Loading...
HomeMy WebLinkAbout109 Yorktown Pl - BR17-002916 - SOLARJob Address: Parcel ID: _n- N - 30- i OCT - 3 W7 ty CITY OF SANFORD BUILDING & FIRE PREVENTION PERMIT APPLICATION Application No: 49A Documented Construction Value: $ 214j -:5 2 D • DO L s n TffA M 3a' 191 Historic District: Yes No WM - 01 y0 Residential ® Commercial Type of Work: New Addition IR Alteration Repair Demo Change of Use Move Description of Work: S= al Insk lb-6)n Plan Review Contact Person: ws ":k(inro Title: 0WIM Phone: q01- U - OM Fax: Email: berranDDrrai l nr10-sn' f •core Property Owner Information Name Phone: q09' SQ(p 5993 Street: ICA IQ l'i6n Qj_ Resident of property? : (,ktmer City, State Zip: Sx( 4 jL Aar)-)1 Contractor Information Name LU15 CM 6(2y kl a, h Street: ` 1SSO J`t41te5 Dvjt ji-15 City, State Zip: 00a(\. p , f L 3a$1 g Name: Street: City, St, Zip: Bonding Company: Address: Phone: q6-1- R3 )_;)o b Fax: State License No.: ryc cao Architect/Engineer Information Phone: Fax: E- mail: Mortgage Lender: Address: WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet standards of all laws regulating construction in this jurisdiction. I understand that a separate permit must be secured for electrical work, plumbing, signs, wells, pools, furnaces, boilers, heaters, tanks, and air conditioners, etc. FBC 1053 Shall be inscribed with the date of application and the code in effect as of that date: 5th Edition (2014) Florida Building Code Revised: June 30, 2015 Permit Application NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. Acceptance of permit is verification that I will notify the owner of the property of the requirements of Florida Lien Law, FS 713. The City of Sanford requires payment ofa plan review fee at the time of permit submittal. A copy of the executed contract is required in order to calculate a plan review charge and will be considered the estimated construction value of the job at the time of submittal. The actual construction value will be figured based on the current ICC Valuation Table in effect at the time the permit is issued, in accordance with local ordinance. Should calculated charges figured off the executed contract exceed the actual construction value, credit will be applied to your permit fees when the permit is issued. OWNER'S AFFIDAVIT: I certify that all of the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. Si er A e Date 0 4 Print Owner/Agent's Nam ,/ ap Notary Public State of Florida Daniel Alexander Stanford MyCommission GG 043343 orq Expires 10/31/2020 Owner/Agent is Personally Known to Me or Produced ID Type of ID Z3 NljefS Jtcfise 9 W) 01 Signature of Contractor/Agent Date Print Contractor/Agent's Name yam Notary Public State of Florida Daniel Alexander Stanford 1. My Commission GG 043343aaExpires10/31/2020 Contractor/Agentis Personally Known to Me or Produced ID 7V Type of ID Z` : 1185 (t & Ire BELOW IS FOR OFFICE USE ONLY Permits Required: Building Electrical Mechanical Plumbing Gas[] Roof Construction Type: Occupancy Use: Total Sq Ft of Bldg: Min. Occupancy Load: Flood Zone: of Stories: New Construction: Electric - # of Amps Plumbing - # of Fixtures Fire Sprinkler Permit: Yes No # of Heads APPROVALS: ZONING: UTILITIES: ENGINEERING: COMMENTS: FIRE: Fire Alarm Permit: Yes No WASTE WATER: BUILDING: -.; r to • 1 —7 Revised: June 30, 2015 Permit Application THIS INSTRUMENT PR PARED BY: Name: Address: ( t h NOTICE OF COMMENCEMENT State of Florida County of Seminole 6RAN T I'ViL.l;)'' . ' E-111 HOL.E (.- LDIT'r' CLERK OF iIR.CU11 COURT 1, COMPTROLLER 9 , P t CLERIC'S T 2i!17097940 ail i " 1. 9,2: 1`1:1 R.E_ l'lr.:r i 1.4 i' i.il,lHi RECORDI-1) RY Jiacl:ertr0 Permit Number: Parcel ID Number: .3q` iq _ 30- 5N '-two --040 The undersigned hereby gives notice that improvement will be made to certain real property, and in accordance with Chapter 713, Florida Statutes, the following information is provided in this Notice of Commencement. GENERAL DESCRIPTION OF IMPROVEMENT: OWNER INFORMATION: Address: M1 'I hi Atytx)r V L Fee Simple Title Holder (if other than owner) rnuToerTnc. Persons within the State of Florida Designated by Owner upon whom notice or other documents may be served as provided by Section 713.13(1)(b), Florida Statutes. Name: In addition to himself, Owner Designates To receive a copy of the LienoPs Notice as Provided in Section 713.13(1)(b), Florida Statutes. Expiration Date of Notice of Commencement (The expiration date Is 1 year from date of recording unless a different date is specified) WARNING TO OWNER: ANY PAYMENTS MADE BY THE OWNER AFTER THE EXPIRATION OF THE NOTICE OF COMMENCEMENT ARE CONSIDERED IMPROPER PAYMENTS UNDER CHAPTER 713, PART 1, SECTION 713.13, FLORIDA STATUTES, AND CAN RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF COMMENCEMENT. Under penalties of perjury, I to the best of mviknowledcth Statute 713.13(1)(g): "The owner must State of f—\— that I have read the stated in it are true Owner's Printed Name notice of commencement and no one else may bepermitted tosign in his or her stead." County of e- The foregoing Instrument was acknowledged before me this 1 day of —Se2 ' VIA t) cr 20 1-7 by G +\ v \ ` . l Who is personally known to me Name of person making statem,4fit OR who has produced identification type of identification produced: :\J1, (_ t CY? 1 SC-- S`lr wI%, Notary Public State of Florida Daniel Alexander Stanford My Commission GG 043343 Notar/Signature OF Expires 10131/2020 IL V REQUIRED INSPECTION SEQUENCE H P# 11- 741 &, Address: BUILDING (PERMIT Minn Max., Inspection Description Footer / Setback Stemwall Foundation / Form Board Survey Slab / Mono Slab Prepour Lintel / Tie Beam / Fill / Down Cell Sheathing — Walls Sheathing — Roof Roof Dry In Frame Insulation Rough In Firewall Screw Pattern Drywall / Sheetrock Lath inspection Final Solar Final Firewall Final Roof Final Stucco / Siding Insulation Final Final Utility Building Final Door Final Window Final Screen Room Final Pool Screen Enclosure Final Single Family Residence Final Building (Other) Min I Max Electric Underground Footer / Slab Steel Bond Electric Rough T.U.G. Pre -Power Final I-nfi I I Electric Final iCt%JC.-F4Q'.27 M, ' 51 1 j Y:Y/[A`lt'. S Minn Max Inspection Descri 4ionn Plumbing Underground Plumbing Sewer Plumbing Tub Set Plumbing Final i I' I III I .I I III I;, I Io111 Description 1 MechanicalRoughMechanical Final t• tlf r l`1 u.._W' 1 u.•. t: rw t, r.4t ]: a':.r4. V,' 'h'`\5::,•'y>..I .'_r n i. 13Zf f`Y r?'.,•!lRyi£i r.:F. A.rY:;i!in'",i=.y t1 ,':J• Ki!v' c.a..Y'i:.c`a;G7!![...7:aJ1cr_,.;.1 5.5.-..' :'. J 3._.rr. Y,a.o.•.:,.!.ti._c s' I III III ; I IoIII Description Gas Underground rem REVISED: June 2014 September 14, 2017 BUILDING DIVISION Subject: John Whaley Roof Mounted Solar Array 109 Yorktown PI, Sanford Roof Mounted Solar Array Structural Certification The solar array to be mounted on the above referenced location has been evaluated and found to be in compliance with the 2014 Florida Building Code 5th Edition and 2014 Florida Building Code Residential 5th Edition. The same wind load can be expected for the solar array as with the original roof structure as the pitch of the array is the same as the original roof pitch. It is my professional opinion and experience that the attachments provide a significant factor of safety to overcome uplift from wind at 149 mph 3 sec gust and exposure C and shear from wind and array weight. The verification of the structural integrity of the roof structure is the responsibility of the contractor. If you have any questions, please don't hesitate to call me at 407-930-2030. Sincerely, w S G. •BA?RET'' CEN3F• O No 82006 STATE OF mac' F 0R1DP.•': V/ m ea—h.— wiroeyammay. u4w s+iaaa..awo.m. PM1petl mWn d NY roamem ae M conWereC slpnM tlrovquwn moat e. verlfeC on an/ Luis Barreto, PE a LG Life's Good proclLrr , vo^ 12 .2. yeas yea LG Mono.X` Plus LG Mono X11 Plus is LG Electronics' high-qua':ity afo-aoveoz=cnccr C/ monocrystatline module. The quality is the result of our V Ejlf I6A V 1 C strong commitment to developing a module to improve E `__ __ _us H iiiii benefits for customers Features of LG Mono Xm Plus include Intertek v rasc.s a ss xcin; durability, convenient installation, and aesthetic exterior. Enhanced Performance Warranty LG Mono X' Plus provides the enhanced performance warranty, The initial degradation has been Improved from 3% to -2%, and the annual degradation has also changed from -0.71% yr to-0.6%!yc Improved Product Warranty Ip In addition to the enhanced performance warranty, LG has extended the product warranty of LG Mono X" Plus for additional 2 years with its newly reinforced Fame design. Outstanding Durability With newly reinforced frame design, LG Mono X0 Plus can endure the static snow load up to 6000 Pa, and the static wind load up to 5400 Pa. About LG Electronics Reduced LID (LILY Technology) LG Mono V Plus has improved the initial degradation by applying LG's new LiLY(LID-improvement for Lifetime Yield) Technology, which controls formation of Boron - Oxygen pair, the key factor of LID. Al Aesthetic Roof LG Mono XO Plus may increase the house value with its shiny black Frames. Also, it looks similar to all -black module from a long distance. Light and Convenient LG Mono X", Plus is carefully designed to benefit Installers by allowing quick installation with a weight of just 17kg and better grips LG [lectru rs is a global plat. vlho has beer, commuted toe:;pandlnq ts:apaatp based on sn ar energy business as its f ,t ire grw th engme '•.'4'e embarked nn a sotar energy source research program in 1985, supported by LG Group's rich experience n semr-conductor, BCD, chemistry and materels mdust:,r f!e a ,e,,fn1 r released first M.—X " se, e,s tc the mart.et in 20 i 0, which were -ported to 32 coun:nes ;n the fulling c yct , Uiereufler In 201 3, NeON- (prey U-1y, kiWW11 as Nloi.0 X` NeON) e". 201 S NaON2 o Ui CLLLC' teef luyy more 'hdei sulai Au=ad', 1114.hp m d i_G is the 1—del of 11n.-b—:n rho mdustry LMonox Plus Mechanical Properties Cells 6 x 10 Cell Vendor LG LG285S7Cr'G4 `LG28051C;G4„ iryLG275S1G G4 Cell Type - - - -__ Monocrystalline / P-type Cell Dimensions 156.75 x 156.75 mm, 6 inches u of Busbar 3 _ Dimensions (L x Wx H) 1640 x 1000 x 40 mm 64.57 x 39.37 x 1.57 inch Front Load 6000 Pa / 125 psf ' Rear Load 5400 Pa / 1 13 psf any! Weight 17.0 ± 0.5 kg / 37,48 ± 1.1 lbs Connector Type MC4, MC4 Compatible, IP67 Junction Box IP67 with 3 Bypass Diodes Length of Cables 2 x 1000 mm / 2 x 39.37 inch Glass Hiqh Transmission Tempered Glass Frame Anodized Aluminum Certifications and Warranty Certifications IEC 61215, IEC 61730-1/-2 IEC 62716 (Ammonia Test) IEC 61701 (Salt Mist CorrosionTest) Electrical Properties (STC *) Module Type 285 W 280 W 275 W MPP Voltage (Vmpp) 32.3 319 31.7 MPP Current (Impp) 8.89 878 8.68 Open Circuit Voltage (Voc) 39 0 38.8 38.7 Short Circuit Current (Isc) 9.43 9,33 9.26 Module Efficiency (V.) 17.4 17,1 16.9 Operating Temperature (*C) 40 - +90 Maximum System Voltage (V) 1000 (1EC, UL) Maximum Series Fuse Rating (A) 15 Power Tolerance (%) 0 - +3 ade -c.. dition) AN11.5 prate parer 0utp.t .near., -ad and determ ned uy LG E e tt,- c at :s sole and absolutn a xreroni 5typ c.I change in module effigync eyat 200 w/m' in relation to 1000 MW is -4.5%. Electrical Properties (NOCT*) Module Type 285 W 280 W 275 W Maximum Power (Pmax) 209 205 202 MPP Voltage (Vmpp) 29.5 29.3 29.1 MPP Current (Impp) 7,08 7,00 6.92 Open Circuit Voltage (Voc) 361. 36.0 35.9 ISO 9001 Short Circuit Current (Isc) 7.56 7,52 7.46 UL1703 N'Qc`(Naminaloperat,n,;ceiTer,,eratara)Irnoances00w"m=,annL-nttempr.,at-20 ,kind:peed1'/5 Module Fire Performance (USA) Type 2 (UL 1703) Fire Rating (for CANADA) Class C (ULC/ORD C1703) _ Dimensions (mm/in) Product Warranty 12 years0 Output Warranty of Pri Linear warranty* : + 1)" t yea:. 98%,-)After 2nd Yeas 06%P annual degradanon, 3)a36%F0r 25yrars Temperature Characteristics a ' e NOC7 46 ± 3 °C - Pmpp - 0.42 %/°C Voc - 0.30 %/°C Isc 0.03 %/oC ----- Characteristic Curves 100o W 99 wow 7 5 . 0w 4 400W 200 W y 0 u„i,aly(V) 5iris2025bo9540ao I 40 0 00 I rPmreraz.,r. C'c725 0 .5 50 75 90 Tire diaance between ti,e center cr the mcuenny/grounding !:ales. North Arne ca S is 6 me ..- ear; Product specifications are subject to change without notice. LC e o^ cs P c DS N2 60 C.-Ca i' EN 30- Lifes Good 10. p Sylvan Ave cng ew rod Chffs, N1 07632 Copyight ( D 201 5 LG Dectronics, All r1h_5 reserved. Innovation for a Better Life 3 Contact Ig.selartv7u lge.con, 01 /02)201 S r www. lgsoiaruia.corn j:s Enphase Microinverters The versatile Enphase M250 Microinverter'" performs in both residential and commercial solar PV installations and is compatible with both 60-cell and 72-cell modules. With its all -AC approach and integrated grounding, the M250 delivers increased energy harvest and reduces design and installation complexity. The Enphase M250 Microinverter integrates seamlessly with the Enphase Engage"' Cable, the Enphase Envoy''" communications gateway, and Enphase Enlighten"" monitoring and analysis software. Productive Designed for a wide range of modules Maximizes energy production Minimizes impact of shading, dust, and debris Simple No DC design or string calculation required No GEC needed for microinverter Easy installation with Engage cable Reliable 4th-generation product More than 1 million hours of testing and millions of units shipped Industry -leading warranty, up to 25 years U` 111111111111811211111 To learn more about Enphase offerings, visit enphase.com Enphase M250 Microinverter INPUT DATA (DC) MODELS: MODELS: M250-60-2LL-S22, M250-72-2LL-S22, M250-60-2LL-S25 M250-72-2LL-S25 w__,. _M-._ . sl-._.._„- __—,-___ Commonly used module pairings' 210 350+ W 210 350+ W35 Compatibility 60-cell PV modules 60-cell and 72-cell PV modules Maximum input DC voltage 48 V 62 V Peak power tracking voltage 27 V - 39 V 27 V - 48 V Operating range 16 V - 48 V 16 V - 60V Min/Max startvoltage 22 V / 48 V 22 V / 48 V Max DC short circuit current 15 A 15 A OUTPUT DATA (AC) Peak output power 250 W—___._.._._..._.,. m_____..d,.,._.._.E Maximum continuous output power 240 W Nominal output current 1.15 A @ 208 VAC 1.0A@240VAC Nominal voltage/range 208 V / 183-229 V @ 208 VAC 240 V / 211-264 V @ 240 VAC Nominal frequency/range 60.0 / 57-61 Hz Extended frequency range 57-62.5 Hz Power factor 0.95 Maximum units per 20 A branch circuit 24 (three-phase 208 VAC) 16 (single phase 240 VAC) Maximum output fault current 850 mA rms for 6 cycles EFFICIENCY CEC weighted efficiency 96.5% Peak inverter efficiency 96.5% Static MPPT efficiency (weighted, reference EN50530) 99.4% Night time power consumption 65 mW max MECHANICAL DATA Ambient temperature range_40°C to +650C_.._..._......_.__._ K.__a,.......... _._,.._,..___....,w__w-,.... Dimensions (WxHxD) 171 mm x 173 mm x 30 mm (without mounting bracket) Weight 1.6 kg (3.4 Ibs) Cooling Natural convection - No fans Enclosure environmental rating Outdoor - NEMA 6 Connector type MC4: M250-60-2LL-S22 and M250-72-2LL-S22 Amphenol H4: M250-60-2LL-S25 and M250-72-2LL-S25 FEATURES Communication Power line Integrated ground The DC circuit meets the requirements for ungrounded PV arrays in NEC 690.35. Equipment ground is provided in the Engage Cable. No additional GEC or ground is required. Ground fault protection (GFP) is integrated into the microinverter. Monitoring Enlighten Manager and MyEnlighten monitoring options Transformer design High frequency transformers, galvanically isolated Compliance UL 2703 recognized, UL1741/IEEE1547, FCC Part 15 Class B, CAN/CSA-C22.2 NO. 0-M91, 0.4-04, and 107.1-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC-2014 and NEC-2017 section 690.12 and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems, for AC and DC conductors, when installed according manufacturer's instructions. 1. No enforced DC/AC ratio. Seethe compatibility calculator at enphase.com/en-us/support/module-compatibility. 2. Frequency ranges can be extended beyond nominal if required by the utility. To learn more about Enphase offerings, visit enphase.com lc 2017 Enphase. Energy. All rights reserved All trademarks or brands used are the property of Enphase Energy, Inc 2017-01-19 n ENPHASE. Photovoltaic system certification The Chapter 377, Title XXVIII of the 2017 Florida Statutes indicates: d) All solar energy systems manufactured or sold in the state must meet the standards established by the center and shall display accepted results of approved performance tests in a manner prescribed by the center, unless otherwise certified by an engineer licensed pursuant to chapter 471 using the standards contained in the most recent version of the Florida Building Code." I, Luis Barreto with Professional Engineer Lic 82006 certified that the photovoltaic system to be installed on the proposed project, meet the standards established by the Florida Solar Energy Center of the Board of Governors and will be installed as the submitted plans. If any more information is needed you can call at 407-930-2030 or send an email to Ibarreto@maximosolar.com Sincerely, BAI;'`• R r No 82006 _ STATE OF 24 n.ri wawa . eoa..anma«wm.a.q.wLuisBarreto, PE°°- POWERWALL 2 DC L Fi The Tesla Powerwall is a DC battery system for residential or light commercial Use. Its rechargeable lithium -ion battery pack provides energy storage for solar self - consumption, load shifting and backup power, Powerwall's electrical interface is provided by an internal isolated bi-directional DC/ DC converter that controls the charge and discharge of the battery for integration with grid -tied solar inverters. Its revolutionary compact design achieves market - leading energy density and is easy to install, enabling owners to quickly realize the benefits of reliable, clean power, PERFORMANCE SPECIFICATIONS DC Energy' 115 kWh Power, continuous 5 k1v1J (Charge and discharge) Power, peak (10 s) 7 kW (discharge only) DC Voltage Range 350-550 V DC Current, continuous 14.3 A DC Current, peak (10 s) 20A Depth of Discharge 100% Internal Battery DC Voltage 50 V Round Trip Efficiency'' 91.8% Warranty 10 years F :7r F :7 INTERFACE SPECIFICATIONS Communication Protocols Modbus (RS485), CAN Modularity Multi-Powerwall capability with compatible inverters User Interface Tesla App ENVIRONMENTAL SPECIFICATIONS Operating Temperature 20'C to 50'C (-4'F to 122'F) Storage Temperature 30'C to 60'C (-22°F to 140'F) Operating Humidity (RH) Up to 1 00%_ condensing Maximum Altitude 3000 rn (9843 ft) Environment Indoor and outdoor rated Enclosure Type NFMA3R Ingress Rating IP67 (Battery & Power Electronics) IP56 (Wiring) Noise Level @ 1 in 40 dBAat 30'C (86-F) MECHANICAL SPECIFICATIONS Dimensions 1150 rrim x 755 rnm x 155 mm 45.3 in x 29,7 in x 6.1 in) Weight 120 kg (264.5 lbs) Mounting options Floor or wall Mount COMPLIANCE INFORMATION Safety UL 1642, UL 1741, ILL 1973, UL 9540, UN 38.3, IEC 62109- 1. IEC 62619, CSA C22.2.107.1 Emissions FCC Part 15 Class B. ICES 003. EN 61000 Class B Environmental RoHS Directive 2011/65/EU, WEEE Directive 2012/19iEU, 2006/66/EC Seismic AC 156. IEEE 693-2005 (high) DC; P0 'vV E --,'\AIA L L TYPICAL SYSTEM LAYOUTS DC -COUPLED PO` FRVVALL SYSTEM WITH SOLAR IDLAR AC -COUPLED POWERWALL SYSTEM WITH SOLAR SMAR PAP T I S L F, MAR PAERTC-',-,,' D,iV FLR', MAN PWQL DC PMVEPWALL Fr f RID A I UME POWER. RECORD COPY 1 THE FOLLOWING DOCUMENTS DO NOT PERMIT CONTRACTOR TO INSTALL THIS SYSTEM AGAINST ANY LOCAL, MUNICIPAL, OR INTERNATIONALLY RECOGNIZED BUILDING / ELECTRICAL CODE. THE PURPOSE OF THESE DOCUMENTS IS TO PROVIDE AUTHORITIES HAVING JURISDICTION AND UTILITIES A METHOD FOR INSPECTION. 2. THE FOLLOWING DOCUMENTS ARE PROPERTY OF MAXIMO SOLAR INDUSTRIES. ALL DESIGNS AND INFORMATION CONTAINED WITHING THE DRAWINGS ARE ONLY FOR THE SPECIFIED PROJECT AND SHALL NOT BE USED FOR ANY OTHER MEANS. USE OF THE DRAWINGS FOR ANY OTHER PURPOSE IS PROHIBITED WITHOUT EXPRESSED WRITTEN CONSENT OF MAXIMO SOLAR INDUSTRIES. 3. IN THE EVENT OF A DISCREPANCY IN QUANTITY OR SIZE OF CONDUIT, WIRE, EQUIPMENT, CIRCUIT BREAKERS, GROUND FAULT PROTECTION SYSTEM, ETC. (ALL MATERIAL), DEPICTED ON THE DOCUMENTS OR SPECIFICATIONS, THE INSTALATION CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING ALL MATERIAL AND SERVICE EQUIPMENT IN COMPLIANCE WITH ALL REGULATIONS, LAWS, ORDINANCES, OR AHJ. 4. IN THE EVENT OF CONFLICTING REGULATIONS, LAWS OR ORDINANCES, THE MOST RESTRICTIVE SHALL PREVAIL. 5. ALL ELECTRICAL MATERIALS AND EQUIPMENT SHALL BE NEW AND LISTED BY A RECOGNIZED ELECTRICAL TESTING LABORATORY. 6. AN INVERTER OR AC MODULE IN AN INTERACTIVE SOLAR PV SYSTEM SHALL AUTOMATICALLY BE -ENERGIZE IT'S OUTPUT TO THE CONNECTED ELECTRICAL PRODUCTION AND DISTRIBUTION NETWORK UPON LOSS OF VOLTAGE IN THAT SYSTEM AND SHALL REMAIN IN THAT STATE UNTIL THE ELECTRICAL PRODUCTION AND DISTRIBUTION NETWORK VOLTAGE HAS BEEN RESTORED PER NEC 690.61 7. ALL SPECIFIED WIRING IS BASED ON COPPER SPECIFICATIONS. 8. THE CONTRACTOR SHALL VERIFY ALL CONTROLLING FILED DIMENSIONS BEFORE ORDERING OR FABRICANTING ANY MATERIAL. 9. SEE PROVIDED SPEC -SHEETS FOR ADDITIONAL EQUIPMENT SPECIFICATIONS. ABBREVIATIONS A: AMPERES AC: ALTERNATING CURRENT AHJ: AUTHORITY HAVING JURISDICTION AWG: AMERICAN WIRE GAUGE CEC: CALIFORNIA ELECTRIC CODE CU: COPPERDC:DIRECTCURRENT DIA: DIAMETER GEC: GROUNDING ELECTRODECONDUCTOR IMP: MAXIMUM POWER CURRENT ISC: SHORT CIRCUIT CURRENT KW: KILO -WATTS MIN: MINIMUM NEC: NATIONAL ELECTRIC CODE NTS. NOT TO SCALE OC: OFF CENTER P: POLE PTC: PV USA TESTING CONDITIONS PV: PHOTOVOLTAIC RR: ROOF RAFTERS TC: STANDARD TESTING CONDITIONS UL: UNDERWRITER'S LABORATORY V: VOLTS VMP: MAXIMUM POWER VOLTAGE VOC: OPEN CIRCUIT VOLTAGE W: WATTS INDEX: OP-1 COVER PAGE WITH PROJECT LOCATION SP-1 SITE PLAN SD-1 STRUCTURAL DETAIL E-1 PHOTOVOLTAIC SYSTEM STRING DIAGRAM WITH ELECTRICAL SPECS, E-2 ONE -LINE ELECTRICAL DIAGRAM E-3 THREE -LINE ELECTRICAL DIAGRAM E4 PHOTOVOLTAIC SYSTEM SAFETY LABELING LOCATION DIAGRAM PLOT PLAN OF ROOF SCALE: 9/128" = V-0" i 3 104L, dM!'YeJ Zak PROJFCT LOCATION MAP SCALE NTS. REVIEWED POR CODE COMPLIANCE PLANS EXAMINER DATE SANFORD BUILDING DIVISION A PERMIT ISSUED SHALL BE CONSTRUED TO BE ALICENSETOPROCEEDWITHTHEWORKANDNOTASAUTHORITYTOVIOLATE, CANCEL, ALTER OR SETASIDEANYOFTHEPROVISIONSOFTHETECHNICALCODES, NOR SHALL ISSUANCE OF A PERMIT PREVENTTHEBUILDINGOFFICIALFROMTHEREAFTERREQUIRINGACORRECTIONOFERRORSINPLANS, CONSTRUCTION OR VIOLATIONS OF THIS CODE iI - Z916 7' J\ING S P F OVID OEPAR, CHECKED BY: REVISED DATE: REVISED: 1- N/A 2. N/A 3. N/A 4. N/A 5. N/A MAXI MO SOLAR INCIUFSTR1E=S MAXIMO SOLAR INDUSTRIES PHONE: 407-930-2030 EMAIL: FLORIDA@MAXIMOSOLAR.COM WEB: WWW.MAXIMOSOLAR.COM ENGINEER: ENG. LUIS BARRETO 7350 FUTURES DR, #15 ORLANDO, FL PHONE:407-446-5256 EMAIL: LBARRETO@MAXIMOSOLAR.COM G.,BARR ",, ' CENSF No 82006 STATE OF L SS1., /ONAL E ... 3.92 KW (DC) - 3.50 KW (AC) PV UTILITY INTERACTIVESYSTEM JOHN WHALEY 109YORKTOWN PL, SANFORD, FL 32771 AHJ: DUKE ENERDY FLORIDA PROJECT NUMBER: F241 SHEET TITLE: COVER PAGE WITH PROJECT LOCATION PROJECT SHEET: CP-1 NOTES: 1. PV EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH NEC 690 AND POSTED WITH APPLICABLE WARNINGS, SIGNAGE & PLAQUES PER NEC 705-10, 690-17, & 705.10 2. UTILITY HAS 24-HR UNRESTRICTED ACCESS TO ALL PHOTOVOLTAIC SYSTEM COMPONENTS LOCATED AT THE SERVICE ENTRANCE. 3. CIRCUITS SHALL BE IDENTIFIED AT POINTS OF TERMINATION, CONNECTION, AND SPLICE POINTS PER NEC 690.4(B)(2) 4. CONDUCTORS EXPOSED TO SUNLIGHTSHALL BE LISTEDAS SUNLIGHT RESISTANT PER NEC 300.6(C)(1), 310.8(D) 5. CONDUCTORS EXPOSED TOWET LOCATIONS SHALL BE SUITABLE FOR USE INWET LOCATIONS PER NEC 310.8(C) 6. WORKING CLEARANCES AROUND THE EXISTING AND NEW ELECTRICAL EQUIPMENT WILL BE MAINTAINED IN ACCORDANCE WITH NEC 110.26 T INSTALLATION SHALL BE IN ACCORDANCE WITH 2006 INTERNATIONAL BUILDING CODE 106.1.1. ARRAY: MODULES: (14) LG MONO X PLUS, 280WATTS MODULE INVERTER: (14) ENPHASE M250-60-2LL-SX-US, (240V), AC MICRO -INVERTERS ROOF: COMPOSITE SHINGLES, 4.4/12 PfTCH MOUNTING METHOD: FLUSH MOUNTEDAT 20° DEG RACKING: IRONRIDGE RX 100 RAIL SYSTEM ARRAY AZIMUTH: ARRAY #1: (14) MODULES AT 147° ARRAY #2: (---) MODULES AT --' ARRAY #3: (---) MODULESAT --' ARRAY #4:1—) MODULES AT —° PV SYSTEM EQUIPMENT WALL (PLAN VIEW) EQUIPMENT WALL ARRAY (ON ROOF) ADJACENT TO UTILITY METER) M r-_77T ------------ Fr --- ------ T A B D E F G H A EXISTING) ALL -IN -ONE UTILITY METER AND 125A MAIN SERVICE PANEL WITH A 125 MAIN CIRCUIT BREAKER. INTER -CONNECTION POINT VIA A SUPPLY SIDE LINE TAP CONNECTION) B NEW) UTILITY AC DISCONNECT SWITCH 2-POLE, PV SYSTEM DEDICATED, 60A, 240V, 1 m WITH TWO FUSES. VISIBLE, LOKABLE, LABELED) (ADJACENT TO MAIN SERVICE) C NEW)BACKUP GATEWAY - AUTOMATIC DISCONNECT FOR SEAMLESS BACKUP TRANSITION 200 AMPS, NEMA 3R E NEW) TESTA BATTERY PACK LITHIUM - ION,13.5 KWH F NEW) GENERATION PANEL & ESSENTIALICRI11CAL LOADS, AC PANELBOARD,120/240 VAC, 125 AMP, NEMA 3R. PROVIDE (2) 2P-20ACIRCUIT BREAKERS FOR PV SYSTEM STRINGS AND (1) 2P-30 CB FOR TESLA BATTERY BACKUP G NEW) CODE APPROVED CONDUIT RUN (RUN THROUGH ATTIC,10" BELOW SHEATHING) H NEW) PV SYSTEM SOLAR DECK Photovoltaic Combiner/Enclosure NEMA 3R, UL 1741) (AT ARRAY - UNDER MODULE) CHECKED BY: REVISED DATE: 1. WA 2. WA 3. WA 4. WA 5. WA r INSTALLATION CONTRACTOR: no80LAR F%11I71I.JST1Mr=9 MAXIMO SOLAR INDUSTRIES PHONE: 407-930-2030 EMAIL: FLORIDA@MAXIMOSOLAR.COM WEB: WWW.MAXIMOSOLAR.COM ENGINEER: ENG. LUIS BARRETO 7350 FUTURES DR, #15 ORLANDO, FL PHONE: 407446-5256 EMAIL: LBARRETO@MAXIMOSOLAR.COM JVSG. BARqCEAIgF• O No 82006 STATE OF i" BONAV,,. PV PROJECTINFORMATION: PV UTILITY INTERACTIVE SYSTEM JOHN WHALEY 109 YORKTOWN PL, SANFORD, FL32771 AHJ: DUKE ENERDY FLORIDA F241 SHEET TITLE: SITE PLAN SITE MAP WITH SETBACKS PROJECT SHEET: SCALE: Custom SP-1 HARDWARE DETAIL SCALE NTS IRONRIDGE FLASHF00T2 (FRONT VIEW) IRONRIDGE FLASHFOOT2 (3D VIEW) 01 HARDWARE DETAIL CLAMPS SCALE NTS DETAIL, END CLAMP FRONT DETAIL, MID CLAMP FRONT lwwma 1116VERSRL RMRMGE STOPPER REWEFASTUMIS CO3WT IRONRIDGE XR 100 RAIL IRONRIDGE XR 100 RAIL SOLAR MODULE: MECHANICAL DATA: LG MONO X PLUS, 280 WATTS MODULE PV MMLE FRAME MODULE SPECIFICATIONS: 6457" x39.37" x 1.57", 37.48 LBS MODULE SQUARE FOOTAGE: 17SS SOFT MODULE WEIGHT PER SQUARE FOOT: 2.12 LEIS SOLAR ARRAY: MECHANICAL DATA MODULES ( 14)MODULES MODULE DETAIL MODULE DEAD LOAD: 555.80 LBS SCALE NTS ARRAY SO. FT: 252.70 SO FT D) 1 57" ARRAY DEAD LOAD (RACKING INCLUDED), 651.28 LBS DEAD LOAD PER ATTACHMENT POINT: 26.0 LBS ARRAY DEAD LOAD WILL NOT EXCEED 4.0 LBISQ.FT ARRAY DEAD LOAD: 2.52 LBSQ.FT lc CONNECTOR TYPE. 5116' X 3.5' S.S. LAG SCREW 25- MIN. EMBEDMENT) I f I I I ATTACHMENT POINTS: (28) TOTAL-— f fr1(`_I_l_I_-' NOTES 1. VERIFY ALL MEASUREMENTS AND CHALK INSTALLATION AREA PRIOR TO DRILLING I I l PLOTHOLES. 2. DRILL 3116" PILOT HOLE PRIOR TO SECURING LAG BOLT 3. LAG BOLT SHALL BE LOCATED IN THE MIDDLE THIRD OF THE STRUCTURAL MEMBER 4. SECURE LAG BOLTS FLUSH TO STRUCTURA. MEMBERS FOIL OWINGMANUFACTURE' S SPECIFIEDIORGUESTRENGTHS. 5. SEAL CONNECTION POINTS WITH ROOF GRADE GEOCEL SEALANT 6. FOLLOW MANUFACTURE'S RECOMMENDATIONSREGARDING RAL SPLICE POINTS FOR THERMAL EXPANSION CONSIDERATION I f f LI- II_-l f- Q ELEVATION DETAIL SCALP NTS. N c' ZSbMOO`101Dt1{ 51" MO wT1sx us,yi P G 0000 STRUCTURAL RACKING MOUNT SCALE: Custom i IRON RIDGE ALUMINUM FLASHING XR 100 RAIL CHECKED BY: REVISED DATE REVISED: 1 WA 2. N/A 3, N/A 4. N/A 5. WA INSTALLATION CONTRACTOR. 114MAXIMO SOLAR IN04JEITIFRIESMAMMOSOLAR INDUSTRIES PHONE.407- 930-2030 EMAIL: FLORIDA( a)MAKIMOSOLAR.COM WEB: WWW. MA)OMOSOLAR.COMENGNEER: ENG. LUIS BARRETO 7350 FUTURES DR, #15 0RIANDO. FL PHONE 407A46- 5256 EMAIL: LBARRETOpMAXIMOSOLAR COM J• C E AISF r0 No 82006 STATE OF .:' Q7: 0c c NALw G. BummgeK Oqm r5, m,n ve Eea PVPROJECT INFORMATION: PVUTILITY INTERACTIVE SYSTEM JOHN WHALEY 109 YORKTOWN PL, SANFORD, FL 32771 AHJ: DUKE ENERGY FLORIDA ROOF SHEATHING I SINGLE LAYER) Ill J 2 X4" WOOD TRUSS QUICKMOUNT PV E-MOUNT 24" O.C.) 4.4112) PITCH PROJECT NUMBER: 5115" X3.5' S.S. LAG SCREW 2.5" MIN. EMBEDMENT -SEAL PENETRATION WITH F241 GEOCEL BASED ROOF SEALANT IRONRIDGE END I MID -CLAMP SHEET TITLE. STRUCTURAL DETAILS COMPOSITE SHINGLESROOFPROJECTSHEET S-1 SOLAR MODULE: ELECTRICAL DATA LG MONO X PLUS, 280 WATTS MODULE SPECIFICATIONS AT STC MAXIMUM POWER VOLTAGE (Vmp): 3190V MAXIMUM POWER CURRENT (Imp): 8.78A OPEN CIRCUIT VOLTAGE (Voc): 38.80V SHORT CIRCUITCURRENT (Isc): 9.33A SERIES FUSE RATING: 15A Voc TEMPERATURE COEFFICIENT: 0.30%/C° WEIGHT: 3748 LBS DIMENSION: 39.37" x 64.57" x 1.571, STC = 25°C,1000W/M2, 1.5 AIR MASS SOLAR INVERTER: ELECTRICAL DATA SIZE: 250 WATTS (AC) MFR: ENPHASE ENERGY MODEL: M250 CERTIFICATION: UL 1741, IEEE 1547 MAX INPUT VOLTAGE: 48VDC INPUT VOLTAGE RANGE: 1648 VAC MAX INPUT CURRENT (Imp): 15 ADC MAX INPUT CURRENT (Isc): 15.0 ADC MAX OUTPUT CURRENT (Imax): 1.OA AC @ 240V PV SYSTEM: SIZEAND EQUIPMENTS 3.92 KW (DC) - 3.50 KW (AC) 14) LG MONO X PLUS, 280 WATTS MODULE 14)ENPHASE M250-60-2LL-SX-US, (240V). AC MICRO -INVERTERS PV SYSTEM: STRINGS CIRCUITS DISTRIBUTION: STRING #1 7 LG MONO X PLUS, 280 WATTS MODULE STRING #2 7 LG MONO X PLUS, 280 WATTS MODULE PV SYSTEM: BRANCH CIRCUITS DEMONSTRATION GROUNDING MID -CLAMP MAX CONTINUOUS POWER: 240 W v CEC WEIGHTED EFFICIENCY: 96.5% WEIGHT: 3.4 LBS DIMENSION: 171mm x 173mm x 30mm I MAX RECOMMENDED INPUT: 210 - 310 W MODULE i Voc MAXIMUM CALCULATION: 40.1 (1 + (1 °C - 25°C)(-.30%/C°) = Voc MAX 40.1 (1.07) = 42.91 AT 1°C (ASHRAE) TEMPERATURE MINIMUM: -40 °C TEMPERATURE MAXIMUM: 65'C ASHRAE NOTES 1. ALL EQUIPMENT SHALL BE INSTALLED AND LABELED IN ACCORDANCE WITH THE NEC AND ALL APPLICABLE REQUIREMENTS OF THE SERVING ELECTRIC UTILITY COMPANY AND OF THE LOCAL AUTHORITY HAVING JURISDICTION. 2. BI-DIRECTIONAL UTILITY METER INSTALLED BY UTILITY COMPANY (AS REQUIRED). 3. LABEL BREAKER "PHOTOVOLTAIC ELECTRIC POWER SOURCE PERNEC 70510, AND "BREAKERS ARE SUITABLE FOR BACKFEED" PER NEC 705.12 (D)(5). LABEL WITH THE MAXIMUM AC OUTPUT OPERATING CURRENTANDTHE OPERATING VOLTAGE. 4. LABEL "PHOTOVOLTAIC SYSTEM UTILITY DISCONNECT SWITCH". SWITCH COVER TO BE LOCKED AT ALLTIMES. SWITCH TO BE VISUAL OPEN AND ACCESSIBLE PER UTILRY REQUIREMENTS AND CONFORM TO NEC 705.22. 5 LABEL "PHOTOVOLTAIC ARRAY DC DISCONNECT DEVICE #16" PER NEC 690.14 (13)(2). LABEL WITH OPERATING CURRENT, OPERATING VOLTAGE, MAXIMUM SYSTEMVOLTAGE, AND SHORT CIRCUIT CURRENT PER NEC 690.53. SWITCH TO BE LOCKED PER NEC 690.7 (D). 6. LABEL "PHOTOVOLTAIC SYSTEM METER'. METER ENCLOSURE AND SOCKET PROVIDED AND INSTALLED BY CUSTOMER. METER PROVIDED BY CUSTOMER. 7. PROVIDE WARNING SIGN PER NEC 690.17 READING "WARNING -ELECTRICAL SHOCK HAZARD -DO NOT TOUCH TERMINALS -TERMINALS ON BOTH LINEAND LOAD SIDES MAY BE ENERGIZED IN THE OFF POSITION." 8. LABEL "WARNING INVERTER OUTPUT CONNECTION. DO NOT RELOCATE THIS OVERCURRENT DEVICE'AND LOCATE BREAKER AT OPPOSITE END OF THE BUS FROM MAIN BREAKER LOCATION PER NEC 705.12(D)(7). 9. LABEL' WARNING, ELECTRIC SHOCK HAZARD. THE DC CONDUCTORS OF THIS PHOTOVOLTAIC SYSTEM ARE UNGROUNDED AND MAY BE ENERGIZED." PER NEC 690.35(F) 10. LABEL'WARNING, ELECTRICAL SHOCK HAZARD IF A GROUND FAULT IS INDICATED, NORMALLY GROUNDED CONDUCTORS MAY BE UNGROUNDED AND ENERGIZED! PER NEC 690.5 (C) ENPHASE ENGAGE CABLE CONDUCTOR COLOR GUIDE 240 VAC, 1 U: BLACK L2: RED NEUTRAL: WHITE AC E.G.C. GREEN NOTES 11. METALLIC CONDUIT SHALL BE USED WffHIN BUILDING PER NEC 690.13(E). 12. LABEL "DEDICATED PHOTOVOLTAIC SYSTEM COMBINER PANEL' AND "DO NOT ADD LOADS TO THIS PANEL". 13. ALL INSTALLATION PRACTICES SHALL BE IN ACCORDANCE WITH: 13.1. 2011 NATIONAL ELECTRICAL CODE 13.2. 2014 FLORIDA BUILDING CODE 13.3. 2014 FLORIDA FIRE PREVENTION CODE 13.4. 2014 FLORIDA PLUMBING CODE 13.5. 2014 FLORIDA MECHANICAL CODE 13.6. 2014 FLORIDA FUEL GAS CODE 13.7. 2014 FLORIDA EXISTING BUILDING CODE 13.8. 2014 FLORIDA ENERGY CONSERVATION CODE 13.9. ANY LOCAL AMENDMENTS ENPHASE ENGAGE CABLE 240VAC 2) #12 THWN-2 AWG CU (L1,12) 1) #12 THWN-2AWG CU (NEUTRAL) 1) #12 THWN-2AWG CU (GROUND) 1) #8 AWG BARE CUGROUND GNO TO BE CONTINUOUS AND IN ACCORDANCE WITH NEC 250.64 (C) 240 VAC ENPHASE AC ENGAGE CABLE AND BARE #8AWG SOLAR DECK NEMA 3R, UL 1741 (AT ARRAY) L1 PV BRANCH CIRCUIT i L2 TRANS TO CONDUIT SEE SHEET E-2) IIIIi N I TO SUB PANEL AND - DOUBLE LUG OR POLARIS TAP OPTIONAL PV METER 2P.50A TO UTILITY NEW BI-DIRECTIONAL NEW FUSED THHwnnvN-2 METER (DECSUPPLIED) DISCONECTED I N}co.Il TO MAIN SUPPLY' SIDE CONNECTION DISTRIBUTION PANEL NOTESINGLE PHASE EERUTILITY-PLACE240 A3VACSINGLEPHASEMETERSOCKETW/ NEMA 3R END OPTION1OF2BETWEENSUBPANELANDFUSEDDISCONNECTTo OPTIONAL - -I MD 60A DOUBLE LUG OR POLARIS TAP SERVICE PANEL 0W2P- MA MAN BREAKERI _ - _ - r--' TO UTILITY NEW BI-DIRECTIONAL NEW NON- FUSED THHµHNN.2 METER (DEC SUPPLIED) DISCONECTED IN} CONDUIT TO MAIN NOTE: IF REQUIRED BY UTILITY - PLACE 240 VAC SUPPLY SIDE CONNECTION DISTRIBUTION PANEL SINGLE PHASE METER SOCKET W7 NEMA 3R END OPTION 2 OF 2 _ BETWEEN NEW SERVICE PANEL AND NON -FUSED DISCONNECT CHECKED BY: REVISED DATE: REVISED: 1. WA 2. WA 3. N/A 4. WA 5. WA INSTALLATION CONTRACTOR: no MAX1MO SOLAR INDUSTRIES MAXIMO SOLAR INDUSTRIES PHONE: 407-930-2030 EMAIL: FLORIDA@MAXIMOSOLAR.COM WEB: WWW.MAXIMOSOLAR.COM ENGINEER: ENG. LUIS BARRETO 7350 FUTURES DR, # 15 ORLANDO, FL PHONE: 407-446-5256 EMAIL: LBARRETO@MAXIMOSOLAR.COM SG. BARRF .. J•`CENSFrO No 82006 r - STATE OF : QQ O •, fZ0RIDP NAL titx 1% AnnnA4wG la,m,sYpaelp'wepN" RYwu mpsof eeam,nr,lr"mi wna0e,a0.4 aY• WO MMpW IIYC YPMMO" Wry PV PROJECT INFORMATION: 3. 92KW (DC) - 3.50 KW (AC) PV UTILITY INTERACTIVE SYSTEM JOHN WHALEY 109 YORKTOWN PL, SANFORD, FL 32771AHJ: DUKE ENERDY FLORIDA PROJECT NUMBER: F241 SHEET TITLE: SYSTEM STRING DIAGRAM WITH ELECTRICAL SPECS PROJECT SHEET: E- 1 14) 240 WATT UTILITY INTERACTIVE INVERTERS MODEL ENPHASE M250-80.21-LSX-US. (240VAC) CEC-INVERTER EFFICIENCY: 27% 24OVAC, lo. 6DH2 VOLTAGEANDPHASE SENSING NEUTRAL LISTED TO UL 1741 48 VDC MAX INPUT VOLTAGE NEGATIVE GROUND INTEGRATED STRING #1 - PV SOURCE CIRCUIT: 7)LG MONO X PLUS 6 280 WATTS MODULE Vx MAX 38.80 VDC l 1. = 9.33 AMPS SUN RES WIRE INTEGRAL TO MODULE AND INVERTER STA NG #2 - PV SOURCE CIRCUIT: 1)LG MONO X PLUG 28C WATTS MODULE Vac MAX38.80 VDC ISO = 9,33 AMPS SUN "" WIRE J INTEGRAL TO MODULE AND INVERTER 1 i y NOTES: 240VAC ENPHASE AC ENGAGE CARI F ANn RARE -A AWr xbVAC tbRRIAh ACU ) tIAANGtM1MxtTTiNN.xaI. AN4P4BUfRAL1I1)AA AE 1TNWYx. IGND( SV'LCAEAPFROJ( DODNfX11T W AC) BATTERY PACK LITHIUM - ION, 13.5 KWH T=5Ln 1 ALL EQUIPMENT SHALL BE INSTALLED AND LABELED IN ACCORDANCE WITH THE NEC AND ALL APPLICABLE REQUIREMENTS OF THE SERVING ELECTRIC UTILITY COMPANY AND OF THE LOCAL AUTHORITY HAVING JURISDICTION. 2 BI- DIRECTIONAL UTILITY METER INSTALLED BY UTILITYCOMPANY (AS REQUIRED). 3, LABEL BREAKER "PHOTOVOLTAIC ELECTRIC POWER SOURCE PER NEC 705,10, AND "BREAKERS ARE SUITABLE FOR BACKFEED" PER NEC 705.12 (D)(5). LABEL WITH THE MAXIMUM AC OUTPUT OPERATING CURRENT AND THE OPERATING VOLTAGE. 4 LABEL " PHOTOVOLTAIC SYSTEM UTILITY DISCONNECT SWITCH" SWITCH COVER TO BE LOCKED AT ALL TIMES SWITCH TO BE VISUAL OPEN AND ACCESSIBLE PER UTILITY REQUIREMENTS AND CONFORM TO NEC 705.22. 5 LABEL " PHOTOVOLTAIC ARRAY DC DISCONNECT DEVICE #/6" PER NEC 690.14 (C)(2). LABEL WITH OPERATING CURRENT, OPERATING VOLTAGE, MAXIMUM SYSTEM VOLTAGE, AND SHORT CIRCUIT CURRENT PER NEC 690.53. SWITCH TO BE LOCKED PER NEC 690.7 (D) 6 LABEL " PHOTOVOLTAIC SYSTEM METER". METER ENCLOSURE ANDSOCKET PROVIDED AND INSTALLED BY CUSTOMER. METER PROVIDED BY CUSTOMER. 7. PROVIDE WARNING SIGN PER NEC 690.17 READING "WARNING -ELECTRICAL SHOCK HAZARD -DO NOT TOUCH TERMINALS -TERMINALS ON BOTH LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OFF POSITION." B. LABEL " WARNING INVERTER OUTPUT CONNECTION. DO NOT RELOCATE THIS OVERCURRENT DEVICE" AND LOCATE BREAKER AT OPPOSITE END OF THE BUS FROM MAIN BREAKER LOCATION PER NEC 705.12(D)(7). 9. LABEL " WARNING, ELECTRIC SHOCK HAZARD THE DC CONDUCTORS OF THIS PHOTOVOLTAIC SYSTEM ARE UNGROUNDED AND MAY BE ENERGIZED" PER NEC 690.35(F) 10. LABEL " WARNING, ELECTRICAL SHOCK HAZARD IF A GROUND FAULTIS INDICATED. NORMALLY GROUNDED CONDUCTORS MAY BE UNGROUNDED AND ENERGIZED' PER NEC 690.5 (C) 11. METALLIC CONDUIT SHALL BE USED WITHIN BUILDING PER NEC 690.13(E). 12, LABEL " DEDICATED PHOTOVOLTAIC SYSTEM COMBINER PANEL" AND "DO NOT ADD LOADS TO THIS PANEL". 13. ALL INSTALLATION PRACTICES SHALL BE IN ACCORDANCE WITH: 13.1 2011 NATIONAL ELECTRICAL CODE 13.2 2014 FLORIDA m BUILDING CODE 13.3. 2014 FLORIDA FIRE PREVENTION CODE 13.4. 2014 FLORIDA PLUMBING CODE 13S 2014 FLORIDA MECHANICAL CODE 13.6. 2014 FLORIDA FUEL GAS CODE 13.7 2014 FLORIDA EXISTING BUILDING CODE 13.8. 2014 FLORIDA ENERGY CONSERVATION CODE 13.9 ANY LOCAL AMENDMENTS GENERATION PAID. A ESSENRILLCMTICAL LOADS) AC PARSOMD. 12ORCVAC. 125 AMP, IM, MO&I, N THISPAND MU (SCENE AU WiANCH CIRCUITSCLR, PRM1212P- 2DAOIITBR9AFORPVSYSTEM. III2 30A CIRCUIT BREAKERSTOTESIABATTERYWAAND ALL BPANOI NEW CIRCUITS TO CMICAL LOADS INCLUDE PERMANENT RESISTANT TOWEATHER CONDITIONSOKAY AM CRITICAL LOADS TO TINSPANEL) u u I I BACNIPGATEWAYAUiOMATC DISCOIRECi FORSEAMLESSBAGNP 1RANSIDON 2W AMPS. KMAT.IPH. OCPD SIZE: 2P-5OA CB / 50A FUSE BATTERY L1, L2 CONDUCTOR SIZE: 10 AWG THWN-2 CU BATTERY NEUTRAL CONDUCTOR SIZE: 10 AWG THWN-2 CU GROUNDING CONDUCTOR SIZE: 10 AWG THWN-2 CU I BACKUP GATEWAY L1, L2 CONDUCTOR SIZE 2 AWG THWN-2 CU BACKUP GATEWAY NEUTRAL CONDUCTOR SIZE: 2 AWG THWN-2 CU BACKUP GATEWAY GROUND CONDUCTOR SIZE 5 AWG THWN-2 CU CONDUIT SIZE: 1-114" CONDUIT BACKUP GATEWAY AC DISCONNECT CAPACITY: 2-POLE-100A, 240V LINE TAP) WTER-CONNECTION POINT(EASING) SUPPLY SIDE) 120240 VAC, 1(DOSTING) MAIN SERVICE PANEL UTILITY METER M IRK NAxm LljI - , I I I DE - RATED) 6 IMY4lRBfTY AC OISCOMhCT SWITCHz-POIE125A - BM240YAC.WW3R( VISIBLE BLAOETYPE . MAIN B(iFANEA LOCKABLE LABELED. ADCESIBLE 24M. A.SDA, NOTESMIOIUSEPENS9 VIE6BA, esa IDaaDEPENDSnTILEwsvnDnM2E. O uICONDUCTOR COLORING ( DC) POSITIVE. BLACK NEGATIVE: RED GROUND GREEN/BARE CONDUCTOR COLORING (AC) L1 BLACK L2: RED N WHITE GROUND GREEN NOTE: ONLY #6 AWG WIRE ORLARGERCAN BE TAPED FOR IDENTIFICATION. 8 AWG OR SMALLER WIRE SIZE SHALL ABIDE BY CHART ABOVE EX6TING) I SYSTEMGRDOND. UFER 120240VAC, 14p UTILITY GRID VOLTAGE DROP CALCULATION V drop% = VOLTAGE DROP (volts) I op= OPERATING CURRENT (amps) L = LENGTH OF CIRCUIT (tt) V op = OPERATING VOLTAGE (volts) lop x2xL x 1000 ft/ktt' kft x 100 V op 1) 14 BRANCH CIRCUIT (PORTRAIT) V-DROP PER ENPHASE V- DROP GUIDE = 0.57% J-BOX TO PV SUB -SYSTEM LOAD CENTER 20Ax2x65' x 12 V drop% = 1000ftlkft240Vx100 = 1. 3% PV SUB -SYSTEM LOAD CENTER TO INTERCONNECTION 20Ax2x10' x 1, 2 V drop% = 10o0tVkft240Vx100 = 0. 2% PV SYSTEM WORST CASE V-DROP (LONGEST SYSTEM RUNS) 1.5% CHECKED BY: REVISED DATE: REVISED: 1. N/ A 2. N/A 3. N/A 4. N/A 5. WA INSTALLATION CONTRACTOR: MAXIM0 wa 80111INE3UEFMIE9 MAXIMO SOLAR INDUSTRIES PHONE: 407 -930- 2030 EMAIL: FLORIDA@MAXIMOSOLAR.COM WEB: WWW.MAXIMOSOLAR. COM ENGINEER: ENG, LUIS BARRETO 7350 FUTURES DR, # 15 ORLANDO, FL PHONE: 407446-5256 EMAIL: LBARRETO@MAXIMOSOLAR.COM A`AAAG.EBAR AAAAA. JCS RFT CEMSF. O No82006 _ STATE OF LDA s AA...... PV PROJECTINFORMATION: 3.92 KW ( DC) - 3.50 KW (AC) PV UTILITY INTERACTIVE SYSTEM JOHN WHALEY 109 YORKTOWN PL, SANFORD, FL 32771 AHJ: DUKEENERDY FLORIDA PROJECT NUMBER: F241 SHEET TITLE: ONE - LINE ELECTRICAL DIAGRAM PROJECT SHEET: E- 2 Total System Cost: $24,320.00 Optional Down Payment: $0.00 Rebate (if any): $0.00 Loan Amount: $24,320.00 Code Compliance: All work shall be completed in,i compliance with all building '6 applicable laws as governed by Jurisdiction) and -the Interconnn( utility." For equipment warranties; according-,fo manufacturer, MSI Corp will act as your representative on any claim. Warrantyofr20 years on inverters and electronicr ,. . ranty of 25yeaf bn solar panels, according to THIS IS A COPY DocuSign Envelope ID: 7F4E8326-14DA-422F-9265-32BBCB31 F3E9 The Authoritative Copy of this record is held at na2.docusign.net ry MA`/.IMC! SOLAR INOUSTRIES 7350 Futures Or #15 Orlando FL 32819 Office 407-930-2030 o Mobile 407-446-5256 o florida@maximosolar.com SOLAR SYSTEM SALES CONTRACT TERMS AND CONDITIONS MAXIMO SOLAR INDUSTRIES CORP ("MSI Corp") and John Whaley subscribe the following sales contract for Warranties: the installation of a photovoltaic solar system in 109 MSI Corp is not responsible for damages caused to the system Yorktown Place Sanford, FL 32771. The system includes by: robbery, fire, or nature manifestations such as flood, documentation, design, installation and electrical materials in lightning, earthquake or hurricane. Any alteration, neglect, or accordance with Utility Requirements. abuse of the product involves the cancellation of the guarantees. 1_1 System Information: System Size: 3.920kWh 14 LG Electronics LG280S1C-G4 14 Enphase Energy M250-60-2LL-S2X Through this contract, MSI Corp, guarantees the installation of the photovoltaic solar system according to the above specifications for the amount of: L ufa`ctu'rer. In0e eve What, fors- sons beyond control, some products were not aall_ableon the market MSI Corp will provide similar H products in capacity and quality, upon consideration of the customer. In the design process, MSI Corp can provide similar or better alternatives for client consideration. ssionabPmanner and in Warranties may be transferable to a second owner only with rical odessand all other MSI Corp prior consent. MSI Corp undertakes to modify, repair, cal AH1 (Authority Having or replace the system or its components at the discretion ofrequirementsofthelocalMSICorp, to meet the specifications of the sales contract. There will be no money refunds ifthe specifications of the sales contract are met. To the extent required by law, all work shall be performed by indivldualsAuly licensed and authorized by law to perform saidwork. Maxi oSolar"Industries, affirms that it is a licensed SOLAR CONTRACTOR by the Department of Business and Professional Regulations. Florida license #CVC57006. Subcontractors: CONTRACTOR, may at its discretion, engage Subcontractors, to perform work hereunder, provided CONTRACTOR shall fully pay said subcontractor and in all instances and remain responsible for the proper completion of this contract. Permitting: CONTRACTOR shall at its own expense obtain all permits necessary for the new work to be performed. In the event that existing portions of the building are inconsistent with the records of the AH1 and the AH1 requires reconciliation of existing building documentation, CONTRACTOR will not be liable for reconciliation of existing building documentation with AH1. CONDITIONS NOT INCLUDED IN CONTRACT: Units, equipment or meters movement, before or after installation. Requirement of special relocation of the disconnector. Electric certifications not related to the solar photovoltaic system. Equipment repairs after warranties timeframe. Electric repairs not related to solar systems sold by MSI Corp. Additional insurance, studies or permits required. CUSTOMER RESPONSIBILITIES: The unit/project is property of MSI Corp until total payments agreed in this contract are completed. The customer undertakes to authorize and allow company employees to enter property grounds, in the address provided in this agreement, at reasonable hours, during the term of this contract, for the purposes of installing, modifying and inspecting the equipment associated with the photovoltaic THIS IS A COPY DocuSign Envelope ID: 7F4E8326-14DA-422F-9265-32BBCB31 F3E9 The Authoritative Copy of this record is held at na2.docusign.net p MAXIMO SOLAR 1NOUSTRIES 7350 Futures Dr #15 Orlando FL 32819 Office 407-930-2030 o Mobile 407-446-5256 o florida@maximosolar.com SOLAR SYSTEM SALES CONTRACT TERMS AND CONDITIONS solar system. Signs indicating that MSI Corp completed the tax credits or Utility incentives ("Incentives"). The Customer installation could be placed in property grounds. shall be solely responsible for determining the applicability of The customer agrees to not move, infer with, or alter the location of any materials of the project without prior authorization of MSI Corp. The client will not interfere, nor will make alterations of any class and will not allow that anybody, except those people authorized by MSI Corp, repair or alter any materials of the project. This agreement prevents the client to negotiate with others the execution and installation of the project. FLORIDA HOMEOWNER'S CONSTRUCTION RECOVERY FUND: Payment may be available from the Florida Homeowner's Construction Recovery Fund if you lose money on a project performed under contract, where the loss results from specified violations of Florida law by a licensed contractor. For information about the Recovery Fund and filing a claim, contact the Florida Construction Industry I Y' Licensing Board at the following address and telephone number: Construction Industry Rcovey,Fund 1940 North Moriroe"Street, Suite 4-2 Tallahassee, FL 32399 Telephone: 850 921-.6593. BUYER'S RIGHT TO CANCEL' V f Applicable to Home Soi lictation Sales Only) Thisisahomesolicitationsale,end if you do not want the, goo services yo'umacancel this agreement by providing ritteennotiiceto MSI Corp in person, by telegram, or by mailr-hi potice-must indicate that you do not want the goods or services and must be delivered 2r po tmarked before midnight the third business day after yoWsign this agreement. If you cancel this agreement, MSI Corp may not keep all or part of any cash down payment. After the midnight of the third business day after you sign this agreement the cancelation fee is a minimum of one thousand dollars to cover MSI Corps incurred cost. FINANCIAL INCENTIVES: MSI Corp makes no written or verbal representations with regard to: State of Florida solar rebates, U.S. Federal Income such Incentives, and should consult with Customer's attorney, financial advisor and governmental officials in this regard. The customer releases MSI Corp from any liability with regard to the applicability of such Incentives. ACCEPTANCE: This agreement will be governed b) accordance with the State/County I entered into and completed'in that agreement constitutes the customer and MSI Corpto stipulated, in thesam'e,Thi all equipmnt and requis ttheattachedorde"lris purc a solar enerevystem. d shall be interpreted in aws, applicable to contracts t. jurisdiction. This int actbetween the t Xl er tspecificationsneXerebycertifies that re purchased or leased on or leased for use exclusively in Contract'Date: August 28, 2017 Customer Name: John Whaley edby: DrrocuSignn' 1/ Customer Signature: I - btA.Lt, W Customer Address: 109 Yorktown Place Sanford, FL 32771 Customer Phone: 4075965793 Customer Email: jwhaley@att.net MSI, Corp: Representative Name: Maximo Torres Representative Signature: Q j,_, General description of revision: N "'al 4t COVY(S+ dlt-OCO dYG(. WwinU6 'D1 u2, 6 b n KFA 1 I' Revision 1 I Response to Comments IT 15 City of Sanford Building & Fire Prevention Division Ph: 407.688.5150 Fax: 407.688.5152 Email: building@sanfordfl.gov Permit # El- 0000 z G(,kw Submittal Date q I va I l-- Project Address: 10q `` Q06: 'p. 5QkD-6 I]a, Contact: YA's aYY(l o Ph: ( 4 0-1) qco - 2D30 Fax: Email: DI-YM1 Y)'1oq( rro-<'jjoy.torn Trades encompassed in revision: Building Plumbing Electrical Mechanical Life Safety Waste Water ROUTING INFORMATION Department Approvals Utilities Waste Water Planning Engineering Fire Prevention Building Stir 2• S • t $ RECORD COPY GENERAL NOTES: 1. THE FOLLOWING DOCUMENTS DO NOT PERMIT CONTRACTOR TO INSTALL THIS SYSTEM AGAINST ANY LOCAL, MUNICIPAL, OR INTERNATIONALLY RECOGNIZED BUILDING / ELECTRICAL CODE. THE PURPOSE OF THESE DOCUMENTS IS TO PROVIDE AUTHORITIES HAVING JURISDICTION AND UTILITIES A METHOD FOR INSPECTION. 2. THE FOLLOWING DOCUMENTS ARE PROPERTY OF MAXIMO SOLAR INDUSTRIES. ALL DESIGNS AND INFORMATION CONTAINED WITHING THE DRAWINGS ARE ONLY FOR THE SPECIFIED PROJECT AND SHALL NOT BE USED FOR ANY OTHER MEANS. USE OF THE DRAWINGS FOR ANY OTHER PURPOSE IS PROHIBITED WITHOUT EXPRESSED WRITTEN CONSENT OF MAXIMO SOLAR INDUSTRIES. 3. IN THE EVENT OF A DISCREPANCY IN QUANTITY OR SIZE OF CONDUIT, WIRE, EQUIPMENT, CIRCUIT BREAKERS, GROUND FAULT PROTECTION SYSTEM, ETC. (ALL MATERIAL), DEPICTED ON THE DOCUMENTS OR SPECIFICATIONS, THE INSTALATION CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING ALL MATERIAL AND SERVICE EQUIPMENT IN COMPLIANCE WITH ALL REGULATIONS, LAWS, ORDINANCES, OR AHJ. 4. IN THE EVENT OF CONFLICTING REGULATIONS, LAWS OR ORDINANCES, THE MOST RESTRICTIVE SHALL PREVAIL. 5. ALL ELECTRICAL MATERIALS AND EQUIPMENT SHALL BE NEW AND LISTED BY RECOGNIZED ELECTRICAL TESTING LABORATORY. 6. AN INVERTER OR AC MODULE IN AN INTERACTIVE SOLAR PV SYSTEM SHALL AUTOMATICALLY BE -ENERGIZE IT'S OUTPUT TO THE CONNECTED ELECTRICAL PRODUCTION AND DISTRIBUTION NETWORK UPON LOSS OF VOLTAGE IN THAT SYSTEM AND SHALL REMAIN IN THAT STATE UNTIL THE ELECTRICAL PRODUCTION AND DISTRIBUTION NETWORK VOLTAGE HAS BEEN RESTORED PER NEC 690.61 7. ALL SPECIFIED WIRING IS BASED ON COPPER SPECIFICATIONS. B. THE CONTRACTOR SHALL VERIFY ALL CONTROLLING FILED DIMENSIONS BEFORE ORDERING OR FABRICANTING ANY MATERIAL. 9. SEE PROVIDED SPEC -SHEETS FOR ADDITIONAL EQUIPMENT SPECIFICATIONS. A: AMPERES AC: ALTERNATING CURRENT AHJ: AUTHORITY HAVING JURISDICTION AWG: AMERICAN WIRE GAUGE CEC: CALIFORNIA ELECTRIC CODE CU: COPPERDC:DIRECT CURRENT DIA: DIAMETER GEC: GROUNDING ELECTRODE CONDUCTOR IMP: MAXIMUM POWER CURRENT ISC: SHORT CIRCUIT CURRENT KW: KILO -WATTS MIN: MINIMUM NEC: NATIONAL ELECTRIC CODE NTS. NOT TO SCALE OC: OFF CENTER P: POLE PTC: PV USA TESTING CONDITIONS PV: PHOTOVOLTAIC RR: ROOF RAFTERS TC: STANDARD TESTING CONDITIONS UL. UNDERWRITER'S LABORATORY V: VOLTS VMP: MAXIMUM POWERVOLTAGE VOC: OPEN CIRCUIT VOLTAGE W: WATTS INDEX: CP-1 COVER PAGE WITH PROJECT LOCATION SP-1 SITE PLAN SD-1 STRUCTURAL DETAIL E-1 PHOTOVOLTAIC SYSTEM STRING DIAGRAM WITH ELECTRICAL SPECS. E-2 ONE -LINE ELECTRICAL DIAGRAM PLOT PLAN OF ROOF SCALE: 9/128" = 1'-0" I JP z',z i:eeery { 109 Yo town PPac! PROJECT LOCATION MAP r_ SATELLITE VIEW SCALE:NTS. SANF p 0 CHECKED BY: REVISED DATE: REVISED: 1. WA 2. N/A 3. N/A 4. WA 5. WA INSTALLATION CONTRACTOR: MAXIMO SOLAR INDUSTRIES MAXIMO SOLAR INDUSTRIES PHONE: 407-930-2030 EMAIL: FLORIDA@MAXIMOSOLAR.COM WEB: WWW.MAXIMOSOLAR.COM ENGINEER: ENG. LUIS BARRETO 7350 FUTURES DR, #15 ORLANDO, FL PHONE: 407-446-5256 EMAIL: LBARRETO@,NAtWCf$Q4p4qM, No.82006 o STATE OF * _ S4rS NAL PV PROJECT INFORMATION: 3.92 KW (DC) - 3.50 KW (AC) PV UTILITY INTERACTIVE SYSTEM JOHN WHALEY 109 YORKTOWN PL, SANFORD, FL 32771 AHJ: DUKE ENERDY FLORIDA PROJECT NUMBER: F241 SHEETTITLE: COVER PAGE WITH PROJECT LOCATION PROJECT SHEET: CP-1 NOTES: 1. PV EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH NEC 690 AND POSTED WITH APPLICABLE WARNINGS, SIGNAGE & PLAQUES PER NEC 705-10, 690-17, & 705.10 2. UTILITY HAS 24-HR UNRESTRICTED ACCESS TO ALL PHOTOVOLTAIC SYSTEM COMPONENTS LOCATED AT THE SERVICE ENTRANCE. 3. CIRCUITS SHALL BE IDENTIFIED AT POINTS OF TERMINATION, CONNECTION, AND SPLICE POINTS PER NEC 690.4(B)(2) 4, CONDUCTORS EXPOSED TO SUNLIGHT SHALL BE LISTEDAS SUNLIGHT RESISTANTPER NEC 300.6(C)(1), 310.8(D) 5. CONDUCTORS EXPOSED TO WETLOCATIONS SHALL BE SUITABLE FOR USE IN WET LOCATIONS PER NEC 310.8(C) 6. WORKING CLEARANCES AROUND THE EXISTING AND NEW ELECTRICAL EQUIPMENT WILL BE MAINTAINED IN ACCORDANCE WITH NEC 110.26 7. 7ALL INSTALLATION PRACTICES SHALL BE IN ACCORDANCE WITH 2O17 FLORIDA BUILDING CODE (6th Edition) , 2014 FLORIDA FIRE PREVENTION CODE AND 2014 NATIONAL ELECTRICAL CODE (NEC). ARRAY: MODULES: (14) LG MONO X PLUS, 280 WATTS MODULE INVERTER: (14)ENPHASE M250-60-2LL-SX-US,(240V),AC MICRO -INVERTERS ROOF: COMPOSITE SHINGLES, 4.4/12 PITCH MOUNTING METHOD: FLUSH MOUNTED AT20°DEG RACKING: IRONRIDGE RX 100 RAIL SYSTEM ARRAY AZIMUTH: ARRAY #1: (14) MODULES AT 147° ARRAY #2: (--) MODULES AT —° ARRAY #3: (--) MODULES AT --° ARRAY #4: (—) MODULES AT --° PV SYSTEM EQUIPMENT WALL (PLAN VIEW) EQUIPMENTWALL ARRAY (ON ROOF) ADJACENT TO UTILITY METER) T--- Mr A B C D E A EXISTING) ALL -IN -ONE UTILITY METER AND 200A MAIN SERVICE PANEL WITH A 125 MAIN CIRCUIT BREAKER. INTER -CONNECTION POINTVIA ASUPPLY SIDE LINE TAP CONNECTION) B NEW) PV SYSTEM DEDICATED 30A, 240V,14 AC DISCONNECT SWITCH WITH TWO FUSES. VISIBLE, LOKABLE, LABELED) (ADJACENT TO MAIN SERVICE) C NEW) PV SYSTEM DEDICATED 60A, 240V.1 R AC AGGREGATE PANEL 2) 20 A, DEDICATED PV BREAKERS (ADJACENT TO MAIN SERVICE) D NEW) CODE APPROVED CONDUIT RUN THROUGH ATTIC,1 W BELOW SHEATHING) E NEW) PV SYSTEM SOLAR DECK Photovoltaic Combiner/Enclosure NEMA 3R, UL 1741) (AT ARRAY - UNDER MODULE) rtz Kam. isMotA SITE MAP WITH SETBACKS SCALE: Custom CHECKED BY: REVISED DATE: 1. N/A 2. N/A 3. N/A 4. N/A 5. N/A r INSTALLATION CONTRACTOR: MAXIMO SOLAR INDUSTRIES MAXIMO SOLAR INDUSTRIES PHONE:407-930-2030 EMAIL: FLORIDA@MAXIMOSOLAR.COM WEB: WWW.MAXIMOSOLAR.COM ENGINEER: ENS. LUIS BARRETO 7350 FUTURES DR, #15 ORLANDO, FL PHONE: 4074146-5256 EMAIL: LBARRETO@tV`PR.COM t`ttttt COM ENS* 0 No. 82/006 STATE OF F 441uittttttt PV PROJECT INFORMATION: PV UTILITY INTERACTIVE SYSTEM JOHN WHALEY 109 YORKTOWN PL, SANFORD, FL 32771 AHJ: DUKE ENERDY FLORIDA PROJECT NUMBER: F241 SHEET TITLE: SITE PLAN PROJECT SHEET: SP-1 HARDWARE DETAIL SCALE: NTS. IRONRIDGE ENDOAMP IR0NMDGEXR100RAIL IRONRIDGE FLASHFOOT2 (FRONT VIEW) IRONRIDGE FLASHFOOT2 (313 VIEW) 0 HARDWARE DETAIL CLAMPS SCALE. NTS. DETAIL, END CLAMP FROM DETAIL, MID CLAMP FRONT IRONRIDGE UNIVERSAL IRONRIDGE STOPPER SLEEVE - FASTENM ORIECr MODULE FRAME III___ _ 1 - __-IRONRIDGE RAIL RONRIDGE XR 100 RAIL IRONRIDGE XR 100 RAIL_ SOLAR MODULE: MECHANICAL DATA: LG MONO X PLUS, 280 WATTS MODULE MODULE SPECIFICATIONS: 64.57" x39.37" x 1.57", 37.48 LEIS MODULE SQUARE FOOTAGE: 17.65 SQ. FT MODULE WEIGHT PER SQUARE FOOT. 2.12 LBS SOLAR ARRAY: MECHANICAL DATA MODULES 14) MODULES MODULE DEAD LOAD: 555,80 LBS ARRAY SQ.FT: 252.70 SQ FT ARRAY DEAD LOAD (RACKING INCLUDED): 651.28 LEIS DEAD LOAD PER ATTACHMENT POINT: 26.0 LEIS ARRAY DEAD LOAD WILL NOT EXCEED. 4.0 LBISQ.FT ARRAY DEAD LOAD: 2.52 LB/SQ.FT CONNECTOR TYPE: 5/16" X 3.5" S.S. LAG SCREW 2.5" MIN. EMBEDMENT) ATTACHMENT POINTS: (28) TOTAL NOTES 1. VERIFY ALL MEASUREMENTS AND CHALK INSTALLATION AREA PRIOR TO DRILLING PILOT HOLES. 2. DRILL 3/16" PILOT HOLE PRIOR TO SECURING LAG BOLT 3. LAG BOLT SHALL BE LOCATED IN THE MIDDLE THIRD OF THE STRUCTURAL MEMBER 4. SECURE LAG BOLTS FLUSH TO STRUCTURAL MEMBERS FOLLOWING MANUFACTURE'S SPECIFIED TORQUE STRENGTHS. 5. SEAL CONNECTION POINTS WITH ROOF GRADE GEOCEL SEALANT. 6. FOLLOW MANUFACTURE'S RECOMMENDATIONS REGARDING RAIL SPLICE POINTS FOR THERMAL EXPANSION CONSIDERATION. MODULE DETAIL SCALE: NTS. D) 1.57 ELEVATION DETAIL SCALE: NTS. - R. N MOOVL` O k`engkll) 5T• sMODove. _ OXP uS.ZgO P LG QUICKMOUNT PV E-MOUNT 5/16' X 3.5" S.S. LAG SCREW 2.5" MIN. EMBEDMENT- SEAL PENETRATION WITH GEOCEL BASED ROOF SEALANT IRONRIDGE END / MID -CLAMP COMPOSITE SHINGLES ROOF IRON RIDGE ALUMINUM FLASHING XR 100 RAIL n XOXA CHECKED BY: REVISED DATE. REVISED: 1 N/A 2. N/A 3. N/A 4. N/A 5. N/A INSTAI.LADON CONTRACTOR MAXIM0 MAAMO SOLAR INDUSTRIES PHONE:407-930-2030 EMAIL: FLORIDA(D@MAXIMOSOLAR COM WEB: WWW.MA)OMOSOLAR.COM ENGINEER: ENG. LUIS BARRETO 7350 FUTURES DR, #15ORLANDO, FL PHONE. 407-446-5256 EMAIL: LBARRETO(J"ffiQKCOM J'7 y - - ElVS 1 No.82006 _ srarE t P ' ; Fs• 0RID.• '6' PONALNIU11INtttttt 3.92 KW (DC) - 3.50 KW (AC) PV UTILITY INTERACTIVE SYSTEM JOHN WHALEY 109YORKTOWN PL, SANFORD, FL 32771 AHJ: DUKE ENERDY FLORIDA PROJECT NUMBER: F241 SHEET TITLE: STRUCTURAL DETAILS PROJECT SHEET: S-1 SOLAR MODULE: ELECTRICAL DATA LG MONO X PLUS, 280 WATTS MODULE SPECIFICATIONS AT STC MAXIMUM POWER VOLTAGE (Vmp): 31.90V MAXIMUM POWER CURRENT (Imp): 8.78A OPEN CIRCUIT VOLTAGE (Voc): 38.80V SHORT CIRCUIT CURRENT (Isc): 9.33A SERIES FUSE RATING: 15A Voc TEMPERATURE COEFFICIENT: 0.30%/C' WEIGHT: 37.48 LBS DIMENSION: 39.37" x 64.57" x 1.57" STC = 25°C, 1000W/M2, 1.5 AIR MASS SOLAR INVERTER: ELECTRICAL DATA SIZE: 250 WATTS (AC) MFR. ENPHASE ENERGY MODEL M250 CERTIFICATION: UL 1741, IEEE 1547 MAX INPUT VOLTAGE: 48VDC INPUT VOLTAGE RANGE: 16-48 VAC MAX INPUT CURRENT (Imp): 15 ADC MAX INPUT CURRENT (Isc): 15.0 ADC MAX OUTPUT CURRENT (Imax): 1.0A AC @ 240V MAX CONTINUOUS POWER: 240 W CEC WEIGHTED EFFICIENCY: 96.5% WEIGHT: 3.4 LEIS DIMENSION: 171 Trim x 173mm x30mm MAX RECOMMENDED INPUT: 210 - 310 W MODULE NOTES 1 ALL EQUIPMENT SHALL BE INSTALLED AND LABELED IN ACCORDANCE WITH THE NEC AND ALL APPLICABLE REQUIREMENTS OF THE SERVING ELECTRIC UTILITY COMPANY AND OF THE LOCAL AUTHORITY HAVING JURISDICTION. 2. BI-DIRECTIONAL UTILITY METER INSTALLED BY UTILITY COMPANY (AS REQUIRED). 3. LABEL BREAKER "PHOTOVOLTAIC ELECTRIC POWER SOURCE PER NEC 705.10, AND "BREAKERS ARE SUITABLE FOR BACKFEED" PER NEC 705.12 (D)(5). LABEL WITH THE MAXIMUM AC OUTPUT OPERATING CURRENT AND THE OPERATING VOLTAGE. 4. LABEL "PHOTOVOLTAIC SYSTEM UTILITY DISCONNECT SWITCH". SWITCH COVER TO BE LOCKED AT ALLTIMES. SWITCH TO BE VISUAL OPENAND ACCESSIBLE PER UTILITY REQUIREMENTS AND CONFORM TO NEC 705.22, 5. LABEL "PHOTOVOLTAIC ARRAY DC DISCONNECT DEVICE #/6' PER NEC 690.14 (C)(2). LABEL WITH OPERATING CURRENT, OPERATING VOLTAGE, MAXIMUM SYSTEM VOLTAGE, AND SHORT CIRCUIT CURRENT PER NEC 690.53. SWITCH TO BE LOCKED PER NEC 690.7 (D). 6. LABEL "PHOTOVOLTAIC SYSTEM METER". METER ENCLOSURE AND SOCKET PROVIDED AND INSTALLED BY CUSTOMER, METER PROVIDED BY CUSTOMER. 7 PROVIDE WARNING SIGN PER NEC 690.17 READING "WARNING -ELECTRICAL SHOCK HAZARD -DO NOT TOUCH TERMINALS -TERMINALSON BOTH LINE AND LOADSIDES MAY BE ENERGIZED IN THE OFF POSITION." 8. LABEL "WARNING INVERTER OUTPUT CONNECTION. DO NOT RELOCATE THIS OVERCURRENT DEVICE" AND LOCATE BREAKER AT OPPOSITE END OF THE BUS FROM MAIN BREAKER LOCATIONPER NEC 705.12(D)(7). 9. LABEL "WARNING, ELECTRIC SHOCK HAZARD. THE OC CONDUCTORS OF THIS PHOTOVOLTAIC SYSTEM ARE UNGROUNDED AND MAY BE ENERGIZED." PER NEC 690.35(F) 10. LABEL "WARNING, ELECTRICAL SHOCKHAZARD IF A GROUND FAULT IS INDICATED, NORMALLY GROUNDEDCONDUCTORS MAY BE UNGROUNDED AND ENERGIZED." PER NEC 690.5 (C) 11. ALL CONDUITS SHALL BE USED WITHIN BUILDING PER NEC 690.13(E). 10. PER FLORIDA STATUE 377.7051. LUIS BARRETO WITH PE # 82006 AN ENGINEER PURSUANT TO CHAPTER 471, CERTIFIED THAT THE PV ELECTRICAL SYSTEM AND ELECTRICALCOMPONENTS ARE DESIGNED AND APPROVED USING THE STANDARDS CONTAINED IN THE MOST RECENT VERSION OFTHE FLORIDA BUILDING CODE. 11, LABEL "DEDICATED PHOTOVOLTAIC SYSTEM COMBINER PANEL" AND "DO NOT ADD LOADS TO THIS PANEL". 12. ALL INSTALLATION PRACTICES SHALL BE IN ACCORDANCE WITH: 13. 13.1. 2014 NATIONAL ELECTRICAL CODE 13.2. 2017 FLORIDA BUILDING CODE (SIXTH EDITION) 13.3. 2014 FLORIDA FIRE PREVENTION CODE 13.4. 2014 FLORIDA PLUMBING CODE 13.5. 2014 FLORIDA MECHANICAL CODE 13.6. 2014 FLORIDA FUEL GAS CODE 13.7. 2014 FLORIDA EXISTING BUILDING CODE 13.8. 2014 FLORIDA ENERGY CONSERVATION CODE 13.9. ANY LOCAL AMENDMENTS PV SYSTEM: SIZE AND EQUIPMENTS 3.92 KW (DC) - 3.50 KW (AC) 14) LG MONO X PLUS, 280 WATTS MODULE 14) ENPHASE M250-60-2LL-SX-US, (240V), AC MICRO -INVERTERS PV SYSTEM: STRINGS CIRCUITS DISTRIBUTION: STRING #1 7 LG MONO X PLUS, 280 WATTS MODULE STRING #2 7 LG MONO X PLUS, 280 WATTS MODULE STRING #4 --- LG MONO XPLUS, 280 WATTS MODULE PV SYSTEM: BRANCH CIRCUITS DEMONSTRATION GROUNDING LAY -IN -LUG MID -CLAMP (1) PER RAIL ENPHASE ENGAGE CABLE CONDUCTOR COLOR GUIDE 240 VAC, 1 Li : BLACK L2: RED NEUTRAL. WHITE AC E.G.C. GREEN 1) #8 AWG BARE CU GROUND GND TO BE CONTINUOUS AND IN ACCORDANCE WITH NEC 2%64 (C) 240 VAC ENPHASE AC ENGAGE CABLE AND BARE #8 AWG J SOLAR 1 (AT ARRAY) UL L1 PV BRANCH CIRCUIT L2 TRANS TO CONDUIT SEE SHEET E-2) i I i ENPHASE ENGAGE CABLE 240 VAC 2) #12 THWN-2 AWG CU (1-1,12) 1) #12THWN-2AWG CU (NEUTRAL) 1) #12 THWN-2AWG CU (GROUND) L-A CHECKED BY: REVISED DATE: REVISED: 1. N/A 2. N/A 3. N/A 4. N/A 5. WA INSTALLATION CONTRACTOR: MAXISOLAR M0IES MAXIMO SOLAR INDUSTRIES PHONE: 407-930-2030 EMAIL: FLORIDA@MAXIMOSOLAR.COM WEB: WWW.MAXIMOSOLAR.COM ENGINEER ENG. LUIS BARRETO 7350 FUTURES DR, # 15 ORLANDO, FL PHONE:407-446-5256 EMAIL: LBARRETq(Rk4MIMO60W jqM CE S\ O No. 82008 a = STATE OF ORIV s!0NA PV PROJECT INFORMATION: 3.92 KW (DC) - 3.50 KW (AC) PV UTILITY INTERACTIVE SYSTEM JOHN WHALEY 109 YORKTOWN PL, SANFORD, FL 32771 AHJ: DUKE ENERDY FLORIDA PROJECT NUMBER: F241 SHEET TITLE: SYSTEM STRING DIAGRAM WITH ELECTRICAL SPECS. PROJECT SHEET: E-1 14) 240 WATT UTILITY INTERACTIVE INVERTERS MODEL: ENPHASE M250-60-2LL-SX-US (240VAC) 240 VAC ENPHASE AC ENGAGE CEC4NVERTER EFFICIENCY: 97% CABLE AND BARE #6 AWG l24OVAC, 1# 60HX VOLTAGE AND PHASE SENSING _ - -- NEUTRAL LISTED TO UL 1741 48 VDC MAX INPUT VOLTAGE NEGATIVE GROUND INTEGRATED STRING#1 PVSDURCFCIRCUIT 7)LG MONO XPLUS 280 WARS MODULE Vac MAX 38.80 VOC Isc - 9.33AMPS SUN RES WIRE INTEGRAL TO MODULE AND INVERTER STRING #2 - PV SOURCE CIRCUT 7)LG MONO X PLU 280 WATTS MODUL VDC MAX 38.80 VO 6c = 933 AMP SUN RES WIi INTEGRAL TO MODULE AND INVERTE PHOTOVOLTAIC SYSTEM EQUIPPED WITH RAPID SHUTDOWN FM m WAAMNG m THIS EQUIPMENT FED BY MULTIPLE SOURCES. TOTAL RATING OF ALL OVERCURRENT DEVICES, EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE, SHALLNOT EXCEEDAMPAGTY OFO BM. 705,12(D)(2)(3)(c) 240 VAC (06 FTRUN) __-- p; A 10 AWO TY(WN4 CU P) I AWO THV N2 CU(MUTRALI 2) Y i0AWG TFWN4 CU POND) W CODE APPROVED CONDUIT UiL THROUGH ATTM, 10•BELOW SAFETY LABELING OEOICATED PV SYSTEM AC AGOREGATE PANEL 12W40 VAC. 125 MRP, WMA 3R MAIN LUO ONLY 2) 2P-20A PV CIRCUIT BRFMLERS PO NOT ADOADEXTIDNAL LOAOSTO74SPANEL) PHOTOVOLTAIC ® WARAWG 1 L MAW PV SYSTEM AC rISCONNECI FUCRICS+OCR FIA7AA0 EIfL'WC SHOCK f•A7MD WART At: wpw CURRENT 30AMP5 1 DOMAI'CUCHTIFIV"s FAGRDUhDFAULTISINDICA'EG NORY/t pSRAT101ivaTAa 120Wro VCI:S RRIARJLSON BOTH LINE AMC hCRMALLY GRWW7EC CONCUC'CAS 68C.54 680311G)(3) I.OACSDESVWm FIERGIFFO MAY W UI"1*wRDUNC AMC ENBRrm0 IMenm miumiMfinftNg hmxs and Amdui(Nary 101 hINE We, Pmrgh NNm!nh d%ah D(tai UaMNln.mas'; I 6xntq I I-------t------t----- -- N ON I Box DC INVERTER AC OR OFE wsPC ceaXrCURRTRATFCMAYPORERi1XN: CUFENi AUf, m WAINMrC CRATEDMAXPOKSPOINTVOLTAGEVDCELECTRICSHOCKHAIAtqTHEDC VAXNLMCIRMIICUWNI AOC CONa1Cia6a R46"MaTAC VAX11'" GI MVOLTAGE: VOC SYSIEM AW UAC MkC CH MAY 69¢S7 - a ENLAGVEC 69C 35F) O011(Wu(ml br umRO'Nm0 syLa!s_ ON PUSYSTEM ", UTILITY II NEW) UTtLTfY AC DISCONNECT SWITCH 2-PDLE, 30A, 240 VAC, NFMA 3111 (VISBLE BLADE TYPE, LOCKABLE, LABELED, ACCESBLE 2417). NOTPUSES FUSES BETWEEN 20AOR 30A WARihG INVEWFP OL."PU' rohwTyx. R. OC NOt RFIOCATF tHS MTICL4NFhT aVl(E hCl mhURYnenNpsDd00rwenm"ro.01edHAm3n1ywCD*.O 0(Am!Pe!ee'' I I I4' MALPOWRI SOURCES. SECCNC SCURCESISPHUTOVOLLAx: Ss! LL' i RAU, AC GL'TPUT J. 50RWAC WMAL OPERAIM Va±AGE t2W4OVCL-5 rO5.1261121t3khl lhd !wnR II PINdE([ 6 6 Rzlm m ImC6n suPNI a e!e aAn05 n ellC'S!minml n!+cNs stlmlpiq u!, LINE TAP) (TJEISTING) IN1EAtMNECTIONPOINT 1201240VAC, I( p GONG) SUPPLY SIDE) MAIN SERVICE PANEL UTTLITYMETERTOERATED) 125A MAIN BREAKER G N EXISTING) SYSTEM GROUND. 12W40 VAC, LIFER 1 cp UTILITY GRID REVISIONVoc MAXIMUMCALCULATION: 40.1 ( 1 + ( 1'C - 25' C)(-.30%/C) - Voc MAX 40.1 (1.07) - 42.91 AT 1 °C (ASHRAE) TEMPERATURE MINIMUM. -40'C TEMPERATURE MAXIMUM: 65 °C ASHRAE CONDUCTOR COLORING. (DC) POSRME BLACK NEGATIVE RED GROUND: GREEN / BARE CONDUCTOR COLORING, (AC) L1 BLACK L2 REDN: WHITE GROUND GREEN NOTE ONLY CONDUCTORS LARGER THAN #6 ARE ALLOWED TO RE4DENTIFICATION. CONDUCTORS #6 OR SMALLER WIRE SIZE SHALL ABIDE BY CHART ABOVE. VOLTAGE DROPCALCULATION V dmp% = VOLTAGE DROP (volts) J Iop= OPERATING CURRENT (amps) L = LENGTHOF CIRCUIT (R) V op = OPERATING VOLTAGE (volts) lop IT2xtX I ODO tVk11' kh x 100 v0p 1) 14 BRANCH CIRCUIT (PORTRAIT) V- DRDP PR FNPHASE V-DROP GUIDE = 0 57% J-BOX TO PV SUBSYSTEM LOAD CENTER 2OAx2x65' x 1z V dfoP%' 1ODD On 240V z100 = 1.3% PV SUBSYSTEM LOAD CENTER TO INTERCONNECTION 20Ax2xIV x 1.2 V dmp% = 1000 IVkfl z 100 = 0.2% 240V PV SYSTEM WORST CASEV-DAOP( LONGEST SYSTEM RUNS) 1.5% CHECKED BY REVISED DATE REVISED. 1. NIA 2 N/A 3 I N/ A 44— NIA 5. WA INSTALLATION CONTRACTOR rl"I MAXIMO SOLAR INDUSTRIES MAXIMO SOLAR INDUSTRIES PHONE 407-930- 2030 EMAIL. FLORIDA@MAXIMOSOIAR. COM WEB: WWW.MA) UMOSOLAR.COM ENGINEER: ENG, LUIS BARRETO 7350 FUTURES DR, # 15 ORLANDO, FL PHONE:407-446-5256 EMAIL: LBARflETO@MAXIMOSOLAR. COM A t{i11ll1AHftlj/ i 1VS.Tp, No. 82006 a STATE OF ' All 4 O. R 1 AA111I1II II IIIIAYV - PV PROJECT INFORMATION: 3.92 KW ( DC) - 3.50 KW (AC) PV UTILITY INTERACTIVE SYSTEM JOHN WHALEY 109 YORKTOWN PL, SANFORD, FL 32771 AHJ: DUKE ENERDY FLORIDA PROJECT NUMBER: F241 SHEET TITLE: ONE — LINE ELECTRICAL DIAGRAM PROJECT SHEET: E-2