HomeMy WebLinkAbout101 Sterling Pine St - BR99-002230 -SFRZONE
CONTRACTOR
ADDRESS
PHONE #
LOCATIOP
OWNER
ADDRESS -
j ``
PHONE # V2 ' / .
ict,zl.33PLUMBINGdfCONTRACTOR y
ADDRESS
PHONE #
i.#E LECTRICAL CONTRACTOR
ADDRESS
PHONE #
MECHANICAL CONTRACTOR
ADDRESS
PHONE #
MISCELLANEOUS CONTRACTOR
ADDRESS
SEPTIC TANK PERMIT NO.
SOIL TEST REQUIREMENTS (__)
FINISHED FLOOR
ELEVATION REQUIREMENTS
ARCHITECTURAL APPROVAL DATE:
DATE
A/ SUBDIVISION:
0 S
PERMIT # LOT NO.
JOB C BLOCK:
SECTION:
COST $ ?-W la 0
SQUARE FEET:
FEE $ MODEL:
l 1057STATENdd iO OCCUPANCY CLASS:
FEE $
FEE $ ' r+
FEE $ "513
INSPECTIONS ITYPEDATEOKREJECTBY
FEE $ ENERGY SECT,
CERTIFICATE OF OCCUPANCY
ISSUED #
FINAL DATE
DATE:
EPI:
f-A
CERTIFICATE OF OCCUPAIJCY / COMPLETION
Thins bu i l:d i
f
g .Wc atgd ,fa'tjY Cam' o }
ut'01 STERLT G PTNR SZk
which permit 99-000022.30 his heretofdf•e been issud'd`On 5/14/29
has been completed according to p lan:s and specifications filed in the
office of the Building 0 cial prior to the issuance of said building
permit, to wit as complies with all the
building, plumbing, elect ical,,'zoning and subdivision regulations
ordinances of the City of Sanford and with the provisions of these
regulations.
aIAFF APPROVAL Subdivision Regulations Apply: Yes No
DATE APPROVAL DAU APPROVAL
BUILDING: FIR13:
Finaled ( 1c'1 (I- Inspected
ZONING:
Inspected
UTILITIES:
Water Sewer
Lines In Lines In
MeterSewer — Set
Tap Reclaimed ——
Water
ENGINEERING:
Street'
Drainage
y.7 ,Paved
Maintenanc
Bond
PUBLIC
WORKS: \ Street
Name
Street Signs
Lights Storm
Sewer
Driveway ` Street —
Work
FEES
PAID DESCRIPTION
DATR AMOUNT WATER -
SEWER IMPACT FEES 01-
APPLCTN FEE -BUILDING 6/01/99 10.00 01-
FIRE IMPACT - RESIDENT 6/01/99 59.27 01-
LIBRARY IMPACT FEE 6/01/99 54.00 01-
OPEN SPACE . 6/01/99 279.61 01-
POLICE IMPACT - RESID 6/01/99 91.93 01-
RADON GAS TAX FEE 6/01/99 12.93 01-
ROAD IMPACT FEES 6/01/99 847.00 01-
RECOVERY FD/CERT. PGM. 6/01/99 12.94
PAGE: 2
This is to certify that the building :Located at
101 ST'RRLTNG P_ T_NE ST for
which permit 99-00002230 has heretofore been issued on 5/14/99
has been completed according to plans and specifications filed in the
office of the Building Official prior to the issuance of said building
permit, to wit as complies with all the
building, plumbing, electrical, zoning and subdivision regulations
ordinances of the City of Sanford and with the provisions of these
regulations.
01-SCHOOL IMPACT
WT IMPACT:SINGLE
SW IMPACT:SINGLE
Subdivision Regulations Apply: Yes
FEE 6/01/99
FAMILY 6/01/99
FAMILY 6/01/99
I O)tja,aa ercz b
10[DAJ8 bH I GG
r-jr
hla A rnCj CA-
OWNEIt
1384.00
650.00
1700.00
o
BUILDING OFFICIAL /'DATE
No
CERTIFICATE OF OCCUPANCY
REQUEST FOR FINAL INSPECTION
NEW RESIDENTIAL/MULTI-FAMILY BUILDING****
DATE:
ADDRESS: p ; e-t -e—
CONTRACTOR/PROJECT NAME: Mwtz do.-
The Building Dept. Has prepared a certificate of occupancy for the
above location and is requesting a final inspection by your
department. After your inspection, please contact the Building
Dept. To sign off on the C.O. or submit an addendum if it has
been denied. Your prompt attention will be appreciated. Thank
you.
Engineering:
Public Works: GI
10r:2-3/ 99
Utilities/Cross Connection:
tol w4
9
G7f
1
CERTIFICATE OF OCCUPANCY
REQUEST FOR FINAL INSPECTION
NEW RESIDENTIAL/MULTI-FAMILY BUILDING****
DATE: )0
ADDRESS:
S ,
CONTRACTOR/PROJECT NAME: MwA_. o_ o
The Building Dept. Has prepared a certificate of occupancy for the
above location and is requesting a final inspection by your
department. After your inspection, please contact the Building
Dept. To sign off on the C.O. or submit an addendum if it has
been denied. Your prompt attention will be appreciated. Thank
you.
C-O-/C.C. CHECKLIST — UT11ITIES :a"
Request Received Fu Uti,;ty iro=p:C:,r y
INITIALS Eis iUtilityInspector's Fincri CuJ _ /u ; 3ira- $ y
Engineering: FDEP Clearance - Water
FDEP Clearance - Sewer
City Services Ecisements --------- --------
WIniol OW Bond t10% - 2yd _----------------- Public Works: ®IpM --- ---------- s+ate -----------+-
ism-i.i LilII
O C i z-99 /0 '¢ >
Utilities/Cross Connection:
k7a o
Di r1lP ' s - Zz3 .lti$T
R 2R2.3
CERTIFICATE OF OCCUPANCY
REQUEST FOR FINAL INSPECTION
NEW RESIDENTIAL/MULTI-FAMILY BUILDING****
DATE: ) 0 -' ( 9 +
ADDRESS: 101
CONTRACTOR/PROJECT NAME:
The Building Dept. Has prepared a certificate of occupancy for the
above location and is requesting a final inspection by yourdepartment. After your inspection, please contact the BuildingDept. To sign off on the C.O. or submit an addendum if it has
been denied. Your prompt attention will be appreciated. Thank
you.
Fequc-,J ReceivedTo Ui;.z:-5
CA" Utility Inspector's Final
Engineering: FED[P Clearance - tvwer __----- -
FDFP Clearance - Se;k<er ----------
City Services Egsemer;ps ------ - --- ------
Winlenonce Bond (10% - 1yr) ---------- ---------- Public Works: 01ha -_---------------------- aa----------------------- ----
i.iLalA
Utilities/Cross Connecti 0 kav ' I.011 ron.
od l 14v FYI, vds vatW- /-NRf, % / 03b +
CERTIFICATE OF OCCUPANCY
REQUEST FOR FINAL INSPECTION
NEW RESIDENTIAL/MULTI-FAMILY BUILDING****
DATE: I () -o'Z1-9
ADDRESS:
CONTRACTOR/PROJECT NAME: IMwiz&cx-
The Building Dept. Has prepared a certificate of occupancy for the
above location and is requesting a final inspection by your
department. After your inspection, please contact the BuildingDept. To sign off on the C.O. or submit an addendum if it has
been denied. Your prompt attention will be appreciated. Thank
you.
Engineering:
Public Works:
Utilities/Cross Connection:
l(2 LQq
I
y0-) ELEVATION CERTIFICATE O.M.B. No. 3067-0077
FEDERAL EMERGENCY MANAGEMENT AGENCY Expires July 31, 1999
NATIONAL FLOOD INSURANCE PROGRAM
ATTENTION: Use of this certificate does not provide a waiver of the flood insurance purchase requirement. This form is used only to pro- vide elevation information necessary to ensure compliance with applicable community floodplain management ordinances, to determine
the proper insurance premium rate, and/or to support a request for a Letter of Map Amendment or Revision (LOMA or LOMR). You are notrequiredtorespondtothiscollectionofinformationunlessavalidOMBcontrolnumberisdisplayedintheupperrightcornerofthisform.
Instructions for completing this form can be found on the following pages.
OWNER'S
SECTION A PROPERTY INFORMATION I FOR INSURANCE COMPANY USE I
POLICY NUMBER
STREET ADDRESS (Including Apt., Unit, Suite and/or 91 g. Number) OR P.O. ROUTE AND BOX NUMBER l COMPANY NAIC NUMBER
Vk VI I
OTHER DEPCF 17QN (Lot and dock Numbers, etc.)
STATE —
7 -7SCODE
SECTION B FLOOD INSURANCE RATE MAP (FIRM) INFORMATION
Provide the following from the proper FIRM (See Instructions):
1. COMMUNITY NUMBER 2. PANEL NUMBER 3. SUFFIX 4. DATE OF FIRM INDEX 5. FIRM ZONE 6. BASE FLOOD ELEVATION
1 & `. 9 H DOL40 LJ 1 q5-
in AO Zones• use depth)
7. Indicate the elevation datum system used on the FIRM for Base Flood Elevations (BFE): NNGVD '29 Other (describe on back) 8.
For Zones A or V, where no BFE is provided on the FIRM, and the community has established a BFE for this building site, indicate the
community's BFE: I I I I I I . LJ feet NGVD (or other FIRM datum —see Section B, Item 7). SECTION
C BUILDING ELEVATION INFORMATION 1.
Using the Elevation Certificate Instructions, indicate the diagram number from the diagrams found on Pages 5 and 6 that best describes
the subject building's reference level 2(
a). FIRM Zones Al-A30, AE, AH, and A (with BFE). The top of the reference level floor from the selected diagram is at an elevation of
LLLL411J .DJ feet NGVD (or other FIRM datum —see Section B, Item 7). b).
FIRM Zones V1-V30, VE, and V (with BFE). The bottom of the lowest horizontal structural member of the reference level from the
selected diagram, is at an elevation of I I I I I I,H feet NGVD (or other FIRM datum —see Section B, Item 7). c).
FIRM Zone A (without BFE). The floor used as the reference level from the selected diagram is LI LLI feet above or below (
check one) the highest grade adjacent to the building. d).
FIRM Zone AO. The floor used as the reference level from the selected diagram is I I LLJ feet above or below (check one)
the highest grade adjacent to the building. If no flood depth number is available, is the building's lowest floor (reference level)
elevated in accordance with the community's floodplain management ordinance? Yes No Unknown 3.
Indicate the elevation datum system used in determining the above reference levelelevations: R NGVD '29 Other (describe under
Comments on Page 2). (NOTE: If the elevation datum used in measuring the elevations is different than that used on the
FIRM [see Section B, Item 7], then convert the elevations to the datum system used on the FIRM and show the conversion equation
under Comments on Page 2.) 4.
Elevation reference mark used appears on FIRM: Yes _U No (See Instructions on Page 4) 5.
The reference level elevation is based on: CK actual construction construction drawings NOTE:
Use of construction drawings is only valid if the building does not yet have the reference level floor in place, in which case
this certificate will only be valid for the building during the course of construction. A post -construction Elevation Certificate will
be required once construction is complete.) 6.
The elevation of the lowest grade immediately adjacent to the building is: l I I NMI. feet NGVD (or other FIRM datum -see Section
B, Item 7). SECTION
D COMMUNITY INFORMATION 1.
If the community official responsible for verifying building elevations specifies that the reference level indicated in Section C, Item 1 is
not the "lowest floor" as defined in the community's floodplain management ordinance, the elevation of the building's "lowest floor"
as defined by the ordinance is: I I I I I I .0 feet NGVD (or other FIRM datum —see Section B, Item 7). 2.
Date of the start of construction or substantial improvement 71un(-- f qq FEMA
Form 81-31, MAR 97 REPLACES ALL PREVIOUS EDITIONS SEE REVERSE SIDE FOR CONTINUATION
SECTION E CERTIFICATION
This certification is to be signed by a land surveyor, engineer, or architect who is authorized by state or local law to certify elevation
information when the elevation information for Zones Al—A30, AE, AH, A (with BFE),V1—V30,VE, and V (with BFE) is required.
Community officials who are authorized by local law or ordinance to provide floodplain management information, may also sign the
certification. In the case of Zones AO and A (without a FEMA or community issued BFE), a building official, a property owner, or an
owner's representative may also sign the certification.
Reference level diagrams 6, 7 and 8 - Distinguishing Features —If the certifier is unable to certify to breakaway/non-breakaway wall,
enclosure size, location of servicing equipment, area use, wall openings, or unfinished area Feature(s), then list the Feature(s) not
included in the certification under Comments below. The diagram number, Section C, Item 1, must still be entered.
I certify that the information in Sections B and C on this certificate represents my best efforts to interpret the data available.
I understand that any false statement may be punishable by fine or imprisonment under 18 U.S. Code, Section 1001.
CERTIFIER'S NAME LICENSE NUMBER (or Affix Sea[)
TITLE ` OMPANY NAME
ADDRESS r.IT:v
SIGNA
STATE
j O
ZIP
Copies should be made of this Certificate for: 1) community official, 2) insurance agent/company, and 3) building owner.
COMMENTS:
ON WITH ON PILES,
SLAB BASEMENT PIERS, OR COLUMNS
A v A A v
ZONES ZONES ZONES ZONES ZONES
REFERENCE
REFERENCE BASE LEVEL REFERENCE
LEVEL FLOODELEVATION
i.::1ia"
BASE.' ':+° ADJACENT :', ; ;: REFERENCEFLOODGRADELEVELELEVATIONREFERENCEADJACENT;:
BASE
FLOODELEVATION
LEVEL GRADE
ml
i: i.: ..•r.•.
ADJACENT:
r., t . f.. R-(Jl : .... lull GRADE ' a::
The diagrams above illustrate the points at which the elevations should be measured in A Zones and V Zones.
Elevations for all A Zones should be measured at the top of the reference level floor.
Elevations for all V Zones should be measured at the bottom of the lowest horizontal structural member.
Page 2
FOUNDATION PLAN
1/4" =1'-O" 5LAWPORGH LOGATION
50N8URY 4
20'-0"
I 3 1/2"CONC. SLAB
C NWC f'c = 2500 PSI I 40 0"
12'-4' REINF. WWF 6X6XW1.4XW1.46,-0°
56D H/ 4' X 1' 5TOOP o
m_ o
I
o
N
I
I STUNK VENT $
I
10 O ELEV. REGE% 6'-O' 5.6D. • •
firI-424\7 - - - -
J
I-
I N
1
III1 PRV Y 1DE 15LAND ELEG.
II
1 J
1'-41,
1'-O"
mI
I
I
I
I
I
I _
I
I
2',5 1/4"
TOP PLATE FACED NAILED W/ 10d
TOP PLATE SHALL BE SPLICED
OVER STUDS AT LEAST 48" FROM BOT, SPLIC
DOUBLE TOP PLATE
ROOF FRAMING
51, O.0
IN. rw[LS BE7uEEN SPLICE
F
f-
DBL.. TOP PLRTE SPICE CONN.
o
w