Loading...
HomeMy WebLinkAbout112 Central Park 00-3948 New construction fire inspection�/R ezwzom. P,+tx 60,-34741? 10 0'�e-- CITY OF SANFOPJD PLANS REVIEW COMMENT SHEET DATE: R - 3 k - 06 -Log Zy— PROJECT. i L ADDRESS: CONTRACTOR: OWNER: PLANS REVIEWED BY: PERSON NOTIFED:- A 4 DATE PHONE: FAX: NO ONE NOTIFIED:. • DATE RESPONSE RECEIVED: F__ ,Whole Building Performance Method for Commercial Buildings i ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Florida Department of Community Affairs FLA/COM-97 Version 2.2 PROJECT NAME_Offices/Warehouse -ADDRESS: _Lot 17 Sanford Central Park _Sanford OWNER: _Weather Masters 'AGENT: Form 40OA-97 PERMITTING OFFICE: _Sanford CLIMATE ZONE PERMIT NO: Q'URISDICTION BUILDING TYPE: _Service Establishments CONSTRUCTION CONDITION: New construction DESIGN COMPLETION: _Finished Building CONDITIONED FLOOR AREA: _3735.9 MAX. TONNAGE OF EQUIPMENT PER SYSTEM: 5 COMPLIANCE CALCULATION: METHOD A ----------------- A• WHOLE BUILDING PRESCRIPTIVE REQUIREMENTS: LIGHTING LIGHTING CONTROL REQUIREMENTS HVAC EQUIPMENT COOLING EQUIPMENT 1. SEER HEATING EQUIPMENT 1. Et AIR DISTRIBUTION SYSTEM INSULATION 1. Unconditioned Space 2. No Ducts REHEAT SYSTEM TYPES USED NO REHEAT SYSTEM is USED WATER HEATING EQUIPMENT PIPING INSULATION REQUIREMENTS DESIGN 54.36 10.00 1.00 REQUIREMENTS 6.00 0.00 _5 NO: 691500 NUMBER OF ZONES CRITERIA 100.00 10.00 2 RESULT PASSES PASSES PASSES N/A 4.20 PASSES 0.00 N/A ------------- _______________ COMPLIANCE CERTIFICATION: ---------------- I hereby certify that the plans and specifications covered by this calcu- Review of the plans and specifica- lation are in compliance with the Lions covered pl this calculation Florida Ener indicates compliance with the 9Y ficie cy, Co Co3,6,� orida Energy Efficiency Code. PREPARED BY: � DATE: Before construction is completed, 04 this building will be inspected I hereby certify Pthe for compliance in accor ce with Yis building is Section 553.908, Flo St tutes. .n compliance w't orida Energy BUILDING _OFFICIAL: Efficiency C �` OWNER/AGEN ��� DATE :'� �c[-- 1 DATE: IF I hereb y Certify(*) that the system design is in compliance with the Florida Energy Efficiency Code. ARCHITECT SYSTEM DESIGNER REGISTRATION/STATE MECHANICAL: PLUMBING `ELECTRICAL: LIGHTING (*) Signature is required where Florida law requires design to beperformed by registered design professionals. Typed names and registration numbers a be -used where all relevant information la s. -- --- is contained on signed/sealed plans-= ` BUILDING ENVELOPE SYSTEMS E11.--____ GLAZING—, COMPLIANCE __evat1On Type South ---- -- U SC -------------------- CHECK South Commercial - - _VLT Shading West Con¢nercial 1 1 1 "----________ Area (Sgft) I East Commercial 1 1 Continuous Ove `---------I Commercial 1 1 1 Continuous Ove 1711 401.-___ 1 1 1 Continuous Ove 4�1 Elevation-GTLA�ZeNG -ZONE 2_-__ Total -Glass _Area in tZoneusl Ove 12851 81 North " _-----__U SC VLT -"_--------- _ 4261 Commercial Shading ____v_ 1 Area(Sgft)I 1-------------- _ 402.--- -W Total Glass Areallone -`'I Eleva-ZONE Zone 2 = 01 tion Type 1------------- Total Glass G Area = 01 South _______________ _ 4261 West East 81/3/4"ISO Btwn 24' oc/5/g Gu -U Insul_R Gross (Sgft) 1 0.15 Adjacent 3/4 Stco/.'I O Btwn 24'!oc/5�8. GYP 0.15 4.2 7501 '16"°c+RllBatt GYP 0• 4.2 402.---- /�'G 15 4.2 5151 Elevation-WA.Le_-ZONE 2--_____Total-Wall Area0in7Z 11 15151 _ _ one 1 _ 0171 out South B�J/3/4 ISO ---___2797j_-- East Mt1 Bldg wall Btwn 24,'oc/5/B??G ______R Gross(Sgft) 1 West Mtl g wal /R-11 Batt 0.41 --- --I Bldg 1/R-11 0 West Mtl g wall Batt •07 6001 Bld /R-11 11 East 8„�T/3/4''ISO Batt 07 11 4501 North 8.!CMW/3/4"ISO Stwn 24oc/5/8„G .07 11 6001 North Mt�T/3/4!'ISO Btwn Btwn 24 °c/5/8,.Gyp 0.41 0.41 0 6001 Bldg wall/R-11 oc/5/8"Gyp 0 41 0 8001 Batt 0 8001 403.____ Total Wall Aria •07 11 12001 Elevation- TypeDOORS_-ZONE 1_____- ---Total Gross Wall nArea _ 59501 Adjacent 1-3/4 Steel D _8747(___ 403,___ oor Fiberglass/M -__-- U Area(Sgft)I Elev DOORS Tot neral ;goo ati,on ZONE 2---Area in 0.60 -' 1 Tma --------__al Door Zone 1 841 North - ___- 841 West 1-3/4 Steel Door_ _-- - --____ U __--_--- 1--- East 1-3/4 Steel Door_Flberglass/Mineral woo ea(Sgf.t)1 1-3/4 Steel Door -Fiberglass glass/Mineral woo 0.60 --1 0. ! `04.---- TO al Doo ineral woo 0 60 1441 _-ROOFS__ r Area 60 1441 ype. ZONE To in Zone 2 ta1-Door Area = 3301 -1 Bldg Roof/R Color -__________4141 19 Batt U Insul R I--- e '4 • - Light - Area (Sgft) i {: Pe _--ROOFg__ZONE 2__-_-- Total Roof •05 19 ---" I Area in Zone 1 = 37361 _ 37361 i Color U Insul R__-_----____!___ Area (Sgft) 1 . ----------------------- Mtl Bldg Roof/R-19 Batt Light .05 19 14764 Total Roof Area in Zone 2 = 147641 405.------FLOORS-ZONE 1------------------Total Roof Area = - ------------------------ 185001----- Type - I -- Insul R A--ea(Sgft) I Slab on Grade/Uninsulated 37361 Total Floor Area in Zone 1 = _405.------FLOORS-ZONE 2---------------------------------------- 37361 Type Insul R -------------------------------------- Area(Sgft)I Slab on Grade/Uninsulated 0 147641 Total Floor Area in Zone 2 = 147641 Total Floor Area = 406.------INFILTRATION ---------------------------- 185001 Infiltration Criteria in 406.1.ABCD have been met. ICHECKI I I MECHANICAL SYSTEMS ---------------------- CHECK HVAC load sizing has been performed. (407.1.ABCD) 407. Type --COOLING SYSTEMS----------- Type Efficiency IPLV -------------------------- --I--- Tons -No 1. Split System 3 10 0 4.331 2. No Cooling System 0 0 0 408.------HEATING SYSTEMS 0.001 Type NoEfficiency ------------------------ BTU/hrl _________ 1. Electric Resistance 1 2. No Heating System 0 0 341301 409.------VENTILATION ----------- 001 Ventilation Criteria in 409.1.ABCD have been met. ICHECK1 410.-----AIR DISTRIBUTION SYSTEM--------------------------------------- - I --------------- ------------------------------- CHECKI Duct sizing and design have been performed. (410.1.ABCD) I I AHU Type Duct Location ---------------------------------- R-value) 1. Air Conditioners Unconditioned Space 61 2. None (Unconditioned Zone) No Ducts 01 ---------------------------------------------------- CHECKI Testing and balancing will be performed. (410.1.ABCD) 411.-----PUMPS AND PIPING -ZONE ----------------------------------------- Basic prescriptive requirements in 411.1.ABCD have been met. 1 I PLUMBING SYSTEMS 411.-----PUMPS AND PIPING -ZONE I --------------------------------------- Type R-value/in Diameter Thicknessl ------------------------ 1. Non -Circulating 0 0 01 411.-----PUMPS AND PIPING -ZONE 2------------ Type ' ------------------------ R-value/in Diameter Thicknessl 1. Non -Circulating ---------- -------- --------- 412.-----WATER HEATING 0 0 SYSTEMS -ZONE 1--------- 01 Type ------------- Efficiency StandbyLoss InputRate ---------- Gallonsl 412.-----WATER HEATING SYSTEMS -ZONE 2-------____ Type ------------- Efficiency StandbyLoss InputRate ---------------------------------------- --- 1--- Gallonsl ELECTRICAL SYSTEMS 413.-----ELECTRICAL POWER DISTRIBUTION____________________ CHECKI Metering criteria in 413.1.ABCD have been met. 414.-----MOTORS ----------------------- ---------------------------- I Motor efficiencies in 414.1.ABCD have been met. I -I 415.-----LIGHTING SYSTEMS -ZONE 1--------__------------------------- I I Space Type No Control ----------------- ----1--- Type 1 No Control Type 2 No Watts Area(Sgft)l --- Accounting 1 On/Off ______ 6 None 0 8000 37361 Total Watts for Zone 1 = 80001 Total Area for Zone 1 = 415.-----LIGHTING SYSTEMS -ZONE 2-------_____ 37361 Space Type No Control ----------------- Type 1 No Control Type 2 No Watts Area(Sgft)l ----------------- Unlisted S 1 On/Off 9 None 0 14000 14764 Total Watts for Zone 2 = 140001 Total Area for Zone 2 = 147641 Total Watts = 22000I Total Area = 185001 Lighting criteria in 415.1.ABCD have been met. ICHECKI ----------------------------------I-----I--- 16. Operation/maintenance manual will be provided to owner.(102.1)1 ------------------------------------------- I PROJECT TITLE -arehouse BUILDING TYPE Offices/W ------------------- BUILDING LOCATION Service Establishments BUILDING AREA (ft') Sanford 18499.9 BUILDING ANNUAL ENERGY USE ---------------------- -------------------------- DESIGN BUILDING 1 : (%) BASELINE BUILDING --------+--------------------------------------- HEATIN ENERGY -------G Electric(�) Resistance ' Electric Furnace ' 5.94 COOLING ENERGY ' 51.94 Direct Expansion Air Conditioner (PTAC) ' ' 6•45 19.37 DOMESTIC HOT WATER ENERGY ' BUILDING MISCELLANEOUS Lights ' Equipment 34.72 ' 2.83 17.04 SYSTEM MISCELLANEOUS ; 2.83 Fans ' 4.42 PLANT MISCELLANEOUS ; 8.81 ---------------------- --------+----------- TOTAL ENERGY CONSUMPTION +------------- ' ' 54.36 ----------------------------------------------------------------- ' 100.00 ******* PASSES ****** ----------------- --- __________ PROJECT TITLE Offices/Warehouse - BUILDING TYPE Service Establishments BUILDING LOCATION : Sanford BUILDING AREA(ft2)--_18499.9 -G DESIGN BUILDING ------- ----------------------_- _ ___________ Exterior Lighting Power 0 W EXTERIOR LIGHTING CRITERIA: AREA CODE AREA DESCRIPTION AREA OR ALLOWANCE ----------------- LENGTH WATTS exterior Lighting Power er Allowance ---------_ ___________________ 0.00 W r. **** Not -------- Applicable-**** - F LIGHTING SYSTEM CONTROL REQUIREMENTS: TOTAL EQUIVALENT --------- SPACE -------- NO. --------- CONTROLS -- CONTROL POINTS NO. DESCRIPTION AREA TASKS TYPE 1 NO. TYPE 2 NO. DESIGN CRITERIA 28 Accounting 3735.8 1 ;On/Off ----------------------- 61None 0'6 -------- 48 Unlisted S 14764.0 ------------------------------------------------------------- 1 ;On/Off 91None 0; 9 = 9 _ ******** PASSES ******** -------------------------------------- PROJECT TITLE Offices/Warehouse BUILDING TYPE Service Establishments BUILDING LOCATION Sanford BUILDING AREA(ft2): 18499.9 --------------------------------------- HVAC SYSTEM REQUIREMENTS: ------------------------------------------------------------------------- Cooling System; Measure ;Minim.;Minim.; System System ; Result Result Type ;#1 #2; #1 1 #2 ; Eff.#1 Eff.#2 ; for #1 for #2 --------------+---------+------+------+--------+--------+---------+---------- Split Sys. ;SEER ; 10.001 0.00; 10.00 0.00 1 PASSES ; --------------+---------+-------------+-----------------+------- Heating System; Measure ; Minimum Req.; Efficiency ; Result --------------+---------+-------------+-----------------j------------ Ele. Resis. ; Et ; 1.00 i N/A ******** PASSES ******** AIR DISTRIBUTION SYSTEM INSULATION REQUIREMENTS: ----------------------------------------------------------------------- Zone # Duct Location Minimum R-Value Design R-Value Result ------------------------------------ 1. Unconditioned Space 4.20 6.00 PASSES 2. No Ducts 0.00 0.00 N/A ----------------------------------------------------------------------- ******** PASSES ******** ----------------------------------------------------------------------- PROJECT TITLE Offices/Warehouse BUILDING TYPE Service Establishments BUILDING LOCATION Sanford BUILDING AREA(ft2): 18499.9 ------------------------------------------------------------------ WATER HEATING SYSTEM REQUIREMENTS ----------------------------------------------------------------------------- System ;Measure; Minimum ; Maximum ; Design ; Design ;Result Type i ; EF / Et SL EF / Et SL ; -----------------+-------+----------+----------+----------+----------+------- ----------------------------------------------------------------------------- **** Not Applicable **** PIPING INSULATION REQUIREMENTS: ----------------------------------------------------------------------------- Pipe Insulation Thickness(in) ' ------------------ --------------- System Type ' O.D.(in); Minimum Req. Design g Result -----------------+---------+----------------- --------------------------------------------- **** Not Applicable **** N-Mas=ter (c ) COMMERCIAL HEAT LOSS / GAIN Based on ACCA MANUAL N MANUAL N Copyrighted (c) 1988 by ACCA ---------- __ Project name Offices ------"----- - Address Lot 17 Sanford Central Park-Phs II I City/State Sanford Owner Weather Masters Builder McKee Const. HVAC contr.: Barnes Htg & A/C ---------------- COOLING PARAMETERS -------------- ____ ------------------- Geographical Location--------"'-- --_- -> State FLORIDA City : Sanford --------- North ----------------------- Latitude � "------ / Elevation I 28 / 14 Ft. Above Sea Level Relaltive Himidity Grains I 64 / Lb. (inside) i Outdoor Dry Buld (Deg F°) Outdoor Wet Bulb (Deg F°) I 93 ° Indoor Dry Bulb (Deg F°) I 76 ° Indoor Wet Bulb I 75 ° (Deg F°) I 62.3 ° Outdoor Humidity Ratio Daily Range I 110 Peak Load Time I 16 ° Temperature Differance (Td)(Deg F°) I 1800 Hours Cooling- -- - LoadTdCorrection (Deg -F°) I 30(+) -------------------- " ----'-- ------------ HEATING SUMMARY TOTAL LOSS 70101.8 COOLING SUt�M?ARy TOTAL SENSIBLE 109682.6 LATENT GAINS 13384 TOTAL GAIN : 123066.6 SENSIBLE OVERSIZE @ 20� 21936.51 --------------------- HVAC Equipment ------------ Manufacturer Carrier Heating Htg System (2) 10kw @ 34.1 MBTU COP/HSPF 1 --------------- Cooling Clg System (2) 5 Ton @ 60.0 MBTU - (1) 3 Ton @ 36.0 MBTU (S)EER 20 Air Handler (1) @ 4000 cfm - (1) @ 1200 cfm Verticle "GLASS SOLAR------------------------------------------ -------------------- TYPE GLASS FACES SINGLE AREA Sc CLEAR East 127.9 1 U-VALUE LOSS/BTUH GAIN/BTUH SINGLE CLEAR South 212.6 1 4732.3 4732.3 SINGLE CLEAR West 85.3 1 7866.2 5315 3156.1 15354 GLASS CONDUCTION_________________________________________ SINGLE CLEAR 127.9 1 ----------------- 1793.6 1744.69 SINGLE CLEAR 212.6 1 2979.4 2898.15 SINGLE CLEAR 85.3 1 1197.2 1164.55 WALLS --------------------- WALL FACES AREA R-VALUE U-VALUE LOSS/BTUH GAIN/BTUH ADJACENT 933 11 .07 845.7645 793.5165 TYPE :WOOD FRAME -ADJACENT East 387.1 4.2 .15 2148.41 2090.34 TYPE :8in.CONC.N/W BLK South 537.4 4.2 .15 2982.57 2176.47 TYPE :8in.CONC.N/W BLK West 429.7 4.2 .15 2384.84 1353.56 TYPE :8in.CONC.N/W BLK WALL SUB TOTAL 8361.584 6413.886 DOORS ------------------------ DOOR FACES AREA R-VALUE U-VALUE LOSS/BTUH GAIN/BTUH North 84 n/a .36 3780 483.84 TYPE :STEEL CEILINGS ----------------------- AREA R-VALUE U-VALUE LOSS/BTUH GAIN/BTUH TYPE :STEEL SHEET W/lin. INSUL WITH SUSPENDED CEILING ROOF COLOR: LITE 3735.9 19 .05 6911.42 14943.6 FLOORS SLAB PERIMETER 279.7 0 .81 9062.28 000.00 STRUCTURAL SUB TOTALS ---------------------------------- 49858.09 53067 53 OTHER SENSIBLE GAINS ------------------------------------------- PEOPLE 20 N/A 5000 FLOUR/LIGHTING 8000 Watts N/A 27658.4 ICAND/LIGHTING 0 N/A 0 INTERNAL GAINS N/A 10000 VENTILATION 300 CFM 11100 5832 ROOM SENSIBLE 60958.09 101557.9 DUCT LOSS & GAIN 9143.713 8124.634 TOTAL SENSIBLE --------------------------------------------------------- 70101.8 109682.6 LATENT GAINS PEOPLE N/A 4000 VENTILATION N/A 9384 _TOTAL LOAD 70101.8 123066.6 SANFORD FIRE DEPARTMENT FIRE PREVENTION DIVISION 300 N. Park Ave. / P.O. Box 1788 Sanford, FL 32771 (407) 302-1022 (407) 330-5677 FAX Pager 407-444-3180 Plans Review Sheet Date: 9/11/00 Business Address: 112 Central Park PI Business Name: Ph. Occ. Ch. 28 Contractor: McKee Construction Ph. (407) 323-1150 Reviewed [ ] Reviewed with comment [ X ] Rejected [ ] Reviewed by: H. A. "Pete" Tucker, Fire Protection Inspector Comment: Sprinkler plans to be submitted for review, permitting, and inspections. If separate certified contractor does underground plans to be submitted for review, permitting, and inspections. Letter from Engineer of Record needs to be submitted with sprinkler plans that system meets design criteria. Fire Alarm Plans to be submitted for review, permitting, and inspections. 1.1 Application — New Building, Type IV Const., 18,500 s.f. 1.2 Mixed — N/A 1.3 Special Definitions — N/N 1.4 Classification of Occupancy — Industrial 1.5 Classification of Hazard of Contents — Ordinary 1.6 Minimum Construction — N/R 2.2 Means of Egress Components — O.K. 2.3 Capacity of Egress — O.K. 2.4 Number of Exits — O.K. 2.5 Arrangement of Egress — O.K. 2.6 Travel Distance — O.K. 2.7 Discharge from Exits — O.K. 2.8 Illumination of Means of Egress — O.K.; will field verify 2.9 Emergency Lighting — O.K.; will field verify 2.10 Marking of Means of Egress — O.K. 2.11 Special Features — O.K. 3.1 Protection of Vertical Openings — as per LSC 28-3.1 3.2 Protection from Hazards — as per LSC 28-3.2 3.3 Interior Finish — Class "B" 3.4 Detection, Alarm and Communications Systems — as per NFPA 72 3.5 Extinguishing Requirements — as per NFPA 10 3.6 Corridors — N/A - 4 Special Provisions - 5 Building Services 5.1 Utilities — as per LSC 28-5.1 5.2 HVAC — as per LSC 28-5.2 5.3 Elevators, Escalators, Conveyors (4A-47) — N/A 5.4 Rubbish Chutes, Incinerators, and Laundry Chutes — N/A Sanford City Code — Chapter 9 Fire Sprinklers: Required; also see 3.5 above Monitoring: Required by a U.L. listed Central Station for all mandated fire sprinklered properties Other: NFPA 1 3-5.1 Fire Lanes — Required if building is more than 150' from street; exception: building has fire sprinkler system. 3-6.1 Key Box — Required; will field verify 3-7.1 Bldg. Address Number Posted and Legible — Required; will field verify