HomeMy WebLinkAbout121 Spanish Bay Dr - BR00-002648 - SFRa / /j¢ y 6. 11
SUBDIVISION:
ZONE
CONTRACTOR
ADDRESS
LOCATION I -/ :, /- L -
OWNER
ADDRESS
PERMIT # I / 6 W LOT NO.
G JOBS BLOCK:
C Q Q SECTION:
COST $ `
SQUARE FEET: 0?
FEE $ MODEL
STATE NO,
PHONE #
j --7
PLUMBING CONTRACTOR a L " FEE $ /`
ADDRESS
PHONE #
ELECTRICAL CONTRACTOR oZ Oso
ADDRESS
PHONE #
FEE $ `57
MECHANICAL CONTRACTOR Uy " 0&5 7- FEE $' ADDRESS
PHONE #
MISCELLANEOUS
CONTRACTOR ADDRESS
SEPTIC
TANK PERMIT NO. SOIL
TEST REQUIREMENTS FINISHED
FLOOR ELEVATION
REQUIREMENTS ARCHITECTURAL
APPROVAL DATE: OCCUPANCY
CLASS: INSPECTIONS
I TYPEDATEOKREJECTBYFEE
It ENERGY SECT CERTIFICATE
OF OCCUPANCY ISSUED #
FINAL
DATE DATE:
EPI:
sr 0
rCERTIF)ICATE- Off' OCCUA MYf COMPcLETSON't
I
This is to certify that the building located at
121 SPANISH BAY DR for
which permit 00-00002648 has heretofore been issued on 6/01/00
has been completed according to plans and specifications filed in the
office of the Building Offic'al prior to the issuance of said building
permit, to wit as j yQ .k1 SM I-- complies with all the
building, plumbing, electrical, zoning and subdivision regulations
ordinances of the City of Sanford and with the provisions of these
regulations.
STAFF APPROVAL Subdivision Regulations Apply: Yes No
DATE APPROVAL DATE APPROVAL
BUILDING: FIRE:
Finaled 0012- L, Q Inspected
U
ZONING:
Inspected
UTILITIES:
Water
Lines In
Meter
Set
Reclaimed
Water
ENGINEERING:
Sewer
Lines In
OI 2%l0 Taper
1- Street
Drainage 1(- 1ob) - _ Paved
Maintenance VJ
Bond
PUBLIC WORKS:
Street
Name Street
Signs Io 2r3 t—'B Lights
Storm
Sewer Driveway
Street
Work
FEES PAID
WATER -SEWER IMPACT FEES
01-APPLCTN FEE -BUILDING 6/06/00
01-FIRE IMPACT - RESIDENT 6/06/00
01-LIBRARY IMPACT FEE I ''r"66160/00
01-OPEN SPACE t/06%00
01-POLICE IMPACT - RESID 6/06/00
01-RADON GAS TAX FEE 6/06/00
01-ROAD IMPACT FEES 6/06/00
01-RECOVERY FD/CERT. PGM. 6/06/00
10.00
59.27
54.00
279.61
91.93
10.71
847.00
10.72
OI2 lo"
w
PAGE: 2
This is to certify that the building located at
191 RPANTRH RAY nR _ for
which permit 00-00002S48 has heretofore been issued on F;/01100
has been completed accordin to plans and specifications filed in the
office of the Building 0 .l prior to the issuance of said building
permit, to wit as complies with all the
building, plumbing, electric zoning and subdivision regulations
ordinances of the City of Sanford and with the provisions of these
regulations.
Subdivision Regulations Apply: Yes No
01-SCHOOL IMPACT FEE 6/06/00 1384.00
WT IMPACT:SINGLE FAMILY 6/06/00 650.00
SW IMPACT:SINGLE-FAMILY 6/06/00 1700.00
BUILDING OFFICIAL / DA'Th
CERTIFICATE OF OCCUPANCY
REQUEST FOR FINAL INSPECTION
RESIDENTIAL SINGLE FAMILY RESIDENCE*******
DATE CO 6,01oc
ADDRESS
60- zo SL
IA-1
CONTRACTOR
The Building department has prepared a C of O for the
above location and is requesting final inspection by
your department. After your inspection, please sign off
on the C.O. or submit an addendum if it has been
denied. Your prompt aftention will be appreciated.
Thank you.
Engineering
Public Works
Utilities/Cross Connection
C.O./C.C. CHECKLIST — UTILITIES DLryT.
Request Received !ol--z3Ao a.., To Utility Inspector
INITIALS DATED
Utility Inspector's Final ___ w__ !Q l000 FDEP
Clearance - Water __________ ______ __ O
FQEP
Clearance - Sewer __________ _ _______ RkC--- — City
Services Easements _______ _ ---------- nT koo . o Maintenance
Bond (10% - 2yr) _------ Other (
S O. O co
I
co I o0 (::2, o/Z s oo s ; .05
CERTIFICATE OF OCCUPANCY
REQUEST FOR FINAL INSPECTION
RESIDENTIAL SINGLE FAMILY RESIDENCE*******
DATE FC L-)C>lc1c.`.
ADDRESS - c l. L-c--
C,^
CONTRACTOR ti J-
The Building department has prepared a C of O .for the
above location and is requesting final inspection by
your department. After your inspection, please sign off
on the C.O.. or submit an addendum if it has been.
denied. Your prompt attention will be appreciated.
Thank you.
Engineering
Public Works
Utilities/Cross Connection
C.O./C.C: C ECiti.IST - v 1't s I' :.. 1.
Request Received L a3 2.,,t,_To Uiility Inspec;M 1031
INNTIALS CATS
Utility Inspector's Final — 10
FDEP Clearance - Water
FI;EP Clearance - Sewer ---------- ----------
City Services Easements ---------- ----------
Maintenance Bond (10% - 2yr)---------- ----------
Other----------------------------------------
CERTIFICATE OF OCCUPANCY
REQUEST FOR FINAL INSPECTION
RESIDENTIAL SINGLE FAMILY RESIDENCE*******
DATE CO 2pI00
ADDRESS I a
6c- 2-e SL>
CONTRACTOR
The Building department has prepared a C of O for the
above location and is requesting final inspection by
your department. After your inspection, please sign off
on the C.O. or submit an addendum if it has been
denied. Your prompt attention will be appreciated.
Thank you.
Engineering
V
Public Works
Utilities/Cross Connection
eHosNo-
r 2w"of St,
Aa a UA"CA4Lr SIDEOooR, No7 ROa
g'vo YaT D.
SL, Lfwr jq/
23/z000 F
F}55er9 7b
111
6 ,-, "'?-
M C, r 1) -('s Vze - inSPPcWom ,
CERTIFICATE OF OCCUPANCY
REQUEST FOR FINAL INSPECTION
RESIDENTIAL SINGLE FAMILY RESIDENCE*******
DATE CO 20I(l0
ADDRESS I a l
6 c- 2-e fi
CONTRACTO
The Building department has prepared a C of O for the
above location and is requesting final inspection by
your department. After your inspection, please sign off
on the C.O. or submit an addendum if it has been
denied. Your prompt attention will be appreciated.
Thank you.
Engineering
Public Works
Utilities/Cross Connection
FOUNDATION PLAN
1/4" =1'-O" O.
20'-011
I
n
3 1/2"CONC. SLAB
1 NWC f'c = 2500 PSI I 40 0°
121_4" REINF. WWF 6X6XW1.4XW1.4b,-o„ I 21'-8'
Lj_j bp, 1-0n8'-4"
561) YW/ 4' X T STOOP o
Im o
s
o
I
1 8„ b'-0"
1
I STUDOR VENT
1
0 ELEV. RECESS 6'-0' 5.6D. ®
r----,--- - -
I Ir =—_'1 -------------------
illiPRWDE 15LMD ELEG.
0o
ow O 75 1/4"1
I ST FLOOR PLAN
20f_0,)
I (
I
I
1 '40' 0"
I
I '
I
I
I 6
6 ' 5.W.5. 23 5.1-1. 6068 5.6D. /
vrR ®
5)— I Fm 1
V4" 3
cc _ --
O
1 arwnci.a 5y5te•nn
O• •
14 1 - IIIA+
0
0
IQ'-O 1/2"
2) 245H VV I
3'ywy 30 ARGH OVER l.3' 5.W.5.
REGE55 PREGA5T LINTEL
w/ LINTEL BLOCK OVER
D
IN
L
W
0
l
C
N FAMILY RM.
w