HomeMy WebLinkAbout111 Towne Center Cir - 95-002774 (1995) (WAR ROOM) (FIRE) (A)7'owoe en�
ZONE DATE
CONTRACTOR or c or
ADDRESS 1 113% AI (1'L)s 4,c'l
PHONE #
LOCATION 1 ��� (-4)n e
OWNER�I-
ADDRESS
PHONE #
e7/5:f� j5 PLUMBING CONTRACTOR Z-62/2
ADDRESS
PHONE #
ELECTRICAL CONTRACTOR &
ADDRESS
PHONE #
MECHANICAL CONTRACTOR
ADDRESS
PHONE #
MISCELLANEOUS CONTRACTOR
ADDRESS
SEPTIC TANK PERMIT NO.
SOIL TEST REQUIREMENTS (�_)
FINISHED FLOOR
ELEVATION REQUIREMENTS (__)
ARCH ITECTURALAPPROVAL DATE:
som
SUBDIVISION:
�-7
PERMIT # ';2/ L/
� ��d�C�I7yrI.S
J 0 B
COST $/ 1 LC � --
FEE
STATE NO.
FEE $ (!: -
v�
FEE $ j" �_..
FEE $ 5 D
LOT NO.
BLOCK:
SECTION:
SQUARE FEET: 117
MODEL:
OCCUPANCY CLASS:
INSPECTIONS
TYPE DATE OK REJECT BY
FEE $ ENERGY SEC EPI:
S 3 e,
CERTIFICATE OF OCCUPANCY
ISSUED # DATE: _
FINAL DATE
GENERAL NOTES
1. Installation in accordance with N.F.P.A. #13.
2. All materials to be UL Listed.
3. Sprinkler piping to be manufactured under one of the following ASTM standards-
A53,A135,Or A795.
4. Mains to be Schedule 10 black steel joined by roll grooved method using grooved fittings
and thread -o -let type outlets.
5. Branch line piping to be Schedule 40 blac'K steel joined with threaded outlet fittings.
6. All sprinkler drops to be V Schedule 40 black steel pipe with 1 x 1/2" threaded reducer.
7. Hangers to be sized and spaced in accordance with N.F.P.A. 13, Section 2-6.
8. Flushing connections to be provided at remote ends of all cross mains.
9. Final cut lengths of pipe and hangers to be determined after an on-site verification of
architectural dimensions has been made.
SPRINKLERS
PROJECT
M S
SYMBOL .. TY<•E SPAINKL£R TEMP. DUAN.
CONTRACT WITH
3,4
} ' C.�pEt
.N f
BLDG. ,
l._....r
.tet-•--•---. •,...� ..y.. ,y.._._� i..•.-•---+-----5 �. S � .__y—. � ._ .j _..
STORY -
[! Cr
SYSTEM NO
�
TOTAL
�r
= L ! t
tC4
{
DATE
91 - -15-
SCA L£
► "-t'v"
CNECI(LO •Y
--
OATS
3F
s
t
1
{1..._...�
_�r
{-.}-�----�-- ? ._..y-"--� � - --'.`�- -� Y----,..�.•._ .,...-.�. �. .,...�.,,.. _.. -.. _ i . _...,{.,... --ice.. �- -
0
IF
it
_
j {
\� 0
:
0
r �
�I
i
A
0 i
.1
1 \�`I
0
III' i1
0�- -
GENERAL NOTES
1. Installation in accordance with N.F.P.A. #13.
2. All materials to be UL Listed.
3. Sprinkler piping to be manufactured under one of the following ASTM standards-
A53,A135,Or A795.
4. Mains to be Schedule 10 black steel joined by roll grooved method using grooved fittings
and thread -o -let type outlets.
5. Branch line piping to be Schedule 40 blac'K steel joined with threaded outlet fittings.
6. All sprinkler drops to be V Schedule 40 black steel pipe with 1 x 1/2" threaded reducer.
7. Hangers to be sized and spaced in accordance with N.F.P.A. 13, Section 2-6.
8. Flushing connections to be provided at remote ends of all cross mains.
9. Final cut lengths of pipe and hangers to be determined after an on-site verification of
architectural dimensions has been made.
SPRINKLERS
PROJECT
M S
SYMBOL .. TY<•E SPAINKL£R TEMP. DUAN.
CONTRACT WITH
3,4
} ' C.�pEt
.N f
BLDG. ,
STORY -
[! Cr
SYSTEM NO
�
TOTAL
:.Southeast,- Fire Sprinklers, Inc.
Automatic fire Protection Contactor
P -O. Boa 126100 0 Wcmwood, FL 3:752 • Phone (+Oi) 331-74"
0
�0wMN
DATE
91 - -15-
SCA L£
► "-t'v"
CNECI(LO •Y
--
OATS
3F
s
�£