HomeMy WebLinkAbout312 W 1 St 99-2947 Interior Remodel Federal Trust bankt
tJ :'1trl ft a l—tf sf,.Iff aVv. Lf -4'1-L V f--0
lu y 14, 1999
City of Sanford
BuIldinq Department
P.O. Box 1788
Sanford, Florida 32772.-1788
aanteGroup Inc. Via Fax 407.330,S677
Architecture and
Construction Attn: rvir. Biil culbeit'son, pkim Examiner
l;e: Fedpra) Trust Bank
604 N SelcherRc,ir1. .I Jae 100
312 West First Street
Ctp,rwater, flo ri.t J37G;-Z103 Sanford, Honda
voice 727.443.1061 Dear Mr. Culbertson.
fvc 727.432.0609
v v,,y q„ir,.Urauia corn This letter is to cunrion our telephone conversation of July 19, 1999
regarding the above project.
The *Vllovving leans vv'ere disczisiwd:
1. dole No. 2 or? Drawing No. A-! %Ayiii'l,,,:rlpvned to delete the
phrase'"see i iUmbing drawings for additional infort71.9tiorf'
2. Tempered glass will be used only at the new Storefront doors, it will
not be used at the new windows.
hch. lieu. M W07237
FL ConVxtw Ur CC, (0106
3- Note 9 on Drawing M-t will be deleted as it is not required.
Revised tJi,iYving5 will be Sent to you for i7tseilion into your record
It You lic-M! further questions of conimients, picise conitaci me -
Sincerely,
11 an"Group, Inc.
richard Adelson. Architect
President
ii
r
CITY OF SANFORD
BUILDING DIVISION
COMMERCIAL REVIEW COMMENTS
INTERIOR ALTERATIONS
PROJECT:vtzrofz,
ADDRESS: 3( Z Gv• Frzs 5-/ SANFORD, FL
CONTRACTOR: Flml icf, Lo,c/ I.r/G+ LIC# i3G a S%SSW
ADDRESS: (G,J 5-,Z00 PHONE: (7,7) 6774
jar 1. Means of egress and occupant load shall comply to Section 1003 1997. S.B.C.
2 Means of egress and illumination shall comply to Section 1016.1, 1016.2 and 1016.3
signs), 1997 S.B.C.
3. All corridors shall be a minimum of 44", Table 1004,1997, S.B.C.
e— 4. All restrooms shall comply to 1997, H.C.F.S, 553, Part 5.
5. Interior finishes shall comply to Sec. 704, Table 803.3,1997, S.B.C.
6. All electrical wiring service & fixtures shall comply to 1996, N.E.0 and Notice L amendments.
7. All plumbing shall comply to 1994,S.P.C.
8. All mechanical equipment & duct systems shall comply to 1997, S.M.C. & 1997, Florida
Energy Code.
ems 9. Firewalls or tenant separations shall comply to Table 413.3 & Table 704.1 & 704.1.4,
penetrations shall be sleeved and fire caulked.
10. Stairs shall comply to Section 1006,1007,1007.1.2,1007.3,1007.4,1007.5,1007.5.3,1007.6,1007.7,
1007.8,1008.6, & 1015, 1997, S.B.C.
11. Shall comply to 1994, N.F.P.A. -1.
12. Shall comply to Life Safety Code 101,1994.
i
Review By: e-j"k-
REQUIRED INSPECTIONS DURING AND UPON COMPLETION OF CONSTRUCTION:
1. Footer
2. Underground electrical, mechanical and plumbing
3. Slab
4. Lintel and/or tie beam
5. Rough electrical
6. Rough mechanical
7. Plumbing rough
8. Tub Set
9. Framing (
10. Insulation, walls and/or ceilings b04c e--ky('s twi
11. Electrical final, mechanical final and plum
12. Building final
Date: /! Signature
3
CITY OF SANFORD BUILDING DEPARTMENT
SUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PERMIT
1. Two (2) complete sets of plans and drawings to scale and to include; 1A-
o A/p-
a. Site plan approved by Planning & Zoning and City Commission
b. Boundary and building location survey
C. Foundation plan
d. Floor plan
e'
1. Room or space identification
2. Indicate room dimensions
3. Specify door and window dimensions and types
4. Indicate tenant separation and fire resistant walls. Complete
UL design noted.
e. Four (4) or more elevations including finish floor(s) elevations,
f Structure details -signed and sealed by engineer
g. Architectural drawings signed and sealed by architecth. Electrical drawings -signed and sealed by engineer, if over 600 ampsi. Mechanical drawings -signed and sealed when 15 tons or more and/or
5,000.00
C1/' j. Plumbing drawings -signed and sealed, shall comply to Florida
Handicap Code.
11 2. Plans shall show:
a. Square Footage
b. Type of construction
c. Occupancy classification (group)
d. Occupant load
o,tml
N
e. Sprinklers, standpipes and alarm systems
f. Fire protection requirements & NFPA requirements
Life
Ono' 3.
g. safety Code 101
Three (3) sets of Florida Energy Forms 40OD-97 signed and sealed by
architect or engineer.
4. Arbor permit when trees are to be removed from property. Contact the
C t 5. City Engineer for details regarding the Arbor Ordinance and permit.
Soil analysis may be included on site plan or foundation
131y,4_ 6• Soil analysis and/or soil compaction report. If soils appear to be unstable
or. if structure to be built on rill, a report may be requested by the BuildingOfficialorhisrepresentative.
olth'7. Utility Letters
Required Inspections During and Upon Completion of Construction
1. Footer
2. Underground electrical, mechanical and plumbing
3. Foundation elevation survey
4. Slab
5. Lintels -tie beams -columns -cells
6. Rough electrical
7. Rough mechanical
8. Rough plumbing
9. Tub Set
10. Framing
11. Tenant separation/firewall
12. Insulation, walls and/or ceilings
13. Electrical final, mechanical final, and plumbing final
14. Building final /
15. Other
DATE--y " /J — SIGNA
or Authorized Agent)
r-.
CITY OF SANFORD
FIRE DEPARTMENT
1303 South French Avenue
Sanford, Florida 32771
407) 302-1091 (407) 302-1097 FAX
Plans Review Sheet
Date: July 13, 1999 Business Address 3j12V
Business Name: Federal Trust Bank Ph.
Occ. Chap. 26
Contractor: Florida Concepts Ph. (727) 447-6776
Reviewed [ ] Reviewed with comment
JJ'[
X]Rejected
Reviewed by: Bart Wright, Fire Protection Inspectoro 0
Dy/-
Comment:
1.1 Application — Alteration to an existing business occupancy
1.2 Mixed - N/A
1.3 Special Definitions - N/A
1.4 Classification — Existing business LSC chapter 27
1.5 Classification of Hazard of Contents - Ordinary
1.6 Minimum Construction — N/R; applicant notes type II const. (SBCCI); Type 1 (332)
NFPA
1.7 Occupant Load — 1/100 sq. ft. (for egress capacity)
2.2 Means of Egress Components - O.K.
2.3 Capacity of Egress - O.K.
2.4 Number of Exits - O.K.
2.5 Arrangement of Egress - O.K.
2.6 Travel Distance - O.K.
2.7 Discharge from Exits - O.K.
2.8 Illumination of Means of Egress - O.K.
2.9 Emergency Lighting — N/R
2.10 Marking of Means of Egress - O.K. for all uses; will field verify
2.11 Special Features -None noted
3.1 Protection of Vertical Openings —None noted
3.2 Protection from Hazards — N/A
3.3 Interior Finish - Class "C"
3.6 Corridors - N/A
4 Special Provisions - None noted
5 Building Services - No comment
5.1 Utilities
5.2 HVAC
5.3 Elevators, Escalators, Conveyors (4A-47)
5.4 Rubbish Chutes, Incinerators, and Laundry Chutes
Sanford City Code - Chapter 9
Fire Sprinklers: N/A to build out
Monitoring: N/A
Other: NFPA 1
3-5.1 Fire Lanes —N/A to build out
3-6.1 Key Box — N/A to build out
3-7.1 Bldg. Address Number Posted and Legible — N/A to build out