HomeMy WebLinkAbout8100 Red Cleveland Blvd - BC05-001144 (SANFORD AIRPORT AUTHORITY) DOCUMENTSPERMIT ADDRESS
CONTRACTOR
ADDRESS
PHONE NUMBER
PROPERTY OWNER
ADDRESS
PHONE NUMBER
ELECTRICAL CONTRACTOR
MECHANICAL CONTRACTO
PLUMBING CONTRACTOR
MISCELLANEOUS CONTRACTOR
PERMIT NUMBER FEE
MISCELLANEOUS CONTRACTOR
PERMIT NUMBER FEE
SUBDIVISION
PERMIT* dS • t ryy DATE JQS * 60 mor
PERMIT DESCRIPTION
PERMIT VALUATION
SQUARE FOOTAGE
d
M
0
Lh
J
CERTIFCATE OF OCCUPANCY
REQUEST FOR FINAL INSPECTION ,\N
ALAMO
****NEW OFFICE, BANKS, ECT.
DATE: 05/11/05
PERMIT #: ` 05-1144 11 \\
VG
ADDRESS: _25WE �
CONTRACTOR: S A Kennedy
PHONE #: 770-667-3602
The building division has prepared a Certificate of Occupancy for the above
- location and is requesting final inspection by your department. After your
inspection, please sign off and date the C. O. or submit addendum if it has
been denied or approved with conditions. Your prompt attention will be
appreciated.
Engineering Z Fire
❑Public Works 0ning
❑Utilities Licensing
CONDITIONS:TO BE C0 W;L LY IF APP VAL IS CONDITIONAL)
J�
9
:.-
City of Sanford
Engineering And Planning Department
memorandum
TO: PATTI SHOLAR, BBM CLEARING AND GRADING
FROM: Greg Hyatt, Development Services Technician P
A
N
DATE: MAY 27, 2005 ENGINM%G
G
SUBJECT: PUNCH LIST FOR WALK THROUGH FOR ALAMO CAR
RENTAL
1. Clean MES from ditch to canal ( from NW pond).
2. Asphalt at Red Cleveland entrance appears to be sliding.
3. Handrail on bridge needs to be repaired at joints.
4. Repair bird baths in parking area.
5. Complete landscaping as per plan.
6. Repair broken curb at the east side of bridge.
7. Pour concrete around inlet on the east side of exit driveway.
8. Complete concrete pad around outfall structure # 500
9. Install concrete flumes in appropriate areas
PLEASE CALL FOR REINSPECTION WHEN ALL ITEMS ARE DONE
_�>iJ_li•I:�`?
GREG
Engineering and Planning Department Phone: (407) 330-5671 Fax: (407) 330-5679
F:\SHA ENG\Development Review\04-Engineering\gregs. memo.wpd
Printed May 27, 2,005 (12:46pm)
CERTIFCATE OF OCCUPANCY
-- REQUEST FOR FINAL INSPECTION
_
ALAMO
****NEW OFFICE, BANKS, ECT.
1 1 ►
LLI 1 1
M' 1 i
t 1 i`
DATE: 05/11/05 ' __"_
I l
t r 1 1
� I
1 4 1 1
PERMIT #: ` 05-1144 p--
ADDRESS: 2550 E. Airmort Blvd � `
�
, j e
"
CONTRACTOR: S A Kennedy
t>: 8 �.
N m
PHONE #: 770-667-3602
The building division has prepared a Certificate of Occupancy for the above
location and is requesting final inspection by your department. After your
inspection, please sign off and date the C. O. or submit addendum if it has
been denied or approved with conditions. Your prompt attention will be
appreciated.
❑Engineering Tire
❑Public Works Zoning
Utiliti(Licensing
CONDITIONS: (TO BE COMPLETED ONLY IF APPROVAL IS CONDITIONAL)
9
LMBC1001 CITY OF SANFORD
Address Misc. Information Inquiry
Location ID . . . . .
Parcel Number. . . . . . .
Alternate location ID . .
Location address . . . . .
Primary related party . .
Type options, press Enter.
5 View detail
Opt Description
272555
05.20.31.300-0010-0000
2550 E AIRPORT BLVD
SANFORD AIRPORT/VANGUARD-ALMO
Free -form information
F2=Address F3=Exit F5=Special Notes F9=Parcel Notes
F12=Cancel F16=Related pty data
5/11/05
16:44:47
z>
CERTIFCATE OF OCCUPANCY
REQUEST FOR FINAL INSPECTIQALAMOl
****NEW OFFICE9 BANKS ***
,ECT.
%A
DATE:05/11/05 = I
PERMIT # 05-114 tZB
7 "I�c�yADDRESS: 2500 E. Air �� `_` to
u w ' %A '
4 J W
CONTRACTOR: S A Kennedy `�,,'� G) '^
PHONE #: Q
770-667-3602
Cr Ll
The building division has prepared a Certificate of Occupancy for the above
location and is requesting final inspection by your department. After your
inspection, please sign off and date the C. O. or submit addendum if it has
been denied or approved with conditions. Your prompt attention will be
appreciated.
CJEngineeri Fire 0/o/ - f
310L
❑Public Workst (IUAkJIfiI _ �Zon'
tiliti Licensing
x wo, I
CONDITIONS: (TO BE COMPLETED ONLY IF APPROVAL IS. CONDITIONAL)
9 n
Ail
r
'KIT NER
S U R V E Y I N G
31 May 2005
City of Sanford Building Department
300 North Park Avenue
Sanford, Florida 32771
o S -\\k*4
Re: ADMINISTRATION BUILDING AT THE NEW ALAMO CAR
RENTAL SITE AT ORLANDO SANFORD AIRPORT
To Whom It May Concern:
This is to certify that the finished floor elevation of the new building
constructed at the above site meets or exceeds the requirements of Section 6-
7 of the City of Sanford Building Code.
Should you have any questions or need additional information, please do not
hesitate to call.
Sincerely,
irA
R. Blair Kitner
P.S.M. No. 3382
P.O. BOX 823 - SANFORD, FLORIDA 32772-0823 0 (407) 322-2000
.� ..,e." . FEDERAL EMERGENCYMANA(,EMENTAGENCY_ ..
0. M. B. No.3067-0077
NATIONAL FLOOD INSURANCE PROQRAM a Expires December 31, 200:
ELEVATION CERTIFICATE
Read the inshuc1lim on. 1- 7..:
SECTION A - PROPERTY OWNER INFORMATION'' `for Ir tic a Cqr parW t7ae
BUILDING OWNER'S NAME PoiCY Number, ,
VANGUARD CAR RENTAL, USA
BUILDING STREET ADDRESS Qndudvg Apt, Unit, Suite, ardor Bldg. No.) OR P.O. ROUTE AND BOX NO. Comparry NAIC Number
AIRPORT BOULEVARD
CITY STATE ZIP CODE
SANFORD FL 32773
PROPERTY DESCRIPTION (Lot and Block Numbers, Tax Parcel Number, Legal Descroon, etc)
ADMINISTRATION BUILDING AT ALAMO CAR RENTAL SITE AT ORLANDO SANFORD AIRPORT
BUILDING USE (e.g.,,Residential, Non-residential, Addition, Accessory, etc. Use a Comments area, if necessary.)
COMMERCIAL .
LATITUDEILONGTUDE,(OPTIQNAL) • HORIZONTAL"DATUM: SOURCE:, E GPS (Type):
{ W -#W - ,ff or ##.fes ❑ NAD 1927 ❑ NAD 1983 USGS Quad Map Q Other:,
SECTION B - FLOOD INSURANCE RATE MAP (FIRIVi[) INFORMATION
B1. NFtP COMMUNITY NAME & COMMUNITY NUM 3ER B2. COUNTY NAME
B3. STATE'
CITY OF SANFORD 120294 SEMINOLE FLORIDA
134. MAP AND PANEL
O a) Top of bottom floor (including basement or enclosure)
B7. FIRM PANEL
m
B9. BASE ROOD ELEVA nON(S)
NA,_t(m)
NUMBER
B5. SUFFD(
B6. FIRM INDID( DATE
EFFECTNEPEVISED DATE
BB. FLOOD ZONES)
(Zone AO, use depth oftl7o ft)
E a
1211700065
E
APR1995
APR1995
X
NA .
❑ t) Lowest adjaoent (finished) grade (LAG)49.0
B10. Indicate the souroe of the Base Flood Elevation (BFE) data or base flood depth entered in B9. .
❑ FIS Profile ® FIRM ❑ Community Determined ❑ Other(Desabe): _
B11. Indicate the elevation datum used for the BFE in 89: Z NGVD 1929, . • - EINAVD 1988 .0 Otter(Descrbe):
612 Is the buffing located in a Coastal Barrier Resources System (CBRS) area or Otherwise Protected Area (OPA)? ❑ Yes ® No Designatbn Date "
SECTION C - BUILDING ELEVATION INFORMATION. (SURVEY REQUIRED)
C1. Building elevations are:based on: ❑ Construction Drawings* ❑ Building Urnder Construct on* ® Finished Construction
*A new Elevation Ceftale will be required when construction of the building is; complete.
C2. Building Diagram Number l (Select the bulding diagram most similar to the building forwhich this eertificate's being completed - see pages 6 and 7, If no diagram .
aocurately represents the buidnng, provide a sketch or photogrepK) M
C3. Elevations—Zones Al A30, AE, AH, A (with BFE) VE, VI 430, V (with BFE), AR, ARIA, ARAE, ARIA1-A30, AR/AH, ARtAO
Complete Items C3. -a -i below according to the buideng diagram specified in Item CZ State the datum used. It the datum is different from the datum used for the BFE in
Section B, convert the datum to that used for the BFE Stow field measurements and datum conversion calculation, Use the space provided or the Comments area of
Section D or Section G, as appropriate, to document the datum conversion.
Datum NGVD29 ConversionlCcmments
Elevation reference mark used Does the elevation reference mark used appear on the FIRM? ❑ Yes ® No
O a) Top of bottom floor (including basement or enclosure)
49. 45 ft(m)
m
D b)Tcp.of'nendhighertloor
NA,_t(m)
0 c) Boitom of lowest horizontal structural member (V zones only)
d) Attached garage (tog of slab)
NA _ft(m)
E a
❑ e) Lowest elevation of mnachmy ardor equipment
w m
servicing the building (Desc be in a Comments area)
❑ t) Lowest adjaoent (finished) grade (LAG)49.0
ft(m)
z N
❑ g) Highest adjacent (finished) grade (HAG)-.
49. 11L(m)
❑ h) No. of permanent openings (flood vents) within I It above adjacent grade
❑ ) Total area of all permanent openings (flood vents) in C3.h _sq: in. (sq. an)
SECTION D - SURVEYOR, ENGINEER, OR ARCHRECT CERTIRCATION
This certification is to be signed and sealed by a land surveyor, engineer, or architect authorized by law to certify elevation information.
I certify that the information in Sections A, B, and Con this certificate represents my best efforts to interpret the data available.
I understand that any false statement maybe punishable by fine or imprisonment under 18 U.S. Code, Section 1001. a
CERTIFIERSNAME R BLAIR KITNER LICENSE NUMBER P.S.M. 3382
TITLE PRESIDENT COMPANY NAME KITNER SURVEYING, INC.
ADDRESS CITY STATE ZIP CODE ..
2597 SANFORD AVENUE SANFORD FL 32772
SIGNATURE �-
DATE
31 MAY2005
IMPORTANT: In these spaces, copy the cmvspondng imbrmation from Section A * For c«rp" Use:
BUILDING STREET ADDRESS ftkxkV Apt, Ur it, Suite, ardor Bkig. No.) OR P.O. ROUTE AND BOX N0. Po4 Number
AIRPORT BOULEVARD
CITY STATE ZIP CODE. OwTariy NAIC Number
SANFORD F- 32773
SECTION D - SURVEYOR, ENGINEER, OR ARCHITECT CERTiRCA71ON (CONTINUED)
Copy both sides of this Elevation Certificate for (I) oommunily official, (2) insurance agentfoompar y, and (3) building owrw..
❑ Check here iI attachments
SECTION E - BUILDING ELEVATION INFORMATION (SURVEY NOT REQUIRED) FOR ZONE AO AND ZONE A (WITHOUT BFE)
For Zone AO and Zone A (without BFE), complete Items El through E4. f the Elevation Cedr%ate is intended for use as supporting information for a LOMA or LOMR-F,
Section C must be -completed.
El. Building Diagram Number_(Seled the building diagram most similar to the building forwhich this certificate is beefing completed – see pages 6 and 7.. If no diagram aowrately
represents the building, provide a sketch or photograph.)
E2 The top of the bottom floor (including basement or enclosure) of the buffing is _ tt.(m) _in.(cxm) ❑ jabove or [–]below (check one) the highest adjacent grade. (Use
natural grade, ifavailable).
B. For Building Diagrams 6-8 with openings (seepage 7), the next higherfloororelevated floor (elevation b) of the buildag is : _ ft(m) _in.(cm) above the highest adjacent
grade. Complete items C3.h and C3.i on front of form.
E4. The top of the platform of machinery andlor equor ent servicing the building is _ ft(m) _in.(am) ❑ abave or [:]below (check one) the highest adjacent grade. (Use
natural grade, tavailable).
E5. ForZone AO ony: If no flood depth number is available, is the top of the bottom floorelevated in accordance with the oommunks floodplain management ordinance?
❑ Yes ❑ No ❑ Unknown. The local official must kerffy this inliormation in Section G.
SECTION F - PROPERTY OWNER (OR OWNER'S REPRESENTATIVE) CEURCATION
The property ownerorowner's authorized representative who completes Sections A, B, C (Items C3.h and C3.i only), and E for Zone A (without a FEMAwissued or community -
issued BFE) orZone AO must sign here. The statements in Sections A, B, C, and E are oared to the best of myfknowfedge.
PROPERTY OWNER'S OR OWNER'S AUTHORIZED REPRESENTATIVE'S NAME
ADDRESS CITY STATE ZIP CODE
SIGNATURE DATE TELEPHONE
COMMENTS
❑ Check here ifatiachments
SECTION G - COMMUNITY INFORMATION (OPTIONAL)
The local otiil who is authorized by law ororiinarwe to administer the oommuniVs floodplain management ordinance can complete Sections A, B, C (or E), and G of this Elevation
Certificate. Complete the applicable item(s) and sign below
G1. ❑ The information in Section Cwas taken from other documentation that has been signed and embossed by a licensed surveyor, engineer, or architect who is authored by state
or load law to certtiy elevation information. Qndicate the source and date of the elevation data in the Comments area below.)
G2. ❑ A community official completed Section E for a building located in Zone A (without a FEMA -issued oroommunily-issued BFE) or Zone A0.
G3. ❑ The folbwirg information (Items G4 -G9) is provided foroommu0y floodplain management purposes.
ISSUED
G7. This permit has been issued for. ❑ New Const action .❑ Substantial Improvement • .
G8. Elevation of as -built list floor (including basement) of the building is _ —ft(m) Datum:
G9. BFE or (in Zone AO) depth of flooding at the budding site is: _ ft(m) Datum:
LOCAL OFFICIAL'S NAME TITLE
COMMUNITY NAME TELEPHONE
SIGNATURE DATE
AL
XITN E R
S U R V E Y I N G
31 May 2005
City of Sanford Building Department
300 North Park Avenue
Sanford, Florida 32771
Re: MAINTENANCE BUILDING AT THE NEW ALAMO CAR RENTAL
SITE AT ORLANDO SANFORD AIRPORT
To Whom It May Concern:
This is to certify that the finished floor elevation of the new building
constructed at the above site meets or exceeds the requirements of Section 6-
7 of the City of Sanford Building Code.
Should you have any questions or need additional information, please do not
hesitate to call.
Sincerely,
GC�--
R. Blair Kitner
P.S.M. No. 3382
P.O. BOX 823 • SANFORD, FLORIDA 32772-0823 • (407) 322-2000
FEDERAL EMERGENCY MANAGEMENTAGENCY - O.M.B. No. 3067-0077• : Y
NATIONAL FLOOD INSURANCE PROGRAM Expires December 31, 200E'
ELEVATION CERTIFICATE
hipoftt Read the instructions on paW 1- 7...
' SECTION A. PROPERTY OWNER INFORMATIONFor.lrsrran7e Company Use:
BUILDING OWNER'S NAME Poflcy Number
VANGUARD CAR RENTAL, USA
BUILDING STREET ADDRESS Qrxlu *V Apt, Unit, Suite, and/or Bldg. No.) OR P.O. ROUTE AND BOX NO. Company NAIC Number
AIRPORT BOULEVARD
CITY STATE ZIP CODE
SANFORD FL 32773
PROPERTY DESCRIPTION (Lot and Block Numbers, Tax Parcel Number, Legal Description, etc)
MAINTENANCE BUILDING AT ALAMO CAR RENTAL SITE AT ORLANDO SANFORD AIRPORT
BUILDING USE (e.g., Residential, Non-residential, Addition, Accessory, etc. Use a Comments area, if necessary.)
COMMERCIAL _. .
LATITUDEILONGITUDE (OPTIONAL) HORIZONTAL DATUM:. SOURCE: El GPS (type):
( #r - #9 - ##JW or ##.# ❑ NAD 1927 Q NAD 1983 ❑-USGS Quad Map ❑ Other:
SECTION B - FLOOD INSURANCE RATE MAP (FIRM) INFORMATION
B1. NFP CONWNNITY NAME & CONWIUNITY NUMBER B2 COUNTY NAME B3. STATE
CITY OF SANFORD 120294 SEMNOLE FLORIDA'
B4. AMP AND PANEL
❑ a) Top of bottom floor (including basement or enclosure)
B7. FIRM PANEL
B9. BASE FLOOD ELEVATION(S)
NUMBER
B5.SUFFD(
B6. FIRMINDEXDATE
EFFECTNEIREVISED DATE
B8. FLOODZONE(S)
(Zone AO, use deplhbffloorfirg)
1211700065
E
APR1995
APR1995
X
NA
B10. Indicate the source of the Base Flood Elevation (BFE) data or base flood depth entered in B9.
❑ FIS Profile ® FIRM ❑ Community Determined ❑ Odrer(Desabe): .
B11. Indicate the elevation datum used for the BFE in B9: ® NGVD •1929 • I ❑ NAVD 1988 . Oto (Describe):
B12 Is the building located in a Coate Barrier Resources System (CBRS) area or Otherwise Profited Area (OPA)? ❑ Yes ® No Designation Date
SECTION C - BUILDING,ELEVATION,INFORMATION (SURVEY REQUIRED]
C1. Building elevations are based on: ❑ Constnrdion Drawings* - ElBuilding urdier Construction* • ® Finished Conshuction
*A new Elevation Certificate will be required when construction of the building is complete.
C2 Building Diagram Number 1(Select the building diagram most similar to the building for which this certificate is being completed - see pages 6 and 7. If no diagram
aocurately represents the building, provide a sketch or photograph.)
C3. Elevations – Zones AlAW, AE, AH, A (with BFE), VE, V1 -V30, V (with BFE), AR, ARIA, ARAE, ARIAI-A30, ARAAH, ARAO
Complete Items C3.-aA below a000rdN to the buldN diagram specified to Item C2 State the datum used. If the datum is different from the datum used for the BFE in
Section B, convert the datum to that used for the BFE. Show field measurements and'datum conversion calculation. Use the space provided or the Comments area of
Section D or Section G, as appropriate, to document the datum conversion.
Datum NGVD 29 ConversionlComments
Elevation reference mark used Does the elevation reference mark used appear on the FIRM? ❑ Yes ®No
❑ a) Top of bottom floor (including basement or enclosure)
47. 571(m)
❑ b) Top pf net hgherfloor ., .
NA
❑ c) Bottom of lowest hkmtal structural member (y zones only)
NA.. ft(m)
o
❑ d) Attached garage (top of slab)
NA —ft(m)
❑ e) Lowest elevation of machinery andror equipment
w m
servicing the building (Describe in a Comments area)
47.3 ft(m)
❑ 0 Lowest adjacent (finished) grade (LAG)
46.6 ft(m)
z� .L
❑ g) Highest adjacent (finished) grade "G)
46. S ft(m)
❑ h) No. of permanent openings (flood vents) within 1 ft above adjacent grade
U ) Total area of all permanent openings (flood vents) in C3.h -sq. in. (sq. an)
SECTION D - SURVEYOR, ENGINEER, ORARCHITECT CERTIFICATION
This certification is to be signed and sealed by a land surveyor, engineer, or architect authorized by law to certify elevation information.
I certify that the information in Sections A, B, and C on this certificate represents my best efforts to interpret the data available,
1 understand that any false statement may be punishable by fine or imprisonment under 18 U. S. Code, Section 1001.
CERTIFIERS NAME R BLAIR KITNER LICENSE NUMBER P.S.M. 3382
TITLE PRESIDENT COMPANY NAME KITNER SURVEYING, INC.
ADDRESS CITY STATE ZIP CODE
2597 SANFORD AVENUE SANFORD FL 32772.
SIGNATURE CC DATE TELEPHONE
31 MAY2005 407 3712000
IMPORTANT: In these spaces, copy the com mpondng information from Section A ) For hamr= Carp" =
BULDING STREETADDRESS Mdudm Act. Urri. Suita dor Bkkt No.) OR P.O. ROUTE AND BOX NO Pobj Number
AIRPORT BOULEVARD
Crry STATE ZIP CODE Company MAIC Number
SANFORD R- 32173
SECTION D - SURVEYOR, ENGINEER, OR ARCHITECT CERTIFICATION (CONTINUED)
Copy both sides of this Elevation Certificate for (1) communky official, (2) prance agenUcornparry, and (3) building ownner.
COMMENTS
❑ Check here iia ichrnents
SECTION E - BUILDING ELEVATION INFORMATION (SURVEY NOT REQUIRED) FOR ZONE AO AND ZONE A (WITHOUT BFE)
For Zone AO arid Zone A (Without BFE), complete Items E1 through E4. If the Elevation Cedicele is intended for use as supporting information for a LOMA orLOMR-F,
Section C must be completed.
E1. Budding Diagram Number_(Seledthe budding diagram most similar to the budding for which this certificate's being completed -seepages 6 and 7. If no diagram accurately
represents the budding, provide a sketch or photograph.)
E2. The top of the bottom floor (including basement or enclosure) of the budding is _ ft(m) _in.(om) ❑ above or ❑ below (dhedc one) the highest adjacent grade. (Use
natural grade, if available).
E3. For Building Diagrams 6-8 with openings (seepage 7), the reed higher floororelovated floor (elevation b) of the budding is _ fl.(m) _in.(,om) above the highest adjacent
grade. Complete items C3.h and C3.i on front of form. `
E4. The top of the platform of machinery andtor equipment servicing the budding is _ I(m) _in.(cm) ❑ above or ❑ below (d}ed(one) the highest adjacent grade. (Use
natural grade, if available).
E5. For Zone AO only. If no flood depth number is available, is the top of the bottom floor elevated in accordance with the oommunWs floodplain management ordinance?
❑ Yes ❑ No ❑ Unknown. The tonal aff ial must oertily this information in Section G.
SECTION F - PROPERTY OWNER (OR OWNER'S REPRESENTATIVE) CERTIFICATION
The property owner or owners authored representative who completes Sections A, B, C (Items C3.h and C3.i only), and E for Zone A (without a FEMAAssuied or community-
issued
BFE) or Zone AO must sign here. The statements lo Sections A, R C, and E are oared to the best of my kmwf6*.
PROPERTY OWNER'S OR OWNER'S AUTHORIZED REPRESENTATIVE'S NAME
ADDRESS GTY STATE ZIP CODE
SIGNATURE DATE TELEPHONE
COMMENTS
❑ Check here if attachments
SECTION G - COMMUNITY INFORMATION (OPTIONAL)
The local of ial who is authorized by law orordinanoe to administer the communiVs floodplain management ordinance can complete Sections A, B, C (or E), and G of this Elevation
Ceffaite. Complete the applicable items) and sign below.
G1. ❑ The iniomnation in Section C was taken from other documentation that has been signed and embossed by a licensed surveyor, engineer, or architect who is authorized by state
or local law to oertfly elevation i nfomation. (Indicate the source and date of the elevation data in the Comments area below.)
G2. F]A oommunity official completed Section E fora budding bcared in Zone A (without a FEMA -issued or communfly-issued BFE) or Zone A0.
G3. ❑ The following information (Items G4 -G9) is provided for community floodplain management purposes. .
X11
CERTIFICATE OF COMM IANCEfCCCUPANCY
G7. This permit has been issued for. ❑ New Construction ❑ SubstantielImprovement
GB. Elevation of asbuilt lowest floor (including basement) of tie budding is: — _ft(m) Datum:
G9. BFE or (n Zone AO) depth of flooding at the budding sire is: _ _ 1t(m) Datum:
LOCAL OFFICIAL'S NAME TITLE
COMMUNITY NAME TELEPHONE
SIGNATURE DATE
COMMENTS
s
DATE:
PERMIT #:
ADDRESS:
CERI'IFCATE OF OCCUPANCY
REQUEST FOR FINAL, INSPEC'T'ION
ALAMO
****NEW OFFICE, BANKS, ECT. ****
05/11/05
05-1141
2500 E. Airport Blvd
CONTRACTOR: S A Kennedy
PHONE #: 770-667-3602
The building division has prepared a Certificate of Occupancy for the above
location and is requesting final inspection by your department. After your
inspection, please sign off and date the C. O. or submit addendum if it has
been denied or approved with conditions. Your prompt attention will be
appreciated.
ngineering ►Fire 22
[]Public Works.
oning
❑Utilities Licensing
CONDITIONS: (TOB CO ETEDrONLY APPROVAL IS CONDITIONAL)
l' 4
a
City of Sanford
Engineering And Planning Department
memorandum
TO: PATTI SHOLAR, BBM CLEARING AND GRADING
FROM: Greg Hyatt, Development Services Technician
A
N
DATE: MAY 27, 2005 ENGINEMG
N
G
SUBJECT: PUNCH LIST FOR WALK THROUGH FOR ALAMO CAR
RENTAL
1. Clean MES from ditch to canal ( from NW pond).
2. Asphalt at Red Cleveland entrance appears to be sliding.
3. Handrail on bridge needs to be repaired at joints.
4. Repair bird baths in parking area.
5. Complete landscaping as per plan.
6. Repair broken curb at the east side of bridge.
7. Pour concrete around inlet on the east side of exit driveway.
8. Complete concrete pad around outfall structure # 500
9. Install concrete flumes in appropriate areas
PLEASE CALL FOR REINSPECTION WHEN ALL ITEMS ARE DONE
GREG
Engineering and Planning Department Phone: (407) 33075671 Fax: (407) 330-5679
F:\SHA ENG\Development Review\04-Engineering\gregs. memo.wpd
Printed May 27, 2,005 (12:46pm)