HomeMy WebLinkAbout2545 Magnolia Ave 17-758 Lanai4x4 P.T. #2 SYP POST 23'-6" 16'_7" WITH SIMPSON ABU44 AT BOTTOM TO FOOTING 11' 9" 11 9 23'_6" 19 NEW 12" x 12" FRAME OUT COLUMN. TYPICAL OF 5 j Z EXISTING 4" THICK CONCRETE SLAB. REMOVE EXISTING 4" CONCRETE SLAB AT I io THIS AREA THEN FORM &POUR iq NEW 24" x24"x12" CONCRETE FOOTING W/co iv N M (3) #5'S EACH WAY. TYPICAL OF 5 PLACES NEW COVERED LANAIN M " M i 8'-0" CLG. .- -0? "v EXISTING 4" THICK CONCRETE SLAB. EXISTING RESIDENCE EXISTING CONCRETE FOOTING 1—STORY FRAME HOUSE FLOOR PLAN FOUNDATION PLAN i SCALE: 3/16"=F-0" SCALE: 3/16"=1'-0" NAILING SCHEDULE. 4x4 P.T. #2 SYP POST ROOFS/CEILINGS: j TYPICAL OF 3 PLACES 6 SIMPSON HUS28-2 15 ROOF SHEATHING TO BE MIN. 32" APA SHEATHING / A-1 FOR BEAM TO BEAM (2) 2 x10 #2 SYP BEAM RATED 24/16 FOR TILES, U.N.O. CEILING SHEATHING j CONNECTION SHALL BE 7/16" OSB. FASTENINGS WITHIN 4'-0" OF EAVES TO BE 4" O.C. AT ALL SUPPORTED EDGES AND 8" OC.0 IN FIELD. FOR ALL OTHER AREAS NAIL 6" O.C. u I n (2) SIMPSON HTS20 SHEATHING TO BE PLACED WITH LONG DIMENSION R COLUMN T BEAM ,i FOR COLUMN TO BEAM (TRUSSES). ROVID P PERPENDICULAR TO SUPPORTS P E ERPE If PLY CLIPS AT ALL UNSUPPORTEROOF HEATHING A-1 CONNECTION ii JOINTS. PLY CLIPS TO BE SPACED NO MORE THAN 24" ii IMPSON L,5bU EA. RAFTER i i O.C. (2) 2 x10 #2 SYP BEAM (2) 2 x10 #2 SYP BEAM SIDEWALL/GABLE ENDS: ALL SHEATHING TO BE IN. 7/16 APA SHEATHING AND u SHALL BE NAILED WITH (2) ROWS STAGGERED @ 6" O.C. ' AT TOP AND (1) ROW AT BOTTOM OF WALL, 6" O.C. ALL SIMPSON H2.5A OTHER EDGES AND 12" IN FIELD. BLOCKING SHALL BE (2) -2x6 #2 SYP RAFTER n i u EA. RAFTER TO BEAM PLACED AT ALL SHEATHING JOINTS. @ 16" O.0 TYPICAL NAILS: u NAILS USED IN ALL SHEATHING APPLICATIONS SHALL BE 8d RING OR SPIRAL SHANK OR HOT DIPPED IM GALVANIZED HAND OR GUN DRIVEN NAILS. GUN DRIVEN NAILS SHALL HAVE HEAD SIZE EQUIVALENT TO HAND (2) SIMPSON L$50 DRIVEN NAILS. (2) SIMPSON LS50 � i i : BEAM TO EXISTING BEAM TO EXISTING TOP PLATE CONNECTION NOTES: TOP PLATE ��� ; \— ALL TRUSS/BEAM TO WOOD FRAME CONNECTORS TO BE 2x6 #2 SYP RIDGE BOARD AT TOP SIMPSON MTS12 W/ (14) - 10dx1 1 /2 (CAP.= 860#) U.N.O. (2) 2x10 #2 SYP BEAM BELOW ALL TRUSS TO TRUSS CONNECTIONS TO BE SPECIFIED BY TRUSS MANUFACTURER U.N.O. SIMPSON H2.5A W/(10) — 8d ' 2x6 #2 SYP RAFTER @ 16" O.0 MAY BE USED ON CORNER JACK TRUSSES WHERE UPLIFT I SIMPSON LS50 EA. RAFTER �` DOES NOT EXCEED 600 LBS. �. TO PLATE TYPICAL 2x10 #2 SYP PLATE W/ - (4) 16d NALS TO EACH TRUSS BELOW EXISTINGP.E. ROOF WOOD TRUSS ROOF FRAMING PLAN SCALE: 3/16"=F-0" :I j. HARDI BOARD SIDING MATCH WITH EXISTING j REAR ELEVATION i i SCALE: 3/ 16"= V-0" i A,P-PROVED f� AIV .� Ok to install 23'-6" x 13'-2" (309.40 square foot) new covered lanai as shown on plan.�I'• T. Meets area and dimension regulations for MR-2 zoning district. I I 1 I //:NEW 4 x 4 P.T. #2 SYP (2) SIMPSON HTS20 WOOD BEAM WOOD POST TO WOOD POST SIMPSON ABU44 (TYPICAL) PSNW (2) 2x10 NEW (2) 2x10 • 0• a" 0 THREADED ROD ( MIN. 8" EMBED YP BEAM #2 SYP BEAM INTO CONCRETE FOOTING) W/ SIMPSON EPDXY SET •. r .• ti • ' :: .,: ';, :'' '' '' ' ±; NEW 4 x 4 P.T. #2 SYP._ CONCRETE FOOTING WOOD POST PER PLAN WOOD POST TO FOOTING CONNECTION 2 BEAM `TO WOOD POST CONNECTION SCALE: N.T.S. A-1 SCALE: N.T.S. SIMPSON HUC28-2 BEAM TO BEAM ' y 2x4 P.T STUD W/ SIMPSON HGA10 ` BOTTOM STUD TO CONC. SLAB NEW STRUCTURAL POST (2) 2x10 PER PLAN #2 SYP BEAM 1/2" THK. P.T. PLYWOOD HARDI BOARD SIDING FINISH TO MATCH WITH EXISTING ON ON TYVEK PAPER 3 BOX OUT COLUMN DETAIL 4 BEAM TO BEAM CONNECTION SCALE: N.T.S. A-1 SCALE: N.T.S. 2x6 COLLAR TIE @ 32" O.0 2x6 #2 SYP CONT. W/ (3) 12d NAILS @ EACH END RIDGE BOARD TO EACH RAFTER SHINGLE ROOF OVER, 15# FELT PAPER, OVER 15/32" APA ROOF SHEATHING, NAILED SIMPSON L50 EACH PER NAILING SCHEDULE RAFTER TO RIDGE BOARD (2)2x6 #2 SYP RAFTER @ 16" O.0 SIMPSON H2.5A EACH RECORD COPY RAFTER TO BEAM TYPICAL x4 i -EXISTING SHINGLE ROOF (2) TOE NAILS @ EA. END SHINGLE ROOF MATCH 2 10 #2 SYP BEAM WITH EXISTING (2) X (2) 2 x 10 #2 SYP BEAM BEAM TO POST CONNECTION SEE PLAN (2) 2 x 10 #2 SYP BEAM BEYOND 4x4 P.T. WOOD POST REVIEWED POR CODE COMPLIANCI �Y PLANS EXAMINER 5 SECT I ON PATEATE ------------- A -'I SCALE: N.T.S, SANFORD BUILDING DIVISION SIMPSON LSTA12 EA. STUD TORAFATER A PERMIT ISSUED SHALL BE CONSTRUED TO BE (2) 2x8 #2 SYP RAFTER @ 16" O.0 LICENSE TO PROCEED WITH THE WORK AND NOT 3 2x4 BLOCKING AT FIRST 3 BAY AUTHORITY To VIOLATE, CANCEL, ALTER OR S PROVISIONS THE TECHNIC 48" O.0 CODES NO SHALL ISSUANCEE O A PERMIT PRV - IT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING A CORRECTION OF ERRORS IN PLAN LEFT ELEVATION CONSTRUCTION OR VIOLATIONS OF THIS CODE (2) 2 x4 TOP PLATE _ SCALE: 3/16"=1'-0" 2 x4 STUD @ 24" O.0 �7 APA SHEATHING INC SIMPSON A35 EACH D .I THIS STRUCTURE HAS BEEN DESIGNED TO MEET OR EXCEED THE 140 M.P.H. 3 SECOND GUST WIND LOAD REQUIREMENTS OF THE 2014 EDITION FLORIDA STUD TO BEAM (2) 2 x 10 #2 SYP BEAM , P�O� �, _ '� rJ BUILDING CODE BUILDING AND RESIDENTIAL & WIND REQUIREMENT OF THE,, A.S.C.E. 7-10 6 BALOON FRAMING A -"I SCALE: N.T.S. W z 0 E� U cr] W C� W E-� Q - � d 4 4 4 v� G C N o tV. U r 0- o c CU on � [ �� � �°uo - L p XJ F�1 c wi'�„ ro U�Li.m bn Q o u o u y V� ia,o O bil H o •o b C"4 .B n m a a� ro ,o o v o PROFESSIONAL SEAL N ' No 7093157, ' STA FLOR\a�'����~\ �//FIlIi1U� Date: 2-22-2017 1,4 C) zw Q � v� p W � DRAWN CHECKED KL CAD PILE PROJECT A-1 DRAWING NUMBER A�l DATE 1-24-17