Plans Review Sheet
Date: 5/30/01 Business Address: 801 Central Park Dr. Occ. Ch. 27
Business Name: Score International Ph.
Contractor: Hutton Enterprises Inc. Ph. (407) 876-5015
Reviewed [ ] Reviewed with comment [ X ] Rejected [ ]
Reviewed by: H. A. "Pete" Tucker, Fire Protection Inspector
Comment: Plans reviewed as Business Occupancy. FD reserves right to require applicable code
requirements if occupancy use changes.
1.1 Application — Interior Renovation, Type IV Const., 1875 sq.ft. area
1.2 Mixed — N/A
1.3 Special Definitions — N/N
1.4 Classification of Occupancy — Business
1.5 Classification of Hazard of Contents — Ordinary
1.6 Minimum Construction — N/R
2.2 Means of Egress Components — O.K.
2.3 Capacity of Egress — O.K.
2.4 Number of Exits — O.K.
2.5 Arrangement of Egress — O.K., will field verify
2.6 Travel Distance — O.K.
2.7 Discharge from Exits — O.K., will field verify
2.8 Illumination of Means of Egress — O.K.; will field verify
2.9 Emergency Lighting — O.K.; will field verify
2.10 Marking of Means of Egress — O.K.; will field verify
2.11 Special Features — N/A
1
SANFORD FIRE DEPARTMENT
FIRE PREVENTION DIVISION
300 N. Park Ave., Sanford, Fl. 32771 / P. O. Box 1788, Sanford, Fl. 32772
I (407 302-1022 / FAX (407) 330-5677
Pager (407) 918-0388
3.1 Protection of Vertical Openings — N/N
3.2 Protection from Hazards — N/N
3.3 Interior Finish — Class "B"
3.4 Detection, Alarm and Communications Systems — N/A
3.5 Extinguishing Requirements — as per NFPA 10
3.6 Corridors — N/A
4 Special Provisions
5 Building Services
5.1 Utilities — as per LSC 7-1
5.2 HVAC — as per LSC 7-2
5.3 Elevators, Escalators, Conveyors (4A-47) — N/A
5.4 Rubbish Chutes, Incinerators, and Laundry Chutes — N/A
Sanford City Code — Chapter 9
Fire Sprinklers: N/A
Monitoring: N/A
Other: NFPA 1
3-5.1 Fire Lanes — Required if building is more than 150' from street; exception:
building has fire sprinkler system.
3-6.1 Key Box — N/A
3-7.1 Bldg. Address Number Posted and Legible — N/A to Renovation
2
Whofle Building Performance Method for Commercial Buildings
7
Form 400A-97
ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
Community AffairFloridaDepartmentofComs
FLA/COM-97 Version 2.2
PROJECT NAME_Score International_______ PERMITTING OFFICE:
ADDRESS: _801 Central Park Drive_____ _Sanford
Sanford, Florida______ CLIMATE ZONE: _5_____
OWNER: _f1utton Enterprises____________ PERMIT NO: _B-_____
BUILDING TYPE: _Business (Office)
CONSTRUCTION CONDITION: New construction
DESIGN COMPLETION: _Finished Building
CONDITIONED FLOOR AREA: _600 NUMBER OF ZONES: 1
MAX. TONNAGE OF EQUIPMENT PER SYSTEM: 1
COMPLIANCE CALCULATION:
METHOD A DESIGN CRITERIA RESULT
A. WHOLE BUILDING 37.70 100.00 PASSES
PRESCRIPTIVE REQUIREMENTS:
LIGHTING
LIGHTING CONTROL REQUIREMENTS PASSES
HVAC EQUIPMENT
COOLING EQUIPMENT
1. EER 10.00 8.50 PASSES
IPLV 7.50 7.50 PASSES
HEATING EQUIPMENT
1. Et 1.00 N/A
AIR DISTRIBUTION SYSTEM INSULATION REQUIREMENTS
1. With Insulated Roof 6.00 6.00 PASSES
REHEAT SYSTEM TYPES USED
NO REHEAT SYSTEM is USED
WATER HEATING EQUIPMENT `
1. EF 16.00 0.86 PASSES
PIPING INSULATION REQUIREMENTS
COMPLIANCE CERTIFICATION:
I hereby certify that the plans and
specifications covered by this calcu-
lationi co liance with theare /
i
FloridaE '
PREPARED BY:01
DATE:
I hereby certify that this building is
in c 1*;I-ie Florida Energy
Efficiency Qdf
OWNER/AGENT
DATE:
Review of the plans and specifica-
tions covered by this calculation
indicates compliance with the
Florida Energy Efficiency Code.
Before construction is completed,
this building will be inspected
for compliance in accordance with
Section 553.9081 Flnki Ates.
BUILDING OFFICIAL: it:iiiiii
DATE:
I hereby certify(*) that the system design is in compliance with the Florida
Energy Efficiency Code.
SYSTEM DESIGNER REGISTRATION/STATE
ARCHITECT :
MECHANICAL:
PLUMBING : '
ELECTRICAL:
LIGHTING :
Signature is required where Florida law requires design to be performed
by registered design professionals. Typed names and registration numbers may
be used where all relevant information is contained on signed/sealed plans.
BUILDING ENVELOPE SYSTEMS COMPLIANCE
CHECK
401------- 6LAZING--ZONE 1------------------------------------------------ v-
Elevation Type U SC VLT Shading Area(Sqft)|
West Commercial 1.31 5 .5 None 48|
East Commercial 1.31 5 .5 None 48|
South Commercial 1.31 5 .5 None 240|
Total Glass Area in Zone 1 = 336|
Total Glass Area = 336|
402------- WALLS --ZONE 1------------------------------------------------
Elevation Type nsuUInsul R G (Sross ft)| q
North 8"CMU/3/4"ISO Btwn 24"oc/5/8"Gyp 0.151 4 800|
South 8"CMU/3/4"ISO Btwn 24"oc/5/8"Gyp 0.151 4 800|
East S"CMU/3/4"ISO Btwn 24"oc/5/8"Gyp 0.151 4 750|
West 8"CMU/3/4"ISO Btwn 24"oc/5/8"Gyp 0.151 4 750:
Total Wall Area in Zone 1 = 3100|
Total Gross Wall Area = 3100|
403------- DOORS --ZONE 1------------------------------------------------
Elevation Type U A|--- rea(S qft)|
West 25 Steel Roll -up Door .5 80|
North 1-3/4 Steel Door -Solid Urethane foam co 0.40 48|
North 25 Steel Roll -up Door . 5 80|
South 125 GLASS DOOR 1.06 481
Total Door Area in Zone 1 = 256|
Total Door Area = 256|
404------- ROOFS --ZONE 1------------------------------------------------|---
Type Color U Insul R Area(Sqft)|
Mtl Bldg Roof/R-11 Batt Light .084 11 6000|
Total Roof Area in Zone 1 = 6000|
Total Roof Area = 6000|
405------- FLOORS -ZONE 1------------------------------------------------
Type Insul R Area(Sqft)|
Slab on Grade/Uninsulated 0 60001 ^
Total Floor Area in Zone 1 = 6000|
Total Floor Area = 6000|
406.------INFILTRATION--------------------------------------------------
CHECK!
Infiltration Criteria in 406.1.ABCD have been met.
MECHANICAL SYSTEMS
CHECK
HVAC load sizing has been performed. (407.1.ABCD)
407------- COOLING SYSTEMS -------------__--------------------------------|---
Type No Efficiency IPLV Tons!
1. Air Cooled ( >= 65,000 Btu/h 4 10 0 17.251 `
408------- HEATING SYSTEMS -_---------------------------------------------
Type No Efficiency BTU/hr|
1. Electric Resistance 4 1 136560|
409------- VENTILATION ---------------------------------------------------
CHECK|
Ventilation Criteria in 409.1.ABCD have been met. | |
410.---- AIR DISTRIBUTION SYSTEM ----------------..... ..... ........ .... ..... ..... ..... ..... ..... ..... -------------|---
CHECK|
Duct sizing and design have been peVformed. (410.1.ABCD) | |
AHU Type Duct Location R-value|
1. Air Conditioners With Insulated Roof 6|
CHECK|
Testing and balancing will be performed. (410.1.ABCD) | |
411------ PUMPS AND PIPING -ZONE -----------------------------------------
Basic prescriptive prescriptive requirements in 411.1.ABCD have been met. | |
PLUMBING SYSTEMS
411------ PUMPS AND PIPING -ZONE 1---------------------------------------
Type R-value/in Diameter Thickness|
1. Circulating 0 0 0|
412------ WATER HEATING SYSTEMS -ZONE 1---_------------------------------|---
Type Efficiency StandbyLoss InputRate Gallons|
1. <=12 kW 16 0 25000 to:
ELECTRICAL SYSTEMS
CHECK!
413------ ELECTRICAL POWER DISTRIBUTION ----------------------------|-----|---
Metering criteria in 413.1.ABCD have been met.
414.-----MOTORS ---------------------------------------------------|-----|---
Motor efficiencies in 414.1.ABCD have been met.
415------ LIGHTING SYSTEMS -ZONE 1---------------------------------------|---
Space Type No Control Type 1 No Control Type 2 No Watts Area(Sqft)|
Accounting 1 On/Off 16 None 0 4200 6000|
Total Watts for Zone 1 = 42001
Total Area for Zone 1 = 6000|
Total Watts = 42001
Total Area = 6000|
CHECK:
Lighting criteria in 415.1.ABCD have been met.
16. Operation/maintenance manual will be provided to owner.(102.1)1
LIGHTING SYSTEM CONTROL REQUIREMENTS:
TOTAL_. EQUIVALENT
DDDDDDDDD SPACE DDDDDDDD NO. DDDDDDDDD CONTROLS DDbDDDDD CONTROL POINTS
NO.. DESCRIPTION AREA TASKS TYPE 1 NO. TYPE 2 NO. DESIGN CRITERIA
MMM!`MMr•1MMMP1/"1MM/"1/"lM/7'/"//"i/"l/"l'/"1/"7'r1Mhlrl/"lM:'/"l/"1/"1/"rN//"lhlh•Yrl%"1/"J'/"1/"l/"1(.>?hlrl/"7'/"ih>r1/"lhl/`9/"1r1/"/h'//">k: hi/"iM/"l/"/ri/"l/"//"1/"//`•1r9/"lrl/'1/"1r1
28 Accounting 6000.0 1 :On/Off 1631one 0: 16 > .._
MM/`/r•1/"1MMMM/'7'M'!"1M'MM/"iMM/"1/"lhirl/"1/"1/"7'/`'1/"//'•1Mr'1,IMP1Mh•1/"7'P1/"/M/"7'/"1Mr9/"1/"/I/"1/"//`9/"//"lh•1/"//"i/"1r'1/7/"//"/r>,_T/"//"7'/"/r9/"1M/"1M/"1/"//"1/">/">h-iMhir/
PASSES >F..... ..... .#.
Mh l"1h9h1/"1l"lI"1hiNll"l!"ll"1h1MMl"1/'•lhll"ll"1hll"lh9hll"il"lI"lhll*ih•1r/hil"lhlhll"lr•1/"lrll"il"lh•1h•1h1h1/"il'•1rlhlhlrll`9h/hlh•9/"ll"ll`•lI"lhll`•lh1/")'h•]`rl1"lrl!"lr`ll"ih/hil"lr•1/"1/"l
PROJECT TITLE . Score International.
BUILDING TYPE Business (Office)
BUILDING LOCATION : Sanford
BUILDING AREA (f t2) : 600c_
DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD: DDDDDI?L.?.t?L.)I.?D171.::DDDDDDDDDDDDDDDDDDDDI:I.)DD
HVAC SYSTEM REQUIREMENTS:
r•1N//"ih/h/h9/"/M/`9h/r•/M/*//"/G h//`/r`//"//"lr//*/r•1h/G/"1'/"7/"/h•1/"//`/[:?/"lr•/r'//"//"7/`/lh'1///"r/`//`//"1/"1h1/`•/C:?/`9/`//"//`/h/h//"//"11.?/`//"//"7/"//`//"/h7/"//"/t?/"/r//"/r//'//"/r//"1r/h
Cooling System;'' Measure ''Minim..,:_Minim..::% System :3 System Result Result1q Measure ... y y
Type 3#1 #23 #1 3 aim.'. 3 Eff.#1 3 Eff.#2 3 for 41. ,::> for *:.:
DDDDDDDDDDDDDDEDDDDDDDDDEDDDDDDERODDDDEDDDDDDDDE-DDDD1:11.1.:1DEw:G I:.l DDDDl:?.1.'?F_IDDDDD.C..:1?L:D
Air Cooled. SEER, IPL..V.3 e.`:",c:::.` 7.500 10.00 3 7.'5 .' PASSES 3 PASSES
MhiMMhlhlMhil'll"il7/"ll''1/"1XhfJ"lMl"il"ll"J'Mhlh'1:k'r'lr7'hll"1/"il"l(_7/*1r7'Ml"ll"ll"lh'r'il"il"ll"ll"1/"7'l"1r1 7/"ll"lr9/"ll`'lr7/"ll`•l:k'h9r'lr'1/"1/"1r)`l"il"ll`'lc )hlrlrlhlr'll"ir'1Mh9h'l
Heating System3 Measure a Minimum Req.3 Efficiency 3 Result
DDDDDDDDDDDDDDEDDDDDDDDDE_ D_ DDDDDDDDDDD. Df_ DDDDDDDDDDDDDDDDDE=DDDDDDD1.;I'1.1.;>L1DD.1:I!1:' DDDD
Ele. Resis. 3 Et 31 „c:)c; ICl/A
DDDDDDDDDDDDDI*)i4DDDDDDDDDI-)DDDDL?%:).l)L)/.:71:.?L?.t.:)I:,::}I)I..'DDD.t:7I..')I:.I::D.l?I?l;I>.l.' DDr'fl?.l>.l.':PDD. ?!).1.:?.t:71::.1.)L?DDDDDDD
ae****.yr.* PASSES
AIR DISTRIBUTION SYSTEM INSULATION REQU I REMENT'S e
DDDDDDDDI)DDDDDDDDDDDDDDDDDL?l:>DDDDDL?I;1.71:aD.f_1DDDDDP:D.l;I?l:>I.-).O ?DDDDDDDD DDl:Dl..'?I?I..:./.7DDDDDDDD
Zone ## Duct Location Minimum R•'•-Vi_a1l1e Design E VaIue Result
vvlrir//"1/`'//"/r// //"//`//"1PIP/"Ihii"//"/h1h//'//`/1"P/r/N//`7h1/`/
1. With Insulated Roof 6.00 PASSES
P1h1MMl"7'l`/MM'r1Ml'll"1MM'r/r''l"1Mh7'r/rll`/l`ll`ll"'l`7'l`/rlhll`'ll"ll"lhll"il`ll"irirvlr/rir l"i"r'rll"i"ll`lhlh/hll`/l`il''1h/l`ll`'lI*ll`/hlMl`ll`ll*lr/l"lhlrll`/l`'ir/l"irn"lr/l"ll"l
PASSES
PROJECT TITL._E. : Score International.
BUILDINGTYPE : Business (Office)
BUILDING LOCATION : Sanford
BUILDING AREA(ft2): 60 i)
DDDDDDDDDDDDDDDDDDDDDDI..'1DDL:?L?DDl.;.lDDDDDDDDDDDL':DDl. DDDDDr l:.l. DDDDDDDDDDDDD.l DDl:D DDlD
WATER HEATING SYSTEM REQUIREMENTS
l"ll"lI"1/`'1/`lh/l`/l"lrlhll`ll"1/"JJ'/l`/rir/c::?ril"rll''ll`'ll"ll"1f?l"ll`ll`ll`ll"ll"1/"ll"lhlhl[?l'/l`lrll''ll"1/`ll`/l`ll"ll"7(?l`lrll"1/`lhll"ll`'ll"7/`/l`lL?l`ll"ll`ll"ll'lrll`ll`ll"ll`'l[?l"ll'lhll"ll"lr/l`l
System 3`1 e a s c_c •r e . -. Minimum ,._. Maximumu,.:; Design ,.a Design 3R e s e.c • .
Type 3 ,_, ,...
Electric 1:'F::W: F:-:F (..f::3f,.:a.fi c.cii)c c> :Lf:i,.c c c c..c:i)r:) ;::;i'A:i ES
7 ? 7) ? ? ? . )
D> '7r. : ?' 7) 7 ': 7 :1 i--'*))1.:>Dl.::1.:11).t:)L?.lDI.-11:?.l'?l.?.1 7.DD. !1: D.t. h::'.}l:).l!.t:).l:.l")1.1I;D.17.1 i? ).t.. D.l:?.t.:7L?.0 DL.l i.:).t_1P.1L)Dl. DDLPl.1..LLL..C.1.P_I1.:1_P_LI Il..l.l...l.l_1 J
PIPING INSULATION REQUIREMENTS,.
DD. DDDDDDDDDDDDDDDDL.:I?.1:11:7.1DDL:1>DD.DDDDDl.?.C..DDDDDDDDL;D.DDDDDL?l.:DDDD.C.)l:>I?.1.::1.?.l:)1.;DD.I. DDI.;DDDDDl;D Pipe
Insulation Thickness(in) r/
l"rrr/lYlr i"r_irir/r/rlrir'll"ll"r/!.:?r/r/rll"lr/r/r rlr/f.>?r/r/l"irlr/rlr/r/r/r i"ir/r/r/r/r/rir/r/r/r>?rlr/r/r/l"ir/l"ir/r/r/rlr/r:.11"rirlr/r'ir/r/r/r/rli"i"ll"1/"ll"/ y
Type c::i ) Minimum Req.Designn Result S _] L rr I ` , J "' O.D.
PROACT TITLE 1 Score International -
BUILDING TYPE Business (Office)
BUILDING LOCATION Sanford
BUILDING AREA (ftl) 6000
BUILDING ANNUAL ENERGY USE _
DDDDDDDDDDDDDDDDDDDDDDDDDDbDDDaDDDDDDDDDDDDDDDDDDDDDDDBDDDDDDDDDDDDDDDDDDDDDD
3 DESIGN BUILDING 3 BASELINE BUILDING
3 3 (%)
DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDEDDDDDDDDDDDRODDDDPDDDDDEVDDDDDDDDDDDDDDDDDDDDD
3
HEATING ENERGY 3 3 '
Electric Resistance 3
3
8.39 3 4.00
3
COOLING ENERGY 3 3
Direct Expansion 3 3 56.78
Air Conditioner (PTAC) 3 15.31 3
3
DOMESTIC HOT WATER ENERGY
3
3 3
Electric DHW System(s) 3
3
0.03 3 0.63
3
BUILDING MISCELLANEOUS 3 3
Lights 3 6.86 3 20.59
Equipment 3 4.63 3 _ 4.63
3 3
SYSTEM MISCELLANEOUS 3 3
Fans 3 2.47 3 13.38
3 3
PLANT MISCELLANEOUS 3 3
D '
3 3
TOTAL ENERGY CONSUMPTION : 3 37.70 3 100.00
3 3
PASSES ******
PROJECT TITLE : Score International
BUILDING TYPE : Business (Office)
BUILDING LOCATION : Sanford
BUILDING AREA(ft2): 6000
BUILDING DESIGN :
Exterior Lighting Power 0 W
EXTERIOR LIGHTING CRITERIA:
AREA AREA _AREA OR ALLOWANCE
CODE DESCRIPTION LENGTH WATTS
Exterior Lighting Power Allowance 0.00 W
Not Applicable ****
co
ll S J
Pa r Z) t-.