hereb
y Certify(*) that the system design is in compliance with the Florida
Energy Efficiency Code.
ARCHITECT SYSTEM DESIGNER REGISTRATION/STATE
MECHANICAL:
PLUMBING
`ELECTRICAL:
LIGHTING
(*) Signature is required where Florida law requires design to beperformed
by registered design professionals. Typed names and registration numbers
a
be -used where all relevant information la s.
-- --- is contained on signed/sealed
plans-=
` BUILDING ENVELOPE SYSTEMS
E11.--____
GLAZING—, COMPLIANCE
__evat1On Type
South ---- -- U SC -------------------- CHECK
South Commercial - - _VLT Shading
West Con¢nercial 1 1 1 "----________ Area (Sgft) I
East Commercial 1 1 Continuous Ove `---------I
Commercial 1 1 1 Continuous Ove 1711
401.-___ 1 1 1 Continuous Ove 4�1
Elevation-GTLA�ZeNG -ZONE 2_-__ Total -Glass
_Area in tZoneusl Ove 12851
81
North " _-----__U SC VLT -"_--------- _ 4261
Commercial Shading ____v_
1 Area(Sgft)I
1-------------- _
402.--- -W Total Glass Areallone -`'I
Eleva-ZONE
Zone 2 = 01
tion Type 1------------- Total Glass
G Area = 01
South _______________ _ 4261
West
East 81/3/4"ISO Btwn 24' oc/5/g Gu -U Insul_R Gross (Sgft) 1
0.15
Adjacent 3/4 Stco/.'I O Btwn 24'!oc/5�8. GYP 0.15 4.2 7501
'16"°c+RllBatt GYP 0• 4.2
402.---- /�'G 15 4.2 5151
Elevation-WA.Le_-ZONE 2--_____Total-Wall Area0in7Z 11 15151
_ _ one 1 _ 0171
out
South B�J/3/4 ISO ---___2797j_--
East Mt1 Bldg wall Btwn 24,'oc/5/B??G ______R Gross(Sgft) 1
West Mtl g wal /R-11 Batt 0.41 --- --I
Bldg 1/R-11 0
West Mtl g wall Batt •07 6001 Bld /R-11 11
East 8„�T/3/4''ISO Batt 07 11 4501
North 8.!CMW/3/4"ISO Stwn 24oc/5/8„G .07 11 6001
North Mt�T/3/4!'ISO Btwn Btwn 24 °c/5/8,.Gyp 0.41 0.41 0 6001
Bldg wall/R-11 oc/5/8"Gyp 0 41 0 8001
Batt 0 8001
403.____ Total Wall Aria •07 11 12001
Elevation- TypeDOORS_-ZONE 1_____- ---Total Gross Wall nArea _ 59501
Adjacent 1-3/4 Steel D _8747(___
403,___ oor Fiberglass/M -__-- U Area(Sgft)I
Elev DOORS Tot
neral ;goo
ati,on ZONE 2---Area in 0.60
-' 1
Tma --------__al Door Zone 1 841
North - ___- 841
West 1-3/4 Steel Door_ _-- - --____ U __--_--- 1---
East 1-3/4 Steel Door_Flberglass/Mineral woo ea(Sgf.t)1
1-3/4 Steel Door -Fiberglass glass/Mineral woo 0.60 --1
0. !
`04.---- TO al Doo ineral woo 0 60 1441
_-ROOFS__ r Area 60 1441
ype. ZONE To in Zone 2
ta1-Door Area = 3301
-1 Bldg Roof/R Color
-__________4141
19 Batt U Insul R I--- e
'4 • - Light - Area (Sgft) i
{:
Pe _--ROOFg__ZONE 2__-_-- Total Roof •05 19 ---" I
Area in Zone 1 = 37361
_ 37361 i
Color U Insul R__-_----____!___
Area (Sgft) 1 .
-----------------------
Mtl Bldg Roof/R-19 Batt Light .05 19
14764
Total Roof Area in Zone 2 =
147641
405.------FLOORS-ZONE 1------------------Total Roof Area =
- ------------------------
185001-----
Type
-
I --
Insul R
A--ea(Sgft) I
Slab on Grade/Uninsulated
37361
Total Floor Area in Zone 1 =
_405.------FLOORS-ZONE 2----------------------------------------
37361
Type
Insul R
--------------------------------------
Area(Sgft)I
Slab on Grade/Uninsulated
0
147641
Total Floor Area in Zone 2 =
147641
Total Floor Area =
406.------INFILTRATION ----------------------------
185001
Infiltration Criteria in 406.1.ABCD have been met.
ICHECKI
I I
MECHANICAL SYSTEMS
----------------------
CHECK
HVAC load sizing has been performed. (407.1.ABCD)
407. Type --COOLING SYSTEMS-----------
Type Efficiency IPLV
--------------------------
--I---
Tons
-No
1. Split System 3 10 0
4.331
2. No Cooling System 0 0 0
408.------HEATING SYSTEMS
0.001
Type NoEfficiency
------------------------
BTU/hrl
_________
1. Electric Resistance 1
2. No Heating System 0 0
341301
409.------VENTILATION -----------
001
Ventilation Criteria in 409.1.ABCD have been met.
ICHECK1
410.-----AIR DISTRIBUTION SYSTEM---------------------------------------
- I
---------------
-------------------------------
CHECKI
Duct sizing and design have been performed. (410.1.ABCD)
I I
AHU Type Duct Location
----------------------------------
R-value)
1. Air Conditioners Unconditioned Space
61
2. None (Unconditioned Zone) No Ducts
01
----------------------------------------------------
CHECKI
Testing and balancing will be performed. (410.1.ABCD)
411.-----PUMPS AND PIPING -ZONE -----------------------------------------
Basic prescriptive requirements in 411.1.ABCD have been met.
1 I
PLUMBING SYSTEMS
411.-----PUMPS AND PIPING -ZONE I ---------------------------------------
Type R-value/in Diameter Thicknessl
------------------------
1. Non -Circulating 0 0
01
411.-----PUMPS AND PIPING -ZONE 2------------
Type
' ------------------------
R-value/in Diameter
Thicknessl
1. Non -Circulating
---------- --------
---------
412.-----WATER HEATING
0 0
SYSTEMS -ZONE 1---------
01
Type
-------------
Efficiency StandbyLoss InputRate
----------
Gallonsl
412.-----WATER HEATING
SYSTEMS -ZONE 2-------____
Type
-------------
Efficiency StandbyLoss InputRate
----------------------------------------
--- 1---
Gallonsl
ELECTRICAL SYSTEMS
413.-----ELECTRICAL POWER DISTRIBUTION____________________
CHECKI
Metering criteria in
413.1.ABCD have been met.
414.-----MOTORS -----------------------
----------------------------
I
Motor efficiencies
in 414.1.ABCD have been met.
I -I
415.-----LIGHTING SYSTEMS -ZONE 1--------__-------------------------
I I
Space Type No Control
-----------------
----1---
Type 1 No Control Type 2 No Watts Area(Sgft)l ---
Accounting 1 On/Off
______
6 None 0 8000
37361
Total Watts for Zone 1 =
80001
Total Area for Zone 1 =
415.-----LIGHTING SYSTEMS -ZONE 2-------_____
37361
Space Type No Control
-----------------
Type 1 No Control Type 2 No Watts Area(Sgft)l
-----------------
Unlisted S 1 On/Off
9 None 0 14000
14764
Total Watts for Zone 2 =
140001
Total Area for Zone 2 =
147641
Total Watts =
22000I
Total Area =
185001
Lighting criteria in 415.1.ABCD have been met.
ICHECKI
----------------------------------I-----I---
16. Operation/maintenance manual will be provided to owner.(102.1)1
-------------------------------------------
I
PROJECT TITLE
-arehouse
BUILDING TYPE
Offices/W
-------------------
BUILDING LOCATION
Service Establishments
BUILDING AREA (ft')
Sanford
18499.9
BUILDING ANNUAL ENERGY USE
----------------------
--------------------------
DESIGN BUILDING 1
: (%)
BASELINE BUILDING
--------+---------------------------------------
HEATIN ENERGY
-------G
Electric(�)
Resistance
'
Electric Furnace
' 5.94
COOLING ENERGY
'
51.94
Direct Expansion
Air Conditioner (PTAC)
'
' 6•45
19.37
DOMESTIC HOT WATER ENERGY
'
BUILDING MISCELLANEOUS
Lights
'
Equipment
34.72
' 2.83
17.04
SYSTEM MISCELLANEOUS
;
2.83
Fans
' 4.42
PLANT MISCELLANEOUS
;
8.81
----------------------
--------+-----------
TOTAL ENERGY CONSUMPTION
+-------------
'
' 54.36
-----------------------------------------------------------------
'
100.00
******* PASSES ******
----------------- --- __________
PROJECT TITLE Offices/Warehouse -
BUILDING TYPE Service Establishments
BUILDING LOCATION : Sanford
BUILDING AREA(ft2)--_18499.9
-G DESIGN
BUILDING ------- ----------------------_-
_ ___________
Exterior Lighting Power
0 W
EXTERIOR LIGHTING CRITERIA:
AREA
CODE AREA
DESCRIPTION AREA OR ALLOWANCE
----------------- LENGTH
WATTS
exterior Lighting Power er Allowance ---------_
___________________ 0.00 W r.
**** Not --------
Applicable-**** -
F
LIGHTING SYSTEM CONTROL REQUIREMENTS:
TOTAL
EQUIVALENT
--------- SPACE --------
NO.
---------
CONTROLS
-- CONTROL POINTS
NO. DESCRIPTION AREA
TASKS
TYPE 1
NO. TYPE 2
NO. DESIGN
CRITERIA
28 Accounting 3735.8
1
;On/Off
-----------------------
61None
0'6
--------
48 Unlisted S 14764.0
-------------------------------------------------------------
1
;On/Off
91None
0; 9
= 9
_
******** PASSES
********
--------------------------------------
PROJECT TITLE Offices/Warehouse
BUILDING TYPE Service Establishments
BUILDING LOCATION Sanford
BUILDING AREA(ft2): 18499.9
---------------------------------------
HVAC SYSTEM REQUIREMENTS:
-------------------------------------------------------------------------
Cooling System; Measure ;Minim.;Minim.; System System ; Result Result
Type ;#1 #2; #1 1 #2 ; Eff.#1 Eff.#2 ; for #1 for #2
--------------+---------+------+------+--------+--------+---------+----------
Split Sys. ;SEER ; 10.001 0.00; 10.00 0.00 1 PASSES ;
--------------+---------+-------------+-----------------+-------
Heating System; Measure ; Minimum Req.; Efficiency ; Result
--------------+---------+-------------+-----------------j------------
Ele. Resis. ; Et ; 1.00 i N/A
******** PASSES ********
AIR DISTRIBUTION SYSTEM INSULATION REQUIREMENTS:
-----------------------------------------------------------------------
Zone # Duct Location Minimum R-Value Design R-Value Result
------------------------------------
1. Unconditioned Space 4.20 6.00 PASSES
2. No Ducts 0.00 0.00 N/A
-----------------------------------------------------------------------
******** PASSES ********
-----------------------------------------------------------------------
PROJECT TITLE Offices/Warehouse
BUILDING TYPE Service Establishments
BUILDING LOCATION Sanford
BUILDING AREA(ft2): 18499.9
------------------------------------------------------------------
WATER HEATING SYSTEM REQUIREMENTS
-----------------------------------------------------------------------------
System ;Measure; Minimum ; Maximum ; Design ; Design ;Result
Type i ; EF / Et SL EF / Et SL ;
-----------------+-------+----------+----------+----------+----------+-------
-----------------------------------------------------------------------------
**** Not Applicable ****
PIPING INSULATION REQUIREMENTS:
-----------------------------------------------------------------------------
Pipe Insulation Thickness(in)
' ------------------ ---------------
System Type ' O.D.(in); Minimum Req. Design g Result
-----------------+---------+-----------------
---------------------------------------------
**** Not Applicable ****
N-Mas=ter (c )
COMMERCIAL HEAT LOSS / GAIN
Based on ACCA MANUAL N
MANUAL N Copyrighted (c) 1988 by ACCA
---------- __
Project name
Offices ------"-----
-
Address Lot 17 Sanford Central Park-Phs II I
City/State Sanford
Owner Weather Masters
Builder McKee Const.
HVAC contr.: Barnes Htg & A/C
----------------
COOLING PARAMETERS
-------------- ____ -------------------
Geographical Location--------"'--
--_- -> State FLORIDA City : Sanford
---------
North -----------------------
Latitude � "------
/ Elevation I 28 / 14 Ft. Above Sea Level
Relaltive Himidity
Grains I 64
/ Lb. (inside) i
Outdoor Dry Buld (Deg F°)
Outdoor Wet Bulb (Deg F°) I 93 °
Indoor Dry Bulb (Deg F°) I 76 °
Indoor Wet Bulb I 75 °
(Deg F°) I 62.3 °
Outdoor Humidity Ratio
Daily Range I 110
Peak Load Time I 16 °
Temperature Differance (Td)(Deg F°) I 1800 Hours
Cooling- -- -
LoadTdCorrection (Deg -F°) I 30(+)
--------------------
" ----'--
------------
HEATING SUMMARY
TOTAL LOSS 70101.8 COOLING SUt�M?ARy
TOTAL SENSIBLE 109682.6
LATENT GAINS 13384
TOTAL GAIN : 123066.6
SENSIBLE OVERSIZE @ 20� 21936.51
---------------------
HVAC Equipment
------------
Manufacturer Carrier Heating
Htg System (2) 10kw @ 34.1 MBTU
COP/HSPF 1
---------------
Cooling
Clg System
(2) 5 Ton @ 60.0 MBTU - (1) 3 Ton @ 36.0 MBTU
(S)EER 20
Air Handler (1) @ 4000 cfm - (1) @ 1200 cfm Verticle
"GLASS
SOLAR------------------------------------------
--------------------
TYPE
GLASS FACES
SINGLE
AREA Sc
CLEAR East 127.9 1
U-VALUE
LOSS/BTUH
GAIN/BTUH
SINGLE
CLEAR South 212.6 1
4732.3
4732.3
SINGLE
CLEAR West 85.3 1
7866.2
5315
3156.1
15354
GLASS
CONDUCTION_________________________________________
SINGLE
CLEAR 127.9
1
-----------------
1793.6
1744.69
SINGLE
CLEAR 212.6
1
2979.4
2898.15
SINGLE
CLEAR 85.3
1
1197.2
1164.55
WALLS ---------------------
WALL
FACES
AREA
R-VALUE
U-VALUE
LOSS/BTUH
GAIN/BTUH
ADJACENT
933
11
.07
845.7645
793.5165
TYPE
:WOOD FRAME -ADJACENT
East
387.1
4.2
.15
2148.41
2090.34
TYPE
:8in.CONC.N/W BLK
South
537.4
4.2
.15
2982.57
2176.47
TYPE
:8in.CONC.N/W BLK
West
429.7
4.2
.15
2384.84
1353.56
TYPE
:8in.CONC.N/W BLK
WALL
SUB TOTAL
8361.584
6413.886
DOORS ------------------------
DOOR FACES AREA R-VALUE U-VALUE LOSS/BTUH GAIN/BTUH
North 84 n/a .36 3780 483.84
TYPE :STEEL
CEILINGS -----------------------
AREA R-VALUE U-VALUE LOSS/BTUH GAIN/BTUH
TYPE :STEEL SHEET W/lin. INSUL
WITH SUSPENDED CEILING
ROOF COLOR: LITE 3735.9 19 .05 6911.42 14943.6
FLOORS
SLAB PERIMETER
279.7 0
.81 9062.28
000.00
STRUCTURAL SUB TOTALS
----------------------------------
49858.09
53067 53
OTHER SENSIBLE GAINS
-------------------------------------------
PEOPLE
20
N/A
5000
FLOUR/LIGHTING
8000 Watts
N/A
27658.4
ICAND/LIGHTING
0
N/A
0
INTERNAL GAINS
N/A
10000
VENTILATION
300 CFM
11100
5832
ROOM SENSIBLE
60958.09
101557.9
DUCT LOSS & GAIN
9143.713
8124.634
TOTAL SENSIBLE
---------------------------------------------------------
70101.8
109682.6
LATENT GAINS
PEOPLE
N/A
4000
VENTILATION
N/A
9384
_TOTAL LOAD
70101.8
123066.6
SANFORD FIRE DEPARTMENT
FIRE PREVENTION DIVISION
300 N. Park Ave. / P.O. Box 1788
Sanford, FL 32771
(407) 302-1022 (407) 330-5677 FAX
Pager 407-444-3180
Plans Review Sheet
Date: 9/11/00 Business Address: 112 Central Park PI
Business Name:
Ph.
Occ. Ch. 28
Contractor: McKee Construction Ph. (407) 323-1150
Reviewed [ ] Reviewed with comment [ X ] Rejected [ ]
Reviewed by: H. A. "Pete" Tucker, Fire Protection Inspector
Comment: Sprinkler plans to be submitted for review, permitting, and inspections. If
separate certified contractor does underground plans to be submitted for review,
permitting, and inspections. Letter from Engineer of Record needs to be submitted with
sprinkler plans that system meets design criteria. Fire Alarm Plans to be submitted for
review, permitting, and inspections.
1.1 Application — New Building, Type IV Const., 18,500 s.f.
1.2 Mixed — N/A
1.3 Special Definitions — N/N
1.4 Classification of Occupancy — Industrial
1.5 Classification of Hazard of Contents — Ordinary
1.6 Minimum Construction — N/R
2.2 Means of Egress Components — O.K.
2.3 Capacity of Egress — O.K.
2.4 Number of Exits — O.K.
2.5 Arrangement of Egress — O.K.
2.6 Travel Distance — O.K.
2.7 Discharge from Exits — O.K.
2.8 Illumination of Means of Egress — O.K.; will field verify
2.9 Emergency Lighting — O.K.; will field verify
2.10 Marking of Means of Egress — O.K.
2.11 Special Features — O.K.
3.1 Protection of Vertical Openings — as per LSC 28-3.1
3.2 Protection from Hazards — as per LSC 28-3.2
3.3 Interior Finish — Class "B"
3.4 Detection, Alarm and Communications Systems — as per NFPA 72
3.5 Extinguishing Requirements — as per NFPA 10
3.6 Corridors — N/A
- 4 Special Provisions
- 5 Building Services
5.1 Utilities — as per LSC 28-5.1
5.2 HVAC — as per LSC 28-5.2
5.3 Elevators, Escalators, Conveyors (4A-47) — N/A
5.4 Rubbish Chutes, Incinerators, and Laundry Chutes — N/A
Sanford City Code — Chapter 9
Fire Sprinklers: Required; also see 3.5 above
Monitoring: Required by a U.L. listed Central Station for all mandated fire
sprinklered properties
Other: NFPA 1
3-5.1 Fire Lanes — Required if building is more than 150' from street; exception:
building has fire sprinkler system.
3-6.1 Key Box — Required; will field verify
3-7.1 Bldg. Address Number Posted and Legible — Required; will field verify