Loading...
HomeMy WebLinkAbout2511-2553 W. Airport Blvd 20974 Plans Sprinklers calculations Riverboat PlazaHYDRAULIC DESIGN INFORMATION SHEET NAME Rwvm-rz 0nw'T Pl. az,w DATE _Tu LOCATION +QM NP'dn.tnp r LorLIQIQ BUILDING R-rvk%ti. SYSTEM NO. CONTRACTOR -%--A .. S Y ,4* a e P a .. a C CONTRACT NO. A 5 3 3 CALCULATED BY " " " DRAWING NO. c F I CONSTRUCTION: COMBUSTIBLE NON-COMBUSTIBLE CEILING HEIGHT 1 0 FT. OCCUPANCY NFPA 13: LT. HAZ. ORD. HAZ. GP. 1 ® 2 3 EX. HAZ. NFPA 231 NFPA 231C: FIGURE CURVE z c OTHER (Specify) SPECIFIC RULING MADE BY DATEN w AREA OF SPRINKLER OPERATION I Sc SYSTEM TYPE DENSITY . 19 0 WET DRY DELUGE PRE -ACTION y AREA PER SPRINKLER 1 3o V4skx SPRINKLER OR NOZZLE HOSE ALLOWANCE GPM: INSIDE MAKE. C=u.-r A%%L MODEL Pe -m makA T HOSE ALLOWANCE GPM: OUTSIDE 2 So SIZE 1lz K-FACTOR s- RACK SPRINKLER ALLOWANCE o TEMPERATURE RATING Ir. S MAIN 1560c- 91:. t4n 1%4 sL oe_- 4S•1S CALCULATION GPM REQUIRED Re"wr@ b1$ PSI REQUIRED ReKOT%-fie AT BASE OF RISER SUMMARY C" FACTOR USED: - OVERHEAD A20 UNDERGROUND 140 y WATER FLOW TEST DATE & TIME PUMP DATA RATED CAPACITY TANK OR RESERVOIR CAPACITY J a STATIC PSI 5 8 AT PSI ELEVATION RESIDUAL PSI 4 ELEVATION H GPM FLOWING 1410 WELL W ELEVATION SW - /sire PROOF FLOW GPM F- LOCATION At sivi SOURCE OF INFORMATION C t'v F S A Na F o V_ 0 COMMODITY CLASS LOCATION W STORAGE HEIGHT AREA AISLE WIDTH STORAGE METHOD: SOLID PILED % PALLETIZED % RACK % H SINGLE ROW CONVENTIONAL PALLET AUTOMATIC STORAGE ENCAPSULATED DOUBLE ROW SLAVE PALLET SOLID SHELVING NON- E' MULTIPLE ROW OPEN ENCAPSULATED U FLUE SPACING IN INCHES CLEARANCE FROM TOP OF STORAGE TO CEILING cc LONGITUDINAL TRANSVERSE FT. IN. v HORIZONTAL BARRIERS PROVIDED HYDRAULIC CALCULATIONS Abbreviations C" Hazen & Williams Flom Value Line Calc" Branch Line Being Calculated Spkl." 3 Number of Sprinklers Being Calculated E.H.P." End Head Pressure K" K Factor Q Gallons Per Minute @ Specific Location Flow" Total Gallons Flowing Diam" Inside Diameter of Piping L/ft" Friction Loss Per Foot FF" Friction Loss Per Foot Lgth" Length of Piping Plus Fitting Loss Len" Length of Piping Plus Fitting Loss Loss" Friction Loss for Total Length PT" Pressure Total End P" a Starting Pressure for Main Calculations lip " Pipe Elevation Loss Stet" Static Pressure Read" Residual Pressure Avail" Pressure Available @ System Demand WATER FLOW TEST SUMMARY SHEET Hydrant Outlet I.D. Pitot Press. Flow Residual Date: Time: Cont. No. No. inches psi gpm psi Cont. Name: Riverboat Plaza 2 Address: Sanford Florida 3 Total Flow Static Press: psi Flow (P 20 psi 120 115 110 105 100 95 90 85 80 75 a a, 70 65 m a 60 55 50 45 40 35 30 25 20 15 10 U mimm_____m ON—mm __® nT,b&4 L1esz4 4.311 P.SA. gpm SI1 W, H 'I 4 InI r—Irm FLG waG 1swmmmummummommummmommmmmmmm mmmlolls 111111111111111111111111 Scclle: N ,.. s 900 1000 1800 2000 3600 The Viking Corporation 4000 Hastings. Michigan Litho_in_ U_S.A-_fecT_Ne_ L6_ m l s i HYDRAULIC CALCULATIONS smiff Lw4. sy JOB NO TYPICAL FRCP Line Calc Line Calc Line Calc 1. SPKL 4• 5• SPKL 18. 68 EHP 19.457 19. 457 EHP 24. 2034o472 5. 48 Q+ 5.48 K D 24.17232907 24. 20340472 FLOW 24•7232907 Q+ 24.17232907 l. o49 DIAM 24.17232907 FLOW 1.o49 51992503828 L/FT 1.049 DIAM L/ FT 1389198042 10. LGTH13891980427770171361 LOSS 10. LGTH 1.3899198o42 i9. 45701714 PT 1.389198042 LOSS 20.8+619804 20. 84619804 PT 24. 20340472 FLOW 5.48 K 5. 48 25. 020385 19. 45701714 PT 25.020385 Q+ 49.19271408 5. 487042604 K 49.192714o8 FLOW 1.38 1. 38 DIAM 1360212836 1360212836 L/FT 10. 10. LGTH 1.360212836 1. 360212836 LOSS 22.28641088 22. 20641088 PT 5. 48 K 23 0 0. 25. 82377589 Q+ 49.19271408 75. ol648997 FLOW 1.61 1. 61 DIAM 0642060575 L/ FT 10. 140152071410. LGTH 0.642060575 1. 401528714 LOSS 22.84847145 23. 60793159 PT 5. 48 K o. 0. 26. 6262207 Q+ 49.19271408 101. 6427107 FLOW 2.067 2. 067 DIAM 0190155941 0728089032 L/FT 104.58 10. LGTH 1.98865o831 728o890322 LOSS 24.83712228 24• 33602o62 PT 5. 48 K 25 49.19271408 27. 033699072 Q+ 24.83712228 128. 67M14 FLOW 9.870749863 2. 7 DIAM 10126332006 L/FT LGTH 940.65284811 LOSS 34. 98886878 PT SPKL EHP K 2fo Q+ FLOW DIAM L/ FT LGTH LOSS PT K Q+ FLOW DIAM L/ FT LGTH LOSS PT Q+ FLOW DIAM L/ FT LGTH LOSS PT Q+ FLOW DIAM L/ FT LGTH LOSS PT FLOW PT 128. 6764o14 FLOW 34. 98886873 PT 21. 75374114 K I HYDRAULIC CALCULATIONS FORRiverboat Plaza By 86CA JOB N0._ C-Factor Riser 1200 316.0431228 FLOW Cross Main 4.26 0233323842 DIAM L/FT 64. LGTH End P 34.988 1.493272589 LOSS 39.1+2736932 PT 128.67o4201 10. 4.33 ELEV PE Q+ 43.75736932 PT 128.6704201 FLOW 4.26 0.004425517 DIAM L/FT Hose 12.5 LGTH o. 0553189623 LOSS Rack Spkl35•04331896 PT 0. 21.753 128.7720992 K Q+ Base of Riser 57.4425193 FLOW 316.0431228 FLOW 4.26 0159656606 DIAM L/FT 3.75736932 PT 13. LGTH LOSS Undg Main2075535884 35.25087255 PT C-Factor 140. 9.87 58.60060346 K Q+ 316.0431228 FLOW 416 0431228 FLOW 4.22 o l83679492 DIAM L/FTT. 26 0233323842 DIAM L/TH 108. 1,891898768 LGTH Loss 2.683224183 LASS 45.64926809 PT 37.93409673 PT C-Factor 150. Undg Main C-Factor 150. 316.0431228 FLOW Flow Test Stat 58 Resd 46 Flow 1470. 566.04 FLOW Avail 55.94689409 PT 8 DIAM 0007263505 L/FT 0. LGTH 0. LASS 45.64926809 PT 250. Q+ `• 566.0431228 FLAW 002DIAM 1349472 L/FT 903. LGTH 1. 927857298 LOSS 0 47. 57712539 -PT w . HYDRAULIC CALCULATIONS 0 Riuernn_Pl a 7A BY i e4vL 6/2/86 JOB P10..._ I TyP CRC, DF%or C-Factor 120. Line Calc 1• SPKL 19.33 5.6 24.62o9ol69 24.62o9ol69 l.o49 1911563886 5.58 1.o66652648 20.39665265 24.6209ol69 20.39665265 5.4516o6542 EHP K Q+ FLOW DIAM L/FT LGTH LOSS PT FLOW PT K Line Cal&,. 3. 20.396 5.45 24.61325232 24.61325232 1.o49 191o465324 12.5 2.388o81655 22.78488165 5.45 26.ol43072 50.62755994 1.38 190791o147 12.83 2.447848718 25.23193037 5.45 27.37611024 78.00366989 1.61 2003659544 63.33 12.68917589 37.921lo626 78.00866989 37.921lo626 12.66702234 Cross Main SPKL End P 37.921 EHP 12.667 x OK078.00342303 Q+ Q+ 78.00342303 FLOW FLOW 3.26 DIAM DIAM 0064519901 L/FT L/FT 10. LGTH LGTH o645199007 LOSS LOSS 37.9855199 PT PT 12.667 K 5OK ® 78.o6975348 Q+ Q+ 156.0731765 FLOW FLOW 3.26 DIAM DIAM 0232777348 L/FT L/FT 10. LGTH LGTH 2327773479 Loss LOSS 38.21829725 PT PT 12.667 K O K 3 78.30859599 Q+ Q+ 234.3817725 FLOW FLOW DIAM 0493903963 L/FT L/FT 10. LGTH LGTH 4939039628 LOSS LOSS 38.71220121 PT PT 12.667 K FLOW 78.8129718 Q+ PT 313.1947443 FLOW K 3.26 DIAM 0844384356 L/FT 22. LGTH 1.857645584 LOSS 4o.5698468 PT 0. K $ 0. Q+ 313.1947443 FLOW 4.26 DIAM 0229448458 L/FT 113.75 LGTH 2.609976209 LOSS 43.179823 PT HYDRAULIC CALCULATIONS River Boat Plaza By 6/2DATI Joe NO Riser UNDG Main 313.1947443 FLOW C-Factor 4.26 DIAM 140. 0229448458 L/FT 64• LGTH 313.1947448 FLOW 1.468470131 LOSS 4.22 DIAM 44.64829314 PT 0180628674 L/FT 10. ELEV 68. LGTH 4.33 PE 1.589532332 LOSS 48•97829314 PT 50-56782547 PT Flow Test Hose 0. Stat 58• Rack Spkl 0• Resd 46. Base of Riser Flow 313.1947443 FLOW 1470. 48•97829314 PT 313.19 FLOW Avail 57-31310751 PT 413.19 FLOW Avail 56.8531112 PT tom. _ . _.r.. .. .. ..: - -