Loading...
HomeMy WebLinkAbout2703 Ridgewood Ave - 99-2977 (pool)A 2 -.a2) ,oSUBDIVISION: 763 ZONE DATE CONTRACTOR .( L= < l e 61D/__e ADDRESS PHONE # LOCATIOI OWNER ADDRESS 72 20/0-76s- kg-6-j6800 PHONE # 'y PLUMBING CONTRACTOR ADDRESS PHONE # ELECTRICAL CONTRACTOR ADDRESS PHONE # MECHANICAL CONTRACTOR ADDRESS PHONE # MISCELLANEOUS CONTRACTOR ADDRESS SEPTIC TANK PERMIT NO. SOIL TEST REQUIREMENTS FINISHED FLOOR I ELEVATION REQUIREMENTS ARCHrrECTURAL APPROVAL DATE: me PERMIT # i(7 C> (-7 7 JOB (/Q c-f COST $ %33, FEE S- - STATE NO. CL FEE $ FEE $ FEE $ LOT NO. BLOCK: SECTION: SOUARE FEET: MODEL: OCCUPANCY CLASS: INSPECTIONS TYPE DATE OK REJECT BY FEES ENERGY SECT. EPI: CERTIFICATE OF OCCUPANCY ISSUED # DATE: FINAL DATEOO Zb n o Elm t CERTIFICATE OF OCCUPANCY REQUEST FOR FINAL INSPECTION NEW COMMERCIAL BUILDING**** DATE: ADDRESS: o 10 t_ CONTRACTOR/PROJECT NAME: 0,4,.,— K D L181,2s The Building Dept. Has prepared a certificate of occupancy for the above location and is requesting a final inspection by your department. After your inspection, please contact the Building Dept. To sign off on the C.O. or submit an addendum if it has been denied. Your prompt attention will be appreciated. Thank you. Engineering: Fire Dept: Public Works: Utilities/Cross Connection: Zoning Department: e•- CERTCATEOF OCCLIPAIFI_%Y DD!lI1A OWNER:_ ADDRESS: DATE: REASON FOR DISAPPROVAL: S o6ji c ? CONDITIONAL AGREEMENT: dPPAu ` // 1 rl tr 0) 7 1 H-/ oi3c rz v s N r1,zs C l h nj)rn,t3f«5 af= co"T(LA -Sr J- S D £ li . -r D A J 6' O )? S S ^ `3 FIRE DEPARTMENT UTILITIES PUBLIC WORKS ENGINEERING w- z t 'r-" CERTIFICATE OF OCCUPANCY REQUEST FOR FINAL INSPECTION NEW COMMERCIAL BUILDING**** DATE: a C1 ADDRESS: 03 k) CONTRACTOR/PROJECT NAME:_ 01- t` -- 6A- •hL,v The Building Dept. Has prepared a certificate of occupancy for the above location and is requesting a final inspection by your department. After your inspection, please contact the Building Dept. To sign off on the C.O. or submit an addendum if it has been denied. Your prompt attention will be appreciated. Thank you. Engineering: Fire Dept: Public Works: gsoa 3Aso s W/G/%5 Utilities/Cross Connection: Zoning Department:_ 1,W ) L / -- 00 / -1 Z 38p 40 won tCaw¢se 3) S+ St ae4 c 4 40Q/ 5'1q Ft-s714D a^ ci ,, e 6 o Xe r, &+ c i lo,. dev i c.s CERTIFICATE OF OCCUPANCY REQUEST FOR FINAL INSPECTION NEW COMMERCIAL BUILDING**** DATE: ADDRESS: 07 CONTRACTOR/PROJECT NAME: o,-4 The Building Dept. Has prepared a certificate of occupancy for the above location and is requesting a final inspection by your department. After your inspection, please contact the Building Dept. To sign off on the C.O. or submit an addendum if it has been denied. Your prompt attention will be appreciated. Thank you. Engineering:_ Fire Dept: Public Works: Soz, 32s-a Utilities/Cross Connection:* Zoning Department: OWNER- G r 'T ADDRESS: 2-702 h`p'(-, DATE: ! I L'2 f5 REASON FOR DISAPPROVAL: 2 lVf, 68 70 G0,VA/Y c7 3 nrcro Q.P CONDITIONAL AGREEMENT: Wc2Ct o1714 •6 n/C! FIRE DEPARTMENT PUBLIC WORKS UTILITIES ENGINEERING CERTIFICATE OF OCCUPANCY REQUEST FOR FINAL INSPECTION NEW COMMERCIAL BUILDING**** DATE: ADDRESS: 2-10 CONTRACTOR/PROJECT NAME: The Building Dept. Has prepared a certificate of occupancy for the above location and is requesting a final inspection by your department. After your inspection, please contact the Building Dept. To sign off on the C.O. or submit an addendum if it has been denied. Your prompt attention will be appreciated. Thank you. Engineering:_ Fire Dept: Public Works: r Utilities/Cross Connection: Zoning Department: CERTIFICATE OF OCCUPANCY REQUEST FOR FINAL INSPECTION NEW COMMERCIAL BUILDING**** DATE: '1a131 l9 ADDRESS:-1_0 23— CONTRACTOR/PROJECT NAME: The Building Dept. Has prepared a certificate of occupancy for the above location and is requesting a final inspection by your department. After your inspection, please contact the Building Dept. To sign off on the C.O. or submit an addendum if it has been denied. Your prompt attention will be appreciated. Thank you. Engineering: Fire Dept: Public Works: Utilities/Cross Connection: Zoning Department: CERTIFICATE OF OCCUPANCY REQUEST FOR FINAL INSPECTION NEW COMMERCIAL BUILDING**** DATE: ADDRESS: -a-in-a CONTRACTOR/PROJECT NAME: ' The Building Dept. Has prepared a certificate of occupancy for the above location and is requesting a final inspection by your department. After your inspection, please contact the Building Dept. To sign off on the C.O. or submit an addendum if it has been denied. Your prompt attention will be appreciated. Thank you. Engineering: Utili ies/Cross Connection: Fire Dept: Zoning Department: Public Works: pF_SANF- APPLICATION FOR TEMPORARY CONSTRUCTION ACTIVITIES USE PERMIT CITY OF SANFORD, FI. f C0 G DATE e • cG PERMIT NO. qCi To the Building Official: The undersigned hereby applies for a permit for the following described work: OWNER ADDRES! NATURE APPLICANT'S ADDRESS /Sid-i 5,04 ! A" APPLICANT'S PHONE NUMBER e- 0171A Building Official I certify that the above infor- mation is true and correct and that I will comply with all applicable codes and ordinances of the City of Sanford, FL. a r-" Applicant's Signature 6/94) Application type = TCAU 12/01/1999 11:31 4072652588 POWER IMPROVEMENTS AWS Inc. 12/01/99 City of Sanford Building Department 300 N. Park Avenue Sanford, Florida 32771 Re: Seminole Higb School Swimming Pool. Building Permit 099-2977 Electrical Permit # 00-130 To whom It May Concern: This is a request fox pre -power for the Seminole High School Swimming Pool Electrical Construction located at 2703Ridgewood Avenue, Sanford, Florida. This area will not be occupied un.itl the CO is issued. We will call for a pre -power inspection appointment. Thank you for your assistance. Kenneth J. Plate President Edgar's Electric Inc. EC-AO01994 295 Anchor Road Casselberry, FL 32707 Phone. (407) 260-1533 Fax- (407) 265-2588 11/30/1999 '11:13 4072652588 WS 5 { no. 11/30/99 City of Sanford Building Department. Re. Seminole Hiigh .School Pool POWER IMPROVEMENTS To Whom It May Concern: This is a request for pre -power for the Seminole High School Pool Electrical Construction. This area will not be occupied until the CO is issued. Sincerely; Lenora Russ Comptroller 295 Anchor Road • Cassefberry, FL 32707 • Phone: (407) 260-1533 • Fax: (407) 265-2588 Jeb Bush Governor Mr. Karl Pecht, P.E. Pecht-Evans Engineering, Inc. 501 E. Jackson Street Orlando, FL 32801 Dear Mr. Pecht: FLORIDA DEPARTmwr OF HOALT . August 3, 1999 Seminole County Seminole Swimming Pool 2701 Ridgewood Avenue, Sanford Robert G. Brooks, M.D. Secretary Effective August 3, 1999, the plans for the above referenced pool are approved under Serial No. SP-15722, subject to the foilowing proviso: The aeration system may only be operated during hours when the pool is not in use. The review of the engineering features of this application has been conducted by me or under my responsible supervision, and I certify that those engineering features satisfy the applicable requirements of Chapter 514, Florida Statutes, and Chapter 64E-9, Florida Administrative Code, or the intent of the variance based upon the design engineer's justification. As noted above, this approval only certifies that your plans were found to be in compliance with the design require- ments of Chapter 64E-9, F.A.C. This is to notify you that a complaint of misconduct is presently being investigated by the Florida Board of Professional Engineers regarding a submittal to the Department of Health, which had certain similarities to your submittal. This office will not take any further action in this regard until the Board's investigation is completed. The application indicates that you have contracted to monitor the pool construction to ensure compliance with the approved documents. Upon completion, your certification along with that of the pool contractor, electrical contractor or inspector; and pool owner, will be necessary for application for an operating permit. Four (4) fully executed copies of DH Form 916 are to be submitted to this office along with the required $125.00 fee (made payable to the Dept. of Health) for final inspection. By copy of this letter, the applicant is advised that unauthorized operation and use of the pool without a valid State operating permit is a violation of Chapter 514, Florida Statutes, and Chapter 64E-9 of the Florida Administrative Code, and may subject the owner to appropriate legal action. Approval is given to this project on the basis of information furnished to the department. There may be county, municipal, or other local regulations or restrictions to be complied with by you and we recommend that appropriate local agencies be consulted before starting construction. i Upon receipt of the approved materials, one set shall be forwarded to the owner, and one set shall be forwarded to the contractor for keeping on the construction site. Thank you for your cooperation. RFF:ce c: Seminole County Env. Health City of Sanford Sincerely, J-4T(r,fj . Robert F. Foster, P.E. Regional Engineer L Environmental Engineering 400 W. Robinson St., Suite S-532 • Orlando, FL 32801 CITY OF SANFORD, FLORIDA APPLICATION FOR BUILDING PERMIT PERMIT ADDRESS 10 i [dw®OJ & -(A )l4 Total Contract P ice of Job v Describe Work S U " PERMIT NUMBER 1 Sq. Ft. Type of Construction S w ,Y, Flood Prone (YES) (NO) Number of Stories -^ Number of Dwellings — Zoning Occupancy: Residential Commercial Industrial LEGAL DESCRIPTION TAX I.D. NUMBER OWNER C `0- San f ADDRESS19. by- CITY n n rni TITLE HOLDER (IF OTHER THAN OWNER) ADDRESS CITY BONDING COMPANY ADDRESS CITY ARCHITECT ADDRESS _ CITY MORTGAGE LENDER ADDRESS CITY lease attach printout from Seminole Count STATE STATE STATE i PHONE NUMBER Lf 0-7 33D -S ? q ZIP 327-] 1' ZIP ZIP STATE ZIP STATE V' - o0 CONTRACTORWe-lie +®O ac j PHONE NUMBf V80 i ADDRESS 1 ; S, 0 p "Sdrn 5.-_ ST. LICENSE NUMBERCP (' 01J)'70G CITY 110o,p Lc.,- STATE r(_ ZIP _;2% b3 Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet standards of all laws regulating construction in this jurisdiction. I understand that a separate permit must be secured for ELECTRICAL, PLUMBING, MECHANICAL, SIGNS, POOLS, ETC. OWNER' S AFFIDAVIT: I certify that all the -;,foregoing information is accurate and that i- allworkwillbedoneincompliancewithallapplicablelawsregulatingConstructionF` and zoning. A COPY OF THE RECORDED COPY OF THE NOTICE OF COMMENCEMENT WILL BE POSTED', ON THE JOB SITE WITH PERMITS NO LATER THAN SEVEN (7) DAYS AFTER THE PERMIT HAS BEEN Q H b 4- 3 U O u w a O ISSUED. FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOU PAYING TWICE FOR THE IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. ACCEPTANCE OF PERMIT IS VERIFICATION THAT I WILL NOTIFY THE OWNER OF THE PROPERTY OF THE REQUIREMENTS OF FLORIDA LIEN LAW, FS713. rt i O N Signature of Owner Agent & Date Signature of ontracto.r & Date w 13 , q 9-i: Imo' N c z Type or P, int Owner/Agent entName YPgType b i. e Pri Contractor's sName fj 8O dr 11', o Oignature of Notary & Date Signature of Notary & Date Official Seal) Official Seal) I`'* c w 3 O E x z Q H H N - 1 M w C o 4 o a o m >1 Zu. F SaV` 3,y Eveline E Bennett O My Commission CC6585.cc Expires July 24, 200 i ro o Application Approved BY: Date: FEES: Building Radon Police Fire m Open Space Road Impact Application H PERMIT VALIDATION: CHECK CASH DATE BY t7 ORIGINAL ( BUILDING) YELLOW CUSTOMER) PINK (COUNTY TAX OFFICE) GOLD (CO. ADMIN) THIS APPLICATIO USED FOR WORK VALUED. 2500.00 OR MORE 7/ao` 07 K oo ` V s e p 1 ti'X- SG rYi C qw ® I c_ . CUt mngineeving ane r-iann:ng JUU--So id P.I of sAkFo Application toi Site Development Permit t4,'-_L c City of Sanford o "*TIIIS PERM IT IS TO POSTED AT THE SITE* * * c.o. Datr —' _.2 / Permit No Ji;, theAdnrr•.i'IT i,iveOfficial. Ise. undcrsiened hereby applies for a permit f0!- the following described work. o, ncr Cl-Ty r 54,,'1 FD,eD Address: 'N; d Nalurc ()r work OopCOtK5TRUCT156v1AlA(11V i'D L 0 !M/iLL CiU w770!!io Legal Ucscription or Tax Identirication Number of Property Legal Description BEGINNING at a point 21.56 chains West and 26 % chains South of the Northeast Comer of Section 2, Township 20 South, Range 30 East, Seminole County, Flr rida, thence run South 8.28 chains; thence run West 4.84 chains; thence run North 8.28 chains; thence run East 4.84 chains to the Point o; Beginning. Applicant's Name KiQ 2 L L. Applicl,it's Address 50/ E • JAeev5om 677. LAA1,0o 309V Api)licant s l'ito!ic,Nutnber , .40 -7 8'2 - 15 /5 Applicant's Fax iVumLer 40 -7 e46 -O 9ev 3 48 HOURS BEFORE YOU DIG $35 4- 1 of cost of proposed workCALLSUNSHINE 1-800-432`4770 1 Certify that the above information IT'S THE LAW IN FLORIDA Is n ue and correct and I will cornp!y Withal! codes and ordinances of the "ty of S f c >>ir,i l ati:c c")1liciai -- — Applicant Si;naiurc I,L, I:':G 'I I:R[P!G DEPARTMLNI T. HtiCl lid .ADVANCE 1-0 SCHMULE r.OR 0(- Cot PLET[oN 1NS1'E(1i1 IQN rr,, 33;;-S673** CONSI RUC:'.iON ABOVE GRADE Al 1, Ild\il- 1-80C-412-4770 P Z(UR TO MGGIM ;0' CITY OF SANFORD AGENDA MEMORANDUM SUBJECT: 50 Meter Pool 1999 JUII 10;ii II 42 DATE June 14, 1999 ITEM NO. C — Y. DEPARTMENT: Recreation & Parks DIVISION: Youth Activities AUTHORIZED BY: _ Mike Kirby h'AIL- CONTACT: Tom Farnsworth EXT: 5697 I ® MOTIONI"COMMENDATION: r v Recommend approval of revised proposal as submitted by Weller Pools. BACKGROUND: On March 8, 1999 we received a design/built proposal on the 50 meter pool to be on propertyjoiningSeminoleHighSchool. We received only one proposal and it was from Weller Pool Contractor, Inc. and the total sum ofdthebidwas $1,213,870. On March 15'', staff met with the Weller people and advised them we were working with a budget of $1,000,000. We asked Weller pools to develop a list of deductions and bring them backforreview. Finally, after weeks of review and looking at many alternatives, we have established the total project budget as reflected below: Weller Pools 558,677. Pool Shell (direct purchase) 175,241. Bathhouse 189,645. Consultant 18,299. Contingency 58,138. Total 1,000,000. This has been done with some considerable contribution by Briar Corporation, reducing the cost of the bath house, direct purchasing by the City, and the City addressing some issues in house. Recommend approval of this proposal so formal agreement can be finalized. Regular X Consent Work Session Briefing_ DATE - : - ('BATCH NUMBER yIpIAAIpYl 11®®I BiW lb'pWY 'II IIWII I W ER I VbNWEI_LER,a'3.;HARC]Li?"J I",';I WEI LER .POOL CONSTRUCTORS INCA1821SORANGEBLOSSOMTRAIL AP,OPKA FL 32703 LAWTON CHILES DISPLAY AS REQUIRED BY LAW R ICHARD T. FARRELL GOVERNOR SECRETARY 1777 SEMINOLE COUNTY OCCUPATIONAL LICENSE C7 STATE OF FLORIDA Account f: 005064 RAY VALDES, TAX COLLECTOR LICENSE TO ENGAGE IN BUSINESS, S N SPECIFIED BELOW. BUSINESS WE.LLER POOL CONSTRUCTORS INC ADDRESS 1021 S ORANGE BLOSSOM TR APOPKAi FL 32703- HAROLD J VONWELLER (PRES) MAILING ADDRESS WEL_LE.R POOL CONSTRUCTORS INC 1021 S ORANGE BLOSSOM TR APOPKA, FL 1z703- Amount Paid: 22684 FOOL/SPA SEFPiSLE (SER(R Q 20.00 OLHSOB/24/9801517 BUILDING DEPARR1ENT CITY OF: SANFORD REFERENCE: SEMINOLE HIGH SCHOOL Gentlemen: Weller Pool Constructors, Inc. 1821 S. Orange Blossom Trail Apopka, Florida 32703 Phone (407) 880-8800 FAX (407) 884-7306 CPC #010705 WELLER ITk,rA 0 Please accept this letter as authorization for the following person to obtain the necessary Building Permit for the above -referenced project: Anthony DeBaise Sincerely, WELLER POOL CONSTRUCTORS, INC. H, J, Von Weller Pres' ent HJVW/rn STATE OF FLORIDA COUNTY OF ORANGE The foregoing instrument was acknowledged before me this 13th day of July ,19 99 by H. J. von Weller w o is persona y nown: o meI or ZwTo has produced as Wentif..ication) and who did. (did take an oath, Commission Expires: o *PY, P1" RUTH A NIXON My Commission CC484232 Expires Sep. 17, 19M ml Bonded by ANBo< Q1-E OF FE gii0=§6 = 78 CITY OF SANFORD BUILDING DEPARTMENT SUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PERMIT s 1 • Two (2) complete sets of plans and drawings to scale and to include; a. Site plan approved by Planning & Zoning and City Commissionb. Boundary and building location surveyC. Foundation plan d. Floor plan 1. Room or space identification 2. Indicate room dimensionse-- 3. Specify door and window dimensions and types8-- 4. Indicate tenant separation and fire resistant walls. CompleteULdesignnoted. e. Four (4) or more elevations including finish floor(s) elevations, f. Structure details -signed and sealed by engineer g. Architectural drawings signed and sealed by architecth. Electrical drawings -signed and sealed by engineer, if over 600 ampsi. Mechanical drawings -signed and sealed when 15 tons or more and/or5,000.00 e- j. Plumbing drawings -signed and sealed, shall comply to FloridaHandicapCode. 2. Plans shall show: a. Square Footage 12r L b. Type of construction C. Occupancy classification (group) d. Occupant load 3— e. Sprinklers, standpipes and alarm systems f. Fire protection requirements & NFPA requirementse— g. Life safety Code 101 3. Three (3) sets of Florida Energy Forms 40OD-97 signed and sealed byarchitectorengineer. e-- 4. Arbor permit when trees are to be removed from property. Contact theCityEngineerfordetailsregardingtheArborOrdinanceandpermit. e— 5. Soil analysis may be included on site plan or foundation6. Soil analysis and/or soil compaction report. If soils appear to be unstable or if structure to be built on fill, a report may be requested by the BuildingOfficialorhisrepresentative. 7. Utility Letters Required Inspections During and Upon Completion of Construction1. Footer S4-w— e( 4 Gke owcc 2. Underground electrical, mechanical and plumbing3. Foundation elevation survey 4. Slab 5. Lintels -tie beams-columns-cetls 6. Rough electrical 7. Rough mechanical 8. Rough plumbing 9. Tub Set 10. Framing 11. Tenant separation/firewall 12. Insulation, walls and/or ceilings 13. Electrical final, mechanical final, and plumbing final14. Building final 15. Other DATE / SIGNATURE By Owner or Authorized Agent)