Loading...
HomeMy WebLinkAbout1 Red Cleveland Blvd 001237 Correspondence fire inspection airport expansionCITY OF SANFORD FIRE DEPARTMENT 300 N. Park Ave. Sanford, FL 32771 (407) 302-1091 (407) 330-5677 FAX Plans Review Sheet Date: January 28, 2000 Business Address ie1�C1ev Arid Occ. Ch. 8 NFPA 1 Ch.26; 416 Business Name: Orlando Sanford International Ph. Airport Contractor: Mark Construction Ph. (407) 831-6275 Reviewed [ ] Reviewd wither ent [Y] Rejected Reviewed by: Bart Wright, Fire Protection Inspector Comment: 1.1 Application — Addition to existing airport 1.2 Mixed — N/A 1.3 Special Definitions —None re: expansion construction EXISTING FIRST FLOOR SECOND FLOOR TOTAL 128,400 105,700 234,100 NEW 11,600 68,000 79,600 REMODEL 13,700 - 0 - 13,700 1.5 Classification of Hazard of Contents — Ordinary 1.7 Occupant Load — 800+2401 = 3201 (for new and remodel areas only) FIRST FLOOR SECOND FLOOR 2.2 Means of Egress Components — O.K. 2.3 2.4 Number of Exits — O.K. 2.5 Arrangement of Egress — O.K. 2.6 Travel Distance — O.K. 2.7 Discharge from Exits — O.K. 2.8 Illumination of Means of Egress — O.K.; will field verify 2.9 Emergency Lighting — O.K.; will field verify 2.10 Marking of Means of Egress — O.K. 2.11 Special Features — O.K. 3.1 Protection of Vertical Openings — N/N 3.2 Protection from Hazards - Protection for cooking equipment required; installation TBA. 3.3 Interior Finish — Class "A" in exit corridors; class "B" exit access areas 3.4 Detection, Alarm and Communications Systems — Required: as noted on plans - 4 Special Provisions - 5 Building Services 5.1 Utilities 5.2 HVAC 5.3 Elevators, Escalators, Conveyors (4A-47) 5.4 Rubbish Chutes, Incinerators, and Laundry Chutes Sanford City Code — Chapter 9 Fire Sprinklers: Required — ART. III Sec. 9-11(1)(b) 2. Monitoring: Required for all mandated fire sprinklered properties Other: NFPA 1 3-5.1 Fire Lanes — Required if building is more than 150' from street; exception: building has fire sprinkler system. 3-6.1 Key Box — Required; will field verify 3-7.1 Bldg. Address Number Posted and Legible — Required; will field verify 11 CITY OF SANFORD INSPECTIONS DMSION COMMERCIAL REVIEW COMMENTS NEW CONSTRUCTION PROJECT: New Addition to Airport DATE: Jan. 25,2000 ADDRESS: 1-Red Cleveland Blvd. SANFORD, FL CONTRACTOR: Mark Construction Co. LICH CGCO25899 ADDRESS: 1969-Corporate Square. Dr .PHONE 9 (407) 831-6275 Longwood, FL 32750 REVIEW COMMENTS: �( 1. Finish floor elevation shall be 16 inches above center line of established street or a min. of 8' above grade whe❑ property has no paved street. City Sections 6-7. 2. Strip footers shall be continuous with 245 rebars for 1-story buildings, 2-story buildings shall have 345 rebars in footers; and #5 dowel at each corner. Size of footers shall be 8" x 16" min. for a 1-story and 10" x 20" for a 2 story. 3. Mono rooter/slab combination shall be 20" deep and 16" wide with 45 degree angle into 4" slab. 2-story shall be 20" deep and 20" wide with 45 degree angle into 4" slab. Reinforcemeot shall be as in strip rooter ad laps a min. of 25 inches. 4• Masonry construction shall have a min. of 145 rebar in lintel course or tie beams. Vertical down rods shall be 45 rebar witb 24'' bend tied to lintel rebar and min. of 25'' lap at each dowel and tied. 5• Means of egress shall comply to Chapter 10, 1997 S.B.C. 6• Means of egress and illuminations shall comply to section 1016.1, 1016.2, and 1016.3 (Exit Signs) 1997 S.B.C. 7• All corridors shall be a minimum of 44", Table 1004, 1997, S.B.C. 8. All restrooms shall comply to 1997, H.C.F.S. 553, Part 5. 9 Interior finishes shall comply to.Chapter 8, Table 803.3, 1997, S.B.C. 10. All electrical wiring service and futures shall comply to 1996 N.E.C. and Notice L amendments. 11. All plumbing shall comply to 1994, S.P.C. and 1997 F.S. 553, Part 5 Florida Accessibility Code .. 12• All mechanical equipment & duct systems shall comply to 1997, S.M.C. and 1997 Florida Enegry Code. 13. Firewalls or tenant separations shad comply to Sec. 413.3 & Table 704.1 & 704.1.4, 1997 S.B.C. All rated wall pentrations shall be sleeved and fire caulked. 14. Stairs shall comply to Section 1006,1007,1007.1.2,1007.3,1007.4,1U07.5,1007,5.3,10U7.6, 1007.7,1007.8,1008.6, & 1015, 1997 S.B.C. X 15, Shall comply to 1994 N.F.P.A. -1. 16, Shall comply to Life Safety Code 101,1994, X17• Final grading inspection needs to be done after final grade but prior to final landscaping JZ 18. Rated access panel under escalator, B label door. 19. Stair handrails shall be 34 to 38 inches as per code. Review by CITY OF SANFORD BUILDING DEPARTMENT SUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PERIMIT Ij 1. Two (2) complete sets of plans and drawings to scale and to include; CPending A. Site plan approved by Planning & Zoning and City Commission z b. Boundary and building location survey C. Foundation plan d. Floor plan 1. Room or space identification 2. Indicate room dimensions X 3. Specify door and window dimensions and types 4. Indicate tenant separation and fire resistant walls. Complete UZ design noted_ e. Four (4) or more elevations including finish floor(s) elevations. f. Structure details -signed and sealed by engineer g. Architectural drawings signed and sealed by architect h. Electrical drawings -signed and sealed by engineer, if over 600 amps i. Mechanical drawings -signed and sealed when 15 tons or more and/or $5,000.00 j. Plumbing drawings -.signed and sealed, shall comply to Florida Handicap Code. 2.. Plans shall show: a. Square Footage Area w Alternate #7 = 126,200 s f, air conditioned b. Type of construction re— n ineered Metal Building 'IT: c. Occupancy classificationOu ) Sou d. Occupant load e. Sprinklers, standpipes and alarm systems f. Fire protection requirements & NFPA requirements g. Life safety Code I01 3. Three (3) sets of Florida Energy Forms 40OD-97 signed and sealed by architect or engineer. 4t 4. Arbor permit when trees are to be removed from property. Contact the City Engineer for details regarding the Arbor Ordinance and permit. 5• Soil analysis ma.y be included on site plan or foundation 6. Soil analysis and/or soil compaction report. If soils appear to be unstable or if structure to be built on fill, a report may be requested by the Building Official or his representative. 7• Utility Letters Required Inspections During and Upon Completion of Construction 1. Footer 2. Underground electrical, mechanical and plumbing 3. Foundation elevation survey 4. Slab S. Lintels -tie beams -columns -cells 6• Rough electrical. 7. Rough mechanical 8. Rough plumbing 9. Tub Set I0. Framing 11. Tenant separation/firewall 12. Insulation, walls and/or ceilings 13. Electrical final, mechanical final, and plumbing final 14. Building final I5. Other DATE_ 12/3/99 SIGNATURE y Owner or Authorized Agent) transmittal date: January 30, 2000 to: Dan Florian from: Nelson Blankenship, Jr1 re: Terminal Expansion Project, Orlando Sanford Airport ---------------------------------------------------- 3 copies of Sheet A100 revised Jan 30, 2000 3 copies of Sheet A900 revised Jan 30, 2000 1 copy Sanford's letter accepting the Alternate Construction Method. Revisions as requested in meeting 1/25/00 are (1) include note to define the "Alternate method" which affects building construction Type II, and (2) show Copies of the pages from UL which define the rated walls as shown in the Wall Type Schedule. Responses which we will address to "Permit Comments" are understood to be: 1. Hand rail on stairs, Sheet A531 shall be 2'-10" in lieu of 2'-8" 2. Access Door to area under the escalator is 90 min. This rating was picked up in Addendum 2, Item 9. Cc: Michael Mcgibeny, Victor White, Don Corinna BLANKENSHIP McMILLEN 330 Crown Oak Centre Drive Longwood, Florida 32750.6149 407.599.0547 Fax 407.599.0548 0 AA0003290 a- 0 Of Sanford, Fj °rld Building Department d P.O. Box 1788 - 32772-1788 Telephone (407) 330-5656 Fax (407) 330-5677 September 3, 1999 Nelson Blankenship Jr. BNA Architects Inc 330 Crown Oak Centre Dr. Longwood, FL 32750 RE: Sanford Airport Terminal Expansion Dear Nelson: Thank you for meeting with me and Fire Marshall McGibney regarding the terminal expansion. Since our discussion I have received and agree with the proposal for the alternate method of achieving the required protection of the ceiling/roof assembly. The documents as prepared by Edwin J. Spahn P.E. adequately demonstrate at least equal if not superior protection under expected performance criteria of a fire incident. If you have any further questions on this matter please feel free to call me at 330-5660. Sincerely, Dan M. Florian Acting Building Official DMF/ar "the Friendly City" 1-01e Building Performance Method for Commercial Buildings ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Florida Department of Community Affairs FLA/COM-97 Version 2.2 PROJECT NAME_ORLANDO SANFORD AIRPORT ADDRESS: SANDFORD, FL (1ey?,lmo d— OWNER: SANFORD AIRPORT ATHORITY AGENT: BUILDING TYPE: _Assembly CONSTRUCTION CONDITION: New construction DESIGN COMPLETION.:.._Finished Building CONDITIONED FLOOR AREA: _125000 MAX. TONNAGE OF EQUIPMENT PER SYSTEM: Form 40OA-97 PERMITTING OFFICE: _Sanford CLIMATE ZONE: _5 PERMIT NO: JURISDICTION N0: 691500 :o NUMBER OF ZONES: 1 COMPLIANCE.CALCULATION: METHOD A DESIGN CRITERIA RESULT ----------------- -------------- ------ A. WHOLE BUILDING 97.75 100.00 PASSES PRESCRIPTIVE -REQUIREMENTS: LIGHTING LIGHTING CONTROL REQUIREMENTS PASSES HVAC EQUIPMENT COOLING EQUIPMENT 1. COP 2.90 2.50 PASSES IPLV 2.90 2.50 :PASSES HEATING EQUIPMENT 1. Et 1.00 N/A FAN SYSTEM.REQUIREMENTS 1. Variable Air Volume ( 0.83 1.25 PASSES AIR DISTRIBUTION SYSTEM INSULATION REQUIREMENTS 1. Conditioned Space 4.50 0.00 N/A REHEAT SYSTEM TYPES -USED NO'REHEAT SYSTEM is USED WATER HEATING EQUIPMENT 1. EF 1.00 0.88 PASSES PIPING INSULATION REQUIREMENTS 1. Non -Circulating w/o H 1.00 0.99 PASSES ---------------------------------------------------------------------------- COMPLIANCE CERTIFICATION: I hereby certify that the plans and specifications covered by this calcu- lation are in compliance with the Florida Energy Efficiency Code. PREPARED BY: � av; d I,,/. ( a S f DATE: Z ? > 9 I hereby certify that this building is in compliance wit the Florida Energy /7 - L--" Review of the plans and specifica- tions covered by this calculation indicates compliance with the Florida Energy Efficiency Code. Before construction is completed, this building will be inspected for compliance in accordance with Section 553.908, F1,rid S_tatu e . BUILDING OFFICIAL: hUlts�. /_ 2- S'--e Efficiency Code. DATE: R/AGENT: D E /7 - z -L/� I hereby certify(*) that the system design is in compliance with the Florida Energy Efficiency Code. SYSTEM DESIGNER REGISTRATION/STATE ARCHITECT : MECHANICAL: a "id by, L Pl" 00 3 9'6 3 8 PLUMBING II 1 ELECTRICAL: LIGHTING (*) Signature is required where Florida law requires design to be performed by registered design professionals. Typed names and registration numbers may be used where all relevant information is contained on signed/sealed plans. BUILDING ENVELOPE SYSTEMS COMPLIANCE CHECK 401.------GLAZING--ZONE 1------ ------------------------------------------ v- Elevation --------- Type --------------- U SC VLT ---- ---- ---- Shading -------------- Area(Sgft) North Commercial 1.31 .75 1.0 None ---------- 1728 Northeast Commercial 1.31 .75 1.0 None 864 South Commercial 1.31. .75 1.0 None 3600 Southwest Commercial 1.31 .75 1.0 None 648 West Commercial 1.31 .75 1.0 None 900 Northwest Commercial 1.31 .75 1.0 None 756 Total Glass Area in Zone 1 = 8496 Total Glass Area = 8496 402.------WALLS--ZONE 1------------------------------------------------ --- Elevation Type U Insul R Gross(Sgft) --------- North -------------------------------- O"Ply/35/8"Mtl ----- Std@24"oc/Rll/M"G ------- .13 11 ----------- 19425 Northeast 5"Ply/35/8"Mtl Std@24"oc/R11/Y"G .13 11 6825 East 5"Ply/35/8"Mtl Std924"oc/R11/M"G .13 11 4025 South %"Ply/35/8"Mtl Std@24"oc/Rll/%"G .13 11 7875 Southwest %"Ply/35/8"Mtl Std@24"oc/Rll/%"G .13 11 8575 West %"Ply/35/8"Mtl Std@24"oc/R11/M"G .13 11 4375 Northwest M"Ply/35/8"Mtl Std@24"oc/Rll/%"G .13 11 2275 Total Wall Area in Zone 1 = 53375 Total Gross Wall Area = 53375 403.------DOORS--ZONE 1------------------------------------------------ --- Elevation Type U Area(Sgft) --------- North ------------------------------------------ 1-3/4 Steel Door-Fiberglass/Mineral ----- woo 0.60 ---------- 168 Northeast 1-3/4 Steel Door-Fiberglass/Mineral woo 0.60 63 Southwest 1-3/4 Steel Door-Fiberglass/Mineral woo 0.60 105 Nest 1-3/4 Steel Door-Fiberglass/Mineral woo 0.60 63 ' lorthwest 1-3/4 Steel Door-Fiberglass/Mineral woo 0.60 63 Total Door Area in Zone 1 = 462 ' Total Door Area = 462 104.--T --- ROOFS --ZONE 1------------------------------------------------ --- Fype ------------------------------------ Color U Insul R Area(Sgft) Itl Bldg Roof/R-19 Batt ------ Medium ------------ .051 19 ---------- 80000 Total Roof Area in Zone 1 = 80000 Total Roof Area = 80000 105.------FLOORS-ZONE 1------------------------------------------------ --- `'ype Insul R Area (Sqf t ) ------------------------------------------------ A ab on Grade/Uninsulated ------- 0 ---------- 0 Tloor over Unconditioned Space/Insulated 4 45000 Total Floor Area in Zone 1 = 45000 / Total Floor Area = 45000 106.------INFILTRATION -------------------------------------------------- --- CHECK Infiltration Criteria in 406.1.ABCD have been met. �-- MECHANICAL SYSTEMS ------------------------------------------------------------ CHECK HVAC load sizing has been performed. (407.1.ABCD) - --`� 407------- COOLING SYSTEMS----------------------------------------------- --- Type No Efficiency IPLV Tons ----------------------- --- ---------- With Condenser 4 2.90 2.90 180.00 408.------HEATING SYSTEMS ----------------------------------------------- Type No Efficiency BTU/hr -------------------------------- --------------------------- 1. Electric Resistance 1 1.0 1066000 409.------VENTILATION --------------------------------------------------- ICHECK Ventilation Criteria in 409.1.ABCD have been met. 410------ AIR DISTRIBUTION SYSTEM ---------------------- ------------ CHECK ------------------------------------------------------------ ---- Duct sizing and design have been performed. (410.1.ABCD) AHU Type Duct Location R-value ---------------------------------------------------------------- 1. Variable Air Volume (VAV) Conditioned Space 4.5 CHECK ------------------------------------------------------------------ ---- Testing and balancing will be performed. (410.1.ABCD) 411------ PUMPS AND PIPING -ZONE ----------------------------------------- Basic prescriptive requirements in 411.1.ABCD have been met. PLUMBING SYSTEMS Ill .-----PUMPS AND PIPING -ZONE 1-- Type R-value/in Diameter Thickness 1. Non -Circulating w/o Heat 4.2 1 1 112.-----WATER HEATING SYSTEMS -ZONE 1 ---------------------------------- Type Efficiency ------------------------ StandbyLoss InputRate Gallons ---------- 1. <=12 kW 1.0 -------------------- .05 15354 ---------- 40 ELECTRICAL SYSTEMS CHECK 113.-----ELECTRICAL POWER DISTRIBUTION---------------------------- ----- Metering criteria in 413.1.ABCD have been met. E14.-----MOTORS --------------------------------------------------- ----- Motor efficiencies in 414.1.ABCD have been met. -� t15.-----LIGHTING SYSTEMS -ZONE 1 --------------------------------------- 3pace Type No Control Type 1 No Control Type 2 No Watts Area(Sgft) ---------- ----------------- ----------------- --- ---------------- daiting an 1 Central Contro 1 187500 125000 Total Watts for Zone 1 = 187500 Total Area for Zone 1 = 125000 Total Watts = 187500 Total Area = 125000 CHECK Lighting criteria in 415.1.ABCD have been met. 1.6. Operation/maintenance ---------------------------------------------------------------------------- manual will be provided to owner.(102.1)