HomeMy WebLinkAbout1201 W P Ball Blvd 04-3205 04-2272 Correspondence Fire inspection Super Targetr!
r
SAN `FIRE DEPARTMENT
FIRE PREVENTION DIVISION
300 N. Park Ave., Sanford, Fl. 32771 / P. O. Box 1788, Sanford, Fl. 32772
(407 302-2520 / FAX (407) 302-2526
Plans Review Sheet
Date: August 26, 2004 Business Address: 1201 W.P. Ball Blvd
Occ. Ch. #36 Mercantile
Business Name: Super Target and Garden Center Ph. ( )
Contractor: Eagle Fire Protection Inc. Ph. (407) 656-8387
FAX (407)656-9405
Reviewed [ ] Reviewed With Comment X ] Rejected [ ]
„..
Reviewed by: Timothy Robles, Fire Protection Inspector/Plans Examiner
Comment: Instillation of Five (5) types of design area. Ordinary Hazard Group # 1,
Ordinary Hazard Group Two (#2) 12' height max storage. Class IV Rack Storage
2204 total fire sprinkler head installation Application— Per N.F.P.A. #13-1999 Ed,
AND BACK FLOW PREVENTER ,Contractor shall have a class # 1 and nor} #5
_ _ .,..r+nna.� ,.. .. .� •. r � ��w�..„.i&s'x�, „ t .; , n , x..
➢ Design System #1= General Sales Area (No Stockpiles over 12') (ft) ordinary
group #2 Density .3 Wet Central Model # EC-14 %" k-Factor 14 Temp. 155
Degrees
➢ Design System #3= General Sales Area (No Stock piles over 12') (ft) ordinary
13
Density .3 Wet Central Model # EC-14 %" k-Factor 14 Temp. 155 Degrees
All
SANFORD FIRE DEPARTMENT
FIRE PREVENTION DIVISION
300 N. Park Ave., Sanford, Fl. 32771 / P. O. Box 1788, Sanford, Fl. 32772
(407 302-2520 / FAX (407) 302-2526
➢ Design System #3A= Food Service Area (No Stock piles over 12') (ft) ordinary group #2
Density .3 Wet Central Model # EC-14 %" k-Factor 14 Temp. 155 Degrees
►:
➢ Design Systems #4= General Sales Area (No Stock piles over 12') (ft) ordinary
group #2 Density .1 Wet Central Model # EC-14 %" k-Factor 14 Temp. 155
Degrees
►9
➢ Design Systems #5= Stock Room Ceiling Height Varies Stock Height (?)Density .3
Wet Central Model #EC-14 3/a" k-Factors 14 Temp. 155 Degrees
0
➢ Design System # 1-B Garden Center Ceiling Height varies Stock Height
(12')Ord. Group #2 . Density .45 Wet Central Model #EC-25 1" k-Factors
25.2 Temp. 155 Degrees
➢ Design System #1-C "Stock Room" Ceiling Height varies Stock Height (15')ft
max height
➢ Density .2 Wet Viking Model # M -1/2" k-Factor 5.6 Temp. 155 Degrees
a
➢ Design System #4-A1 "Stock Room" Ceiling Height varies Stock Height
15'max height
➢ Density .45 Wet Central Model # EC-25 -1" k-Factor 25.2 Temp. 165
Degrees
➢ Central EC-14-EX-COV SSP 3/4" 155 Reek K-14 593 Heads
➢ Viking M1/2" Brass SSU 155 K=5.6 65 Heads
➢ Central EC-25-EX-COV SSU 1" 165 K-25.5 206 Heads
2
• Do not block access to hose cabinets , and fire inspector test valves
3
Component Performance Method for Commercial Buildings
ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
Florida Department of Community Affairs
PROJECT NAME—MDS004096
ADDRESS:
OWNER:
AGENT:
FLA/COM-97 Version 2.2
WILLIAMS/SCOTSMAN
BUILDING TYPE: Business (Office)
CONSTRUCTION CONDITION: New construction
DESIGN COMPLETION: _Finished Building
CONDITIONED FLOOR AREA: _672
MAX. TONNAGE OF EQUIPMENT PER SYSTEM:
COMPLIANCE CALCULATION:
Form 40OB-97
PERMITTING OFFICE:
_ORANGE COUNTY
CLIMATE ZONE: 5
PERMIT NO: _
JURISDICTION NO: 581000
3
NUMBER OF ZONES: 1
METHOD B
DESIGN
CRITERIA
RESULT
------
-----------------
ENVELOPE PERFORMANCE
------
47.75
--------
74.50
PASSES
OTHER ENVELOPE REQUIREMENTS
PASSES
LIGHTING
INTERIOR LIGHTING
585.60
1323.00
PASSES
EXTERIOR LIGHTING
0.00
150.00
PASSES
LIGHTING CONTROL REQUIREMENTS
PASSES
HVAC EQUIPMENT
COOLING EQUIPMENT
1. SEER
10.00
9.70
PASSES
HEATING EQUIPMENT
1. Et
1.00
N/A
AIR DISTRIBUTION SYSTEM INSULATION
REQUIREMENTS
1. Ventilated
6.00
6.00
PASSES
REHEAT SYSTEM TYPES USED
NO REHEAT SYSTEM is USED
WATER HEATING EQUIPMENT
1. EF
1.50
0.92
PASSES
PIPING INSULATION REQUIREMENTS
1. Non -Circulating w/o H
1.00
1.00
PASSES
----------------------------------------------------------------------------
COMPLIANCE CERTIFICATION:
I hereby certify that the plans and
specifications covered by this calcu-
lation are in compliance with the
Florida Energy"' iciency Code.
PREPARED BY:
DATE: U
I hereby ce. 'i y that this building is
in comp1i_a;:. w th 't-ne Florida Energy
Efficiency ,CCcde .
OWNER/AGENT:
DATE:
Review of the plans and specifica-
tions covered by this calculation
indicates compliance with the
Florida Energy Efficiency Code.
Before construction is completed.,
this building will be inspected
for compliance in accordance with
Section 553.908, Florida Statutes.
BUILDING OFFICIAL:
DATE: _ _ _
I hereby certify(*) that the system design is in compliance with the Florida
Energy Efficiency Code.
SYSTEM DESIGNER REGISTRATION/STATE
ARCHITECT :
MECHANICAL:_
PLUMBING _
ELECTRICAL:_
LIGHTING
(*) Signature
by registered
be used where
is required where Florida law requires design to be performed
design professionals. Typed names and registration numbers may
all relevant information is contained on signed/sealed plans.
BUILDING ENVELOPE SYSTEMS
COMPLIANCE
CHECK
401-------
GLAZING --ZONE 1
------------------------------------------------ v-
Elevation
Type
U SC VLT Shading
---- ---- ---- --------------
Area(Sgft)
----------
---------
North
---------------
Commercial
1.13 1.0 1.0 None
35
West
Commercial
1.13 1.0 1.0 None
27
West
Commercial
1.13 1.0 1.0 None
0
East
Commercial
1.13 1.0 1.0 None
0
Total Glass Area in Zone 1 =
62
Total Glass Area =
62
402-------
WALLS --ZONE 1------------------------------------------------
---
Elevation
---------
Type
--------------------------------
U Insul R
----- -------
Gross(Sgft)
-----------
East
Frame Wall + 3"
InS. 0.081 0.0
96
West
Frame Wall + 3"
InS. 0.081 0.0
96
North
Frame Wall + 311
InS. 0.081 0.0
448
South
Frame Wall + 3"
InS. 0.081 0.0
448
Total Wall Area in Zone 1 =_
1088
Total Gross Wall Area =
1088
403-------
DOORS --ZONE 1------------------------------------------------
---
Elevation
Type
U
-----
Area(Sgft)
----------
---------
East
------------------------------------------
1-3/4 Steel Door -Solid Urethane foam co 0.40
40
Total Door Area in Zone 1 =
40
Total Door Area =
40
404.------ROOFS--ZONE
1------------------------------------------------
---
Type
Color U Insul R
------ ----- -------
Area(Sgft)
----------
------------------------------------
STD. TRUSS'
Light .0526 19
672
Total Roof Area in Zone 1 =
672
Total Roof Area =
672
405-------
FLOORS -ZONE 1------------------------------------------------
---
Type
Insul R
-------
Area(Sgft)
----------
------------------------------------------------
Floor over
Unconditioned Space/Insulated
11
672
Total Floor Area in Zone 1 =
672
Total Floor Area =
672
406.------INFILTRATION
--------------------------------------------------
---
CHECK
Criteria
in 406.1.ABCD have been met.
IInfiltration
MECHANICAL SYSTEMS
CHECK
HVAC
load sizing has been performed. (407.1.ABCD)
407.------COOLING
SYSTEMS-----------------------------------------------
---
Type
No Efficiency IPLV
------------- -------------------
Tons
----------------------------
1. Single
Package
1 10.0 0.0
3.00
408.------HEATING
SYSTEMS-----------------------------------------------
---
Type
No Efficiency
BTU/hr
1. Electric
Resistance
2 1.0
35000
409.------VENTILATION
---------------------------------------------------
---
CHECK
Ventilation
Criteria in
409.1.ABCD have been met.
I
410------ AIR DISTRIBUTION SYSTEM----------------------------------------- ---
CH.E,CK
------------------------------------------------------------ ---- ---
Duct sizing and design have been performed. (410.1.ABCD)
AHU Type Duct Location R-value
----------------------------------------------------------------
1. Packaged Constant Volume Ventilated 6
CHECK
---------------------------------------------------------- --- ---
Testing and balancing will be performed. (410.1.ABCD)
411.-----PUMPS AND PIPING -ZONE ----------------------------------------- ---
Basic prescriptive requirements in 411.1.ABCD have been met.
PLUMBING SYSTEMS
411------ PUMPS AND PIPING -ZONE 1---------------------------------------
---
Type R-value/in
----------
Diameter
--------
Thickness
---------
------------------------
1. Non -Circulating w/o Heat 3.63
0.75
1.0
412------ WATER HEATING SYSTEMS -ZONE 1----------------------.------------
---
Type Efficiency StandbyLoss
InputRate
Gallons
1. <=12 kW 1.5 0.0
3.5
6
ELECTRICAL SYSTEMS
CHECK
413------ ELECTRICAL POWER DISTRIBUTION----------------------------
-----
---
Metering criteria in 413.1.ABCD have been met.
-----
---
Motor efficiencies in 414.1.ABCD have been met.
415------ LIGHTING SYSTEMS -ZONE 1---------------------------------------
---
Space Type No Control Type 1 No Control Type 2
No Watts
Area(Sgft)
Reading, T 1 On/Off 2 None
00 526
636
Toilet and 1 On/Off 2 None
00 60
36
Total Watts for Zone 1 =
586
Total Area for Zone 1 =
672
Total
Watts =
586
Total
Area =
672
CHECK
Lighting criteria in 415.1.ABCD have been met.
16. Operation/maintenance manual will be provided to owner.(102.1)
----------------------------------------------------------------------------
SANFOR.D FIRE.DEPARTMENT
FIRE PREVENTION DIVISION IL
300 N. Park Ave., Sanford, Fl. 32771 / P. O. Box 1788, Sanford, Fl. 32772
(407 302-2520 / FAX (407) 302-2520-
Pager (407) 918-0395
Plans Review Sheet
Date: November 24, 2004 Business Address: W..1201 W. P. Ball Blvd Occ. Ch. New Mercantile
Business Name: Target Store #1966 Ph. ( )
Contractor: Bob Sanders Electric Ph. (407) 467-0055
Fax. (407)324-8028
Reviewed [ ] Reviewed with comment [X ] Rejected [ ]
Reviewed by: Timothy Robles, Fire Protection Inspector/Plans Examiner
Comment: Fire alarm instillation inside a new Mercantile Occupancy
1.1 Application — New installation of one (1) pull stations, multiple smoke detectors, and multiple duct
detectors; multiple horn/strobes through out store
• Knox box required (see application attached)
• 75 disables of sound shall be available inside structure (per N.FPA. #72)
• Monitoring phone lines shall be 31jx type
• Battery calculations verified
• Final function test required by Sanford fire department
• Additional Horn Strobes maybe required if visual, and (or) decibel sound is not per N.F.PA. #72
• Fire Suppression system shall be tied into the main fire alarm system as full activation
• 48 hour notice required on inspections
• Place fire alarm system off test and have live for finial
1