HomeMy WebLinkAbout119 Spanish Bay Dr - BR00-000386 - SFRSUBDIVISION: i L'G S
ZONE DATI ` ..
CONTRACTOR
ADDRESS wQ U kQ QQ-J 'C D LGJT3200
PHONE # TO-7- 4-75--9iia
LOCATION '
OWNER
ADDRESS
PHONE #
PLUMBING CONTRACTOR /
ADDRESS
PHONE #
ELECTRICAL CONTRACTOR
ADDRESS
PHONE #
MECHANICAL CONTRACTOR 00
ADDRESS
PHONE #
MISCELLANEOUS CONTRACTOR
ADDRESS
SEPTIC TANK PERMIT NO.
SOIL TEST REQUIREMENTS )
FINISHED FLOOR
ELEVATION REQUIREMENTS )
ARCHITECTURAL APPROVAL DATE:
PERMIT* # (1)0 v
JOB S / r
COST $? 31 000
LOT NO. -7 1
BLOCK:
SECTION: /
SQUARE FEET:
FEE $ MODEL:
STATE NO.
FEE S
FEE 9
FEE!
OCCUPANCY CLASS:
G 7.
J
INSPECTIONS
TYPE DATE OK REJECT BY
FEE $ ENERGY SECT.
CERTIFICATE OF OCCUPANCY
ISSUED #
FINAL DATE
DATE:
EPI:
If
CERTIFICATE OF OCCUPANCY / COMPLETION
stpfce.iJ,fy that the building l.oca ed a
6- SPA I'ISI_hAY tDI.J - .SY t' - (Cf I I , ?(Ior
which permit' bb-0000038S.7 has Xeretofor,6 `been issued o`n 1 1./d3j00
has been completed according to plans and specifications filed irk the
office of the Building Official prior to the issuance of said building
permit, to wit as s-51r complies with all the
building, plumbing, electrical, zoning and subdivision regulations
ordinances of the City of Sanford and with the provisions of these
regulations.
DATE
BUILDING:
Finaled
ZONING:
Inspected
UTILITIES:
Subdivision Regulations Apply: Yes No
FIRE:
Inspected
Water I ,\' Sewer
Lines In G' [ Lines In
Meter UY Sewer
Set Tap
Reclaimed ---
Water /
ENGINEERING•l
Drainage Z
Maintenance
Bond
PUBLIC
Street
Name
Signs
Storm
Sewer
Street
Work
WORKS:
o cs L-1— *
14
DESCRIPTION
WATER -SEWER IMPACT FEES
01-APPLCTN FEE -BUILDING
01-FIRE IMPACT - RESIDENT
01-LIBRARY IMPACT FEE
01-OPEN SPACE
01-POLICE IMPACT - RESiD
01-RADON GAS TAX FEE
01-ROAD IMPACT FEES
01-RECOVERY FD/CERT. PGM.
Street
Paved
Street
Lights
Driveway
1/04/00 10.00
1/04/00 59.27
1/04/00 54.00
1/04/00 279.61
1/04/00 91.93
1/04/00 9.37
1/04/00 847.00
1/04/00 9.38
PAGE: 2
This is to certify that the building located at
119 SPANISH BAY DR for
which permit 00-00000386 has heretofore been issued on 1/03/00
has been completed according to plans and specifications filed in the
office of the Building 0 facial prior to the iseuance of said building
permit, to wit as complies with all the
building, plumbing, electrical, zoning and subdivision regulations
ordinances of the City of Sanford and with the provisions of these
regulations.
01-SCHOOL IMPACT
WT IMPACT:SINGLE
SW IMPACT:SINGLE
Subdivision Regulations Apply: Yes No
FEE 1/04/00 1384.00
FAMILY '1/04/00 650.00
FAMILY 1/04/00 1700.00
QIjJIOr-->
UWNERh2))-- Hi can W L - ' z
BUILDING OFFICIAL / DATE
CERTIFICATE OF OCCUPANCY
REQUEST FOR FINAL INSPECTION
RESIDENTIAL SINGLE: FAMILY RESIDENCE*******
DATE
ADDRESS
CONTRACTOR
The Building department has, prepared a C of O for the
above location and is requesting final inspection by
your department. After your inspection, please sign off
on the C.O. or submit an addendum if it has been
denied. Your prompt aftention will be appreciated.
Thank you.
Engineering
Public Works
Utilities/Cross Connection .V
C.O./C.C. CHEDW-ST - UTIL IC"3 C':L IT.
Request Received U2* g=4.f_To Utility Inspector
INITIALS DATE
Utility Inspector's Final __ ew---- 1zVG
FDEP Clearance - Water ------------------ -
FDEP Clearance - Sewer __________ ____ ____
City Services Easements ___-____--
Maintenance Bond (10% - 2yr) _______ __ -----------
Other-------------------- - ----------------
5b (-'Xo Mam
0,0 6W (oSJ, 06
5/ z/o0 4= o¢
CERTIFICATE OF OCCUPANCY
REQUEST FOR FINAL INSPECTION
RESIDENTIAL SINGLE FAMILY RESIDENCE'""
DATE •5 1 `i (Zi
ADDRESS 119 Q'I.i! 1/')
CONTRACTOR
The. Building department has prepared a C of O for the
above location and is requesting final inspection by
your department. After your inspection, please sign off
on the C.O. or submit an addendum if it has been
denied. Your prompt attention will be appreciated.
Thank you.
Engineering
Public Works
Utilities/Cross1 Connection
C.O./C.C. CHM(LI.ST - UT1LITicS
Request Received 1J2* g--To Utility Inspector - 0Ao
INITIALS. L—T ele
Utility Inspector's Final --- --I - - I
O
FDEP Clearance - Water ----------- ------_-_._.
FIDEP Clearance - Sewer ---------- ----------
City Services Easements ---------- ----------
Maintenance Bond (10% - 1yr)---------------------
Othtr-------------------- ---------------------
ti
ems,
CERTIFICATE OF OCCUPANCY
REQUEST FOR FINAL INSPECTION
RESIDENTIAL SINGLE: FAMILY RESIDENCE'""
DATE s 1 110b
ADDRESS
CONTRACTOR
The Building department has, prepared a C of O for the
above location and is requesting final inspection by
your department. After your inspection, please sign off
on the C.O. or submit an addendum if it has been
denied. Your prompt attention will be appreciated.
Thank you.
Engineering
r
Public Works
S• yP .av
Utilities/Cross Connection
b-c 6
qV6 C)
CERTIFICATE OF OCCUPANCY
REQUEST FOR FINAL INSPECTION
RESIDENTIAL SINGLE FAMILY RESIDENCE*******
DATES/
ADDRESS III
CONTRACTOR
The Building department has; prepared a C of O for the
above location and is requesting final inspection by
your department. After your inspection, please sign off
on the C.O. or submit an addendum if it has been
denied. Your prompt aftention ill be appreciated.
Thank you.
Engineering T
Public Wor
Utilities/Cross Connection
LAND SURVEYORS
300 COUNTY ROAD 427 5OUTH LONGWOOD, FLORIDA 32750-5499
TELEPHONE: (407) 930-9080 FAX: (407) 339-3636
CERTIFICATE OF ELEVATION
Address: 119' Spanish Bay Dr.
Legal Description: Lot 79, Monterey Oaks Phase I, a Replat
Plat Book 56, Pages 33 and 34
The Finished Floor Elevation of the house on Loi 79,
Monterey Oaks Phase T. a Re,p,lat
meets or exceeds the requirements set forth in the City
of Sanford Building Code, Sec. 6-7 (a).
V41 Lz ( -
ominick F. Cavone
Florida Land Surveyor S Mapper Reg. No. 2005
Licensed Business -No. 5073
2/29/2000
Date Fieldwork Completed
W.O.N 2000-1942