HomeMy WebLinkAbout200 W Airport Blvd Roof and Electrical inspection Grace Methodist Churchr
6 .. i- 9
Environmental
Design Group
Incorporated
Nils M. Schweizer FAIA, GRA
Chairman of the Board
Mark Schweizer AIA, NSPE
President
P. O. Box 1120
174 Comstock West
Winter Park, Florida 32789
Telephone (305) 647-4814
Mr. Bill Braceland
Building Department
North Park Avenue
Sanford, Florida 32771
RE: GRACE UNITED METHODIST CHURCH
SANFORD, FLORIDA
Dear Mr. Braceland:
Please be advised of the following change to the construction of Grace
United Methodist Church.
The 15# lapped layer of felt over the 1'.' rigid insulation board has been
omitted except for 15# felt patches over electrical boxes. Omission was
contractor's error; however, following a complete evaluation, it is felt
by this firm that the installation is adequate and will afford complete
protection for our client. Your acceptance of this installation is
requested.
Sincerely,
ark Schweizer, Jr., IA, PE
19 December 1975
MSjr:bp
Members of the Environmental Design Group: Schweizer Associates Architects, Inc. . EDG Planning, Inc. . EDG Engineering, Inc.. EDG Graphic Systems. Inc.
e y COMMERCIAL & RESIDENTIAL ELECTRICAL CONTRACTORS
V u
ICI•
Dedember 4, 1975
Nr•
M•+ City of Sanford
Post Office Box 1778
Sanford, Florida 32771
Attention: Mr. Winn
Building Department
Re: Grace United Methodist Church
Dear Mr. Winn:
On December 3, 1975 the overhead electrical service to the
Grace United Methodist Church on Airport Boulevard was connected
v to underground 400 Amp, 3-phase. Two (2) 2-1/2" conduits run '
underground from the transformer pad to MDP with four (4) 250
MCM THW Aluminum wire in each. Also, one (1) 2 -1 / 2" stubbed
CA out of MDP back to Classrooms to be remodeled. This would be
classified as a change of existing service.
i
Very truly yours,
Tri-City Electrical Contractors, Inc.
N
co
Charlie Pendergrast
Construction Manager
CP:dlw
a
W
k S1 Telephone (305) 831- 5000