Loading...
HomeMy WebLinkAbout2901 Aileron Bldg 19820 Plans new constructions Lowe's Truss facilitySITE PLAN /1 C)Gt Date Approved � Name I of Business�, W (:,- > or -Type of Use Addressbi��� e iowner w�i� CHECK LIST FOR SITE PLANS: 6. SEWER 1, ZONING 7. DRAINAGE 2. SETBACKS g. LANDSCAPING 3, LOT COVERAGE 9, FENCES 4. PARKING <: 3_0. SIGNS 5. WATER 4 SPECIFICATIONS a NOTES SPECIFICATIONS 61 NOTES WATER 1. SPECIFICATIONS 61 NOTES SANITARY Roof drains, foundation drains or other storm water connections to the sanitary sewer 1. SPECIFICATIONS Sr NOTES PAVE ENT a GRADING Quantities are only estimates and should be re -calculated by the Contractor for 1. The Contractor shall construct all storm sewer appurtenances in accordance 1. The Contractor shad lay the water line and services a minimum of 3'-0" below finished -with F.D.O..T. Standard Specifications for Road and Bridge construction. grade, to the top of pipe. are prohibited. bid submittals. 2. Reinforced concrete pipe (R.C.P.) shall be Class III with rubber gasket joints. 2. The Contractor shall extend the water service to a point 3'-0" from the outside of the 2. A minimum of 18" of vertical separation shall be provided between the sanitary sewer 2. The Contractor's bid shall be comprehensive and include all Iabor, materials and foundation wall. A valve and box shall be installed at this location. and water Iines. Where 18" of separation cannot be provided, or if the water line is equipment necessary to complete the excavation and grading work in accordance with 3. Corrugated metal pipe shall be fully bituminous coated (A.C.C.M.P.) in accordance to be installed below the sanitary sewer the Fewer shall be constructed of ductile iron the Plans and Specifications. with AASHT'O M-190, and shall be installed in accordance with manufacturer's 3. Where water lines conflict with storm and sanitary sewer the water lines shall be lowered pipe for a distance of 10 feet on both sides of the water line crossing. recommendations. Particular attention should be paid to the bedding aril back- during construction. 3. The Contractor shall locate all utilities or underground structures prior to construction filling in 6" lifts on alternating sides of the pipe, hand tamped to eliminate voids. 3. A minimum of 10 feet of horizontal separation shall be provided between the sanitary and notify each respective utility owner forty-eight hours prior to commencement of Pipe 15" to 48" diameter shall be 16 gauge with band joints supplied by the pipe 4. There shall be a 10' minimum horizontal and 18" minimum vertical separation between sewer and water lines. construction. manufacturer for the pipe used. Bands shall be O-Ring gasket type, ASTM C-443, sanitary sewer and water lines. and shall accept a minimum of two complete corrugations from each pipe. 4. The sewer Contractor shall extend 6" sanitary services to within 5' of the 4. The Contractor shall restore off -site construction areas to an equal or better condition 5. All 3/4" water service Lines shall be P.V.C, with solvent --cement welded joints. foundation of the specified invert elevation. The plumbing contractor shall install than existing, prior to commencement of construction, 4. Underdr•ains shall be installed as required on the Plan, by the Construction Manager/ a cleanout at this location. Engineer or local regulatory agency. Even though underdrains may not be tailed for 6. All 811water lines shall be P.V.C., cast iron mechanical joints and rubber ring slip-on 5. The Contractor shall immediately notify the supervising Construction Manager/Engineer on the Plans conditions encountered in the field may require installation of under- joints. 5. All sanitary sewer pipe shall be Y.V.C. sewer pipe conforming to ASTM D-3034 S.D.R. if a pavement or foundation stake is disturbed. drains. Any wet soil conditions, hard pan or suspect soil conditions encountered 35, and be installed in accordance with ASTM D-2321. U shall be brought to the Construction Manager/Engineer's attention for further 7. P.V.C. shall conform to ASTM D-2241 Plastic Pi (S-DR-PR, Class T) ASTM 1784, Type 1, f Pipe 6. The supervising Construction Manager shall approve all sub -base material and compaction Ld investigation. Grade 1, 2,000 P.S.I. design stress and be N.S.F. approved, Class 200 (SDR-21) with 6. The Contractorshall be required to perform an infiltration or exfiltration test in fill areas. Q markings on each section showing conformance to the above specifications. All P.V.C. whichever is applicable. Infiltration shall not exceed 300 gallons per day per inch of Underdrains shalt be 6" slotted corrugated polyethylene drainage tubing conforming pipe shall bear the N.S.F. Logo for potable water. Rubber joints shall be gasketed and diameter per mile of length, or the computed equivalent for shorter lengths of time. 7. All elevations are based on N.G.V.D, datum. -to ASTM F405-74 with performations as specified in ASTM C-508. Installation shall conform to ASTM D-1869 or ASA-A21.11. Solvent -cement couplings shall conform be in accordance with manufacturer's recommendations and as required in Section f q to ASTM D-3D36. 7. " �� The Contractor shall supply complete as -built information relative to inverts, 8. 1 The Contractor sttat[ excavate -and rough grade pavement areas to within f0.1 of the 4-10 of the F.D.O.T. Standard Specifications. Underdrains shall have factory and rim elevations, location of manholes and lengths of pipe. Laterals shall be specified sub -base elevations. assembled envelope or nylon screen sock surrounding the drain. 8. Gate valves 3" and larger shall conform to AWWA C-500, with wrenchnut, extension stems located from the centerline of the nearest downstream rnanhole. The information and other appurtenances as required. They shalt be iron body, fully bronze mounted, shall be submitted on legibly rnarked-up prints to the Engineer prior to final 9. The Contractor shall excavate and rough grade for foundations as directed by the 5. BackfL11 under pavement shall be approved granular backfill in 12" layers and double disk, parallel seat, non -rising stem valves with O-Ring seats and end connections inspection. supervising Construction Manager. compacted to 100% maximum density as determined by A.A.S.H.O.-T-99. as called for on the Plans. 8. The Contractor shalt meet all requirements, codes and ordinances of the City of 10. After construction of foundations, the Contractor shall backfill and fine grade court- W 6. The Contractor shall install 4" & 6" (black) rigid plastic pipe (1,000 lb. crush) for Gate valves smaller than 3" shall be bronze body, rising stem, solid wedge valves capable Sanford Public Works Department including advance notification prior to yards, side yards, paverrtent sub -base and floor slab areas to within ;L0.1' of the the underground down spout drains (D.S.D.). Where two downspout drains or more a being repacked under pressure when valve is open. f d pa P Pe construction and testing. specified sub -base elevations. A connect -the Contractor shall install 6" rigid plastic pipe from the connection �. point to the outlet. All single downspout drains shall be 4" rigid plastic pipe. Valves shalt open in a counterclockwise direction. 9. Backfill under pavement shall be approved granular backfilL in 12" layers and 11. Prior to commencement of construction, the Contractor shall meet with and submit compacted to 100% maximum density as determined by A.A.S.H.O.-T-99. a construction schedule to the Airport Engineer, Construction Manager/Engineer and 7. The Contractor shall fur7tish and install the adapter from the underground 9. All tees, caps, plugs, bends, fire hydrants, valves, etc., shall be provided with thrust secure all necessary licenses and permits. downspout drains to the building gutter downspout drains. (See architectural plans blocks. 10, Kosanchick & Associates, P.A. shall be notified a minimum of 48 hours (2 full m for sizing) working days) prior to construction and testing of the sanitary sewer. Phone: (305) 12. During construction, the Contractor shall provide for adequate drainage and proper 10. All pipe shall be disinfected in accordance with AWWA Standard C-601. The Contractor 830-8310. soil erosion control measures for protection of all drainage and sewer structures, q i shall provide, at his own expense, all necessary testing equipment, pressure gauges, and at all adjacent roads and lands. water meters, water and materials and facilities required for pressure and leakage i2cnJ',_WOUm�( ' testing. 13. Unless otherwise rioted, grade to meet existing elevations at property tines. Excavation and Grading work shall be done in accordance with F.D.O.T. Standard Specifications for Road and Bridge Construction,LO s O 14. Excavation and grading shall include removal of, all pavement, foundations, concrete • N slabs, sewer pipes, headwall,etc., and satisfactorily disposed of off -site, o 15. The Contractor shall construct pavement in accordance with the Typical Pavement ; o _ Sections and F.D.O.T. Standard Specifications for Road and Bridge Construction. p o } The finished pavement grades shall conform to those specified on the Srte Grading Plan. � �m oco 16. The Contractor shalt form sidewalks stoops, patios, curbs trash pads etc: in (D _ID accordance with the Site Grading Plan and Specifications. Minimum sidewalk slope 1Z z shall be 0.5% and maximum slope of 5.0%. ® or: 17. The Contractor shall use concrete with a minimum 28 day strength of 2,500 P.S.I. w c 18. All sidewalk widths shall be as noted, and shall have 1" deep contraction joints every o o x (D 4' on center. q Z 1-- ° U(DJ w o -a rn 19. AiI sidewalk, unless otherwise noted on the Site Grading Plan, shah be flush with C7 Qa �2m z adjacent pavement or where they meet. � 4m0 LL1 Q q m ESTIMATE Off" 11UANTI TIES -- STORE EST/A ATE nF QUANTI T1E5 -- WATER ESTIMATE Off' taUANTI TIES - SANITARY m W QUAN. 60 QUAN. 250 QUAN. 236 DESCRIPTION 6" Sanitary Sewer 2" Force Main Ejector Pump -Complete 6" Cleanout - - CE-FSTI ATE --- QUAN. UNIT LUMP SUM - OF QUANITIES IRA V'EMENT a GRADING DESCRIPTION Clearing & Grubbing J V) O t �d Y = -6 z C `o CO CO LO UNIT DESCRIPTION UNIT [DESCRIPTION UNIT L.F. 21" A.C.C.M.P. L.F. 6" Water Line L.F. 380 L.F. 12" A.C.C.M.P. 430 L.F. 3/4" Water Service A 350 L.F. - 64 LF. 2"Water Line A) J 1 EA. . Inlet I EA. Fire Hydrant 1 EA_ 2 EA. 21" End Section 2 EA. 1 3/4" Valve & Box 2 EA. 1 EA. 12" End Section 1 EA. 2" Master Meter & Pi# A j ----- - L UMP SUM On -Site Cut & Till ' L UMP SUM Tree Removal LUMP SUM Pavement Concrete & Foungiation Rernoval O � . 25,150 S. Y. Concrete Pavement ., 660 S.F. Concrete Sidewalk C1 Ct: 0:: U__ 41(:)z Q J� LL `� 4 - _ CO o ►-- J vy _ d ri O fIf UKAWN-' Soufh_. /4 Corner .. .4. , G-2o-31 /�1RPOFi-r OLVrO. r + I' �t �.: -�`• ___ ! � i" .. i �, �� •.�_ I � _;c-�, 1'".` sue, r - \� 1 tO 2r--V; i =� 1�'Sr•f <vo AMA ��,;,. r� `LU Nam+:: c; L: e? _kA- - FLAIS: -i M-f. 'wo33r {� j 1 I/�— ryl l `n i' �) j A 1X1 @ - t — i i -j-i-i 122L 1 Ai f� A�:. i I 2�� IT 1 ,' _; , , s3 , IZECr 1 /�G t E. ---- - --____rtG- 1 I Ii I nt_ Ii jU{f�L CotSrd�G'�J tpr�D 20 laM95 � 'J'6 I.� L+// '. F 60- AtP(� POLram. L._ F-- Vr Ki�CAL L.-•�11...-t �t..A tl Y r I "IN-ld Ft'ctJ!2� k _ �:r-l; . N I'r'l,c r'r:_---- I V i -t t__-�'j c�l /�t..-. i<�-C-%.I -� 1 I v �= r �} t- .��I ]• -��{�> t/ _!1G- s iC �i-i.`? �.`) �- 1 r�— t - ` r M�Jra� ice(. _1[= F l j 11�'!� I(o -� r�•, i~, C11 A Lox I i, i? si LS, , . . t PE. 4-',-1-(�'sL - 24' Dr�rt7------- 2- FLLJpt,. i"Ll�`(Ij>~�`7j L`jr f i F- i •C- " r �r ry j p- )r' �p^• Y A4 i - �q� i i L ) C I =; w" L-L iA,-- Lr f --��'- nH /`, : (C r :' . ; ��a. •-• (-t✓ I . I � � r I �L--- - -- Wn Att)IE C 1 vt .L ''= C7 +% ,1T/� - POr, ('�^ I �i�[1 � -- --1------- f= y/�I4&4 (�4E w12F= } - - - - -- - -- -- i N -- , - Y..- - - --- -- - -------- [::54 T12 -- ---------- - --- - -- --- -- - - - - ---- -- ------ - _ .-.-_ -- ptrUrr, vY/��PAL rat U r✓r�,.1. J ^^L-L Y .r PF �e tt� t_-.: �, 5( cl ; 1 - I cr��i�/ !r[cAN, ;�,�<�T .f i1 TO ZD'•71E P�N FOIZ OF -rf PE `1�' :i-T``i'I✓ \ Gt 4 1)r G, Z �c�AMP SEr� ✓ic E fit' (2)-- 4 10 TH P: T- �w I N a iALL 6- U`(5, AN r' C-;�2AC-E- A 2F0' L--'. - �- Z- 6 ' [14v/ - I FA _ ._.—-----r-� ---_ _�) i ��••ji /,'a j}t�.�/ .. Irr.G • �. �•. t i�. c�r��.�r_ - + � _ %� � ' � -+F ,��. . rr/►rt~r-��,c�u,-r _ _ �ij StJ��c !�����;rs F�l G ; �; `s T7 (`/`.�I N I�t.. VEt . C'v L.. J r•�t r..i . iI '-%To -4- THVi-%2G. ML6Tr 4 tt Ip "'PIN MfvN ,1 4 ldTHY/- I`C,. �. 1 � �. ptar tf�tJ(. fit• wl �%1t=TFi' t GAS H ! &CCA, - -- � ioo i # 1 f7^F-E-1 1�71 2rP•=y-' WEE PAnr 1. "A, -- - - -- --_ --- -- _ ----- -- - C G-t F-9 U t,10 Pf-R N. L 1 G1 rl"vj i ' - — - _.__..-. `/_ _._.--•`-iC` ,._-__-_—_-fy�.i.- j --T----; 45� /'�1 '�-IG� .i �a>✓F f+ - t �.lC; L)P'�i-(� IGO -' I. ALL \)V0!2k AMD --_ --- ! 110/ 220V, 34114 i?S,N., (000ANAP, 62(-,dAM) I`�"i;IN GEC G 2 Sc�U E'D' i 1�! U E �!A! �SU � ;4' 2, ALL CoNt UJ)CTOZ5 '--41,ALL, Cal= C-OP. Fz i ; � �, j� Fo U s �.�If/, 2,U55.i-: 1 N, 2 ! 2.0 }►ANI 'w" 1� � T {--� /IJ r3r- /L�.it r✓�. - T j . Rt � C':�rl1PP..c.Sf-�G'f_ 3 4, r=z. 1r , _ can �. r' �I" rl - _ _ �: - --- --- - -= - i—! ( I l �A 1CC G. L j`l1r�l li f�, S (C� L Uh)1 j f�t�-� F<_. r . -ra'� v��-�------- Mi+1N"j�l�!G LGCC/:1. i=t.'i ��✓1 r1� L'f �?iJi =V. 2.01 -t ! 20_�— !3%> 10 R ! IG 10 ?� j .O '�, l.�L'P•11" tS l i - < , �,---t — I `r'/i,ZE (� Di�Go(hl _�jS F Y j, /.A.G. E; il('? l .A-tT. f-pl W) Zi W1 l YG tt l G s „� --- ---- - --- - -- - - - - - - --- �vti!-� r•t �- j -r✓ j��ul u��r"� - � �,` i-i, V, /=• � �' c'.f�G � �=•� -�- ' �n I i I 12 I [ 2.0 ( �.��r 12 ` ) r 13�jr I�'- 5 3 ? - - c. - i 1�.D; i _� ! - DO Y-- 4 T Yt/IJI�Et {~v� }1VAC _> F_M= C Mi-Gif. reel SAW �'3:Ip :� �' ! !o (� /: �.� _ r .�• Al-t ��i�N !('ter >r�� St{PU kiA/E P�U/Q.i" Ti�FI CI Vi: L�I�FGCO�'IF_:' — T� r T rt o;:; E� J! _� SA N - /� 10 2! 22 � 5"6 - --- 1-T� �G')-1i t�Mr r- t tr •!S ....,'L.� (� i Nf� .'f�'.���=. !vtDt'.>W. -T[-t;�."1 >J �'' ;�"f'1' � 12.0 ----` -- - I - -- ^ - - t`r :'t!VMF;�,t-,1"`r COO NJEC:rIC)Nf, ! �25�- I � � '26� -r'A �� P—t— [ —1 i r- r• a- STiCX, `J" l AcG .E2- .. !2r? ` %� !() , 2 %, (. ' i 2� i 2 i!�U ^ a�1. IT IS "CHF INTEraT T}iF -r DEA ! r1A—�I J ror� ; cU"(ri✓; 3''=(• O vi lu cr O Mmi a: - r -.., v'• ► Atc-1.> -j" � 7?j.-. ELEG (�.lC/-'•.�. COt� 12 t .Z� � � ;-----r �� � - c _. »_ ✓i LL WCAAUE A COMt? E [--m .AIJD -(F-5TD ANU 2EAu, WHETIjaz EV ( ITEM of ritATC2'sAi IS S: A-„//t,j , � f3.41 I 151 14 o!_! EQ- !_ 3 "r�±—j /3i �4 i 33,�- �-{ - r' j3Qi j 3�7,Jr :lo� ia,' iD, At_L C'NTt�r C:lir�t� _ CE�;"1F IG�� �' !^l`�i s IDh.► :>hiA; ! ( ter} ��1{:'r �J \W- -p -FHE �n/r•tc2 Llf'OtJ C �1f -; Iq! I — L: __!' _ G' L �} -' . • �- i • I ! P0�r�1 :�, J� `IG LE I`�I-ia�.�t U`rt, "C`j � r�Lli�'. .NIEt c q f ":► �� C> t- M� ,201. , .A/A - <t - loi• n l� `�l. T T. ToT/-�.l._ >.Q Q /A�?�I �h/jr7�3 I I +I B - <c7 3rti/ Q j ELl���n/P�s�'AI�trATlorl �r� ——r_ -__ / CoCO AMP, 3 F--"DLP_ Z 12, ALi._ LL- 13, ALL U � , W I F-- - n- Q-0 ! ! pr/ � n�/; 3¢ �} (� •1., 2 G :>A., 2COA. t:IA!N (t f' �><EL �rt.tP•2E `G S-L 1I tF Ch' F-;k,? !At. mot_+� < , . MGrJh 0 -- --- - w O j USE - 'l/. 1 1 ,�j'fUsr 1 _ ------ - -- ---Lij i- 1 5� Sl totem L tG�ii iS -..J i� ! f- -'� ---�-ri, __ 31;At �Z. c A I! i 12 72 2.� n ! `�•'-<f,..�`r' �1 c-cL7 J,:��- t..L s- -- z fr i L) LE ' ! rf7r� r 1 U - r-- —vY S k i� _ C. ` t -- (n GF�-tG LlGil`Ct�� I,lp I z L I t Lij f fit') - —i i i�="`-- � r` W I.r + O J '-- --�-` ' i � 7t/ ' �-2� I ! `rti'/\(�f=;1 i-tEA'i Er> ►.� ! `2r%' , fi" 125� `- f-- r-� ` �'1/� �Y��� � � � r� ,:. - -- - - `/A? = r -50 • r— `l [ - ` Q W V .� . �42- �53'1 'YNW ry A - la.o i,`,�/ SHEET TOTAL �frJrlFCTt~D l-o�ir� 14 ,�.MP� i `� 3 - I1•-i K"n/ % f OF '. 'r.., . ., - ;. :,.. - .. ., .. ._ ._. ... -_ ._ : _ - ,. .... .. -: ... .- -. ..:f"\ -t `t,!•.:•1 Y: • rrY r.,• L•V 7•g+i.f - - .. _ _ ,. ., _. 1K _ �. �G. :.; ,LOOR .., .... _ _. 5 ;. iv- ov : ' r : r a - T j E a� i YAL t, r rl 1. N .>5 F—s .: - 3 t a r , � t / i 'r t ! I ti P l l O , 3 r -,-. - - : .. t _ „ J r, a u 0� Q .. .C� Z V) W` E--. Q Q Q V / V Q w ley'LL O '. , OC -_ Mwu� r. t M r BASE COL UrWN W J v OPEN --•----- OPEN — O CONCRETE SLA8 SET ALL PLATE ELEVATION.5 Q ^ L O Z x ELEVATIO PLAN m O a SCALE: I /8" = 1'-0" E K L IZ 26 C;A. GAL l/ALUNIE I� 0E-(A�. �&UII-OINK, Sr�UCTUr)AL.- DESIvt\f SkIAL! O I� COM PI_ , WI ALL AFFLI CABLE �DPES, CL II LAL.-ULA-T;0Ns AND STEEL FAF,91L 7110r1 50AI-L KA4 TOE SEAL A � E.G I51 YEp PRor-. C ) cr- -_ 2) Al L P �A �,�� l r (, 5� I -I A i_ L I-E -5U N I i T E 12 ► o CAN, co O FDK) QVIE\d AND A f FO'O EN 5TA fE AW �oLA� ��� 6X N�4 �� "P,PoJ co LL 6UILPOC, OMCIAI_ 6�p Z � �� 6" w Q `z 3) ALL C-Od(-KEVF- S�AU- 6E 3,0CXD P� I Q Q q a W sTEE� gAs� R_ 4) riErY, io METAL 6011_DIK16 DKA*/lKJ6S FOK �� O V- - ANc.�lo� �L_TS r q v \ >I �i Erl�l��r\ AND DEiAI a NOT SNc�d O 5) ALL STr-EL rEIKiFov INU 9AV- SAALL 5E A \y T w _ o co D BASE PLATE ELO E/ARON @ I 1 I I I i \ _ LEVEI.LIN� 'o �ti . - - "� ANCHOR BOL T5 BY ii/ETAL BL OG'. Mf R --. G RpU 1 .. .� bO U D 3,. Q O w - w 10 /y` GCAN R TE SLA OV RTTM A�1ATOP a BO7-5 T�A/V5VERSE YER Of= SA/VU _ 5 LONG/TUD/NAL w --- O Q E D7"A / i ,� �.. C� a VERTICAL /?E/NFORC/1Va 4 5 DOWELS W//0" LEA EA. EN i W it 3 C L. EA R i a ° < w w o ID Al_L SIDES o v MIqIIVIU�I EvjgEPMr)q-r of SHEET a SECTION A 3 6 w E a i a S OF N 0 I (?E-SiDIENTIAL Cmj-rr?A TOR Ov Ij F FEE To PA AT, Ll