Loading...
HomeMy WebLinkAbout2700 Orlando Dr 12268 Remodeling correspondence Arthur Treacher'si -• ' .` KARD WARE s'GLIDDEN PAINTS BUILDING SUPPLIES Panning -Lumber P. O. Box 15280 and Supply Co., Inc. 5018 West Colonial Drive - 293-4000 - ORLANDO, FLORIDA 32808 T & G CONSTRUCTION COMPANY 312 BROADVIEW AVENUE ALTAMONTE SPRINGS, FLORIDA 32701 JANUARY 10, 1977 RE: WALL PANELING ON ARTHUR TREACHER"S JOB SANFORD, FLORIDA DEAR SIRS: IN REFERENCE TO OUR PHONE CONVERSATION OF THE 7TH, CONCERNING THE FIRE RATING OF PANELS FURNISHED TO ARTHUR TREACHERS, 2700 ORLANDO AVENUE, SANFORD, FLORIDA, THE FOLLOWING IS THE INFORMATION I HAVE RECEIVED FROM MY SUPPLIERS: THE FOLLOWING PANELS: 1. WALL—LITE — TILE BOARD, SOLID WHITE — MFG. BY U.S. GYPSUM 2. PATTERN —PLY — MADRAS GOLD — MFG. BY EVANS PROD. 3. HEARIN — BARCELONA HICKORY — MFG. BY D.G. SHELTER PROD. ALL CARRY THE "UNDERWRITERS LABORATORY" APPROVED CLASS 'Cl FLAME RATING WITH A FLAME SPREAD OF 200, OR LESS, PER HOUR. I HOPE THIS IS THE INFORMATION YOU REQUIRED. IF NOT, PLEASE DO NOT HESITATE TO CALL FOR FURTHER ASSISTANCE. SINCERELY YOURS, PANNING LUMBER & SUPP Y CO., INC. ERALIMAI<tAGER r J A CX L. TURN r:R- 0 A R C H I T E C T P. 0. BOX 847 AUBURNDALE, FLORIDA 33823 TELEPHONE (813) 967-2632 January 7, 1977 Mr. Bill Braceland Sanford Building Department Sanford, Florida Dear Mr. Braceland: Eagle Contractor has submitted to me the below details regarding the Arthur Treachers remodel job in Sanford. If these details are as shown.in the actual job installation then they in my Architectural opinion would be structurally safe and supercedes the requirement required for the structural design. Yours Very Tr , c1c T ' nerrJl 1 JLT/bw T <$ POUR,-, TD Cow P-L. Lj -5 oPT r R,ICHARDSON ENGINEERING 131 ZELMA STREET ORLANDO, FLORIDA 32803 TELEPHONE: (305) 425-4002 December 1, 1976 Mr. Al Payne Housing Code Inspector CITY OF SA11FORD Sanford, Florida Dear Mr. Payne: I inspected the remodeling of the Arthur Treacher-s restaurant on Wednesday, December 1, 1976 with regards to the steel joists and roof deck system. The joists were reworked from other joists and were oversized. In my opinion, the structure exceeds the requirements of the Southern Standard Building Code. If you have any questions, please contact me. Yours trul , Richard B. Richardson RBR/dea Al v Air- .3