Loading...
HomeMy WebLinkAbout109 Wheatfield Cir 17-359 ShedPk0000' CITY OF SANFORD BUILDING & FIRE PREVENTION ECEIVE PERMIT APPLICATION 1 FEB 7 2011 Application No: / 7'S v oa gY' Documented Construction Value: S co Job Address: t'/!i(l[.rl i Historic District: Yes No Parcel ID: Residential ® Commercial Type of Work: New Addition Alteration Repair Demo Change of Use Move Description of Work:V9A 1 ! 9fatIAL AL f 21U od .c,.i,,. n 1' Ian Review Contact Person: Phone: am Street: I V `j City, State Zip: Name Street: City, State Zip: Name: Street: Fax: Title: Email: M A'% A 9-0-SC 1 q Owner Information / / y Q '/ Phone: 0z (D. Resident of property? : Contractor Information Phone: Fax: State License No.: Architect/ Engineee Information Phone: Fax: City, St, Zip: E-mail: Bonding Company: Address: Mortgage Lender: Address: WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet standards of all laws regulating construction in this jurisdiction. I understand that a separate permit must be secured for electrical .cork, plumbing, signs, wells, pools, furnaces, boilers, heaters, tanks, and air conditioners, etc. FBC 105.3 Shall be inscribed with the date of application and the code in effect as of that date: 5'" Edition (2014) Florida Building Code Revised: June 30, 2015 Permit Application r7 41 O l Ak NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. Acceptance of permit is verification that I will notify the owner of the property of the requirements of Florida Lien Law, FS 713. The City of Sanford requires payment of a plan review fee at the time of permit submittal. A copy of the executed contract is required in order to calculate a plan review charge and will be considered the estimated construction value of the job at the time of submittal. The actual construction value will be figured based on the current ICC Valuation Table in effect at the time the permit is issued, in accordance with local ordinance. Should calculated charges figured off the executed contract exceed the actual construction value, credit will be applied to your permit fees when the permit is issued. OWNER'S AFFIDAVIT: 1 certify that all of the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. wor Signature of Owncr/AgentDate Signature of Contractor/Agent Date 4as,o-j t^)-- Sa-1Aprit / Print Owner/Agent's Name (, Print Contractor/Agent's Name NNA •o i Signature of Notary -state F 'do ` D j''•• nature of Notary -State of Florida Date My Comm. t Jura 17 S N No FF Owner/Agent is Personally Kno rr'ysA(y LIC, ••.•••• Q' 'ontractor/Agent is Personally Known to Me or Produced ID t/ Type of ID i •'•••••'• '0.1Z'Produced ID Type of [D BELOW IS FOR OFFICE USE ONLY Permits Required: Building Electrical Mechanical Plumbing[] Gas[] Roof Construction Type: Total Sq Ft of Bldg: Occupancy Use: Min. Occupancy Load: Flood Zone: of Stories: New Construction: Electric - # of Amps Plumbing - # of Fixtures Fire Sprinkler Permit: Yes No # of Heads APPROVALS: ZONING: Z -- • I-7 UTILITIES: ENGINEERING: COMMF*ITc- FIRE: Fire Alarm Permit: Yes No WASTE WATER: BUILDING:a•37-t% Ok to install 10 x 12 (120 square foot) shed as shown on plan. Shed must be a minimum of 4 feet from rear property line and 5 feet from side property line. Shed shall not encroach into 5 foot drainage easement as shown on survey. Revised: June 30, 2015 Permit Application REQUIRED INSPECTION SEQUENCE BP# 1 * 1- lks9 Address: f o9 BUILDING PERMIT Min Max Inspection Description Footer / Setback Stemwall Foundation / Form Board Survey Slab / Mono Slab Pre our Lintel / Tie Beam / Fill / Down Cell Sheathing — Walls Sheathing — Roof Roof Dry In Frame Insulation Rough In Firewall Screw Pattern Drywall / Sheetrock Lath Inspection Final Solar Final Firewall Final Roof Final Stucco / Siding Insulation Final Final Utility Building Final Door Final Window Final Screen Room Final Pool Screen Enclosure Final Single Family Residence Final Building Other ELECTRICAL PERMIT Min Max Inspection Description Electric Underground Footer / Slab Steel Bond Electric Rough T.U.G. Pre -Power Final Electric Final Min Max Inspection Description Plumbing Underground Plumbing Sewer Plumbing Tub Set Plumbing Final MECHANICAL PERMIT Min Max Inspection Description Mechanical Rough Mechanical Final Min Max Ins ection Description Gas Underground Gas Rough Gas Final REVISED: June 2014 1 4 OWNER BUILDER STATEMENT/AFFIDAVIT Altamonte Springs, Casselberry, Lake Mary, Longwood, Oviedo, Sanford, Seminole County, Winter Springs Florida Statutes are quoted here in part for your information to indicate the authority for exemptions for homeowners from qualifying as contractors and to express any applicable restrictions and responsibilities. OWNERS MUST PERSONALLY APPEAR AT THE BUILDING DIVISION TO SIGN THIS DOCUMENT BY SIGNING THIS STATEMENT, I ATTEST THAT: (Initial to the left of each statement) I understand that state law requires construction to be done by a licensed contractor and have applied for an owner -builder permit under an exemption from the law. The exemption specifies that 1, as the owner of the property listed, may act as my own contractor with certain restrictions even though I do not have a license. I understand that building permits are not required to be signed by a property owner unless he or she is responsible for the construction and is not hiring a licensed contractor to assume responsibility. I understand that, as an owner -builder, 1 am the responsible party of record on a permit. I understand that I may protect myself from potential financial risk by hiring a licensed contractor and having the permit filed in his or her name instead of my own name. I also understand that a contractor is required by law to be 125 licensed in Florida and to list his or her license numbers on all permit and contracts. I understand that I may build or improve a one -family or two-family residence or a farm outbuilding. I may also build or improve a commercial building if the costs do not exceed $75,000. The building or residence must be for my own use or occupancy. It may not be built or substantially improved for sale or lease. If a building or residence that I have built or substantially improved myself is sold or leased within RS in 1 year after the construction is complete, the law will presume that 1 built or substantially improved it for sale or lease, which violates this exemption. I understand that, as the owner -builder, I must provide direct, onsite supervision of the construction. understand that I may not hire an unlicensed individual person to act as my contractor or to supervise persons working on my building or residence. It is my responsibility to ensure that the persons whom 1 n C employ have the licenses required by law and by city ordinance. I understand that it is a frequent practice of unlicensed persons to have the property owner obtain an owner -builder permit that erroneously implies that the property owner is providing his or her own labor and materials. 1, as an owner -builder, may be held liable and subjected to serious financial risk for any injuries sustained by an unlicensed person or his or her employees while working on my property. My homeowner's insurance may not provide coverage for those injuries. I am willfully acting as an owner - builder and am aware of the limits of my insurance coverage for injuries to workers on my property. I understand that 1 may not delegate the responsibility for supervising work to a licensed contractor who is not licensed to perform the work being done. Any person working on my building who Is not licensed must work under my direct supervision and must be employed by me, which means that I must comply with laws requiring the withholding of federal income tax and social security contributions under the Federal Insurance Contributions Act (FICA) and must provide workers' compensation for the employee. 1 understand that my failure to follow these laws may subject me to serious financial risk. Rev. 9.14.2009 I agree that, as the party legally and financially responsible for this proposed construction activity, I wtII abide by all applicable laws and requirements that govern owner -builders as well as employers. I also n understand that the construction must comply with all applicable laws, ordinances, building codes, and zoning regulations. IC 1 am of aware of construction practices and I have access to the Florida Building Codes. I understand that I may obtain more information regarding my obligations as an employer from the Internal Revenue Service, the United States Small Business Administration, the Florida Department of Financial Services, and the Florida Department of Revenue. I also understand that I may contact the Florida Construction Industry Licensing Board at 1-850-487-1395 or at www.myflorida.com/dbpr/pro/cilb/ for Rsmore information about licensed contractors. 1 am aware of, and consent to, an owner -builder building permit applied for in my name and understand that I am the party legally and financially responsible for the proposed construction activity at the address listed below. 1 agree to notify the building department immediately of any additions, deletions, or changes to any of the information that I have provided on this disclosure or in the permit application package. Licensed contractors are regulated by laws designed to protect the public. If you contract with a person who does not have a license, the Construction Industry Licensing Board, the Department of Business and Professional Regulation and the building department may be unable to assist you with any financial loss that you sustain as a result of a complaint. Your only remedy against an unlicensed contractor may be in civil court. It is also important for you to understand that, if an unlicensed contractor or employee of an individual or firm is injured while working on your property, you may be held liable for damages. If you obtain an owner -builder permit and wish to hire a licensed contractor, you will be responsible for verifying whether the contractor is property licensed and the status of the contractor's workers' compensation coverage. Property Address: /v 11'1- " , do hereby state that I am qualified and capable of performing the requested construction involved with the permit application filed and agree to the conditions specified above. ck ZSignatureofOwner -Builder Data Form of Identification Must be Photo ID) A violation of this exemption is a misdemeanor of the first degree punishable by a term of imprisonment not exceeding 1 year and a $1,000.00 fine in addition to any civil penalties. In addition, the local permitting jurisdiction shall withhold final approval, revoke the permit, or pursue any action or remedy for unlicensed activity against the owner and any person performing work that requires licensure under the permit issued. Rev. 9.14.2009 6 City of Sanford Shed / Gazebo Permit Application Checklist All permit application packages must be complete prior to acceptance. You must check each box to the left or indicate n/a on this submittal. A complete application package shall include the following: O Building Permit Application completed, signed and notarized. Application must include correct address and complete parcel I.D. number. O Copy of a contract, signed by the contractor and the property owner, indicating the documented construction value of the project. O Copy of applicable contractor's license issued by the State of Florida (if contractor is applicant). O A site specific notarized power of attorney shall be required from the licensed contractor if he/she appoints an employee of his/her company to sign the permit application as the contractor. O Certificate of insurance indicating worker's compensation insurance coverage and naming the City of Sanford as certificate holder, or a copy of a worker's compensation exemption issued by the State of Florida (must be submitted with each application if contractor is the applicant). O Completed and signed Owner Builder Statement / Affidavit (if owner is applicant). O Two (2) site plans indicating proposed location and distances to property line(s). IA Shed or Gazebo l0'x 12'or less: Completed and signed Statewide Product Approval Specification Form. Two (2) copies of manufacturer's installation instructions. 2) Two copies of a legible drawing showing all framing details, foundation details, and meet all applicable code requirements (if applicable) Commonly accepted construction practices with appropriate tie downs or; ANSI / AF & PA WFCM wood frame construction manual for one and two family dwellings. 0 WPPC Guide to wood construction is high wind areas. Florida State Department of Community Affairs Approved Building. O Shed or Gazebo greater than 10' x 12': Two (2) sets signed and sealed engineered drawings. Wind design data required on drawings per FBC 1603.1.4 to meet 129 mph ultimate design wind speed for risk category I buildings. Completed and signed Statewide Product Approval Specification Form. Two (2) copies of manufacturer's installation instructions. Florida State Department of Community Affairs Approved Building. These guidelines were compiled to assist the applicant in preparing a Shed / Gazebo permit application and may not be complete. The applicant is required to meet all City of Sanford, state, and , federal code requirements. Revised: February 2015 Owner's Manual & Assembly Instructions Model No. ARROW Storage Products FIEVIEwl[D POA CODE emomp E PLANS (AMINER oATE Mifi Ifi8§t•180 BHA LL BE CON RUWITHTHEWORR SET dfiHEpIfiYfi0VI®tJe,TE. CANCEL. AL C gAN1 ® fiHli ppOVIS10NS OF THE N@F1 i HAL 18SUANCE OF A PEa tN d16 INf3 OFt:ICIAL FROOF M THE ER C' I VIOLATIONS OF E ED1012- B1 WR1012 GD1012- D1 Missing Parts, Questions on Assembly? Call: 1-800-851-1085 or assist@arrowsheds. com Do not return to dealer, they are not equipped to handle your requests. 17- 359 J ING SANFpRO 714441213 CAUTION: SOME PARTS HAVE SHARP OF I't E Storage Area: 115 Sq. Ft. 734 Cu. Ft. to\ MUST BE TAKEN WHEN HANDLING THE VARIOUS 10, 7 mZ 20.8 m3 PIECES TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ SAFETY INFORMATION PROVIDED IN THIS MANUAL BEFORE BEGINNING CONSTRUCTION. BUILDING DIMENSIONS ' Size rounded off to the nearest toot WEAR GLOVES WHEN HANDLING METAL PARTS. Exterior Dimensions Interior Dimensions Door Approx. Base (Roof Edge to Roof Edge) (Wall to Wall) Opening Size Size Width Depth Height Width Depth Height Width Height 10' x 12' 121" X 143 1/4" 123 1/4" 145 3/4" 82 1/8" 118 1/4" 140 1/2" 80 7/8' 55 1/2" 69 1/4" 1 3,0 m x 3.6 m 307,3 cm x 363.9 cm 313,1 cm 370,2 cm 208,6 cm 300,4 cm 356.9 cm 205,4 cm 141,0 cm 175,9 cm I BEFORE YOU BEGIN.... Owner's Manual Before beginning construction, check local building codes regarding footings, location and other requirements. Study and understand this owner's manual. Important information and helpful tips will make your construction easier and more enjoyable. Assembly Instructions: Instructions are supplied in this manual and contain all appropriate information for your building model. Review all instructions before you begin, and during assembly, follow the step sequence carefully for successful results. Flooring and Anchoring: Your storage building must be anchored to prevent wind damage. A base is necessary to construct a square and level building. Anchoring and base materials are not included with your building. We recommend the combined use of an Arrow Floor Frame Kit and an Arrow Anchoring Kit as an effective method of securing your building to the ground (Available at your local dealer, Arrow's website arrowsheds.com or call Arrow's Customer Service department 1-800-851-1085) or you may construct a base and anchoring system of your choice. Your assembly instructions provide information on a few methods commonly used to secure and level a storage building. Parts and Parts List: Check to be sure that you have all the necessary parts for your building. All part numbers can be found on the parts. All of these numbers (before the -) must agree with the numbers on the Parts List page. If you find that a part is missing, include the model number of your building and contact: Arrow Shed, LLC Customer Service Department 1101 North 4th Street Breese, Illinois 62230 1-800-851-1085 or assist@arrowsheds.com Separate contents of the carton by the part number while reviewing parts list. The first few steps show how to join related parts to make larger sub assemblies which will be used later. Familiarize yourself with the hardware and fasteners for easier use during construction. These are packaged within the carton. Note that extra fasteners have been supplied for your convenience. PLAN AHEAD.... IAa Watch the Weather: Be sure the day you select to install your building is dry and calm. Do not attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Teamwork: Whenever possible, two or more people .should work together to assemble your building. One person can position parts or panels while the other is able to handle the fasteners and the tools. Tools and Materials: These are some basic tools and materials you will need for the construction of your building. Decide which method of anchoring and the type of base you wish to use in order to form a complete list of the materials you will need. Required Eye Goggles No. 2 Phillips Screwdriver With Hardened Magnetic Tip) Note: A power screwdriver or vari- able speed drill with Phillips -Up attachment can speed assembly by as much as 40%. Required Work Gloves Step Ladder Utility Knife / Scissors Pliers Carpenter's Level Tape Measure Optional Time -Savers Wrench / Nut Driver Electric / Cordless Drill Square String (for squaring frame) Base Preparation Hammer and Nails Spade or Shovel Hand Saw / Power Saw Lumber and/or Concrete Selecting and Preparing Your Site: Before assembly, you will want to decide on a location for your building. The best location is a level area with good drainage. Allow enough working space forease of moving parts into position during assembly. Besurethere will be enough space at entrance for doors to open fully and enough space around the building to be able to fasten the panel screws from the outside. Before you begin the first steps in assembling your parts, a base should be constructed and an anchoring system should be ready to use.