HomeMy WebLinkAbout123 Spanish Bay Dr - BR00-003755 - SFRPon iS Pic-
SUBDIVISION:`
ZONE DATE 2 -,2K 0y CONTRACTOR
Pll(--tn%nda--tcm es J) C• ADDRESS
I C>l L CJ i C!1 J, t L PHONE #
Lf /`_" C'I/Z _3 23 LOCATION /
sh Ac,-14- /-)C OWNER
ADDRESS
PHONE #
1
PERMIT' #
JOB
C_J s,Lt SI F ees COST $
L C
i CUU LOT
NO. --7 % BLOCK:
SECTION:
SQUARE
FEET: y FEE $
MODEL: STATE
NO. CI\ e `' OCCUPANCY CLASS: j _
PLUMBING CONTRACTOR c, l e FEE $ ADDRESS
PHONE #
ELECTRICAL
CONTRACTOR FEE $ Z1 ADDRESS
PHONE #
Co
z -7 MECHANICAL CONTRACTOR :) G 21 (f- ADDRESS
PHONE #
MISCELLANEOUS
CONTRACTOR ADDRESS
SEPTIC
TANK PERMIT NO. SOIL
TEST REQUIREMENTS ) FINISHED
FLOOR ELEVATION
REQUIREMENTS (__) ARCH
ITECTURALAPPROVAL DATE: FEE $
INSPECTIONS
I TYPEDATEOKREJECTBYFEE $
ENERGY SECT CERTIFICATE
OF OCCUPANCY ISSUED #
FINAL
DATE " • DO EPI:
DATE: _
a -I T O Z:) _ w
CERTIFICATE OF OCCUPANCY / COMPLETION
rzthis'?to''tiify/hat;-the''building,:loc atgd atr(= ii r 1 ,
123 SPANISH BAI DR 7' ' fbr
which permit 00-00003755 has heretofore been issued on 8/28/00
has been completed according to plans and specifications filed in the
office of the Building Official prior to the issuance of said building
permit, to wit as kna `I) I'Fr complies with all the
building, plumbing,'eiectrical, zoning and subdivision regulations
ordinances of the City of Sanford and with the provisions of these
regulations.
STAFF APPROVAL Subdivision Regulations Apply: Yes No
DATE APPROVARATE APPROVAL BUILDING:
FIRE: Finaled
1gAvda-) L Inspected ZONING:
Inspected
UTILITIES: '
Water
Sewer M
LinesIn P li l k l f e Lines In Meter"-
Set
ap Reclaimed
Water
ENGINEERING:
Street ,
Drainage -—
Paved Maintenance
ug Bond
PUBLIC
WORKS: Street
Name
Signs
t Z k?, Street
Lights
Storm
U1 Sewer
Driveway Street
Work
FEES
PAID WATER -
SEWER IMPACT FEES 01-
APPLCTN FEE -BUILDING 01-
FIRE IMPACT - RESIDENT 01-
LIBRARY IMPACT FEE 01-
OPEN SPACE 01-
POLICE IMPACT - RESID 01-
RADON GAS TAX FEE 01-
ROAD IMPACT FEES 01-
RECOVERY FD/CERT_ PGM. 8/
29/00 10.00 8/
29/00 59.27 8/
29/00 54.00 8/
29/00 279.61 8%
29/00 91.93 8/
29/00 10.72 8/
29/00 847.00 8/
29/00 10.71
PAGE: 2
This is to certify that the building located at
123 SPA_NISH BAY DR for
which permit 00-00003755 has heretofore been issued on _8/28/00
has been completed according to plans and specifications filed in the
office of the Building Off 1,prior to the issuance of said building
permit, to wit as Vf '-3-11:::- complies with all the
building, plumbing, electrical, zoning and subdivision regulations
ordinances of the City of Sanford and with the provisions of these
regulations.
STAFF APPROVAL Subdivision Regulati.ons Apply: Yes No
O1-SCHOOL IMPACT FEE 8/29/00 1384.00
WT IMPACT:SINGLE FAMILY 8/29/00 650.00
SW IMPACT:SINGLE FAMILY 8/29/00 1700.00
n-
M
t c. k tiJ - I2 CCUI
OWNER •BUILDING OFFICIAL / DATWO
n
Fema Rec'd
Slab Rec'd AF Inspector App'd
REQUEST FOR FINAL INSPECTION
CERTIFICATE OF OCCUPANCY
SINGLE FAMILY RESIDENCE****
DATE '`-i'0D
PERMIT# 00-3-1 L-
ADDRESS
SUBDIVISION
CONTRACTOR Maronda Homes
The Building Division has received a request for a final inspection and a
Certificate of Occupancy for the above referenced address. We would appreciate
a final inspection of the site by your department. Approval by your department
would result in a granting a C.O. for the address. If you have any issues that the
contractor will need to address, please submit a statement for denial of C.O. or a
conditional agreement to be attached to the C.O.
Thank you for your cooperation.
co./C.C. CHECKLIST - UTILITIES DEFT.
6Request Received te;-4 Ao 14 To Utility Inspector
INITIALS DATE
Engineering Utility Inspector's Final--------------------
FDEP Clearance - Water ---------- ----------
Public Works FDEP Clearance - Sewer -------
Utilities City Services Easements -------- -----------
Mointencince Bond (10% - 2yr)------L ------------
Other-------------------- ---------- ----------
Conditions: to be com feted onl if a roval is conditional
u
Fema Rec'd
Slab Rec'd
Inspector App'd
REQUEST FOR FINAL INSPECTION
CERTIFICATE OF OCCUPANCY
SINGLE FAMILY RESIDENCE"""
DATE ,
PERMIT # C;0
ADDRESS
SUBDIVISION L)
CONTRACTOR Maronda Homes
The Building Division has received a request for a -final inspection and a
Certificate of Occupancy for the above referenced address. We would appreciate
a final inspection of the site by your department. Approval by your department
would result in a granting a C.O. for the address. If you have any issues that the
contractor will need to address, please submit a statement for denial of C.O.. or a
conditional agreement to be attached to the C.O.
Thank you for your cooperation.
Engineering
Public Works
Utilities
C.O./C.C. CHECKLIST - UTZLiTiES DE:'T.
Request Received Lz1z0 ?y-_<_To utility Inspector t',.s
INITIALS DATE
Utility Inspector's Final_`-°----f-- 10` P
p Clearance - Water --------------------
FDEP Clearance - Sewer --------------------
City Services Easements -------------------
Maintenance Bond (10% - 2yi)
Other-------------------- ---
Conditions: (to be completed only if approval is conditional
Fema Rec'd l
Slab Rec'd
Inspector App'd
REQUEST FOR FINAL INSPECTION
CERTIFICATE OF OCCUPANCY
SINGLE FAMILY RESIDENCE****
DATE I L- N - O-0
PERMIT #
ADDRESS NU
SUBDIVISION
CONTRACTOR Maronda Homes
The Building Division has received a request for a final inspection and a
Certificate of Occupancy for the above referenced address. We would appreciate
a final inspection of the site by your department. Approval by your department
would result in a granting a C.O. for the address. If you have any issues that the
contractor will need to address, please submit a statement for denial of C.O. or a
conditional agreement to be attached to the C.O.
Thank you for your cooperation.
I Qt7
Engineering
Public Works
Utilities
Conditions: (to be completed only if approval is conditional)_
Fema Rec'd
Slab Rec'd
Inspector App'd
REQUEST FOR FINAL INSPECTION
CERTIFICATE OF OCCUPANCY
SINGLE FAMILY RESIDENCE****
DATE D-HZ'O
PERMIT #
ADDRESS 1 3 SOcan lS k
SUBDIVISION C)C, S
CONTRACTOR Maronda Homes
The Building Division has received a request for a final inspection and a
Certificate of Occupancy for the above referenced address. We would appreciate
a final inspection of the site by your department. Approval by your department
would result in a granting a C.O. for the address. If you have any issues that the
contractor will need to address, please submit a statement for denial of C.O. or a
conditional agreement to be attached to the C.O.
Thank you for your cooperation.
Engineering
Public Works' «
1
Utilities
Conditions: (to be completed only if approval is conditional)
I ST FL-00 PL_AN
1/4.4-0"
20'-0"
I 1
14
I
I
I
I3' 5.W.5. 23 5.H. 6065 5.6D.
Ll
las
I N
vl\ -la
y
5LAWPOR61-1 LOCATION
5UNBURY
0
Iq'-O 1/2"
2) 245H IN I
3SW5 30 ARGH OVER
lr9
REGE55 PREGA5T LINTEL
W LINTEL BLOCK OVER
n O_
UI
i
O
N FAMILY RM.
l'-4 ta
1.3' 5.W.5.