Loading...
HomeMy WebLinkAbout415 W 19 Stt r. SECENED NOV 4 2010 60PI '5UrUe'4 CITY OF SANFORD BUILDING & FIRE PREVENTION PERMIT APPLICATION Application No: i Documented Construction Value: $ 73 • oz—bz* ldress: 4-1 _ LU .. ' 7-114 1, Historic District: Yes No Parcel ID: Description of Work: g x l y S P559Z&iew Contact Person: V i CRITOEM: 40 3 3 -4 % -4 4 Fax: G) r..da' Zoning: E-mail: Property Owner Information Title: 9reset:- / J- Gni P r / '' S Resident of property? City1CState=zip: SA'P /j-'- Contractor Information Name Phone: Street: Fax: City, State Zip: State License No.:. Architect/Engineer Information Name: Street: City, St, Zip: Bonding Company: Address: Building Permit Square Footage: No. of Dwelling Units: Phone: Fax: E-mail: Mortgage Lender: Address: PERMIT INFORMATION Construction Type: Flood Zone: Electrical New Service - No. of AMPS: Mechanical (Duct layout required for new systems) No. of Stories: Plumbing New Construction - No. of Fixtures: Fire Sprinkler/Alarm No. of heads: 4 1 Application is hereby made to obtain a permit to do the work and installations as indicated. I Certify khat no work or installation has commenced prior to the issuance of 'a permit and that all work will be performed to meet standards of all lawsregulating construction in this jurisdiction. I understand that a separate permit must be secured for electrical work, plumbing, signs, wells, pools, furnaces, boilers, heaters, tanks, and air conditioners, etc. OWNER'S AFFIDAVIT: I certify that all of the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required. from other governmental entities such as water management districts, state agencies, or federal agencies. Acceptance of permit is verification that I will notify the owner of the property of the requirements of Florida Lien Law, FS 713. The City of Sanford requires payment of a plan review fee. A copy of the executed contract is required in order to calculate a plan review charge. If the executed contract is not submitted, we reserve the right to calculate the plan review fee based on past permit activity levels. Should calculated charges exceed the documented construction value when the executed contract is submitted, credit will be applied to your permit fees when the permit is released. jZatureofOwner/Agent Date fc_)),4,o Co'e-AC'_40 Print Owner/Agent's Name Signature of Notary -State of Florida Date Owner/Agent is Personally Known to Me or Produced ID Type of ID APPROVALS: ZONING: 9 (0—tjy UTILITIES: Signature of Contractor/Agent Date Print Contractor/Agent's Name Signature of Notary -State of Florida Date Contractor/Agent is Personally Known to Me or Produced ID Type of ID WASTE WATER: r ENGINEERING: FIRE: BUILDING: Ic _ze, j COMMENTS: 0 Rev 11.08 C kol 1 1 L 0 Altamonte Springs, Casselberry, Lake Mary, Longwood, Oviedo, Sanford, Seminole County, Winter: Springs Florida Statutes are quoted. here in part for your information to indicate the authority for exemptions for homeowners from qualifying as contractors and to express any applicable restrictions and responsibilities. OWNERS MUST PERSONALLY APPEAR AT THE BUILDING DIVISION TO SIGN THIS DOCUMENT BY SIGNING THIS STATEMENT, I ATTEST THAT: (Initial to the left of each statement) Rev. 9.14.2009 I understand that state law requires construction to be done by a licensed contractor and have applied for an owner -.builder permit under an exemption from the law. The exemption specifies that I, as the owner of the property listed, may act as my own contractor with certain restrictions even though I do not have a license. I understand that building permits are not required to be signed by a property owner unless he or she is responsible for the construction and is not hiring a` licensed contractor to assume responsibility. I understand that, as an owner -builder, I am the responsible party of record on a permit. I understand that I may protect myself from potential financial risk by hiring a licensed contractor and having the permit filed in his or her name, instead of my own name. I also understand that a contractor is required by law to be licensed: in Florida and to list his or her license numbers on all permit and contracts. I understand that I may build or improve a one -family or two-family residence or a farm outbuilding. I may also build or improve a commercial building if the costs do not exceed $75,000. The .building or residence must be for'my own use or occupancy'. It may not be built or substantially improved for sale or lease. If a building or residence that I have built or substantially improved myself is sold or leased within in 1 year after the construction is complete, the law will presume that I built or substantially improved it for sale or lease, which violates this exemption. I understand that, as the owner -builder,, I must provide direct, onsite supervision of the construction. I understand that I may not hire an unlicensed individual person to act as my contractor or to supervise persons working on my building or residence. It is my responsibility to ensure that the persons whom I employ have the licenses required by law and by city ordinance. I understand that it is a frequent practice of unlicensed persons to have the property owner obtain`'an owner -builder permit that erroneously implies that the property owner is providing his or her own labor and materials. I, as an owner -builder, may be held liable and subjected to serious financial risk for any injuries sustained by an unlicensed person or his or her employees while working on my property. My homeowner's insurance may not provide coverage for those injuries. I am willfully acting as an owner - builder and am aware of the limits of my insurance coverage for injuries to workers on my property. I understand that I may not delegate the responsibility for supervising work to,a licensed contractor who is not licensed to perform the work being done. Any person working on my building who Is not licensed must work under my direct supervision and must be employed by me, which means that I must comply with laws requiring the withholding of federal income tax and social security contributions under the Federal Insurance Contributions Act (FICA) and must provide workers' compensation for the employee. I understand that my failure to follow these laws may subject me to serious financial risk. Rev. 9.14.2009 1-koperty Address: A—I f / 5f__ 51" Pe cl 11,32'43: 1 do hereby state that I am qualified md6t pable of performing the requested construction involved with the permit application filed and agree to the conditions specified above. ature of Owner -Bu Form of Identification Must be Photo ID) Date A violation of this exemption is a misdemeanor of the first degree punishable by a term of imprisonment not exceeding 1 year and a $1,000.00 fine in addition to any civil penalties. In addition, the local permitting jurisdiction shall withhold final approval, revoke the permit, or pursue any action or remedy for unlicensed activity against the owner and any person performing work that requires licensure under the permit issued. Rev. 9.14.2009 J I agree that, as the party legally and financially responsible for this proposed construction activity, I will abide by all applicable laws and requirements that govern owner -builders as well as employers. I also understand that the construction must comply with all applicable laws, ordinances, building codes, grid zoning regulations. I am of aware of construction practices and I have access to the Florida Building Codes. o I understand that I may obtain more information regarding my obligations as an employer from the Internal Revenue Service, the United States Small Business Administration, the Florida Department of Financial Services, and the Florida Department of Revenue. I also understand that I may contact the Florida Construction Industry Licensing Board at 1-850-487-1395 or at www.myflorida.com/dbpr/pro/cilb/ for more information about licensed contractors. I am aware of, and consent to, an owner -builder building permit applied for in my name and understand that I am the party legally and financially responsible for the proposed construction activity at the address listed below. I agree to notify the building department immediately of any additions, deletions, or changes to any of the information that I have provided on this disclosure or in the permit application package. Licensed contractors are regulated by laws designed to protect the public. If you contract with a person who does not have a license, the Construction Industry Licensing Board, the Department of Business and Professional Regulation and the building department may be unable to assist you with any financial loss that you sustain as a result of a complaint. Your only remedy against an unlicensed contractor may be in civil court. It is also important for you to understand that, if an unlicensed contractor or employee of an individual or firm is injured while working on your property, you may be held liable for damages. If you obtain an owner -builder permit and wish to hire a licensed contractor, you will be responsible for verifying whether the contractor is property licensed and the status of the contractor's workers' compensation coverage. 7 1-koperty Address: A—I f / 5f__ 51" Pe cl 11,32'43: 1 do hereby state that I am qualified md6t pable of performing the requested construction involved with the permit application filed and agree to the conditions specified above. ature of Owner -Bu Form of Identification Must be Photo ID) Date A violation of this exemption is a misdemeanor of the first degree punishable by a term of imprisonment not exceeding 1 year and a $1,000.00 fine in addition to any civil penalties. In addition, the local permitting jurisdiction shall withhold final approval, revoke the permit, or pursue any action or remedy for unlicensed activity against the owner and any person performing work that requires licensure under the permit issued. Rev. 9.14.2009 J f 6P ORDER FORM11111",'',1111, A07. ..-.:.,...,. ,. 10/09 NOW! There are three ways 'Arrow Storage Building Model # to Order Arrow Storage (We want to be sure.the accessories you order fit your storage building.), Building Accessories. Option 1 can be purchased through: arrowsheds.com Option 2 Order accessories by telephone using your MasterCard or Visa credit, card Call toll free 1-800-851-1085 . Customer Service). Allow 2 weeks for delivery. Option 3 Mail Order. Complete both sides of this form and send with your check -or -£ money order payable to: Arrow Group industries, Inca 1101 North 4th Street Breese, IL 62230-9901 IMPORTANT: Be sure you provide a complete address as shipments cannot be made to a post office box. Allow'2=4 weeks for delivery. SPECIAL NOTE: If no one is available to sign for the delivery, you may be subject to a re -delivery charge assessed by the carrier. To minimize the chance of this assessment, please provide a phone number so the carrier may contact you to arrange delivery. Fill out complete shipping Instructions on reverse side. New Jersey, Illinois and California Residents Add Appropriate State Sales Tax Total Amount of Check 7 PRICE* TOTAL MODEL : DESCRIPTION QUANTITY USD , ' PRICE AM Auger Anchor Kit -Four 30" (76 cm) Augers, 54.00 60'(18 m) Cable, Four Cable Clamps, Fits All Arrow Buildings Except Yardsaver. 10.00 Shipping) Concrete Anchor Ktt-AnchorStorage Building Directly to a Concrete Slab, AK100 Hot -dipped Galvanized Steel Comer Gussets 43.00 and Perimeter Clips Rt Over Floor Frame and Free Shipping) Lag Bolt Into a Concrete Slab. Fits All Arrow Storage Buildings. AK6 Earth Anchor Kit - Four Earth Anchors and 37.00 Corner Gussets. Fits all Arrow Storage Buildings. 8.00 Shipping) SS900-A Complete Shelf Unit 36.50 With Three Shelves For Wall Mounting. 10.00 Shipping) SS4W Universal Shelving System 4 28.50 Shelf Brackets, 2 Pair Wail Braces Makes B" to 12" (20,3-30,5 cm) Wide Shelves. 8.00 Shipping) AT101 Attic/Workbench Kit 49.00 10' Long, 250 lb. (113 kg) Load 15.00 Shipping) Floor Frame Kit For 8'x8',10' x7', 90.00' F13109 -A 10' xB',10'xs' and 10'x10' Arrow Buildings Exce tHomestead) 10.00 Shipping) FB'I014-A Floor Frame Kit For 10'x11',y0'x12 ; , 10.00 10'x13' and 10'x14' Arrow Buildings.. 25.00 Shipping) F85465 Floor Frame Kit For 80.00 5'x4' and 6'x5' Arrow Buildings. 10.00 Shipping) F647410 Floor Frame Kit For Yardsaver Building 80.00 Shipping) 4'x7'and4'x10'Arrow Buildings.($10.00 FB106-A Floor Frame Kit For 81x8' and 10'x6'. 80.00 10.00 Shipping) Tool - Hanging Kh-Perfect Tool Organizer Includes 27.00 THl 5 Standard Utility Hangers and 1 Heavy Duty Small Tool Holder, Two 251/2" 64,8 cm) Steel Tracks & a complete 8.00 Shipping) Hardware Kit. RS -4 4Sheff Sturdy Rack 58"H x 36"W x 16"D 49.00. 147,3 cm x 81 A cm x 40,6 cm) . 15.00 Shipping) RSK6586 38.00 fits 6'x5' & 8'x6') High Country, RoofStren gthening 10:00 Shipping) RBK10616 fits 10'x6', 10'x8' heavysnow)Klta Extra roof beams and gable braces 81.50 1. 10'x9' 10'x10') designed for added protection against 25.00 Shipping) heavy snow accumulation. increases the strength ofRBK1012 190.00 fits 10'x12') your roof by 50%. Easy to install Free Shipping),, RSK1014 217.00 fits 10'x13' & 10'-04') Free Shipping) New Jersey, Illinois and California Residents Add Appropriate State Sales Tax Total Amount of Check 7 Complete fie ®T® Information Please send order with check or money order payable to: Arrow Group Industries, Inc. 1101 North 4th Street Breese, IL 62230-9901 Thank you for your order. DATE NAME STREET NO P.O. BOXES, PLEASE!. STATE ZIPCITY I TELEPHONE NUMBER (HOME) (WORK) Area Code AreaTode I DELIVERY INSTRUCTIONS i I NOTE: Please provide phone number in case carrier has to contact you. Arrow Group Industries; Inc. 1996 8 1 I i i. Printed in USA I ounda"fion A09 The Foundation For Your, i3uiiding OPTION 1: ARROW FLOOR FRAME, KIT: (Order No FB109'-A"or 68385-A) Arrow has the best base for your building in this simple kit. It keeps stored: items above the ground. This kit should be used with one of the following: A. To support a plywood deck B. To be filled with sand. We recommend the combined use of 1. an ARROW FLOOR FRAME KIT and 2. an ARROW ANCHORING KIT as an effective method of securing the building to the ground. Allow 1 - 2 hours for construction. OPTION 2: Wood Platform If you decide to build your own foundation, be sure to select the appropriate materials. These are the recommended materials for your foundation: 2 x 4's (5cm x 10cm) Pressure Treated Lumber 0 5/8" (1,5cm) 4 x 8 (122cm x 244cm) Plywood -exterior grade 0 10 & 4 penny Galvanized Nails ® Concrete Blocks (optional) The platform shouldbe level and flat (free of bumps, ridges etc.) to provide good support for the building. The necessary materials may be -obtained from your local lumberyard. 11 To construct the foundation follow instructions and diagram. Construct frame (using 10 penny galvanized nails). Measure 16"/24" (40,6cm/61 cm) sections to construct inside frame (see diagram) " Secure plywood to frame (using 4 penny galvanized nails) Allow 6 - 7 hours for construction. Note: Platform/Slab will extend 9/16',. (1,4cm) beyond floor frame on all four sides. Seal this 9/16 of wood with a roofing cement (not included), or bevel this 9/16" ofOPTION3: Concrete slab concrete when pouring, for good water- drainage. The slab should be at least 3"`"to 4",(8-106m) thick. It must be level avid flat to provide good support for the frame. The following are the recommended materials for your foundation. 0 1 x 4's (2,5cm x 10cm) (will be'rernoved once the concrete cures) Concrete 0 Sheet.of 6 mil plastic Ne recommend for a proper strength concrete to use a mix of: 1 part cement 0 3 parts pea sized gravel 0 2 1/2 parts clean sand Prepare the Site/Construct a Foundation 1. Dig a square; 6" (15cm) deep into the ground (remove grass). 2. rill up to 4" (10cm) in the square with graveland tamp firm. 3. Cover gravel with a sheet of 6 mil plastic. 4. Construct a wood, Irame using four planks of 1'x4 (2,5cm x 10cm) lumber. FRONT DOOR) l'r 9231 5. Pour in concrete to fill-in the hole and the frame givinga total of 4 (8-10cm) thick concrete. Be sure surface is level. Allow 3 = 5 hours for construction and a week for concrete curing time te:.finished Slab dimensions, with lumber removed. 9 Anchorin A10 , Anchoring Down The Building It is important that the entire floor frame be anchored after the building is erected. Below are recommended ways of anchoring. Arrow Anchoring Kit: (Model No. AK4 or 60298) Anchoring into Wood/Post: Recommended for use with any suggested base. Use 1/4" Wood Screws. There are 1/4" (0,63cm) dia. Contains: 4 Anchors with Cable, Clamps and holes provided in the frames for proper anchoring. installation instruction. r; r`' I rOVER THE BEAMS AND • THE GROUND Arrow Anchoring Kit: (Model No. AK100 or 68383) Recommended for use with the concrete foundation. Contains: Corner gussets, perimeter clips, hardware, 1/4" masonary drill bit and installation instruction. t l 10 1. 2. iii; i '; • : ff K IL /may Anchoring into Concrete: 1. For poured concrete slab or footing or patio blocks: Use 1/4" x 2" Lag Screws. 2. For Anchor Post of Concrete poured after building is erected: Use 1/4" x 6" Lag Screws. 1. 2• r: a • ,.: t `• i."i." d j PdM pie t D12 MM Assembly Part Part Quantity Check Ke No. Number Description in Carton List 1 8934 Ramp 2 5986 Rear Wall Angle 2 3 9365 Front Wall Channel 4 6085 Roof Beam,Bracket 5 6108 Large Right Gable 2 6 6109 Large Left Gable 2 7 6114 > Small Right Gable 2 8 6115 Small Left Gable 2. g 8470 Corner Panel 4 1:0 6515 Wall Panel 6 11 6538 Roof Panel 2 12 8462 Right Roof Panel 2 13 8463 Left Roof Panel 2 14 622-7 Roof Beam Brace 2 15 10497 r. BraceHorizontalDoo 4 1' 6 6278 Vertical Door Brace 2 1711 9369 , Door Jamb 2 18. 8936 Rear Floor Frame 2 1,g9917` Rear Wall. Channel 21 20 6403 Door Track Splice 1 21 9366 Door Track 2 22 9367 Front Floor Frame 2 23, 7332 Wall Panel 4 z 24 9373 Front Wall Panel 2 25 5209' Roof Panel 4 26 6636 Gable Brace 2 27 8937. Side Floor Frame 4 28 9922 Side Wall Channel 4 29 8841: Side Wall Angle 4 30 10470 Roof Beam 8 3i 8486 Ridge Cap 3 32 Right Side Roof Trim 2 33 8485 Left Side Roof Trim 1 f 34 10475 Right Door 35 10475 Left Door 1 363719 Door Handle ;:Brace 2 37 8840 Ridge Cap 3 j 38 67521 Edge Trim 2 0 8934 Ramp (1) Parts Needed For 0 ® 9367 Front Floor' Frame (2) e Floor Frame Assemblies ® 8936 Rear Floor Frame (2) 8937 Side Floor Frame (4) A14 The front floor frame is made up of three pieces. The side floor frames and the rear floor frame are made up of two pieces. The holes in these pieces will align when the pieces are Ss34 positioned with correct amount of overlap. The illustrations below show 9367 the properoverall length forthe sides, rear and front. Proceed as follows: 1 Place the front floor frames as shown: Centerthe ramp, with drain holes facing outside, on top of the two front floorframes. Join the frames by inserting eight screws. 2 Overlap the side floor frames and the rear floor frames as shown. The holes in'these pieces will align when the pieces are positioned with correct amount of overlap. See the illustrations belowforthe properover- all length of the side and rear floor frames. Join the frames by inserting four/five bolts into each frame set as shown. 3 Double check the length of each and set these pieces aside for `later use. 14 8936 8937 STEP Front Floor 9 8934 Frame Assembly 119 3/8" 3,Om_ 9362 I f - 9367 DRAIN HOLES FACE OUTSIDE 8937 Side Floor Frame 91 1/8" 2,3m 8937 Rear Floor Frame 119 3/8" 3,Om 36 ; 893689 91 1/8" 2,3m 91 1/8" 2,3m 119 3/8" 3,Om Front & Rear 119 3/8" 3,Om 5986 Rear Wall Angle (2) 0 Parts Needed For ID ® 9917 Rear Wall ChannelS'll0FrameASSel l><eS 9922 Side Wall Channel (4) 8841 Side Wall D15 Angle (4) The main frame pieces reinforce the walls. These pieces will later be in- 9917, ® Rear Wall Channel stalled in the center and at the top o 1181/8" 3,0m edge of the side walls and the rear 9917 wall. Proceed as follows: •eo 0 Overlap the rear wall channel pieces as shown in the figure and ® Side Wall Channels fasten the two, pieces together with o 89 7/8° 2,3m one bolt in the center hole (three 9922 9922' holes will align). '80 n 2 Make two side wall channels by STEP STEP overlapping the side wall channel 1 2 pieces as shown. Fasten each set together with -one bolt in the center Rear Wall Angle hole of each set. 5986 118 1/8" 3,0m 3 Overlap the rear wall angle pieces as shown in the figure and fasten them together with one bolt in the center hole. 4 Make two side wall angles by overlapping the side wall angle pieces as shown. Fasten each set together with one bolt in the center hole. rJ Set the assemblies aside. You will use them later. 0 00 5986 Side Wall Angles rj0 88489 7/8" 2,3m . 8841 0 STEP STEP 0 3 4 Rear Wall Channel 1181/8" 3,0m 0 Side Wall Channels 2,3m I Angle Urn Angles 2,3m r 0 Parts Needed For 0 41111.10470 Roof Beam (8) Step 3 Roof Beam Assemblies D16 The roof beams join the two gables and support the roof panels. The main roof beam is made up of four pieces overlapped back to back at the center. The left and right roof beam assemblies are made up of two pieces. Hint: These pieces are force -fitted, so you may have to press hard to join them together. 1 Place the end of one roof beam inside a second roof beam so that the six holes in each piece align. Make four sets of roof beams by repeating this procedure. Do not insert bolts 2 Take; two of the pressed -together roof baams and join them as shown to form the main roof beam assem- bly. Hold the assembly together and fasten with 14 bolts. Build only one Doubled Beam Assembly. 3 Fasten the other two pressed - together roof beams with eight bolts to make the left and right roof beam assemblies. 4 Set these pieces aside for later assembly. 16 10470 10470 Roof Beam 91 7/8" 2,3m STEP 1 STEP 2 ASSEMBLED END VIEW 10470 l Build one Doubled Main Roof l Beam Assembly for Peak in Roof 10470 10470 STEP ,• " 1 t 10470 Build twc 917/8" 2,3m 91 7/8" 2,3m Parts Needed FOC e 0 Front Floor Assembly (1) Step• Side Floor Assembly, (2) Floor Fft•a1'ii e A Rear Floor Assembly (1) Alb RIGHT' REAR T 8937 1 Assemble the four corners of the STEP 8936 floor frame using two screws at each 1 comer as shown. At the front corners fasten bolts through from the bottom with nuts on top. u RR RIGHT 0 FRONT 8937' I 9367 a p Measure the floor frame diago When Diagonal Measurements nally. When the diagonal measure- are Equal the Floor Frame ments are :equal, the floor frame is is square. square. ana 113 Each screw and bolt n, Vie wall re- quires a washer: Position a corner panel::•at the SIDE TOP, VIEW SIDE corner of the floor -frame as shown. The widest part of each comer, panel , ; STEPmustbeplacedalongthesideofthe 8470 8470 building for all four corners. Fasten 1 the corner. panel to the floor _frame FRONT with one screw. Support the comer panel with a step 6515 6515, ladder until -a wall panel is attached: 2 Attach the frontwall,panels tothe STEP front corner panels, as shown A 3 small gap will exist between,'front sTEP wall panel and ramp 2 Y j 3 Attach the wall panels;to the rear 3 corner shown. panels, as 9373 9373 NOTE Be careful to install the correct STEP,. im ed Rib . Crimped6515r _ panel in each position as shown 8410" 8470 underneath 6515 ,8470 4 Double-checkthe part numbers of 8470" 9373 er ' the wall panels, before proceeding..: 44 a The fl oor;frame.must,be square Washer P I and level or holes -will .not ali'• n. 9 j 9373. 8470 V Panels rest on frame as shown . 19 i I j Parts Needed For Step 7" Frames D20 The main frame 'pieces give .rigidity to the -side walls andprovide a sur- face for attaching the gables which Wall.Angles support the roof st F: insMuiace de Building Fasten the rear wap angleas- sembly across the'inside top of the rear wall using screws: 2 Fasten the rear wall channel assembly across the middle of the rear wall using screws. STEP STEP 1 2 8841 3, Fasten the side wall angles across ewe. the inside top of the side panels using screws. Side wall angles must overlap rear wall angle in corners. 4 Fasten the side wall channel assemblies across the middle of the d I ` F t 0 Door Track Assembly (1) Rear Wall Angle Assembly (1) ` Side Wall Angle Assemblies (2) Rear Wall Channel Assembly (1) Side Wall Channel Assemblies (2) 5986 7"7` 9917 FRONT L_ sl a pane s using screws. as en STEP STEPIII overlaps in rearcorners with screws. ..,/ L3 4 FRONT J Fasten the door track assembly holes on"top) across the top of the front wall panels using screws. See the figure.. NOTE The wall channels behind the front wall panels will be installed in a..later step. i 1111IN - .. .. 11 rMN't'll ,' Facing in Short Leg on Bofforn STEP 5 FROST t Parts Needed'.For ®. 7332 Wall Panel 4 Wall 'ftntlS 6515 Wall Panel (4) D2 V d The wall panels come in two widths.. STEP Each wall panel has a crimped rib on 1 6515 6515 one side. The crimped rib should go,-,; Under the rib of the"panel that follows it. 7332 t 65151Locateallofthewallpanelsand7332 STEP i^ set each one alongside the building,. 2 2 Be sure that you have the correct 7332 panels , in each, position. Do this: by ` x515. overlapping the panelsand deter-Panels rest on mining if the hales line up with the frame as shown 7332 holes in the frame. , As f l Crimped Rib k Underneath i Detail Showin g i 3 Fasten the wall panels at the to9p p Center of Panel Screwed l and bottom with screws. to Wall Channell 4 Fasten the center of eachpanel to the wall channel with screws. Fasten overlapping ribs" as before. a-,6y i STEP 3 STEP does not, go thru,/.,;,< wall chanhel 4' at overlap ' e 5 When you have attached all wall panels in the correct positions; the Use bolts and building will look like this. nuts fhru wall angle overlaps at the top of II panel at sides and tear. STEP 21 ;, 0 Parts Needed For 0 ® 9369 Door Jamb (2) Stepy' Front Channel/IDoor Jamb ®8365 Front Wall Channel (2) D22 The door jambs reinforce the door opening and provide an attractive 9365 - trim. Follow these steps for both door jambs. Fasten the front wall channels in their positions between the end of the side wall channel and the INSIDE OF - corner panel using screws. Do not BUILDING put a screw in the hole at the end behind the door opening at this time. STEP VIEW 2 (2) bolts Door Track Acorn Nut 9369 2 Fasten a door jamb to the front Bolt panel with two bolts, nuts and acorn / Front Wall Channel Hex Nut TOP VIEW. Cross -Section nuts, as shown. \ Top View Front Wall Channel 3 Fasten the center of the door Screw, jamb to the front wall paneland the Acorn t 9369 Screw w. STEP front wail channel with two screws. 2 4 Fasten the top of the door jamb to the door track with two screws. Do the same for the bottom into frame. Repeat steps 2 through 4 for the opposite door jamb. 22 TOP VIEW I 0 6108 Large Right Gable (2) Parts Needed For; I . ® 6109 Large Left Gable (2) Ste O i; ®5114 Small Right Gable (2) ablet sSeilnbiie ®6115 Small Left Gable (2) ? D23 ® 6085 Roof Beam Bracket (4) a The gables go on top of the front and 67521 Edge Trim rear walls to support the roof beams. (Plastic Piece) F NOTE Y The gables are packed nested together and might :be mistaken them before continuing. ateasonepiece. Carefully_ separ q 1 Apply edge trim to the edge of the I large left gable and the large right gable, cut to length. 2 Join the large gables to the small 6109 gables on the left and right sides Washer using four bolts, washers and nuts on each side. This part of the gable J 3 is called`the outer.gable leg.' V__- 6115 STEP STEP 3 Attach the four roof " beam brackets to the outer gable legs ; using two bolts in the two bottom holes of the four holes that align. 6108 STEP 3 10 1 6085 Roof Beam Bracket 23-- 11.1 Left Gable Assemblies (2) Step1 ® Parts Needed For ® Right Gable Assemblies (2) Gables/ -Roof Beams ® Single Roof Beam (2) 6636 Gable Brace (2) D24 f Lift and fasten a right and left gable, under angle at comer, to the door track and rear wall angle with screws. YA Hint: On the front gable, leave out 2 screws closest to center ,gable leg. On the rear gable, use a bolt and nut at the overlapping rear wall angle. % 2 Fasten the single roof beam to the outer gable leg as shown using bolts. o Hint: The holes along the length of the beam must be on the top surface. . Gable Repeat Step 1 for the -opposite side Q of building. 3 Join the left and right gables ° together with a gable brace using a bolt in the second hole from the bottom only. Do this step for both ° front and rear gables. fl Repeat Step 2 for the opposite side of building. 24 G Parts Needed For 0Steo'13, Right Roof Panel 0 8462 Right Roof Panel (1). AV26 Installing the roof panels is best done with a step ladder. Begin installing roof panels at the back right comer of ass2= the building. Each screw and bolt in the roof requires awasher. , 52096 .5 5209 NOTE Measure the building diagonally again and make adjustments to make sure the buildirig"J's square. 6538 8 7 .6538 This will make the roof. panels fit better,,and holes will. align 5209 10 5209 NOTE If a Roof Beef -Up Kit was purchased, assemble prior to attaching the roof panels. L 1 Locate the roof panels by their numbers. Note the sequence and position they are to be installed. 2Positi on the rightroof panel at the . back right comer and fasten to the gable with 7 bolts and nuts and roof beams using 2 screws. Do not fasten the lower end of panel to the side wall angle at this time. Hint: Attach fasteners in ordershown in diagram. 8462 4 3 8463 FRONT STEP W 8462 Right Roof Panel tm 3 T 4 5, 7 aff 4 tj ,, h o Is FL Iq T DF SUR VC Y 17F,5CRIPTION L -OT 104 Si\NFORD HE-IGHT ADF1T,10,,,J LL HEREOF RECORIVI) [IV PL, r9 T P,0/ pfirlcclo-I 62 AND THE FUSL IC RECOR85 Of- U NOL L= c (I.;'IJill T Y, FL 12, Rl 17/7 19T1-1 ST 50, R/W PAVFF) N (9 q 45'.-37: FFDRFRAR CITY OF SAN70HU - MUILUI - PLANNING AL ri UMIVEL -j'41- QERVICESIP . , BEV DATE, --------- 25 AIG 510 I,1C) 7 516 ER TIFIFO TO L YL014 RORLE-1no TAM 1ITL F 1m7vc _viv Ayr,00- moRTrAG,- 0r SOUR ,E OF 1,1E4776AL CONTROL 5767 SEASAIOLE COUNT t 3297401 FlE V 5j..32 f ( c) F B M TOP REBAR ELEV, 51 71 8 4 T3 7 W W. FD REBAR SET REBAR )0 0() 14' ALLEY FHIS PROPERTI' LIES 7 5 ESMT - EASEMENT UN F ACCOR11- JI114POC - POINT OF COtVFNCMFNI IRot,l fIFESTY _ STORY TO FIRM MAP 121 XCB - CHORD BEARING R RADIUS CFTJTERLINF 0045RIGIIT 4, or WAY DLLTA DATE X-Y,7X - FENCE FL - PROPERTY LINE C - CHORD RES 9 0 6. z ST Y RES BLDG - BUILDING coNc =CONCRETE P -PLAT L07- lo,3 WD FRM -WOOD FRAME MON - MONUMPIT n NUIPER 415 Fl cn Oe - FD RFRAR SFT REBAR 42259 0 - SET CONC 140N 42259 7 F E1- EV N.G. NATURAL GROUND FF - RNISH FLOOR RM RF MARKNCH 10 i E'_: 0.7 520 I NOT VALID WIT''OUT THE SIGNATURE AND THE ORIGINAL RAISED SEAL L 0 OF A FLORIDA LICENSED SURVEYOR AND MAPPER 2 THIS SURVEY WAS PREPARED FROM TITLE fNFORMA71ON FURNISHED To THE SURVEYOR. 1 -HERE MAY BE OTHER RESTRICTIONS OR UNRECORDED FAS17MENTS THAT EFFECT THIS PROPERTY. ER TIFIFO TO L YL014 RORLE-1no TAM 1ITL F 1m7vc _viv Ayr,00- moRTrAG,- 0r SOUR ,E OF 1,1E4776AL CONTROL 5767 SEASAIOLE COUNT t 3297401 FlE V 5j..32 f ( c) F B M TOP REBAR ELEV, 51 71 8 4 T3 7 W W. FD REBAR SET REBAR )0 0() 14' ALLEY FHIS PROPERTI' LIES ESMT - EASEMENT UN F ACCOR11- JI114POC - POINT OF COtVFNCMFNI IRot,l fIFESTY _ STORY TO FIRM MAP 121 XCB - CHORD BEARING R RADIUS CFTJTERLINF 0045RIGIITorWAYDLLTA DATE X-Y,7X - FENCE FL - PROPERTY LINE C - CHORD RES RESIDFMCE PC - POINT OF CURVE L - LEN5HT BLDG - BUILDING coNc =CONCRETE P -PLAT WD FRM -WOOD FRAME MON - MONUMPIT n NUIPER UTL - UTILITY RD ROADM -FD CoNr NoNOe - FD RFRAR SFT REBAR 42259 0 - SET CONC 140N 42259 TPM JEMPORY BLNCI4 HARK Itiv INVERT N.G. NATURAL GROUND FF - RNISH FLOOR RM RF MARKNCH 10 i E'_: I NOT VALID WIT''OUT THE SIGNATURE AND THE ORIGINAL RAISED SEAL OF A FLORIDA LICENSED SURVEYOR AND MAPPER 2 THIS SURVEY WAS PREPARED FROM TITLE fNFORMA71ON FURNISHED To THE SURVEYOR. 1 -HERE MAY BE OTHER RESTRICTIONS OR UNRECORDED FAS17MENTS THAT EFFECT THIS PROPERTY. 3 NO UNDER GROUND IMPROVEMENTS HAVE BEEN LOCATED UNLESS OTHER WISESHOWN 4 DIMENSIONS SHOWN FOR THE LOCATION OF IMPROVEMENTS HFRI__,oN St -I0 1SI-IOUI_1 1,10T BE. USED TO RECONSTRUCT BOUNDARY LINES*. BEARINGS ARE BASED ON ASSUMED DAIIJI.4 AND ON THE LINE SHOWN AS BASE BEARING (B13) 9 VERTICAL CONTROL (NATIONAL GEODETIC VERTICAL DATUM 19241 NA. EDWARD GORD01',1 SURVEYING 7- YPF /73`1 DA TF- 6/05,20L6 FE- (ISTF RED LAD SLJPVE YOP 4'2258 PO BOX 1557 SANF(Xil) . FLORIDA 32772 PHONE 324 .1572.0 519 WI ST TI1 S I REEI SANFORD . FLORIDA sot1 r. THE SURVFY DEPICTED HERE IS ,101- COVERED BY PROFESSIONAL LIABILITY INSURANCE