HomeMy WebLinkAbout3941 W 1st St 01-2208 (CO)a 9
Thies is to certify that ' the building loc ted at
for
velar r�?i�t�' �' la ��� 0R has i h i4& �6re)16e�nT1-�; oed- Q� l�-01
his been comple`tedf according to plans and slecif icat ns f i le4 in the
office of the Building Off cial prior to the issuance of said building
permit, to wit as omplies with all the
building, plumbing, electrical, zoning and subdivision regulations
ordinances of the City of Sanford and v ith the provisions of these
regulations_
DATE
.,BUILDING:
Finaled 2"Z I-01
ZONING: ,1Li I �Z
Inspected
Subdivision Regulation Apply: Yes No
FIRE:
Inspec ed
UTILITIES:
Water j• Sewer
Lines In �,. Lines
Meter (K1 Sewer
Set �_ C0� _e ki Tap
Reclaimed
Water
ENGINEERING:
Street
Drainage i t ,i0z Y Paved
Maintenance /
Bond of c I A
PUBLIC WORKS:
Street
Name Street
Signs Lights
Storm 101
Sewer Drivew
Street �..,
Work
WATER -SEWER IMPACT FEES
01-APPLCTN FEE -ELECTRIC
01-APPLCTN FEE -BUILDING
01-APPLCTN FEE -MECHANIC
01-APPLCTN FEE -PLUMBING
01-PREPOWER AGREEMENT
01-PLANS - EXTRA SETS
01-FIRE IMPACT - NONRES
01-FIRE INSPECT-ALTER/RPR
DATE
• I
9/10/0] �.
8/24/01
11/13/01
8/27/01
12/11/01
8/24/01
8/24/01
8/24/01
0
Ln
10.00
10.00
10.00
10.00
60.00
18.00. .
800.75
464.20
1 `
� f
r %!21TZ4;TIQO �k -ru, 50 HW-",-Vllam
2 ELL
a ri.-L -T oJ sri�b-,)oas
;jC,
si-a
`7, J- -1 L 1 J 7 0 -.D
1.j-.6 Lra e ff C, i -k, CrLr a Dnj3 f Q A-: oe gn clff!llj-1 L b i'l
fl,:; r Gl f I Z 0 0 Ek 'D Fif L 5
lo E�f .0 F!
To K, -L
---ak3y - nolalvibdue". jAVQH!I.SA
7aK)EST 5-a
T
r c
11%
�n-
T
jL7
- A,-:,r'C-t, j LA
, 2 V-r
i% - , . V x *.. 'f .L
T
.- wc.L T.1 " - -ITU
%.41--
W
zt 2
.4 �l ZJJ 5 W
II a al,
r, -10EI 'DI
axqL,,iW ojjal;q
ra
1
0\Ox
�T .77 ;r00 - LO
-d
TO--1H— —A
0 -.0 1
10 iN 2,\ 8
f -M LlqqA10
00
cl 11
00. r
10
D 7 A� fj IET '!/;* TD qL'A - 0- 0 Ll J 1A
Q 0 . 0 8-j
LO\ L-1*11,21
TV. KlIZROA ,ILL AJI I
0 0 S I
0 V, 2 P-1
3D Tc -" i:-:,' A'r-'L*r"L"X7,L ill k 0
008
HH 0 M TO,iqM7 ajl,-
J,' �- - _t 0
A, .4 .1.
1-0
cc, P-\,ci
PAGE: 2
k
e
This is to certify that the building located at
{ for
which permit 01-00002208 has heretofore been issued on IO't
has been completed according to plans a d specifications filed in the
office of the Building Official prior to the issuance of said building
permit, to wit as complies with all the
building, plumbing, electrical, zoning, and subdivision regulations
ordinances of the City of Sanford and with the provisions of these
regulations. 1
STAFF APPSubdivision . Regn4atio Apply:
f
01-PLAN ALTERATIONS 9/10/01. ' 35.00
01-POLICE IMPACT - NONRES 8/24/01 1,5106.20
01-RADON GAS TAX FEE 8/24/01 116.05
01-ROAD IMPACT FEES 8/24/01 1 247.38
01-RECOVERY FD/CERT. PGM. 8/24/01 116.05
WD IMPACT:COMMERCIAL 8/24/01 300.00
SD IMPACT:COMMERCIAL-, 8/24/01 t400.00
1
ADS
a
Yes No
CP—
OWM BUILD NG OFFICIAL fbXTE
PREPARED !- ,/2f8/02 -INSt�k&TON _ ICKET PAGE
1
A vw% 1,7
az
d .-.o D--j a! -iriT
mseq sic) JDjlo� -fw ---
O-J-- LUE ad 9-c-, aol'illo
fY I
-.1 o
IJB if zt i w r!c? Q a J5 j'IW 0.+ a 1 e-;,
a 0 zi: I sol i-f.3:fCj
L-1 %j 0 aflo 5 c, -�rJ- '3-o a -f.s ri
--a SY :Vl,--!--IA zZoltBILSeR rlol8ivkb0*u'-"2 t., A T Tj
y TA 'HqAT�'
A A t
a v.o
(),T (8 Ol
-L-
a 22 1 JA0211— I tJ
cjc_l LI
a 0
00 CICJ*�".i O\N,?\b
(IW
00 0() 6 JA"*. I.L. JF100:T3A"-TIM- I
2-DAq "r , VICI T Nn, ik�Rqq
FEMA REC'd
SLAB REC'd
INSPECTOR JDLI at 77
REQUEST FOR FII.P.L 'NSPECTION
CERTIFICATE OF OCCLIF';^ CY/COMPLETION X
***`NEW COMMERCI?�h BUILDING****
v
DATEV\�/
PERMIT # p
ADDRESS 35 H I GQ I St
PROJECT
CONTRACTOR 1N n Devc)(aprnw+ 14,I6
The Building Division has receivec: quest for a final inspection and a
Certificate of Occupancy for the above I . L r c _ d address. We would appreciate
a final inspection of the site by your del:, ;., cnl. Approval by your department
would result in a granting a C.O. for the ... . _ If you have any issues that the
contractor will need to address, please statement for denial of C.O. or a
conditional agreement to be attached tc
Thank you for your cooperation.
Engineerin �t s
Z/z7 /or
Public Works L� .530rti ores L %gL,2Z f n
Utilities
Conditions: (to be completed only if approval is cona:;:�
_ c "'Ising
Certificate Of Occupan
Owner: Sharp Car Store
Address: 3941 W. 1" Street
Date: January 9, 2002
This is Engineering's sign -off for the Certificate
Addendum
for the Sharp Car Store.
Conditional Approval:
The following is allowed to be delayed because of a recent placement of the concrete
parking lot:
❑ All pavement markings, including Stop Bars an
installed by January 15, 2002.
❑ Handicap pavement markings and sign shall be
Thanks,
Dave
parking space striping, shall be
by January 15, 2002.
FASHA_ENG1Development Review106-Post ApprovahCertificote of occupancy120011Sharp Car Store CO2.wpd
Revised: Jan 15, 002
Certificate Of Occupan y Addendum
Owner: Sharp Car Store
Address: 3941 W. I" Street
Date: December 27, 2001
Reason for Disapproval:
❑ A 30-inch, High Intensity Stop sign is required
❑ Two other Stop signs, 24 inches, Engineering
approved plans.
❑ A Certificate of Completion letter from the Ent
along with 3 sets of as -built drawings.
❑ The outfall structure is incomplete. The weir a
the approved drawings.
Conditional Approval:
The following is allowed to be delayed
parking lot:
❑ All pavement markings, including
installed by January 15, 2002.
❑ Handicap pavement markings an4
Thanks,
Dave
Bars
shall
of
the driveway . tersection with SR 46.
de, shall be/hstalled as shown on the
for the site is required
is required to be installed per
recent placement of the concrete
parking space striping, shall be
installed by January 15, 2002.
FASHA_ENG\Development Review\06-Post Approval\Certificate of occupancy\2001\Sharp Car Store CO.wpd
Revised: Dec 27t 2001
JOANN JOHNSON - Sharp Car Stores I rayu 1 1
From:
ELIZABETH OREILLY
To:
JOANN JOHNSON
Date:
1 /28/02 11:23AM
Subject:
Sharp Car Stores
JoAnn,
They are having serious problems with FDEP getting clearance' for their new water line. Until that is
settled. Utilities cannot sign off on a CO. I left a message r the engineer on this project last Friday
1/25, but I haven't heard from him yet. There may be additional items on the checklist that are still
outstanding, but that is the big one.
Elizabeth
FEMA REC'd
SLAB REC'd
INSPECTOR
REQUEST FOR FINAL INSPECTION
CERTIFICATE OF OCCUPANCY/COMPLETION
****NEW COMMERCIAL BUILDING****
DATE I� �J
PERMIT # V�G� 'ZWpC
ADDRESS 31( H I W I
PROJECT I% Y acp �
CONTRACTOR 1 oo-050n v�fIAvyv,Y� TnG
The Building Division has received a request for a final inspection and a
Certificate of Occupancy for the above rererer,ced address. We would appreciate
a final inspection of the site by your department. Approval by your department
would result in a granting a C.O. for the aa(:lress. If you have any issues that the
contractor will need to address, please submit a statement for denial of C.O. or a
rnnrtitinnal anraamant to ha attar.hari tr. , = r' n
OWNER:
ADDRESS
DATE:
,Do,rl�LDSo.v 44VEL.
3 57 4) �V, f sr ST-,
REASON FOR DISAPPROV
CONDITIONAL AGREEMENT:_
Ppo � 6rs 2C' VLLuP1.k
74clfe6
o�v Z
> d� Go�P1R76J
FIRE DEPARTMENT
PUBLIC WORKS
pu-VCH 4PS7 70 QE
(f D2
11-2 e
UTILITIES
ENGINEERING
4P s
SLAB REC'd
INSPECTOR
REQUEST FOR F114AL INSPECTION
CERTIFICATE OF OCCl1F14NCYICCMPLETION
****NEW COMMERCIAL BUILDING****
DATE 2 111101
PERMIT #
ADDRESS
PROJECT
CONTRACTOR l��a-" D�� gfoery'� T'n6
e Building Division has received a request for a final inspection and a
Certificate of Occupancy for the above re.;erenced address. We would appreciate
a final inspection of the site by your department. Approval by your department
would result in a granting a C.O. for the a J(.-; a 3s. If you have any issues that the
contractor will need to address, please SLibl' lit a statement for denial of C.O. or a
conditional agreement to be attached to IC 0.
Thank you for your cooperation. )2121 1
Engineering
Public Works
Utilities�_cr�n<�ina
Conditions: (to be completed only if approval is condition:..;
o 0 4 4os44444444 UGriiii�aii➢a➢i➢'u�a➢a➢i�i�ui�uir�vv
982543/SC/1SS PS "S
RAPiE) MEMO
—r
1 .Q
DATE Z C) f //
SUSJT v sY ! y Pdj'• `G�j��3
Chce,�
r
!� E
� p
1l qcC flr vj f s e
" r re IOJ
✓ :N✓Nrl-�P/ -.'SrAOta (
' -I YO �S 7,5 0.
6Adart SC1158
PEMA REC'd
SLAB REC'd
INSPECTOR
REQUEST FOR FIIJAL !NSPECTION
CERTIFICATE OF OCCUPANCY/COMPLETION
"""NEW COMMERCIAL BUILDING""
DATE IZ I �1
PERMIT # V�G�
ADDRESS 3 1I, H I GQ I
PROJECT JY��P C
CONTRACTOR ya -�56 n Dftj2(opr}'� j4YIG
The Building Division has received a request for a final inspection and a
Certificate of Occupancy for the above referenced address. We would appreciate
a final inspection of the site by your department. Approval by your department
would result in a granting a C.O. for the a Jere 3s. If you have any issues that the
contractor will need to address, please Submit a statement for denial of C.O. or a
conditional agreement to be attached to tna C O.
Thank you for your cooperation.
Engineeri
Public Works
Utilities
Conditions: (to be completed only if approval is condition.!
//
CITY OF SANFORD FIRE DEPARTMENT
FEES FOR SERVICES
h� PHONE # 407-302-1091 * FIX #: 407-330-5677
DATE: Q i ^ II PE IT#: )
BUSINESS NAME / PROJECT:
ADDRESS' V
PHONE NO.: (.3 R � ^ 19 q 1 FAX
CONST. INSP. [ ] C / O INSP.:[ ] REINSPECTION [ ] PLANS REVIEW [ ]
F. A. [ ] F.S. 'K HOOD [ ] PAINT BOOTH [ ] BURN PERMIT [ ]
TENT PERMIT E ] TANK PERMIT [ ] OTHER K
TOTAL FEES: $
COMMENTS:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
UNIT SEE
Fees oer Bldg. / Unit
Fees must be paid to Sanford Building Department, 300 N. Park Ave., Sanford, FI. 32771 Phone # -407-
330-5656. Proof of Payment must be made to Fire Prevention division before any further services can take
place. I certify that the above is true and correct and that 1
will comply with all applicable codes and ordinances
of the City of Sanford, Florida.
Sanford Fire Preventioh Division Applicant's Signature
CITY OF SANFORD FIRE DEPARTMENT
FEES FOR SERVICES
PH/ONE # 407-302-1091 * Ff AX #: 407-330-5677
DATE: �L(D 0 PERMIT#: C)"
BUSINESS NAME /
PHONE NO.``t0 %2 - Q� I I FAX NO.:
CONST. INSP. [ ] C / O INSP.:[ ] REINSPEC ION [ ] PLANS REVIEW [ ]
F. A. [ kF.S. [ ] HOOD [ ] PAINT BOOT���{{I1` ] BUgt� PERMIT��
TENT PERMIT ] TANK PERMIT [ ] OTHER (] t :fie /{/!�C r�
TOTAL FEES: S (PER UNIT SEE BELOW) 4
Address / Bldg. # / Unit #
1.
2. e F
3.
4. 1
5.
6.
7.
8. e
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
Square Footage Fees ner Bldg. / Unit
Fees must be paid to Sanford Building Department, 300 N. Park Ave., Sanford, FI. 32771 Phone # -407-
330-5656. Proof of Payment must be made to Fire Prevention division before any further services can take
place. I certify that the above is true and correct and that I
will comply with all applicable codes and ordinances
l� of the City of Sanford, Florida.
l771,—
Sanford Fire P • ention ivision
icant's Signature
FEMA REC'd
SLAB REC'd
INSPECTOR
REQUEST FOR FIIJAL INSPECTION
CERTIFICATE OF OCCUPANCY/COMPLETION
****NEW COMMERCIAL BUILDING****
DATE I �l
PERMIT #�}—
ADDRESS�,�
PROJECT S Y �'�� 5 U r�
CONTRACTOR �aa-a,IJ-50 n Deo�?(c)�ry- , J41G
The Building Division has received a request for a final inspection and a
Certificate of Occupancy for the above re: ererced address. We would appreciate
a final inspection of the site by your department. Approval by your department
would result in a granting a C.O. for the a i,:,i e is. If you have any issues that the
contractor will need to address, please subi-niz a statement for denial of C.O. or a
conditional agreement to be attached to taa C )
Thank you for your cooperation.
Engineering _i
Public Works
Utilities
Conditions: (to be completed only if approval is condifior-