HomeMy WebLinkAbout618 E 10 St Plan correspondence paving New Bethel Baptist ChurchMEMORANDUM
From: CITY MANAGER
To:
Subject:
CiTlJ
City Engineer
OF. SAN FORD
Date December 2, 1982
Parking lot costs for New Bethal Baptist Church, 618 E 10th St.
Rev Doctor was in to see me this morning re this church not being
able to pave their parking lot as required by the City Code. The
City Commission gave them a one year waiver 7/14/80. They have
worked to set up a paving fund and not, have $10, 237. but they were
told the cost was $22,000.
Attached is the site plan,with the approved parking lot showing 761.11
square yards of paving plus the entrance from Hickory Ave. Please
review and obtain current prices from -any reliable contractor as to
would cost them to get it paved now. Have name of contractor
to see what we can do to help them reach their end. Prepare.
r praking pavement and get quote on that. I can not see over
and someone must have "misunderstood" when the $22,000.
as given to them.
MI
SrREEt
oo
0
I
PeOPOS99 FUTwzE PAzKI Nc,
Zo s.ces
I
I
Ep
c '
c
N,•.i
I I'.O• Kew -- --
zEE
NEW at y91- ggPrlsr cl-lopa
PUAS
D
W? Lam. /d
r.
ING DES.IGN 11Y + UMPONENT PERFORMANCE API'I
P},ACE ON FIRST DRAW I NG
IRAW ALI, 'TYP1(AL•' WALL. AND CE.I LING S1.i 'I luN 0N- THIS DkAWING
NEW BETHEL MISSIONARY BAPTIST CHURCH
THIS CODE COMPLIANCE
BUILDING BUILDING-REQ'D
BUILDING INFOIcMATION
GROSS SQUARE FEET CONDiTIONEU/flLA,FD FLOOR SPACE
WALL AREAS: TOTAL OPAQUE AREA
TOTAL GLASS AREA
TOTAL DOOR AREA _
GROSS WALL AREA (TOTAL OF ABOVE)
lI VALUE CALCULATIONS
Up = U OF OPAQUE AkI:A -
Uf - U OF GLASS AREA = °
r
Ud - U OF DOOR AkFA =
Uw - U OF OVERALL WALL/GLASS/D(JuRs =
Uc - U OF OVERALL CEILING/ROOF =
UO -.TOTAL OVE..(ALL U VALUE _
OTTVICALCULATIONS (NONRESIDENTIAL)
WALL CONDUCTION COMPONENT U_w Aw 'I'Do,1
Aw --
GLASS CONDUCTION COMPONENT Uc elf p t =
Aw ---
GLASS RADIATION COMPONENT Af(SF) sc a
Aw
OVERALL OTTV
CALCULATIONS MUST (ISE ORIENTATION SOLAR FACTORS
IF GLASS IS NOT EQUAL ON ALL SIDES.
WINDOW AND DOOR INFILTRATION
WINDOW INFILTRATION RATES
WINDOW MFR. & MODEL 4
DOOR INFILTRATION RATES
DOOR MFR. & MODEL
MECHANICAL SYSTEMS
REHEAT COMPLIANCI' WITH CODE (503.3)
HVAC EQUIPMENT PERFORMANCE
EER OR COP *1
MFR. & MODEL # G.E. BGT A860
AIR 'TRANSPORT FACTOR
CHECK HVAC CONTROLS FOR COMPLIANCE
DUCT SYSTEM INSULATION R VALUES
PIPING INSULATION THICKNE:.;S
SERVICE WATER HEATING —
CHECK PERFORMANCE EFI.ICIENCY
SWIMM NG POOL CONTIcOL COMPLIANCE
CONSERVATION OF HOT WATER
SHOWER FLOW RATE
LAVATORIES (PUBLIC)
FLOW LIMITED TO
OUTLET TEMPERATURE
LECTRICAL PLMER AND LIGHTING (NONRESTDENTIAL)
CHECK COMPLIANCE OF:
POWER FACTOR CORRECTION
VOLTAGE DROP +
LIGHTING SWITCHING
METERING (INDIVIDUAL)
LIGHTING BUDGET
FACADE LIGHTING AS PERCENT OF BLDG.
5200
3895
530
140
4565
0.15
1.13
0.40
0.271
3.8
2.0 —
14.00
19.8
EXISTING
7.3
CODE VALUES
37
0.10
0. 4T
1 30.7_-
1 0.5
1.25
0.5
13 6.0
N/A I 3gpm
0.5 0.5gpm
0 100 F
r
0 _7 2%
CERTIFY THAT I AM THE OWNER OF THIS PROPERTY AND THAT THE PROPOSED BUILDING WHEN
C-MPLETED WILL COMPLY WITH THE SEMINOLE COUZENYEFFICIENCY BUILDING CODE.
Signature
2 28 O
Gate
SWINGING
SLIDING
i
Chv, re
p +-h S-
U d P4erMJ q*