Loading...
HomeMy WebLinkAbout8100 Red Cleveland Blvd - BC05-001144 (SANFORD AIRPORT AUTHORITY) DOCUMENTSPERMIT ADDRESS CONTRACTOR ADDRESS PHONE NUMBER PROPERTY OWNER ADDRESS PHONE NUMBER ELECTRICAL CONTRACTOR MECHANICAL CONTRACTO PLUMBING CONTRACTOR MISCELLANEOUS CONTRACTOR PERMIT NUMBER FEE MISCELLANEOUS CONTRACTOR PERMIT NUMBER FEE SUBDIVISION PERMIT* dS • t ryy DATE JQS * 60 mor PERMIT DESCRIPTION PERMIT VALUATION SQUARE FOOTAGE d M 0 Lh J CERTIFCATE OF OCCUPANCY REQUEST FOR FINAL INSPECTION ,\N ALAMO ****NEW OFFICE, BANKS, ECT. DATE: 05/11/05 PERMIT #: ` 05-1144 11 \\ VG ADDRESS: _25WE � CONTRACTOR: S A Kennedy PHONE #: 770-667-3602 The building division has prepared a Certificate of Occupancy for the above - location and is requesting final inspection by your department. After your inspection, please sign off and date the C. O. or submit addendum if it has been denied or approved with conditions. Your prompt attention will be appreciated. Engineering Z Fire ❑Public Works 0ning ❑Utilities Licensing CONDITIONS:TO BE C0 W;L LY IF APP VAL IS CONDITIONAL) J� 9 :.- City of Sanford Engineering And Planning Department memorandum TO: PATTI SHOLAR, BBM CLEARING AND GRADING FROM: Greg Hyatt, Development Services Technician P A N DATE: MAY 27, 2005 ENGINM%G G SUBJECT: PUNCH LIST FOR WALK THROUGH FOR ALAMO CAR RENTAL 1. Clean MES from ditch to canal ( from NW pond). 2. Asphalt at Red Cleveland entrance appears to be sliding. 3. Handrail on bridge needs to be repaired at joints. 4. Repair bird baths in parking area. 5. Complete landscaping as per plan. 6. Repair broken curb at the east side of bridge. 7. Pour concrete around inlet on the east side of exit driveway. 8. Complete concrete pad around outfall structure # 500 9. Install concrete flumes in appropriate areas PLEASE CALL FOR REINSPECTION WHEN ALL ITEMS ARE DONE _�>iJ_li•I:�`? GREG Engineering and Planning Department Phone: (407) 330-5671 Fax: (407) 330-5679 F:\SHA ENG\Development Review\04-Engineering\gregs. memo.wpd Printed May 27, 2,005 (12:46pm) CERTIFCATE OF OCCUPANCY -- REQUEST FOR FINAL INSPECTION _ ALAMO ****NEW OFFICE, BANKS, ECT. 1 1 ► LLI 1 1 M' 1 i t 1 i` DATE: 05/11/05 ' __"_ I l t r 1 1 � I 1 4 1 1 PERMIT #: ` 05-1144 p-- ADDRESS: 2550 E. Airmort Blvd � ` � , j e " CONTRACTOR: S A Kennedy t>: 8 �. N m PHONE #: 770-667-3602 The building division has prepared a Certificate of Occupancy for the above location and is requesting final inspection by your department. After your inspection, please sign off and date the C. O. or submit addendum if it has been denied or approved with conditions. Your prompt attention will be appreciated. ❑Engineering Tire ❑Public Works Zoning Utiliti(Licensing CONDITIONS: (TO BE COMPLETED ONLY IF APPROVAL IS CONDITIONAL) 9 LMBC1001 CITY OF SANFORD Address Misc. Information Inquiry Location ID . . . . . Parcel Number. . . . . . . Alternate location ID . . Location address . . . . . Primary related party . . Type options, press Enter. 5 View detail Opt Description 272555 05.20.31.300-0010-0000 2550 E AIRPORT BLVD SANFORD AIRPORT/VANGUARD-ALMO Free -form information F2=Address F3=Exit F5=Special Notes F9=Parcel Notes F12=Cancel F16=Related pty data 5/11/05 16:44:47 z> CERTIFCATE OF OCCUPANCY REQUEST FOR FINAL INSPECTIQALAMOl ****NEW OFFICE9 BANKS *** ,ECT. %A DATE:05/11/05 = I PERMIT # 05-114 tZB 7 "I�c�yADDRESS: 2500 E. Air �� `_` to u w ' %A ' 4 J W CONTRACTOR: S A Kennedy `�,,'� G) '^ PHONE #: Q 770-667-3602 Cr Ll The building division has prepared a Certificate of Occupancy for the above location and is requesting final inspection by your department. After your inspection, please sign off and date the C. O. or submit addendum if it has been denied or approved with conditions. Your prompt attention will be appreciated. CJEngineeri Fire 0/o/ - f 310L ❑Public Workst (IUAkJIfiI _ �Zon' tiliti Licensing x wo, I CONDITIONS: (TO BE COMPLETED ONLY IF APPROVAL IS. CONDITIONAL) 9 n Ail r 'KIT NER S U R V E Y I N G 31 May 2005 City of Sanford Building Department 300 North Park Avenue Sanford, Florida 32771 o S -\\k*4 Re: ADMINISTRATION BUILDING AT THE NEW ALAMO CAR RENTAL SITE AT ORLANDO SANFORD AIRPORT To Whom It May Concern: This is to certify that the finished floor elevation of the new building constructed at the above site meets or exceeds the requirements of Section 6- 7 of the City of Sanford Building Code. Should you have any questions or need additional information, please do not hesitate to call. Sincerely, irA R. Blair Kitner P.S.M. No. 3382 P.O. BOX 823 - SANFORD, FLORIDA 32772-0823 0 (407) 322-2000 .� ..,e." . FEDERAL EMERGENCYMANA(,EMENTAGENCY_ .. 0. M. B. No.3067-0077 NATIONAL FLOOD INSURANCE PROQRAM a Expires December 31, 200: ELEVATION CERTIFICATE Read the inshuc1lim on. 1- 7..: SECTION A - PROPERTY OWNER INFORMATION'' `for Ir tic a Cqr parW t7ae BUILDING OWNER'S NAME PoiCY Number, , VANGUARD CAR RENTAL, USA BUILDING STREET ADDRESS Qndudvg Apt, Unit, Suite, ardor Bldg. No.) OR P.O. ROUTE AND BOX NO. Comparry NAIC Number AIRPORT BOULEVARD CITY STATE ZIP CODE SANFORD FL 32773 PROPERTY DESCRIPTION (Lot and Block Numbers, Tax Parcel Number, Legal Descroon, etc) ADMINISTRATION BUILDING AT ALAMO CAR RENTAL SITE AT ORLANDO SANFORD AIRPORT BUILDING USE (e.g.,,Residential, Non-residential, Addition, Accessory, etc. Use a Comments area, if necessary.) COMMERCIAL . LATITUDEILONGTUDE,(OPTIQNAL) • HORIZONTAL"DATUM: SOURCE:, E GPS (Type): { W -#W - ,ff or ##.fes ❑ NAD 1927 ❑ NAD 1983 USGS Quad Map Q Other:, SECTION B - FLOOD INSURANCE RATE MAP (FIRIVi[) INFORMATION B1. NFtP COMMUNITY NAME & COMMUNITY NUM 3ER B2. COUNTY NAME B3. STATE' CITY OF SANFORD 120294 SEMINOLE FLORIDA 134. MAP AND PANEL O a) Top of bottom floor (including basement or enclosure) B7. FIRM PANEL m B9. BASE ROOD ELEVA nON(S) NA,_t(m) NUMBER B5. SUFFD( B6. FIRM INDID( DATE EFFECTNEPEVISED DATE BB. FLOOD ZONES) (Zone AO, use depth oftl7o ft) E a 1211700065 E APR1995 APR1995 X NA . ❑ t) Lowest adjaoent (finished) grade (LAG)49.0 B10. Indicate the souroe of the Base Flood Elevation (BFE) data or base flood depth entered in B9. . ❑ FIS Profile ® FIRM ❑ Community Determined ❑ Other(Desabe): _ B11. Indicate the elevation datum used for the BFE in 89: Z NGVD 1929, . • - EINAVD 1988 .0 Otter(Descrbe): 612 Is the buffing located in a Coastal Barrier Resources System (CBRS) area or Otherwise Protected Area (OPA)? ❑ Yes ® No Designatbn Date " SECTION C - BUILDING ELEVATION INFORMATION. (SURVEY REQUIRED) C1. Building elevations are:based on: ❑ Construction Drawings* ❑ Building Urnder Construct on* ® Finished Construction *A new Elevation Ceftale will be required when construction of the building is; complete. C2. Building Diagram Number l (Select the bulding diagram most similar to the building forwhich this eertificate's being completed - see pages 6 and 7, If no diagram . aocurately represents the buidnng, provide a sketch or photogrepK) M C3. Elevations—Zones Al A30, AE, AH, A (with BFE) VE, VI 430, V (with BFE), AR, ARIA, ARAE, ARIA1-A30, AR/AH, ARtAO Complete Items C3. -a -i below according to the buideng diagram specified in Item CZ State the datum used. It the datum is different from the datum used for the BFE in Section B, convert the datum to that used for the BFE Stow field measurements and datum conversion calculation, Use the space provided or the Comments area of Section D or Section G, as appropriate, to document the datum conversion. Datum NGVD29 ConversionlCcmments Elevation reference mark used Does the elevation reference mark used appear on the FIRM? ❑ Yes ® No O a) Top of bottom floor (including basement or enclosure) 49. 45 ft(m) m D b)Tcp.of'nendhighertloor NA,_t(m) 0 c) Boitom of lowest horizontal structural member (V zones only) d) Attached garage (tog of slab) NA _ft(m) E a ❑ e) Lowest elevation of mnachmy ardor equipment w m servicing the building (Desc be in a Comments area) ❑ t) Lowest adjaoent (finished) grade (LAG)49.0 ft(m) z N ❑ g) Highest adjacent (finished) grade (HAG)-. 49. 11L(m) ❑ h) No. of permanent openings (flood vents) within I It above adjacent grade ❑ ) Total area of all permanent openings (flood vents) in C3.h _sq: in. (sq. an) SECTION D - SURVEYOR, ENGINEER, OR ARCHRECT CERTIRCATION This certification is to be signed and sealed by a land surveyor, engineer, or architect authorized by law to certify elevation information. I certify that the information in Sections A, B, and Con this certificate represents my best efforts to interpret the data available. I understand that any false statement maybe punishable by fine or imprisonment under 18 U.S. Code, Section 1001. a CERTIFIERSNAME R BLAIR KITNER LICENSE NUMBER P.S.M. 3382 TITLE PRESIDENT COMPANY NAME KITNER SURVEYING, INC. ADDRESS CITY STATE ZIP CODE .. 2597 SANFORD AVENUE SANFORD FL 32772 SIGNATURE �- DATE 31 MAY2005 IMPORTANT: In these spaces, copy the cmvspondng imbrmation from Section A * For c«rp" Use: BUILDING STREET ADDRESS ftkxkV Apt, Ur it, Suite, ardor Bkig. No.) OR P.O. ROUTE AND BOX N0. Po4 Number AIRPORT BOULEVARD CITY STATE ZIP CODE. OwTariy NAIC Number SANFORD F- 32773 SECTION D - SURVEYOR, ENGINEER, OR ARCHITECT CERTiRCA71ON (CONTINUED) Copy both sides of this Elevation Certificate for (I) oommunily official, (2) insurance agentfoompar y, and (3) building owrw.. ❑ Check here iI attachments SECTION E - BUILDING ELEVATION INFORMATION (SURVEY NOT REQUIRED) FOR ZONE AO AND ZONE A (WITHOUT BFE) For Zone AO and Zone A (without BFE), complete Items El through E4. f the Elevation Cedr%ate is intended for use as supporting information for a LOMA or LOMR-F, Section C must be -completed. El. Building Diagram Number_(Seled the building diagram most similar to the building forwhich this certificate is beefing completed – see pages 6 and 7.. If no diagram aowrately represents the building, provide a sketch or photograph.) E2 The top of the bottom floor (including basement or enclosure) of the buffing is _ tt.(m) _in.(cxm) ❑ jabove or [–]below (check one) the highest adjacent grade. (Use natural grade, ifavailable). B. For Building Diagrams 6-8 with openings (seepage 7), the next higherfloororelevated floor (elevation b) of the buildag is : _ ft(m) _in.(cm) above the highest adjacent grade. Complete items C3.h and C3.i on front of form. E4. The top of the platform of machinery andlor equor ent servicing the building is _ ft(m) _in.(am) ❑ abave or [:]below (check one) the highest adjacent grade. (Use natural grade, tavailable). E5. ForZone AO ony: If no flood depth number is available, is the top of the bottom floorelevated in accordance with the oommunks floodplain management ordinance? ❑ Yes ❑ No ❑ Unknown. The local official must kerffy this inliormation in Section G. SECTION F - PROPERTY OWNER (OR OWNER'S REPRESENTATIVE) CEURCATION The property ownerorowner's authorized representative who completes Sections A, B, C (Items C3.h and C3.i only), and E for Zone A (without a FEMAwissued or community - issued BFE) orZone AO must sign here. The statements in Sections A, B, C, and E are oared to the best of myfknowfedge. PROPERTY OWNER'S OR OWNER'S AUTHORIZED REPRESENTATIVE'S NAME ADDRESS CITY STATE ZIP CODE SIGNATURE DATE TELEPHONE COMMENTS ❑ Check here ifatiachments SECTION G - COMMUNITY INFORMATION (OPTIONAL) The local otiil who is authorized by law ororiinarwe to administer the oommuniVs floodplain management ordinance can complete Sections A, B, C (or E), and G of this Elevation Certificate. Complete the applicable item(s) and sign below G1. ❑ The information in Section Cwas taken from other documentation that has been signed and embossed by a licensed surveyor, engineer, or architect who is authored by state or load law to certtiy elevation information. Qndicate the source and date of the elevation data in the Comments area below.) G2. ❑ A community official completed Section E for a building located in Zone A (without a FEMA -issued oroommunily-issued BFE) or Zone A0. G3. ❑ The folbwirg information (Items G4 -G9) is provided foroommu0y floodplain management purposes. ISSUED G7. This permit has been issued for. ❑ New Const action .❑ Substantial Improvement • . G8. Elevation of as -built list floor (including basement) of the building is _ —ft(m) Datum: G9. BFE or (in Zone AO) depth of flooding at the budding site is: _ ft(m) Datum: LOCAL OFFICIAL'S NAME TITLE COMMUNITY NAME TELEPHONE SIGNATURE DATE AL XITN E R S U R V E Y I N G 31 May 2005 City of Sanford Building Department 300 North Park Avenue Sanford, Florida 32771 Re: MAINTENANCE BUILDING AT THE NEW ALAMO CAR RENTAL SITE AT ORLANDO SANFORD AIRPORT To Whom It May Concern: This is to certify that the finished floor elevation of the new building constructed at the above site meets or exceeds the requirements of Section 6- 7 of the City of Sanford Building Code. Should you have any questions or need additional information, please do not hesitate to call. Sincerely, GC�-- R. Blair Kitner P.S.M. No. 3382 P.O. BOX 823 • SANFORD, FLORIDA 32772-0823 • (407) 322-2000 FEDERAL EMERGENCY MANAGEMENTAGENCY - O.M.B. No. 3067-0077• : Y NATIONAL FLOOD INSURANCE PROGRAM Expires December 31, 200E' ELEVATION CERTIFICATE hipoftt Read the instructions on paW 1- 7... ' SECTION A. PROPERTY OWNER INFORMATIONFor.lrsrran7e Company Use: BUILDING OWNER'S NAME Poflcy Number VANGUARD CAR RENTAL, USA BUILDING STREET ADDRESS Qrxlu *V Apt, Unit, Suite, and/or Bldg. No.) OR P.O. ROUTE AND BOX NO. Company NAIC Number AIRPORT BOULEVARD CITY STATE ZIP CODE SANFORD FL 32773 PROPERTY DESCRIPTION (Lot and Block Numbers, Tax Parcel Number, Legal Description, etc) MAINTENANCE BUILDING AT ALAMO CAR RENTAL SITE AT ORLANDO SANFORD AIRPORT BUILDING USE (e.g., Residential, Non-residential, Addition, Accessory, etc. Use a Comments area, if necessary.) COMMERCIAL _. . LATITUDEILONGITUDE (OPTIONAL) HORIZONTAL DATUM:. SOURCE: El GPS (type): ( #r - #9 - ##JW or ##.# ❑ NAD 1927 Q NAD 1983 ❑-USGS Quad Map ❑ Other: SECTION B - FLOOD INSURANCE RATE MAP (FIRM) INFORMATION B1. NFP CONWNNITY NAME & CONWIUNITY NUMBER B2 COUNTY NAME B3. STATE CITY OF SANFORD 120294 SEMNOLE FLORIDA' B4. AMP AND PANEL ❑ a) Top of bottom floor (including basement or enclosure) B7. FIRM PANEL B9. BASE FLOOD ELEVATION(S) NUMBER B5.SUFFD( B6. FIRMINDEXDATE EFFECTNEIREVISED DATE B8. FLOODZONE(S) (Zone AO, use deplhbffloorfirg) 1211700065 E APR1995 APR1995 X NA B10. Indicate the source of the Base Flood Elevation (BFE) data or base flood depth entered in B9. ❑ FIS Profile ® FIRM ❑ Community Determined ❑ Odrer(Desabe): . B11. Indicate the elevation datum used for the BFE in B9: ® NGVD •1929 • I ❑ NAVD 1988 . Oto (Describe): B12 Is the building located in a Coate Barrier Resources System (CBRS) area or Otherwise Profited Area (OPA)? ❑ Yes ® No Designation Date SECTION C - BUILDING,ELEVATION,INFORMATION (SURVEY REQUIRED] C1. Building elevations are based on: ❑ Constnrdion Drawings* - ElBuilding urdier Construction* • ® Finished Conshuction *A new Elevation Certificate will be required when construction of the building is complete. C2 Building Diagram Number 1(Select the building diagram most similar to the building for which this certificate is being completed - see pages 6 and 7. If no diagram aocurately represents the building, provide a sketch or photograph.) C3. Elevations – Zones AlAW, AE, AH, A (with BFE), VE, V1 -V30, V (with BFE), AR, ARIA, ARAE, ARIAI-A30, ARAAH, ARAO Complete Items C3.-aA below a000rdN to the buldN diagram specified to Item C2 State the datum used. If the datum is different from the datum used for the BFE in Section B, convert the datum to that used for the BFE. Show field measurements and'datum conversion calculation. Use the space provided or the Comments area of Section D or Section G, as appropriate, to document the datum conversion. Datum NGVD 29 ConversionlComments Elevation reference mark used Does the elevation reference mark used appear on the FIRM? ❑ Yes ®No ❑ a) Top of bottom floor (including basement or enclosure) 47. 571(m) ❑ b) Top pf net hgherfloor ., . NA ❑ c) Bottom of lowest hkmtal structural member (y zones only) NA.. ft(m) o ❑ d) Attached garage (top of slab) NA —ft(m) ❑ e) Lowest elevation of machinery andror equipment w m servicing the building (Describe in a Comments area) 47.3 ft(m) ❑ 0 Lowest adjacent (finished) grade (LAG) 46.6 ft(m) z� .L ❑ g) Highest adjacent (finished) grade "G) 46. S ft(m) ❑ h) No. of permanent openings (flood vents) within 1 ft above adjacent grade U ) Total area of all permanent openings (flood vents) in C3.h -sq. in. (sq. an) SECTION D - SURVEYOR, ENGINEER, ORARCHITECT CERTIFICATION This certification is to be signed and sealed by a land surveyor, engineer, or architect authorized by law to certify elevation information. I certify that the information in Sections A, B, and C on this certificate represents my best efforts to interpret the data available, 1 understand that any false statement may be punishable by fine or imprisonment under 18 U. S. Code, Section 1001. CERTIFIERS NAME R BLAIR KITNER LICENSE NUMBER P.S.M. 3382 TITLE PRESIDENT COMPANY NAME KITNER SURVEYING, INC. ADDRESS CITY STATE ZIP CODE 2597 SANFORD AVENUE SANFORD FL 32772. SIGNATURE CC DATE TELEPHONE 31 MAY2005 407 3712000 IMPORTANT: In these spaces, copy the com mpondng information from Section A ) For hamr= Carp" = BULDING STREETADDRESS Mdudm Act. Urri. Suita dor Bkkt No.) OR P.O. ROUTE AND BOX NO Pobj Number AIRPORT BOULEVARD Crry STATE ZIP CODE Company MAIC Number SANFORD R- 32173 SECTION D - SURVEYOR, ENGINEER, OR ARCHITECT CERTIFICATION (CONTINUED) Copy both sides of this Elevation Certificate for (1) communky official, (2) prance agenUcornparry, and (3) building ownner. COMMENTS ❑ Check here iia ichrnents SECTION E - BUILDING ELEVATION INFORMATION (SURVEY NOT REQUIRED) FOR ZONE AO AND ZONE A (WITHOUT BFE) For Zone AO arid Zone A (Without BFE), complete Items E1 through E4. If the Elevation Cedicele is intended for use as supporting information for a LOMA orLOMR-F, Section C must be completed. E1. Budding Diagram Number_(Seledthe budding diagram most similar to the budding for which this certificate's being completed -seepages 6 and 7. If no diagram accurately represents the budding, provide a sketch or photograph.) E2. The top of the bottom floor (including basement or enclosure) of the budding is _ ft(m) _in.(om) ❑ above or ❑ below (dhedc one) the highest adjacent grade. (Use natural grade, if available). E3. For Building Diagrams 6-8 with openings (seepage 7), the reed higher floororelovated floor (elevation b) of the budding is _ fl.(m) _in.(,om) above the highest adjacent grade. Complete items C3.h and C3.i on front of form. ` E4. The top of the platform of machinery andtor equipment servicing the budding is _ I(m) _in.(cm) ❑ above or ❑ below (d}ed(one) the highest adjacent grade. (Use natural grade, if available). E5. For Zone AO only. If no flood depth number is available, is the top of the bottom floor elevated in accordance with the oommunWs floodplain management ordinance? ❑ Yes ❑ No ❑ Unknown. The tonal aff ial must oertily this information in Section G. SECTION F - PROPERTY OWNER (OR OWNER'S REPRESENTATIVE) CERTIFICATION The property owner or owners authored representative who completes Sections A, B, C (Items C3.h and C3.i only), and E for Zone A (without a FEMAAssuied or community- issued BFE) or Zone AO must sign here. The statements lo Sections A, R C, and E are oared to the best of my kmwf6*. PROPERTY OWNER'S OR OWNER'S AUTHORIZED REPRESENTATIVE'S NAME ADDRESS GTY STATE ZIP CODE SIGNATURE DATE TELEPHONE COMMENTS ❑ Check here if attachments SECTION G - COMMUNITY INFORMATION (OPTIONAL) The local of ial who is authorized by law orordinanoe to administer the communiVs floodplain management ordinance can complete Sections A, B, C (or E), and G of this Elevation Ceffaite. Complete the applicable items) and sign below. G1. ❑ The iniomnation in Section C was taken from other documentation that has been signed and embossed by a licensed surveyor, engineer, or architect who is authorized by state or local law to oertfly elevation i nfomation. (Indicate the source and date of the elevation data in the Comments area below.) G2. F]A oommunity official completed Section E fora budding bcared in Zone A (without a FEMA -issued or communfly-issued BFE) or Zone A0. G3. ❑ The following information (Items G4 -G9) is provided for community floodplain management purposes. . X11 CERTIFICATE OF COMM IANCEfCCCUPANCY G7. This permit has been issued for. ❑ New Construction ❑ SubstantielImprovement GB. Elevation of asbuilt lowest floor (including basement) of tie budding is: — _ft(m) Datum: G9. BFE or (n Zone AO) depth of flooding at the budding sire is: _ _ 1t(m) Datum: LOCAL OFFICIAL'S NAME TITLE COMMUNITY NAME TELEPHONE SIGNATURE DATE COMMENTS s DATE: PERMIT #: ADDRESS: CERI'IFCATE OF OCCUPANCY REQUEST FOR FINAL, INSPEC'T'ION ALAMO ****NEW OFFICE, BANKS, ECT. **** 05/11/05 05-1141 2500 E. Airport Blvd CONTRACTOR: S A Kennedy PHONE #: 770-667-3602 The building division has prepared a Certificate of Occupancy for the above location and is requesting final inspection by your department. After your inspection, please sign off and date the C. O. or submit addendum if it has been denied or approved with conditions. Your prompt attention will be appreciated. ngineering ►Fire 22 []Public Works. oning ❑Utilities Licensing CONDITIONS: (TOB CO ETEDrONLY APPROVAL IS CONDITIONAL) l' 4 a City of Sanford Engineering And Planning Department memorandum TO: PATTI SHOLAR, BBM CLEARING AND GRADING FROM: Greg Hyatt, Development Services Technician A N DATE: MAY 27, 2005 ENGINEMG N G SUBJECT: PUNCH LIST FOR WALK THROUGH FOR ALAMO CAR RENTAL 1. Clean MES from ditch to canal ( from NW pond). 2. Asphalt at Red Cleveland entrance appears to be sliding. 3. Handrail on bridge needs to be repaired at joints. 4. Repair bird baths in parking area. 5. Complete landscaping as per plan. 6. Repair broken curb at the east side of bridge. 7. Pour concrete around inlet on the east side of exit driveway. 8. Complete concrete pad around outfall structure # 500 9. Install concrete flumes in appropriate areas PLEASE CALL FOR REINSPECTION WHEN ALL ITEMS ARE DONE GREG Engineering and Planning Department Phone: (407) 33075671 Fax: (407) 330-5679 F:\SHA ENG\Development Review\04-Engineering\gregs. memo.wpd Printed May 27, 2,005 (12:46pm)