Loading...
HomeMy WebLinkAbout2595, 2597, 2599, 2601 River Landing Dr (a)9" c N 3° 6° FOAM SOFFIT BRACKET #1 FOAM SOFFIT BRACKETS) 1/411 = 1'-0' MEAN ROOF HEKH_ +23'-3A TOP OF 2ND STY. WALL PLATE +11T-07/8" 2nd STY. AN. FLR. 1 TOP OF 1ST STY. BLK. WALL +9 -4 J FOAM SOFFIT / TOP OF SLABjr_ (REF. ELEV.) LEXINGTON UNIT "A" 12 5� SHINGLE ROOFING PRINCETON UNIT "B" PRINCETON UNIT "B" LEXINGTON 12 � 15 „� 'BE �� �.�,� - - ,., 1 —1. DECO DECO PROD. BEYOND BAND AT BAND AT BAND RT FINISH PROJ. BEYOND FOAM SHUTTER STONE DOOR/WDW. DOOR/WDW. DOOR/WDWFOAM . STONE SHUTTER 7/16° OSB SHEATHING GABLE END TRUSS OR FRAME WALL 78° CEMENT PLASTER N PAPER BACK LATH AIR INFILTRATION BARRIER (DESIGN STANDARD: TYVEK) N MID -WALL WEEP SCREED 1/2° MIN. CEMENT PLASTER 8" CMU WALL CONTROL JOINT DETAIL TOP OF BLOCK 0" /x" FOAM SOFFIT GABLE CORBEL 1/4" = 1'-0" PROJ. 3/4° KEYSTONE 1/4" = l'-0" TOP OF 2ND STY. WALL PLATE +18'-9 7/8° 2nd STY. AN. FLR. J TOP OF 1 ST STY. mk BLK. WALL T9':7? FOAM SOFFIT RACKET- EQ. SPACED � TOP OF SLAB FRONT ELEVATION -A_ ELEVATION NOTES: 1. ALL RAISED AND SCORED BANDS SHALL BE SMOOTH SAND FINISH. 2. SCORED BAND REFERs TO FLUSH (NOT RAISED) BAND. SCRIBE LINE AT BAND WIDTH PER ELEVATION. 3. ALL RAISED BANDS SHALL BE FOAM OR STUCCO (PER PLAN). 4. CONTROL JOINTS SHOWN ADJACENT TO WINDOWS ON SIDE AND REAR ELEVATIONS SHALL BE 6" FROM EDGE OF WINDOW JAMBS. 5. ALL SECOND FLOOR WINDOW SILLS HEIGHT SHALL BE A MIN 24" R.F.F. CODE SUMMARY APPLICABLE CODES 1. FLORIDA BUILDING CODE 2010 - RESIDENTIAL 2. NATIONAL ELECTRICAL CODE - NEC 2011. 3. FLORIDA ARE PREVENTION CODE 2010 U) BUILDING TYPE: 2 STORY TOWNHOUSE 45; n 'W CONSTRUCTION TYPE: UNPROTECTED, UNSPRINKLED Or FIRE PROTECTION RATING REQUIREMENTS: W -17 REQUIRED PROVIDED 1. PARTY AND FIRE WALLS 2 HR. 2 HR. 2. INTERIOR BEARING WALLS 0 0 3. INTERIOR NON BEARING PARTITIONS PER 705.-l-.2 0 0 4. COLUMNS 0 0 b. IkWi, GIRDERS, TRUSSES AND ARCHES 0 0 6. FLOOR CEILING CONSTRUCTION � 7. ROOF CEILING CONSTRUCTION 0 0 8. EXTERIOR BEARING WALLS LliLu HORIZONTAL SEPARATION: (PARRALLEL WALLS) 0 ft. to 6 ft 0 %OPENINGS 1 (0% LlJ OVER 6 ft 0 0 9. EXTERIOR NON BEARING WALLS Z HORIZONTAL SEPARATION: (PARRALLEL WALLS) 0 0 ft. to 6 ft 0 % OPENINGS 1 (0%) N/A 0% OVER 6 ft 0 0 _ �2cn� Q = U LATEST REVISION DATE TO MASTER: 07-01-12 DO NOT SCALE PRINTS! CONSTRUCTION SHALL BE PER INDICATED DIMENSIONS ONLY, ANY DISCREPENCIES TO BE REPORTED TO M/I HOMES FOR CLARIFICATION! f 1 J. e 1 of14 M/I ORLANDO U) 45; n 'W Or 0 0 W -17 5;[ifW U Zz� 7W 0 Q a� O � Z LliLu � Q o p G O LlJ 0 LL Z 0 C O00 co U coo Z ' Ca LJJ H CgV co w o 0 � coo _ �2cn� Q = U < Lu �� CJZoc� O Q C� — I LL. LLL Cu CV Lu o Q a M M M CV I LJ_ = UJI V ' M O J m > W Z W O � DO NOT SCALE PRINTS! CONSTRUCTION SHALL BE PER INDICATED DIMENSIONS ONLY, ANY DISCREPENCIES TO BE REPORTED TO M/I HOMES FOR CLARIFICATION! f 1 J. e 1 of14 M/I ORLANDO MEAN ROOF HEIGHT TOP OF 2ND STY. WALL PLATE 2ndSTY. FIN. FLR. TOP OF 1ST STY. —BLK. WALL_ +9'-4" TOP OF SI_A :FO -,-O- MEAN ROOF HEIGHT — — +23'-3" — — — TOP OF 2ND STY. WALL PLATE — +t8'-9 7/8' LEXINGTON UNIT "A" 4'=0" MIN. TYP. ALL 4' GALV. MTL. OFF -RIDGE VENT 12 5F— -------------- SHINGLE ROOFING PRINCETON PRINCETON UNIT "B" UNIT "B" lk MIN. TYP. ALL UNITS MIN. TYP. ALL UNITS 4' GALV. MTL, OFF -RIDGE VENT SHINGLE ROOFING SLOPE 5:12 GALV. MTL OFF -RIDGE VENT SLOPE 5:12 81 SCORED LINE — — — — —ALONG SOFFIT - TYP.F 4'-O" MIN. TYP. ALL UNITS LEXINGTON UNIT "A" 4' GALV. MTL OFF -RIDGE VENT SHINGLE ROOFING 0 2nd STY. FIN. FLR. r6 12 +10'-8- 3/4" TOP OF 1ST STY. SHINGLE ROOFING BLK. WALL — — _ SIN— +9'-4" — — - TOP OF SLA +0'-0" 12 t2 15 5 4' GALV. MTL. OFF -RIDGE VENT SHINGLE ROOFING 81 SCORED LINE ----------- ALONG SOFFIT - TYPE SCORED BAND AT TEXTURED WALL FINISH DOOR/WDW. TEXTURED WALL FINISH cc It — — — — — — — — — — — — — — — — — — — SHINGLE ROOFING 2'4° TEXTURED WALL FINISH 2'-6" ~ U) �1 TEXTURED WALL FINISH SQUARE HOOD ROLA VENT SLOPE 5:12 v ci C.J. 81 SCORED BAND AT DOOR/WDW. v I — C.J. SQUARE HOOD ROOF VENT�� SLOPE 5:12 O0 0 2nd STY. FIN. FLR. r6 12 +10'-8- 3/4" TOP OF 1ST STY. SHINGLE ROOFING BLK. WALL — — _ SIN— +9'-4" — — - TOP OF SLA +0'-0" 12 t2 15 5 4' GALV. MTL. OFF -RIDGE VENT SHINGLE ROOFING 81 SCORED LINE ----------- ALONG SOFFIT - TYPE SCORED BAND AT TEXTURED WALL FINISH DOOR/WDW. TEXTURED WALL FINISH cc It — — — — — — — — — — — — — — — — — — — SHINGLE ROOFING FFOOAAMMSSOFFIT BRACKET- EQ. 2X12 CMU COL TEXTURED WALL FINISH TOPOF 2ND STY. WALL PLATE +18'-9 T%8" — — 2ND STY. WDW. HDR. HT. +17'-7 5/8" _ SHINGLE ROOF 12 5 — — — —gk 2nd STY. FIN. FLR.— — +10— TOP OF 1ST STY. BLK. WALL +9'-4" FOAM SOFFIT BRACKET- EQ. SPACED SIDE ELEVATION A - "LEXINGTON" UNIT - 1/4" ._TOP OE_SLAI1 +D'-11' (REF. ELEV.) TOP OF 2ND STY_ WALL PLATE +18'-9 7/8"� — — — — 2ND STY. WDW. HDR. HT. +11T-7-5/8' �— — — — — SHINGLE ROOF _ _2nd STY. FIN. FLR. TOP OF 1ST STY. BLK. WALL +9'-4" FOAM SOFFIT BRACKET- EQ.-,--' SPACED IOP_OF _ABJ0=0 (REF. ELEV.) _ MEAN ROOF HEIGHT +23'-5" TOP OF 2ND STY. _WALL PLATE +18'-9 7/8" 2nd STY. FIN. FLR. TOP OF IST STY. BLK. WALL +9'-4" REAR ELEVATION ' OF SLAB -0 F. ELEV.) 12 5� 12 4' GALV. MTL. 5 OFF -RIDGE VENT —— ----- _-------4EANROOF HEIGHT SHINGLE ROOFING 8"W. SCORED LINE — — ALONG SOFFIT - TYP. — — — — — TOP OF 2ND STY. — — — — — — — — — _WALL PLATE --------------------- -- -- — — — +18'-9 7/8" E H TEXTURED WALL FINISHo 81 SCORED BAND AT DOOR/WDW. LLLJ 12 5F— ------ SHINGLE ROOFING 15 FOAM SOFFIT BRACKET- EQ. SPACED 12X12 CMU COL-/' TEXTURED WALL FINISH TEXTURED WALL FINISH 12 2nd STY. AN. FLR. SHINGLE ROOFING TOP OF 1ST STY. BLK. WALL t___f - - f_ ' OF SLAB -0 SIDE ELEVATION A - "LEXINGTON" UNIT, LATEST REVISION DATE TO MASTER: 07-01-12 ~ U) �1 �� I FFOOAAMMSSOFFIT BRACKET- EQ. 2X12 CMU COL TEXTURED WALL FINISH TOPOF 2ND STY. WALL PLATE +18'-9 T%8" — — 2ND STY. WDW. HDR. HT. +17'-7 5/8" _ SHINGLE ROOF 12 5 — — — —gk 2nd STY. FIN. FLR.— — +10— TOP OF 1ST STY. BLK. WALL +9'-4" FOAM SOFFIT BRACKET- EQ. SPACED SIDE ELEVATION A - "LEXINGTON" UNIT - 1/4" ._TOP OE_SLAI1 +D'-11' (REF. ELEV.) TOP OF 2ND STY_ WALL PLATE +18'-9 7/8"� — — — — 2ND STY. WDW. HDR. HT. +11T-7-5/8' �— — — — — SHINGLE ROOF _ _2nd STY. FIN. FLR. TOP OF 1ST STY. BLK. WALL +9'-4" FOAM SOFFIT BRACKET- EQ.-,--' SPACED IOP_OF _ABJ0=0 (REF. ELEV.) _ MEAN ROOF HEIGHT +23'-5" TOP OF 2ND STY. _WALL PLATE +18'-9 7/8" 2nd STY. FIN. FLR. TOP OF IST STY. BLK. WALL +9'-4" REAR ELEVATION ' OF SLAB -0 F. ELEV.) 12 5� 12 4' GALV. MTL. 5 OFF -RIDGE VENT —— ----- _-------4EANROOF HEIGHT SHINGLE ROOFING 8"W. SCORED LINE — — ALONG SOFFIT - TYP. — — — — — TOP OF 2ND STY. — — — — — — — — — _WALL PLATE --------------------- -- -- — — — +18'-9 7/8" E H TEXTURED WALL FINISHo 81 SCORED BAND AT DOOR/WDW. LLLJ 12 5F— ------ SHINGLE ROOFING 15 FOAM SOFFIT BRACKET- EQ. SPACED 12X12 CMU COL-/' TEXTURED WALL FINISH TEXTURED WALL FINISH 12 2nd STY. AN. FLR. SHINGLE ROOFING TOP OF 1ST STY. BLK. WALL t___f - - f_ ' OF SLAB -0 SIDE ELEVATION A - "LEXINGTON" UNIT, LATEST REVISION DATE TO MASTER: 07-01-12 ~ U) z 75 It O0 Op � -17W W wry �i 0 W co �• U) w = O � O 0 O co U c z i V co C w 0 2IW— oU)� a�00 0 �Cy)� J Z MCD O ¢ L�CN.J Lu LL Q 0 r co Mr 1 co QO c-4 u' LLJ _I - Lu V O J m � w z D O C/) J U) DO NOT SCALE PRINTS! CONSTRUCTION SHALL BE PER INDICATED DIMENSIONS ONLY, ANY DISCREPENCIES TO BE REPORTED TO M/1 HOMES FOR CLARIFICATION! f 1 1 A1721 � 1 1 2of14 _ 1 M/I ORLANDO Q ~ �ZD z 75 W Op � wry �i 0 W �z = � O O co U c z i V co C w 0 2IW— oU)� a�00 0 �Cy)� J Z MCD O ¢ L�CN.J Lu LL Q 0 r co Mr 1 co QO c-4 u' LLJ _I - Lu V O J m � w z D O C/) J U) DO NOT SCALE PRINTS! CONSTRUCTION SHALL BE PER INDICATED DIMENSIONS ONLY, ANY DISCREPENCIES TO BE REPORTED TO M/1 HOMES FOR CLARIFICATION! f 1 1 A1721 � 1 1 2of14 _ 1 M/I ORLANDO 6'-3" 23'-0' 5'-3" 1. 8'-8" 2'-10' 1_ 2'-10' 22'-6' 91'-0" 221_6- 13'-4" 2'-10" 1_ 2'-10" 23'-0" 8'-8" 1 5-3" 6'-3" 36' KNEE WALL W/ 36' KNEE WALL W/ 36' KNEE WALL W/ 36' KNEE WALL W/ TEMP. GLS. ABOVE 3040 3040 TEMP. GLS. ABOVE 5040HR 5040HR TEMP. GLS. ABOVE 3040 3040 TEMP. GLS. ABOVE ROOF BELOW PRE -FAB 48X32 TEMP. TEMP. PRE -FAB 48X32 EGRESS EGRESS PRE -FAB 48X32 TEMP. TEMP. PRE -FAB 48X32 ROOF BELOW SHOWER BASE FIXED FIXED SHOWER BASE SHOWER BASE FIXED FIXED SHOWER BAS EGRESS o e EGRESS 0 00 C=) co N 4'-0' _' 4'-0' >4-0" � � 5'-0" � 4'-0" C14TEMP TEMP TEMP TEMP GLS GLS1.4- 2e o GLS II CLS II II - _ o II Q' ■ a' 668 I I ■ , ° (I 266 a' ■ "' a' 668 II 266 2 2468 SHM50 M. BATH - - - - BAT 8-0 CLG. HT. 8-0 CLG. HT. BAT 2468 468 _ M. BATH EGRESS -- -- MASTER C C MASTER - 3'-2' 2' 2" 3'-2' CARPET � CARPET 3'_2° 2' ° 3'_2' a o 0 0 0 0 c oee Zn N 8'-0' CLG. HT. = 2468 I 12468 N _ _ _ _ _ _ _ _ _ _ _ _ _ _ 8'-0' CLG. HT. `�' MASTER ` 9'-9" it -7, 2" " N 12'-, 1/2" 12'-, 1/2' 3'-7, 2 �i i� 2x6 9'-9n MASTER CARPET 2x6 / 1-2 4 -8"-2 / i i = WALL 11 2x6 _ wAtl 112468 i i i WALL x i i WALL n i 2468 II ° i 5 LINEN SH M ■ M 5 LINEN SH i i ° i i AC DUCT 3'-2" I 3'-Z AC DUCT i i i 2668 2668 �' 2x6 CHASE TO 1ST i, i _ _ ii �i CHASE TO ,ST 2� WALL STY. ii LL ____________ ___ 7� — _—____— _�—______====—J� ii STY. WALL " SH3050 12'-1 1/2' 5 LINEN SH =__ _ ________ RISERS RISRS=_______ - __= 5 LINEN SH1/2 EGRESS 3' 4" _ F 2x6 If — �� 5'-o II I I I lo' "' 2 ■ to" I I I -o" ° _ FF = �iF� 2x6 6" I II I ■ I I I I Cosa_ ■ 5osl{ I I I I ■ ! n 2x6 III WALL r2�68 L — — J L — Zxs r = 1 1 8,_6" HANDRAIL 2" HANDRAIL I \ L _ _ J L _ _ J 26x8 WALL — WALLWALL ° F — % 1 z 68 " 266 " /2 1/ " III '-2 I 1 0 =-2n 3,_2 8' 6, I I -2' II 1111 '-6 " , " _ n S8S s,_5" 2868 I` ° f 178 6 5 -2 2 1 H \ jl M I ( I AHU PFN TO BELOW AHU I I �' J. ° e BATH 2 3 2 42°H.W2AxL4L +' ■ ;' WALL 2x4 S-2' BAT 2 a ° ROOF BELOWIii o A DRA — — AND AI o _BATH 2 " g - — r — — 2668 2668 — — 1 -3 /2' BEL W M 5'-0° BATH 5 1/ e 5 1/2 5 -0 7'-11 1 3' 2" e D" - 3'- 2" 3'-2 ' 8° �� ° " ' o e° - I I L— � I I AHu 2ssa 2668 AHU o WASHER I I 24' VOID STACK 42"H. 2x4 RAILING WALL DN 17j RI" R 10 UAIT BOLD L DBL. WALL ■ __________________ _ _ 2668 834 _ _ 2668 SPACING_ ___________� =___ 901 ■ ____ =_______----- 1635 ==-L 2668 - - 2668 ______=_L 6830 ■ 40 51 42"H. 2x4 D 17) RAILING Rf 1 WALL �, 40 182 GARAGE I f 230 230 238 1 LANAI ;­, NA 17-1 , " 3 4 41 82 TOTAL U.R. 1 2099 1916 1916 2099 `t— 8030 I I I `V `V HAN RAIL II 2668 266$1 HANDRAIL L ■ — — — — — — .6. 5068 50fi8 5068 5068 - v ° ----- — — — — ----- 2668 2668 ----------------- 2668 26fi8 ________________`-__________ n 7 -6 7 -7 " 7'-7- " , " 7'-6- -4 5068 5068 5068vv 5068 7 -$ 7 10 9 1 D i D 7'-8- 7 8 8'-0' CLG. HT. r2 8'-0" CLG. HT.c4 8'-D" (LG. HT. r'8'-0' CLG. HT. BED 2 BED 3 -' - -' BED 3 BED 2 CARPET CARPET ■ CARPET CARPET ■ _ 8'4 CLG. HT. 8'-0' CLG. HTs BED 3 BED 2- CARPET CARPET EXTEND SHAFT WALL INTO ■ OVERHANG TO ■ GN ABV. SOFFIT5040HR co EGRESS 1 ■ ■ 1 CN SH3050 SH3050 EGRESS EGRESS I LINE OF IST STORY— EXTERIOR TORY_EXTERIOR WALL LINE OF IST STORYd EXTERIOR WALL — — ROOF�ELI)W — 11'-4" B'-01/2" 5_5' 11'-0 1/2' LEXINGTON UNIT"All ONE-HOUR RATED 7/16" FIRE RETARDANT SHEATHING A) kIlk IIAIIIA1 I A C`IFIr nF- rr-nAnATInKI 4A(AI I PRINCETON UNIT "B" 8'-0' CLG. HT. 8'-0" CLG. HT. BED BED CARPET CARPET ■ ■ WA TIEL INTO ■ ■ OVERHANG TO SH3050 7 5/!' SH3050 5040HR ALIGN ABV. SOFFT EGRESSEGRESS I EGRESS 1 ■ I I ■ SH3050 SH3050 I EGRESS EGRESS I _LINE OF 1ST STORY M EXTERIOR WALL ---- —------- ROOFaLOW — — .LINE OF IST STORY EXTERIOR WALL I 11'-0 1/2' 5'-5° 6'-0 1/2" 11'4 5'-11" 7/8" EXT. PORTLAND CEMENT 112 )) X 81. THREADED ROD W/ 1" RND. WASHER PLASTER ON PAPER BACKED SET IN EPDXY FILLED 5/8" DIA. DRILLED & EXPANDED METAL LATH ON TYVEK CLEANED HOLE (4" MIN. EMBED INTO CMU WALL) BOLT INSTALLATION NOTES: 3" MIN. EDGE DISTANCE BOLTS SHALL NOT BE INSTALLED IN A HORIZONTAL LINE ON OPPOSITE SIDES OF SEPARATION WALL - STAGGER 4" VERTICALLY FROM BOLT ON OPPOSITE SIDE OF WALL TYP. CMU TO FRAME WALL DETAIL AT SEPARATION WALL SCALE: 3"=1'-O" PRINCETON UNIT "B" WDWROUGH OPNG.NOTE 36 718 x 63 WIDTH x HEIGHT (IN INCHES) LEXINGTON UNIT "A" co SH3050 EGRESS M 0 SH3050 EGRESS ROOF BELOW o i 2nd STY. FLOOR PLAN FALL LEGEND_ ® INDICATES 2x4 BEARING WALL W/ QUICK TIE SYSTEM HOLDDOWNS FROM TOP OF 1ST STORY BLOCK WALL TO SECOND STORY TOP PLATE. SEE SHEET 11 FOR ADD'L INFORMATION ® INDICATES 2x4 BEARING WALL ABOVE LAM. BEAM. PROVIDE STRAPPING PER DETAIL #5 ON SHT. 12 ® INDICATES 2 -HR. ARE SEPARATION WALL BTWN. UNITS. SEPARATION WALL CONTINUOUS FROM TOP OF FIRST STORY SLAB TO UNDERSIDE OF SECOND STORY ROOF DECKING. NO ELECTRICAL, PLUMBING, MECHANICAL, OR OTHER BLDG. SERVICE SHALL BE WITHIN OR PENETRATE THE SEPARATION WALL REFER TO SEPARATION WALL DETAIL(s) FOR ADDITIONAL INFORMATION. AREA WASHER PLUMB'GBOX 24' VOID STACK UNIT PLACE DBL UAIT BOLD L DBL. WALL STUD ADJ. TO STUD VENT PIPE 834 STUD SPACING_ DETAILWA0SHER 7/8" EXT. PORTLAND CEMENT 112 )) X 81. THREADED ROD W/ 1" RND. WASHER PLASTER ON PAPER BACKED SET IN EPDXY FILLED 5/8" DIA. DRILLED & EXPANDED METAL LATH ON TYVEK CLEANED HOLE (4" MIN. EMBED INTO CMU WALL) BOLT INSTALLATION NOTES: 3" MIN. EDGE DISTANCE BOLTS SHALL NOT BE INSTALLED IN A HORIZONTAL LINE ON OPPOSITE SIDES OF SEPARATION WALL - STAGGER 4" VERTICALLY FROM BOLT ON OPPOSITE SIDE OF WALL TYP. CMU TO FRAME WALL DETAIL AT SEPARATION WALL SCALE: 3"=1'-O" PRINCETON UNIT "B" WDWROUGH OPNG.NOTE 36 718 x 63 WIDTH x HEIGHT (IN INCHES) LEXINGTON UNIT "A" co SH3050 EGRESS M 0 SH3050 EGRESS ROOF BELOW o i 2nd STY. FLOOR PLAN FALL LEGEND_ ® INDICATES 2x4 BEARING WALL W/ QUICK TIE SYSTEM HOLDDOWNS FROM TOP OF 1ST STORY BLOCK WALL TO SECOND STORY TOP PLATE. SEE SHEET 11 FOR ADD'L INFORMATION ® INDICATES 2x4 BEARING WALL ABOVE LAM. BEAM. PROVIDE STRAPPING PER DETAIL #5 ON SHT. 12 ® INDICATES 2 -HR. ARE SEPARATION WALL BTWN. UNITS. SEPARATION WALL CONTINUOUS FROM TOP OF FIRST STORY SLAB TO UNDERSIDE OF SECOND STORY ROOF DECKING. NO ELECTRICAL, PLUMBING, MECHANICAL, OR OTHER BLDG. SERVICE SHALL BE WITHIN OR PENETRATE THE SEPARATION WALL REFER TO SEPARATION WALL DETAIL(s) FOR ADDITIONAL INFORMATION. AREA DATE TO MASTER: TAB UAIT UNIT UBIT UAIT BOLD L 1st STY. LIVING 834 734 734 834 3136 2nd STY. LIVING 946 901 901 946 3694 TOTAL LIVING 1780 1635 1635 1780 6830 ENTRY 40 51 51 40 182 GARAGE 238 230 230 238 936 LANAI 1 411 NA NA 41 82 TOTAL U.R. 1 2099 1916 1916 2099 `t— 8030 I I I I SECOND STORY PLAN NOTES: 1. DRYER VENT BOX - VENT THRU ROOF. 2. 24" W. WALL CAVITY, VOID OF STUDS, FOR WASHER BOX AND STACK. 3. 12" W. WALL CAVITY, VOID OF STUDS, FOR SHOWER VALVE AND/OR HEAD. 4. HARZARDOUS GLAZING LOCATION, INSTALL TEMPERED GLASS IN ALL SHOWER ENCLOSURES AND/OR WINDOWS. 5. DO NOT SCALE PRINTS! CONSTRUCTION TO BE FROM CALCULATED DIMENSIONS ONLY. ANY DISCREPENCIES TO BE REPORTED TO M/I HOMES FOR CLARIFICATION. ALL FRAME WALLS ARE DRAWN AND DIMENSIONED TO BE 3 1/2' WIDE UNLESS OTHERWISE NOTED. 6. PROVIDE DRAIN PAN BELOW EACH WASHER. DRAIN LINE TO EXTERIOR. 7. PROVIDE 20 AT 24" O.C. VERT. LADDER BLOCKING AT INTERSECTION OF INTERIOR TO EXTERIOR FRAME WALLS FOR INSTALLATION OF INSULATION. LATEST REVISION DATE TO MASTER: 07-01-12 Q ~ U) W � z D0 W IIY W U) 0 O 7 ,jj 0 O 00 -I--$3U H coZ~20 i U c� w ca Woo�� = U) Q = ¢w=o U ���� ( N c", �• J Z C7 CIO O Q LL. U �J ILLI N - Q � � r c� M 1 co 4T00 N L LLJ J W Q a _o cuN L L1 z o w o DO NOT SCALE PRINTS! CONSTRUCTION SHALL BE PER INDICATED DIMENSIONS ONLY, ANY DISCREPENCIES TO BE REPORTED TO M/I HOMES FOR CLARIFICATION! 1 I 1 1 r` 1 a� 1 1 4ofl4 1 M/I ORLANDO -- Q ~ � z W Op �w� z � O O 00 -I--$3U H coZ~20 i U c� w ca Woo�� = U) Q = ¢w=o U ���� ( N c", �• J Z C7 CIO O Q LL. U �J ILLI N - Q � � r c� M 1 co 4T00 N L LLJ J W Q a _o cuN L L1 z o w o DO NOT SCALE PRINTS! CONSTRUCTION SHALL BE PER INDICATED DIMENSIONS ONLY, ANY DISCREPENCIES TO BE REPORTED TO M/I HOMES FOR CLARIFICATION! 1 I 1 1 r` 1 a� 1 1 4ofl4 1 M/I ORLANDO -- FACE OF STUD WALL KNEE WALL - TOP AT 427-, UPPER LANDING GIRDER PER CD & STAIRS TO BE GIRDER (BEYOND) FRAMING PLAN--,,, " 1 NOSING SUPPORTED BY — U ryo K] GIRDER ABOVE BEARING n _ w m o ,c=- ------- - -- ---- -- -n.�-----------, WALL II �fi.. �� �� �� .\ -' IBIS U c�ro�Lu CIO Lu 0o0CD �� cz I IL ----------- - ��-- U' 1— O N D J w r", L� Q CW.D O 3/4' PLYWD. Q �W a o0 RISER C) Qoco r..0 V 00 1/2" DRYWALL -J = W `'4 5 1/2" UNDER STAIRS- / 2x12 CARRIAGE LL J " TYPE X" IN W/ SPACER AT 0 o Q, o GARAGE SDE WALLS L � 0 J w oU) 10" J D0 NOT SCALE PRINTS! CONSTRUCTION SHALL BE r- II DIMENSIONS ONLY, ANY DISCREPENCIES TO BE REPORTED J i HOMES FOR CLARIFICATION! 1 �� - I S -J GARAGE 5of14 M/1 ORLANDO S - ' FLOOR I i --J----------- ----- -------- A"SEESECTION THRU UPPER STAIR - UNIT "All- SEE SECTION / DETAIL SHTS. FOR ADD'L. INFORMATION 42'H. KNEE WALL 3/4" PLYWD. ON 3 -2' 2x8 JOISTS (5) RISERS AT LANDING BEYOND 3/4" PLYWD. ON - 202 FRMG AT TREADS 1x10 STRINGER 1" NOSING 0 o M Li c O 1 � V7 O O N 10" ICARRIAGE o / 2x1W/ SIDE PER PLAN S-2" STAIR SECTION AT UNIT "B" SEE SECTION / DETAIL SHTS. FOR ADD'L. INFORMATION HANDRAIL WITH CIRCULAR CROSS SECTION DIAMETER BTWN. 1 1/2" TO 2", OR PRONDE CROSS SECTION OF EQUIVALENT GRASPABILITY PERFORM ANCE - TYPICAL SECTION AT HANDRAIL BALUSTER SPACING LESS THAN 4" DIA. SPHERE 1 1/2- DIAMETER CONT. HANDRAIL BOTTOM RAIL LESS TAHN 2" DIA. SPHERE M/I HOME TYP. STAIR TREAD AND RISER CALCULATION CONCRETE SLAB TO PLYWOOD SECOND FLOOR HT. = 128.75" / 17 RISERS = 7.57" RISER TYP. RISER= 7.57" TYP. TREAD=10" REFER TO FLOOR PLAN FOR STAIR CONFIGURATION TOTAL STAIR RUN TREAD (NOT INCLUDING NOSING) = 10" WIDE 3/4" PLYWOOD -2x8 BLOCKING BEHIND HANDRAIL 1" NOSING FLOORING TOP AT 39" ABOVE EDGE OF TREAD 10" (TYP.) 17 FLOOR TRUSS i NAIL (2)2x4 TO BOTTOM OF / �FLOOR TRUSS 12' OR LESS IN 1x10 STRINGER / DEPTH 1" NOSING / 2x12 TREAD / / 2x8 STAIR LEDGER CONNECT TO / FLOOR TRUSS W/ (2)IOd NAILS AT 3/4" PLYWD. / 6" O.C. MAX. OR EQUIVALENT RISER / / CONNECT CARRIAGE TO LEDGER W/ / (2)104 TOE -NAILED COMMONS / STAGGERED EA. SIDE CONNECT PLYWD. RISER TO TREAD WITH (4) 8d NAILS / 2x12 CARRIAGE AT SIDES AND O / CENTER OF STAIRS WITH 2x6 �m / SPACER AT SIDE WALLS / CONNECT SPACER TO EA. STUD / W/ (2) 10d COMMONS / 20 P.T. / KICK PLATE NOTE: PICKETS SHALL BE PLACED NO GREATER THAN 4" O.G. TYPICAL STAIR SECTION SCALE: N.T.S. HANDRAILS FOR STAIRWAYS SHALL BE CONTINUOUS FOR THE FULL LENGTH OF THE FLIGHT, FROM A POINT DIRECTLY ABOVE THE TOP RISER OF THE FLIGHT TO A POINT DIRECTLY ABOVE THE LOWEST RISER OF THE FLIGHT. HANDRAIL ENDS SHALL BE RETURNED OR SHALL TERMINATE IN NEWEL POSTS OR SAFETY TERMINALS. HANDRAILS ADJACENT TO A WALL SHALL HAVE A SPACE OF NOT LESS THAN 1-1/2" (38MM) BETWEEN THE WALL AND THE HANDRAILS 1 1 1 1 f f f LATEST REVISION DATE TO MASTER: 07-01-12 U, w O 0 W W W O CD Z � Q �Z o — U ryo K] W0LL- O O O n _ w m o r 0 U 00p0 00 U c�ro�Lu CIO Lu 0o0CD �� cz N 2 1— O N D J w r", L� Q CW.D O �M Q �W a o0 Lij Qoco r..0 V X = W Q LL J CONCRETE SLAB TO PLYWOOD SECOND FLOOR HT. = 128.75" / 17 RISERS = 7.57" RISER TYP. RISER= 7.57" TYP. TREAD=10" REFER TO FLOOR PLAN FOR STAIR CONFIGURATION TOTAL STAIR RUN TREAD (NOT INCLUDING NOSING) = 10" WIDE 3/4" PLYWOOD -2x8 BLOCKING BEHIND HANDRAIL 1" NOSING FLOORING TOP AT 39" ABOVE EDGE OF TREAD 10" (TYP.) 17 FLOOR TRUSS i NAIL (2)2x4 TO BOTTOM OF / �FLOOR TRUSS 12' OR LESS IN 1x10 STRINGER / DEPTH 1" NOSING / 2x12 TREAD / / 2x8 STAIR LEDGER CONNECT TO / FLOOR TRUSS W/ (2)IOd NAILS AT 3/4" PLYWD. / 6" O.C. MAX. OR EQUIVALENT RISER / / CONNECT CARRIAGE TO LEDGER W/ / (2)104 TOE -NAILED COMMONS / STAGGERED EA. SIDE CONNECT PLYWD. RISER TO TREAD WITH (4) 8d NAILS / 2x12 CARRIAGE AT SIDES AND O / CENTER OF STAIRS WITH 2x6 �m / SPACER AT SIDE WALLS / CONNECT SPACER TO EA. STUD / W/ (2) 10d COMMONS / 20 P.T. / KICK PLATE NOTE: PICKETS SHALL BE PLACED NO GREATER THAN 4" O.G. TYPICAL STAIR SECTION SCALE: N.T.S. HANDRAILS FOR STAIRWAYS SHALL BE CONTINUOUS FOR THE FULL LENGTH OF THE FLIGHT, FROM A POINT DIRECTLY ABOVE THE TOP RISER OF THE FLIGHT TO A POINT DIRECTLY ABOVE THE LOWEST RISER OF THE FLIGHT. HANDRAIL ENDS SHALL BE RETURNED OR SHALL TERMINATE IN NEWEL POSTS OR SAFETY TERMINALS. HANDRAILS ADJACENT TO A WALL SHALL HAVE A SPACE OF NOT LESS THAN 1-1/2" (38MM) BETWEEN THE WALL AND THE HANDRAILS 1 1 1 1 f f f LATEST REVISION DATE TO MASTER: 07-01-12 U, w O 0 W W W O Z � Q Woo — U ryo W J W0LL- z _ 0 r 0 U 00p0 00 U c�ro�Lu CIO Lu 0o0CD �� Lo Qw=� Q = U U JZNCM 0 C J O J c w N LL Q � � M M I M Q 00 Lo N `f Lij r..0 V O cum F_ N w z � o w oU) J D0 NOT SCALE PRINTS! CONSTRUCTION SHALL BE PER INDICATED DIMENSIONS ONLY, ANY DISCREPENCIES TO BE REPORTED TO M HOMES FOR CLARIFICATION! 1 �� 5of14 M/1 ORLANDO PRE-ENGINEERED ROOF TRUSS OR CONY. FRAMED RAFTER SIMPSON "HETA20" STRAP AT EA. TRUSS - NAILS PER SCHEDULE "HEfA20" STRAP NAILING SCHEDULE UPLIFT # OF NAILS VALUE REQUIRED 1810 (9)10d x 1-1/2" 1200 (6)10d x 1-1/Zi 800 410d x 1-1 2 \/ I L I -CMU WALL TYPICAL TRUSS TO 1 BLOCK WALL CONNECTION 12 * UNLESS OTHERWISE NOTED ON THE PLAN * UPLIFT LOAD REQUIREMENTS OBTAINED FROM SEALED ENGINEERING DRAWINGS FROM TRUSS MANUF. FLOOR TRUSSES AT 24" O.C. MAX. 2x4 CONT. RIM BOARD AT TOP & BOT. CHORD CONNECT TO EA. FLR. TRUSS W/ (4)164 NAILS SETBACK FACE OF RIM BOARD 112' FROM CMU WALLIFMROM FACE OF BLOCK 2" MIN. DIMSIMPSON "HETA20" ANCHOR TO STRAP AT EA. FLOOR TRUSS - FILL ALL NAIL HOLES FACE OF BLK TYPICAL FLR. TRUSS / BEAM 2 PERPENDICULAR TO CMU WALL Q2J I IDI IST CTRAD rOKIW:rTIOKI * UNLESS OTHERWISE NOTED ON THE PLAN 2 or 3 PLY 16" DP FLATCONC. BLOCK CONNECTGIRDER TRUSS HANGER TO MU WALL W/ D» 1/4"x2-1/2' SIMPSON "TITEN WALL 2 PLY-SIMPSON LGUM28-2 HANGER W/ (6) SDS- 1/4'x2 1/2" SCREWS TO TRUSS (2435# MAX UPLIFT) 3 PLY-SIMPSON LGUM28-3 HANGER W/ (6) SDS- 1/4'x2 1/2" SCREWS TO TRUSS (3575 # MAX UPLIFT) FLAT GIRDER TRUSS ('7 TO CMU WALL 12 HANGER CONNECTION 2x4 X -BRACING AT 2x4 BOX FRAME AT 48" 0_C. MAX. W/ OSB 48" O.C. MAX. IN SHEATHING EA. SIDE (CONNECT TO 2x4 W/ 16" DP. FLOOR FIRSTER TRUSS BAYS - OR 8d NAILS AT 6" O.C.) AT FIRST (2) (TRUSS TRUSSES PER PLAN N(�EA. BAYS-CONNECT EA. CORNER W/OENAII /)IOdTOENAILS LS 16" DP. GABLE END FLR. TRUSS OR j� 16" DP. LAM. BEAM PER PLAN SETBACK FACE OF RIM BOARD 112' FROM FACE OF BLOCK CONC. BLOCK WALL PROVIDE SIMPSON "HETA20" ANCHOR AT ALTERNATE 4" O.C. MAX. — PROVIDE soup 2x4 BRACING BTWN. FROM D ACE IMENSIOF BON TO WALL HORDSLFOR NAI�LINGFILL ALUSS LLL NAIBOT. FLR. TRUSSES HOLES PERIMETER WALL DETAIL 12 TRUSSES PARRALLEL TO WALL v1141 1 rA VIVI I U v1141 1 v — - GABLE END FLR. TRUSS OR LAM. BEAM PER PLAN PARRALLEL TO WALL SETBACK FACE OF TRUSS OR BEAM 1/2' FROM FACE OF BLOCK CMU WALL SIMPSON "HETA20" ANCHOR 4' DIMENSION TO AT 24" O.C. MAX. - PROVIDE SOLID 2x4 VERT. BLKG. BTWN. TRUSS TOP STRAP FROM FACE & BOT. CHORDS FOR NAILING OF BLK. WALL FILL ALL NAIL HOLES TYPICAL FLR. TRUSS / BEAM 4 PARALLEL TO CMU WALL QJ2 UPLIFT STRAP CONNECTION * UNLESS OTHERWISE NOTED ON THE PLAN SIMPSON "LSTA12" OR QUICK -TIE 'LS12" FLAT STRAP CONNECTING EA. 2ND STY. STUD TO TOP PLATE CENTER STRAP ON BOT. OF TOP PLATE 12 STRAP CONNECTION MID SPAN BEARING CONDITION WOW. OPENING PER PLAN DBL STRAP AT 3 PLY 16" DP. CMU SEPARATION EA. SIDE OF OPNG. FLAT GIRDER TRUSS WALL BTWN. UNITS SIMPSON "LGT3-SDS2.5" W/ (21)164 SINKERS TO COLUMN & 4 (12) SDS 1/4"x2 1/2" SCREWS TO GIRDER )91 3.5"x6' LVL CONNECTOR VARIES -SEE GIRDER TRUSS OR LVL COLUMN BEAM PER PLAN SIMPSON N"HTT16" HOLDDOWN PLAN FOR INFORMATIfNV /EPDXY MPSON 'HTT16" W/ 8 THREADED ROD W 5J8" THREADED ROD TO SIMPSON 'LSTA12" OR QUICK -TIE "LS12" FLAT STRAP/BLK. WALL -SET IN LABU-SET IN EPDXY FILLED CONNECTING EA. 2ND STY. STUD TO GIRDER TRUSS OR FILLED HOLE HOLE W/ 5' MIN. EMBED BEAM, CENTER STRAP ON BOT. OF TRUSS OR BEAM W/ 5" MIN. EMBED FILL ALL NAIL HOLES FILL ALL NAIL HOLES 4 2ND STY FRAME WALL TO GIRDER -GIRDER TRUSS TO 9 12 OR BEAM STRAP CONNECTION 12 COLUMN TO SLAB CONNECTION LVL BEAM OR GIRDER TRUSS PER PLAN CONC. BLOCK WALL SIMPSON "HT116" HOLDDOWN CW 5J8" THREADED ROD TO 8 K. WALL -SET IN EPDXY FILLED HOLE W/ 5' MIN. EMBED FILL ALL NAIL HOLES BEAM 1 GIRDER TRUSS 6 TO CMU WALL 12 STRAP CONNECTION 16' DP. FLAT GIRDER TRUSS OR 16" DP. FLOOR TRUSS PROVIDE WD. SHIMS AS / REQ'D. TO FILL GAP BTWN. HANGER AND TRUSS SIMPSON "HU46" HANGER W/ (6) 10d NAILS TO TRUSS -CONC. BLOCK WALL .CONNECT HANGER TO CMU WALL W/ Q2) 1 4"x2 3/4" SIMPSON TITEN SCREWS 10 TRUSS TO CMU WALL 12 HANGER CONNECTION 13" DP. FLAT GIRDER TRUSS OR 16" DP. FLOOR TRUSS PROVIDE WD. SHIMS AS REQ'D. TO FILL GAP BTWN: HANGER AND TRUSS SIMPSON HU26 OR HU26-2 HANGER W/ (6) 10d NAILS_ TO TRUSS -CONC. BLOCK WALL CONNECT HANGER TO CMO WALL W/ �12) 114"x2 3/4» SIMPSON TITEN SCREWS (—�jjTRUSS TO CMU WALL 12 HANGER CONNECTION 1 s STY. FRAMING PLAN FRAMING PLAN NOTES: 1. PERMANENT OR TEMPORARY BRACING OF TRUSSES PER HIB91. ANY ADDITIONAL TRUSS BRACING REQUIRED WILL BE DETERMINED BY TRUSS ENGINEER ON SIGNED AND SEALED TRUSS DIAGRAMS. 2. ALL TRUSS TO TRUSS CONNECTORS TO BE SUPPLIED BY TRUSS MANUFACTURER. 3. INDICATES #2 SYP OR BETTER 20 BLKG. AT 48' O.C. BTWN. TRUSS BOT. CHORDS ®W/ (2)-164 COMMONS TOE -NAILED EA. SIDE. (TYP. AT 1ST (4) TRUSS BAYS AT ALL GABLE ENDS UNLESS OTHERWISE SHOWN ON THE PLAN) 4. ALL OVERHANGS TO BE 12" UNLESS OTHERWISE NOTED ON FRAMING PLAN OR ELEVATIONS. 5. PROVIDE MIN. (2)-10d TOE -NAILED COMMONS AT EA. TRUSS BEARING BOTTOM CHORD TO TOP PLATE AT ALL FRAME BRG. WALLS. (ADDS 150 LBS UPLIFT CAPACITY TO STRAP CAPACITY) 6. ALL INTERIOR FRAME BEARING WALLS SUPPORT GRAVITY LOADS ONLY (NO UPLIFT CONNECTORS REQ'D.) 7. FLOOR TRUSS TOP CHORD BEARING CONDITION ON 13' OP. GIRDER TRUSS OR BEAM. 8. 1ST STY. OR 2ND STY. PLUMBING WALL, TOILET, OR FLOOR FITTING. 9. PROVIDE AC DUCT RUN THRU FLOOR TRUSSES - MAXIMIZE OPENING AT CENTER H SPAN 10.PROVIDE 2x12 LEDGER (BOTTOM AT TRUSS BRG. HT.) W/ (10) 10d NAILS AT EA. VERT. STUD. 11.PROVIDE 2x4 LEDGER AS REQ'D. FOR FLOOR DECK NAILING. 12.ALL GIRDERS SHOWN SINGLE PLY. FOR CLARITY -SEE TRUSS EN{NEERfNG F{N3 REQUIRED NUMBER OF PLIES. DESIGN LOADS: ASPHALT SHINGLE ROOF LOADS: LVE - 20 PSF. DEAD - 17 PSF. (T.C. - 7 PSF.), (B.C. - 10 PSF.) CEMENT TILE ROOF LOADS: LIVE - 20 PSF. DEAD - 25 PSF. (T.C. - 15 PSF.), (B.C. - 10 PSF.) DESIGN DATA - WIND LOADS: • ULTIMATE DESIGN WIND SPEEED (Vult) = 140 MPH • NOMINAL DESIGN WIND SPEEED (Vasd) = 108 MPH • RISK CATEGORY = II • WIND EXPOSURE = C • ENCLOSURE CLASSIFICATION = ENCLOSED • INTERNAL PRESSURE COEFFICIENTS = +/- 0.18 • COMPONENTS & CLADDING PRESSURES = REFER TO TABLE SHEET D-1 FLOOR LOADS: LIVE - 40 PSF. DEAD - 15 PSF (T.C. - 10 PSF.), (B.C. 5 PSF.) 1. NOTE: TRUSSES SHALL CARRY ADDITIONAL 10 PSF NON -CONCURRENT BOTTOM CHORD LIVE LOAD. 2. TRUSS DESIGN TO INCLUDE 20PSF LIVE LOADS FOR ATTICS WITH LIMITED STORAGE AND PROVIDE NOTATION ON PROFILES REQUIRING ADDITIONAL LIVE LOAD LATEST REVISION 16" DP. FLOOR 07-01-12 o co CO TRUSSES W/ MID U z U) SPAN BRG.-FILL w s ALL NAIL HOLES CONC. SIMPSON "HETA20" BLK. Q =Lu iz- U c"') w AT EA. FLR. TRUSS - WALL FILL ALL NAIL HOLES FLR. TRUSS TO CMU WALL 12 STRAP CONNECTION MID SPAN BEARING CONDITION WOW. OPENING PER PLAN DBL STRAP AT 3 PLY 16" DP. CMU SEPARATION EA. SIDE OF OPNG. FLAT GIRDER TRUSS WALL BTWN. UNITS SIMPSON "LGT3-SDS2.5" W/ (21)164 SINKERS TO COLUMN & 4 (12) SDS 1/4"x2 1/2" SCREWS TO GIRDER )91 3.5"x6' LVL CONNECTOR VARIES -SEE GIRDER TRUSS OR LVL COLUMN BEAM PER PLAN SIMPSON N"HTT16" HOLDDOWN PLAN FOR INFORMATIfNV /EPDXY MPSON 'HTT16" W/ 8 THREADED ROD W 5J8" THREADED ROD TO SIMPSON 'LSTA12" OR QUICK -TIE "LS12" FLAT STRAP/BLK. WALL -SET IN LABU-SET IN EPDXY FILLED CONNECTING EA. 2ND STY. STUD TO GIRDER TRUSS OR FILLED HOLE HOLE W/ 5' MIN. EMBED BEAM, CENTER STRAP ON BOT. OF TRUSS OR BEAM W/ 5" MIN. EMBED FILL ALL NAIL HOLES FILL ALL NAIL HOLES 4 2ND STY FRAME WALL TO GIRDER -GIRDER TRUSS TO 9 12 OR BEAM STRAP CONNECTION 12 COLUMN TO SLAB CONNECTION LVL BEAM OR GIRDER TRUSS PER PLAN CONC. BLOCK WALL SIMPSON "HT116" HOLDDOWN CW 5J8" THREADED ROD TO 8 K. WALL -SET IN EPDXY FILLED HOLE W/ 5' MIN. EMBED FILL ALL NAIL HOLES BEAM 1 GIRDER TRUSS 6 TO CMU WALL 12 STRAP CONNECTION 16' DP. FLAT GIRDER TRUSS OR 16" DP. FLOOR TRUSS PROVIDE WD. SHIMS AS / REQ'D. TO FILL GAP BTWN. HANGER AND TRUSS SIMPSON "HU46" HANGER W/ (6) 10d NAILS TO TRUSS -CONC. BLOCK WALL .CONNECT HANGER TO CMU WALL W/ Q2) 1 4"x2 3/4" SIMPSON TITEN SCREWS 10 TRUSS TO CMU WALL 12 HANGER CONNECTION 13" DP. FLAT GIRDER TRUSS OR 16" DP. FLOOR TRUSS PROVIDE WD. SHIMS AS REQ'D. TO FILL GAP BTWN: HANGER AND TRUSS SIMPSON HU26 OR HU26-2 HANGER W/ (6) 10d NAILS_ TO TRUSS -CONC. BLOCK WALL CONNECT HANGER TO CMO WALL W/ �12) 114"x2 3/4» SIMPSON TITEN SCREWS (—�jjTRUSS TO CMU WALL 12 HANGER CONNECTION 1 s STY. FRAMING PLAN FRAMING PLAN NOTES: 1. PERMANENT OR TEMPORARY BRACING OF TRUSSES PER HIB91. ANY ADDITIONAL TRUSS BRACING REQUIRED WILL BE DETERMINED BY TRUSS ENGINEER ON SIGNED AND SEALED TRUSS DIAGRAMS. 2. ALL TRUSS TO TRUSS CONNECTORS TO BE SUPPLIED BY TRUSS MANUFACTURER. 3. INDICATES #2 SYP OR BETTER 20 BLKG. AT 48' O.C. BTWN. TRUSS BOT. CHORDS ®W/ (2)-164 COMMONS TOE -NAILED EA. SIDE. (TYP. AT 1ST (4) TRUSS BAYS AT ALL GABLE ENDS UNLESS OTHERWISE SHOWN ON THE PLAN) 4. ALL OVERHANGS TO BE 12" UNLESS OTHERWISE NOTED ON FRAMING PLAN OR ELEVATIONS. 5. PROVIDE MIN. (2)-10d TOE -NAILED COMMONS AT EA. TRUSS BEARING BOTTOM CHORD TO TOP PLATE AT ALL FRAME BRG. WALLS. (ADDS 150 LBS UPLIFT CAPACITY TO STRAP CAPACITY) 6. ALL INTERIOR FRAME BEARING WALLS SUPPORT GRAVITY LOADS ONLY (NO UPLIFT CONNECTORS REQ'D.) 7. FLOOR TRUSS TOP CHORD BEARING CONDITION ON 13' OP. GIRDER TRUSS OR BEAM. 8. 1ST STY. OR 2ND STY. PLUMBING WALL, TOILET, OR FLOOR FITTING. 9. PROVIDE AC DUCT RUN THRU FLOOR TRUSSES - MAXIMIZE OPENING AT CENTER H SPAN 10.PROVIDE 2x12 LEDGER (BOTTOM AT TRUSS BRG. HT.) W/ (10) 10d NAILS AT EA. VERT. STUD. 11.PROVIDE 2x4 LEDGER AS REQ'D. FOR FLOOR DECK NAILING. 12.ALL GIRDERS SHOWN SINGLE PLY. FOR CLARITY -SEE TRUSS EN{NEERfNG F{N3 REQUIRED NUMBER OF PLIES. DESIGN LOADS: ASPHALT SHINGLE ROOF LOADS: LVE - 20 PSF. DEAD - 17 PSF. (T.C. - 7 PSF.), (B.C. - 10 PSF.) CEMENT TILE ROOF LOADS: LIVE - 20 PSF. DEAD - 25 PSF. (T.C. - 15 PSF.), (B.C. - 10 PSF.) DESIGN DATA - WIND LOADS: • ULTIMATE DESIGN WIND SPEEED (Vult) = 140 MPH • NOMINAL DESIGN WIND SPEEED (Vasd) = 108 MPH • RISK CATEGORY = II • WIND EXPOSURE = C • ENCLOSURE CLASSIFICATION = ENCLOSED • INTERNAL PRESSURE COEFFICIENTS = +/- 0.18 • COMPONENTS & CLADDING PRESSURES = REFER TO TABLE SHEET D-1 FLOOR LOADS: LIVE - 40 PSF. DEAD - 15 PSF (T.C. - 10 PSF.), (B.C. 5 PSF.) 1. NOTE: TRUSSES SHALL CARRY ADDITIONAL 10 PSF NON -CONCURRENT BOTTOM CHORD LIVE LOAD. 2. TRUSS DESIGN TO INCLUDE 20PSF LIVE LOADS FOR ATTICS WITH LIMITED STORAGE AND PROVIDE NOTATION ON PROFILES REQUIRING ADDITIONAL LIVE LOAD LATEST REVISION DATE TO MASTER: 07-01-12 o co CO Qz U z U) w s �CL cu 2 F— cD 0 w o Q =Lu iz- U c"') w fy W e L 0 WOp 0 Q � D O IW O c/) IU) DO NOT SCALE PRINTS! CONSTRUCTION SHALL BE PER INDICATED DIMENSIONS ONLY, ANY DISCREPENCIES TO BE REPORTED TO Mll HOMES FOR CLARIFICATION! 1 1 ^ 1 ' 12of14 1 1 M/1 ORLANDO o co CO Qz U z t--CM0W E 0 W W� s cu 2 F— cD Q =Lu iz- U c"') JZ_C3 co WOp Q �wry r M � OO co 1 CV3 W CC) L0 N = z � � O w IW O c/) IU) DO NOT SCALE PRINTS! CONSTRUCTION SHALL BE PER INDICATED DIMENSIONS ONLY, ANY DISCREPENCIES TO BE REPORTED TO Mll HOMES FOR CLARIFICATION! 1 1 ^ 1 ' 12of14 1 1 M/1 ORLANDO o co CO U z t--CM0W E 0 W W� s cu 2 F— cD Q =Lu iz- U c"') JZ_C3 co _O Q uj Cn (v LL Q r M co 1 CV3 CC) L0 N `1 Lu � J = Q w O J }' m a) W ZDz IW O c/) IU) DO NOT SCALE PRINTS! CONSTRUCTION SHALL BE PER INDICATED DIMENSIONS ONLY, ANY DISCREPENCIES TO BE REPORTED TO Mll HOMES FOR CLARIFICATION! 1 1 ^ 1 ' 12of14 1 1 M/1 ORLANDO I I TRANSOM WDW, DBL SINGLE HUNG WDW. OR DOOR 7'-0' MAX. MASONRY OPENING WIDTH ROOF TRUSS OR 2x4 BLKG. CONC. AT 24" O.C. BTWN. TRUSSES-\ FBLK. WA CONNECT HANGER W/ (4)1/4"x2 3/4" MASONRY SCREWS INTO EA. BLOCK JAMB AND (4)164 NAILS INTO HEADER -\ 2x4 ACROSS FRONT (ALIGN FLUSH W BLOCK FACE) CONNECT W/ (2)10d NAILS AT 12' O.C. (6" FROM EA. END) EXTERIOR FACE SIMPSON "HUS26-2"HANGER-ORIENT HORIZONTAL OR VERTICAL (2)2x6 LAID FLAT -NAIL TOGETHER W/ (2)8d NAILS AT 6. O.C. BLK. JAMB 1 1/2" MIN. EDGE 1 1/2" MIN. EDGE DISTANCE FOR DISTANCE FOR MASONRY SCREWS MASONRY SCREWS LAS INTERIOR • (2)2x6 HDR. FACE CTR. ON JAMB FURR OUT AS REQ'D. HANGER W/ HANGER WI HORIZONTAL VERTICAL ORIENTATION ORIENTATION WOOD HEADER BTWN. WDWS, OR WDW./DOOR i. MAXIMUM DESIGN PRESSURE 48.6 PSF FOR ANY DOOR OR WDW. 2. INSTALL WOW. AND DOOR SCREW ANCHORS INTO HEADER PER WDW. OR DOOR INSTALLATION DETAILS. O.S.B. SHEATHING W/ 8d AT 6" O.C. - 2x4 CONT. W/ (2) i0d 2x4 BLKG. AT 24" O.C. AT EA. TRUSS OR BLKG. (2) 10d AT EA. 2x4 2x4 AT 24" O.C. 2x6 OR 2x8 2x4 P.T. CONT. W/ 10d AT 12" O.C. 3/16" x 3" MIN. MASONRY 20 P.T. W/ SCREWS AT 16" O.C.-­-b..3/16' x 3" MIN. MASONRY SCREWS O.S.B. SHEATHING AT 24" O.C. W/ 8d AT 6" O, 10d AT 12" O.C. 2x4 P.T. W/ (2)10d C. (2)1Od AT EA. 2x4 2x6 OR 2x8 CONT. HARD CASE SPIRAL BLCONAMB NAILS AT 24" O.C. HEAD JAMB POCKET SGD HEAD/JAMB DETAIL LOCATIONS WHERE POCKET SGD TRACK IS OUTSIDE BLOCK WALL OPNG. 20 P.T. - ATTACH W/ 1/4"x3" MASONRY SCREW 6" MAX. (1 1/4r MIN. EMBED.) 6" MAX. SIMPSON SP1 AT 16" O.C. Z CD W Li U p O Ln X= (2) 2x4 @ QCD F- CD CDEACH END a = <n p U Cl- QQ� 0 2x4 ® C 16' O.C. X CD �m SIMPSON SPI AT 16" O.C.- X - BLOCK OPENING ALL BLK. CELLS ABV. LINTEL TO BE CONC. FILLED PRECAST LINTEL PER PLAN ACROSS OPNG, 2x6 P.T. FROM BOT. OF LINTEL TO TOP OF WALL - CENTER ON OPNG. FASTEN TO BLOCK W/ i/2' J -BOLT W/ 2" SQ. WASHER �1 t 2x6 OR 2x4 P.T. W/ CONC. NAILS AT 12" O.C. ACROSS TOP OF OPNG. o EXTEND JAMB 14" MIN. 4" MIN. d ABV. OPNG. EDGE \2x6 P.T. BUCK AT GARAGE DOOR JAMBS DIST. FASTEN TO BLOCK W/ 1/2° DIA. X 6" J -BOLTS o OR 5" X6" 'REDHEAD' TYPE EXPAN90N BOLTS m AT k O.C. MAX. W 2- SQ. WASHERS AT EA. SIDE OF OPNG. GARAGE DOOR MASONRY OPENING GARAGE DOOR DETAIL X \ cim o \ a N � 2x4 P.T. FURRING z ATTACH TO BLK. W/ 1/4"x3" MASONRY cq _ o SC (1 REW 1/4" MIN, EMBED.) O.S.B. SHEATHING W/ 8d W • NAILS ® 6" O.C. EDGE), 12 O.C. (FIELD) 20 STUDS x 16' D.G. 6' 2x4 P.T. - ATTACH 6" WALL STBK. PER PKT. SGD. MANUF. MAX. W/ 1/4"0" TAPCONS MAX. (1 1/4' MIN. EMBED.) WALL ELEVATION JAMB / HEAD DETAIL FRAME WALL AT POCKET SGD BLOCK OPENING LOCATIONS WHERE POCKET SGD TRACK IS BELOW PRECAST LINTEL BLOCK JAMB/HEAD 2x4 P.T FURRING SCREW" (1M-1/4'RMIN, EMBED) 10d NAILS @ 6' O.C. 2x4 P/T/ @ TOP AND SIDES OF BLK. OPNG. NOTES 1, Values shown are based on allowable stress design using 140 miles per hour, Exposure C, Enclosed condition,lmportance Factor of 1.0. 1 Positive values act toward the surface, negative values act away from the surface. 3. Manufacturing data for components and cladding shall exceed the values shown in this table. 4. Edge pressures noted shall be used for components that are located within eight feet of building edges or corners. All other components shall use typical pressure values. 5. Effectiive Wind Area is defined as the projected surface area for components such as doors and windows. The Effective Wind Area for components such as studs and trusses, and for cladding such as roof and wall sheathing, is defined as the span length multiplied by an effective width need not be less than one-third the span length. a 3 2�2 3 1 QINALKa 2 1 22 1 2 2 HIP ROOF 7 < 8 <=== 27 DESIGN WIND LOAD PRESSURE (PSF) -EXPOSURE "C" LOCATION ZONE COMPONENT EFFECTIVE AREA 1fl 45 2D 30 4Q 50 b0 70 $0 9fl 100 ROOF ] .159 ar -269 +16.1 a: -25.4 +1&0 or -26.1 +16.0 or -25.] +26.0 or -25.4 +16.0 or -25.1 +26.0 or -249 +16A or -24.8 +16.0 ar -24.6 160-24.5 +16.0 or -24A ROOF 2 +16.9 or -46.7 +16.1 or -44.6 +16.0 or +15.0 or -40.8 x16.0 ar-39.2 +16.0 or -381 +26.0 or -371 +16.0 ar-35.3 +16,0 o, -35-5 +16.0 or -34.9 +16.0-343 ROOF 3 +269 or -69.1 +i6.1 or -66.5 +1E.0 or -64.6 +16.0 or -62.0 +15.0 ar -60.1 +16.0 or -58.7 +16.0-575 +16.0 cr -56.5 +16.0 nr 55.7 +36-0 or -549 +16.0 or -54.2 WALL 4 +29A or -31.8 +28.6 or -31.1 +28.0 or -30.5 +27.3 or -29.7 +26,7 or -29.2 +25.3 or -28.8 +25.9 ar-28.4 +25.5 or -28.1 +25.4 or -27,9 +25.2 or -27-7 +25Aar-27.5 WALL 5 +29.G or -39.3 +28,6 or -37.6 +2&0 ar -36.7 +27.3 or -36.1 +26.7 ar -34.0 +26.3 or -33.2 +25.9 or -325 +-25.6 or -33.9 +25.4 or -31.4 +25.2 or --30.9 +25.0 or -30.5 9'xT GARAGE DOOR +25-Gor-z8.3 16'xT GARAGE DOOR +24.G or -265 2 - 2x4 OR DBL 1x4 BUCK - CONNECT SECTION EA. TO BLOCK W/ 3/16"x3' TAPCON (t A -A 1/4' MiN. EMBEDMENT INTO BLK.) BLOCK HEADER SOLID BLKG. AT TOP BTWN. 4'- 1'-4' ARCH BLKG. &BUCK MAX. 2x4 45d DIAGONAL BRACE(S) "x3' TAPCOJS AV <- 2x4 45d DIAGONAL BUILT UP PLWD. OR / " BRACE AT EA. FACE MASONITE BUCK -SCRIBE ARCH PANEL 4 t0d NAILS INTO EA. BACKSIDE TO FiT ARCH= () OF ARCH W� �2�10d CONNECT W/ $d NAILS 2z4 BRACE/BLKG. NAILS AT € . D INSTALL NOW. SCREW ANCHOR 2x4 SOLID BLKG. (FULL WIDTH � WALL) PROVIDE TAPCON INTO ARCH BLKG. PER BTWN. OSB ARCH FACES W/ (2)10d NAILS 4N1HIN 4' MIN. OF INSTALLATION DETAILS THRU OSB INTO EA. 2x4 BRACE _ _START OF ARCH _ SECTION A -A PROVIDE TAPCON PER WOW. INSTALLATION 4' MAX. RAD. DETAILS OR THRU 11 j2" THK. OR MORE BUCK WITHIN 8° MIN. OF START OF ARCH FRAME ARCH TOP DETAIL BLOCK OPNG. SHOWN FRAME OPNG. SIMILAR (NO BUCK REQ'D. WHEN NO PLYWD. JOINT AT JAMBS) 2 - 2z4 OR DBL. 1x4 BUCK - SECTION CONNECT EA. TO BLOCK W/ 3/16"0" B -B BLOCK HEADER TAPCON (1 1/4' MIN. EMBEDMENT INTO PROVIDE 2x4 DIAL. BRACE SOLID BLKG. AT TOP 8d NAILS AT 8" O.C. AT BUCK 3/16 BTWN. BTWN. VERT. BRACES WHEN HT ARCH BLKG, & BUCK OF BRACE EXCEEDS 24' MAX. PROVIDE 2) MIN. TAPCON r�T EA. SIDE 24 VERT. 8d NAILS AT 8' O.C. BUCK- (1) WITHIN 4" BRACE(S) AT BUCK MIN. OF START OF ARCH BUILT UP PLWD. OR 7/16' OSB MASONITE BUCK -SCRIBE ARCH PANEL START OF ARCH_ BACKSIDE TO FIT ARCH- EQ. EQ. - - - 4' MAX. RAD. CONNECT W/ 8d NAILS 20 VERT. AT EA. FACE OF ARCH INSTALL WDW. SCREW ANCHOR W/ (3)IOd NAILS AT EA, END INTO ARCH BLKG. PER 2x4 SOLID BLKG. (FULL WIDTH OF WALL) INSTALLATION DETAILS BTWN. OSB ARCH FACES W/ (2)104 NAILS SECTION B -B THRU OSB INTO EA. 20 FRAME ELLIPSE ARCH TOP DETAIL BLOCK OPNG. SHOWN FRAME OPNG. SIMILAR (NO BUCK REQ'D. WHEN NO PLYWD. JOINT AT JAMBS) �.` ° B °• P •v O e 4 GROUT BLOCK SOLID AS SHOWN -EXTEND GROUT CONTINUOUS TO THE NEAREST REINFORCED CELLS BEYOND THE LOCATION OF THE MAXIMUM 2" BLOCK OVERHANG (FILL TO BOTTOM OF WI NDOW ALL AT LOCATIONS WHERE SILL IS LESS THAN 2'-0" ABOVE TOP OF SLAB) 2' MAX. OVERHANGING BLOCK REPAIR DETAIL MAXIMUM WALL HT 1140 MPH / EXP C 1 RISK GAT. fl SIZE/SPECIES SPACING MAXIMUM HEIGHT 2x4 SPF 16° OC 8'4 2x4 SPF 12' OC 9'-0° 2x4 SPF 16' OC 9'-4" 2x4 SPF 12" OC 10'-0" 2x6 SPF 16° OC 12'-4" 26 SPF 12° OC 13'-0" 20 SPF 16" OC 14'-0" 26 SPF 12' OC 15-0" NOTE: HEIGHTS SHOWN IN THIS TABLE ARE BASED ON STUDS BEING ATTACHED TO 1/2 MINIMUM OSB SHEATHING iMTH 8d MIN NAILS ®12° OC INTERMEDIATE SUPPORTS AND 6" OC AT PERIMETER AND 4" OC 0 CORNER STUDS. SHEATHING TO BE CONTINUOUS OVER 3 OR MORE STUDS. TAPCON INSTALLATION ANCHOR CHART FOR BLOCK OPNGS. W/ BUCKS. 1 1/2" THICK OR GREATER WIDTH WIDTH WIDTH WIDTH D FEF D D E D D E D 24" 0. C. 8" MAX. MAX. A 8„ A 8" A � - C MAX. C MAX. C B B J B _� = C WOW. C WOW. � WOW. C SGD OR OPNG. OPNG. OPNG. A A A � � ¢ EXT. DOOR SILL /MULL SILL /MULL OPNG. SINGLE WOW, OR MULTIPLE SIDE STACKED WOW. BY SIDE WOWS. W/ MULL BTWN. ® Wl MULL BTWN. ® � Q WOW. OPNG. LOCATIONS WDW. OPNG. LOCATIONS � HEIGHT IN HEAD �1 WIDTH IN HEAD (D UP TO 40" A UP TO 40" D EXTERIOR DOOR 40.01" TO 60" A , B 40 .01" TO 60" D , E OPENINGS 60.01" TO 80" A , C 60.01" TO 80" D , F 80.01" TO 100" A , B , C 80.01" TO 100" D , E , F 1. LOCATIONS PER INDIVIDUAL WOW. OPNG DiMENSfON NOT MULLED WOW. OPNG. DIMENSION 2. MAXIMUM ALLOWABLE SPACING BTWN. TAPCON ANCHORS TO BE 24" O.C. 2x HDR. PLATE OR EXTERIOR WD. HDR. SHEATHING 2 LAYERS OF 7/16" O.S.B. OR (i) LAYER OF 3/4' PLYWD. CONNECT W/ {2)8d NAILS AT 16" O.C. BUILT UP WOOD HDR. OR 2x HDR. PLATE EXTERIOR SHEATHING 2x CRIPPLE STUDS AT 16" O.C. BTWN. SILL PLATE & BOT. PLATE OR HDR. & HDR. PLATE 2x HDR. OR SILL PLATE OR HDR. JACK ATTACH WDW./[l0(Xi PER MANUF. SPECIIFFICRTIONS SILL 1 JAMB 1 HEAD FRAME WALL OPNG. WDW./DOOR DETAILS TAPCON PER 1 3/4" SCHEDULE MIN. � X M � EXT. FACE (2)1Dd x 1 1/2" AT 24" OF BLOCK O.C. FOR BUCK BUILT UP TO 2 1/2" THICK PROVIDE 2x P.T. AGAINST OR BLOCK FOR BUILT UP BUCKS (2)8d z 2 1/2" AT 24° 2" THICK OR MORE O.C. FOR BUCK BUILT UP BUILT UP BUCK DETAIL 21/2" THIO( OR MORE THICKNESS 11/2" OR GREATER PRECAST CONC. MIN. 2 1/2" WIDE BUCK - LINTEL ABV. OPNG. .MAXIMUM 2 3/4" BUILT UP OR CMU JAMB THICKNESS - CONNECT W/ CAULK BTWN. 3/16" DIA. TAPCONS. BUCK /BLOCK TAPCON LENGTH MUST BE SUFFICIENT TO ACHIEVE MIN. CEMENT FINISH � 1 1/4" EMBEDMENT INTO ODER BLOCK BLOCK JAMB /HERD INSTALL WOW./DOOR SCREW DRYWALL ANCHOR INTO BUCK PER INSTALLATION DETAILS HEAD/JAMB FOR BUCK THICKNESS 1112" OR GREATER INSTALL WDW./DOOR TAPCON PRECAST CONC. ANCHOR INTO BLOCK PER LINTEL ABV. OPNG. INSTALLATION DETAILS OR CMU JAMB CAULK BTWN. MIN. 2 1/2' WIDE BUCK - MAXIMUM BUILT UP BUCK % BLK THICKNESS MUST BE LESS THAN 1 1/2' CONNECT W/ CEMENT FINISH SPIRAL NAILS AT 16" O.G. OVER BLOCK DRYWALL HEAD/JAMB FOR BUCK THICKNESS LESS THAN 11121" CEMENT FINISH ATTACH WDW./DOOR PER OVER BLOCK MANUF. SPEOFlCR110NS PRECAST CONC. SILL � I SILL ' BLOCK WALL OPNG, WDW./DOOR BUCK DETAILS ALL EXTERIOR WINDOWS AND DOORS SHALL HAVE MEET PRESSURES IN CHART- EXPOSURE "C" FASTENER SCHEDULE FOR BUILT UP STUD COLUMNS VERTICAL SPACING OF FASTENERS AT 8' O.C. STAGGERED UNLESS OTHERWISE NOTED. THIRD AND FOURTH PLIES SHALL BE ADDED TO EITHER SIDE OF 2 -PLY COMPOSITE POST. MINIMUM END DISTANCE SHALL BE 2 1/2' AND MINIMUM EDGE DISTANCE SHALL BE t". STUD # OF NAILS NUMBER OF PLYS SIZE PER RDW (2) PLYS (3) PLYS (4) PLYS 20 (t) 10d x A. 10d x 31 10d X A. OR 1/2" DIAM. BST 0 16° O.C. 26 (2) 10d x A. i Qd x A. 10d X A. OR 1/2° DIAM.BOLT 0 16' D.C. 2x$ (2) tOd x 31 1 O x A. i0d X A. OR 1/2" DIA. BOLT 0 16" D.G. IN LIEU OF NAILS, MEMBERS MAY BE BOLTED TOGETHER. WITH 1/2' DIAM. THRU-BOLTS AT 16" O.G. VERTICALLY WITH THE SAME NUMBER OF BOLTS PER ROW AS NAILS WOOD HEADER SCHEDULE MAXIMUM CLEAR SPAN FOR LOAD BEARING FRAME WALLS SIZES NOTED ON PLANS TO SUPERCEDE VALUES SHOWN ON THIS SCHEDULE HEADER LOAD HEADER SIZE CONDITION (2)2x6 NJ (2)2x8 NJ (2)2x10 NJ (2)2x12 NJ ROOF ONLY 4'-0' 2 5'-4° 2 6'-8" 2 7'-6" 2 2nd FLOC ONLY 3'-6' 2 4'-5" 2 5-5" 2 6'-3" 2 2nd FLOOR &ROOF 3'-0' 2 4'-8" 2 5 -5" 3 ON "NJ" =MINIMUM NUMBER OF JACK STUDS REQ'D. AT EA. END UNLESS OTHERWISE NOTED THE PLAN ALL STRUCTURAL HEADERS TO BE #2 4R BETTER S.Y.P. ALL NON-STRUCTURAL HEADERS HEM -FIR OR S -P -F OR BETTER CONSTRUCTION NOTES L .APPLICABLE CODES: - FLOR IDA BUILDING CODE 2410 -RESIDENTIAL=Jz E-= - NATIONAL ELECTRICAL CODE REQUIREMENTS FOR ONE AND TWO FAMILY DWELINGS, NFPA 70A; 2007. - FLORIDA FIRE PREVENTION CODE - F.F.P.C. 2010 2. SUBCONTRACTORS SHALL VERIFY ALL DIMENSIONS IN THE FIELD AND NOTiFY THE BUILDER/ARCHITECT OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH CONSTRUCTION. 3. ALL CONSTRUCTION SHALL BE BRACED AND SHORED BY CONTRACTOR AS REQUIRED TO SAFELY PERFORM THE WORK. TERMITE PROTECTION 1. TERMITE PRETREATMENT SHALL MAKE USE OF BORA-CARE TERMIIICIDE. THE BORA-CARE TERMITIODE TREATMENT IS REGISTERED BY THE FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES AS REQUIERED BY THE FLORIDA BUILDING CODE 2010 - RESIDENTIAL 2. UPON COMPLETION OF THE APPLICATION OF THE TERMITE PROTECTIVE TREATMENT, A CERTIFICATE OF COMPLIANCE SHALL BE ISSUED BY A LICENSED PEST CONTROL COMPANY BEFORE A CERTIFICATE OF OCCUPANCY MAY BE ISSUED. THE CERTIFICATE OF COMPLIANCE SHALL STATE: 'THE BUILDING HAS RECEIVED A COMPLETE TREATMENT FOR THE PREVENTION OF SUBTERRANEAN TERMITES. THE TREATMENT IS IN ACCORDANCE WITH THE RULES AND LAWS ESTABLISHED BY THE FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES'. FOUNDATION NOTES 1. FOUNDATION IS DEIGNED BASED ON PRESUMPTIVE SAFE ALLOWABLE BEARING PRESSURE OF 2000 PSF. CONTRACTOR MALL VERIFY THAT THE MINIMUM BEARING PRESSURE OF 2000 PSF IS OBTAINED PRIOR TO FOOTING PLACEMENT. 2. FOOTING MALL BE PLACED ON COMPACTED SOIL FREE OF ORGANIC DEBRIS. 3. AS REQUIRED BY THE LOCAL MUNiCAPILITY BUILDING DEPARTMENT, A FOUNDATION SURVEY SHALL BE PERFORMED AND A COPY OF THE SURVEY SHALL ON THE SITE FOR 1TiE BUILDING INSPECTOR'S USE, OR ALL PROPERTY MARKERS SHALL BE EXPOSED AND A STRING STRETCHED FROM MARKER TO MARKER TO VERIFY REQUIRED SETBACKS. CONCRETE NOTES 1. CONCRETE STRENGTH SHALL BE 2500 PSI AT 28 DAYS AND IN ACCORDANCE WITH A.C.I. 318-11. 2. REINFORCING STEEL SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF ASTM A615 GRAFE 44. 3. WELDED WIRE FABRIC SHALL BE IN ACCORDANCE 4NTH THE LATEST EDITION OF ASTM A185. CONCRETE MASONRY NOTES 1. CONCRETE MASONRY WORK SHALL BE IN ACCORDANCE NTH A.C.I. 530/ASCE 5/TMS 402. 2. CONCRETE MASONRY .UNITS SHALL BE 1N CONFORMANCE WITH ASTM C90, GRADE N, TYPE II ASTM C140 AND SHALL HAVE A COMPRESSIVE STRENGTH OF 2000 PSI MINIMUM BASED ON THE NET GROSS SECTIONAL AREA. 3. COARSE GROUT SHALL BE IN CONFORMANCE WITH ASTM C476. 4. MORTAR SHALL BE TYPE "M" OR "S' IN ACCORDANCE WITH ASTM C270. 5. ALL MASONRRY UNITS SHALL BE LAID IN RUNNING BOND U.N.O. 6. PROVIDE 8" PRECAST CONCRETE LINTELS ABOVE ALL MASONARY OPNGS. ALL LINTEL FOR OPNGS. OVER 5-6" SHALL BE GROUTED SOLID W/ 8" STANDARD BRC. EA. END U.N.O. (4' MIN. BEARING REQ'D.) PRE-ENGINEERED: WOOD TRUSSES L ALL TRUSSES SHALL BE IN ACCORDANCE WITH THE LATEST EDITIONS OF THE "NATIONAL DESIGN SP€CIFICATONS FOR STRESS -MADE LUMBER AND ITS FASTENERS" AS RECOMMENDED BY THE NATIONAL FOREST PRODUCTS ASSOCIATION. 2. THE TRUSS MANUF. SHALL VERIFY ALL TRUSS SPANS, SLOPES, BEARING POINTS, AND DIMENSIONS BEFORE FABRICATION. ANY DEVATIONS OR DISCREPANCIES FROM THE PLANS TO BE BROUGHT TO THE AT1>=NTiON OF THE BUILDER/ARCHITECT/ENGINEER PRIOR TO PROCEEDING. TRUSS MANUF. TO SUPPLY ALL TRUSS TO TRUSS HANGERS AND CONNECTIONS. 3. TRUSS MANUF. TO PROVIDE SHOP DRAiNNGS ON NEW AND/OR REVISED MODEL PLANS TO BUILDER FOR REVIEW BEFORE FABRICATION. TRUSS SHOP DRAWINGS SHALL SHOW ALL TRUSS PROFILES, GRAVITY/UPLIFT LOADS, BRACING MEMBERS, AND TRUSS TO TRUSS HANGERS. 4. ALL PREFAB. WOOD TRUSSES SHALL BE SECURELY FASTENED TO THEIR SUPPORTING WALLS OR BEAMS AS REQUIRED PER THE FRAMING PLANS. 5. PRE-ENGINEERED WOOD TRUSSES, RAFTERS, AND OTHER ROOF FRAMING MEMBERS SHALL BE SPACED AT 24' O.C. MAXIMUM. 6. RIDGE AND VALLEY SE( MEMBERS SHALL BE A NOMINAL DIMENSION OF 2" LARGER THAN RAFTERS. 7. ALL ROOF FRAMING MEMBERS SHALL BE MIN. SYP #2 OR BETTER. WALL &ROOF FRAMING NOTES 1. WOOD CONSTRUCTION SHALL CONFORM TO THE LATEST EDITION OF °NATIONAL DEIGN SPEORGAl10NS FOR WOOD CONSTRUCTi(XV" BY THE NATIONAL FOREST PRODUCT ASSOOAl10N. 2. ROOF AND WALL STRUCTURAL SHEATHING SHALL BE SPAN RATED IN ACCORDANCE WITH APA PS 1-83 OR NER-108. NAILS USED IN ALL SHEATHING APPLICATIONS SHALL BE 8d RING SHANK, HOT DIPPED GALVANIZED, HAivD OR GUN DRIVEN NAILS. GUN DRIVEN NAILS SHALL HAVE HEAD AND SHANK SIZE EQUIVALENT TO HAND DRIVEN NAILS, OTHERWISE SPACING SHALL BE REDUCED FROM 12" TO 10',8' TO 6°, 6° TO 5°, 4° TO 3°, AND 3' TO 2° IN THOSE APPLICATIONS. 3. ALL EXTERIOR FRAMED WALL STUDS SHALL BE AS NOTED ON PLANS AND OR A MINIMUM GRADE OF #2 SYP OR BETTER. INTERIOR WALL STUDS SHALL BE A MINIMUM OF S -P -F #2 OR BETTER. 4. WOOD HEADERS PER SCHEDULE UNLESS NflTID OTHERWISE ON PLANS. ALL HEADER MATERIAL TO BE SOUTHERN YELLOW PINE #2 MIN. PROVIDE STRAPS AS REQ'D. PER DETAILS. 5. PROVIDE A BUILT UP OR SOLID SAWN COLUMN UNDER ALL GIRDERS AND BEAMS IN FRAMED WALLS UNLESS NOTED OTHERWISE 4N PLANS. A MINIMUM OF (2)2x4 STUDS SHALL BE USED. STRAP MEMBER DIRECTLY TO TOP OF COLUMN AND BOTTOM W A MIN. OF SIMPSON SPH4 OR EQUAL AT EACH STUD. PROVIDE BLOCKING TO BEARING WALL BELOW AS REQUIRED. HEAVY HOLD DOWNS MAY BE REQUIRED AT SOME LOCATIONS AS NOTED ON PLANS. 6. END JOINTS IN STRUCTURAL DOUBLE PLATE 91ALL BE OFFSET AT LEAST 4'-0°. STRUCTURAL DOUBLE PLATES TO BE NAILED AT 6" D.C. 7. AT EXTERIOR FRAME WALLS, PROVIDE FULL PANEL OF SHEATHING FROM ALL CORNER EDGES. FULL PANEL MUST BE SAWCUT AROUND ANY OPENINGS. SEE DETAILS FOR NAILING REQUIREMENTS. 8. THE NUMBER AND SIZE OF NhLS CONNECTING WOOD MEMBERS SHALL NOT BE LESS THAN THOSE SPECIFIED IN TABLE 2304.9.1 (FASTENING SCHEDULE) OF THE FLORIDA BUILDING CODE 2010 -RESIDENTIAL- UNLESS NOTED OTHERWISE. 9. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED LUMBER OR SEPARATED FROM CONCRETE W/ FELT PAPER OR METAL PLATES. 14. ALL NAILS AND BOLTS EXPOSED TO WEATHER SHALL BE HOT DIPPED GALVINIZED. UPLIFT CONNECTORS 1. UPLIFT CONNECTORS ARE ONLY REQUIRED ON MEMBERS IN WALLS THAT ARE EXPOSED TO UPLIFT FORCES. INTERIOR LOAD BEARING WALLS ARE NOT ALWAYS EXPOSED TO UPLIFT FORCES. THE MEMBERS OF THESE WALL WOULD NOT NEED TO HAVE CONNECTORS APPLIED. 2. UPLIFT CONNECTORS TO PROVIDE CONTINUITY FROM ROOF TRUSSES THRU PLATES TO SLAB AND FOUNDATION PER PLAN. 3. UPLIFT CONNECTORS AT ROOF TRUSSES SHALL BE BENT OVER TRUSS TOP CHORDS AS REQUIRED AND NAILED PRIOR TO APPLICATION OF ROOF SHEATHING. MISSED STRAPS SHALL BE INSTALLED PER PLAN PRIOR TO SHEATHING INSTALLAIiOJ. 4. THE MAXIMUM NUMBER OF FLAT STRAPS (I.E. "HETA20") IN THE TOP BLOCK WALL COURSE AT ANY GiRDER TRUSS SHALL BE (2) STRAPS WITH 8" CLEAR DIMENSION BEFORE NEXT STRAP(S). 5. ALL SPECIFIED CONNECTORS SHALL BE INSTALLED PER CONNECTOR MANUFACTURERS INSTRUCTIONS. 6. NO CONNECTOR SHALL BE BENT IN THE FIELD UNLESS NOTED AS ACCEPTABLE IN THE CONNECTOR MANUF. PRODUCT CATALOG. 7. WHEN ANCHORING (2) WOOD ITEMS TOGETHER, THE LENGTH OF HURRICANE STRAP MUST BE EQUALLY HALF ON ER. ITEM. 8. INSTALL ALL SPECIFIED FASTENERS AT EACH CONNECTOR. REFER TO CONNECTS SCHEDULE FOR MINIMUM NUMBER OF FASTENERS 9. MAY SUBSTITUTE HURRICANE STRAP WITH STRAP OF GREATER HOLD DOWN VALUE OR GREATER UPLIFT VALUE IN FIELD WITHOUT VERIFICATION, PROVIDED ALL MANUFACTURERS INSTALLATION INSTRUCTIONS OR REQUIREMENTS ARE FOLLOWED. STRUCTURAL CRITERIA 1. APPLICABLE CODE FLORIDA BUILDING CODE 2010 -RESIDENTIAL WIND SPEED - 144 NON -WIND-BORNE DEBRIS REGION; WIND IMPORTANCE FACTOR - (1) ONE; 'ENCLOSED' BUILDING TYPE; EXPOSURE CATEGORY C -SEE ROOF PLAN NOTES. 2. INTERNAL PRESSURE COEFFICIENT: +/- 0.18 MAXIMUM MEAN ROOF HT. = 30 FEET GENERAL NOTES 1. DOORS BETWEEN GARAGE AND LIVING SPA( MALL BE MINIMUM 1 3/8' THICK SOLID CORE WORD ODORS, 1 3/8' SOLID DR HONEYCOMB CORE STEEL DOORS, OR 20 -MINUTE FIRE RATED DOORS. 2. THE GARAGE SHALL BE SEPARATED FROM THE RESIDENCE AND ITS ATTiC AREA BY NOT LESS THAN 1/2" GYPSUM BOARD APPLIED TO THE GARAGE SIDE. GARAGES BENEATH HABITABLE ROOMS SHALL BE SEPARATED FROM ALL HABITABLE ROOMS ABOVE BY NOT LESS THAN 5/8" TYPE X GYPSUM BOARD OR ITS EQUIVALENT 3. DUCTS IN THE GARAGE AND DUCTS PENETRATING THE WALLS OR (FILINGS SEPARATING THE DWELL{N FROM THE GARAGE SHALL BE CONSTRUCTED 4F A MINIMUM N0. 26 GAGE SHEET STEEL OR APPROVED EQUAL 4. ENCLOSED ACCESSIBLE SPACE UNDER STAIRS SHALL HAVE WALLS, UNDER STAIR SURFACE AND ANY SOFFITS PROTECTED ON THE ENCLOSED .SIDE WITH 1/2' GYPSUM BOARD. DOOR SCHEDULE 2068 DOOR DOOR DOOR DOOR WIDTH WIDTH HT, HT. FEET INCHES FEET INCHES NOTES 1. NUMBER OF PANELS, HAND, & SWING AS SHOWN ON PLAN 1 1 1 1 ry ry cn i 1 i 1 LATEST REVISION DATE TO MASTER: 07-01-12 W� U Ali _ W WI 0 0 f z c� o Q - U � tUJ o LV o L..L z O O c� -9C-0 CIS Lu �) U oho CQ LLJ o � � � � = Q w = ~o C-- � J (� O C'7 O LLLU 00 LID - (n CV LL Q � M 1 M L'1"J � LL I LLJ LLJ W 0 C/) Lu z 0 � o W o� J co DO NOT SCALE PRINTS! CONSTRUC114N SHALL BE PER INDICATED DIMENSIONS ONLY, ANY DISCREPENCIES TO BE REPORTED TO M/i HOMES FOR CLARIFI FURR OUT AS REQ'D. HANGER W/ HANGER WI HORIZONTAL VERTICAL ORIENTATION ORIENTATION WOOD HEADER BTWN. WDWS, OR WDW./DOOR i. MAXIMUM DESIGN PRESSURE 48.6 PSF FOR ANY DOOR OR WDW. 2. INSTALL WOW. AND DOOR SCREW ANCHORS INTO HEADER PER WDW. OR DOOR INSTALLATION DETAILS. O.S.B. SHEATHING W/ 8d AT 6" O.C. - 2x4 CONT. W/ (2) i0d 2x4 BLKG. AT 24" O.C. AT EA. TRUSS OR BLKG. (2) 10d AT EA. 2x4 2x4 AT 24" O.C. 2x6 OR 2x8 2x4 P.T. CONT. W/ 10d AT 12" O.C. 3/16" x 3" MIN. MASONRY 20 P.T. W/ SCREWS AT 16" O.C.-­-b..3/16' x 3" MIN. MASONRY SCREWS O.S.B. SHEATHING AT 24" O.C. W/ 8d AT 6" O, 10d AT 12" O.C. 2x4 P.T. W/ (2)10d C. (2)1Od AT EA. 2x4 2x6 OR 2x8 CONT. HARD CASE SPIRAL BLCONAMB NAILS AT 24" O.C. HEAD JAMB POCKET SGD HEAD/JAMB DETAIL LOCATIONS WHERE POCKET SGD TRACK IS OUTSIDE BLOCK WALL OPNG. 20 P.T. - ATTACH W/ 1/4"x3" MASONRY SCREW 6" MAX. (1 1/4r MIN. EMBED.) 6" MAX. SIMPSON SP1 AT 16" O.C. Z CD W Li U p O Ln X= (2) 2x4 @ QCD F- CD CDEACH END a = <n p U Cl- QQ� 0 2x4 ® C 16' O.C. X CD �m SIMPSON SPI AT 16" O.C.- X - BLOCK OPENING ALL BLK. CELLS ABV. LINTEL TO BE CONC. FILLED PRECAST LINTEL PER PLAN ACROSS OPNG, 2x6 P.T. FROM BOT. OF LINTEL TO TOP OF WALL - CENTER ON OPNG. FASTEN TO BLOCK W/ i/2' J -BOLT W/ 2" SQ. WASHER �1 t 2x6 OR 2x4 P.T. W/ CONC. NAILS AT 12" O.C. ACROSS TOP OF OPNG. o EXTEND JAMB 14" MIN. 4" MIN. d ABV. OPNG. EDGE \2x6 P.T. BUCK AT GARAGE DOOR JAMBS DIST. FASTEN TO BLOCK W/ 1/2° DIA. X 6" J -BOLTS o OR 5" X6" 'REDHEAD' TYPE EXPAN90N BOLTS m AT k O.C. MAX. W 2- SQ. WASHERS AT EA. SIDE OF OPNG. GARAGE DOOR MASONRY OPENING GARAGE DOOR DETAIL X \ cim o \ a N � 2x4 P.T. FURRING z ATTACH TO BLK. W/ 1/4"x3" MASONRY cq _ o SC (1 REW 1/4" MIN, EMBED.) O.S.B. SHEATHING W/ 8d W • NAILS ® 6" O.C. EDGE), 12 O.C. (FIELD) 20 STUDS x 16' D.G. 6' 2x4 P.T. - ATTACH 6" WALL STBK. PER PKT. SGD. MANUF. MAX. W/ 1/4"0" TAPCONS MAX. (1 1/4' MIN. EMBED.) WALL ELEVATION JAMB / HEAD DETAIL FRAME WALL AT POCKET SGD BLOCK OPENING LOCATIONS WHERE POCKET SGD TRACK IS BELOW PRECAST LINTEL BLOCK JAMB/HEAD 2x4 P.T FURRING SCREW" (1M-1/4'RMIN, EMBED) 10d NAILS @ 6' O.C. 2x4 P/T/ @ TOP AND SIDES OF BLK. OPNG. NOTES 1, Values shown are based on allowable stress design using 140 miles per hour, Exposure C, Enclosed condition,lmportance Factor of 1.0. 1 Positive values act toward the surface, negative values act away from the surface. 3. Manufacturing data for components and cladding shall exceed the values shown in this table. 4. Edge pressures noted shall be used for components that are located within eight feet of building edges or corners. All other components shall use typical pressure values. 5. Effectiive Wind Area is defined as the projected surface area for components such as doors and windows. The Effective Wind Area for components such as studs and trusses, and for cladding such as roof and wall sheathing, is defined as the span length multiplied by an effective width need not be less than one-third the span length. a 3 2�2 3 1 QINALKa 2 1 22 1 2 2 HIP ROOF 7 < 8 <=== 27 DESIGN WIND LOAD PRESSURE (PSF) -EXPOSURE "C" LOCATION ZONE COMPONENT EFFECTIVE AREA 1fl 45 2D 30 4Q 50 b0 70 $0 9fl 100 ROOF ] .159 ar -269 +16.1 a: -25.4 +1&0 or -26.1 +16.0 or -25.] +26.0 or -25.4 +16.0 or -25.1 +26.0 or -249 +16A or -24.8 +16.0 ar -24.6 160-24.5 +16.0 or -24A ROOF 2 +16.9 or -46.7 +16.1 or -44.6 +16.0 or +15.0 or -40.8 x16.0 ar-39.2 +16.0 or -381 +26.0 or -371 +16.0 ar-35.3 +16,0 o, -35-5 +16.0 or -34.9 +16.0-343 ROOF 3 +269 or -69.1 +i6.1 or -66.5 +1E.0 or -64.6 +16.0 or -62.0 +15.0 ar -60.1 +16.0 or -58.7 +16.0-575 +16.0 cr -56.5 +16.0 nr 55.7 +36-0 or -549 +16.0 or -54.2 WALL 4 +29A or -31.8 +28.6 or -31.1 +28.0 or -30.5 +27.3 or -29.7 +26,7 or -29.2 +25.3 or -28.8 +25.9 ar-28.4 +25.5 or -28.1 +25.4 or -27,9 +25.2 or -27-7 +25Aar-27.5 WALL 5 +29.G or -39.3 +28,6 or -37.6 +2&0 ar -36.7 +27.3 or -36.1 +26.7 ar -34.0 +26.3 or -33.2 +25.9 or -325 +-25.6 or -33.9 +25.4 or -31.4 +25.2 or --30.9 +25.0 or -30.5 9'xT GARAGE DOOR +25-Gor-z8.3 16'xT GARAGE DOOR +24.G or -265 2 - 2x4 OR DBL 1x4 BUCK - CONNECT SECTION EA. TO BLOCK W/ 3/16"x3' TAPCON (t A -A 1/4' MiN. EMBEDMENT INTO BLK.) BLOCK HEADER SOLID BLKG. AT TOP BTWN. 4'- 1'-4' ARCH BLKG. &BUCK MAX. 2x4 45d DIAGONAL BRACE(S) "x3' TAPCOJS AV <- 2x4 45d DIAGONAL BUILT UP PLWD. OR / " BRACE AT EA. FACE MASONITE BUCK -SCRIBE ARCH PANEL 4 t0d NAILS INTO EA. BACKSIDE TO FiT ARCH= () OF ARCH W� �2�10d CONNECT W/ $d NAILS 2z4 BRACE/BLKG. NAILS AT € . D INSTALL NOW. SCREW ANCHOR 2x4 SOLID BLKG. (FULL WIDTH � WALL) PROVIDE TAPCON INTO ARCH BLKG. PER BTWN. OSB ARCH FACES W/ (2)10d NAILS 4N1HIN 4' MIN. OF INSTALLATION DETAILS THRU OSB INTO EA. 2x4 BRACE _ _START OF ARCH _ SECTION A -A PROVIDE TAPCON PER WOW. INSTALLATION 4' MAX. RAD. DETAILS OR THRU 11 j2" THK. OR MORE BUCK WITHIN 8° MIN. OF START OF ARCH FRAME ARCH TOP DETAIL BLOCK OPNG. SHOWN FRAME OPNG. SIMILAR (NO BUCK REQ'D. WHEN NO PLYWD. JOINT AT JAMBS) 2 - 2z4 OR DBL. 1x4 BUCK - SECTION CONNECT EA. TO BLOCK W/ 3/16"0" B -B BLOCK HEADER TAPCON (1 1/4' MIN. EMBEDMENT INTO PROVIDE 2x4 DIAL. BRACE SOLID BLKG. AT TOP 8d NAILS AT 8" O.C. AT BUCK 3/16 BTWN. BTWN. VERT. BRACES WHEN HT ARCH BLKG, & BUCK OF BRACE EXCEEDS 24' MAX. PROVIDE 2) MIN. TAPCON r�T EA. SIDE 24 VERT. 8d NAILS AT 8' O.C. BUCK- (1) WITHIN 4" BRACE(S) AT BUCK MIN. OF START OF ARCH BUILT UP PLWD. OR 7/16' OSB MASONITE BUCK -SCRIBE ARCH PANEL START OF ARCH_ BACKSIDE TO FIT ARCH- EQ. EQ. - - - 4' MAX. RAD. CONNECT W/ 8d NAILS 20 VERT. AT EA. FACE OF ARCH INSTALL WDW. SCREW ANCHOR W/ (3)IOd NAILS AT EA, END INTO ARCH BLKG. PER 2x4 SOLID BLKG. (FULL WIDTH OF WALL) INSTALLATION DETAILS BTWN. OSB ARCH FACES W/ (2)104 NAILS SECTION B -B THRU OSB INTO EA. 20 FRAME ELLIPSE ARCH TOP DETAIL BLOCK OPNG. SHOWN FRAME OPNG. SIMILAR (NO BUCK REQ'D. WHEN NO PLYWD. JOINT AT JAMBS) �.` ° B °• P •v O e 4 GROUT BLOCK SOLID AS SHOWN -EXTEND GROUT CONTINUOUS TO THE NEAREST REINFORCED CELLS BEYOND THE LOCATION OF THE MAXIMUM 2" BLOCK OVERHANG (FILL TO BOTTOM OF WI NDOW ALL AT LOCATIONS WHERE SILL IS LESS THAN 2'-0" ABOVE TOP OF SLAB) 2' MAX. OVERHANGING BLOCK REPAIR DETAIL MAXIMUM WALL HT 1140 MPH / EXP C 1 RISK GAT. fl SIZE/SPECIES SPACING MAXIMUM HEIGHT 2x4 SPF 16° OC 8'4 2x4 SPF 12' OC 9'-0° 2x4 SPF 16' OC 9'-4" 2x4 SPF 12" OC 10'-0" 2x6 SPF 16° OC 12'-4" 26 SPF 12° OC 13'-0" 20 SPF 16" OC 14'-0" 26 SPF 12' OC 15-0" NOTE: HEIGHTS SHOWN IN THIS TABLE ARE BASED ON STUDS BEING ATTACHED TO 1/2 MINIMUM OSB SHEATHING iMTH 8d MIN NAILS ®12° OC INTERMEDIATE SUPPORTS AND 6" OC AT PERIMETER AND 4" OC 0 CORNER STUDS. SHEATHING TO BE CONTINUOUS OVER 3 OR MORE STUDS. TAPCON INSTALLATION ANCHOR CHART FOR BLOCK OPNGS. W/ BUCKS. 1 1/2" THICK OR GREATER WIDTH WIDTH WIDTH WIDTH D FEF D D E D D E D 24" 0. C. 8" MAX. MAX. A 8„ A 8" A � - C MAX. C MAX. C B B J B _� = C WOW. C WOW. � WOW. C SGD OR OPNG. OPNG. OPNG. A A A � � ¢ EXT. DOOR SILL /MULL SILL /MULL OPNG. SINGLE WOW, OR MULTIPLE SIDE STACKED WOW. BY SIDE WOWS. W/ MULL BTWN. ® Wl MULL BTWN. ® � Q WOW. OPNG. LOCATIONS WDW. OPNG. LOCATIONS � HEIGHT IN HEAD �1 WIDTH IN HEAD (D UP TO 40" A UP TO 40" D EXTERIOR DOOR 40.01" TO 60" A , B 40 .01" TO 60" D , E OPENINGS 60.01" TO 80" A , C 60.01" TO 80" D , F 80.01" TO 100" A , B , C 80.01" TO 100" D , E , F 1. LOCATIONS PER INDIVIDUAL WOW. OPNG DiMENSfON NOT MULLED WOW. OPNG. DIMENSION 2. MAXIMUM ALLOWABLE SPACING BTWN. TAPCON ANCHORS TO BE 24" O.C. 2x HDR. PLATE OR EXTERIOR WD. HDR. SHEATHING 2 LAYERS OF 7/16" O.S.B. OR (i) LAYER OF 3/4' PLYWD. CONNECT W/ {2)8d NAILS AT 16" O.C. BUILT UP WOOD HDR. OR 2x HDR. PLATE EXTERIOR SHEATHING 2x CRIPPLE STUDS AT 16" O.C. BTWN. SILL PLATE & BOT. PLATE OR HDR. & HDR. PLATE 2x HDR. OR SILL PLATE OR HDR. JACK ATTACH WDW./[l0(Xi PER MANUF. SPECIIFFICRTIONS SILL 1 JAMB 1 HEAD FRAME WALL OPNG. WDW./DOOR DETAILS TAPCON PER 1 3/4" SCHEDULE MIN. � X M � EXT. FACE (2)1Dd x 1 1/2" AT 24" OF BLOCK O.C. FOR BUCK BUILT UP TO 2 1/2" THICK PROVIDE 2x P.T. AGAINST OR BLOCK FOR BUILT UP BUCKS (2)8d z 2 1/2" AT 24° 2" THICK OR MORE O.C. FOR BUCK BUILT UP BUILT UP BUCK DETAIL 21/2" THIO( OR MORE THICKNESS 11/2" OR GREATER PRECAST CONC. MIN. 2 1/2" WIDE BUCK - LINTEL ABV. OPNG. .MAXIMUM 2 3/4" BUILT UP OR CMU JAMB THICKNESS - CONNECT W/ CAULK BTWN. 3/16" DIA. TAPCONS. BUCK /BLOCK TAPCON LENGTH MUST BE SUFFICIENT TO ACHIEVE MIN. CEMENT FINISH � 1 1/4" EMBEDMENT INTO ODER BLOCK BLOCK JAMB /HERD INSTALL WOW./DOOR SCREW DRYWALL ANCHOR INTO BUCK PER INSTALLATION DETAILS HEAD/JAMB FOR BUCK THICKNESS 1112" OR GREATER INSTALL WDW./DOOR TAPCON PRECAST CONC. ANCHOR INTO BLOCK PER LINTEL ABV. OPNG. INSTALLATION DETAILS OR CMU JAMB CAULK BTWN. MIN. 2 1/2' WIDE BUCK - MAXIMUM BUILT UP BUCK % BLK THICKNESS MUST BE LESS THAN 1 1/2' CONNECT W/ CEMENT FINISH SPIRAL NAILS AT 16" O.G. OVER BLOCK DRYWALL HEAD/JAMB FOR BUCK THICKNESS LESS THAN 11121" CEMENT FINISH ATTACH WDW./DOOR PER OVER BLOCK MANUF. SPEOFlCR110NS PRECAST CONC. SILL � I SILL ' BLOCK WALL OPNG, WDW./DOOR BUCK DETAILS ALL EXTERIOR WINDOWS AND DOORS SHALL HAVE MEET PRESSURES IN CHART- EXPOSURE "C" FASTENER SCHEDULE FOR BUILT UP STUD COLUMNS VERTICAL SPACING OF FASTENERS AT 8' O.C. STAGGERED UNLESS OTHERWISE NOTED. THIRD AND FOURTH PLIES SHALL BE ADDED TO EITHER SIDE OF 2 -PLY COMPOSITE POST. MINIMUM END DISTANCE SHALL BE 2 1/2' AND MINIMUM EDGE DISTANCE SHALL BE t". STUD # OF NAILS NUMBER OF PLYS SIZE PER RDW (2) PLYS (3) PLYS (4) PLYS 20 (t) 10d x A. 10d x 31 10d X A. OR 1/2" DIAM. BST 0 16° O.C. 26 (2) 10d x A. i Qd x A. 10d X A. OR 1/2° DIAM.BOLT 0 16' D.C. 2x$ (2) tOd x 31 1 O x A. i0d X A. OR 1/2" DIA. BOLT 0 16" D.G. IN LIEU OF NAILS, MEMBERS MAY BE BOLTED TOGETHER. WITH 1/2' DIAM. THRU-BOLTS AT 16" O.G. VERTICALLY WITH THE SAME NUMBER OF BOLTS PER ROW AS NAILS WOOD HEADER SCHEDULE MAXIMUM CLEAR SPAN FOR LOAD BEARING FRAME WALLS SIZES NOTED ON PLANS TO SUPERCEDE VALUES SHOWN ON THIS SCHEDULE HEADER LOAD HEADER SIZE CONDITION (2)2x6 NJ (2)2x8 NJ (2)2x10 NJ (2)2x12 NJ ROOF ONLY 4'-0' 2 5'-4° 2 6'-8" 2 7'-6" 2 2nd FLOC ONLY 3'-6' 2 4'-5" 2 5-5" 2 6'-3" 2 2nd FLOOR &ROOF 3'-0' 2 4'-8" 2 5 -5" 3 ON "NJ" =MINIMUM NUMBER OF JACK STUDS REQ'D. AT EA. END UNLESS OTHERWISE NOTED THE PLAN ALL STRUCTURAL HEADERS TO BE #2 4R BETTER S.Y.P. ALL NON-STRUCTURAL HEADERS HEM -FIR OR S -P -F OR BETTER CONSTRUCTION NOTES L .APPLICABLE CODES: - FLOR IDA BUILDING CODE 2410 -RESIDENTIAL=Jz E-= - NATIONAL ELECTRICAL CODE REQUIREMENTS FOR ONE AND TWO FAMILY DWELINGS, NFPA 70A; 2007. - FLORIDA FIRE PREVENTION CODE - F.F.P.C. 2010 2. SUBCONTRACTORS SHALL VERIFY ALL DIMENSIONS IN THE FIELD AND NOTiFY THE BUILDER/ARCHITECT OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH CONSTRUCTION. 3. ALL CONSTRUCTION SHALL BE BRACED AND SHORED BY CONTRACTOR AS REQUIRED TO SAFELY PERFORM THE WORK. TERMITE PROTECTION 1. TERMITE PRETREATMENT SHALL MAKE USE OF BORA-CARE TERMIIICIDE. THE BORA-CARE TERMITIODE TREATMENT IS REGISTERED BY THE FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES AS REQUIERED BY THE FLORIDA BUILDING CODE 2010 - RESIDENTIAL 2. UPON COMPLETION OF THE APPLICATION OF THE TERMITE PROTECTIVE TREATMENT, A CERTIFICATE OF COMPLIANCE SHALL BE ISSUED BY A LICENSED PEST CONTROL COMPANY BEFORE A CERTIFICATE OF OCCUPANCY MAY BE ISSUED. THE CERTIFICATE OF COMPLIANCE SHALL STATE: 'THE BUILDING HAS RECEIVED A COMPLETE TREATMENT FOR THE PREVENTION OF SUBTERRANEAN TERMITES. THE TREATMENT IS IN ACCORDANCE WITH THE RULES AND LAWS ESTABLISHED BY THE FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES'. FOUNDATION NOTES 1. FOUNDATION IS DEIGNED BASED ON PRESUMPTIVE SAFE ALLOWABLE BEARING PRESSURE OF 2000 PSF. CONTRACTOR MALL VERIFY THAT THE MINIMUM BEARING PRESSURE OF 2000 PSF IS OBTAINED PRIOR TO FOOTING PLACEMENT. 2. FOOTING MALL BE PLACED ON COMPACTED SOIL FREE OF ORGANIC DEBRIS. 3. AS REQUIRED BY THE LOCAL MUNiCAPILITY BUILDING DEPARTMENT, A FOUNDATION SURVEY SHALL BE PERFORMED AND A COPY OF THE SURVEY SHALL ON THE SITE FOR 1TiE BUILDING INSPECTOR'S USE, OR ALL PROPERTY MARKERS SHALL BE EXPOSED AND A STRING STRETCHED FROM MARKER TO MARKER TO VERIFY REQUIRED SETBACKS. CONCRETE NOTES 1. CONCRETE STRENGTH SHALL BE 2500 PSI AT 28 DAYS AND IN ACCORDANCE WITH A.C.I. 318-11. 2. REINFORCING STEEL SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF ASTM A615 GRAFE 44. 3. WELDED WIRE FABRIC SHALL BE IN ACCORDANCE 4NTH THE LATEST EDITION OF ASTM A185. CONCRETE MASONRY NOTES 1. CONCRETE MASONRY WORK SHALL BE IN ACCORDANCE NTH A.C.I. 530/ASCE 5/TMS 402. 2. CONCRETE MASONRY .UNITS SHALL BE 1N CONFORMANCE WITH ASTM C90, GRADE N, TYPE II ASTM C140 AND SHALL HAVE A COMPRESSIVE STRENGTH OF 2000 PSI MINIMUM BASED ON THE NET GROSS SECTIONAL AREA. 3. COARSE GROUT SHALL BE IN CONFORMANCE WITH ASTM C476. 4. MORTAR SHALL BE TYPE "M" OR "S' IN ACCORDANCE WITH ASTM C270. 5. ALL MASONRRY UNITS SHALL BE LAID IN RUNNING BOND U.N.O. 6. PROVIDE 8" PRECAST CONCRETE LINTELS ABOVE ALL MASONARY OPNGS. ALL LINTEL FOR OPNGS. OVER 5-6" SHALL BE GROUTED SOLID W/ 8" STANDARD BRC. EA. END U.N.O. (4' MIN. BEARING REQ'D.) PRE-ENGINEERED: WOOD TRUSSES L ALL TRUSSES SHALL BE IN ACCORDANCE WITH THE LATEST EDITIONS OF THE "NATIONAL DESIGN SP€CIFICATONS FOR STRESS -MADE LUMBER AND ITS FASTENERS" AS RECOMMENDED BY THE NATIONAL FOREST PRODUCTS ASSOCIATION. 2. THE TRUSS MANUF. SHALL VERIFY ALL TRUSS SPANS, SLOPES, BEARING POINTS, AND DIMENSIONS BEFORE FABRICATION. ANY DEVATIONS OR DISCREPANCIES FROM THE PLANS TO BE BROUGHT TO THE AT1>=NTiON OF THE BUILDER/ARCHITECT/ENGINEER PRIOR TO PROCEEDING. TRUSS MANUF. TO SUPPLY ALL TRUSS TO TRUSS HANGERS AND CONNECTIONS. 3. TRUSS MANUF. TO PROVIDE SHOP DRAiNNGS ON NEW AND/OR REVISED MODEL PLANS TO BUILDER FOR REVIEW BEFORE FABRICATION. TRUSS SHOP DRAWINGS SHALL SHOW ALL TRUSS PROFILES, GRAVITY/UPLIFT LOADS, BRACING MEMBERS, AND TRUSS TO TRUSS HANGERS. 4. ALL PREFAB. WOOD TRUSSES SHALL BE SECURELY FASTENED TO THEIR SUPPORTING WALLS OR BEAMS AS REQUIRED PER THE FRAMING PLANS. 5. PRE-ENGINEERED WOOD TRUSSES, RAFTERS, AND OTHER ROOF FRAMING MEMBERS SHALL BE SPACED AT 24' O.C. MAXIMUM. 6. RIDGE AND VALLEY SE( MEMBERS SHALL BE A NOMINAL DIMENSION OF 2" LARGER THAN RAFTERS. 7. ALL ROOF FRAMING MEMBERS SHALL BE MIN. SYP #2 OR BETTER. WALL &ROOF FRAMING NOTES 1. WOOD CONSTRUCTION SHALL CONFORM TO THE LATEST EDITION OF °NATIONAL DEIGN SPEORGAl10NS FOR WOOD CONSTRUCTi(XV" BY THE NATIONAL FOREST PRODUCT ASSOOAl10N. 2. ROOF AND WALL STRUCTURAL SHEATHING SHALL BE SPAN RATED IN ACCORDANCE WITH APA PS 1-83 OR NER-108. NAILS USED IN ALL SHEATHING APPLICATIONS SHALL BE 8d RING SHANK, HOT DIPPED GALVANIZED, HAivD OR GUN DRIVEN NAILS. GUN DRIVEN NAILS SHALL HAVE HEAD AND SHANK SIZE EQUIVALENT TO HAND DRIVEN NAILS, OTHERWISE SPACING SHALL BE REDUCED FROM 12" TO 10',8' TO 6°, 6° TO 5°, 4° TO 3°, AND 3' TO 2° IN THOSE APPLICATIONS. 3. ALL EXTERIOR FRAMED WALL STUDS SHALL BE AS NOTED ON PLANS AND OR A MINIMUM GRADE OF #2 SYP OR BETTER. INTERIOR WALL STUDS SHALL BE A MINIMUM OF S -P -F #2 OR BETTER. 4. WOOD HEADERS PER SCHEDULE UNLESS NflTID OTHERWISE ON PLANS. ALL HEADER MATERIAL TO BE SOUTHERN YELLOW PINE #2 MIN. PROVIDE STRAPS AS REQ'D. PER DETAILS. 5. PROVIDE A BUILT UP OR SOLID SAWN COLUMN UNDER ALL GIRDERS AND BEAMS IN FRAMED WALLS UNLESS NOTED OTHERWISE 4N PLANS. A MINIMUM OF (2)2x4 STUDS SHALL BE USED. STRAP MEMBER DIRECTLY TO TOP OF COLUMN AND BOTTOM W A MIN. OF SIMPSON SPH4 OR EQUAL AT EACH STUD. PROVIDE BLOCKING TO BEARING WALL BELOW AS REQUIRED. HEAVY HOLD DOWNS MAY BE REQUIRED AT SOME LOCATIONS AS NOTED ON PLANS. 6. END JOINTS IN STRUCTURAL DOUBLE PLATE 91ALL BE OFFSET AT LEAST 4'-0°. STRUCTURAL DOUBLE PLATES TO BE NAILED AT 6" D.C. 7. AT EXTERIOR FRAME WALLS, PROVIDE FULL PANEL OF SHEATHING FROM ALL CORNER EDGES. FULL PANEL MUST BE SAWCUT AROUND ANY OPENINGS. SEE DETAILS FOR NAILING REQUIREMENTS. 8. THE NUMBER AND SIZE OF NhLS CONNECTING WOOD MEMBERS SHALL NOT BE LESS THAN THOSE SPECIFIED IN TABLE 2304.9.1 (FASTENING SCHEDULE) OF THE FLORIDA BUILDING CODE 2010 -RESIDENTIAL- UNLESS NOTED OTHERWISE. 9. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED LUMBER OR SEPARATED FROM CONCRETE W/ FELT PAPER OR METAL PLATES. 14. ALL NAILS AND BOLTS EXPOSED TO WEATHER SHALL BE HOT DIPPED GALVINIZED. UPLIFT CONNECTORS 1. UPLIFT CONNECTORS ARE ONLY REQUIRED ON MEMBERS IN WALLS THAT ARE EXPOSED TO UPLIFT FORCES. INTERIOR LOAD BEARING WALLS ARE NOT ALWAYS EXPOSED TO UPLIFT FORCES. THE MEMBERS OF THESE WALL WOULD NOT NEED TO HAVE CONNECTORS APPLIED. 2. UPLIFT CONNECTORS TO PROVIDE CONTINUITY FROM ROOF TRUSSES THRU PLATES TO SLAB AND FOUNDATION PER PLAN. 3. UPLIFT CONNECTORS AT ROOF TRUSSES SHALL BE BENT OVER TRUSS TOP CHORDS AS REQUIRED AND NAILED PRIOR TO APPLICATION OF ROOF SHEATHING. MISSED STRAPS SHALL BE INSTALLED PER PLAN PRIOR TO SHEATHING INSTALLAIiOJ. 4. THE MAXIMUM NUMBER OF FLAT STRAPS (I.E. "HETA20") IN THE TOP BLOCK WALL COURSE AT ANY GiRDER TRUSS SHALL BE (2) STRAPS WITH 8" CLEAR DIMENSION BEFORE NEXT STRAP(S). 5. ALL SPECIFIED CONNECTORS SHALL BE INSTALLED PER CONNECTOR MANUFACTURERS INSTRUCTIONS. 6. NO CONNECTOR SHALL BE BENT IN THE FIELD UNLESS NOTED AS ACCEPTABLE IN THE CONNECTOR MANUF. PRODUCT CATALOG. 7. WHEN ANCHORING (2) WOOD ITEMS TOGETHER, THE LENGTH OF HURRICANE STRAP MUST BE EQUALLY HALF ON ER. ITEM. 8. INSTALL ALL SPECIFIED FASTENERS AT EACH CONNECTOR. REFER TO CONNECTS SCHEDULE FOR MINIMUM NUMBER OF FASTENERS 9. MAY SUBSTITUTE HURRICANE STRAP WITH STRAP OF GREATER HOLD DOWN VALUE OR GREATER UPLIFT VALUE IN FIELD WITHOUT VERIFICATION, PROVIDED ALL MANUFACTURERS INSTALLATION INSTRUCTIONS OR REQUIREMENTS ARE FOLLOWED. STRUCTURAL CRITERIA 1. APPLICABLE CODE FLORIDA BUILDING CODE 2010 -RESIDENTIAL WIND SPEED - 144 NON -WIND-BORNE DEBRIS REGION; WIND IMPORTANCE FACTOR - (1) ONE; 'ENCLOSED' BUILDING TYPE; EXPOSURE CATEGORY C -SEE ROOF PLAN NOTES. 2. INTERNAL PRESSURE COEFFICIENT: +/- 0.18 MAXIMUM MEAN ROOF HT. = 30 FEET GENERAL NOTES 1. DOORS BETWEEN GARAGE AND LIVING SPA( MALL BE MINIMUM 1 3/8' THICK SOLID CORE WORD ODORS, 1 3/8' SOLID DR HONEYCOMB CORE STEEL DOORS, OR 20 -MINUTE FIRE RATED DOORS. 2. THE GARAGE SHALL BE SEPARATED FROM THE RESIDENCE AND ITS ATTiC AREA BY NOT LESS THAN 1/2" GYPSUM BOARD APPLIED TO THE GARAGE SIDE. GARAGES BENEATH HABITABLE ROOMS SHALL BE SEPARATED FROM ALL HABITABLE ROOMS ABOVE BY NOT LESS THAN 5/8" TYPE X GYPSUM BOARD OR ITS EQUIVALENT 3. DUCTS IN THE GARAGE AND DUCTS PENETRATING THE WALLS OR (FILINGS SEPARATING THE DWELL{N FROM THE GARAGE SHALL BE CONSTRUCTED 4F A MINIMUM N0. 26 GAGE SHEET STEEL OR APPROVED EQUAL 4. ENCLOSED ACCESSIBLE SPACE UNDER STAIRS SHALL HAVE WALLS, UNDER STAIR SURFACE AND ANY SOFFITS PROTECTED ON THE ENCLOSED .SIDE WITH 1/2' GYPSUM BOARD. DOOR SCHEDULE 2068 DOOR DOOR DOOR DOOR WIDTH WIDTH HT, HT. FEET INCHES FEET INCHES NOTES 1. NUMBER OF PANELS, HAND, & SWING AS SHOWN ON PLAN 1 1 1 1 ry ry cn i 1 i 1 LATEST REVISION DATE TO MASTER: 07-01-12 W� U Ali _ W WI 0 0 f z c� o Q - U � tUJ o LV o L..L z O O c� -9C-0 CIS Lu �) U oho CQ LLJ o � � � � = Q w = ~o C-- � J (� O C'7 O LLLU 00 LID - (n CV LL Q � M 1 M L'1"J � LL I LLJ LLJ W 0 C/) Lu z 0 � o W o� J co DO NOT SCALE PRINTS! CONSTRUC114N SHALL BE PER INDICATED DIMENSIONS ONLY, ANY DISCREPENCIES TO BE REPORTED TO M/i HOMES FOR CLARIFI WOOD HEADER BTWN. WDWS, OR WDW./DOOR i. MAXIMUM DESIGN PRESSURE 48.6 PSF FOR ANY DOOR OR WDW. 2. INSTALL WOW. AND DOOR SCREW ANCHORS INTO HEADER PER WDW. OR DOOR INSTALLATION DETAILS. O.S.B. SHEATHING W/ 8d AT 6" O.C. - 2x4 CONT. W/ (2) i0d 2x4 BLKG. AT 24" O.C. AT EA. TRUSS OR BLKG. (2) 10d AT EA. 2x4 2x4 AT 24" O.C. 2x6 OR 2x8 2x4 P.T. CONT. W/ 10d AT 12" O.C. 3/16" x 3" MIN. MASONRY 20 P.T. W/ SCREWS AT 16" O.C.-­-b..3/16' x 3" MIN. MASONRY SCREWS O.S.B. SHEATHING AT 24" O.C. W/ 8d AT 6" O, 10d AT 12" O.C. 2x4 P.T. W/ (2)10d C. (2)1Od AT EA. 2x4 2x6 OR 2x8 CONT. HARD CASE SPIRAL BLCONAMB NAILS AT 24" O.C. HEAD JAMB POCKET SGD HEAD/JAMB DETAIL LOCATIONS WHERE POCKET SGD TRACK IS OUTSIDE BLOCK WALL OPNG. 20 P.T. - ATTACH W/ 1/4"x3" MASONRY SCREW 6" MAX. (1 1/4r MIN. EMBED.) 6" MAX. SIMPSON SP1 AT 16" O.C. Z CD W Li U p O Ln X= (2) 2x4 @ QCD F- CD CDEACH END a = <n p U Cl- QQ� 0 2x4 ® C 16' O.C. X CD �m SIMPSON SPI AT 16" O.C.- X - BLOCK OPENING ALL BLK. CELLS ABV. LINTEL TO BE CONC. FILLED PRECAST LINTEL PER PLAN ACROSS OPNG, 2x6 P.T. FROM BOT. OF LINTEL TO TOP OF WALL - CENTER ON OPNG. FASTEN TO BLOCK W/ i/2' J -BOLT W/ 2" SQ. WASHER �1 t 2x6 OR 2x4 P.T. W/ CONC. NAILS AT 12" O.C. ACROSS TOP OF OPNG. o EXTEND JAMB 14" MIN. 4" MIN. d ABV. OPNG. EDGE \2x6 P.T. BUCK AT GARAGE DOOR JAMBS DIST. FASTEN TO BLOCK W/ 1/2° DIA. X 6" J -BOLTS o OR 5" X6" 'REDHEAD' TYPE EXPAN90N BOLTS m AT k O.C. MAX. W 2- SQ. WASHERS AT EA. SIDE OF OPNG. GARAGE DOOR MASONRY OPENING GARAGE DOOR DETAIL X \ cim o \ a N � 2x4 P.T. FURRING z ATTACH TO BLK. W/ 1/4"x3" MASONRY cq _ o SC (1 REW 1/4" MIN, EMBED.) O.S.B. SHEATHING W/ 8d W • NAILS ® 6" O.C. EDGE), 12 O.C. (FIELD) 20 STUDS x 16' D.G. 6' 2x4 P.T. - ATTACH 6" WALL STBK. PER PKT. SGD. MANUF. MAX. W/ 1/4"0" TAPCONS MAX. (1 1/4' MIN. EMBED.) WALL ELEVATION JAMB / HEAD DETAIL FRAME WALL AT POCKET SGD BLOCK OPENING LOCATIONS WHERE POCKET SGD TRACK IS BELOW PRECAST LINTEL BLOCK JAMB/HEAD 2x4 P.T FURRING SCREW" (1M-1/4'RMIN, EMBED) 10d NAILS @ 6' O.C. 2x4 P/T/ @ TOP AND SIDES OF BLK. OPNG. NOTES 1, Values shown are based on allowable stress design using 140 miles per hour, Exposure C, Enclosed condition,lmportance Factor of 1.0. 1 Positive values act toward the surface, negative values act away from the surface. 3. Manufacturing data for components and cladding shall exceed the values shown in this table. 4. Edge pressures noted shall be used for components that are located within eight feet of building edges or corners. All other components shall use typical pressure values. 5. Effectiive Wind Area is defined as the projected surface area for components such as doors and windows. The Effective Wind Area for components such as studs and trusses, and for cladding such as roof and wall sheathing, is defined as the span length multiplied by an effective width need not be less than one-third the span length. a 3 2�2 3 1 QINALKa 2 1 22 1 2 2 HIP ROOF 7 < 8 <=== 27 DESIGN WIND LOAD PRESSURE (PSF) -EXPOSURE "C" LOCATION ZONE COMPONENT EFFECTIVE AREA 1fl 45 2D 30 4Q 50 b0 70 $0 9fl 100 ROOF ] .159 ar -269 +16.1 a: -25.4 +1&0 or -26.1 +16.0 or -25.] +26.0 or -25.4 +16.0 or -25.1 +26.0 or -249 +16A or -24.8 +16.0 ar -24.6 160-24.5 +16.0 or -24A ROOF 2 +16.9 or -46.7 +16.1 or -44.6 +16.0 or +15.0 or -40.8 x16.0 ar-39.2 +16.0 or -381 +26.0 or -371 +16.0 ar-35.3 +16,0 o, -35-5 +16.0 or -34.9 +16.0-343 ROOF 3 +269 or -69.1 +i6.1 or -66.5 +1E.0 or -64.6 +16.0 or -62.0 +15.0 ar -60.1 +16.0 or -58.7 +16.0-575 +16.0 cr -56.5 +16.0 nr 55.7 +36-0 or -549 +16.0 or -54.2 WALL 4 +29A or -31.8 +28.6 or -31.1 +28.0 or -30.5 +27.3 or -29.7 +26,7 or -29.2 +25.3 or -28.8 +25.9 ar-28.4 +25.5 or -28.1 +25.4 or -27,9 +25.2 or -27-7 +25Aar-27.5 WALL 5 +29.G or -39.3 +28,6 or -37.6 +2&0 ar -36.7 +27.3 or -36.1 +26.7 ar -34.0 +26.3 or -33.2 +25.9 or -325 +-25.6 or -33.9 +25.4 or -31.4 +25.2 or --30.9 +25.0 or -30.5 9'xT GARAGE DOOR +25-Gor-z8.3 16'xT GARAGE DOOR +24.G or -265 2 - 2x4 OR DBL 1x4 BUCK - CONNECT SECTION EA. TO BLOCK W/ 3/16"x3' TAPCON (t A -A 1/4' MiN. EMBEDMENT INTO BLK.) BLOCK HEADER SOLID BLKG. AT TOP BTWN. 4'- 1'-4' ARCH BLKG. &BUCK MAX. 2x4 45d DIAGONAL BRACE(S) "x3' TAPCOJS AV <- 2x4 45d DIAGONAL BUILT UP PLWD. OR / " BRACE AT EA. FACE MASONITE BUCK -SCRIBE ARCH PANEL 4 t0d NAILS INTO EA. BACKSIDE TO FiT ARCH= () OF ARCH W� �2�10d CONNECT W/ $d NAILS 2z4 BRACE/BLKG. NAILS AT € . D INSTALL NOW. SCREW ANCHOR 2x4 SOLID BLKG. (FULL WIDTH � WALL) PROVIDE TAPCON INTO ARCH BLKG. PER BTWN. OSB ARCH FACES W/ (2)10d NAILS 4N1HIN 4' MIN. OF INSTALLATION DETAILS THRU OSB INTO EA. 2x4 BRACE _ _START OF ARCH _ SECTION A -A PROVIDE TAPCON PER WOW. INSTALLATION 4' MAX. RAD. DETAILS OR THRU 11 j2" THK. OR MORE BUCK WITHIN 8° MIN. OF START OF ARCH FRAME ARCH TOP DETAIL BLOCK OPNG. SHOWN FRAME OPNG. SIMILAR (NO BUCK REQ'D. WHEN NO PLYWD. JOINT AT JAMBS) 2 - 2z4 OR DBL. 1x4 BUCK - SECTION CONNECT EA. TO BLOCK W/ 3/16"0" B -B BLOCK HEADER TAPCON (1 1/4' MIN. EMBEDMENT INTO PROVIDE 2x4 DIAL. BRACE SOLID BLKG. AT TOP 8d NAILS AT 8" O.C. AT BUCK 3/16 BTWN. BTWN. VERT. BRACES WHEN HT ARCH BLKG, & BUCK OF BRACE EXCEEDS 24' MAX. PROVIDE 2) MIN. TAPCON r�T EA. SIDE 24 VERT. 8d NAILS AT 8' O.C. BUCK- (1) WITHIN 4" BRACE(S) AT BUCK MIN. OF START OF ARCH BUILT UP PLWD. OR 7/16' OSB MASONITE BUCK -SCRIBE ARCH PANEL START OF ARCH_ BACKSIDE TO FIT ARCH- EQ. EQ. - - - 4' MAX. RAD. CONNECT W/ 8d NAILS 20 VERT. AT EA. FACE OF ARCH INSTALL WDW. SCREW ANCHOR W/ (3)IOd NAILS AT EA, END INTO ARCH BLKG. PER 2x4 SOLID BLKG. (FULL WIDTH OF WALL) INSTALLATION DETAILS BTWN. OSB ARCH FACES W/ (2)104 NAILS SECTION B -B THRU OSB INTO EA. 20 FRAME ELLIPSE ARCH TOP DETAIL BLOCK OPNG. SHOWN FRAME OPNG. SIMILAR (NO BUCK REQ'D. WHEN NO PLYWD. JOINT AT JAMBS) �.` ° B °• P •v O e 4 GROUT BLOCK SOLID AS SHOWN -EXTEND GROUT CONTINUOUS TO THE NEAREST REINFORCED CELLS BEYOND THE LOCATION OF THE MAXIMUM 2" BLOCK OVERHANG (FILL TO BOTTOM OF WI NDOW ALL AT LOCATIONS WHERE SILL IS LESS THAN 2'-0" ABOVE TOP OF SLAB) 2' MAX. OVERHANGING BLOCK REPAIR DETAIL MAXIMUM WALL HT 1140 MPH / EXP C 1 RISK GAT. fl SIZE/SPECIES SPACING MAXIMUM HEIGHT 2x4 SPF 16° OC 8'4 2x4 SPF 12' OC 9'-0° 2x4 SPF 16' OC 9'-4" 2x4 SPF 12" OC 10'-0" 2x6 SPF 16° OC 12'-4" 26 SPF 12° OC 13'-0" 20 SPF 16" OC 14'-0" 26 SPF 12' OC 15-0" NOTE: HEIGHTS SHOWN IN THIS TABLE ARE BASED ON STUDS BEING ATTACHED TO 1/2 MINIMUM OSB SHEATHING iMTH 8d MIN NAILS ®12° OC INTERMEDIATE SUPPORTS AND 6" OC AT PERIMETER AND 4" OC 0 CORNER STUDS. SHEATHING TO BE CONTINUOUS OVER 3 OR MORE STUDS. TAPCON INSTALLATION ANCHOR CHART FOR BLOCK OPNGS. W/ BUCKS. 1 1/2" THICK OR GREATER WIDTH WIDTH WIDTH WIDTH D FEF D D E D D E D 24" 0. C. 8" MAX. MAX. A 8„ A 8" A � - C MAX. C MAX. C B B J B _� = C WOW. C WOW. � WOW. C SGD OR OPNG. OPNG. OPNG. A A A � � ¢ EXT. DOOR SILL /MULL SILL /MULL OPNG. SINGLE WOW, OR MULTIPLE SIDE STACKED WOW. BY SIDE WOWS. W/ MULL BTWN. ® Wl MULL BTWN. ® � Q WOW. OPNG. LOCATIONS WDW. OPNG. LOCATIONS � HEIGHT IN HEAD �1 WIDTH IN HEAD (D UP TO 40" A UP TO 40" D EXTERIOR DOOR 40.01" TO 60" A , B 40 .01" TO 60" D , E OPENINGS 60.01" TO 80" A , C 60.01" TO 80" D , F 80.01" TO 100" A , B , C 80.01" TO 100" D , E , F 1. LOCATIONS PER INDIVIDUAL WOW. OPNG DiMENSfON NOT MULLED WOW. OPNG. DIMENSION 2. MAXIMUM ALLOWABLE SPACING BTWN. TAPCON ANCHORS TO BE 24" O.C. 2x HDR. PLATE OR EXTERIOR WD. HDR. SHEATHING 2 LAYERS OF 7/16" O.S.B. OR (i) LAYER OF 3/4' PLYWD. CONNECT W/ {2)8d NAILS AT 16" O.C. BUILT UP WOOD HDR. OR 2x HDR. PLATE EXTERIOR SHEATHING 2x CRIPPLE STUDS AT 16" O.C. BTWN. SILL PLATE & BOT. PLATE OR HDR. & HDR. PLATE 2x HDR. OR SILL PLATE OR HDR. JACK ATTACH WDW./[l0(Xi PER MANUF. SPECIIFFICRTIONS SILL 1 JAMB 1 HEAD FRAME WALL OPNG. WDW./DOOR DETAILS TAPCON PER 1 3/4" SCHEDULE MIN. � X M � EXT. FACE (2)1Dd x 1 1/2" AT 24" OF BLOCK O.C. FOR BUCK BUILT UP TO 2 1/2" THICK PROVIDE 2x P.T. AGAINST OR BLOCK FOR BUILT UP BUCKS (2)8d z 2 1/2" AT 24° 2" THICK OR MORE O.C. FOR BUCK BUILT UP BUILT UP BUCK DETAIL 21/2" THIO( OR MORE THICKNESS 11/2" OR GREATER PRECAST CONC. MIN. 2 1/2" WIDE BUCK - LINTEL ABV. OPNG. .MAXIMUM 2 3/4" BUILT UP OR CMU JAMB THICKNESS - CONNECT W/ CAULK BTWN. 3/16" DIA. TAPCONS. BUCK /BLOCK TAPCON LENGTH MUST BE SUFFICIENT TO ACHIEVE MIN. CEMENT FINISH � 1 1/4" EMBEDMENT INTO ODER BLOCK BLOCK JAMB /HERD INSTALL WOW./DOOR SCREW DRYWALL ANCHOR INTO BUCK PER INSTALLATION DETAILS HEAD/JAMB FOR BUCK THICKNESS 1112" OR GREATER INSTALL WDW./DOOR TAPCON PRECAST CONC. ANCHOR INTO BLOCK PER LINTEL ABV. OPNG. INSTALLATION DETAILS OR CMU JAMB CAULK BTWN. MIN. 2 1/2' WIDE BUCK - MAXIMUM BUILT UP BUCK % BLK THICKNESS MUST BE LESS THAN 1 1/2' CONNECT W/ CEMENT FINISH SPIRAL NAILS AT 16" O.G. OVER BLOCK DRYWALL HEAD/JAMB FOR BUCK THICKNESS LESS THAN 11121" CEMENT FINISH ATTACH WDW./DOOR PER OVER BLOCK MANUF. SPEOFlCR110NS PRECAST CONC. SILL � I SILL ' BLOCK WALL OPNG, WDW./DOOR BUCK DETAILS ALL EXTERIOR WINDOWS AND DOORS SHALL HAVE MEET PRESSURES IN CHART- EXPOSURE "C" FASTENER SCHEDULE FOR BUILT UP STUD COLUMNS VERTICAL SPACING OF FASTENERS AT 8' O.C. STAGGERED UNLESS OTHERWISE NOTED. THIRD AND FOURTH PLIES SHALL BE ADDED TO EITHER SIDE OF 2 -PLY COMPOSITE POST. MINIMUM END DISTANCE SHALL BE 2 1/2' AND MINIMUM EDGE DISTANCE SHALL BE t". STUD # OF NAILS NUMBER OF PLYS SIZE PER RDW (2) PLYS (3) PLYS (4) PLYS 20 (t) 10d x A. 10d x 31 10d X A. OR 1/2" DIAM. BST 0 16° O.C. 26 (2) 10d x A. i Qd x A. 10d X A. OR 1/2° DIAM.BOLT 0 16' D.C. 2x$ (2) tOd x 31 1 O x A. i0d X A. OR 1/2" DIA. BOLT 0 16" D.G. IN LIEU OF NAILS, MEMBERS MAY BE BOLTED TOGETHER. WITH 1/2' DIAM. THRU-BOLTS AT 16" O.G. VERTICALLY WITH THE SAME NUMBER OF BOLTS PER ROW AS NAILS WOOD HEADER SCHEDULE MAXIMUM CLEAR SPAN FOR LOAD BEARING FRAME WALLS SIZES NOTED ON PLANS TO SUPERCEDE VALUES SHOWN ON THIS SCHEDULE HEADER LOAD HEADER SIZE CONDITION (2)2x6 NJ (2)2x8 NJ (2)2x10 NJ (2)2x12 NJ ROOF ONLY 4'-0' 2 5'-4° 2 6'-8" 2 7'-6" 2 2nd FLOC ONLY 3'-6' 2 4'-5" 2 5-5" 2 6'-3" 2 2nd FLOOR &ROOF 3'-0' 2 4'-8" 2 5 -5" 3 ON "NJ" =MINIMUM NUMBER OF JACK STUDS REQ'D. AT EA. END UNLESS OTHERWISE NOTED THE PLAN ALL STRUCTURAL HEADERS TO BE #2 4R BETTER S.Y.P. ALL NON-STRUCTURAL HEADERS HEM -FIR OR S -P -F OR BETTER CONSTRUCTION NOTES L .APPLICABLE CODES: - FLOR IDA BUILDING CODE 2410 -RESIDENTIAL=Jz E-= - NATIONAL ELECTRICAL CODE REQUIREMENTS FOR ONE AND TWO FAMILY DWELINGS, NFPA 70A; 2007. - FLORIDA FIRE PREVENTION CODE - F.F.P.C. 2010 2. SUBCONTRACTORS SHALL VERIFY ALL DIMENSIONS IN THE FIELD AND NOTiFY THE BUILDER/ARCHITECT OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH CONSTRUCTION. 3. ALL CONSTRUCTION SHALL BE BRACED AND SHORED BY CONTRACTOR AS REQUIRED TO SAFELY PERFORM THE WORK. TERMITE PROTECTION 1. TERMITE PRETREATMENT SHALL MAKE USE OF BORA-CARE TERMIIICIDE. THE BORA-CARE TERMITIODE TREATMENT IS REGISTERED BY THE FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES AS REQUIERED BY THE FLORIDA BUILDING CODE 2010 - RESIDENTIAL 2. UPON COMPLETION OF THE APPLICATION OF THE TERMITE PROTECTIVE TREATMENT, A CERTIFICATE OF COMPLIANCE SHALL BE ISSUED BY A LICENSED PEST CONTROL COMPANY BEFORE A CERTIFICATE OF OCCUPANCY MAY BE ISSUED. THE CERTIFICATE OF COMPLIANCE SHALL STATE: 'THE BUILDING HAS RECEIVED A COMPLETE TREATMENT FOR THE PREVENTION OF SUBTERRANEAN TERMITES. THE TREATMENT IS IN ACCORDANCE WITH THE RULES AND LAWS ESTABLISHED BY THE FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES'. FOUNDATION NOTES 1. FOUNDATION IS DEIGNED BASED ON PRESUMPTIVE SAFE ALLOWABLE BEARING PRESSURE OF 2000 PSF. CONTRACTOR MALL VERIFY THAT THE MINIMUM BEARING PRESSURE OF 2000 PSF IS OBTAINED PRIOR TO FOOTING PLACEMENT. 2. FOOTING MALL BE PLACED ON COMPACTED SOIL FREE OF ORGANIC DEBRIS. 3. AS REQUIRED BY THE LOCAL MUNiCAPILITY BUILDING DEPARTMENT, A FOUNDATION SURVEY SHALL BE PERFORMED AND A COPY OF THE SURVEY SHALL ON THE SITE FOR 1TiE BUILDING INSPECTOR'S USE, OR ALL PROPERTY MARKERS SHALL BE EXPOSED AND A STRING STRETCHED FROM MARKER TO MARKER TO VERIFY REQUIRED SETBACKS. CONCRETE NOTES 1. CONCRETE STRENGTH SHALL BE 2500 PSI AT 28 DAYS AND IN ACCORDANCE WITH A.C.I. 318-11. 2. REINFORCING STEEL SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF ASTM A615 GRAFE 44. 3. WELDED WIRE FABRIC SHALL BE IN ACCORDANCE 4NTH THE LATEST EDITION OF ASTM A185. CONCRETE MASONRY NOTES 1. CONCRETE MASONRY WORK SHALL BE IN ACCORDANCE NTH A.C.I. 530/ASCE 5/TMS 402. 2. CONCRETE MASONRY .UNITS SHALL BE 1N CONFORMANCE WITH ASTM C90, GRADE N, TYPE II ASTM C140 AND SHALL HAVE A COMPRESSIVE STRENGTH OF 2000 PSI MINIMUM BASED ON THE NET GROSS SECTIONAL AREA. 3. COARSE GROUT SHALL BE IN CONFORMANCE WITH ASTM C476. 4. MORTAR SHALL BE TYPE "M" OR "S' IN ACCORDANCE WITH ASTM C270. 5. ALL MASONRRY UNITS SHALL BE LAID IN RUNNING BOND U.N.O. 6. PROVIDE 8" PRECAST CONCRETE LINTELS ABOVE ALL MASONARY OPNGS. ALL LINTEL FOR OPNGS. OVER 5-6" SHALL BE GROUTED SOLID W/ 8" STANDARD BRC. EA. END U.N.O. (4' MIN. BEARING REQ'D.) PRE-ENGINEERED: WOOD TRUSSES L ALL TRUSSES SHALL BE IN ACCORDANCE WITH THE LATEST EDITIONS OF THE "NATIONAL DESIGN SP€CIFICATONS FOR STRESS -MADE LUMBER AND ITS FASTENERS" AS RECOMMENDED BY THE NATIONAL FOREST PRODUCTS ASSOCIATION. 2. THE TRUSS MANUF. SHALL VERIFY ALL TRUSS SPANS, SLOPES, BEARING POINTS, AND DIMENSIONS BEFORE FABRICATION. ANY DEVATIONS OR DISCREPANCIES FROM THE PLANS TO BE BROUGHT TO THE AT1>=NTiON OF THE BUILDER/ARCHITECT/ENGINEER PRIOR TO PROCEEDING. TRUSS MANUF. TO SUPPLY ALL TRUSS TO TRUSS HANGERS AND CONNECTIONS. 3. TRUSS MANUF. TO PROVIDE SHOP DRAiNNGS ON NEW AND/OR REVISED MODEL PLANS TO BUILDER FOR REVIEW BEFORE FABRICATION. TRUSS SHOP DRAWINGS SHALL SHOW ALL TRUSS PROFILES, GRAVITY/UPLIFT LOADS, BRACING MEMBERS, AND TRUSS TO TRUSS HANGERS. 4. ALL PREFAB. WOOD TRUSSES SHALL BE SECURELY FASTENED TO THEIR SUPPORTING WALLS OR BEAMS AS REQUIRED PER THE FRAMING PLANS. 5. PRE-ENGINEERED WOOD TRUSSES, RAFTERS, AND OTHER ROOF FRAMING MEMBERS SHALL BE SPACED AT 24' O.C. MAXIMUM. 6. RIDGE AND VALLEY SE( MEMBERS SHALL BE A NOMINAL DIMENSION OF 2" LARGER THAN RAFTERS. 7. ALL ROOF FRAMING MEMBERS SHALL BE MIN. SYP #2 OR BETTER. WALL &ROOF FRAMING NOTES 1. WOOD CONSTRUCTION SHALL CONFORM TO THE LATEST EDITION OF °NATIONAL DEIGN SPEORGAl10NS FOR WOOD CONSTRUCTi(XV" BY THE NATIONAL FOREST PRODUCT ASSOOAl10N. 2. ROOF AND WALL STRUCTURAL SHEATHING SHALL BE SPAN RATED IN ACCORDANCE WITH APA PS 1-83 OR NER-108. NAILS USED IN ALL SHEATHING APPLICATIONS SHALL BE 8d RING SHANK, HOT DIPPED GALVANIZED, HAivD OR GUN DRIVEN NAILS. GUN DRIVEN NAILS SHALL HAVE HEAD AND SHANK SIZE EQUIVALENT TO HAND DRIVEN NAILS, OTHERWISE SPACING SHALL BE REDUCED FROM 12" TO 10',8' TO 6°, 6° TO 5°, 4° TO 3°, AND 3' TO 2° IN THOSE APPLICATIONS. 3. ALL EXTERIOR FRAMED WALL STUDS SHALL BE AS NOTED ON PLANS AND OR A MINIMUM GRADE OF #2 SYP OR BETTER. INTERIOR WALL STUDS SHALL BE A MINIMUM OF S -P -F #2 OR BETTER. 4. WOOD HEADERS PER SCHEDULE UNLESS NflTID OTHERWISE ON PLANS. ALL HEADER MATERIAL TO BE SOUTHERN YELLOW PINE #2 MIN. PROVIDE STRAPS AS REQ'D. PER DETAILS. 5. PROVIDE A BUILT UP OR SOLID SAWN COLUMN UNDER ALL GIRDERS AND BEAMS IN FRAMED WALLS UNLESS NOTED OTHERWISE 4N PLANS. A MINIMUM OF (2)2x4 STUDS SHALL BE USED. STRAP MEMBER DIRECTLY TO TOP OF COLUMN AND BOTTOM W A MIN. OF SIMPSON SPH4 OR EQUAL AT EACH STUD. PROVIDE BLOCKING TO BEARING WALL BELOW AS REQUIRED. HEAVY HOLD DOWNS MAY BE REQUIRED AT SOME LOCATIONS AS NOTED ON PLANS. 6. END JOINTS IN STRUCTURAL DOUBLE PLATE 91ALL BE OFFSET AT LEAST 4'-0°. STRUCTURAL DOUBLE PLATES TO BE NAILED AT 6" D.C. 7. AT EXTERIOR FRAME WALLS, PROVIDE FULL PANEL OF SHEATHING FROM ALL CORNER EDGES. FULL PANEL MUST BE SAWCUT AROUND ANY OPENINGS. SEE DETAILS FOR NAILING REQUIREMENTS. 8. THE NUMBER AND SIZE OF NhLS CONNECTING WOOD MEMBERS SHALL NOT BE LESS THAN THOSE SPECIFIED IN TABLE 2304.9.1 (FASTENING SCHEDULE) OF THE FLORIDA BUILDING CODE 2010 -RESIDENTIAL- UNLESS NOTED OTHERWISE. 9. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED LUMBER OR SEPARATED FROM CONCRETE W/ FELT PAPER OR METAL PLATES. 14. ALL NAILS AND BOLTS EXPOSED TO WEATHER SHALL BE HOT DIPPED GALVINIZED. UPLIFT CONNECTORS 1. UPLIFT CONNECTORS ARE ONLY REQUIRED ON MEMBERS IN WALLS THAT ARE EXPOSED TO UPLIFT FORCES. INTERIOR LOAD BEARING WALLS ARE NOT ALWAYS EXPOSED TO UPLIFT FORCES. THE MEMBERS OF THESE WALL WOULD NOT NEED TO HAVE CONNECTORS APPLIED. 2. UPLIFT CONNECTORS TO PROVIDE CONTINUITY FROM ROOF TRUSSES THRU PLATES TO SLAB AND FOUNDATION PER PLAN. 3. UPLIFT CONNECTORS AT ROOF TRUSSES SHALL BE BENT OVER TRUSS TOP CHORDS AS REQUIRED AND NAILED PRIOR TO APPLICATION OF ROOF SHEATHING. MISSED STRAPS SHALL BE INSTALLED PER PLAN PRIOR TO SHEATHING INSTALLAIiOJ. 4. THE MAXIMUM NUMBER OF FLAT STRAPS (I.E. "HETA20") IN THE TOP BLOCK WALL COURSE AT ANY GiRDER TRUSS SHALL BE (2) STRAPS WITH 8" CLEAR DIMENSION BEFORE NEXT STRAP(S). 5. ALL SPECIFIED CONNECTORS SHALL BE INSTALLED PER CONNECTOR MANUFACTURERS INSTRUCTIONS. 6. NO CONNECTOR SHALL BE BENT IN THE FIELD UNLESS NOTED AS ACCEPTABLE IN THE CONNECTOR MANUF. PRODUCT CATALOG. 7. WHEN ANCHORING (2) WOOD ITEMS TOGETHER, THE LENGTH OF HURRICANE STRAP MUST BE EQUALLY HALF ON ER. ITEM. 8. INSTALL ALL SPECIFIED FASTENERS AT EACH CONNECTOR. REFER TO CONNECTS SCHEDULE FOR MINIMUM NUMBER OF FASTENERS 9. MAY SUBSTITUTE HURRICANE STRAP WITH STRAP OF GREATER HOLD DOWN VALUE OR GREATER UPLIFT VALUE IN FIELD WITHOUT VERIFICATION, PROVIDED ALL MANUFACTURERS INSTALLATION INSTRUCTIONS OR REQUIREMENTS ARE FOLLOWED. STRUCTURAL CRITERIA 1. APPLICABLE CODE FLORIDA BUILDING CODE 2010 -RESIDENTIAL WIND SPEED - 144 NON -WIND-BORNE DEBRIS REGION; WIND IMPORTANCE FACTOR - (1) ONE; 'ENCLOSED' BUILDING TYPE; EXPOSURE CATEGORY C -SEE ROOF PLAN NOTES. 2. INTERNAL PRESSURE COEFFICIENT: +/- 0.18 MAXIMUM MEAN ROOF HT. = 30 FEET GENERAL NOTES 1. DOORS BETWEEN GARAGE AND LIVING SPA( MALL BE MINIMUM 1 3/8' THICK SOLID CORE WORD ODORS, 1 3/8' SOLID DR HONEYCOMB CORE STEEL DOORS, OR 20 -MINUTE FIRE RATED DOORS. 2. THE GARAGE SHALL BE SEPARATED FROM THE RESIDENCE AND ITS ATTiC AREA BY NOT LESS THAN 1/2" GYPSUM BOARD APPLIED TO THE GARAGE SIDE. GARAGES BENEATH HABITABLE ROOMS SHALL BE SEPARATED FROM ALL HABITABLE ROOMS ABOVE BY NOT LESS THAN 5/8" TYPE X GYPSUM BOARD OR ITS EQUIVALENT 3. DUCTS IN THE GARAGE AND DUCTS PENETRATING THE WALLS OR (FILINGS SEPARATING THE DWELL{N FROM THE GARAGE SHALL BE CONSTRUCTED 4F A MINIMUM N0. 26 GAGE SHEET STEEL OR APPROVED EQUAL 4. ENCLOSED ACCESSIBLE SPACE UNDER STAIRS SHALL HAVE WALLS, UNDER STAIR SURFACE AND ANY SOFFITS PROTECTED ON THE ENCLOSED .SIDE WITH 1/2' GYPSUM BOARD. DOOR SCHEDULE 2068 DOOR DOOR DOOR DOOR WIDTH WIDTH HT, HT. FEET INCHES FEET INCHES NOTES 1. NUMBER OF PANELS, HAND, & SWING AS SHOWN ON PLAN 1 1 1 1 ry ry cn i 1 i 1 LATEST REVISION DATE TO MASTER: 07-01-12 W� U Ali _ W WI 0 0 f z c� o Q - U � tUJ o LV o L..L z O O c� -9C-0 CIS Lu �) U oho CQ LLJ o � � � � = Q w = ~o C-- � J (� O C'7 O LLLU 00 LID - (n CV LL Q � M 1 M L'1"J � LL I LLJ LLJ W 0 C/) Lu z 0 � o W o� J co DO NOT SCALE PRINTS! CONSTRUC114N SHALL BE PER INDICATED DIMENSIONS ONLY, ANY DISCREPENCIES TO BE REPORTED TO M/i HOMES FOR CLARIFI 20 P.T. - ATTACH W/ 1/4"x3" MASONRY SCREW 6" MAX. (1 1/4r MIN. EMBED.) 6" MAX. SIMPSON SP1 AT 16" O.C. Z CD W Li U p O Ln X= (2) 2x4 @ QCD F- CD CDEACH END a = <n p U Cl- QQ� 0 2x4 ® C 16' O.C. X CD �m SIMPSON SPI AT 16" O.C.- X - BLOCK OPENING ALL BLK. CELLS ABV. LINTEL TO BE CONC. FILLED PRECAST LINTEL PER PLAN ACROSS OPNG, 2x6 P.T. FROM BOT. OF LINTEL TO TOP OF WALL - CENTER ON OPNG. FASTEN TO BLOCK W/ i/2' J -BOLT W/ 2" SQ. WASHER �1 t 2x6 OR 2x4 P.T. W/ CONC. NAILS AT 12" O.C. ACROSS TOP OF OPNG. o EXTEND JAMB 14" MIN. 4" MIN. d ABV. OPNG. EDGE \2x6 P.T. BUCK AT GARAGE DOOR JAMBS DIST. FASTEN TO BLOCK W/ 1/2° DIA. X 6" J -BOLTS o OR 5" X6" 'REDHEAD' TYPE EXPAN90N BOLTS m AT k O.C. MAX. W 2- SQ. WASHERS AT EA. SIDE OF OPNG. GARAGE DOOR MASONRY OPENING GARAGE DOOR DETAIL X \ cim o \ a N � 2x4 P.T. FURRING z ATTACH TO BLK. W/ 1/4"x3" MASONRY cq _ o SC (1 REW 1/4" MIN, EMBED.) O.S.B. SHEATHING W/ 8d W • NAILS ® 6" O.C. EDGE), 12 O.C. (FIELD) 20 STUDS x 16' D.G. 6' 2x4 P.T. - ATTACH 6" WALL STBK. PER PKT. SGD. MANUF. MAX. W/ 1/4"0" TAPCONS MAX. (1 1/4' MIN. EMBED.) WALL ELEVATION JAMB / HEAD DETAIL FRAME WALL AT POCKET SGD BLOCK OPENING LOCATIONS WHERE POCKET SGD TRACK IS BELOW PRECAST LINTEL BLOCK JAMB/HEAD 2x4 P.T FURRING SCREW" (1M-1/4'RMIN, EMBED) 10d NAILS @ 6' O.C. 2x4 P/T/ @ TOP AND SIDES OF BLK. OPNG. NOTES 1, Values shown are based on allowable stress design using 140 miles per hour, Exposure C, Enclosed condition,lmportance Factor of 1.0. 1 Positive values act toward the surface, negative values act away from the surface. 3. Manufacturing data for components and cladding shall exceed the values shown in this table. 4. Edge pressures noted shall be used for components that are located within eight feet of building edges or corners. All other components shall use typical pressure values. 5. Effectiive Wind Area is defined as the projected surface area for components such as doors and windows. The Effective Wind Area for components such as studs and trusses, and for cladding such as roof and wall sheathing, is defined as the span length multiplied by an effective width need not be less than one-third the span length. a 3 2�2 3 1 QINALKa 2 1 22 1 2 2 HIP ROOF 7 < 8 <=== 27 DESIGN WIND LOAD PRESSURE (PSF) -EXPOSURE "C" LOCATION ZONE COMPONENT EFFECTIVE AREA 1fl 45 2D 30 4Q 50 b0 70 $0 9fl 100 ROOF ] .159 ar -269 +16.1 a: -25.4 +1&0 or -26.1 +16.0 or -25.] +26.0 or -25.4 +16.0 or -25.1 +26.0 or -249 +16A or -24.8 +16.0 ar -24.6 160-24.5 +16.0 or -24A ROOF 2 +16.9 or -46.7 +16.1 or -44.6 +16.0 or +15.0 or -40.8 x16.0 ar-39.2 +16.0 or -381 +26.0 or -371 +16.0 ar-35.3 +16,0 o, -35-5 +16.0 or -34.9 +16.0-343 ROOF 3 +269 or -69.1 +i6.1 or -66.5 +1E.0 or -64.6 +16.0 or -62.0 +15.0 ar -60.1 +16.0 or -58.7 +16.0-575 +16.0 cr -56.5 +16.0 nr 55.7 +36-0 or -549 +16.0 or -54.2 WALL 4 +29A or -31.8 +28.6 or -31.1 +28.0 or -30.5 +27.3 or -29.7 +26,7 or -29.2 +25.3 or -28.8 +25.9 ar-28.4 +25.5 or -28.1 +25.4 or -27,9 +25.2 or -27-7 +25Aar-27.5 WALL 5 +29.G or -39.3 +28,6 or -37.6 +2&0 ar -36.7 +27.3 or -36.1 +26.7 ar -34.0 +26.3 or -33.2 +25.9 or -325 +-25.6 or -33.9 +25.4 or -31.4 +25.2 or --30.9 +25.0 or -30.5 9'xT GARAGE DOOR +25-Gor-z8.3 16'xT GARAGE DOOR +24.G or -265 2 - 2x4 OR DBL 1x4 BUCK - CONNECT SECTION EA. TO BLOCK W/ 3/16"x3' TAPCON (t A -A 1/4' MiN. EMBEDMENT INTO BLK.) BLOCK HEADER SOLID BLKG. AT TOP BTWN. 4'- 1'-4' ARCH BLKG. &BUCK MAX. 2x4 45d DIAGONAL BRACE(S) "x3' TAPCOJS AV <- 2x4 45d DIAGONAL BUILT UP PLWD. OR / " BRACE AT EA. FACE MASONITE BUCK -SCRIBE ARCH PANEL 4 t0d NAILS INTO EA. BACKSIDE TO FiT ARCH= () OF ARCH W� �2�10d CONNECT W/ $d NAILS 2z4 BRACE/BLKG. NAILS AT € . D INSTALL NOW. SCREW ANCHOR 2x4 SOLID BLKG. (FULL WIDTH � WALL) PROVIDE TAPCON INTO ARCH BLKG. PER BTWN. OSB ARCH FACES W/ (2)10d NAILS 4N1HIN 4' MIN. OF INSTALLATION DETAILS THRU OSB INTO EA. 2x4 BRACE _ _START OF ARCH _ SECTION A -A PROVIDE TAPCON PER WOW. INSTALLATION 4' MAX. RAD. DETAILS OR THRU 11 j2" THK. OR MORE BUCK WITHIN 8° MIN. OF START OF ARCH FRAME ARCH TOP DETAIL BLOCK OPNG. SHOWN FRAME OPNG. SIMILAR (NO BUCK REQ'D. WHEN NO PLYWD. JOINT AT JAMBS) 2 - 2z4 OR DBL. 1x4 BUCK - SECTION CONNECT EA. TO BLOCK W/ 3/16"0" B -B BLOCK HEADER TAPCON (1 1/4' MIN. EMBEDMENT INTO PROVIDE 2x4 DIAL. BRACE SOLID BLKG. AT TOP 8d NAILS AT 8" O.C. AT BUCK 3/16 BTWN. BTWN. VERT. BRACES WHEN HT ARCH BLKG, & BUCK OF BRACE EXCEEDS 24' MAX. PROVIDE 2) MIN. TAPCON r�T EA. SIDE 24 VERT. 8d NAILS AT 8' O.C. BUCK- (1) WITHIN 4" BRACE(S) AT BUCK MIN. OF START OF ARCH BUILT UP PLWD. OR 7/16' OSB MASONITE BUCK -SCRIBE ARCH PANEL START OF ARCH_ BACKSIDE TO FIT ARCH- EQ. EQ. - - - 4' MAX. RAD. CONNECT W/ 8d NAILS 20 VERT. AT EA. FACE OF ARCH INSTALL WDW. SCREW ANCHOR W/ (3)IOd NAILS AT EA, END INTO ARCH BLKG. PER 2x4 SOLID BLKG. (FULL WIDTH OF WALL) INSTALLATION DETAILS BTWN. OSB ARCH FACES W/ (2)104 NAILS SECTION B -B THRU OSB INTO EA. 20 FRAME ELLIPSE ARCH TOP DETAIL BLOCK OPNG. SHOWN FRAME OPNG. SIMILAR (NO BUCK REQ'D. WHEN NO PLYWD. JOINT AT JAMBS) �.` ° B °• P •v O e 4 GROUT BLOCK SOLID AS SHOWN -EXTEND GROUT CONTINUOUS TO THE NEAREST REINFORCED CELLS BEYOND THE LOCATION OF THE MAXIMUM 2" BLOCK OVERHANG (FILL TO BOTTOM OF WI NDOW ALL AT LOCATIONS WHERE SILL IS LESS THAN 2'-0" ABOVE TOP OF SLAB) 2' MAX. OVERHANGING BLOCK REPAIR DETAIL MAXIMUM WALL HT 1140 MPH / EXP C 1 RISK GAT. fl SIZE/SPECIES SPACING MAXIMUM HEIGHT 2x4 SPF 16° OC 8'4 2x4 SPF 12' OC 9'-0° 2x4 SPF 16' OC 9'-4" 2x4 SPF 12" OC 10'-0" 2x6 SPF 16° OC 12'-4" 26 SPF 12° OC 13'-0" 20 SPF 16" OC 14'-0" 26 SPF 12' OC 15-0" NOTE: HEIGHTS SHOWN IN THIS TABLE ARE BASED ON STUDS BEING ATTACHED TO 1/2 MINIMUM OSB SHEATHING iMTH 8d MIN NAILS ®12° OC INTERMEDIATE SUPPORTS AND 6" OC AT PERIMETER AND 4" OC 0 CORNER STUDS. SHEATHING TO BE CONTINUOUS OVER 3 OR MORE STUDS. TAPCON INSTALLATION ANCHOR CHART FOR BLOCK OPNGS. W/ BUCKS. 1 1/2" THICK OR GREATER WIDTH WIDTH WIDTH WIDTH D FEF D D E D D E D 24" 0. C. 8" MAX. MAX. A 8„ A 8" A � - C MAX. C MAX. C B B J B _� = C WOW. C WOW. � WOW. C SGD OR OPNG. OPNG. OPNG. A A A � � ¢ EXT. DOOR SILL /MULL SILL /MULL OPNG. SINGLE WOW, OR MULTIPLE SIDE STACKED WOW. BY SIDE WOWS. W/ MULL BTWN. ® Wl MULL BTWN. ® � Q WOW. OPNG. LOCATIONS WDW. OPNG. LOCATIONS � HEIGHT IN HEAD �1 WIDTH IN HEAD (D UP TO 40" A UP TO 40" D EXTERIOR DOOR 40.01" TO 60" A , B 40 .01" TO 60" D , E OPENINGS 60.01" TO 80" A , C 60.01" TO 80" D , F 80.01" TO 100" A , B , C 80.01" TO 100" D , E , F 1. LOCATIONS PER INDIVIDUAL WOW. OPNG DiMENSfON NOT MULLED WOW. OPNG. DIMENSION 2. MAXIMUM ALLOWABLE SPACING BTWN. TAPCON ANCHORS TO BE 24" O.C. 2x HDR. PLATE OR EXTERIOR WD. HDR. SHEATHING 2 LAYERS OF 7/16" O.S.B. OR (i) LAYER OF 3/4' PLYWD. CONNECT W/ {2)8d NAILS AT 16" O.C. BUILT UP WOOD HDR. OR 2x HDR. PLATE EXTERIOR SHEATHING 2x CRIPPLE STUDS AT 16" O.C. BTWN. SILL PLATE & BOT. PLATE OR HDR. & HDR. PLATE 2x HDR. OR SILL PLATE OR HDR. JACK ATTACH WDW./[l0(Xi PER MANUF. SPECIIFFICRTIONS SILL 1 JAMB 1 HEAD FRAME WALL OPNG. WDW./DOOR DETAILS TAPCON PER 1 3/4" SCHEDULE MIN. � X M � EXT. FACE (2)1Dd x 1 1/2" AT 24" OF BLOCK O.C. FOR BUCK BUILT UP TO 2 1/2" THICK PROVIDE 2x P.T. AGAINST OR BLOCK FOR BUILT UP BUCKS (2)8d z 2 1/2" AT 24° 2" THICK OR MORE O.C. FOR BUCK BUILT UP BUILT UP BUCK DETAIL 21/2" THIO( OR MORE THICKNESS 11/2" OR GREATER PRECAST CONC. MIN. 2 1/2" WIDE BUCK - LINTEL ABV. OPNG. .MAXIMUM 2 3/4" BUILT UP OR CMU JAMB THICKNESS - CONNECT W/ CAULK BTWN. 3/16" DIA. TAPCONS. BUCK /BLOCK TAPCON LENGTH MUST BE SUFFICIENT TO ACHIEVE MIN. CEMENT FINISH � 1 1/4" EMBEDMENT INTO ODER BLOCK BLOCK JAMB /HERD INSTALL WOW./DOOR SCREW DRYWALL ANCHOR INTO BUCK PER INSTALLATION DETAILS HEAD/JAMB FOR BUCK THICKNESS 1112" OR GREATER INSTALL WDW./DOOR TAPCON PRECAST CONC. ANCHOR INTO BLOCK PER LINTEL ABV. OPNG. INSTALLATION DETAILS OR CMU JAMB CAULK BTWN. MIN. 2 1/2' WIDE BUCK - MAXIMUM BUILT UP BUCK % BLK THICKNESS MUST BE LESS THAN 1 1/2' CONNECT W/ CEMENT FINISH SPIRAL NAILS AT 16" O.G. OVER BLOCK DRYWALL HEAD/JAMB FOR BUCK THICKNESS LESS THAN 11121" CEMENT FINISH ATTACH WDW./DOOR PER OVER BLOCK MANUF. SPEOFlCR110NS PRECAST CONC. SILL � I SILL ' BLOCK WALL OPNG, WDW./DOOR BUCK DETAILS ALL EXTERIOR WINDOWS AND DOORS SHALL HAVE MEET PRESSURES IN CHART- EXPOSURE "C" FASTENER SCHEDULE FOR BUILT UP STUD COLUMNS VERTICAL SPACING OF FASTENERS AT 8' O.C. STAGGERED UNLESS OTHERWISE NOTED. THIRD AND FOURTH PLIES SHALL BE ADDED TO EITHER SIDE OF 2 -PLY COMPOSITE POST. MINIMUM END DISTANCE SHALL BE 2 1/2' AND MINIMUM EDGE DISTANCE SHALL BE t". STUD # OF NAILS NUMBER OF PLYS SIZE PER RDW (2) PLYS (3) PLYS (4) PLYS 20 (t) 10d x A. 10d x 31 10d X A. OR 1/2" DIAM. BST 0 16° O.C. 26 (2) 10d x A. i Qd x A. 10d X A. OR 1/2° DIAM.BOLT 0 16' D.C. 2x$ (2) tOd x 31 1 O x A. i0d X A. OR 1/2" DIA. BOLT 0 16" D.G. IN LIEU OF NAILS, MEMBERS MAY BE BOLTED TOGETHER. WITH 1/2' DIAM. THRU-BOLTS AT 16" O.G. VERTICALLY WITH THE SAME NUMBER OF BOLTS PER ROW AS NAILS WOOD HEADER SCHEDULE MAXIMUM CLEAR SPAN FOR LOAD BEARING FRAME WALLS SIZES NOTED ON PLANS TO SUPERCEDE VALUES SHOWN ON THIS SCHEDULE HEADER LOAD HEADER SIZE CONDITION (2)2x6 NJ (2)2x8 NJ (2)2x10 NJ (2)2x12 NJ ROOF ONLY 4'-0' 2 5'-4° 2 6'-8" 2 7'-6" 2 2nd FLOC ONLY 3'-6' 2 4'-5" 2 5-5" 2 6'-3" 2 2nd FLOOR &ROOF 3'-0' 2 4'-8" 2 5 -5" 3 ON "NJ" =MINIMUM NUMBER OF JACK STUDS REQ'D. AT EA. END UNLESS OTHERWISE NOTED THE PLAN ALL STRUCTURAL HEADERS TO BE #2 4R BETTER S.Y.P. ALL NON-STRUCTURAL HEADERS HEM -FIR OR S -P -F OR BETTER CONSTRUCTION NOTES L .APPLICABLE CODES: - FLOR IDA BUILDING CODE 2410 -RESIDENTIAL=Jz E-= - NATIONAL ELECTRICAL CODE REQUIREMENTS FOR ONE AND TWO FAMILY DWELINGS, NFPA 70A; 2007. - FLORIDA FIRE PREVENTION CODE - F.F.P.C. 2010 2. SUBCONTRACTORS SHALL VERIFY ALL DIMENSIONS IN THE FIELD AND NOTiFY THE BUILDER/ARCHITECT OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH CONSTRUCTION. 3. ALL CONSTRUCTION SHALL BE BRACED AND SHORED BY CONTRACTOR AS REQUIRED TO SAFELY PERFORM THE WORK. TERMITE PROTECTION 1. TERMITE PRETREATMENT SHALL MAKE USE OF BORA-CARE TERMIIICIDE. THE BORA-CARE TERMITIODE TREATMENT IS REGISTERED BY THE FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES AS REQUIERED BY THE FLORIDA BUILDING CODE 2010 - RESIDENTIAL 2. UPON COMPLETION OF THE APPLICATION OF THE TERMITE PROTECTIVE TREATMENT, A CERTIFICATE OF COMPLIANCE SHALL BE ISSUED BY A LICENSED PEST CONTROL COMPANY BEFORE A CERTIFICATE OF OCCUPANCY MAY BE ISSUED. THE CERTIFICATE OF COMPLIANCE SHALL STATE: 'THE BUILDING HAS RECEIVED A COMPLETE TREATMENT FOR THE PREVENTION OF SUBTERRANEAN TERMITES. THE TREATMENT IS IN ACCORDANCE WITH THE RULES AND LAWS ESTABLISHED BY THE FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES'. FOUNDATION NOTES 1. FOUNDATION IS DEIGNED BASED ON PRESUMPTIVE SAFE ALLOWABLE BEARING PRESSURE OF 2000 PSF. CONTRACTOR MALL VERIFY THAT THE MINIMUM BEARING PRESSURE OF 2000 PSF IS OBTAINED PRIOR TO FOOTING PLACEMENT. 2. FOOTING MALL BE PLACED ON COMPACTED SOIL FREE OF ORGANIC DEBRIS. 3. AS REQUIRED BY THE LOCAL MUNiCAPILITY BUILDING DEPARTMENT, A FOUNDATION SURVEY SHALL BE PERFORMED AND A COPY OF THE SURVEY SHALL ON THE SITE FOR 1TiE BUILDING INSPECTOR'S USE, OR ALL PROPERTY MARKERS SHALL BE EXPOSED AND A STRING STRETCHED FROM MARKER TO MARKER TO VERIFY REQUIRED SETBACKS. CONCRETE NOTES 1. CONCRETE STRENGTH SHALL BE 2500 PSI AT 28 DAYS AND IN ACCORDANCE WITH A.C.I. 318-11. 2. REINFORCING STEEL SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF ASTM A615 GRAFE 44. 3. WELDED WIRE FABRIC SHALL BE IN ACCORDANCE 4NTH THE LATEST EDITION OF ASTM A185. CONCRETE MASONRY NOTES 1. CONCRETE MASONRY WORK SHALL BE IN ACCORDANCE NTH A.C.I. 530/ASCE 5/TMS 402. 2. CONCRETE MASONRY .UNITS SHALL BE 1N CONFORMANCE WITH ASTM C90, GRADE N, TYPE II ASTM C140 AND SHALL HAVE A COMPRESSIVE STRENGTH OF 2000 PSI MINIMUM BASED ON THE NET GROSS SECTIONAL AREA. 3. COARSE GROUT SHALL BE IN CONFORMANCE WITH ASTM C476. 4. MORTAR SHALL BE TYPE "M" OR "S' IN ACCORDANCE WITH ASTM C270. 5. ALL MASONRRY UNITS SHALL BE LAID IN RUNNING BOND U.N.O. 6. PROVIDE 8" PRECAST CONCRETE LINTELS ABOVE ALL MASONARY OPNGS. ALL LINTEL FOR OPNGS. OVER 5-6" SHALL BE GROUTED SOLID W/ 8" STANDARD BRC. EA. END U.N.O. (4' MIN. BEARING REQ'D.) PRE-ENGINEERED: WOOD TRUSSES L ALL TRUSSES SHALL BE IN ACCORDANCE WITH THE LATEST EDITIONS OF THE "NATIONAL DESIGN SP€CIFICATONS FOR STRESS -MADE LUMBER AND ITS FASTENERS" AS RECOMMENDED BY THE NATIONAL FOREST PRODUCTS ASSOCIATION. 2. THE TRUSS MANUF. SHALL VERIFY ALL TRUSS SPANS, SLOPES, BEARING POINTS, AND DIMENSIONS BEFORE FABRICATION. ANY DEVATIONS OR DISCREPANCIES FROM THE PLANS TO BE BROUGHT TO THE AT1>=NTiON OF THE BUILDER/ARCHITECT/ENGINEER PRIOR TO PROCEEDING. TRUSS MANUF. TO SUPPLY ALL TRUSS TO TRUSS HANGERS AND CONNECTIONS. 3. TRUSS MANUF. TO PROVIDE SHOP DRAiNNGS ON NEW AND/OR REVISED MODEL PLANS TO BUILDER FOR REVIEW BEFORE FABRICATION. TRUSS SHOP DRAWINGS SHALL SHOW ALL TRUSS PROFILES, GRAVITY/UPLIFT LOADS, BRACING MEMBERS, AND TRUSS TO TRUSS HANGERS. 4. ALL PREFAB. WOOD TRUSSES SHALL BE SECURELY FASTENED TO THEIR SUPPORTING WALLS OR BEAMS AS REQUIRED PER THE FRAMING PLANS. 5. PRE-ENGINEERED WOOD TRUSSES, RAFTERS, AND OTHER ROOF FRAMING MEMBERS SHALL BE SPACED AT 24' O.C. MAXIMUM. 6. RIDGE AND VALLEY SE( MEMBERS SHALL BE A NOMINAL DIMENSION OF 2" LARGER THAN RAFTERS. 7. ALL ROOF FRAMING MEMBERS SHALL BE MIN. SYP #2 OR BETTER. WALL &ROOF FRAMING NOTES 1. WOOD CONSTRUCTION SHALL CONFORM TO THE LATEST EDITION OF °NATIONAL DEIGN SPEORGAl10NS FOR WOOD CONSTRUCTi(XV" BY THE NATIONAL FOREST PRODUCT ASSOOAl10N. 2. ROOF AND WALL STRUCTURAL SHEATHING SHALL BE SPAN RATED IN ACCORDANCE WITH APA PS 1-83 OR NER-108. NAILS USED IN ALL SHEATHING APPLICATIONS SHALL BE 8d RING SHANK, HOT DIPPED GALVANIZED, HAivD OR GUN DRIVEN NAILS. GUN DRIVEN NAILS SHALL HAVE HEAD AND SHANK SIZE EQUIVALENT TO HAND DRIVEN NAILS, OTHERWISE SPACING SHALL BE REDUCED FROM 12" TO 10',8' TO 6°, 6° TO 5°, 4° TO 3°, AND 3' TO 2° IN THOSE APPLICATIONS. 3. ALL EXTERIOR FRAMED WALL STUDS SHALL BE AS NOTED ON PLANS AND OR A MINIMUM GRADE OF #2 SYP OR BETTER. INTERIOR WALL STUDS SHALL BE A MINIMUM OF S -P -F #2 OR BETTER. 4. WOOD HEADERS PER SCHEDULE UNLESS NflTID OTHERWISE ON PLANS. ALL HEADER MATERIAL TO BE SOUTHERN YELLOW PINE #2 MIN. PROVIDE STRAPS AS REQ'D. PER DETAILS. 5. PROVIDE A BUILT UP OR SOLID SAWN COLUMN UNDER ALL GIRDERS AND BEAMS IN FRAMED WALLS UNLESS NOTED OTHERWISE 4N PLANS. A MINIMUM OF (2)2x4 STUDS SHALL BE USED. STRAP MEMBER DIRECTLY TO TOP OF COLUMN AND BOTTOM W A MIN. OF SIMPSON SPH4 OR EQUAL AT EACH STUD. PROVIDE BLOCKING TO BEARING WALL BELOW AS REQUIRED. HEAVY HOLD DOWNS MAY BE REQUIRED AT SOME LOCATIONS AS NOTED ON PLANS. 6. END JOINTS IN STRUCTURAL DOUBLE PLATE 91ALL BE OFFSET AT LEAST 4'-0°. STRUCTURAL DOUBLE PLATES TO BE NAILED AT 6" D.C. 7. AT EXTERIOR FRAME WALLS, PROVIDE FULL PANEL OF SHEATHING FROM ALL CORNER EDGES. FULL PANEL MUST BE SAWCUT AROUND ANY OPENINGS. SEE DETAILS FOR NAILING REQUIREMENTS. 8. THE NUMBER AND SIZE OF NhLS CONNECTING WOOD MEMBERS SHALL NOT BE LESS THAN THOSE SPECIFIED IN TABLE 2304.9.1 (FASTENING SCHEDULE) OF THE FLORIDA BUILDING CODE 2010 -RESIDENTIAL- UNLESS NOTED OTHERWISE. 9. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED LUMBER OR SEPARATED FROM CONCRETE W/ FELT PAPER OR METAL PLATES. 14. ALL NAILS AND BOLTS EXPOSED TO WEATHER SHALL BE HOT DIPPED GALVINIZED. UPLIFT CONNECTORS 1. UPLIFT CONNECTORS ARE ONLY REQUIRED ON MEMBERS IN WALLS THAT ARE EXPOSED TO UPLIFT FORCES. INTERIOR LOAD BEARING WALLS ARE NOT ALWAYS EXPOSED TO UPLIFT FORCES. THE MEMBERS OF THESE WALL WOULD NOT NEED TO HAVE CONNECTORS APPLIED. 2. UPLIFT CONNECTORS TO PROVIDE CONTINUITY FROM ROOF TRUSSES THRU PLATES TO SLAB AND FOUNDATION PER PLAN. 3. UPLIFT CONNECTORS AT ROOF TRUSSES SHALL BE BENT OVER TRUSS TOP CHORDS AS REQUIRED AND NAILED PRIOR TO APPLICATION OF ROOF SHEATHING. MISSED STRAPS SHALL BE INSTALLED PER PLAN PRIOR TO SHEATHING INSTALLAIiOJ. 4. THE MAXIMUM NUMBER OF FLAT STRAPS (I.E. "HETA20") IN THE TOP BLOCK WALL COURSE AT ANY GiRDER TRUSS SHALL BE (2) STRAPS WITH 8" CLEAR DIMENSION BEFORE NEXT STRAP(S). 5. ALL SPECIFIED CONNECTORS SHALL BE INSTALLED PER CONNECTOR MANUFACTURERS INSTRUCTIONS. 6. NO CONNECTOR SHALL BE BENT IN THE FIELD UNLESS NOTED AS ACCEPTABLE IN THE CONNECTOR MANUF. PRODUCT CATALOG. 7. WHEN ANCHORING (2) WOOD ITEMS TOGETHER, THE LENGTH OF HURRICANE STRAP MUST BE EQUALLY HALF ON ER. ITEM. 8. INSTALL ALL SPECIFIED FASTENERS AT EACH CONNECTOR. REFER TO CONNECTS SCHEDULE FOR MINIMUM NUMBER OF FASTENERS 9. MAY SUBSTITUTE HURRICANE STRAP WITH STRAP OF GREATER HOLD DOWN VALUE OR GREATER UPLIFT VALUE IN FIELD WITHOUT VERIFICATION, PROVIDED ALL MANUFACTURERS INSTALLATION INSTRUCTIONS OR REQUIREMENTS ARE FOLLOWED. STRUCTURAL CRITERIA 1. APPLICABLE CODE FLORIDA BUILDING CODE 2010 -RESIDENTIAL WIND SPEED - 144 NON -WIND-BORNE DEBRIS REGION; WIND IMPORTANCE FACTOR - (1) ONE; 'ENCLOSED' BUILDING TYPE; EXPOSURE CATEGORY C -SEE ROOF PLAN NOTES. 2. INTERNAL PRESSURE COEFFICIENT: +/- 0.18 MAXIMUM MEAN ROOF HT. = 30 FEET GENERAL NOTES 1. DOORS BETWEEN GARAGE AND LIVING SPA( MALL BE MINIMUM 1 3/8' THICK SOLID CORE WORD ODORS, 1 3/8' SOLID DR HONEYCOMB CORE STEEL DOORS, OR 20 -MINUTE FIRE RATED DOORS. 2. THE GARAGE SHALL BE SEPARATED FROM THE RESIDENCE AND ITS ATTiC AREA BY NOT LESS THAN 1/2" GYPSUM BOARD APPLIED TO THE GARAGE SIDE. GARAGES BENEATH HABITABLE ROOMS SHALL BE SEPARATED FROM ALL HABITABLE ROOMS ABOVE BY NOT LESS THAN 5/8" TYPE X GYPSUM BOARD OR ITS EQUIVALENT 3. DUCTS IN THE GARAGE AND DUCTS PENETRATING THE WALLS OR (FILINGS SEPARATING THE DWELL{N FROM THE GARAGE SHALL BE CONSTRUCTED 4F A MINIMUM N0. 26 GAGE SHEET STEEL OR APPROVED EQUAL 4. ENCLOSED ACCESSIBLE SPACE UNDER STAIRS SHALL HAVE WALLS, UNDER STAIR SURFACE AND ANY SOFFITS PROTECTED ON THE ENCLOSED .SIDE WITH 1/2' GYPSUM BOARD. DOOR SCHEDULE 2068 DOOR DOOR DOOR DOOR WIDTH WIDTH HT, HT. FEET INCHES FEET INCHES NOTES 1. NUMBER OF PANELS, HAND, & SWING AS SHOWN ON PLAN 1 1 1 1 ry ry cn i 1 i 1 LATEST REVISION DATE TO MASTER: 07-01-12 W� U Ali _ W WI 0 0 f z c� o Q - U � tUJ o LV o L..L z O O c� -9C-0 CIS Lu �) U oho CQ LLJ o � � � � = Q w = ~o C-- � J (� O C'7 O LLLU 00 LID - (n CV LL Q � M 1 M L'1"J � LL I LLJ LLJ W 0 C/) Lu z 0 � o W o� J co DO NOT SCALE PRINTS! CONSTRUC114N SHALL BE PER INDICATED DIMENSIONS ONLY, ANY DISCREPENCIES TO BE REPORTED TO M/i HOMES FOR CLARIFI SIMPSON SPI AT 16" O.C.- X - BLOCK OPENING ALL BLK. CELLS ABV. LINTEL TO BE CONC. FILLED PRECAST LINTEL PER PLAN ACROSS OPNG, 2x6 P.T. FROM BOT. OF LINTEL TO TOP OF WALL - CENTER ON OPNG. FASTEN TO BLOCK W/ i/2' J -BOLT W/ 2" SQ. WASHER �1 t 2x6 OR 2x4 P.T. W/ CONC. NAILS AT 12" O.C. ACROSS TOP OF OPNG. o EXTEND JAMB 14" MIN. 4" MIN. d ABV. OPNG. EDGE \2x6 P.T. BUCK AT GARAGE DOOR JAMBS DIST. FASTEN TO BLOCK W/ 1/2° DIA. X 6" J -BOLTS o OR 5" X6" 'REDHEAD' TYPE EXPAN90N BOLTS m AT k O.C. MAX. W 2- SQ. WASHERS AT EA. SIDE OF OPNG. GARAGE DOOR MASONRY OPENING GARAGE DOOR DETAIL X \ cim o \ a N � 2x4 P.T. FURRING z ATTACH TO BLK. W/ 1/4"x3" MASONRY cq _ o SC (1 REW 1/4" MIN, EMBED.) O.S.B. SHEATHING W/ 8d W • NAILS ® 6" O.C. EDGE), 12 O.C. (FIELD) 20 STUDS x 16' D.G. 6' 2x4 P.T. - ATTACH 6" WALL STBK. PER PKT. SGD. MANUF. MAX. W/ 1/4"0" TAPCONS MAX. (1 1/4' MIN. EMBED.) WALL ELEVATION JAMB / HEAD DETAIL FRAME WALL AT POCKET SGD BLOCK OPENING LOCATIONS WHERE POCKET SGD TRACK IS BELOW PRECAST LINTEL BLOCK JAMB/HEAD 2x4 P.T FURRING SCREW" (1M-1/4'RMIN, EMBED) 10d NAILS @ 6' O.C. 2x4 P/T/ @ TOP AND SIDES OF BLK. OPNG. NOTES 1, Values shown are based on allowable stress design using 140 miles per hour, Exposure C, Enclosed condition,lmportance Factor of 1.0. 1 Positive values act toward the surface, negative values act away from the surface. 3. Manufacturing data for components and cladding shall exceed the values shown in this table. 4. Edge pressures noted shall be used for components that are located within eight feet of building edges or corners. All other components shall use typical pressure values. 5. Effectiive Wind Area is defined as the projected surface area for components such as doors and windows. The Effective Wind Area for components such as studs and trusses, and for cladding such as roof and wall sheathing, is defined as the span length multiplied by an effective width need not be less than one-third the span length. a 3 2�2 3 1 QINALKa 2 1 22 1 2 2 HIP ROOF 7 < 8 <=== 27 DESIGN WIND LOAD PRESSURE (PSF) -EXPOSURE "C" LOCATION ZONE COMPONENT EFFECTIVE AREA 1fl 45 2D 30 4Q 50 b0 70 $0 9fl 100 ROOF ] .159 ar -269 +16.1 a: -25.4 +1&0 or -26.1 +16.0 or -25.] +26.0 or -25.4 +16.0 or -25.1 +26.0 or -249 +16A or -24.8 +16.0 ar -24.6 160-24.5 +16.0 or -24A ROOF 2 +16.9 or -46.7 +16.1 or -44.6 +16.0 or +15.0 or -40.8 x16.0 ar-39.2 +16.0 or -381 +26.0 or -371 +16.0 ar-35.3 +16,0 o, -35-5 +16.0 or -34.9 +16.0-343 ROOF 3 +269 or -69.1 +i6.1 or -66.5 +1E.0 or -64.6 +16.0 or -62.0 +15.0 ar -60.1 +16.0 or -58.7 +16.0-575 +16.0 cr -56.5 +16.0 nr 55.7 +36-0 or -549 +16.0 or -54.2 WALL 4 +29A or -31.8 +28.6 or -31.1 +28.0 or -30.5 +27.3 or -29.7 +26,7 or -29.2 +25.3 or -28.8 +25.9 ar-28.4 +25.5 or -28.1 +25.4 or -27,9 +25.2 or -27-7 +25Aar-27.5 WALL 5 +29.G or -39.3 +28,6 or -37.6 +2&0 ar -36.7 +27.3 or -36.1 +26.7 ar -34.0 +26.3 or -33.2 +25.9 or -325 +-25.6 or -33.9 +25.4 or -31.4 +25.2 or --30.9 +25.0 or -30.5 9'xT GARAGE DOOR +25-Gor-z8.3 16'xT GARAGE DOOR +24.G or -265 2 - 2x4 OR DBL 1x4 BUCK - CONNECT SECTION EA. TO BLOCK W/ 3/16"x3' TAPCON (t A -A 1/4' MiN. EMBEDMENT INTO BLK.) BLOCK HEADER SOLID BLKG. AT TOP BTWN. 4'- 1'-4' ARCH BLKG. &BUCK MAX. 2x4 45d DIAGONAL BRACE(S) "x3' TAPCOJS AV <- 2x4 45d DIAGONAL BUILT UP PLWD. OR / " BRACE AT EA. FACE MASONITE BUCK -SCRIBE ARCH PANEL 4 t0d NAILS INTO EA. BACKSIDE TO FiT ARCH= () OF ARCH W� �2�10d CONNECT W/ $d NAILS 2z4 BRACE/BLKG. NAILS AT € . D INSTALL NOW. SCREW ANCHOR 2x4 SOLID BLKG. (FULL WIDTH � WALL) PROVIDE TAPCON INTO ARCH BLKG. PER BTWN. OSB ARCH FACES W/ (2)10d NAILS 4N1HIN 4' MIN. OF INSTALLATION DETAILS THRU OSB INTO EA. 2x4 BRACE _ _START OF ARCH _ SECTION A -A PROVIDE TAPCON PER WOW. INSTALLATION 4' MAX. RAD. DETAILS OR THRU 11 j2" THK. OR MORE BUCK WITHIN 8° MIN. OF START OF ARCH FRAME ARCH TOP DETAIL BLOCK OPNG. SHOWN FRAME OPNG. SIMILAR (NO BUCK REQ'D. WHEN NO PLYWD. JOINT AT JAMBS) 2 - 2z4 OR DBL. 1x4 BUCK - SECTION CONNECT EA. TO BLOCK W/ 3/16"0" B -B BLOCK HEADER TAPCON (1 1/4' MIN. EMBEDMENT INTO PROVIDE 2x4 DIAL. BRACE SOLID BLKG. AT TOP 8d NAILS AT 8" O.C. AT BUCK 3/16 BTWN. BTWN. VERT. BRACES WHEN HT ARCH BLKG, & BUCK OF BRACE EXCEEDS 24' MAX. PROVIDE 2) MIN. TAPCON r�T EA. SIDE 24 VERT. 8d NAILS AT 8' O.C. BUCK- (1) WITHIN 4" BRACE(S) AT BUCK MIN. OF START OF ARCH BUILT UP PLWD. OR 7/16' OSB MASONITE BUCK -SCRIBE ARCH PANEL START OF ARCH_ BACKSIDE TO FIT ARCH- EQ. EQ. - - - 4' MAX. RAD. CONNECT W/ 8d NAILS 20 VERT. AT EA. FACE OF ARCH INSTALL WDW. SCREW ANCHOR W/ (3)IOd NAILS AT EA, END INTO ARCH BLKG. PER 2x4 SOLID BLKG. (FULL WIDTH OF WALL) INSTALLATION DETAILS BTWN. OSB ARCH FACES W/ (2)104 NAILS SECTION B -B THRU OSB INTO EA. 20 FRAME ELLIPSE ARCH TOP DETAIL BLOCK OPNG. SHOWN FRAME OPNG. SIMILAR (NO BUCK REQ'D. WHEN NO PLYWD. JOINT AT JAMBS) �.` ° B °• P •v O e 4 GROUT BLOCK SOLID AS SHOWN -EXTEND GROUT CONTINUOUS TO THE NEAREST REINFORCED CELLS BEYOND THE LOCATION OF THE MAXIMUM 2" BLOCK OVERHANG (FILL TO BOTTOM OF WI NDOW ALL AT LOCATIONS WHERE SILL IS LESS THAN 2'-0" ABOVE TOP OF SLAB) 2' MAX. OVERHANGING BLOCK REPAIR DETAIL MAXIMUM WALL HT 1140 MPH / EXP C 1 RISK GAT. fl SIZE/SPECIES SPACING MAXIMUM HEIGHT 2x4 SPF 16° OC 8'4 2x4 SPF 12' OC 9'-0° 2x4 SPF 16' OC 9'-4" 2x4 SPF 12" OC 10'-0" 2x6 SPF 16° OC 12'-4" 26 SPF 12° OC 13'-0" 20 SPF 16" OC 14'-0" 26 SPF 12' OC 15-0" NOTE: HEIGHTS SHOWN IN THIS TABLE ARE BASED ON STUDS BEING ATTACHED TO 1/2 MINIMUM OSB SHEATHING iMTH 8d MIN NAILS ®12° OC INTERMEDIATE SUPPORTS AND 6" OC AT PERIMETER AND 4" OC 0 CORNER STUDS. SHEATHING TO BE CONTINUOUS OVER 3 OR MORE STUDS. TAPCON INSTALLATION ANCHOR CHART FOR BLOCK OPNGS. W/ BUCKS. 1 1/2" THICK OR GREATER WIDTH WIDTH WIDTH WIDTH D FEF D D E D D E D 24" 0. C. 8" MAX. MAX. A 8„ A 8" A � - C MAX. C MAX. C B B J B _� = C WOW. C WOW. � WOW. C SGD OR OPNG. OPNG. OPNG. A A A � � ¢ EXT. DOOR SILL /MULL SILL /MULL OPNG. SINGLE WOW, OR MULTIPLE SIDE STACKED WOW. BY SIDE WOWS. W/ MULL BTWN. ® Wl MULL BTWN. ® � Q WOW. OPNG. LOCATIONS WDW. OPNG. LOCATIONS � HEIGHT IN HEAD �1 WIDTH IN HEAD (D UP TO 40" A UP TO 40" D EXTERIOR DOOR 40.01" TO 60" A , B 40 .01" TO 60" D , E OPENINGS 60.01" TO 80" A , C 60.01" TO 80" D , F 80.01" TO 100" A , B , C 80.01" TO 100" D , E , F 1. LOCATIONS PER INDIVIDUAL WOW. OPNG DiMENSfON NOT MULLED WOW. OPNG. DIMENSION 2. MAXIMUM ALLOWABLE SPACING BTWN. TAPCON ANCHORS TO BE 24" O.C. 2x HDR. PLATE OR EXTERIOR WD. HDR. SHEATHING 2 LAYERS OF 7/16" O.S.B. OR (i) LAYER OF 3/4' PLYWD. CONNECT W/ {2)8d NAILS AT 16" O.C. BUILT UP WOOD HDR. OR 2x HDR. PLATE EXTERIOR SHEATHING 2x CRIPPLE STUDS AT 16" O.C. BTWN. SILL PLATE & BOT. PLATE OR HDR. & HDR. PLATE 2x HDR. OR SILL PLATE OR HDR. JACK ATTACH WDW./[l0(Xi PER MANUF. SPECIIFFICRTIONS SILL 1 JAMB 1 HEAD FRAME WALL OPNG. WDW./DOOR DETAILS TAPCON PER 1 3/4" SCHEDULE MIN. � X M � EXT. FACE (2)1Dd x 1 1/2" AT 24" OF BLOCK O.C. FOR BUCK BUILT UP TO 2 1/2" THICK PROVIDE 2x P.T. AGAINST OR BLOCK FOR BUILT UP BUCKS (2)8d z 2 1/2" AT 24° 2" THICK OR MORE O.C. FOR BUCK BUILT UP BUILT UP BUCK DETAIL 21/2" THIO( OR MORE THICKNESS 11/2" OR GREATER PRECAST CONC. MIN. 2 1/2" WIDE BUCK - LINTEL ABV. OPNG. .MAXIMUM 2 3/4" BUILT UP OR CMU JAMB THICKNESS - CONNECT W/ CAULK BTWN. 3/16" DIA. TAPCONS. BUCK /BLOCK TAPCON LENGTH MUST BE SUFFICIENT TO ACHIEVE MIN. CEMENT FINISH � 1 1/4" EMBEDMENT INTO ODER BLOCK BLOCK JAMB /HERD INSTALL WOW./DOOR SCREW DRYWALL ANCHOR INTO BUCK PER INSTALLATION DETAILS HEAD/JAMB FOR BUCK THICKNESS 1112" OR GREATER INSTALL WDW./DOOR TAPCON PRECAST CONC. ANCHOR INTO BLOCK PER LINTEL ABV. OPNG. INSTALLATION DETAILS OR CMU JAMB CAULK BTWN. MIN. 2 1/2' WIDE BUCK - MAXIMUM BUILT UP BUCK % BLK THICKNESS MUST BE LESS THAN 1 1/2' CONNECT W/ CEMENT FINISH SPIRAL NAILS AT 16" O.G. OVER BLOCK DRYWALL HEAD/JAMB FOR BUCK THICKNESS LESS THAN 11121" CEMENT FINISH ATTACH WDW./DOOR PER OVER BLOCK MANUF. SPEOFlCR110NS PRECAST CONC. SILL � I SILL ' BLOCK WALL OPNG, WDW./DOOR BUCK DETAILS ALL EXTERIOR WINDOWS AND DOORS SHALL HAVE MEET PRESSURES IN CHART- EXPOSURE "C" FASTENER SCHEDULE FOR BUILT UP STUD COLUMNS VERTICAL SPACING OF FASTENERS AT 8' O.C. STAGGERED UNLESS OTHERWISE NOTED. THIRD AND FOURTH PLIES SHALL BE ADDED TO EITHER SIDE OF 2 -PLY COMPOSITE POST. MINIMUM END DISTANCE SHALL BE 2 1/2' AND MINIMUM EDGE DISTANCE SHALL BE t". STUD # OF NAILS NUMBER OF PLYS SIZE PER RDW (2) PLYS (3) PLYS (4) PLYS 20 (t) 10d x A. 10d x 31 10d X A. OR 1/2" DIAM. BST 0 16° O.C. 26 (2) 10d x A. i Qd x A. 10d X A. OR 1/2° DIAM.BOLT 0 16' D.C. 2x$ (2) tOd x 31 1 O x A. i0d X A. OR 1/2" DIA. BOLT 0 16" D.G. IN LIEU OF NAILS, MEMBERS MAY BE BOLTED TOGETHER. WITH 1/2' DIAM. THRU-BOLTS AT 16" O.G. VERTICALLY WITH THE SAME NUMBER OF BOLTS PER ROW AS NAILS WOOD HEADER SCHEDULE MAXIMUM CLEAR SPAN FOR LOAD BEARING FRAME WALLS SIZES NOTED ON PLANS TO SUPERCEDE VALUES SHOWN ON THIS SCHEDULE HEADER LOAD HEADER SIZE CONDITION (2)2x6 NJ (2)2x8 NJ (2)2x10 NJ (2)2x12 NJ ROOF ONLY 4'-0' 2 5'-4° 2 6'-8" 2 7'-6" 2 2nd FLOC ONLY 3'-6' 2 4'-5" 2 5-5" 2 6'-3" 2 2nd FLOOR &ROOF 3'-0' 2 4'-8" 2 5 -5" 3 ON "NJ" =MINIMUM NUMBER OF JACK STUDS REQ'D. AT EA. END UNLESS OTHERWISE NOTED THE PLAN ALL STRUCTURAL HEADERS TO BE #2 4R BETTER S.Y.P. ALL NON-STRUCTURAL HEADERS HEM -FIR OR S -P -F OR BETTER CONSTRUCTION NOTES L .APPLICABLE CODES: - FLOR IDA BUILDING CODE 2410 -RESIDENTIAL=Jz E-= - NATIONAL ELECTRICAL CODE REQUIREMENTS FOR ONE AND TWO FAMILY DWELINGS, NFPA 70A; 2007. - FLORIDA FIRE PREVENTION CODE - F.F.P.C. 2010 2. SUBCONTRACTORS SHALL VERIFY ALL DIMENSIONS IN THE FIELD AND NOTiFY THE BUILDER/ARCHITECT OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH CONSTRUCTION. 3. ALL CONSTRUCTION SHALL BE BRACED AND SHORED BY CONTRACTOR AS REQUIRED TO SAFELY PERFORM THE WORK. TERMITE PROTECTION 1. TERMITE PRETREATMENT SHALL MAKE USE OF BORA-CARE TERMIIICIDE. THE BORA-CARE TERMITIODE TREATMENT IS REGISTERED BY THE FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES AS REQUIERED BY THE FLORIDA BUILDING CODE 2010 - RESIDENTIAL 2. UPON COMPLETION OF THE APPLICATION OF THE TERMITE PROTECTIVE TREATMENT, A CERTIFICATE OF COMPLIANCE SHALL BE ISSUED BY A LICENSED PEST CONTROL COMPANY BEFORE A CERTIFICATE OF OCCUPANCY MAY BE ISSUED. THE CERTIFICATE OF COMPLIANCE SHALL STATE: 'THE BUILDING HAS RECEIVED A COMPLETE TREATMENT FOR THE PREVENTION OF SUBTERRANEAN TERMITES. THE TREATMENT IS IN ACCORDANCE WITH THE RULES AND LAWS ESTABLISHED BY THE FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES'. FOUNDATION NOTES 1. FOUNDATION IS DEIGNED BASED ON PRESUMPTIVE SAFE ALLOWABLE BEARING PRESSURE OF 2000 PSF. CONTRACTOR MALL VERIFY THAT THE MINIMUM BEARING PRESSURE OF 2000 PSF IS OBTAINED PRIOR TO FOOTING PLACEMENT. 2. FOOTING MALL BE PLACED ON COMPACTED SOIL FREE OF ORGANIC DEBRIS. 3. AS REQUIRED BY THE LOCAL MUNiCAPILITY BUILDING DEPARTMENT, A FOUNDATION SURVEY SHALL BE PERFORMED AND A COPY OF THE SURVEY SHALL ON THE SITE FOR 1TiE BUILDING INSPECTOR'S USE, OR ALL PROPERTY MARKERS SHALL BE EXPOSED AND A STRING STRETCHED FROM MARKER TO MARKER TO VERIFY REQUIRED SETBACKS. CONCRETE NOTES 1. CONCRETE STRENGTH SHALL BE 2500 PSI AT 28 DAYS AND IN ACCORDANCE WITH A.C.I. 318-11. 2. REINFORCING STEEL SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF ASTM A615 GRAFE 44. 3. WELDED WIRE FABRIC SHALL BE IN ACCORDANCE 4NTH THE LATEST EDITION OF ASTM A185. CONCRETE MASONRY NOTES 1. CONCRETE MASONRY WORK SHALL BE IN ACCORDANCE NTH A.C.I. 530/ASCE 5/TMS 402. 2. CONCRETE MASONRY .UNITS SHALL BE 1N CONFORMANCE WITH ASTM C90, GRADE N, TYPE II ASTM C140 AND SHALL HAVE A COMPRESSIVE STRENGTH OF 2000 PSI MINIMUM BASED ON THE NET GROSS SECTIONAL AREA. 3. COARSE GROUT SHALL BE IN CONFORMANCE WITH ASTM C476. 4. MORTAR SHALL BE TYPE "M" OR "S' IN ACCORDANCE WITH ASTM C270. 5. ALL MASONRRY UNITS SHALL BE LAID IN RUNNING BOND U.N.O. 6. PROVIDE 8" PRECAST CONCRETE LINTELS ABOVE ALL MASONARY OPNGS. ALL LINTEL FOR OPNGS. OVER 5-6" SHALL BE GROUTED SOLID W/ 8" STANDARD BRC. EA. END U.N.O. (4' MIN. BEARING REQ'D.) PRE-ENGINEERED: WOOD TRUSSES L ALL TRUSSES SHALL BE IN ACCORDANCE WITH THE LATEST EDITIONS OF THE "NATIONAL DESIGN SP€CIFICATONS FOR STRESS -MADE LUMBER AND ITS FASTENERS" AS RECOMMENDED BY THE NATIONAL FOREST PRODUCTS ASSOCIATION. 2. THE TRUSS MANUF. SHALL VERIFY ALL TRUSS SPANS, SLOPES, BEARING POINTS, AND DIMENSIONS BEFORE FABRICATION. ANY DEVATIONS OR DISCREPANCIES FROM THE PLANS TO BE BROUGHT TO THE AT1>=NTiON OF THE BUILDER/ARCHITECT/ENGINEER PRIOR TO PROCEEDING. TRUSS MANUF. TO SUPPLY ALL TRUSS TO TRUSS HANGERS AND CONNECTIONS. 3. TRUSS MANUF. TO PROVIDE SHOP DRAiNNGS ON NEW AND/OR REVISED MODEL PLANS TO BUILDER FOR REVIEW BEFORE FABRICATION. TRUSS SHOP DRAWINGS SHALL SHOW ALL TRUSS PROFILES, GRAVITY/UPLIFT LOADS, BRACING MEMBERS, AND TRUSS TO TRUSS HANGERS. 4. ALL PREFAB. WOOD TRUSSES SHALL BE SECURELY FASTENED TO THEIR SUPPORTING WALLS OR BEAMS AS REQUIRED PER THE FRAMING PLANS. 5. PRE-ENGINEERED WOOD TRUSSES, RAFTERS, AND OTHER ROOF FRAMING MEMBERS SHALL BE SPACED AT 24' O.C. MAXIMUM. 6. RIDGE AND VALLEY SE( MEMBERS SHALL BE A NOMINAL DIMENSION OF 2" LARGER THAN RAFTERS. 7. ALL ROOF FRAMING MEMBERS SHALL BE MIN. SYP #2 OR BETTER. WALL &ROOF FRAMING NOTES 1. WOOD CONSTRUCTION SHALL CONFORM TO THE LATEST EDITION OF °NATIONAL DEIGN SPEORGAl10NS FOR WOOD CONSTRUCTi(XV" BY THE NATIONAL FOREST PRODUCT ASSOOAl10N. 2. ROOF AND WALL STRUCTURAL SHEATHING SHALL BE SPAN RATED IN ACCORDANCE WITH APA PS 1-83 OR NER-108. NAILS USED IN ALL SHEATHING APPLICATIONS SHALL BE 8d RING SHANK, HOT DIPPED GALVANIZED, HAivD OR GUN DRIVEN NAILS. GUN DRIVEN NAILS SHALL HAVE HEAD AND SHANK SIZE EQUIVALENT TO HAND DRIVEN NAILS, OTHERWISE SPACING SHALL BE REDUCED FROM 12" TO 10',8' TO 6°, 6° TO 5°, 4° TO 3°, AND 3' TO 2° IN THOSE APPLICATIONS. 3. ALL EXTERIOR FRAMED WALL STUDS SHALL BE AS NOTED ON PLANS AND OR A MINIMUM GRADE OF #2 SYP OR BETTER. INTERIOR WALL STUDS SHALL BE A MINIMUM OF S -P -F #2 OR BETTER. 4. WOOD HEADERS PER SCHEDULE UNLESS NflTID OTHERWISE ON PLANS. ALL HEADER MATERIAL TO BE SOUTHERN YELLOW PINE #2 MIN. PROVIDE STRAPS AS REQ'D. PER DETAILS. 5. PROVIDE A BUILT UP OR SOLID SAWN COLUMN UNDER ALL GIRDERS AND BEAMS IN FRAMED WALLS UNLESS NOTED OTHERWISE 4N PLANS. A MINIMUM OF (2)2x4 STUDS SHALL BE USED. STRAP MEMBER DIRECTLY TO TOP OF COLUMN AND BOTTOM W A MIN. OF SIMPSON SPH4 OR EQUAL AT EACH STUD. PROVIDE BLOCKING TO BEARING WALL BELOW AS REQUIRED. HEAVY HOLD DOWNS MAY BE REQUIRED AT SOME LOCATIONS AS NOTED ON PLANS. 6. END JOINTS IN STRUCTURAL DOUBLE PLATE 91ALL BE OFFSET AT LEAST 4'-0°. STRUCTURAL DOUBLE PLATES TO BE NAILED AT 6" D.C. 7. AT EXTERIOR FRAME WALLS, PROVIDE FULL PANEL OF SHEATHING FROM ALL CORNER EDGES. FULL PANEL MUST BE SAWCUT AROUND ANY OPENINGS. SEE DETAILS FOR NAILING REQUIREMENTS. 8. THE NUMBER AND SIZE OF NhLS CONNECTING WOOD MEMBERS SHALL NOT BE LESS THAN THOSE SPECIFIED IN TABLE 2304.9.1 (FASTENING SCHEDULE) OF THE FLORIDA BUILDING CODE 2010 -RESIDENTIAL- UNLESS NOTED OTHERWISE. 9. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED LUMBER OR SEPARATED FROM CONCRETE W/ FELT PAPER OR METAL PLATES. 14. ALL NAILS AND BOLTS EXPOSED TO WEATHER SHALL BE HOT DIPPED GALVINIZED. UPLIFT CONNECTORS 1. UPLIFT CONNECTORS ARE ONLY REQUIRED ON MEMBERS IN WALLS THAT ARE EXPOSED TO UPLIFT FORCES. INTERIOR LOAD BEARING WALLS ARE NOT ALWAYS EXPOSED TO UPLIFT FORCES. THE MEMBERS OF THESE WALL WOULD NOT NEED TO HAVE CONNECTORS APPLIED. 2. UPLIFT CONNECTORS TO PROVIDE CONTINUITY FROM ROOF TRUSSES THRU PLATES TO SLAB AND FOUNDATION PER PLAN. 3. UPLIFT CONNECTORS AT ROOF TRUSSES SHALL BE BENT OVER TRUSS TOP CHORDS AS REQUIRED AND NAILED PRIOR TO APPLICATION OF ROOF SHEATHING. MISSED STRAPS SHALL BE INSTALLED PER PLAN PRIOR TO SHEATHING INSTALLAIiOJ. 4. THE MAXIMUM NUMBER OF FLAT STRAPS (I.E. "HETA20") IN THE TOP BLOCK WALL COURSE AT ANY GiRDER TRUSS SHALL BE (2) STRAPS WITH 8" CLEAR DIMENSION BEFORE NEXT STRAP(S). 5. ALL SPECIFIED CONNECTORS SHALL BE INSTALLED PER CONNECTOR MANUFACTURERS INSTRUCTIONS. 6. NO CONNECTOR SHALL BE BENT IN THE FIELD UNLESS NOTED AS ACCEPTABLE IN THE CONNECTOR MANUF. PRODUCT CATALOG. 7. WHEN ANCHORING (2) WOOD ITEMS TOGETHER, THE LENGTH OF HURRICANE STRAP MUST BE EQUALLY HALF ON ER. ITEM. 8. INSTALL ALL SPECIFIED FASTENERS AT EACH CONNECTOR. REFER TO CONNECTS SCHEDULE FOR MINIMUM NUMBER OF FASTENERS 9. MAY SUBSTITUTE HURRICANE STRAP WITH STRAP OF GREATER HOLD DOWN VALUE OR GREATER UPLIFT VALUE IN FIELD WITHOUT VERIFICATION, PROVIDED ALL MANUFACTURERS INSTALLATION INSTRUCTIONS OR REQUIREMENTS ARE FOLLOWED. STRUCTURAL CRITERIA 1. APPLICABLE CODE FLORIDA BUILDING CODE 2010 -RESIDENTIAL WIND SPEED - 144 NON -WIND-BORNE DEBRIS REGION; WIND IMPORTANCE FACTOR - (1) ONE; 'ENCLOSED' BUILDING TYPE; EXPOSURE CATEGORY C -SEE ROOF PLAN NOTES. 2. INTERNAL PRESSURE COEFFICIENT: +/- 0.18 MAXIMUM MEAN ROOF HT. = 30 FEET GENERAL NOTES 1. DOORS BETWEEN GARAGE AND LIVING SPA( MALL BE MINIMUM 1 3/8' THICK SOLID CORE WORD ODORS, 1 3/8' SOLID DR HONEYCOMB CORE STEEL DOORS, OR 20 -MINUTE FIRE RATED DOORS. 2. THE GARAGE SHALL BE SEPARATED FROM THE RESIDENCE AND ITS ATTiC AREA BY NOT LESS THAN 1/2" GYPSUM BOARD APPLIED TO THE GARAGE SIDE. GARAGES BENEATH HABITABLE ROOMS SHALL BE SEPARATED FROM ALL HABITABLE ROOMS ABOVE BY NOT LESS THAN 5/8" TYPE X GYPSUM BOARD OR ITS EQUIVALENT 3. DUCTS IN THE GARAGE AND DUCTS PENETRATING THE WALLS OR (FILINGS SEPARATING THE DWELL{N FROM THE GARAGE SHALL BE CONSTRUCTED 4F A MINIMUM N0. 26 GAGE SHEET STEEL OR APPROVED EQUAL 4. ENCLOSED ACCESSIBLE SPACE UNDER STAIRS SHALL HAVE WALLS, UNDER STAIR SURFACE AND ANY SOFFITS PROTECTED ON THE ENCLOSED .SIDE WITH 1/2' GYPSUM BOARD. DOOR SCHEDULE 2068 DOOR DOOR DOOR DOOR WIDTH WIDTH HT, HT. FEET INCHES FEET INCHES NOTES 1. NUMBER OF PANELS, HAND, & SWING AS SHOWN ON PLAN 1 1 1 1 ry ry cn i 1 i 1 LATEST REVISION DATE TO MASTER: 07-01-12 W� U Ali _ W WI 0 0 f z c� o Q - U � tUJ o LV o L..L z O O c� -9C-0 CIS Lu �) U oho CQ LLJ o � � � � = Q w = ~o C-- � J (� O C'7 O LLLU 00 LID - (n CV LL Q � M 1 M L'1"J � LL I LLJ LLJ W 0 C/) Lu z 0 � o W o� J co DO NOT SCALE PRINTS! CONSTRUC114N SHALL BE PER INDICATED DIMENSIONS ONLY, ANY DISCREPENCIES TO BE REPORTED TO M/i HOMES FOR CLARIFI X \ cim o \ a N � 2x4 P.T. FURRING z ATTACH TO BLK. W/ 1/4"x3" MASONRY cq _ o SC (1 REW 1/4" MIN, EMBED.) O.S.B. SHEATHING W/ 8d W • NAILS ® 6" O.C. EDGE), 12 O.C. (FIELD) 20 STUDS x 16' D.G. 6' 2x4 P.T. - ATTACH 6" WALL STBK. PER PKT. SGD. MANUF. MAX. W/ 1/4"0" TAPCONS MAX. (1 1/4' MIN. EMBED.) WALL ELEVATION JAMB / HEAD DETAIL FRAME WALL AT POCKET SGD BLOCK OPENING LOCATIONS WHERE POCKET SGD TRACK IS BELOW PRECAST LINTEL BLOCK JAMB/HEAD 2x4 P.T FURRING SCREW" (1M-1/4'RMIN, EMBED) 10d NAILS @ 6' O.C. 2x4 P/T/ @ TOP AND SIDES OF BLK. OPNG. NOTES 1, Values shown are based on allowable stress design using 140 miles per hour, Exposure C, Enclosed condition,lmportance Factor of 1.0. 1 Positive values act toward the surface, negative values act away from the surface. 3. Manufacturing data for components and cladding shall exceed the values shown in this table. 4. Edge pressures noted shall be used for components that are located within eight feet of building edges or corners. All other components shall use typical pressure values. 5. Effectiive Wind Area is defined as the projected surface area for components such as doors and windows. The Effective Wind Area for components such as studs and trusses, and for cladding such as roof and wall sheathing, is defined as the span length multiplied by an effective width need not be less than one-third the span length. a 3 2�2 3 1 QINALKa 2 1 22 1 2 2 HIP ROOF 7 < 8 <=== 27 DESIGN WIND LOAD PRESSURE (PSF) -EXPOSURE "C" LOCATION ZONE COMPONENT EFFECTIVE AREA 1fl 45 2D 30 4Q 50 b0 70 $0 9fl 100 ROOF ] .159 ar -269 +16.1 a: -25.4 +1&0 or -26.1 +16.0 or -25.] +26.0 or -25.4 +16.0 or -25.1 +26.0 or -249 +16A or -24.8 +16.0 ar -24.6 160-24.5 +16.0 or -24A ROOF 2 +16.9 or -46.7 +16.1 or -44.6 +16.0 or +15.0 or -40.8 x16.0 ar-39.2 +16.0 or -381 +26.0 or -371 +16.0 ar-35.3 +16,0 o, -35-5 +16.0 or -34.9 +16.0-343 ROOF 3 +269 or -69.1 +i6.1 or -66.5 +1E.0 or -64.6 +16.0 or -62.0 +15.0 ar -60.1 +16.0 or -58.7 +16.0-575 +16.0 cr -56.5 +16.0 nr 55.7 +36-0 or -549 +16.0 or -54.2 WALL 4 +29A or -31.8 +28.6 or -31.1 +28.0 or -30.5 +27.3 or -29.7 +26,7 or -29.2 +25.3 or -28.8 +25.9 ar-28.4 +25.5 or -28.1 +25.4 or -27,9 +25.2 or -27-7 +25Aar-27.5 WALL 5 +29.G or -39.3 +28,6 or -37.6 +2&0 ar -36.7 +27.3 or -36.1 +26.7 ar -34.0 +26.3 or -33.2 +25.9 or -325 +-25.6 or -33.9 +25.4 or -31.4 +25.2 or --30.9 +25.0 or -30.5 9'xT GARAGE DOOR +25-Gor-z8.3 16'xT GARAGE DOOR +24.G or -265 2 - 2x4 OR DBL 1x4 BUCK - CONNECT SECTION EA. TO BLOCK W/ 3/16"x3' TAPCON (t A -A 1/4' MiN. EMBEDMENT INTO BLK.) BLOCK HEADER SOLID BLKG. AT TOP BTWN. 4'- 1'-4' ARCH BLKG. &BUCK MAX. 2x4 45d DIAGONAL BRACE(S) "x3' TAPCOJS AV <- 2x4 45d DIAGONAL BUILT UP PLWD. OR / " BRACE AT EA. FACE MASONITE BUCK -SCRIBE ARCH PANEL 4 t0d NAILS INTO EA. BACKSIDE TO FiT ARCH= () OF ARCH W� �2�10d CONNECT W/ $d NAILS 2z4 BRACE/BLKG. NAILS AT € . D INSTALL NOW. SCREW ANCHOR 2x4 SOLID BLKG. (FULL WIDTH � WALL) PROVIDE TAPCON INTO ARCH BLKG. PER BTWN. OSB ARCH FACES W/ (2)10d NAILS 4N1HIN 4' MIN. OF INSTALLATION DETAILS THRU OSB INTO EA. 2x4 BRACE _ _START OF ARCH _ SECTION A -A PROVIDE TAPCON PER WOW. INSTALLATION 4' MAX. RAD. DETAILS OR THRU 11 j2" THK. OR MORE BUCK WITHIN 8° MIN. OF START OF ARCH FRAME ARCH TOP DETAIL BLOCK OPNG. SHOWN FRAME OPNG. SIMILAR (NO BUCK REQ'D. WHEN NO PLYWD. JOINT AT JAMBS) 2 - 2z4 OR DBL. 1x4 BUCK - SECTION CONNECT EA. TO BLOCK W/ 3/16"0" B -B BLOCK HEADER TAPCON (1 1/4' MIN. EMBEDMENT INTO PROVIDE 2x4 DIAL. BRACE SOLID BLKG. AT TOP 8d NAILS AT 8" O.C. AT BUCK 3/16 BTWN. BTWN. VERT. BRACES WHEN HT ARCH BLKG, & BUCK OF BRACE EXCEEDS 24' MAX. PROVIDE 2) MIN. TAPCON r�T EA. SIDE 24 VERT. 8d NAILS AT 8' O.C. BUCK- (1) WITHIN 4" BRACE(S) AT BUCK MIN. OF START OF ARCH BUILT UP PLWD. OR 7/16' OSB MASONITE BUCK -SCRIBE ARCH PANEL START OF ARCH_ BACKSIDE TO FIT ARCH- EQ. EQ. - - - 4' MAX. RAD. CONNECT W/ 8d NAILS 20 VERT. AT EA. FACE OF ARCH INSTALL WDW. SCREW ANCHOR W/ (3)IOd NAILS AT EA, END INTO ARCH BLKG. PER 2x4 SOLID BLKG. (FULL WIDTH OF WALL) INSTALLATION DETAILS BTWN. OSB ARCH FACES W/ (2)104 NAILS SECTION B -B THRU OSB INTO EA. 20 FRAME ELLIPSE ARCH TOP DETAIL BLOCK OPNG. SHOWN FRAME OPNG. SIMILAR (NO BUCK REQ'D. WHEN NO PLYWD. JOINT AT JAMBS) �.` ° B °• P •v O e 4 GROUT BLOCK SOLID AS SHOWN -EXTEND GROUT CONTINUOUS TO THE NEAREST REINFORCED CELLS BEYOND THE LOCATION OF THE MAXIMUM 2" BLOCK OVERHANG (FILL TO BOTTOM OF WI NDOW ALL AT LOCATIONS WHERE SILL IS LESS THAN 2'-0" ABOVE TOP OF SLAB) 2' MAX. OVERHANGING BLOCK REPAIR DETAIL MAXIMUM WALL HT 1140 MPH / EXP C 1 RISK GAT. fl SIZE/SPECIES SPACING MAXIMUM HEIGHT 2x4 SPF 16° OC 8'4 2x4 SPF 12' OC 9'-0° 2x4 SPF 16' OC 9'-4" 2x4 SPF 12" OC 10'-0" 2x6 SPF 16° OC 12'-4" 26 SPF 12° OC 13'-0" 20 SPF 16" OC 14'-0" 26 SPF 12' OC 15-0" NOTE: HEIGHTS SHOWN IN THIS TABLE ARE BASED ON STUDS BEING ATTACHED TO 1/2 MINIMUM OSB SHEATHING iMTH 8d MIN NAILS ®12° OC INTERMEDIATE SUPPORTS AND 6" OC AT PERIMETER AND 4" OC 0 CORNER STUDS. SHEATHING TO BE CONTINUOUS OVER 3 OR MORE STUDS. TAPCON INSTALLATION ANCHOR CHART FOR BLOCK OPNGS. W/ BUCKS. 1 1/2" THICK OR GREATER WIDTH WIDTH WIDTH WIDTH D FEF D D E D D E D 24" 0. C. 8" MAX. MAX. A 8„ A 8" A � - C MAX. C MAX. C B B J B _� = C WOW. C WOW. � WOW. C SGD OR OPNG. OPNG. OPNG. A A A � � ¢ EXT. DOOR SILL /MULL SILL /MULL OPNG. SINGLE WOW, OR MULTIPLE SIDE STACKED WOW. BY SIDE WOWS. W/ MULL BTWN. ® Wl MULL BTWN. ® � Q WOW. OPNG. LOCATIONS WDW. OPNG. LOCATIONS � HEIGHT IN HEAD �1 WIDTH IN HEAD (D UP TO 40" A UP TO 40" D EXTERIOR DOOR 40.01" TO 60" A , B 40 .01" TO 60" D , E OPENINGS 60.01" TO 80" A , C 60.01" TO 80" D , F 80.01" TO 100" A , B , C 80.01" TO 100" D , E , F 1. LOCATIONS PER INDIVIDUAL WOW. OPNG DiMENSfON NOT MULLED WOW. OPNG. DIMENSION 2. MAXIMUM ALLOWABLE SPACING BTWN. TAPCON ANCHORS TO BE 24" O.C. 2x HDR. PLATE OR EXTERIOR WD. HDR. SHEATHING 2 LAYERS OF 7/16" O.S.B. OR (i) LAYER OF 3/4' PLYWD. CONNECT W/ {2)8d NAILS AT 16" O.C. BUILT UP WOOD HDR. OR 2x HDR. PLATE EXTERIOR SHEATHING 2x CRIPPLE STUDS AT 16" O.C. BTWN. SILL PLATE & BOT. PLATE OR HDR. & HDR. PLATE 2x HDR. OR SILL PLATE OR HDR. JACK ATTACH WDW./[l0(Xi PER MANUF. SPECIIFFICRTIONS SILL 1 JAMB 1 HEAD FRAME WALL OPNG. WDW./DOOR DETAILS TAPCON PER 1 3/4" SCHEDULE MIN. � X M � EXT. FACE (2)1Dd x 1 1/2" AT 24" OF BLOCK O.C. FOR BUCK BUILT UP TO 2 1/2" THICK PROVIDE 2x P.T. AGAINST OR BLOCK FOR BUILT UP BUCKS (2)8d z 2 1/2" AT 24° 2" THICK OR MORE O.C. FOR BUCK BUILT UP BUILT UP BUCK DETAIL 21/2" THIO( OR MORE THICKNESS 11/2" OR GREATER PRECAST CONC. MIN. 2 1/2" WIDE BUCK - LINTEL ABV. OPNG. .MAXIMUM 2 3/4" BUILT UP OR CMU JAMB THICKNESS - CONNECT W/ CAULK BTWN. 3/16" DIA. TAPCONS. BUCK /BLOCK TAPCON LENGTH MUST BE SUFFICIENT TO ACHIEVE MIN. CEMENT FINISH � 1 1/4" EMBEDMENT INTO ODER BLOCK BLOCK JAMB /HERD INSTALL WOW./DOOR SCREW DRYWALL ANCHOR INTO BUCK PER INSTALLATION DETAILS HEAD/JAMB FOR BUCK THICKNESS 1112" OR GREATER INSTALL WDW./DOOR TAPCON PRECAST CONC. ANCHOR INTO BLOCK PER LINTEL ABV. OPNG. INSTALLATION DETAILS OR CMU JAMB CAULK BTWN. MIN. 2 1/2' WIDE BUCK - MAXIMUM BUILT UP BUCK % BLK THICKNESS MUST BE LESS THAN 1 1/2' CONNECT W/ CEMENT FINISH SPIRAL NAILS AT 16" O.G. OVER BLOCK DRYWALL HEAD/JAMB FOR BUCK THICKNESS LESS THAN 11121" CEMENT FINISH ATTACH WDW./DOOR PER OVER BLOCK MANUF. SPEOFlCR110NS PRECAST CONC. SILL � I SILL ' BLOCK WALL OPNG, WDW./DOOR BUCK DETAILS ALL EXTERIOR WINDOWS AND DOORS SHALL HAVE MEET PRESSURES IN CHART- EXPOSURE "C" FASTENER SCHEDULE FOR BUILT UP STUD COLUMNS VERTICAL SPACING OF FASTENERS AT 8' O.C. STAGGERED UNLESS OTHERWISE NOTED. THIRD AND FOURTH PLIES SHALL BE ADDED TO EITHER SIDE OF 2 -PLY COMPOSITE POST. MINIMUM END DISTANCE SHALL BE 2 1/2' AND MINIMUM EDGE DISTANCE SHALL BE t". STUD # OF NAILS NUMBER OF PLYS SIZE PER RDW (2) PLYS (3) PLYS (4) PLYS 20 (t) 10d x A. 10d x 31 10d X A. OR 1/2" DIAM. BST 0 16° O.C. 26 (2) 10d x A. i Qd x A. 10d X A. OR 1/2° DIAM.BOLT 0 16' D.C. 2x$ (2) tOd x 31 1 O x A. i0d X A. OR 1/2" DIA. BOLT 0 16" D.G. IN LIEU OF NAILS, MEMBERS MAY BE BOLTED TOGETHER. WITH 1/2' DIAM. THRU-BOLTS AT 16" O.G. VERTICALLY WITH THE SAME NUMBER OF BOLTS PER ROW AS NAILS WOOD HEADER SCHEDULE MAXIMUM CLEAR SPAN FOR LOAD BEARING FRAME WALLS SIZES NOTED ON PLANS TO SUPERCEDE VALUES SHOWN ON THIS SCHEDULE HEADER LOAD HEADER SIZE CONDITION (2)2x6 NJ (2)2x8 NJ (2)2x10 NJ (2)2x12 NJ ROOF ONLY 4'-0' 2 5'-4° 2 6'-8" 2 7'-6" 2 2nd FLOC ONLY 3'-6' 2 4'-5" 2 5-5" 2 6'-3" 2 2nd FLOOR &ROOF 3'-0' 2 4'-8" 2 5 -5" 3 ON "NJ" =MINIMUM NUMBER OF JACK STUDS REQ'D. AT EA. END UNLESS OTHERWISE NOTED THE PLAN ALL STRUCTURAL HEADERS TO BE #2 4R BETTER S.Y.P. ALL NON-STRUCTURAL HEADERS HEM -FIR OR S -P -F OR BETTER CONSTRUCTION NOTES L .APPLICABLE CODES: - FLOR IDA BUILDING CODE 2410 -RESIDENTIAL=Jz E-= - NATIONAL ELECTRICAL CODE REQUIREMENTS FOR ONE AND TWO FAMILY DWELINGS, NFPA 70A; 2007. - FLORIDA FIRE PREVENTION CODE - F.F.P.C. 2010 2. SUBCONTRACTORS SHALL VERIFY ALL DIMENSIONS IN THE FIELD AND NOTiFY THE BUILDER/ARCHITECT OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH CONSTRUCTION. 3. ALL CONSTRUCTION SHALL BE BRACED AND SHORED BY CONTRACTOR AS REQUIRED TO SAFELY PERFORM THE WORK. TERMITE PROTECTION 1. TERMITE PRETREATMENT SHALL MAKE USE OF BORA-CARE TERMIIICIDE. THE BORA-CARE TERMITIODE TREATMENT IS REGISTERED BY THE FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES AS REQUIERED BY THE FLORIDA BUILDING CODE 2010 - RESIDENTIAL 2. UPON COMPLETION OF THE APPLICATION OF THE TERMITE PROTECTIVE TREATMENT, A CERTIFICATE OF COMPLIANCE SHALL BE ISSUED BY A LICENSED PEST CONTROL COMPANY BEFORE A CERTIFICATE OF OCCUPANCY MAY BE ISSUED. THE CERTIFICATE OF COMPLIANCE SHALL STATE: 'THE BUILDING HAS RECEIVED A COMPLETE TREATMENT FOR THE PREVENTION OF SUBTERRANEAN TERMITES. THE TREATMENT IS IN ACCORDANCE WITH THE RULES AND LAWS ESTABLISHED BY THE FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES'. FOUNDATION NOTES 1. FOUNDATION IS DEIGNED BASED ON PRESUMPTIVE SAFE ALLOWABLE BEARING PRESSURE OF 2000 PSF. CONTRACTOR MALL VERIFY THAT THE MINIMUM BEARING PRESSURE OF 2000 PSF IS OBTAINED PRIOR TO FOOTING PLACEMENT. 2. FOOTING MALL BE PLACED ON COMPACTED SOIL FREE OF ORGANIC DEBRIS. 3. AS REQUIRED BY THE LOCAL MUNiCAPILITY BUILDING DEPARTMENT, A FOUNDATION SURVEY SHALL BE PERFORMED AND A COPY OF THE SURVEY SHALL ON THE SITE FOR 1TiE BUILDING INSPECTOR'S USE, OR ALL PROPERTY MARKERS SHALL BE EXPOSED AND A STRING STRETCHED FROM MARKER TO MARKER TO VERIFY REQUIRED SETBACKS. CONCRETE NOTES 1. CONCRETE STRENGTH SHALL BE 2500 PSI AT 28 DAYS AND IN ACCORDANCE WITH A.C.I. 318-11. 2. REINFORCING STEEL SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF ASTM A615 GRAFE 44. 3. WELDED WIRE FABRIC SHALL BE IN ACCORDANCE 4NTH THE LATEST EDITION OF ASTM A185. CONCRETE MASONRY NOTES 1. CONCRETE MASONRY WORK SHALL BE IN ACCORDANCE NTH A.C.I. 530/ASCE 5/TMS 402. 2. CONCRETE MASONRY .UNITS SHALL BE 1N CONFORMANCE WITH ASTM C90, GRADE N, TYPE II ASTM C140 AND SHALL HAVE A COMPRESSIVE STRENGTH OF 2000 PSI MINIMUM BASED ON THE NET GROSS SECTIONAL AREA. 3. COARSE GROUT SHALL BE IN CONFORMANCE WITH ASTM C476. 4. MORTAR SHALL BE TYPE "M" OR "S' IN ACCORDANCE WITH ASTM C270. 5. ALL MASONRRY UNITS SHALL BE LAID IN RUNNING BOND U.N.O. 6. PROVIDE 8" PRECAST CONCRETE LINTELS ABOVE ALL MASONARY OPNGS. ALL LINTEL FOR OPNGS. OVER 5-6" SHALL BE GROUTED SOLID W/ 8" STANDARD BRC. EA. END U.N.O. (4' MIN. BEARING REQ'D.) PRE-ENGINEERED: WOOD TRUSSES L ALL TRUSSES SHALL BE IN ACCORDANCE WITH THE LATEST EDITIONS OF THE "NATIONAL DESIGN SP€CIFICATONS FOR STRESS -MADE LUMBER AND ITS FASTENERS" AS RECOMMENDED BY THE NATIONAL FOREST PRODUCTS ASSOCIATION. 2. THE TRUSS MANUF. SHALL VERIFY ALL TRUSS SPANS, SLOPES, BEARING POINTS, AND DIMENSIONS BEFORE FABRICATION. ANY DEVATIONS OR DISCREPANCIES FROM THE PLANS TO BE BROUGHT TO THE AT1>=NTiON OF THE BUILDER/ARCHITECT/ENGINEER PRIOR TO PROCEEDING. TRUSS MANUF. TO SUPPLY ALL TRUSS TO TRUSS HANGERS AND CONNECTIONS. 3. TRUSS MANUF. TO PROVIDE SHOP DRAiNNGS ON NEW AND/OR REVISED MODEL PLANS TO BUILDER FOR REVIEW BEFORE FABRICATION. TRUSS SHOP DRAWINGS SHALL SHOW ALL TRUSS PROFILES, GRAVITY/UPLIFT LOADS, BRACING MEMBERS, AND TRUSS TO TRUSS HANGERS. 4. ALL PREFAB. WOOD TRUSSES SHALL BE SECURELY FASTENED TO THEIR SUPPORTING WALLS OR BEAMS AS REQUIRED PER THE FRAMING PLANS. 5. PRE-ENGINEERED WOOD TRUSSES, RAFTERS, AND OTHER ROOF FRAMING MEMBERS SHALL BE SPACED AT 24' O.C. MAXIMUM. 6. RIDGE AND VALLEY SE( MEMBERS SHALL BE A NOMINAL DIMENSION OF 2" LARGER THAN RAFTERS. 7. ALL ROOF FRAMING MEMBERS SHALL BE MIN. SYP #2 OR BETTER. WALL &ROOF FRAMING NOTES 1. WOOD CONSTRUCTION SHALL CONFORM TO THE LATEST EDITION OF °NATIONAL DEIGN SPEORGAl10NS FOR WOOD CONSTRUCTi(XV" BY THE NATIONAL FOREST PRODUCT ASSOOAl10N. 2. ROOF AND WALL STRUCTURAL SHEATHING SHALL BE SPAN RATED IN ACCORDANCE WITH APA PS 1-83 OR NER-108. NAILS USED IN ALL SHEATHING APPLICATIONS SHALL BE 8d RING SHANK, HOT DIPPED GALVANIZED, HAivD OR GUN DRIVEN NAILS. GUN DRIVEN NAILS SHALL HAVE HEAD AND SHANK SIZE EQUIVALENT TO HAND DRIVEN NAILS, OTHERWISE SPACING SHALL BE REDUCED FROM 12" TO 10',8' TO 6°, 6° TO 5°, 4° TO 3°, AND 3' TO 2° IN THOSE APPLICATIONS. 3. ALL EXTERIOR FRAMED WALL STUDS SHALL BE AS NOTED ON PLANS AND OR A MINIMUM GRADE OF #2 SYP OR BETTER. INTERIOR WALL STUDS SHALL BE A MINIMUM OF S -P -F #2 OR BETTER. 4. WOOD HEADERS PER SCHEDULE UNLESS NflTID OTHERWISE ON PLANS. ALL HEADER MATERIAL TO BE SOUTHERN YELLOW PINE #2 MIN. PROVIDE STRAPS AS REQ'D. PER DETAILS. 5. PROVIDE A BUILT UP OR SOLID SAWN COLUMN UNDER ALL GIRDERS AND BEAMS IN FRAMED WALLS UNLESS NOTED OTHERWISE 4N PLANS. A MINIMUM OF (2)2x4 STUDS SHALL BE USED. STRAP MEMBER DIRECTLY TO TOP OF COLUMN AND BOTTOM W A MIN. OF SIMPSON SPH4 OR EQUAL AT EACH STUD. PROVIDE BLOCKING TO BEARING WALL BELOW AS REQUIRED. HEAVY HOLD DOWNS MAY BE REQUIRED AT SOME LOCATIONS AS NOTED ON PLANS. 6. END JOINTS IN STRUCTURAL DOUBLE PLATE 91ALL BE OFFSET AT LEAST 4'-0°. STRUCTURAL DOUBLE PLATES TO BE NAILED AT 6" D.C. 7. AT EXTERIOR FRAME WALLS, PROVIDE FULL PANEL OF SHEATHING FROM ALL CORNER EDGES. FULL PANEL MUST BE SAWCUT AROUND ANY OPENINGS. SEE DETAILS FOR NAILING REQUIREMENTS. 8. THE NUMBER AND SIZE OF NhLS CONNECTING WOOD MEMBERS SHALL NOT BE LESS THAN THOSE SPECIFIED IN TABLE 2304.9.1 (FASTENING SCHEDULE) OF THE FLORIDA BUILDING CODE 2010 -RESIDENTIAL- UNLESS NOTED OTHERWISE. 9. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED LUMBER OR SEPARATED FROM CONCRETE W/ FELT PAPER OR METAL PLATES. 14. ALL NAILS AND BOLTS EXPOSED TO WEATHER SHALL BE HOT DIPPED GALVINIZED. UPLIFT CONNECTORS 1. UPLIFT CONNECTORS ARE ONLY REQUIRED ON MEMBERS IN WALLS THAT ARE EXPOSED TO UPLIFT FORCES. INTERIOR LOAD BEARING WALLS ARE NOT ALWAYS EXPOSED TO UPLIFT FORCES. THE MEMBERS OF THESE WALL WOULD NOT NEED TO HAVE CONNECTORS APPLIED. 2. UPLIFT CONNECTORS TO PROVIDE CONTINUITY FROM ROOF TRUSSES THRU PLATES TO SLAB AND FOUNDATION PER PLAN. 3. UPLIFT CONNECTORS AT ROOF TRUSSES SHALL BE BENT OVER TRUSS TOP CHORDS AS REQUIRED AND NAILED PRIOR TO APPLICATION OF ROOF SHEATHING. MISSED STRAPS SHALL BE INSTALLED PER PLAN PRIOR TO SHEATHING INSTALLAIiOJ. 4. THE MAXIMUM NUMBER OF FLAT STRAPS (I.E. "HETA20") IN THE TOP BLOCK WALL COURSE AT ANY GiRDER TRUSS SHALL BE (2) STRAPS WITH 8" CLEAR DIMENSION BEFORE NEXT STRAP(S). 5. ALL SPECIFIED CONNECTORS SHALL BE INSTALLED PER CONNECTOR MANUFACTURERS INSTRUCTIONS. 6. NO CONNECTOR SHALL BE BENT IN THE FIELD UNLESS NOTED AS ACCEPTABLE IN THE CONNECTOR MANUF. PRODUCT CATALOG. 7. WHEN ANCHORING (2) WOOD ITEMS TOGETHER, THE LENGTH OF HURRICANE STRAP MUST BE EQUALLY HALF ON ER. ITEM. 8. INSTALL ALL SPECIFIED FASTENERS AT EACH CONNECTOR. REFER TO CONNECTS SCHEDULE FOR MINIMUM NUMBER OF FASTENERS 9. MAY SUBSTITUTE HURRICANE STRAP WITH STRAP OF GREATER HOLD DOWN VALUE OR GREATER UPLIFT VALUE IN FIELD WITHOUT VERIFICATION, PROVIDED ALL MANUFACTURERS INSTALLATION INSTRUCTIONS OR REQUIREMENTS ARE FOLLOWED. STRUCTURAL CRITERIA 1. APPLICABLE CODE FLORIDA BUILDING CODE 2010 -RESIDENTIAL WIND SPEED - 144 NON -WIND-BORNE DEBRIS REGION; WIND IMPORTANCE FACTOR - (1) ONE; 'ENCLOSED' BUILDING TYPE; EXPOSURE CATEGORY C -SEE ROOF PLAN NOTES. 2. INTERNAL PRESSURE COEFFICIENT: +/- 0.18 MAXIMUM MEAN ROOF HT. = 30 FEET GENERAL NOTES 1. DOORS BETWEEN GARAGE AND LIVING SPA( MALL BE MINIMUM 1 3/8' THICK SOLID CORE WORD ODORS, 1 3/8' SOLID DR HONEYCOMB CORE STEEL DOORS, OR 20 -MINUTE FIRE RATED DOORS. 2. THE GARAGE SHALL BE SEPARATED FROM THE RESIDENCE AND ITS ATTiC AREA BY NOT LESS THAN 1/2" GYPSUM BOARD APPLIED TO THE GARAGE SIDE. GARAGES BENEATH HABITABLE ROOMS SHALL BE SEPARATED FROM ALL HABITABLE ROOMS ABOVE BY NOT LESS THAN 5/8" TYPE X GYPSUM BOARD OR ITS EQUIVALENT 3. DUCTS IN THE GARAGE AND DUCTS PENETRATING THE WALLS OR (FILINGS SEPARATING THE DWELL{N FROM THE GARAGE SHALL BE CONSTRUCTED 4F A MINIMUM N0. 26 GAGE SHEET STEEL OR APPROVED EQUAL 4. ENCLOSED ACCESSIBLE SPACE UNDER STAIRS SHALL HAVE WALLS, UNDER STAIR SURFACE AND ANY SOFFITS PROTECTED ON THE ENCLOSED .SIDE WITH 1/2' GYPSUM BOARD. DOOR SCHEDULE 2068 DOOR DOOR DOOR DOOR WIDTH WIDTH HT, HT. FEET INCHES FEET INCHES NOTES 1. NUMBER OF PANELS, HAND, & SWING AS SHOWN ON PLAN 1 1 1 1 ry ry cn i 1 i 1 LATEST REVISION DATE TO MASTER: 07-01-12 W� U Ali _ W WI 0 0 f z c� o Q - U � tUJ o LV o L..L z O O c� -9C-0 CIS Lu �) U oho CQ LLJ o � � � � = Q w = ~o C-- � J (� O C'7 O LLLU 00 LID - (n CV LL Q � M 1 M L'1"J � LL I LLJ LLJ W 0 C/) Lu z 0 � o W o� J co DO NOT SCALE PRINTS! CONSTRUC114N SHALL BE PER INDICATED DIMENSIONS ONLY, ANY DISCREPENCIES TO BE REPORTED TO M/i HOMES FOR CLARIFI 6' 2x4 P.T. - ATTACH 6" WALL STBK. PER PKT. SGD. MANUF. MAX. W/ 1/4"0" TAPCONS MAX. (1 1/4' MIN. EMBED.) WALL ELEVATION JAMB / HEAD DETAIL FRAME WALL AT POCKET SGD BLOCK OPENING LOCATIONS WHERE POCKET SGD TRACK IS BELOW PRECAST LINTEL BLOCK JAMB/HEAD 2x4 P.T FURRING SCREW" (1M-1/4'RMIN, EMBED) 10d NAILS @ 6' O.C. 2x4 P/T/ @ TOP AND SIDES OF BLK. OPNG. NOTES 1, Values shown are based on allowable stress design using 140 miles per hour, Exposure C, Enclosed condition,lmportance Factor of 1.0. 1 Positive values act toward the surface, negative values act away from the surface. 3. Manufacturing data for components and cladding shall exceed the values shown in this table. 4. Edge pressures noted shall be used for components that are located within eight feet of building edges or corners. All other components shall use typical pressure values. 5. Effectiive Wind Area is defined as the projected surface area for components such as doors and windows. The Effective Wind Area for components such as studs and trusses, and for cladding such as roof and wall sheathing, is defined as the span length multiplied by an effective width need not be less than one-third the span length. a 3 2�2 3 1 QINALKa 2 1 22 1 2 2 HIP ROOF 7 < 8 <=== 27 DESIGN WIND LOAD PRESSURE (PSF) -EXPOSURE "C" LOCATION ZONE COMPONENT EFFECTIVE AREA 1fl 45 2D 30 4Q 50 b0 70 $0 9fl 100 ROOF ] .159 ar -269 +16.1 a: -25.4 +1&0 or -26.1 +16.0 or -25.] +26.0 or -25.4 +16.0 or -25.1 +26.0 or -249 +16A or -24.8 +16.0 ar -24.6 160-24.5 +16.0 or -24A ROOF 2 +16.9 or -46.7 +16.1 or -44.6 +16.0 or +15.0 or -40.8 x16.0 ar-39.2 +16.0 or -381 +26.0 or -371 +16.0 ar-35.3 +16,0 o, -35-5 +16.0 or -34.9 +16.0-343 ROOF 3 +269 or -69.1 +i6.1 or -66.5 +1E.0 or -64.6 +16.0 or -62.0 +15.0 ar -60.1 +16.0 or -58.7 +16.0-575 +16.0 cr -56.5 +16.0 nr 55.7 +36-0 or -549 +16.0 or -54.2 WALL 4 +29A or -31.8 +28.6 or -31.1 +28.0 or -30.5 +27.3 or -29.7 +26,7 or -29.2 +25.3 or -28.8 +25.9 ar-28.4 +25.5 or -28.1 +25.4 or -27,9 +25.2 or -27-7 +25Aar-27.5 WALL 5 +29.G or -39.3 +28,6 or -37.6 +2&0 ar -36.7 +27.3 or -36.1 +26.7 ar -34.0 +26.3 or -33.2 +25.9 or -325 +-25.6 or -33.9 +25.4 or -31.4 +25.2 or --30.9 +25.0 or -30.5 9'xT GARAGE DOOR +25-Gor-z8.3 16'xT GARAGE DOOR +24.G or -265 2 - 2x4 OR DBL 1x4 BUCK - CONNECT SECTION EA. TO BLOCK W/ 3/16"x3' TAPCON (t A -A 1/4' MiN. EMBEDMENT INTO BLK.) BLOCK HEADER SOLID BLKG. AT TOP BTWN. 4'- 1'-4' ARCH BLKG. &BUCK MAX. 2x4 45d DIAGONAL BRACE(S) "x3' TAPCOJS AV <- 2x4 45d DIAGONAL BUILT UP PLWD. OR / " BRACE AT EA. FACE MASONITE BUCK -SCRIBE ARCH PANEL 4 t0d NAILS INTO EA. BACKSIDE TO FiT ARCH= () OF ARCH W� �2�10d CONNECT W/ $d NAILS 2z4 BRACE/BLKG. NAILS AT € . D INSTALL NOW. SCREW ANCHOR 2x4 SOLID BLKG. (FULL WIDTH � WALL) PROVIDE TAPCON INTO ARCH BLKG. PER BTWN. OSB ARCH FACES W/ (2)10d NAILS 4N1HIN 4' MIN. OF INSTALLATION DETAILS THRU OSB INTO EA. 2x4 BRACE _ _START OF ARCH _ SECTION A -A PROVIDE TAPCON PER WOW. INSTALLATION 4' MAX. RAD. DETAILS OR THRU 11 j2" THK. OR MORE BUCK WITHIN 8° MIN. OF START OF ARCH FRAME ARCH TOP DETAIL BLOCK OPNG. SHOWN FRAME OPNG. SIMILAR (NO BUCK REQ'D. WHEN NO PLYWD. JOINT AT JAMBS) 2 - 2z4 OR DBL. 1x4 BUCK - SECTION CONNECT EA. TO BLOCK W/ 3/16"0" B -B BLOCK HEADER TAPCON (1 1/4' MIN. EMBEDMENT INTO PROVIDE 2x4 DIAL. BRACE SOLID BLKG. AT TOP 8d NAILS AT 8" O.C. AT BUCK 3/16 BTWN. BTWN. VERT. BRACES WHEN HT ARCH BLKG, & BUCK OF BRACE EXCEEDS 24' MAX. PROVIDE 2) MIN. TAPCON r�T EA. SIDE 24 VERT. 8d NAILS AT 8' O.C. BUCK- (1) WITHIN 4" BRACE(S) AT BUCK MIN. OF START OF ARCH BUILT UP PLWD. OR 7/16' OSB MASONITE BUCK -SCRIBE ARCH PANEL START OF ARCH_ BACKSIDE TO FIT ARCH- EQ. EQ. - - - 4' MAX. RAD. CONNECT W/ 8d NAILS 20 VERT. AT EA. FACE OF ARCH INSTALL WDW. SCREW ANCHOR W/ (3)IOd NAILS AT EA, END INTO ARCH BLKG. PER 2x4 SOLID BLKG. (FULL WIDTH OF WALL) INSTALLATION DETAILS BTWN. OSB ARCH FACES W/ (2)104 NAILS SECTION B -B THRU OSB INTO EA. 20 FRAME ELLIPSE ARCH TOP DETAIL BLOCK OPNG. SHOWN FRAME OPNG. SIMILAR (NO BUCK REQ'D. WHEN NO PLYWD. JOINT AT JAMBS) �.` ° B °• P •v O e 4 GROUT BLOCK SOLID AS SHOWN -EXTEND GROUT CONTINUOUS TO THE NEAREST REINFORCED CELLS BEYOND THE LOCATION OF THE MAXIMUM 2" BLOCK OVERHANG (FILL TO BOTTOM OF WI NDOW ALL AT LOCATIONS WHERE SILL IS LESS THAN 2'-0" ABOVE TOP OF SLAB) 2' MAX. OVERHANGING BLOCK REPAIR DETAIL MAXIMUM WALL HT 1140 MPH / EXP C 1 RISK GAT. fl SIZE/SPECIES SPACING MAXIMUM HEIGHT 2x4 SPF 16° OC 8'4 2x4 SPF 12' OC 9'-0° 2x4 SPF 16' OC 9'-4" 2x4 SPF 12" OC 10'-0" 2x6 SPF 16° OC 12'-4" 26 SPF 12° OC 13'-0" 20 SPF 16" OC 14'-0" 26 SPF 12' OC 15-0" NOTE: HEIGHTS SHOWN IN THIS TABLE ARE BASED ON STUDS BEING ATTACHED TO 1/2 MINIMUM OSB SHEATHING iMTH 8d MIN NAILS ®12° OC INTERMEDIATE SUPPORTS AND 6" OC AT PERIMETER AND 4" OC 0 CORNER STUDS. SHEATHING TO BE CONTINUOUS OVER 3 OR MORE STUDS. TAPCON INSTALLATION ANCHOR CHART FOR BLOCK OPNGS. W/ BUCKS. 1 1/2" THICK OR GREATER WIDTH WIDTH WIDTH WIDTH D FEF D D E D D E D 24" 0. C. 8" MAX. MAX. A 8„ A 8" A � - C MAX. C MAX. C B B J B _� = C WOW. C WOW. � WOW. C SGD OR OPNG. OPNG. OPNG. A A A � � ¢ EXT. DOOR SILL /MULL SILL /MULL OPNG. SINGLE WOW, OR MULTIPLE SIDE STACKED WOW. BY SIDE WOWS. W/ MULL BTWN. ® Wl MULL BTWN. ® � Q WOW. OPNG. LOCATIONS WDW. OPNG. LOCATIONS � HEIGHT IN HEAD �1 WIDTH IN HEAD (D UP TO 40" A UP TO 40" D EXTERIOR DOOR 40.01" TO 60" A , B 40 .01" TO 60" D , E OPENINGS 60.01" TO 80" A , C 60.01" TO 80" D , F 80.01" TO 100" A , B , C 80.01" TO 100" D , E , F 1. LOCATIONS PER INDIVIDUAL WOW. OPNG DiMENSfON NOT MULLED WOW. OPNG. DIMENSION 2. MAXIMUM ALLOWABLE SPACING BTWN. TAPCON ANCHORS TO BE 24" O.C. 2x HDR. PLATE OR EXTERIOR WD. HDR. SHEATHING 2 LAYERS OF 7/16" O.S.B. OR (i) LAYER OF 3/4' PLYWD. CONNECT W/ {2)8d NAILS AT 16" O.C. BUILT UP WOOD HDR. OR 2x HDR. PLATE EXTERIOR SHEATHING 2x CRIPPLE STUDS AT 16" O.C. BTWN. SILL PLATE & BOT. PLATE OR HDR. & HDR. PLATE 2x HDR. OR SILL PLATE OR HDR. JACK ATTACH WDW./[l0(Xi PER MANUF. SPECIIFFICRTIONS SILL 1 JAMB 1 HEAD FRAME WALL OPNG. WDW./DOOR DETAILS TAPCON PER 1 3/4" SCHEDULE MIN. � X M � EXT. FACE (2)1Dd x 1 1/2" AT 24" OF BLOCK O.C. FOR BUCK BUILT UP TO 2 1/2" THICK PROVIDE 2x P.T. AGAINST OR BLOCK FOR BUILT UP BUCKS (2)8d z 2 1/2" AT 24° 2" THICK OR MORE O.C. FOR BUCK BUILT UP BUILT UP BUCK DETAIL 21/2" THIO( OR MORE THICKNESS 11/2" OR GREATER PRECAST CONC. MIN. 2 1/2" WIDE BUCK - LINTEL ABV. OPNG. .MAXIMUM 2 3/4" BUILT UP OR CMU JAMB THICKNESS - CONNECT W/ CAULK BTWN. 3/16" DIA. TAPCONS. BUCK /BLOCK TAPCON LENGTH MUST BE SUFFICIENT TO ACHIEVE MIN. CEMENT FINISH � 1 1/4" EMBEDMENT INTO ODER BLOCK BLOCK JAMB /HERD INSTALL WOW./DOOR SCREW DRYWALL ANCHOR INTO BUCK PER INSTALLATION DETAILS HEAD/JAMB FOR BUCK THICKNESS 1112" OR GREATER INSTALL WDW./DOOR TAPCON PRECAST CONC. ANCHOR INTO BLOCK PER LINTEL ABV. OPNG. INSTALLATION DETAILS OR CMU JAMB CAULK BTWN. MIN. 2 1/2' WIDE BUCK - MAXIMUM BUILT UP BUCK % BLK THICKNESS MUST BE LESS THAN 1 1/2' CONNECT W/ CEMENT FINISH SPIRAL NAILS AT 16" O.G. OVER BLOCK DRYWALL HEAD/JAMB FOR BUCK THICKNESS LESS THAN 11121" CEMENT FINISH ATTACH WDW./DOOR PER OVER BLOCK MANUF. SPEOFlCR110NS PRECAST CONC. SILL � I SILL ' BLOCK WALL OPNG, WDW./DOOR BUCK DETAILS ALL EXTERIOR WINDOWS AND DOORS SHALL HAVE MEET PRESSURES IN CHART- EXPOSURE "C" FASTENER SCHEDULE FOR BUILT UP STUD COLUMNS VERTICAL SPACING OF FASTENERS AT 8' O.C. STAGGERED UNLESS OTHERWISE NOTED. THIRD AND FOURTH PLIES SHALL BE ADDED TO EITHER SIDE OF 2 -PLY COMPOSITE POST. MINIMUM END DISTANCE SHALL BE 2 1/2' AND MINIMUM EDGE DISTANCE SHALL BE t". STUD # OF NAILS NUMBER OF PLYS SIZE PER RDW (2) PLYS (3) PLYS (4) PLYS 20 (t) 10d x A. 10d x 31 10d X A. OR 1/2" DIAM. BST 0 16° O.C. 26 (2) 10d x A. i Qd x A. 10d X A. OR 1/2° DIAM.BOLT 0 16' D.C. 2x$ (2) tOd x 31 1 O x A. i0d X A. OR 1/2" DIA. BOLT 0 16" D.G. IN LIEU OF NAILS, MEMBERS MAY BE BOLTED TOGETHER. WITH 1/2' DIAM. THRU-BOLTS AT 16" O.G. VERTICALLY WITH THE SAME NUMBER OF BOLTS PER ROW AS NAILS WOOD HEADER SCHEDULE MAXIMUM CLEAR SPAN FOR LOAD BEARING FRAME WALLS SIZES NOTED ON PLANS TO SUPERCEDE VALUES SHOWN ON THIS SCHEDULE HEADER LOAD HEADER SIZE CONDITION (2)2x6 NJ (2)2x8 NJ (2)2x10 NJ (2)2x12 NJ ROOF ONLY 4'-0' 2 5'-4° 2 6'-8" 2 7'-6" 2 2nd FLOC ONLY 3'-6' 2 4'-5" 2 5-5" 2 6'-3" 2 2nd FLOOR &ROOF 3'-0' 2 4'-8" 2 5 -5" 3 ON "NJ" =MINIMUM NUMBER OF JACK STUDS REQ'D. AT EA. END UNLESS OTHERWISE NOTED THE PLAN ALL STRUCTURAL HEADERS TO BE #2 4R BETTER S.Y.P. ALL NON-STRUCTURAL HEADERS HEM -FIR OR S -P -F OR BETTER CONSTRUCTION NOTES L .APPLICABLE CODES: - FLOR IDA BUILDING CODE 2410 -RESIDENTIAL=Jz E-= - NATIONAL ELECTRICAL CODE REQUIREMENTS FOR ONE AND TWO FAMILY DWELINGS, NFPA 70A; 2007. - FLORIDA FIRE PREVENTION CODE - F.F.P.C. 2010 2. SUBCONTRACTORS SHALL VERIFY ALL DIMENSIONS IN THE FIELD AND NOTiFY THE BUILDER/ARCHITECT OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH CONSTRUCTION. 3. ALL CONSTRUCTION SHALL BE BRACED AND SHORED BY CONTRACTOR AS REQUIRED TO SAFELY PERFORM THE WORK. TERMITE PROTECTION 1. TERMITE PRETREATMENT SHALL MAKE USE OF BORA-CARE TERMIIICIDE. THE BORA-CARE TERMITIODE TREATMENT IS REGISTERED BY THE FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES AS REQUIERED BY THE FLORIDA BUILDING CODE 2010 - RESIDENTIAL 2. UPON COMPLETION OF THE APPLICATION OF THE TERMITE PROTECTIVE TREATMENT, A CERTIFICATE OF COMPLIANCE SHALL BE ISSUED BY A LICENSED PEST CONTROL COMPANY BEFORE A CERTIFICATE OF OCCUPANCY MAY BE ISSUED. THE CERTIFICATE OF COMPLIANCE SHALL STATE: 'THE BUILDING HAS RECEIVED A COMPLETE TREATMENT FOR THE PREVENTION OF SUBTERRANEAN TERMITES. THE TREATMENT IS IN ACCORDANCE WITH THE RULES AND LAWS ESTABLISHED BY THE FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES'. FOUNDATION NOTES 1. FOUNDATION IS DEIGNED BASED ON PRESUMPTIVE SAFE ALLOWABLE BEARING PRESSURE OF 2000 PSF. CONTRACTOR MALL VERIFY THAT THE MINIMUM BEARING PRESSURE OF 2000 PSF IS OBTAINED PRIOR TO FOOTING PLACEMENT. 2. FOOTING MALL BE PLACED ON COMPACTED SOIL FREE OF ORGANIC DEBRIS. 3. AS REQUIRED BY THE LOCAL MUNiCAPILITY BUILDING DEPARTMENT, A FOUNDATION SURVEY SHALL BE PERFORMED AND A COPY OF THE SURVEY SHALL ON THE SITE FOR 1TiE BUILDING INSPECTOR'S USE, OR ALL PROPERTY MARKERS SHALL BE EXPOSED AND A STRING STRETCHED FROM MARKER TO MARKER TO VERIFY REQUIRED SETBACKS. CONCRETE NOTES 1. CONCRETE STRENGTH SHALL BE 2500 PSI AT 28 DAYS AND IN ACCORDANCE WITH A.C.I. 318-11. 2. REINFORCING STEEL SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF ASTM A615 GRAFE 44. 3. WELDED WIRE FABRIC SHALL BE IN ACCORDANCE 4NTH THE LATEST EDITION OF ASTM A185. CONCRETE MASONRY NOTES 1. CONCRETE MASONRY WORK SHALL BE IN ACCORDANCE NTH A.C.I. 530/ASCE 5/TMS 402. 2. CONCRETE MASONRY .UNITS SHALL BE 1N CONFORMANCE WITH ASTM C90, GRADE N, TYPE II ASTM C140 AND SHALL HAVE A COMPRESSIVE STRENGTH OF 2000 PSI MINIMUM BASED ON THE NET GROSS SECTIONAL AREA. 3. COARSE GROUT SHALL BE IN CONFORMANCE WITH ASTM C476. 4. MORTAR SHALL BE TYPE "M" OR "S' IN ACCORDANCE WITH ASTM C270. 5. ALL MASONRRY UNITS SHALL BE LAID IN RUNNING BOND U.N.O. 6. PROVIDE 8" PRECAST CONCRETE LINTELS ABOVE ALL MASONARY OPNGS. ALL LINTEL FOR OPNGS. OVER 5-6" SHALL BE GROUTED SOLID W/ 8" STANDARD BRC. EA. END U.N.O. (4' MIN. BEARING REQ'D.) PRE-ENGINEERED: WOOD TRUSSES L ALL TRUSSES SHALL BE IN ACCORDANCE WITH THE LATEST EDITIONS OF THE "NATIONAL DESIGN SP€CIFICATONS FOR STRESS -MADE LUMBER AND ITS FASTENERS" AS RECOMMENDED BY THE NATIONAL FOREST PRODUCTS ASSOCIATION. 2. THE TRUSS MANUF. SHALL VERIFY ALL TRUSS SPANS, SLOPES, BEARING POINTS, AND DIMENSIONS BEFORE FABRICATION. ANY DEVATIONS OR DISCREPANCIES FROM THE PLANS TO BE BROUGHT TO THE AT1>=NTiON OF THE BUILDER/ARCHITECT/ENGINEER PRIOR TO PROCEEDING. TRUSS MANUF. TO SUPPLY ALL TRUSS TO TRUSS HANGERS AND CONNECTIONS. 3. TRUSS MANUF. TO PROVIDE SHOP DRAiNNGS ON NEW AND/OR REVISED MODEL PLANS TO BUILDER FOR REVIEW BEFORE FABRICATION. TRUSS SHOP DRAWINGS SHALL SHOW ALL TRUSS PROFILES, GRAVITY/UPLIFT LOADS, BRACING MEMBERS, AND TRUSS TO TRUSS HANGERS. 4. ALL PREFAB. WOOD TRUSSES SHALL BE SECURELY FASTENED TO THEIR SUPPORTING WALLS OR BEAMS AS REQUIRED PER THE FRAMING PLANS. 5. PRE-ENGINEERED WOOD TRUSSES, RAFTERS, AND OTHER ROOF FRAMING MEMBERS SHALL BE SPACED AT 24' O.C. MAXIMUM. 6. RIDGE AND VALLEY SE( MEMBERS SHALL BE A NOMINAL DIMENSION OF 2" LARGER THAN RAFTERS. 7. ALL ROOF FRAMING MEMBERS SHALL BE MIN. SYP #2 OR BETTER. WALL &ROOF FRAMING NOTES 1. WOOD CONSTRUCTION SHALL CONFORM TO THE LATEST EDITION OF °NATIONAL DEIGN SPEORGAl10NS FOR WOOD CONSTRUCTi(XV" BY THE NATIONAL FOREST PRODUCT ASSOOAl10N. 2. ROOF AND WALL STRUCTURAL SHEATHING SHALL BE SPAN RATED IN ACCORDANCE WITH APA PS 1-83 OR NER-108. NAILS USED IN ALL SHEATHING APPLICATIONS SHALL BE 8d RING SHANK, HOT DIPPED GALVANIZED, HAivD OR GUN DRIVEN NAILS. GUN DRIVEN NAILS SHALL HAVE HEAD AND SHANK SIZE EQUIVALENT TO HAND DRIVEN NAILS, OTHERWISE SPACING SHALL BE REDUCED FROM 12" TO 10',8' TO 6°, 6° TO 5°, 4° TO 3°, AND 3' TO 2° IN THOSE APPLICATIONS. 3. ALL EXTERIOR FRAMED WALL STUDS SHALL BE AS NOTED ON PLANS AND OR A MINIMUM GRADE OF #2 SYP OR BETTER. INTERIOR WALL STUDS SHALL BE A MINIMUM OF S -P -F #2 OR BETTER. 4. WOOD HEADERS PER SCHEDULE UNLESS NflTID OTHERWISE ON PLANS. ALL HEADER MATERIAL TO BE SOUTHERN YELLOW PINE #2 MIN. PROVIDE STRAPS AS REQ'D. PER DETAILS. 5. PROVIDE A BUILT UP OR SOLID SAWN COLUMN UNDER ALL GIRDERS AND BEAMS IN FRAMED WALLS UNLESS NOTED OTHERWISE 4N PLANS. A MINIMUM OF (2)2x4 STUDS SHALL BE USED. STRAP MEMBER DIRECTLY TO TOP OF COLUMN AND BOTTOM W A MIN. OF SIMPSON SPH4 OR EQUAL AT EACH STUD. PROVIDE BLOCKING TO BEARING WALL BELOW AS REQUIRED. HEAVY HOLD DOWNS MAY BE REQUIRED AT SOME LOCATIONS AS NOTED ON PLANS. 6. END JOINTS IN STRUCTURAL DOUBLE PLATE 91ALL BE OFFSET AT LEAST 4'-0°. STRUCTURAL DOUBLE PLATES TO BE NAILED AT 6" D.C. 7. AT EXTERIOR FRAME WALLS, PROVIDE FULL PANEL OF SHEATHING FROM ALL CORNER EDGES. FULL PANEL MUST BE SAWCUT AROUND ANY OPENINGS. SEE DETAILS FOR NAILING REQUIREMENTS. 8. THE NUMBER AND SIZE OF NhLS CONNECTING WOOD MEMBERS SHALL NOT BE LESS THAN THOSE SPECIFIED IN TABLE 2304.9.1 (FASTENING SCHEDULE) OF THE FLORIDA BUILDING CODE 2010 -RESIDENTIAL- UNLESS NOTED OTHERWISE. 9. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED LUMBER OR SEPARATED FROM CONCRETE W/ FELT PAPER OR METAL PLATES. 14. ALL NAILS AND BOLTS EXPOSED TO WEATHER SHALL BE HOT DIPPED GALVINIZED. UPLIFT CONNECTORS 1. UPLIFT CONNECTORS ARE ONLY REQUIRED ON MEMBERS IN WALLS THAT ARE EXPOSED TO UPLIFT FORCES. INTERIOR LOAD BEARING WALLS ARE NOT ALWAYS EXPOSED TO UPLIFT FORCES. THE MEMBERS OF THESE WALL WOULD NOT NEED TO HAVE CONNECTORS APPLIED. 2. UPLIFT CONNECTORS TO PROVIDE CONTINUITY FROM ROOF TRUSSES THRU PLATES TO SLAB AND FOUNDATION PER PLAN. 3. UPLIFT CONNECTORS AT ROOF TRUSSES SHALL BE BENT OVER TRUSS TOP CHORDS AS REQUIRED AND NAILED PRIOR TO APPLICATION OF ROOF SHEATHING. MISSED STRAPS SHALL BE INSTALLED PER PLAN PRIOR TO SHEATHING INSTALLAIiOJ. 4. THE MAXIMUM NUMBER OF FLAT STRAPS (I.E. "HETA20") IN THE TOP BLOCK WALL COURSE AT ANY GiRDER TRUSS SHALL BE (2) STRAPS WITH 8" CLEAR DIMENSION BEFORE NEXT STRAP(S). 5. ALL SPECIFIED CONNECTORS SHALL BE INSTALLED PER CONNECTOR MANUFACTURERS INSTRUCTIONS. 6. NO CONNECTOR SHALL BE BENT IN THE FIELD UNLESS NOTED AS ACCEPTABLE IN THE CONNECTOR MANUF. PRODUCT CATALOG. 7. WHEN ANCHORING (2) WOOD ITEMS TOGETHER, THE LENGTH OF HURRICANE STRAP MUST BE EQUALLY HALF ON ER. ITEM. 8. INSTALL ALL SPECIFIED FASTENERS AT EACH CONNECTOR. REFER TO CONNECTS SCHEDULE FOR MINIMUM NUMBER OF FASTENERS 9. MAY SUBSTITUTE HURRICANE STRAP WITH STRAP OF GREATER HOLD DOWN VALUE OR GREATER UPLIFT VALUE IN FIELD WITHOUT VERIFICATION, PROVIDED ALL MANUFACTURERS INSTALLATION INSTRUCTIONS OR REQUIREMENTS ARE FOLLOWED. STRUCTURAL CRITERIA 1. APPLICABLE CODE FLORIDA BUILDING CODE 2010 -RESIDENTIAL WIND SPEED - 144 NON -WIND-BORNE DEBRIS REGION; WIND IMPORTANCE FACTOR - (1) ONE; 'ENCLOSED' BUILDING TYPE; EXPOSURE CATEGORY C -SEE ROOF PLAN NOTES. 2. INTERNAL PRESSURE COEFFICIENT: +/- 0.18 MAXIMUM MEAN ROOF HT. = 30 FEET GENERAL NOTES 1. DOORS BETWEEN GARAGE AND LIVING SPA( MALL BE MINIMUM 1 3/8' THICK SOLID CORE WORD ODORS, 1 3/8' SOLID DR HONEYCOMB CORE STEEL DOORS, OR 20 -MINUTE FIRE RATED DOORS. 2. THE GARAGE SHALL BE SEPARATED FROM THE RESIDENCE AND ITS ATTiC AREA BY NOT LESS THAN 1/2" GYPSUM BOARD APPLIED TO THE GARAGE SIDE. GARAGES BENEATH HABITABLE ROOMS SHALL BE SEPARATED FROM ALL HABITABLE ROOMS ABOVE BY NOT LESS THAN 5/8" TYPE X GYPSUM BOARD OR ITS EQUIVALENT 3. DUCTS IN THE GARAGE AND DUCTS PENETRATING THE WALLS OR (FILINGS SEPARATING THE DWELL{N FROM THE GARAGE SHALL BE CONSTRUCTED 4F A MINIMUM N0. 26 GAGE SHEET STEEL OR APPROVED EQUAL 4. ENCLOSED ACCESSIBLE SPACE UNDER STAIRS SHALL HAVE WALLS, UNDER STAIR SURFACE AND ANY SOFFITS PROTECTED ON THE ENCLOSED .SIDE WITH 1/2' GYPSUM BOARD. DOOR SCHEDULE 2068 DOOR DOOR DOOR DOOR WIDTH WIDTH HT, HT. FEET INCHES FEET INCHES NOTES 1. NUMBER OF PANELS, HAND, & SWING AS SHOWN ON PLAN 1 1 1 1 ry ry cn i 1 i 1 LATEST REVISION DATE TO MASTER: 07-01-12 W� U Ali _ W WI 0 0 f z c� o Q - U � tUJ o LV o L..L z O O c� -9C-0 CIS Lu �) U oho CQ LLJ o � � � � = Q w = ~o C-- � J (� O C'7 O LLLU 00 LID - (n CV LL Q � M 1 M L'1"J � LL I LLJ LLJ W 0 C/) Lu z 0 � o W o� J co DO NOT SCALE PRINTS! CONSTRUC114N SHALL BE PER INDICATED DIMENSIONS ONLY, ANY DISCREPENCIES TO BE REPORTED TO M/i HOMES FOR CLARIFI CATION! D1 M!i ORLANDO -36.1 +26.7 ar -34.0 +26.3 or -33.2 +25.9 or -325 +-25.6 or -33.9 +25.4 or -31.4 +25.2 or --30.9 +25.0 or -30.5 9'xT GARAGE DOOR +25-Gor-z8.3 16'xT GARAGE DOOR +24.G or -265 2 - 2x4 OR DBL 1x4 BUCK - CONNECT SECTION EA. TO BLOCK W/ 3/16"x3' TAPCON (t A -A 1/4' MiN. EMBEDMENT INTO BLK.) BLOCK HEADER SOLID BLKG. AT TOP BTWN. 4'- 1'-4' ARCH BLKG. &BUCK MAX. 2x4 45d DIAGONAL BRACE(S) "x3' TAPCOJS AV <- 2x4 45d DIAGONAL BUILT UP PLWD. OR / " BRACE AT EA. FACE MASONITE BUCK -SCRIBE ARCH PANEL 4 t0d NAILS INTO EA. BACKSIDE TO FiT ARCH= () OF ARCH W� �2�10d CONNECT W/ $d NAILS 2z4 BRACE/BLKG. NAILS AT € . D INSTALL NOW. SCREW ANCHOR 2x4 SOLID BLKG. (FULL WIDTH � WALL) PROVIDE TAPCON INTO ARCH BLKG. PER BTWN. OSB ARCH FACES W/ (2)10d NAILS 4N1HIN 4' MIN. OF INSTALLATION DETAILS THRU OSB INTO EA. 2x4 BRACE _ _START OF ARCH _ SECTION A -A PROVIDE TAPCON PER WOW. INSTALLATION 4' MAX. RAD. DETAILS OR THRU 11 j2" THK. OR MORE BUCK WITHIN 8° MIN. OF START OF ARCH FRAME ARCH TOP DETAIL BLOCK OPNG. SHOWN FRAME OPNG. SIMILAR (NO BUCK REQ'D. WHEN NO PLYWD. JOINT AT JAMBS) 2 - 2z4 OR DBL. 1x4 BUCK - SECTION CONNECT EA. TO BLOCK W/ 3/16"0" B -B BLOCK HEADER TAPCON (1 1/4' MIN. EMBEDMENT INTO PROVIDE 2x4 DIAL. BRACE SOLID BLKG. AT TOP 8d NAILS AT 8" O.C. AT BUCK 3/16 BTWN. BTWN. VERT. BRACES WHEN HT ARCH BLKG, & BUCK OF BRACE EXCEEDS 24' MAX. PROVIDE 2) MIN. TAPCON r�T EA. SIDE 24 VERT. 8d NAILS AT 8' O.C. BUCK- (1) WITHIN 4" BRACE(S) AT BUCK MIN. OF START OF ARCH BUILT UP PLWD. OR 7/16' OSB MASONITE BUCK -SCRIBE ARCH PANEL START OF ARCH_ BACKSIDE TO FIT ARCH- EQ. EQ. - - - 4' MAX. RAD. CONNECT W/ 8d NAILS 20 VERT. AT EA. FACE OF ARCH INSTALL WDW. SCREW ANCHOR W/ (3)IOd NAILS AT EA, END INTO ARCH BLKG. PER 2x4 SOLID BLKG. (FULL WIDTH OF WALL) INSTALLATION DETAILS BTWN. OSB ARCH FACES W/ (2)104 NAILS SECTION B -B THRU OSB INTO EA. 20 FRAME ELLIPSE ARCH TOP DETAIL BLOCK OPNG. SHOWN FRAME OPNG. SIMILAR (NO BUCK REQ'D. WHEN NO PLYWD. JOINT AT JAMBS) �.` ° B °• P •v O e 4 GROUT BLOCK SOLID AS SHOWN -EXTEND GROUT CONTINUOUS TO THE NEAREST REINFORCED CELLS BEYOND THE LOCATION OF THE MAXIMUM 2" BLOCK OVERHANG (FILL TO BOTTOM OF WI NDOW ALL AT LOCATIONS WHERE SILL IS LESS THAN 2'-0" ABOVE TOP OF SLAB) 2' MAX. OVERHANGING BLOCK REPAIR DETAIL MAXIMUM WALL HT 1140 MPH / EXP C 1 RISK GAT. fl SIZE/SPECIES SPACING MAXIMUM HEIGHT 2x4 SPF 16° OC 8'4 2x4 SPF 12' OC 9'-0° 2x4 SPF 16' OC 9'-4" 2x4 SPF 12" OC 10'-0" 2x6 SPF 16° OC 12'-4" 26 SPF 12° OC 13'-0" 20 SPF 16" OC 14'-0" 26 SPF 12' OC 15-0" NOTE: HEIGHTS SHOWN IN THIS TABLE ARE BASED ON STUDS BEING ATTACHED TO 1/2 MINIMUM OSB SHEATHING iMTH 8d MIN NAILS ®12° OC INTERMEDIATE SUPPORTS AND 6" OC AT PERIMETER AND 4" OC 0 CORNER STUDS. SHEATHING TO BE CONTINUOUS OVER 3 OR MORE STUDS. TAPCON INSTALLATION ANCHOR CHART FOR BLOCK OPNGS. W/ BUCKS. 1 1/2" THICK OR GREATER WIDTH WIDTH WIDTH WIDTH D FEF D D E D D E D 24" 0. C. 8" MAX. MAX. A 8„ A 8" A � - C MAX. C MAX. C B B J B _� = C WOW. C WOW. � WOW. C SGD OR OPNG. OPNG. OPNG. A A A � � ¢ EXT. DOOR SILL /MULL SILL /MULL OPNG. SINGLE WOW, OR MULTIPLE SIDE STACKED WOW. BY SIDE WOWS. W/ MULL BTWN. ® Wl MULL BTWN. ® � Q WOW. OPNG. LOCATIONS WDW. OPNG. LOCATIONS � HEIGHT IN HEAD �1 WIDTH IN HEAD (D UP TO 40" A UP TO 40" D EXTERIOR DOOR 40.01" TO 60" A , B 40 .01" TO 60" D , E OPENINGS 60.01" TO 80" A , C 60.01" TO 80" D , F 80.01" TO 100" A , B , C 80.01" TO 100" D , E , F 1. LOCATIONS PER INDIVIDUAL WOW. OPNG DiMENSfON NOT MULLED WOW. OPNG. DIMENSION 2. MAXIMUM ALLOWABLE SPACING BTWN. TAPCON ANCHORS TO BE 24" O.C. 2x HDR. PLATE OR EXTERIOR WD. HDR. SHEATHING 2 LAYERS OF 7/16" O.S.B. OR (i) LAYER OF 3/4' PLYWD. CONNECT W/ {2)8d NAILS AT 16" O.C. BUILT UP WOOD HDR. OR 2x HDR. PLATE EXTERIOR SHEATHING 2x CRIPPLE STUDS AT 16" O.C. BTWN. SILL PLATE & BOT. PLATE OR HDR. & HDR. PLATE 2x HDR. OR SILL PLATE OR HDR. JACK ATTACH WDW./[l0(Xi PER MANUF. SPECIIFFICRTIONS SILL 1 JAMB 1 HEAD FRAME WALL OPNG. WDW./DOOR DETAILS TAPCON PER 1 3/4" SCHEDULE MIN. � X M � EXT. FACE (2)1Dd x 1 1/2" AT 24" OF BLOCK O.C. FOR BUCK BUILT UP TO 2 1/2" THICK PROVIDE 2x P.T. AGAINST OR BLOCK FOR BUILT UP BUCKS (2)8d z 2 1/2" AT 24° 2" THICK OR MORE O.C. FOR BUCK BUILT UP BUILT UP BUCK DETAIL 21/2" THIO( OR MORE THICKNESS 11/2" OR GREATER PRECAST CONC. MIN. 2 1/2" WIDE BUCK - LINTEL ABV. OPNG. .MAXIMUM 2 3/4" BUILT UP OR CMU JAMB THICKNESS - CONNECT W/ CAULK BTWN. 3/16" DIA. TAPCONS. BUCK /BLOCK TAPCON LENGTH MUST BE SUFFICIENT TO ACHIEVE MIN. CEMENT FINISH � 1 1/4" EMBEDMENT INTO ODER BLOCK BLOCK JAMB /HERD INSTALL WOW./DOOR SCREW DRYWALL ANCHOR INTO BUCK PER INSTALLATION DETAILS HEAD/JAMB FOR BUCK THICKNESS 1112" OR GREATER INSTALL WDW./DOOR TAPCON PRECAST CONC. ANCHOR INTO BLOCK PER LINTEL ABV. OPNG. INSTALLATION DETAILS OR CMU JAMB CAULK BTWN. MIN. 2 1/2' WIDE BUCK - MAXIMUM BUILT UP BUCK % BLK THICKNESS MUST BE LESS THAN 1 1/2' CONNECT W/ CEMENT FINISH SPIRAL NAILS AT 16" O.G. OVER BLOCK DRYWALL HEAD/JAMB FOR BUCK THICKNESS LESS THAN 11121" CEMENT FINISH ATTACH WDW./DOOR PER OVER BLOCK MANUF. SPEOFlCR110NS PRECAST CONC. SILL � I SILL ' BLOCK WALL OPNG, WDW./DOOR BUCK DETAILS ALL EXTERIOR WINDOWS AND DOORS SHALL HAVE MEET PRESSURES IN CHART- EXPOSURE "C" FASTENER SCHEDULE FOR BUILT UP STUD COLUMNS VERTICAL SPACING OF FASTENERS AT 8' O.C. STAGGERED UNLESS OTHERWISE NOTED. THIRD AND FOURTH PLIES SHALL BE ADDED TO EITHER SIDE OF 2 -PLY COMPOSITE POST. MINIMUM END DISTANCE SHALL BE 2 1/2' AND MINIMUM EDGE DISTANCE SHALL BE t". STUD # OF NAILS NUMBER OF PLYS SIZE PER RDW (2) PLYS (3) PLYS (4) PLYS 20 (t) 10d x A. 10d x 31 10d X A. OR 1/2" DIAM. BST 0 16° O.C. 26 (2) 10d x A. i Qd x A. 10d X A. OR 1/2° DIAM.BOLT 0 16' D.C. 2x$ (2) tOd x 31 1 O x A. i0d X A. OR 1/2" DIA. BOLT 0 16" D.G. IN LIEU OF NAILS, MEMBERS MAY BE BOLTED TOGETHER. WITH 1/2' DIAM. THRU-BOLTS AT 16" O.G. VERTICALLY WITH THE SAME NUMBER OF BOLTS PER ROW AS NAILS WOOD HEADER SCHEDULE MAXIMUM CLEAR SPAN FOR LOAD BEARING FRAME WALLS SIZES NOTED ON PLANS TO SUPERCEDE VALUES SHOWN ON THIS SCHEDULE HEADER LOAD HEADER SIZE CONDITION (2)2x6 NJ (2)2x8 NJ (2)2x10 NJ (2)2x12 NJ ROOF ONLY 4'-0' 2 5'-4° 2 6'-8" 2 7'-6" 2 2nd FLOC ONLY 3'-6' 2 4'-5" 2 5-5" 2 6'-3" 2 2nd FLOOR &ROOF 3'-0' 2 4'-8" 2 5 -5" 3 ON "NJ" =MINIMUM NUMBER OF JACK STUDS REQ'D. AT EA. END UNLESS OTHERWISE NOTED THE PLAN ALL STRUCTURAL HEADERS TO BE #2 4R BETTER S.Y.P. ALL NON-STRUCTURAL HEADERS HEM -FIR OR S -P -F OR BETTER CONSTRUCTION NOTES L .APPLICABLE CODES: - FLOR IDA BUILDING CODE 2410 -RESIDENTIAL=Jz E-= - NATIONAL ELECTRICAL CODE REQUIREMENTS FOR ONE AND TWO FAMILY DWELINGS, NFPA 70A; 2007. - FLORIDA FIRE PREVENTION CODE - F.F.P.C. 2010 2. SUBCONTRACTORS SHALL VERIFY ALL DIMENSIONS IN THE FIELD AND NOTiFY THE BUILDER/ARCHITECT OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH CONSTRUCTION. 3. ALL CONSTRUCTION SHALL BE BRACED AND SHORED BY CONTRACTOR AS REQUIRED TO SAFELY PERFORM THE WORK. TERMITE PROTECTION 1. TERMITE PRETREATMENT SHALL MAKE USE OF BORA-CARE TERMIIICIDE. THE BORA-CARE TERMITIODE TREATMENT IS REGISTERED BY THE FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES AS REQUIERED BY THE FLORIDA BUILDING CODE 2010 - RESIDENTIAL 2. UPON COMPLETION OF THE APPLICATION OF THE TERMITE PROTECTIVE TREATMENT, A CERTIFICATE OF COMPLIANCE SHALL BE ISSUED BY A LICENSED PEST CONTROL COMPANY BEFORE A CERTIFICATE OF OCCUPANCY MAY BE ISSUED. THE CERTIFICATE OF COMPLIANCE SHALL STATE: 'THE BUILDING HAS RECEIVED A COMPLETE TREATMENT FOR THE PREVENTION OF SUBTERRANEAN TERMITES. THE TREATMENT IS IN ACCORDANCE WITH THE RULES AND LAWS ESTABLISHED BY THE FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES'. FOUNDATION NOTES 1. FOUNDATION IS DEIGNED BASED ON PRESUMPTIVE SAFE ALLOWABLE BEARING PRESSURE OF 2000 PSF. CONTRACTOR MALL VERIFY THAT THE MINIMUM BEARING PRESSURE OF 2000 PSF IS OBTAINED PRIOR TO FOOTING PLACEMENT. 2. FOOTING MALL BE PLACED ON COMPACTED SOIL FREE OF ORGANIC DEBRIS. 3. AS REQUIRED BY THE LOCAL MUNiCAPILITY BUILDING DEPARTMENT, A FOUNDATION SURVEY SHALL BE PERFORMED AND A COPY OF THE SURVEY SHALL ON THE SITE FOR 1TiE BUILDING INSPECTOR'S USE, OR ALL PROPERTY MARKERS SHALL BE EXPOSED AND A STRING STRETCHED FROM MARKER TO MARKER TO VERIFY REQUIRED SETBACKS. CONCRETE NOTES 1. CONCRETE STRENGTH SHALL BE 2500 PSI AT 28 DAYS AND IN ACCORDANCE WITH A.C.I. 318-11. 2. REINFORCING STEEL SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF ASTM A615 GRAFE 44. 3. WELDED WIRE FABRIC SHALL BE IN ACCORDANCE 4NTH THE LATEST EDITION OF ASTM A185. CONCRETE MASONRY NOTES 1. CONCRETE MASONRY WORK SHALL BE IN ACCORDANCE NTH A.C.I. 530/ASCE 5/TMS 402. 2. CONCRETE MASONRY .UNITS SHALL BE 1N CONFORMANCE WITH ASTM C90, GRADE N, TYPE II ASTM C140 AND SHALL HAVE A COMPRESSIVE STRENGTH OF 2000 PSI MINIMUM BASED ON THE NET GROSS SECTIONAL AREA. 3. COARSE GROUT SHALL BE IN CONFORMANCE WITH ASTM C476. 4. MORTAR SHALL BE TYPE "M" OR "S' IN ACCORDANCE WITH ASTM C270. 5. ALL MASONRRY UNITS SHALL BE LAID IN RUNNING BOND U.N.O. 6. PROVIDE 8" PRECAST CONCRETE LINTELS ABOVE ALL MASONARY OPNGS. ALL LINTEL FOR OPNGS. OVER 5-6" SHALL BE GROUTED SOLID W/ 8" STANDARD BRC. EA. END U.N.O. (4' MIN. BEARING REQ'D.) PRE-ENGINEERED: WOOD TRUSSES L ALL TRUSSES SHALL BE IN ACCORDANCE WITH THE LATEST EDITIONS OF THE "NATIONAL DESIGN SP€CIFICATONS FOR STRESS -MADE LUMBER AND ITS FASTENERS" AS RECOMMENDED BY THE NATIONAL FOREST PRODUCTS ASSOCIATION. 2. THE TRUSS MANUF. SHALL VERIFY ALL TRUSS SPANS, SLOPES, BEARING POINTS, AND DIMENSIONS BEFORE FABRICATION. ANY DEVATIONS OR DISCREPANCIES FROM THE PLANS TO BE BROUGHT TO THE AT1>=NTiON OF THE BUILDER/ARCHITECT/ENGINEER PRIOR TO PROCEEDING. TRUSS MANUF. TO SUPPLY ALL TRUSS TO TRUSS HANGERS AND CONNECTIONS. 3. TRUSS MANUF. TO PROVIDE SHOP DRAiNNGS ON NEW AND/OR REVISED MODEL PLANS TO BUILDER FOR REVIEW BEFORE FABRICATION. TRUSS SHOP DRAWINGS SHALL SHOW ALL TRUSS PROFILES, GRAVITY/UPLIFT LOADS, BRACING MEMBERS, AND TRUSS TO TRUSS HANGERS. 4. ALL PREFAB. WOOD TRUSSES SHALL BE SECURELY FASTENED TO THEIR SUPPORTING WALLS OR BEAMS AS REQUIRED PER THE FRAMING PLANS. 5. PRE-ENGINEERED WOOD TRUSSES, RAFTERS, AND OTHER ROOF FRAMING MEMBERS SHALL BE SPACED AT 24' O.C. MAXIMUM. 6. RIDGE AND VALLEY SE( MEMBERS SHALL BE A NOMINAL DIMENSION OF 2" LARGER THAN RAFTERS. 7. ALL ROOF FRAMING MEMBERS SHALL BE MIN. SYP #2 OR BETTER. WALL &ROOF FRAMING NOTES 1. WOOD CONSTRUCTION SHALL CONFORM TO THE LATEST EDITION OF °NATIONAL DEIGN SPEORGAl10NS FOR WOOD CONSTRUCTi(XV" BY THE NATIONAL FOREST PRODUCT ASSOOAl10N. 2. ROOF AND WALL STRUCTURAL SHEATHING SHALL BE SPAN RATED IN ACCORDANCE WITH APA PS 1-83 OR NER-108. NAILS USED IN ALL SHEATHING APPLICATIONS SHALL BE 8d RING SHANK, HOT DIPPED GALVANIZED, HAivD OR GUN DRIVEN NAILS. GUN DRIVEN NAILS SHALL HAVE HEAD AND SHANK SIZE EQUIVALENT TO HAND DRIVEN NAILS, OTHERWISE SPACING SHALL BE REDUCED FROM 12" TO 10',8' TO 6°, 6° TO 5°, 4° TO 3°, AND 3' TO 2° IN THOSE APPLICATIONS. 3. ALL EXTERIOR FRAMED WALL STUDS SHALL BE AS NOTED ON PLANS AND OR A MINIMUM GRADE OF #2 SYP OR BETTER. INTERIOR WALL STUDS SHALL BE A MINIMUM OF S -P -F #2 OR BETTER. 4. WOOD HEADERS PER SCHEDULE UNLESS NflTID OTHERWISE ON PLANS. ALL HEADER MATERIAL TO BE SOUTHERN YELLOW PINE #2 MIN. PROVIDE STRAPS AS REQ'D. PER DETAILS. 5. PROVIDE A BUILT UP OR SOLID SAWN COLUMN UNDER ALL GIRDERS AND BEAMS IN FRAMED WALLS UNLESS NOTED OTHERWISE 4N PLANS. A MINIMUM OF (2)2x4 STUDS SHALL BE USED. STRAP MEMBER DIRECTLY TO TOP OF COLUMN AND BOTTOM W A MIN. OF SIMPSON SPH4 OR EQUAL AT EACH STUD. PROVIDE BLOCKING TO BEARING WALL BELOW AS REQUIRED. HEAVY HOLD DOWNS MAY BE REQUIRED AT SOME LOCATIONS AS NOTED ON PLANS. 6. END JOINTS IN STRUCTURAL DOUBLE PLATE 91ALL BE OFFSET AT LEAST 4'-0°. STRUCTURAL DOUBLE PLATES TO BE NAILED AT 6" D.C. 7. AT EXTERIOR FRAME WALLS, PROVIDE FULL PANEL OF SHEATHING FROM ALL CORNER EDGES. FULL PANEL MUST BE SAWCUT AROUND ANY OPENINGS. SEE DETAILS FOR NAILING REQUIREMENTS. 8. THE NUMBER AND SIZE OF NhLS CONNECTING WOOD MEMBERS SHALL NOT BE LESS THAN THOSE SPECIFIED IN TABLE 2304.9.1 (FASTENING SCHEDULE) OF THE FLORIDA BUILDING CODE 2010 -RESIDENTIAL- UNLESS NOTED OTHERWISE. 9. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED LUMBER OR SEPARATED FROM CONCRETE W/ FELT PAPER OR METAL PLATES. 14. ALL NAILS AND BOLTS EXPOSED TO WEATHER SHALL BE HOT DIPPED GALVINIZED. UPLIFT CONNECTORS 1. UPLIFT CONNECTORS ARE ONLY REQUIRED ON MEMBERS IN WALLS THAT ARE EXPOSED TO UPLIFT FORCES. INTERIOR LOAD BEARING WALLS ARE NOT ALWAYS EXPOSED TO UPLIFT FORCES. THE MEMBERS OF THESE WALL WOULD NOT NEED TO HAVE CONNECTORS APPLIED. 2. UPLIFT CONNECTORS TO PROVIDE CONTINUITY FROM ROOF TRUSSES THRU PLATES TO SLAB AND FOUNDATION PER PLAN. 3. UPLIFT CONNECTORS AT ROOF TRUSSES SHALL BE BENT OVER TRUSS TOP CHORDS AS REQUIRED AND NAILED PRIOR TO APPLICATION OF ROOF SHEATHING. MISSED STRAPS SHALL BE INSTALLED PER PLAN PRIOR TO SHEATHING INSTALLAIiOJ. 4. THE MAXIMUM NUMBER OF FLAT STRAPS (I.E. "HETA20") IN THE TOP BLOCK WALL COURSE AT ANY GiRDER TRUSS SHALL BE (2) STRAPS WITH 8" CLEAR DIMENSION BEFORE NEXT STRAP(S). 5. ALL SPECIFIED CONNECTORS SHALL BE INSTALLED PER CONNECTOR MANUFACTURERS INSTRUCTIONS. 6. NO CONNECTOR SHALL BE BENT IN THE FIELD UNLESS NOTED AS ACCEPTABLE IN THE CONNECTOR MANUF. PRODUCT CATALOG. 7. WHEN ANCHORING (2) WOOD ITEMS TOGETHER, THE LENGTH OF HURRICANE STRAP MUST BE EQUALLY HALF ON ER. ITEM. 8. INSTALL ALL SPECIFIED FASTENERS AT EACH CONNECTOR. REFER TO CONNECTS SCHEDULE FOR MINIMUM NUMBER OF FASTENERS 9. MAY SUBSTITUTE HURRICANE STRAP WITH STRAP OF GREATER HOLD DOWN VALUE OR GREATER UPLIFT VALUE IN FIELD WITHOUT VERIFICATION, PROVIDED ALL MANUFACTURERS INSTALLATION INSTRUCTIONS OR REQUIREMENTS ARE FOLLOWED. STRUCTURAL CRITERIA 1. APPLICABLE CODE FLORIDA BUILDING CODE 2010 -RESIDENTIAL WIND SPEED - 144 NON -WIND-BORNE DEBRIS REGION; WIND IMPORTANCE FACTOR - (1) ONE; 'ENCLOSED' BUILDING TYPE; EXPOSURE CATEGORY C -SEE ROOF PLAN NOTES. 2. INTERNAL PRESSURE COEFFICIENT: +/- 0.18 MAXIMUM MEAN ROOF HT. = 30 FEET GENERAL NOTES 1. DOORS BETWEEN GARAGE AND LIVING SPA( MALL BE MINIMUM 1 3/8' THICK SOLID CORE WORD ODORS, 1 3/8' SOLID DR HONEYCOMB CORE STEEL DOORS, OR 20 -MINUTE FIRE RATED DOORS. 2. THE GARAGE SHALL BE SEPARATED FROM THE RESIDENCE AND ITS ATTiC AREA BY NOT LESS THAN 1/2" GYPSUM BOARD APPLIED TO THE GARAGE SIDE. GARAGES BENEATH HABITABLE ROOMS SHALL BE SEPARATED FROM ALL HABITABLE ROOMS ABOVE BY NOT LESS THAN 5/8" TYPE X GYPSUM BOARD OR ITS EQUIVALENT 3. DUCTS IN THE GARAGE AND DUCTS PENETRATING THE WALLS OR (FILINGS SEPARATING THE DWELL{N FROM THE GARAGE SHALL BE CONSTRUCTED 4F A MINIMUM N0. 26 GAGE SHEET STEEL OR APPROVED EQUAL 4. ENCLOSED ACCESSIBLE SPACE UNDER STAIRS SHALL HAVE WALLS, UNDER STAIR SURFACE AND ANY SOFFITS PROTECTED ON THE ENCLOSED .SIDE WITH 1/2' GYPSUM BOARD. DOOR SCHEDULE 2068 DOOR DOOR DOOR DOOR WIDTH WIDTH HT, HT. FEET INCHES FEET INCHES NOTES 1. NUMBER OF PANELS, HAND, & SWING AS SHOWN ON PLAN 1 1 1 1 ry ry cn i 1 i 1 LATEST REVISION DATE TO MASTER: 07-01-12 W� U Ali _ W WI 0 0 f z c� o Q - U � tUJ o LV o L..L z O O c� -9C-0 CIS Lu �) U oho CQ LLJ o � � � � = Q w = ~o C-- � J (� O C'7 O LLLU 00 LID - (n CV LL Q � M 1 M L'1"J � LL I LLJ LLJ W 0 C/) Lu z 0 � o W o� J co DO NOT SCALE PRINTS! CONSTRUC114N SHALL BE PER INDICATED DIMENSIONS ONLY, ANY DISCREPENCIES TO BE REPORTED TO M/i HOMES FOR CLARIFI CATION! D1 M!i ORLANDO "x3' TAPCOJS AV <- 2x4 45d DIAGONAL BUILT UP PLWD. OR / " BRACE AT EA. FACE MASONITE BUCK -SCRIBE ARCH PANEL 4 t0d NAILS INTO EA. BACKSIDE TO FiT ARCH= () OF ARCH W� �2�10d CONNECT W/ $d NAILS 2z4 BRACE/BLKG. NAILS AT € . D INSTALL NOW. SCREW ANCHOR 2x4 SOLID BLKG. (FULL WIDTH � WALL) PROVIDE TAPCON INTO ARCH BLKG. PER BTWN. OSB ARCH FACES W/ (2)10d NAILS 4N1HIN 4' MIN. OF INSTALLATION DETAILS THRU OSB INTO EA. 2x4 BRACE _ _START OF ARCH _ SECTION A -A PROVIDE TAPCON PER WOW. INSTALLATION 4' MAX. RAD. DETAILS OR THRU 11 j2" THK. OR MORE BUCK WITHIN 8° MIN. OF START OF ARCH FRAME ARCH TOP DETAIL BLOCK OPNG. SHOWN FRAME OPNG. SIMILAR (NO BUCK REQ'D. WHEN NO PLYWD. JOINT AT JAMBS) 2 - 2z4 OR DBL. 1x4 BUCK - SECTION CONNECT EA. TO BLOCK W/ 3/16"0" B -B BLOCK HEADER TAPCON (1 1/4' MIN. EMBEDMENT INTO PROVIDE 2x4 DIAL. BRACE SOLID BLKG. AT TOP 8d NAILS AT 8" O.C. AT BUCK 3/16 BTWN. BTWN. VERT. BRACES WHEN HT ARCH BLKG, & BUCK OF BRACE EXCEEDS 24' MAX. PROVIDE 2) MIN. TAPCON r�T EA. SIDE 24 VERT. 8d NAILS AT 8' O.C. BUCK- (1) WITHIN 4" BRACE(S) AT BUCK MIN. OF START OF ARCH BUILT UP PLWD. OR 7/16' OSB MASONITE BUCK -SCRIBE ARCH PANEL START OF ARCH_ BACKSIDE TO FIT ARCH- EQ. EQ. - - - 4' MAX. RAD. CONNECT W/ 8d NAILS 20 VERT. AT EA. FACE OF ARCH INSTALL WDW. SCREW ANCHOR W/ (3)IOd NAILS AT EA, END INTO ARCH BLKG. PER 2x4 SOLID BLKG. (FULL WIDTH OF WALL) INSTALLATION DETAILS BTWN. OSB ARCH FACES W/ (2)104 NAILS SECTION B -B THRU OSB INTO EA. 20 FRAME ELLIPSE ARCH TOP DETAIL BLOCK OPNG. SHOWN FRAME OPNG. SIMILAR (NO BUCK REQ'D. WHEN NO PLYWD. JOINT AT JAMBS) �.` ° B °• P •v O e 4 GROUT BLOCK SOLID AS SHOWN -EXTEND GROUT CONTINUOUS TO THE NEAREST REINFORCED CELLS BEYOND THE LOCATION OF THE MAXIMUM 2" BLOCK OVERHANG (FILL TO BOTTOM OF WI NDOW ALL AT LOCATIONS WHERE SILL IS LESS THAN 2'-0" ABOVE TOP OF SLAB) 2' MAX. OVERHANGING BLOCK REPAIR DETAIL MAXIMUM WALL HT 1140 MPH / EXP C 1 RISK GAT. fl SIZE/SPECIES SPACING MAXIMUM HEIGHT 2x4 SPF 16° OC 8'4 2x4 SPF 12' OC 9'-0° 2x4 SPF 16' OC 9'-4" 2x4 SPF 12" OC 10'-0" 2x6 SPF 16° OC 12'-4" 26 SPF 12° OC 13'-0" 20 SPF 16" OC 14'-0" 26 SPF 12' OC 15-0" NOTE: HEIGHTS SHOWN IN THIS TABLE ARE BASED ON STUDS BEING ATTACHED TO 1/2 MINIMUM OSB SHEATHING iMTH 8d MIN NAILS ®12° OC INTERMEDIATE SUPPORTS AND 6" OC AT PERIMETER AND 4" OC 0 CORNER STUDS. SHEATHING TO BE CONTINUOUS OVER 3 OR MORE STUDS. TAPCON INSTALLATION ANCHOR CHART FOR BLOCK OPNGS. W/ BUCKS. 1 1/2" THICK OR GREATER WIDTH WIDTH WIDTH WIDTH D FEF D D E D D E D 24" 0. C. 8" MAX. MAX. A 8„ A 8" A � - C MAX. C MAX. C B B J B _� = C WOW. C WOW. � WOW. C SGD OR OPNG. OPNG. OPNG. A A A � � ¢ EXT. DOOR SILL /MULL SILL /MULL OPNG. SINGLE WOW, OR MULTIPLE SIDE STACKED WOW. BY SIDE WOWS. W/ MULL BTWN. ® Wl MULL BTWN. ® � Q WOW. OPNG. LOCATIONS WDW. OPNG. LOCATIONS � HEIGHT IN HEAD �1 WIDTH IN HEAD (D UP TO 40" A UP TO 40" D EXTERIOR DOOR 40.01" TO 60" A , B 40 .01" TO 60" D , E OPENINGS 60.01" TO 80" A , C 60.01" TO 80" D , F 80.01" TO 100" A , B , C 80.01" TO 100" D , E , F 1. LOCATIONS PER INDIVIDUAL WOW. OPNG DiMENSfON NOT MULLED WOW. OPNG. DIMENSION 2. MAXIMUM ALLOWABLE SPACING BTWN. TAPCON ANCHORS TO BE 24" O.C. 2x HDR. PLATE OR EXTERIOR WD. HDR. SHEATHING 2 LAYERS OF 7/16" O.S.B. OR (i) LAYER OF 3/4' PLYWD. CONNECT W/ {2)8d NAILS AT 16" O.C. BUILT UP WOOD HDR. OR 2x HDR. PLATE EXTERIOR SHEATHING 2x CRIPPLE STUDS AT 16" O.C. BTWN. SILL PLATE & BOT. PLATE OR HDR. & HDR. PLATE 2x HDR. OR SILL PLATE OR HDR. JACK ATTACH WDW./[l0(Xi PER MANUF. SPECIIFFICRTIONS SILL 1 JAMB 1 HEAD FRAME WALL OPNG. WDW./DOOR DETAILS TAPCON PER 1 3/4" SCHEDULE MIN. � X M � EXT. FACE (2)1Dd x 1 1/2" AT 24" OF BLOCK O.C. FOR BUCK BUILT UP TO 2 1/2" THICK PROVIDE 2x P.T. AGAINST OR BLOCK FOR BUILT UP BUCKS (2)8d z 2 1/2" AT 24° 2" THICK OR MORE O.C. FOR BUCK BUILT UP BUILT UP BUCK DETAIL 21/2" THIO( OR MORE THICKNESS 11/2" OR GREATER PRECAST CONC. MIN. 2 1/2" WIDE BUCK - LINTEL ABV. OPNG. .MAXIMUM 2 3/4" BUILT UP OR CMU JAMB THICKNESS - CONNECT W/ CAULK BTWN. 3/16" DIA. TAPCONS. BUCK /BLOCK TAPCON LENGTH MUST BE SUFFICIENT TO ACHIEVE MIN. CEMENT FINISH � 1 1/4" EMBEDMENT INTO ODER BLOCK BLOCK JAMB /HERD INSTALL WOW./DOOR SCREW DRYWALL ANCHOR INTO BUCK PER INSTALLATION DETAILS HEAD/JAMB FOR BUCK THICKNESS 1112" OR GREATER INSTALL WDW./DOOR TAPCON PRECAST CONC. ANCHOR INTO BLOCK PER LINTEL ABV. OPNG. INSTALLATION DETAILS OR CMU JAMB CAULK BTWN. MIN. 2 1/2' WIDE BUCK - MAXIMUM BUILT UP BUCK % BLK THICKNESS MUST BE LESS THAN 1 1/2' CONNECT W/ CEMENT FINISH SPIRAL NAILS AT 16" O.G. OVER BLOCK DRYWALL HEAD/JAMB FOR BUCK THICKNESS LESS THAN 11121" CEMENT FINISH ATTACH WDW./DOOR PER OVER BLOCK MANUF. SPEOFlCR110NS PRECAST CONC. SILL � I SILL ' BLOCK WALL OPNG, WDW./DOOR BUCK DETAILS ALL EXTERIOR WINDOWS AND DOORS SHALL HAVE MEET PRESSURES IN CHART- EXPOSURE "C" FASTENER SCHEDULE FOR BUILT UP STUD COLUMNS VERTICAL SPACING OF FASTENERS AT 8' O.C. STAGGERED UNLESS OTHERWISE NOTED. THIRD AND FOURTH PLIES SHALL BE ADDED TO EITHER SIDE OF 2 -PLY COMPOSITE POST. MINIMUM END DISTANCE SHALL BE 2 1/2' AND MINIMUM EDGE DISTANCE SHALL BE t". STUD # OF NAILS NUMBER OF PLYS SIZE PER RDW (2) PLYS (3) PLYS (4) PLYS 20 (t) 10d x A. 10d x 31 10d X A. OR 1/2" DIAM. BST 0 16° O.C. 26 (2) 10d x A. i Qd x A. 10d X A. OR 1/2° DIAM.BOLT 0 16' D.C. 2x$ (2) tOd x 31 1 O x A. i0d X A. OR 1/2" DIA. BOLT 0 16" D.G. IN LIEU OF NAILS, MEMBERS MAY BE BOLTED TOGETHER. WITH 1/2' DIAM. THRU-BOLTS AT 16" O.G. VERTICALLY WITH THE SAME NUMBER OF BOLTS PER ROW AS NAILS WOOD HEADER SCHEDULE MAXIMUM CLEAR SPAN FOR LOAD BEARING FRAME WALLS SIZES NOTED ON PLANS TO SUPERCEDE VALUES SHOWN ON THIS SCHEDULE HEADER LOAD HEADER SIZE CONDITION (2)2x6 NJ (2)2x8 NJ (2)2x10 NJ (2)2x12 NJ ROOF ONLY 4'-0' 2 5'-4° 2 6'-8" 2 7'-6" 2 2nd FLOC ONLY 3'-6' 2 4'-5" 2 5-5" 2 6'-3" 2 2nd FLOOR &ROOF 3'-0' 2 4'-8" 2 5 -5" 3 ON "NJ" =MINIMUM NUMBER OF JACK STUDS REQ'D. AT EA. END UNLESS OTHERWISE NOTED THE PLAN ALL STRUCTURAL HEADERS TO BE #2 4R BETTER S.Y.P. ALL NON-STRUCTURAL HEADERS HEM -FIR OR S -P -F OR BETTER CONSTRUCTION NOTES L .APPLICABLE CODES: - FLOR IDA BUILDING CODE 2410 -RESIDENTIAL=Jz E-= - NATIONAL ELECTRICAL CODE REQUIREMENTS FOR ONE AND TWO FAMILY DWELINGS, NFPA 70A; 2007. - FLORIDA FIRE PREVENTION CODE - F.F.P.C. 2010 2. SUBCONTRACTORS SHALL VERIFY ALL DIMENSIONS IN THE FIELD AND NOTiFY THE BUILDER/ARCHITECT OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH CONSTRUCTION. 3. ALL CONSTRUCTION SHALL BE BRACED AND SHORED BY CONTRACTOR AS REQUIRED TO SAFELY PERFORM THE WORK. TERMITE PROTECTION 1. TERMITE PRETREATMENT SHALL MAKE USE OF BORA-CARE TERMIIICIDE. THE BORA-CARE TERMITIODE TREATMENT IS REGISTERED BY THE FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES AS REQUIERED BY THE FLORIDA BUILDING CODE 2010 - RESIDENTIAL 2. UPON COMPLETION OF THE APPLICATION OF THE TERMITE PROTECTIVE TREATMENT, A CERTIFICATE OF COMPLIANCE SHALL BE ISSUED BY A LICENSED PEST CONTROL COMPANY BEFORE A CERTIFICATE OF OCCUPANCY MAY BE ISSUED. THE CERTIFICATE OF COMPLIANCE SHALL STATE: 'THE BUILDING HAS RECEIVED A COMPLETE TREATMENT FOR THE PREVENTION OF SUBTERRANEAN TERMITES. THE TREATMENT IS IN ACCORDANCE WITH THE RULES AND LAWS ESTABLISHED BY THE FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES'. FOUNDATION NOTES 1. FOUNDATION IS DEIGNED BASED ON PRESUMPTIVE SAFE ALLOWABLE BEARING PRESSURE OF 2000 PSF. CONTRACTOR MALL VERIFY THAT THE MINIMUM BEARING PRESSURE OF 2000 PSF IS OBTAINED PRIOR TO FOOTING PLACEMENT. 2. FOOTING MALL BE PLACED ON COMPACTED SOIL FREE OF ORGANIC DEBRIS. 3. AS REQUIRED BY THE LOCAL MUNiCAPILITY BUILDING DEPARTMENT, A FOUNDATION SURVEY SHALL BE PERFORMED AND A COPY OF THE SURVEY SHALL ON THE SITE FOR 1TiE BUILDING INSPECTOR'S USE, OR ALL PROPERTY MARKERS SHALL BE EXPOSED AND A STRING STRETCHED FROM MARKER TO MARKER TO VERIFY REQUIRED SETBACKS. CONCRETE NOTES 1. CONCRETE STRENGTH SHALL BE 2500 PSI AT 28 DAYS AND IN ACCORDANCE WITH A.C.I. 318-11. 2. REINFORCING STEEL SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF ASTM A615 GRAFE 44. 3. WELDED WIRE FABRIC SHALL BE IN ACCORDANCE 4NTH THE LATEST EDITION OF ASTM A185. CONCRETE MASONRY NOTES 1. CONCRETE MASONRY WORK SHALL BE IN ACCORDANCE NTH A.C.I. 530/ASCE 5/TMS 402. 2. CONCRETE MASONRY .UNITS SHALL BE 1N CONFORMANCE WITH ASTM C90, GRADE N, TYPE II ASTM C140 AND SHALL HAVE A COMPRESSIVE STRENGTH OF 2000 PSI MINIMUM BASED ON THE NET GROSS SECTIONAL AREA. 3. COARSE GROUT SHALL BE IN CONFORMANCE WITH ASTM C476. 4. MORTAR SHALL BE TYPE "M" OR "S' IN ACCORDANCE WITH ASTM C270. 5. ALL MASONRRY UNITS SHALL BE LAID IN RUNNING BOND U.N.O. 6. PROVIDE 8" PRECAST CONCRETE LINTELS ABOVE ALL MASONARY OPNGS. ALL LINTEL FOR OPNGS. OVER 5-6" SHALL BE GROUTED SOLID W/ 8" STANDARD BRC. EA. END U.N.O. (4' MIN. BEARING REQ'D.) PRE-ENGINEERED: WOOD TRUSSES L ALL TRUSSES SHALL BE IN ACCORDANCE WITH THE LATEST EDITIONS OF THE "NATIONAL DESIGN SP€CIFICATONS FOR STRESS -MADE LUMBER AND ITS FASTENERS" AS RECOMMENDED BY THE NATIONAL FOREST PRODUCTS ASSOCIATION. 2. THE TRUSS MANUF. SHALL VERIFY ALL TRUSS SPANS, SLOPES, BEARING POINTS, AND DIMENSIONS BEFORE FABRICATION. ANY DEVATIONS OR DISCREPANCIES FROM THE PLANS TO BE BROUGHT TO THE AT1>=NTiON OF THE BUILDER/ARCHITECT/ENGINEER PRIOR TO PROCEEDING. TRUSS MANUF. TO SUPPLY ALL TRUSS TO TRUSS HANGERS AND CONNECTIONS. 3. TRUSS MANUF. TO PROVIDE SHOP DRAiNNGS ON NEW AND/OR REVISED MODEL PLANS TO BUILDER FOR REVIEW BEFORE FABRICATION. TRUSS SHOP DRAWINGS SHALL SHOW ALL TRUSS PROFILES, GRAVITY/UPLIFT LOADS, BRACING MEMBERS, AND TRUSS TO TRUSS HANGERS. 4. ALL PREFAB. WOOD TRUSSES SHALL BE SECURELY FASTENED TO THEIR SUPPORTING WALLS OR BEAMS AS REQUIRED PER THE FRAMING PLANS. 5. PRE-ENGINEERED WOOD TRUSSES, RAFTERS, AND OTHER ROOF FRAMING MEMBERS SHALL BE SPACED AT 24' O.C. MAXIMUM. 6. RIDGE AND VALLEY SE( MEMBERS SHALL BE A NOMINAL DIMENSION OF 2" LARGER THAN RAFTERS. 7. ALL ROOF FRAMING MEMBERS SHALL BE MIN. SYP #2 OR BETTER. WALL &ROOF FRAMING NOTES 1. WOOD CONSTRUCTION SHALL CONFORM TO THE LATEST EDITION OF °NATIONAL DEIGN SPEORGAl10NS FOR WOOD CONSTRUCTi(XV" BY THE NATIONAL FOREST PRODUCT ASSOOAl10N. 2. ROOF AND WALL STRUCTURAL SHEATHING SHALL BE SPAN RATED IN ACCORDANCE WITH APA PS 1-83 OR NER-108. NAILS USED IN ALL SHEATHING APPLICATIONS SHALL BE 8d RING SHANK, HOT DIPPED GALVANIZED, HAivD OR GUN DRIVEN NAILS. GUN DRIVEN NAILS SHALL HAVE HEAD AND SHANK SIZE EQUIVALENT TO HAND DRIVEN NAILS, OTHERWISE SPACING SHALL BE REDUCED FROM 12" TO 10',8' TO 6°, 6° TO 5°, 4° TO 3°, AND 3' TO 2° IN THOSE APPLICATIONS. 3. ALL EXTERIOR FRAMED WALL STUDS SHALL BE AS NOTED ON PLANS AND OR A MINIMUM GRADE OF #2 SYP OR BETTER. INTERIOR WALL STUDS SHALL BE A MINIMUM OF S -P -F #2 OR BETTER. 4. WOOD HEADERS PER SCHEDULE UNLESS NflTID OTHERWISE ON PLANS. ALL HEADER MATERIAL TO BE SOUTHERN YELLOW PINE #2 MIN. PROVIDE STRAPS AS REQ'D. PER DETAILS. 5. PROVIDE A BUILT UP OR SOLID SAWN COLUMN UNDER ALL GIRDERS AND BEAMS IN FRAMED WALLS UNLESS NOTED OTHERWISE 4N PLANS. A MINIMUM OF (2)2x4 STUDS SHALL BE USED. STRAP MEMBER DIRECTLY TO TOP OF COLUMN AND BOTTOM W A MIN. OF SIMPSON SPH4 OR EQUAL AT EACH STUD. PROVIDE BLOCKING TO BEARING WALL BELOW AS REQUIRED. HEAVY HOLD DOWNS MAY BE REQUIRED AT SOME LOCATIONS AS NOTED ON PLANS. 6. END JOINTS IN STRUCTURAL DOUBLE PLATE 91ALL BE OFFSET AT LEAST 4'-0°. STRUCTURAL DOUBLE PLATES TO BE NAILED AT 6" D.C. 7. AT EXTERIOR FRAME WALLS, PROVIDE FULL PANEL OF SHEATHING FROM ALL CORNER EDGES. FULL PANEL MUST BE SAWCUT AROUND ANY OPENINGS. SEE DETAILS FOR NAILING REQUIREMENTS. 8. THE NUMBER AND SIZE OF NhLS CONNECTING WOOD MEMBERS SHALL NOT BE LESS THAN THOSE SPECIFIED IN TABLE 2304.9.1 (FASTENING SCHEDULE) OF THE FLORIDA BUILDING CODE 2010 -RESIDENTIAL- UNLESS NOTED OTHERWISE. 9. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED LUMBER OR SEPARATED FROM CONCRETE W/ FELT PAPER OR METAL PLATES. 14. ALL NAILS AND BOLTS EXPOSED TO WEATHER SHALL BE HOT DIPPED GALVINIZED. UPLIFT CONNECTORS 1. UPLIFT CONNECTORS ARE ONLY REQUIRED ON MEMBERS IN WALLS THAT ARE EXPOSED TO UPLIFT FORCES. INTERIOR LOAD BEARING WALLS ARE NOT ALWAYS EXPOSED TO UPLIFT FORCES. THE MEMBERS OF THESE WALL WOULD NOT NEED TO HAVE CONNECTORS APPLIED. 2. UPLIFT CONNECTORS TO PROVIDE CONTINUITY FROM ROOF TRUSSES THRU PLATES TO SLAB AND FOUNDATION PER PLAN. 3. UPLIFT CONNECTORS AT ROOF TRUSSES SHALL BE BENT OVER TRUSS TOP CHORDS AS REQUIRED AND NAILED PRIOR TO APPLICATION OF ROOF SHEATHING. MISSED STRAPS SHALL BE INSTALLED PER PLAN PRIOR TO SHEATHING INSTALLAIiOJ. 4. THE MAXIMUM NUMBER OF FLAT STRAPS (I.E. "HETA20") IN THE TOP BLOCK WALL COURSE AT ANY GiRDER TRUSS SHALL BE (2) STRAPS WITH 8" CLEAR DIMENSION BEFORE NEXT STRAP(S). 5. ALL SPECIFIED CONNECTORS SHALL BE INSTALLED PER CONNECTOR MANUFACTURERS INSTRUCTIONS. 6. NO CONNECTOR SHALL BE BENT IN THE FIELD UNLESS NOTED AS ACCEPTABLE IN THE CONNECTOR MANUF. PRODUCT CATALOG. 7. WHEN ANCHORING (2) WOOD ITEMS TOGETHER, THE LENGTH OF HURRICANE STRAP MUST BE EQUALLY HALF ON ER. ITEM. 8. INSTALL ALL SPECIFIED FASTENERS AT EACH CONNECTOR. REFER TO CONNECTS SCHEDULE FOR MINIMUM NUMBER OF FASTENERS 9. MAY SUBSTITUTE HURRICANE STRAP WITH STRAP OF GREATER HOLD DOWN VALUE OR GREATER UPLIFT VALUE IN FIELD WITHOUT VERIFICATION, PROVIDED ALL MANUFACTURERS INSTALLATION INSTRUCTIONS OR REQUIREMENTS ARE FOLLOWED. STRUCTURAL CRITERIA 1. APPLICABLE CODE FLORIDA BUILDING CODE 2010 -RESIDENTIAL WIND SPEED - 144 NON -WIND-BORNE DEBRIS REGION; WIND IMPORTANCE FACTOR - (1) ONE; 'ENCLOSED' BUILDING TYPE; EXPOSURE CATEGORY C -SEE ROOF PLAN NOTES. 2. INTERNAL PRESSURE COEFFICIENT: +/- 0.18 MAXIMUM MEAN ROOF HT. = 30 FEET GENERAL NOTES 1. DOORS BETWEEN GARAGE AND LIVING SPA( MALL BE MINIMUM 1 3/8' THICK SOLID CORE WORD ODORS, 1 3/8' SOLID DR HONEYCOMB CORE STEEL DOORS, OR 20 -MINUTE FIRE RATED DOORS. 2. THE GARAGE SHALL BE SEPARATED FROM THE RESIDENCE AND ITS ATTiC AREA BY NOT LESS THAN 1/2" GYPSUM BOARD APPLIED TO THE GARAGE SIDE. GARAGES BENEATH HABITABLE ROOMS SHALL BE SEPARATED FROM ALL HABITABLE ROOMS ABOVE BY NOT LESS THAN 5/8" TYPE X GYPSUM BOARD OR ITS EQUIVALENT 3. DUCTS IN THE GARAGE AND DUCTS PENETRATING THE WALLS OR (FILINGS SEPARATING THE DWELL{N FROM THE GARAGE SHALL BE CONSTRUCTED 4F A MINIMUM N0. 26 GAGE SHEET STEEL OR APPROVED EQUAL 4. ENCLOSED ACCESSIBLE SPACE UNDER STAIRS SHALL HAVE WALLS, UNDER STAIR SURFACE AND ANY SOFFITS PROTECTED ON THE ENCLOSED .SIDE WITH 1/2' GYPSUM BOARD. DOOR SCHEDULE 2068 DOOR DOOR DOOR DOOR WIDTH WIDTH HT, HT. FEET INCHES FEET INCHES NOTES 1. NUMBER OF PANELS, HAND, & SWING AS SHOWN ON PLAN 1 1 1 1 ry ry cn i 1 i 1 LATEST REVISION DATE TO MASTER: 07-01-12 W� U Ali _ W WI 0 0 f z c� o Q - U � tUJ o LV o L..L z O O c� -9C-0 CIS Lu �) U oho CQ LLJ o � � � � = Q w = ~o C-- � J (� O C'7 O LLLU 00 LID - (n CV LL Q � M 1 M L'1"J � LL I LLJ LLJ W 0 C/) Lu z 0 � o W o� J co DO NOT SCALE PRINTS! CONSTRUC114N SHALL BE PER INDICATED DIMENSIONS ONLY, ANY DISCREPENCIES TO BE REPORTED TO M/i HOMES FOR CLARIFI .01" TO 60" D , E OPENINGS 60.01" TO 80" A , C 60.01" TO 80" D , F 80.01" TO 100" A , B , C 80.01" TO 100" D , E , F 1. LOCATIONS PER INDIVIDUAL WOW. OPNG DiMENSfON NOT MULLED WOW. OPNG. DIMENSION 2. MAXIMUM ALLOWABLE SPACING BTWN. TAPCON ANCHORS TO BE 24" O.C. 2x HDR. PLATE OR EXTERIOR WD. HDR. SHEATHING 2 LAYERS OF 7/16" O.S.B. OR (i) LAYER OF 3/4' PLYWD. CONNECT W/ {2)8d NAILS AT 16" O.C. BUILT UP WOOD HDR. OR 2x HDR. PLATE EXTERIOR SHEATHING 2x CRIPPLE STUDS AT 16" O.C. BTWN. SILL PLATE & BOT. PLATE OR HDR. & HDR. PLATE 2x HDR. OR SILL PLATE OR HDR. JACK ATTACH WDW./[l0(Xi PER MANUF. SPECIIFFICRTIONS SILL 1 JAMB 1 HEAD FRAME WALL OPNG. WDW./DOOR DETAILS TAPCON PER 1 3/4" SCHEDULE MIN. � X M � EXT. FACE (2)1Dd x 1 1/2" AT 24" OF BLOCK O.C. FOR BUCK BUILT UP TO 2 1/2" THICK PROVIDE 2x P.T. AGAINST OR BLOCK FOR BUILT UP BUCKS (2)8d z 2 1/2" AT 24° 2" THICK OR MORE O.C. FOR BUCK BUILT UP BUILT UP BUCK DETAIL 21/2" THIO( OR MORE THICKNESS 11/2" OR GREATER PRECAST CONC. MIN. 2 1/2" WIDE BUCK - LINTEL ABV. OPNG. .MAXIMUM 2 3/4" BUILT UP OR CMU JAMB THICKNESS - CONNECT W/ CAULK BTWN. 3/16" DIA. TAPCONS. BUCK /BLOCK TAPCON LENGTH MUST BE SUFFICIENT TO ACHIEVE MIN. CEMENT FINISH � 1 1/4" EMBEDMENT INTO ODER BLOCK BLOCK JAMB /HERD INSTALL WOW./DOOR SCREW DRYWALL ANCHOR INTO BUCK PER INSTALLATION DETAILS HEAD/JAMB FOR BUCK THICKNESS 1112" OR GREATER INSTALL WDW./DOOR TAPCON PRECAST CONC. ANCHOR INTO BLOCK PER LINTEL ABV. OPNG. INSTALLATION DETAILS OR CMU JAMB CAULK BTWN. MIN. 2 1/2' WIDE BUCK - MAXIMUM BUILT UP BUCK % BLK THICKNESS MUST BE LESS THAN 1 1/2' CONNECT W/ CEMENT FINISH SPIRAL NAILS AT 16" O.G. OVER BLOCK DRYWALL HEAD/JAMB FOR BUCK THICKNESS LESS THAN 11121" CEMENT FINISH ATTACH WDW./DOOR PER OVER BLOCK MANUF. SPEOFlCR110NS PRECAST CONC. SILL � I SILL ' BLOCK WALL OPNG, WDW./DOOR BUCK DETAILS ALL EXTERIOR WINDOWS AND DOORS SHALL HAVE MEET PRESSURES IN CHART- EXPOSURE "C" FASTENER SCHEDULE FOR BUILT UP STUD COLUMNS VERTICAL SPACING OF FASTENERS AT 8' O.C. STAGGERED UNLESS OTHERWISE NOTED. THIRD AND FOURTH PLIES SHALL BE ADDED TO EITHER SIDE OF 2 -PLY COMPOSITE POST. MINIMUM END DISTANCE SHALL BE 2 1/2' AND MINIMUM EDGE DISTANCE SHALL BE t". STUD # OF NAILS NUMBER OF PLYS SIZE PER RDW (2) PLYS (3) PLYS (4) PLYS 20 (t) 10d x A. 10d x 31 10d X A. OR 1/2" DIAM. BST 0 16° O.C. 26 (2) 10d x A. i Qd x A. 10d X A. OR 1/2° DIAM.BOLT 0 16' D.C. 2x$ (2) tOd x 31 1 O x A. i0d X A. OR 1/2" DIA. BOLT 0 16" D.G. IN LIEU OF NAILS, MEMBERS MAY BE BOLTED TOGETHER. WITH 1/2' DIAM. THRU-BOLTS AT 16" O.G. VERTICALLY WITH THE SAME NUMBER OF BOLTS PER ROW AS NAILS WOOD HEADER SCHEDULE MAXIMUM CLEAR SPAN FOR LOAD BEARING FRAME WALLS SIZES NOTED ON PLANS TO SUPERCEDE VALUES SHOWN ON THIS SCHEDULE HEADER LOAD HEADER SIZE CONDITION (2)2x6 NJ (2)2x8 NJ (2)2x10 NJ (2)2x12 NJ ROOF ONLY 4'-0' 2 5'-4° 2 6'-8" 2 7'-6" 2 2nd FLOC ONLY 3'-6' 2 4'-5" 2 5-5" 2 6'-3" 2 2nd FLOOR &ROOF 3'-0' 2 4'-8" 2 5 -5" 3 ON "NJ" =MINIMUM NUMBER OF JACK STUDS REQ'D. AT EA. END UNLESS OTHERWISE NOTED THE PLAN ALL STRUCTURAL HEADERS TO BE #2 4R BETTER S.Y.P. ALL NON-STRUCTURAL HEADERS HEM -FIR OR S -P -F OR BETTER CONSTRUCTION NOTES L .APPLICABLE CODES: - FLOR IDA BUILDING CODE 2410 -RESIDENTIAL=Jz E-= - NATIONAL ELECTRICAL CODE REQUIREMENTS FOR ONE AND TWO FAMILY DWELINGS, NFPA 70A; 2007. - FLORIDA FIRE PREVENTION CODE - F.F.P.C. 2010 2. SUBCONTRACTORS SHALL VERIFY ALL DIMENSIONS IN THE FIELD AND NOTiFY THE BUILDER/ARCHITECT OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH CONSTRUCTION. 3. ALL CONSTRUCTION SHALL BE BRACED AND SHORED BY CONTRACTOR AS REQUIRED TO SAFELY PERFORM THE WORK. TERMITE PROTECTION 1. TERMITE PRETREATMENT SHALL MAKE USE OF BORA-CARE TERMIIICIDE. THE BORA-CARE TERMITIODE TREATMENT IS REGISTERED BY THE FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES AS REQUIERED BY THE FLORIDA BUILDING CODE 2010 - RESIDENTIAL 2. UPON COMPLETION OF THE APPLICATION OF THE TERMITE PROTECTIVE TREATMENT, A CERTIFICATE OF COMPLIANCE SHALL BE ISSUED BY A LICENSED PEST CONTROL COMPANY BEFORE A CERTIFICATE OF OCCUPANCY MAY BE ISSUED. THE CERTIFICATE OF COMPLIANCE SHALL STATE: 'THE BUILDING HAS RECEIVED A COMPLETE TREATMENT FOR THE PREVENTION OF SUBTERRANEAN TERMITES. THE TREATMENT IS IN ACCORDANCE WITH THE RULES AND LAWS ESTABLISHED BY THE FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES'. FOUNDATION NOTES 1. FOUNDATION IS DEIGNED BASED ON PRESUMPTIVE SAFE ALLOWABLE BEARING PRESSURE OF 2000 PSF. CONTRACTOR MALL VERIFY THAT THE MINIMUM BEARING PRESSURE OF 2000 PSF IS OBTAINED PRIOR TO FOOTING PLACEMENT. 2. FOOTING MALL BE PLACED ON COMPACTED SOIL FREE OF ORGANIC DEBRIS. 3. AS REQUIRED BY THE LOCAL MUNiCAPILITY BUILDING DEPARTMENT, A FOUNDATION SURVEY SHALL BE PERFORMED AND A COPY OF THE SURVEY SHALL ON THE SITE FOR 1TiE BUILDING INSPECTOR'S USE, OR ALL PROPERTY MARKERS SHALL BE EXPOSED AND A STRING STRETCHED FROM MARKER TO MARKER TO VERIFY REQUIRED SETBACKS. CONCRETE NOTES 1. CONCRETE STRENGTH SHALL BE 2500 PSI AT 28 DAYS AND IN ACCORDANCE WITH A.C.I. 318-11. 2. REINFORCING STEEL SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF ASTM A615 GRAFE 44. 3. WELDED WIRE FABRIC SHALL BE IN ACCORDANCE 4NTH THE LATEST EDITION OF ASTM A185. CONCRETE MASONRY NOTES 1. CONCRETE MASONRY WORK SHALL BE IN ACCORDANCE NTH A.C.I. 530/ASCE 5/TMS 402. 2. CONCRETE MASONRY .UNITS SHALL BE 1N CONFORMANCE WITH ASTM C90, GRADE N, TYPE II ASTM C140 AND SHALL HAVE A COMPRESSIVE STRENGTH OF 2000 PSI MINIMUM BASED ON THE NET GROSS SECTIONAL AREA. 3. COARSE GROUT SHALL BE IN CONFORMANCE WITH ASTM C476. 4. MORTAR SHALL BE TYPE "M" OR "S' IN ACCORDANCE WITH ASTM C270. 5. ALL MASONRRY UNITS SHALL BE LAID IN RUNNING BOND U.N.O. 6. PROVIDE 8" PRECAST CONCRETE LINTELS ABOVE ALL MASONARY OPNGS. ALL LINTEL FOR OPNGS. OVER 5-6" SHALL BE GROUTED SOLID W/ 8" STANDARD BRC. EA. END U.N.O. (4' MIN. BEARING REQ'D.) PRE-ENGINEERED: WOOD TRUSSES L ALL TRUSSES SHALL BE IN ACCORDANCE WITH THE LATEST EDITIONS OF THE "NATIONAL DESIGN SP€CIFICATONS FOR STRESS -MADE LUMBER AND ITS FASTENERS" AS RECOMMENDED BY THE NATIONAL FOREST PRODUCTS ASSOCIATION. 2. THE TRUSS MANUF. SHALL VERIFY ALL TRUSS SPANS, SLOPES, BEARING POINTS, AND DIMENSIONS BEFORE FABRICATION. ANY DEVATIONS OR DISCREPANCIES FROM THE PLANS TO BE BROUGHT TO THE AT1>=NTiON OF THE BUILDER/ARCHITECT/ENGINEER PRIOR TO PROCEEDING. TRUSS MANUF. TO SUPPLY ALL TRUSS TO TRUSS HANGERS AND CONNECTIONS. 3. TRUSS MANUF. TO PROVIDE SHOP DRAiNNGS ON NEW AND/OR REVISED MODEL PLANS TO BUILDER FOR REVIEW BEFORE FABRICATION. TRUSS SHOP DRAWINGS SHALL SHOW ALL TRUSS PROFILES, GRAVITY/UPLIFT LOADS, BRACING MEMBERS, AND TRUSS TO TRUSS HANGERS. 4. ALL PREFAB. WOOD TRUSSES SHALL BE SECURELY FASTENED TO THEIR SUPPORTING WALLS OR BEAMS AS REQUIRED PER THE FRAMING PLANS. 5. PRE-ENGINEERED WOOD TRUSSES, RAFTERS, AND OTHER ROOF FRAMING MEMBERS SHALL BE SPACED AT 24' O.C. MAXIMUM. 6. RIDGE AND VALLEY SE( MEMBERS SHALL BE A NOMINAL DIMENSION OF 2" LARGER THAN RAFTERS. 7. ALL ROOF FRAMING MEMBERS SHALL BE MIN. SYP #2 OR BETTER. WALL &ROOF FRAMING NOTES 1. WOOD CONSTRUCTION SHALL CONFORM TO THE LATEST EDITION OF °NATIONAL DEIGN SPEORGAl10NS FOR WOOD CONSTRUCTi(XV" BY THE NATIONAL FOREST PRODUCT ASSOOAl10N. 2. ROOF AND WALL STRUCTURAL SHEATHING SHALL BE SPAN RATED IN ACCORDANCE WITH APA PS 1-83 OR NER-108. NAILS USED IN ALL SHEATHING APPLICATIONS SHALL BE 8d RING SHANK, HOT DIPPED GALVANIZED, HAivD OR GUN DRIVEN NAILS. GUN DRIVEN NAILS SHALL HAVE HEAD AND SHANK SIZE EQUIVALENT TO HAND DRIVEN NAILS, OTHERWISE SPACING SHALL BE REDUCED FROM 12" TO 10',8' TO 6°, 6° TO 5°, 4° TO 3°, AND 3' TO 2° IN THOSE APPLICATIONS. 3. ALL EXTERIOR FRAMED WALL STUDS SHALL BE AS NOTED ON PLANS AND OR A MINIMUM GRADE OF #2 SYP OR BETTER. INTERIOR WALL STUDS SHALL BE A MINIMUM OF S -P -F #2 OR BETTER. 4. WOOD HEADERS PER SCHEDULE UNLESS NflTID OTHERWISE ON PLANS. ALL HEADER MATERIAL TO BE SOUTHERN YELLOW PINE #2 MIN. PROVIDE STRAPS AS REQ'D. PER DETAILS. 5. PROVIDE A BUILT UP OR SOLID SAWN COLUMN UNDER ALL GIRDERS AND BEAMS IN FRAMED WALLS UNLESS NOTED OTHERWISE 4N PLANS. A MINIMUM OF (2)2x4 STUDS SHALL BE USED. STRAP MEMBER DIRECTLY TO TOP OF COLUMN AND BOTTOM W A MIN. OF SIMPSON SPH4 OR EQUAL AT EACH STUD. PROVIDE BLOCKING TO BEARING WALL BELOW AS REQUIRED. HEAVY HOLD DOWNS MAY BE REQUIRED AT SOME LOCATIONS AS NOTED ON PLANS. 6. END JOINTS IN STRUCTURAL DOUBLE PLATE 91ALL BE OFFSET AT LEAST 4'-0°. STRUCTURAL DOUBLE PLATES TO BE NAILED AT 6" D.C. 7. AT EXTERIOR FRAME WALLS, PROVIDE FULL PANEL OF SHEATHING FROM ALL CORNER EDGES. FULL PANEL MUST BE SAWCUT AROUND ANY OPENINGS. SEE DETAILS FOR NAILING REQUIREMENTS. 8. THE NUMBER AND SIZE OF NhLS CONNECTING WOOD MEMBERS SHALL NOT BE LESS THAN THOSE SPECIFIED IN TABLE 2304.9.1 (FASTENING SCHEDULE) OF THE FLORIDA BUILDING CODE 2010 -RESIDENTIAL- UNLESS NOTED OTHERWISE. 9. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED LUMBER OR SEPARATED FROM CONCRETE W/ FELT PAPER OR METAL PLATES. 14. ALL NAILS AND BOLTS EXPOSED TO WEATHER SHALL BE HOT DIPPED GALVINIZED. UPLIFT CONNECTORS 1. UPLIFT CONNECTORS ARE ONLY REQUIRED ON MEMBERS IN WALLS THAT ARE EXPOSED TO UPLIFT FORCES. INTERIOR LOAD BEARING WALLS ARE NOT ALWAYS EXPOSED TO UPLIFT FORCES. THE MEMBERS OF THESE WALL WOULD NOT NEED TO HAVE CONNECTORS APPLIED. 2. UPLIFT CONNECTORS TO PROVIDE CONTINUITY FROM ROOF TRUSSES THRU PLATES TO SLAB AND FOUNDATION PER PLAN. 3. UPLIFT CONNECTORS AT ROOF TRUSSES SHALL BE BENT OVER TRUSS TOP CHORDS AS REQUIRED AND NAILED PRIOR TO APPLICATION OF ROOF SHEATHING. MISSED STRAPS SHALL BE INSTALLED PER PLAN PRIOR TO SHEATHING INSTALLAIiOJ. 4. THE MAXIMUM NUMBER OF FLAT STRAPS (I.E. "HETA20") IN THE TOP BLOCK WALL COURSE AT ANY GiRDER TRUSS SHALL BE (2) STRAPS WITH 8" CLEAR DIMENSION BEFORE NEXT STRAP(S). 5. ALL SPECIFIED CONNECTORS SHALL BE INSTALLED PER CONNECTOR MANUFACTURERS INSTRUCTIONS. 6. NO CONNECTOR SHALL BE BENT IN THE FIELD UNLESS NOTED AS ACCEPTABLE IN THE CONNECTOR MANUF. PRODUCT CATALOG. 7. WHEN ANCHORING (2) WOOD ITEMS TOGETHER, THE LENGTH OF HURRICANE STRAP MUST BE EQUALLY HALF ON ER. ITEM. 8. INSTALL ALL SPECIFIED FASTENERS AT EACH CONNECTOR. REFER TO CONNECTS SCHEDULE FOR MINIMUM NUMBER OF FASTENERS 9. MAY SUBSTITUTE HURRICANE STRAP WITH STRAP OF GREATER HOLD DOWN VALUE OR GREATER UPLIFT VALUE IN FIELD WITHOUT VERIFICATION, PROVIDED ALL MANUFACTURERS INSTALLATION INSTRUCTIONS OR REQUIREMENTS ARE FOLLOWED. STRUCTURAL CRITERIA 1. APPLICABLE CODE FLORIDA BUILDING CODE 2010 -RESIDENTIAL WIND SPEED - 144 NON -WIND-BORNE DEBRIS REGION; WIND IMPORTANCE FACTOR - (1) ONE; 'ENCLOSED' BUILDING TYPE; EXPOSURE CATEGORY C -SEE ROOF PLAN NOTES. 2. INTERNAL PRESSURE COEFFICIENT: +/- 0.18 MAXIMUM MEAN ROOF HT. = 30 FEET GENERAL NOTES 1. DOORS BETWEEN GARAGE AND LIVING SPA( MALL BE MINIMUM 1 3/8' THICK SOLID CORE WORD ODORS, 1 3/8' SOLID DR HONEYCOMB CORE STEEL DOORS, OR 20 -MINUTE FIRE RATED DOORS. 2. THE GARAGE SHALL BE SEPARATED FROM THE RESIDENCE AND ITS ATTiC AREA BY NOT LESS THAN 1/2" GYPSUM BOARD APPLIED TO THE GARAGE SIDE. GARAGES BENEATH HABITABLE ROOMS SHALL BE SEPARATED FROM ALL HABITABLE ROOMS ABOVE BY NOT LESS THAN 5/8" TYPE X GYPSUM BOARD OR ITS EQUIVALENT 3. DUCTS IN THE GARAGE AND DUCTS PENETRATING THE WALLS OR (FILINGS SEPARATING THE DWELL{N FROM THE GARAGE SHALL BE CONSTRUCTED 4F A MINIMUM N0. 26 GAGE SHEET STEEL OR APPROVED EQUAL 4. ENCLOSED ACCESSIBLE SPACE UNDER STAIRS SHALL HAVE WALLS, UNDER STAIR SURFACE AND ANY SOFFITS PROTECTED ON THE ENCLOSED .SIDE WITH 1/2' GYPSUM BOARD. DOOR SCHEDULE 2068 DOOR DOOR DOOR DOOR WIDTH WIDTH HT, HT. FEET INCHES FEET INCHES NOTES 1. NUMBER OF PANELS, HAND, & SWING AS SHOWN ON PLAN 1 1 1 1 ry ry cn i 1 i 1 LATEST REVISION DATE TO MASTER: 07-01-12 W� U Ali _ W WI 0 0 f z c� o Q - U � tUJ o LV o L..L z O O c� -9C-0 CIS Lu �) U oho CQ LLJ o � � � � = Q w = ~o C-- � J (� O C'7 O LLLU 00 LID - (n CV LL Q � M 1 M L'1"J � LL I LLJ LLJ W 0 C/) Lu z 0 � o W o� J co DO NOT SCALE PRINTS! CONSTRUC114N SHALL BE PER INDICATED DIMENSIONS ONLY, ANY DISCREPENCIES TO BE REPORTED TO M/i HOMES FOR CLARIFI DiMENSfON NOT MULLED WOW. OPNG. DIMENSION 2. MAXIMUM ALLOWABLE SPACING BTWN. TAPCON ANCHORS TO BE 24" O.C. 2x HDR. PLATE OR EXTERIOR WD. HDR. SHEATHING 2 LAYERS OF 7/16" O.S.B. OR (i) LAYER OF 3/4' PLYWD. CONNECT W/ {2)8d NAILS AT 16" O.C. BUILT UP WOOD HDR. OR 2x HDR. PLATE EXTERIOR SHEATHING 2x CRIPPLE STUDS AT 16" O.C. BTWN. SILL PLATE & BOT. PLATE OR HDR. & HDR. PLATE 2x HDR. OR SILL PLATE OR HDR. JACK ATTACH WDW./[l0(Xi PER MANUF. SPECIIFFICRTIONS SILL 1 JAMB 1 HEAD FRAME WALL OPNG. WDW./DOOR DETAILS TAPCON PER 1 3/4" SCHEDULE MIN. � X M � EXT. FACE (2)1Dd x 1 1/2" AT 24" OF BLOCK O.C. FOR BUCK BUILT UP TO 2 1/2" THICK PROVIDE 2x P.T. AGAINST OR BLOCK FOR BUILT UP BUCKS (2)8d z 2 1/2" AT 24° 2" THICK OR MORE O.C. FOR BUCK BUILT UP BUILT UP BUCK DETAIL 21/2" THIO( OR MORE THICKNESS 11/2" OR GREATER PRECAST CONC. MIN. 2 1/2" WIDE BUCK - LINTEL ABV. OPNG. .MAXIMUM 2 3/4" BUILT UP OR CMU JAMB THICKNESS - CONNECT W/ CAULK BTWN. 3/16" DIA. TAPCONS. BUCK /BLOCK TAPCON LENGTH MUST BE SUFFICIENT TO ACHIEVE MIN. CEMENT FINISH � 1 1/4" EMBEDMENT INTO ODER BLOCK BLOCK JAMB /HERD INSTALL WOW./DOOR SCREW DRYWALL ANCHOR INTO BUCK PER INSTALLATION DETAILS HEAD/JAMB FOR BUCK THICKNESS 1112" OR GREATER INSTALL WDW./DOOR TAPCON PRECAST CONC. ANCHOR INTO BLOCK PER LINTEL ABV. OPNG. INSTALLATION DETAILS OR CMU JAMB CAULK BTWN. MIN. 2 1/2' WIDE BUCK - MAXIMUM BUILT UP BUCK % BLK THICKNESS MUST BE LESS THAN 1 1/2' CONNECT W/ CEMENT FINISH SPIRAL NAILS AT 16" O.G. OVER BLOCK DRYWALL HEAD/JAMB FOR BUCK THICKNESS LESS THAN 11121" CEMENT FINISH ATTACH WDW./DOOR PER OVER BLOCK MANUF. SPEOFlCR110NS PRECAST CONC. SILL � I SILL ' BLOCK WALL OPNG, WDW./DOOR BUCK DETAILS ALL EXTERIOR WINDOWS AND DOORS SHALL HAVE MEET PRESSURES IN CHART- EXPOSURE "C" FASTENER SCHEDULE FOR BUILT UP STUD COLUMNS VERTICAL SPACING OF FASTENERS AT 8' O.C. STAGGERED UNLESS OTHERWISE NOTED. THIRD AND FOURTH PLIES SHALL BE ADDED TO EITHER SIDE OF 2 -PLY COMPOSITE POST. MINIMUM END DISTANCE SHALL BE 2 1/2' AND MINIMUM EDGE DISTANCE SHALL BE t". STUD # OF NAILS NUMBER OF PLYS SIZE PER RDW (2) PLYS (3) PLYS (4) PLYS 20 (t) 10d x A. 10d x 31 10d X A. OR 1/2" DIAM. BST 0 16° O.C. 26 (2) 10d x A. i Qd x A. 10d X A. OR 1/2° DIAM.BOLT 0 16' D.C. 2x$ (2) tOd x 31 1 O x A. i0d X A. OR 1/2" DIA. BOLT 0 16" D.G. IN LIEU OF NAILS, MEMBERS MAY BE BOLTED TOGETHER. WITH 1/2' DIAM. THRU-BOLTS AT 16" O.G. VERTICALLY WITH THE SAME NUMBER OF BOLTS PER ROW AS NAILS WOOD HEADER SCHEDULE MAXIMUM CLEAR SPAN FOR LOAD BEARING FRAME WALLS SIZES NOTED ON PLANS TO SUPERCEDE VALUES SHOWN ON THIS SCHEDULE HEADER LOAD HEADER SIZE CONDITION (2)2x6 NJ (2)2x8 NJ (2)2x10 NJ (2)2x12 NJ ROOF ONLY 4'-0' 2 5'-4° 2 6'-8" 2 7'-6" 2 2nd FLOC ONLY 3'-6' 2 4'-5" 2 5-5" 2 6'-3" 2 2nd FLOOR &ROOF 3'-0' 2 4'-8" 2 5 -5" 3 ON "NJ" =MINIMUM NUMBER OF JACK STUDS REQ'D. AT EA. END UNLESS OTHERWISE NOTED THE PLAN ALL STRUCTURAL HEADERS TO BE #2 4R BETTER S.Y.P. ALL NON-STRUCTURAL HEADERS HEM -FIR OR S -P -F OR BETTER CONSTRUCTION NOTES L .APPLICABLE CODES: - FLOR IDA BUILDING CODE 2410 -RESIDENTIAL=Jz E-= - NATIONAL ELECTRICAL CODE REQUIREMENTS FOR ONE AND TWO FAMILY DWELINGS, NFPA 70A; 2007. - FLORIDA FIRE PREVENTION CODE - F.F.P.C. 2010 2. SUBCONTRACTORS SHALL VERIFY ALL DIMENSIONS IN THE FIELD AND NOTiFY THE BUILDER/ARCHITECT OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH CONSTRUCTION. 3. ALL CONSTRUCTION SHALL BE BRACED AND SHORED BY CONTRACTOR AS REQUIRED TO SAFELY PERFORM THE WORK. TERMITE PROTECTION 1. TERMITE PRETREATMENT SHALL MAKE USE OF BORA-CARE TERMIIICIDE. THE BORA-CARE TERMITIODE TREATMENT IS REGISTERED BY THE FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES AS REQUIERED BY THE FLORIDA BUILDING CODE 2010 - RESIDENTIAL 2. UPON COMPLETION OF THE APPLICATION OF THE TERMITE PROTECTIVE TREATMENT, A CERTIFICATE OF COMPLIANCE SHALL BE ISSUED BY A LICENSED PEST CONTROL COMPANY BEFORE A CERTIFICATE OF OCCUPANCY MAY BE ISSUED. THE CERTIFICATE OF COMPLIANCE SHALL STATE: 'THE BUILDING HAS RECEIVED A COMPLETE TREATMENT FOR THE PREVENTION OF SUBTERRANEAN TERMITES. THE TREATMENT IS IN ACCORDANCE WITH THE RULES AND LAWS ESTABLISHED BY THE FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES'. FOUNDATION NOTES 1. FOUNDATION IS DEIGNED BASED ON PRESUMPTIVE SAFE ALLOWABLE BEARING PRESSURE OF 2000 PSF. CONTRACTOR MALL VERIFY THAT THE MINIMUM BEARING PRESSURE OF 2000 PSF IS OBTAINED PRIOR TO FOOTING PLACEMENT. 2. FOOTING MALL BE PLACED ON COMPACTED SOIL FREE OF ORGANIC DEBRIS. 3. AS REQUIRED BY THE LOCAL MUNiCAPILITY BUILDING DEPARTMENT, A FOUNDATION SURVEY SHALL BE PERFORMED AND A COPY OF THE SURVEY SHALL ON THE SITE FOR 1TiE BUILDING INSPECTOR'S USE, OR ALL PROPERTY MARKERS SHALL BE EXPOSED AND A STRING STRETCHED FROM MARKER TO MARKER TO VERIFY REQUIRED SETBACKS. CONCRETE NOTES 1. CONCRETE STRENGTH SHALL BE 2500 PSI AT 28 DAYS AND IN ACCORDANCE WITH A.C.I. 318-11. 2. REINFORCING STEEL SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF ASTM A615 GRAFE 44. 3. WELDED WIRE FABRIC SHALL BE IN ACCORDANCE 4NTH THE LATEST EDITION OF ASTM A185. CONCRETE MASONRY NOTES 1. CONCRETE MASONRY WORK SHALL BE IN ACCORDANCE NTH A.C.I. 530/ASCE 5/TMS 402. 2. CONCRETE MASONRY .UNITS SHALL BE 1N CONFORMANCE WITH ASTM C90, GRADE N, TYPE II ASTM C140 AND SHALL HAVE A COMPRESSIVE STRENGTH OF 2000 PSI MINIMUM BASED ON THE NET GROSS SECTIONAL AREA. 3. COARSE GROUT SHALL BE IN CONFORMANCE WITH ASTM C476. 4. MORTAR SHALL BE TYPE "M" OR "S' IN ACCORDANCE WITH ASTM C270. 5. ALL MASONRRY UNITS SHALL BE LAID IN RUNNING BOND U.N.O. 6. PROVIDE 8" PRECAST CONCRETE LINTELS ABOVE ALL MASONARY OPNGS. ALL LINTEL FOR OPNGS. OVER 5-6" SHALL BE GROUTED SOLID W/ 8" STANDARD BRC. EA. END U.N.O. (4' MIN. BEARING REQ'D.) PRE-ENGINEERED: WOOD TRUSSES L ALL TRUSSES SHALL BE IN ACCORDANCE WITH THE LATEST EDITIONS OF THE "NATIONAL DESIGN SP€CIFICATONS FOR STRESS -MADE LUMBER AND ITS FASTENERS" AS RECOMMENDED BY THE NATIONAL FOREST PRODUCTS ASSOCIATION. 2. THE TRUSS MANUF. SHALL VERIFY ALL TRUSS SPANS, SLOPES, BEARING POINTS, AND DIMENSIONS BEFORE FABRICATION. ANY DEVATIONS OR DISCREPANCIES FROM THE PLANS TO BE BROUGHT TO THE AT1>=NTiON OF THE BUILDER/ARCHITECT/ENGINEER PRIOR TO PROCEEDING. TRUSS MANUF. TO SUPPLY ALL TRUSS TO TRUSS HANGERS AND CONNECTIONS. 3. TRUSS MANUF. TO PROVIDE SHOP DRAiNNGS ON NEW AND/OR REVISED MODEL PLANS TO BUILDER FOR REVIEW BEFORE FABRICATION. TRUSS SHOP DRAWINGS SHALL SHOW ALL TRUSS PROFILES, GRAVITY/UPLIFT LOADS, BRACING MEMBERS, AND TRUSS TO TRUSS HANGERS. 4. ALL PREFAB. WOOD TRUSSES SHALL BE SECURELY FASTENED TO THEIR SUPPORTING WALLS OR BEAMS AS REQUIRED PER THE FRAMING PLANS. 5. PRE-ENGINEERED WOOD TRUSSES, RAFTERS, AND OTHER ROOF FRAMING MEMBERS SHALL BE SPACED AT 24' O.C. MAXIMUM. 6. RIDGE AND VALLEY SE( MEMBERS SHALL BE A NOMINAL DIMENSION OF 2" LARGER THAN RAFTERS. 7. ALL ROOF FRAMING MEMBERS SHALL BE MIN. SYP #2 OR BETTER. WALL &ROOF FRAMING NOTES 1. WOOD CONSTRUCTION SHALL CONFORM TO THE LATEST EDITION OF °NATIONAL DEIGN SPEORGAl10NS FOR WOOD CONSTRUCTi(XV" BY THE NATIONAL FOREST PRODUCT ASSOOAl10N. 2. ROOF AND WALL STRUCTURAL SHEATHING SHALL BE SPAN RATED IN ACCORDANCE WITH APA PS 1-83 OR NER-108. NAILS USED IN ALL SHEATHING APPLICATIONS SHALL BE 8d RING SHANK, HOT DIPPED GALVANIZED, HAivD OR GUN DRIVEN NAILS. GUN DRIVEN NAILS SHALL HAVE HEAD AND SHANK SIZE EQUIVALENT TO HAND DRIVEN NAILS, OTHERWISE SPACING SHALL BE REDUCED FROM 12" TO 10',8' TO 6°, 6° TO 5°, 4° TO 3°, AND 3' TO 2° IN THOSE APPLICATIONS. 3. ALL EXTERIOR FRAMED WALL STUDS SHALL BE AS NOTED ON PLANS AND OR A MINIMUM GRADE OF #2 SYP OR BETTER. INTERIOR WALL STUDS SHALL BE A MINIMUM OF S -P -F #2 OR BETTER. 4. WOOD HEADERS PER SCHEDULE UNLESS NflTID OTHERWISE ON PLANS. ALL HEADER MATERIAL TO BE SOUTHERN YELLOW PINE #2 MIN. PROVIDE STRAPS AS REQ'D. PER DETAILS. 5. PROVIDE A BUILT UP OR SOLID SAWN COLUMN UNDER ALL GIRDERS AND BEAMS IN FRAMED WALLS UNLESS NOTED OTHERWISE 4N PLANS. A MINIMUM OF (2)2x4 STUDS SHALL BE USED. STRAP MEMBER DIRECTLY TO TOP OF COLUMN AND BOTTOM W A MIN. OF SIMPSON SPH4 OR EQUAL AT EACH STUD. PROVIDE BLOCKING TO BEARING WALL BELOW AS REQUIRED. HEAVY HOLD DOWNS MAY BE REQUIRED AT SOME LOCATIONS AS NOTED ON PLANS. 6. END JOINTS IN STRUCTURAL DOUBLE PLATE 91ALL BE OFFSET AT LEAST 4'-0°. STRUCTURAL DOUBLE PLATES TO BE NAILED AT 6" D.C. 7. AT EXTERIOR FRAME WALLS, PROVIDE FULL PANEL OF SHEATHING FROM ALL CORNER EDGES. FULL PANEL MUST BE SAWCUT AROUND ANY OPENINGS. SEE DETAILS FOR NAILING REQUIREMENTS. 8. THE NUMBER AND SIZE OF NhLS CONNECTING WOOD MEMBERS SHALL NOT BE LESS THAN THOSE SPECIFIED IN TABLE 2304.9.1 (FASTENING SCHEDULE) OF THE FLORIDA BUILDING CODE 2010 -RESIDENTIAL- UNLESS NOTED OTHERWISE. 9. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED LUMBER OR SEPARATED FROM CONCRETE W/ FELT PAPER OR METAL PLATES. 14. ALL NAILS AND BOLTS EXPOSED TO WEATHER SHALL BE HOT DIPPED GALVINIZED. UPLIFT CONNECTORS 1. UPLIFT CONNECTORS ARE ONLY REQUIRED ON MEMBERS IN WALLS THAT ARE EXPOSED TO UPLIFT FORCES. INTERIOR LOAD BEARING WALLS ARE NOT ALWAYS EXPOSED TO UPLIFT FORCES. THE MEMBERS OF THESE WALL WOULD NOT NEED TO HAVE CONNECTORS APPLIED. 2. UPLIFT CONNECTORS TO PROVIDE CONTINUITY FROM ROOF TRUSSES THRU PLATES TO SLAB AND FOUNDATION PER PLAN. 3. UPLIFT CONNECTORS AT ROOF TRUSSES SHALL BE BENT OVER TRUSS TOP CHORDS AS REQUIRED AND NAILED PRIOR TO APPLICATION OF ROOF SHEATHING. MISSED STRAPS SHALL BE INSTALLED PER PLAN PRIOR TO SHEATHING INSTALLAIiOJ. 4. THE MAXIMUM NUMBER OF FLAT STRAPS (I.E. "HETA20") IN THE TOP BLOCK WALL COURSE AT ANY GiRDER TRUSS SHALL BE (2) STRAPS WITH 8" CLEAR DIMENSION BEFORE NEXT STRAP(S). 5. ALL SPECIFIED CONNECTORS SHALL BE INSTALLED PER CONNECTOR MANUFACTURERS INSTRUCTIONS. 6. NO CONNECTOR SHALL BE BENT IN THE FIELD UNLESS NOTED AS ACCEPTABLE IN THE CONNECTOR MANUF. PRODUCT CATALOG. 7. WHEN ANCHORING (2) WOOD ITEMS TOGETHER, THE LENGTH OF HURRICANE STRAP MUST BE EQUALLY HALF ON ER. ITEM. 8. INSTALL ALL SPECIFIED FASTENERS AT EACH CONNECTOR. REFER TO CONNECTS SCHEDULE FOR MINIMUM NUMBER OF FASTENERS 9. MAY SUBSTITUTE HURRICANE STRAP WITH STRAP OF GREATER HOLD DOWN VALUE OR GREATER UPLIFT VALUE IN FIELD WITHOUT VERIFICATION, PROVIDED ALL MANUFACTURERS INSTALLATION INSTRUCTIONS OR REQUIREMENTS ARE FOLLOWED. STRUCTURAL CRITERIA 1. APPLICABLE CODE FLORIDA BUILDING CODE 2010 -RESIDENTIAL WIND SPEED - 144 NON -WIND-BORNE DEBRIS REGION; WIND IMPORTANCE FACTOR - (1) ONE; 'ENCLOSED' BUILDING TYPE; EXPOSURE CATEGORY C -SEE ROOF PLAN NOTES. 2. INTERNAL PRESSURE COEFFICIENT: +/- 0.18 MAXIMUM MEAN ROOF HT. = 30 FEET GENERAL NOTES 1. DOORS BETWEEN GARAGE AND LIVING SPA( MALL BE MINIMUM 1 3/8' THICK SOLID CORE WORD ODORS, 1 3/8' SOLID DR HONEYCOMB CORE STEEL DOORS, OR 20 -MINUTE FIRE RATED DOORS. 2. THE GARAGE SHALL BE SEPARATED FROM THE RESIDENCE AND ITS ATTiC AREA BY NOT LESS THAN 1/2" GYPSUM BOARD APPLIED TO THE GARAGE SIDE. GARAGES BENEATH HABITABLE ROOMS SHALL BE SEPARATED FROM ALL HABITABLE ROOMS ABOVE BY NOT LESS THAN 5/8" TYPE X GYPSUM BOARD OR ITS EQUIVALENT 3. DUCTS IN THE GARAGE AND DUCTS PENETRATING THE WALLS OR (FILINGS SEPARATING THE DWELL{N FROM THE GARAGE SHALL BE CONSTRUCTED 4F A MINIMUM N0. 26 GAGE SHEET STEEL OR APPROVED EQUAL 4. ENCLOSED ACCESSIBLE SPACE UNDER STAIRS SHALL HAVE WALLS, UNDER STAIR SURFACE AND ANY SOFFITS PROTECTED ON THE ENCLOSED .SIDE WITH 1/2' GYPSUM BOARD. DOOR SCHEDULE 2068 DOOR DOOR DOOR DOOR WIDTH WIDTH HT, HT. FEET INCHES FEET INCHES NOTES 1. NUMBER OF PANELS, HAND, & SWING AS SHOWN ON PLAN 1 1 1 1 ry ry cn i 1 i 1 LATEST REVISION DATE TO MASTER: 07-01-12 W� U Ali _ W WI 0 0 f z c� o Q - U � tUJ o LV o L..L z O O c� -9C-0 CIS Lu �) U oho CQ LLJ o � � � � = Q w = ~o C-- � J (� O C'7 O LLLU 00 LID - (n CV LL Q � M 1 M L'1"J � LL I LLJ LLJ W 0 C/) Lu z 0 � o W o� J co DO NOT SCALE PRINTS! CONSTRUC114N SHALL BE PER INDICATED DIMENSIONS ONLY, ANY DISCREPENCIES TO BE REPORTED TO M/i HOMES FOR CLARIFI -5" 3 ON "NJ" =MINIMUM NUMBER OF JACK STUDS REQ'D. AT EA. END UNLESS OTHERWISE NOTED THE PLAN ALL STRUCTURAL HEADERS TO BE #2 4R BETTER S.Y.P. ALL NON-STRUCTURAL HEADERS HEM -FIR OR S -P -F OR BETTER CONSTRUCTION NOTES L .APPLICABLE CODES: - FLOR IDA BUILDING CODE 2410 -RESIDENTIAL=Jz E-= - NATIONAL ELECTRICAL CODE REQUIREMENTS FOR ONE AND TWO FAMILY DWELINGS, NFPA 70A; 2007. - FLORIDA FIRE PREVENTION CODE - F.F.P.C. 2010 2. SUBCONTRACTORS SHALL VERIFY ALL DIMENSIONS IN THE FIELD AND NOTiFY THE BUILDER/ARCHITECT OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH CONSTRUCTION. 3. ALL CONSTRUCTION SHALL BE BRACED AND SHORED BY CONTRACTOR AS REQUIRED TO SAFELY PERFORM THE WORK. TERMITE PROTECTION 1. TERMITE PRETREATMENT SHALL MAKE USE OF BORA-CARE TERMIIICIDE. THE BORA-CARE TERMITIODE TREATMENT IS REGISTERED BY THE FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES AS REQUIERED BY THE FLORIDA BUILDING CODE 2010 - RESIDENTIAL 2. UPON COMPLETION OF THE APPLICATION OF THE TERMITE PROTECTIVE TREATMENT, A CERTIFICATE OF COMPLIANCE SHALL BE ISSUED BY A LICENSED PEST CONTROL COMPANY BEFORE A CERTIFICATE OF OCCUPANCY MAY BE ISSUED. THE CERTIFICATE OF COMPLIANCE SHALL STATE: 'THE BUILDING HAS RECEIVED A COMPLETE TREATMENT FOR THE PREVENTION OF SUBTERRANEAN TERMITES. THE TREATMENT IS IN ACCORDANCE WITH THE RULES AND LAWS ESTABLISHED BY THE FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES'. FOUNDATION NOTES 1. FOUNDATION IS DEIGNED BASED ON PRESUMPTIVE SAFE ALLOWABLE BEARING PRESSURE OF 2000 PSF. CONTRACTOR MALL VERIFY THAT THE MINIMUM BEARING PRESSURE OF 2000 PSF IS OBTAINED PRIOR TO FOOTING PLACEMENT. 2. FOOTING MALL BE PLACED ON COMPACTED SOIL FREE OF ORGANIC DEBRIS. 3. AS REQUIRED BY THE LOCAL MUNiCAPILITY BUILDING DEPARTMENT, A FOUNDATION SURVEY SHALL BE PERFORMED AND A COPY OF THE SURVEY SHALL ON THE SITE FOR 1TiE BUILDING INSPECTOR'S USE, OR ALL PROPERTY MARKERS SHALL BE EXPOSED AND A STRING STRETCHED FROM MARKER TO MARKER TO VERIFY REQUIRED SETBACKS. CONCRETE NOTES 1. CONCRETE STRENGTH SHALL BE 2500 PSI AT 28 DAYS AND IN ACCORDANCE WITH A.C.I. 318-11. 2. REINFORCING STEEL SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF ASTM A615 GRAFE 44. 3. WELDED WIRE FABRIC SHALL BE IN ACCORDANCE 4NTH THE LATEST EDITION OF ASTM A185. CONCRETE MASONRY NOTES 1. CONCRETE MASONRY WORK SHALL BE IN ACCORDANCE NTH A.C.I. 530/ASCE 5/TMS 402. 2. CONCRETE MASONRY .UNITS SHALL BE 1N CONFORMANCE WITH ASTM C90, GRADE N, TYPE II ASTM C140 AND SHALL HAVE A COMPRESSIVE STRENGTH OF 2000 PSI MINIMUM BASED ON THE NET GROSS SECTIONAL AREA. 3. COARSE GROUT SHALL BE IN CONFORMANCE WITH ASTM C476. 4. MORTAR SHALL BE TYPE "M" OR "S' IN ACCORDANCE WITH ASTM C270. 5. ALL MASONRRY UNITS SHALL BE LAID IN RUNNING BOND U.N.O. 6. PROVIDE 8" PRECAST CONCRETE LINTELS ABOVE ALL MASONARY OPNGS. ALL LINTEL FOR OPNGS. OVER 5-6" SHALL BE GROUTED SOLID W/ 8" STANDARD BRC. EA. END U.N.O. (4' MIN. BEARING REQ'D.) PRE-ENGINEERED: WOOD TRUSSES L ALL TRUSSES SHALL BE IN ACCORDANCE WITH THE LATEST EDITIONS OF THE "NATIONAL DESIGN SP€CIFICATONS FOR STRESS -MADE LUMBER AND ITS FASTENERS" AS RECOMMENDED BY THE NATIONAL FOREST PRODUCTS ASSOCIATION. 2. THE TRUSS MANUF. SHALL VERIFY ALL TRUSS SPANS, SLOPES, BEARING POINTS, AND DIMENSIONS BEFORE FABRICATION. ANY DEVATIONS OR DISCREPANCIES FROM THE PLANS TO BE BROUGHT TO THE AT1>=NTiON OF THE BUILDER/ARCHITECT/ENGINEER PRIOR TO PROCEEDING. TRUSS MANUF. TO SUPPLY ALL TRUSS TO TRUSS HANGERS AND CONNECTIONS. 3. TRUSS MANUF. TO PROVIDE SHOP DRAiNNGS ON NEW AND/OR REVISED MODEL PLANS TO BUILDER FOR REVIEW BEFORE FABRICATION. TRUSS SHOP DRAWINGS SHALL SHOW ALL TRUSS PROFILES, GRAVITY/UPLIFT LOADS, BRACING MEMBERS, AND TRUSS TO TRUSS HANGERS. 4. ALL PREFAB. WOOD TRUSSES SHALL BE SECURELY FASTENED TO THEIR SUPPORTING WALLS OR BEAMS AS REQUIRED PER THE FRAMING PLANS. 5. PRE-ENGINEERED WOOD TRUSSES, RAFTERS, AND OTHER ROOF FRAMING MEMBERS SHALL BE SPACED AT 24' O.C. MAXIMUM. 6. RIDGE AND VALLEY SE( MEMBERS SHALL BE A NOMINAL DIMENSION OF 2" LARGER THAN RAFTERS. 7. ALL ROOF FRAMING MEMBERS SHALL BE MIN. SYP #2 OR BETTER. WALL &ROOF FRAMING NOTES 1. WOOD CONSTRUCTION SHALL CONFORM TO THE LATEST EDITION OF °NATIONAL DEIGN SPEORGAl10NS FOR WOOD CONSTRUCTi(XV" BY THE NATIONAL FOREST PRODUCT ASSOOAl10N. 2. ROOF AND WALL STRUCTURAL SHEATHING SHALL BE SPAN RATED IN ACCORDANCE WITH APA PS 1-83 OR NER-108. NAILS USED IN ALL SHEATHING APPLICATIONS SHALL BE 8d RING SHANK, HOT DIPPED GALVANIZED, HAivD OR GUN DRIVEN NAILS. GUN DRIVEN NAILS SHALL HAVE HEAD AND SHANK SIZE EQUIVALENT TO HAND DRIVEN NAILS, OTHERWISE SPACING SHALL BE REDUCED FROM 12" TO 10',8' TO 6°, 6° TO 5°, 4° TO 3°, AND 3' TO 2° IN THOSE APPLICATIONS. 3. ALL EXTERIOR FRAMED WALL STUDS SHALL BE AS NOTED ON PLANS AND OR A MINIMUM GRADE OF #2 SYP OR BETTER. INTERIOR WALL STUDS SHALL BE A MINIMUM OF S -P -F #2 OR BETTER. 4. WOOD HEADERS PER SCHEDULE UNLESS NflTID OTHERWISE ON PLANS. ALL HEADER MATERIAL TO BE SOUTHERN YELLOW PINE #2 MIN. PROVIDE STRAPS AS REQ'D. PER DETAILS. 5. PROVIDE A BUILT UP OR SOLID SAWN COLUMN UNDER ALL GIRDERS AND BEAMS IN FRAMED WALLS UNLESS NOTED OTHERWISE 4N PLANS. A MINIMUM OF (2)2x4 STUDS SHALL BE USED. STRAP MEMBER DIRECTLY TO TOP OF COLUMN AND BOTTOM W A MIN. OF SIMPSON SPH4 OR EQUAL AT EACH STUD. PROVIDE BLOCKING TO BEARING WALL BELOW AS REQUIRED. HEAVY HOLD DOWNS MAY BE REQUIRED AT SOME LOCATIONS AS NOTED ON PLANS. 6. END JOINTS IN STRUCTURAL DOUBLE PLATE 91ALL BE OFFSET AT LEAST 4'-0°. STRUCTURAL DOUBLE PLATES TO BE NAILED AT 6" D.C. 7. AT EXTERIOR FRAME WALLS, PROVIDE FULL PANEL OF SHEATHING FROM ALL CORNER EDGES. FULL PANEL MUST BE SAWCUT AROUND ANY OPENINGS. SEE DETAILS FOR NAILING REQUIREMENTS. 8. THE NUMBER AND SIZE OF NhLS CONNECTING WOOD MEMBERS SHALL NOT BE LESS THAN THOSE SPECIFIED IN TABLE 2304.9.1 (FASTENING SCHEDULE) OF THE FLORIDA BUILDING CODE 2010 -RESIDENTIAL- UNLESS NOTED OTHERWISE. 9. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED LUMBER OR SEPARATED FROM CONCRETE W/ FELT PAPER OR METAL PLATES. 14. ALL NAILS AND BOLTS EXPOSED TO WEATHER SHALL BE HOT DIPPED GALVINIZED. UPLIFT CONNECTORS 1. UPLIFT CONNECTORS ARE ONLY REQUIRED ON MEMBERS IN WALLS THAT ARE EXPOSED TO UPLIFT FORCES. INTERIOR LOAD BEARING WALLS ARE NOT ALWAYS EXPOSED TO UPLIFT FORCES. THE MEMBERS OF THESE WALL WOULD NOT NEED TO HAVE CONNECTORS APPLIED. 2. UPLIFT CONNECTORS TO PROVIDE CONTINUITY FROM ROOF TRUSSES THRU PLATES TO SLAB AND FOUNDATION PER PLAN. 3. UPLIFT CONNECTORS AT ROOF TRUSSES SHALL BE BENT OVER TRUSS TOP CHORDS AS REQUIRED AND NAILED PRIOR TO APPLICATION OF ROOF SHEATHING. MISSED STRAPS SHALL BE INSTALLED PER PLAN PRIOR TO SHEATHING INSTALLAIiOJ. 4. THE MAXIMUM NUMBER OF FLAT STRAPS (I.E. "HETA20") IN THE TOP BLOCK WALL COURSE AT ANY GiRDER TRUSS SHALL BE (2) STRAPS WITH 8" CLEAR DIMENSION BEFORE NEXT STRAP(S). 5. ALL SPECIFIED CONNECTORS SHALL BE INSTALLED PER CONNECTOR MANUFACTURERS INSTRUCTIONS. 6. NO CONNECTOR SHALL BE BENT IN THE FIELD UNLESS NOTED AS ACCEPTABLE IN THE CONNECTOR MANUF. PRODUCT CATALOG. 7. WHEN ANCHORING (2) WOOD ITEMS TOGETHER, THE LENGTH OF HURRICANE STRAP MUST BE EQUALLY HALF ON ER. ITEM. 8. INSTALL ALL SPECIFIED FASTENERS AT EACH CONNECTOR. REFER TO CONNECTS SCHEDULE FOR MINIMUM NUMBER OF FASTENERS 9. MAY SUBSTITUTE HURRICANE STRAP WITH STRAP OF GREATER HOLD DOWN VALUE OR GREATER UPLIFT VALUE IN FIELD WITHOUT VERIFICATION, PROVIDED ALL MANUFACTURERS INSTALLATION INSTRUCTIONS OR REQUIREMENTS ARE FOLLOWED. STRUCTURAL CRITERIA 1. APPLICABLE CODE FLORIDA BUILDING CODE 2010 -RESIDENTIAL WIND SPEED - 144 NON -WIND-BORNE DEBRIS REGION; WIND IMPORTANCE FACTOR - (1) ONE; 'ENCLOSED' BUILDING TYPE; EXPOSURE CATEGORY C -SEE ROOF PLAN NOTES. 2. INTERNAL PRESSURE COEFFICIENT: +/- 0.18 MAXIMUM MEAN ROOF HT. = 30 FEET GENERAL NOTES 1. DOORS BETWEEN GARAGE AND LIVING SPA( MALL BE MINIMUM 1 3/8' THICK SOLID CORE WORD ODORS, 1 3/8' SOLID DR HONEYCOMB CORE STEEL DOORS, OR 20 -MINUTE FIRE RATED DOORS. 2. THE GARAGE SHALL BE SEPARATED FROM THE RESIDENCE AND ITS ATTiC AREA BY NOT LESS THAN 1/2" GYPSUM BOARD APPLIED TO THE GARAGE SIDE. GARAGES BENEATH HABITABLE ROOMS SHALL BE SEPARATED FROM ALL HABITABLE ROOMS ABOVE BY NOT LESS THAN 5/8" TYPE X GYPSUM BOARD OR ITS EQUIVALENT 3. DUCTS IN THE GARAGE AND DUCTS PENETRATING THE WALLS OR (FILINGS SEPARATING THE DWELL{N FROM THE GARAGE SHALL BE CONSTRUCTED 4F A MINIMUM N0. 26 GAGE SHEET STEEL OR APPROVED EQUAL 4. ENCLOSED ACCESSIBLE SPACE UNDER STAIRS SHALL HAVE WALLS, UNDER STAIR SURFACE AND ANY SOFFITS PROTECTED ON THE ENCLOSED .SIDE WITH 1/2' GYPSUM BOARD. DOOR SCHEDULE 2068 DOOR DOOR DOOR DOOR WIDTH WIDTH HT, HT. FEET INCHES FEET INCHES NOTES 1. NUMBER OF PANELS, HAND, & SWING AS SHOWN ON PLAN 1 1 1 1 ry ry cn i 1 i 1 LATEST REVISION DATE TO MASTER: 07-01-12 W� U Ali _ W WI 0 0 f z c� o Q - U � tUJ o LV o L..L z O O c� -9C-0 CIS Lu �) U oho CQ LLJ o � � � � = Q w = ~o C-- � J (� O C'7 O LLLU 00 LID - (n CV LL Q � M 1 M L'1"J � LL I LLJ LLJ W 0 C/) Lu z 0 � o W o� J co DO NOT SCALE PRINTS! CONSTRUC114N SHALL BE PER INDICATED DIMENSIONS ONLY, ANY DISCREPENCIES TO BE REPORTED TO M/i HOMES FOR CLARIFI 4R BETTER S.Y.P. ALL NON-STRUCTURAL HEADERS HEM -FIR OR S -P -F OR BETTER CONSTRUCTION NOTES L .APPLICABLE CODES: - FLOR IDA BUILDING CODE 2410 -RESIDENTIAL=Jz E-= - NATIONAL ELECTRICAL CODE REQUIREMENTS FOR ONE AND TWO FAMILY DWELINGS, NFPA 70A; 2007. - FLORIDA FIRE PREVENTION CODE - F.F.P.C. 2010 2. SUBCONTRACTORS SHALL VERIFY ALL DIMENSIONS IN THE FIELD AND NOTiFY THE BUILDER/ARCHITECT OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH CONSTRUCTION. 3. ALL CONSTRUCTION SHALL BE BRACED AND SHORED BY CONTRACTOR AS REQUIRED TO SAFELY PERFORM THE WORK. TERMITE PROTECTION 1. TERMITE PRETREATMENT SHALL MAKE USE OF BORA-CARE TERMIIICIDE. THE BORA-CARE TERMITIODE TREATMENT IS REGISTERED BY THE FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES AS REQUIERED BY THE FLORIDA BUILDING CODE 2010 - RESIDENTIAL 2. UPON COMPLETION OF THE APPLICATION OF THE TERMITE PROTECTIVE TREATMENT, A CERTIFICATE OF COMPLIANCE SHALL BE ISSUED BY A LICENSED PEST CONTROL COMPANY BEFORE A CERTIFICATE OF OCCUPANCY MAY BE ISSUED. THE CERTIFICATE OF COMPLIANCE SHALL STATE: 'THE BUILDING HAS RECEIVED A COMPLETE TREATMENT FOR THE PREVENTION OF SUBTERRANEAN TERMITES. THE TREATMENT IS IN ACCORDANCE WITH THE RULES AND LAWS ESTABLISHED BY THE FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES'. FOUNDATION NOTES 1. FOUNDATION IS DEIGNED BASED ON PRESUMPTIVE SAFE ALLOWABLE BEARING PRESSURE OF 2000 PSF. CONTRACTOR MALL VERIFY THAT THE MINIMUM BEARING PRESSURE OF 2000 PSF IS OBTAINED PRIOR TO FOOTING PLACEMENT. 2. FOOTING MALL BE PLACED ON COMPACTED SOIL FREE OF ORGANIC DEBRIS. 3. AS REQUIRED BY THE LOCAL MUNiCAPILITY BUILDING DEPARTMENT, A FOUNDATION SURVEY SHALL BE PERFORMED AND A COPY OF THE SURVEY SHALL ON THE SITE FOR 1TiE BUILDING INSPECTOR'S USE, OR ALL PROPERTY MARKERS SHALL BE EXPOSED AND A STRING STRETCHED FROM MARKER TO MARKER TO VERIFY REQUIRED SETBACKS. CONCRETE NOTES 1. CONCRETE STRENGTH SHALL BE 2500 PSI AT 28 DAYS AND IN ACCORDANCE WITH A.C.I. 318-11. 2. REINFORCING STEEL SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF ASTM A615 GRAFE 44. 3. WELDED WIRE FABRIC SHALL BE IN ACCORDANCE 4NTH THE LATEST EDITION OF ASTM A185. CONCRETE MASONRY NOTES 1. CONCRETE MASONRY WORK SHALL BE IN ACCORDANCE NTH A.C.I. 530/ASCE 5/TMS 402. 2. CONCRETE MASONRY .UNITS SHALL BE 1N CONFORMANCE WITH ASTM C90, GRADE N, TYPE II ASTM C140 AND SHALL HAVE A COMPRESSIVE STRENGTH OF 2000 PSI MINIMUM BASED ON THE NET GROSS SECTIONAL AREA. 3. COARSE GROUT SHALL BE IN CONFORMANCE WITH ASTM C476. 4. MORTAR SHALL BE TYPE "M" OR "S' IN ACCORDANCE WITH ASTM C270. 5. ALL MASONRRY UNITS SHALL BE LAID IN RUNNING BOND U.N.O. 6. PROVIDE 8" PRECAST CONCRETE LINTELS ABOVE ALL MASONARY OPNGS. ALL LINTEL FOR OPNGS. OVER 5-6" SHALL BE GROUTED SOLID W/ 8" STANDARD BRC. EA. END U.N.O. (4' MIN. BEARING REQ'D.) PRE-ENGINEERED: WOOD TRUSSES L ALL TRUSSES SHALL BE IN ACCORDANCE WITH THE LATEST EDITIONS OF THE "NATIONAL DESIGN SP€CIFICATONS FOR STRESS -MADE LUMBER AND ITS FASTENERS" AS RECOMMENDED BY THE NATIONAL FOREST PRODUCTS ASSOCIATION. 2. THE TRUSS MANUF. SHALL VERIFY ALL TRUSS SPANS, SLOPES, BEARING POINTS, AND DIMENSIONS BEFORE FABRICATION. ANY DEVATIONS OR DISCREPANCIES FROM THE PLANS TO BE BROUGHT TO THE AT1>=NTiON OF THE BUILDER/ARCHITECT/ENGINEER PRIOR TO PROCEEDING. TRUSS MANUF. TO SUPPLY ALL TRUSS TO TRUSS HANGERS AND CONNECTIONS. 3. TRUSS MANUF. TO PROVIDE SHOP DRAiNNGS ON NEW AND/OR REVISED MODEL PLANS TO BUILDER FOR REVIEW BEFORE FABRICATION. TRUSS SHOP DRAWINGS SHALL SHOW ALL TRUSS PROFILES, GRAVITY/UPLIFT LOADS, BRACING MEMBERS, AND TRUSS TO TRUSS HANGERS. 4. ALL PREFAB. WOOD TRUSSES SHALL BE SECURELY FASTENED TO THEIR SUPPORTING WALLS OR BEAMS AS REQUIRED PER THE FRAMING PLANS. 5. PRE-ENGINEERED WOOD TRUSSES, RAFTERS, AND OTHER ROOF FRAMING MEMBERS SHALL BE SPACED AT 24' O.C. MAXIMUM. 6. RIDGE AND VALLEY SE( MEMBERS SHALL BE A NOMINAL DIMENSION OF 2" LARGER THAN RAFTERS. 7. ALL ROOF FRAMING MEMBERS SHALL BE MIN. SYP #2 OR BETTER. WALL &ROOF FRAMING NOTES 1. WOOD CONSTRUCTION SHALL CONFORM TO THE LATEST EDITION OF °NATIONAL DEIGN SPEORGAl10NS FOR WOOD CONSTRUCTi(XV" BY THE NATIONAL FOREST PRODUCT ASSOOAl10N. 2. ROOF AND WALL STRUCTURAL SHEATHING SHALL BE SPAN RATED IN ACCORDANCE WITH APA PS 1-83 OR NER-108. NAILS USED IN ALL SHEATHING APPLICATIONS SHALL BE 8d RING SHANK, HOT DIPPED GALVANIZED, HAivD OR GUN DRIVEN NAILS. GUN DRIVEN NAILS SHALL HAVE HEAD AND SHANK SIZE EQUIVALENT TO HAND DRIVEN NAILS, OTHERWISE SPACING SHALL BE REDUCED FROM 12" TO 10',8' TO 6°, 6° TO 5°, 4° TO 3°, AND 3' TO 2° IN THOSE APPLICATIONS. 3. ALL EXTERIOR FRAMED WALL STUDS SHALL BE AS NOTED ON PLANS AND OR A MINIMUM GRADE OF #2 SYP OR BETTER. INTERIOR WALL STUDS SHALL BE A MINIMUM OF S -P -F #2 OR BETTER. 4. WOOD HEADERS PER SCHEDULE UNLESS NflTID OTHERWISE ON PLANS. ALL HEADER MATERIAL TO BE SOUTHERN YELLOW PINE #2 MIN. PROVIDE STRAPS AS REQ'D. PER DETAILS. 5. PROVIDE A BUILT UP OR SOLID SAWN COLUMN UNDER ALL GIRDERS AND BEAMS IN FRAMED WALLS UNLESS NOTED OTHERWISE 4N PLANS. A MINIMUM OF (2)2x4 STUDS SHALL BE USED. STRAP MEMBER DIRECTLY TO TOP OF COLUMN AND BOTTOM W A MIN. OF SIMPSON SPH4 OR EQUAL AT EACH STUD. PROVIDE BLOCKING TO BEARING WALL BELOW AS REQUIRED. HEAVY HOLD DOWNS MAY BE REQUIRED AT SOME LOCATIONS AS NOTED ON PLANS. 6. END JOINTS IN STRUCTURAL DOUBLE PLATE 91ALL BE OFFSET AT LEAST 4'-0°. STRUCTURAL DOUBLE PLATES TO BE NAILED AT 6" D.C. 7. AT EXTERIOR FRAME WALLS, PROVIDE FULL PANEL OF SHEATHING FROM ALL CORNER EDGES. FULL PANEL MUST BE SAWCUT AROUND ANY OPENINGS. SEE DETAILS FOR NAILING REQUIREMENTS. 8. THE NUMBER AND SIZE OF NhLS CONNECTING WOOD MEMBERS SHALL NOT BE LESS THAN THOSE SPECIFIED IN TABLE 2304.9.1 (FASTENING SCHEDULE) OF THE FLORIDA BUILDING CODE 2010 -RESIDENTIAL- UNLESS NOTED OTHERWISE. 9. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED LUMBER OR SEPARATED FROM CONCRETE W/ FELT PAPER OR METAL PLATES. 14. ALL NAILS AND BOLTS EXPOSED TO WEATHER SHALL BE HOT DIPPED GALVINIZED. UPLIFT CONNECTORS 1. UPLIFT CONNECTORS ARE ONLY REQUIRED ON MEMBERS IN WALLS THAT ARE EXPOSED TO UPLIFT FORCES. INTERIOR LOAD BEARING WALLS ARE NOT ALWAYS EXPOSED TO UPLIFT FORCES. THE MEMBERS OF THESE WALL WOULD NOT NEED TO HAVE CONNECTORS APPLIED. 2. UPLIFT CONNECTORS TO PROVIDE CONTINUITY FROM ROOF TRUSSES THRU PLATES TO SLAB AND FOUNDATION PER PLAN. 3. UPLIFT CONNECTORS AT ROOF TRUSSES SHALL BE BENT OVER TRUSS TOP CHORDS AS REQUIRED AND NAILED PRIOR TO APPLICATION OF ROOF SHEATHING. MISSED STRAPS SHALL BE INSTALLED PER PLAN PRIOR TO SHEATHING INSTALLAIiOJ. 4. THE MAXIMUM NUMBER OF FLAT STRAPS (I.E. "HETA20") IN THE TOP BLOCK WALL COURSE AT ANY GiRDER TRUSS SHALL BE (2) STRAPS WITH 8" CLEAR DIMENSION BEFORE NEXT STRAP(S). 5. ALL SPECIFIED CONNECTORS SHALL BE INSTALLED PER CONNECTOR MANUFACTURERS INSTRUCTIONS. 6. NO CONNECTOR SHALL BE BENT IN THE FIELD UNLESS NOTED AS ACCEPTABLE IN THE CONNECTOR MANUF. PRODUCT CATALOG. 7. WHEN ANCHORING (2) WOOD ITEMS TOGETHER, THE LENGTH OF HURRICANE STRAP MUST BE EQUALLY HALF ON ER. ITEM. 8. INSTALL ALL SPECIFIED FASTENERS AT EACH CONNECTOR. REFER TO CONNECTS SCHEDULE FOR MINIMUM NUMBER OF FASTENERS 9. MAY SUBSTITUTE HURRICANE STRAP WITH STRAP OF GREATER HOLD DOWN VALUE OR GREATER UPLIFT VALUE IN FIELD WITHOUT VERIFICATION, PROVIDED ALL MANUFACTURERS INSTALLATION INSTRUCTIONS OR REQUIREMENTS ARE FOLLOWED. STRUCTURAL CRITERIA 1. APPLICABLE CODE FLORIDA BUILDING CODE 2010 -RESIDENTIAL WIND SPEED - 144 NON -WIND-BORNE DEBRIS REGION; WIND IMPORTANCE FACTOR - (1) ONE; 'ENCLOSED' BUILDING TYPE; EXPOSURE CATEGORY C -SEE ROOF PLAN NOTES. 2. INTERNAL PRESSURE COEFFICIENT: +/- 0.18 MAXIMUM MEAN ROOF HT. = 30 FEET GENERAL NOTES 1. DOORS BETWEEN GARAGE AND LIVING SPA( MALL BE MINIMUM 1 3/8' THICK SOLID CORE WORD ODORS, 1 3/8' SOLID DR HONEYCOMB CORE STEEL DOORS, OR 20 -MINUTE FIRE RATED DOORS. 2. THE GARAGE SHALL BE SEPARATED FROM THE RESIDENCE AND ITS ATTiC AREA BY NOT LESS THAN 1/2" GYPSUM BOARD APPLIED TO THE GARAGE SIDE. GARAGES BENEATH HABITABLE ROOMS SHALL BE SEPARATED FROM ALL HABITABLE ROOMS ABOVE BY NOT LESS THAN 5/8" TYPE X GYPSUM BOARD OR ITS EQUIVALENT 3. DUCTS IN THE GARAGE AND DUCTS PENETRATING THE WALLS OR (FILINGS SEPARATING THE DWELL{N FROM THE GARAGE SHALL BE CONSTRUCTED 4F A MINIMUM N0. 26 GAGE SHEET STEEL OR APPROVED EQUAL 4. ENCLOSED ACCESSIBLE SPACE UNDER STAIRS SHALL HAVE WALLS, UNDER STAIR SURFACE AND ANY SOFFITS PROTECTED ON THE ENCLOSED .SIDE WITH 1/2' GYPSUM BOARD. DOOR SCHEDULE 2068 DOOR DOOR DOOR DOOR WIDTH WIDTH HT, HT. FEET INCHES FEET INCHES NOTES 1. NUMBER OF PANELS, HAND, & SWING AS SHOWN ON PLAN 1 1 1 1 ry ry cn i 1 i 1 LATEST REVISION DATE TO MASTER: 07-01-12 W� U Ali _ W WI 0 0 f z c� o Q - U � tUJ o LV o L..L z O O c� -9C-0 CIS Lu �) U oho CQ LLJ o � � � � = Q w = ~o C-- � J (� O C'7 O LLLU 00 LID - (n CV LL Q � M 1 M L'1"J � LL I LLJ LLJ W 0 C/) Lu z 0 � o W o� J co DO NOT SCALE PRINTS! CONSTRUC114N SHALL BE PER INDICATED DIMENSIONS ONLY, ANY DISCREPENCIES TO BE REPORTED TO M/i HOMES FOR CLARIFI CATION! D1 M!i ORLANDO 7/16' OSB SHEATHING GABLE END OR FLOOR TRUSS 7/8" CEMENT PLASTER ON PAPER BACK LATH AIR INFILTRATION BARRIER (DESIGN STANDARD: TYVEK)-y Z - MID -WALL WEEP SCREED 1/2' MIN. CEMENT PLASTER 8' CMU WALL DETAILS BLOCK IFRAME CONNECTION SCALE: 3" = 1'-O" r TYVEK OVER 'C' PEEL AND STICK I FLASHING AND WINDOW FLANGE TAPE OVER CUT I TYVEK PEEL AND STICK DETAIL 8'-D" MAX. SPAN W/O 2x8 RIDGE 2z4 VERTICAL BLKG. 2x6 VALLEY RAFTERS (4)164 2x4 COLLAR TIE IN NAILS UPPER 3RD OF ROOF HT. MTS12 _ STRAP - ------ - �I 2x4 VERT. AT MTS12 0' O.C. MAX. (ONLY STRAP I AT SPANS > 8'-D' 2x4 BLKG. AT VALLEY RAFTER BRG. BTWN. TRUSSES ROOF TRUSS ROOF TRUSS BELOW RAFTER HAND VALLEY FRMG. DETAIL ALTERNATE VALLEY DETAIL FROM TRUSS ENGINEER MAY BE SUBSTITUTED PROVIDED DETAIL HAS STATE OF FLORIDA LICENSED STRUCTURAL ENGINEER STAMP BLOCK CELL DETAIL 2ND STY. SHOWER DETAIL N.T.S. Z 3 4" DIA. x 6' DP. HOLE SET IN INSTALLATION DETAILS) OVER 15# FELT (2' SIDE LAP / 4' END LAP AND m F R f BAR DOWEL EPDXY ADHESIVE ROOF EDGE ROOF O.H. ,� W FULL BED OF SILICONE GROUT SOLID AT COATED CLASS MAT WATER-RESISTANT TOP OF BLK. WALL TOP OF CELL GYPSUM BACKER BOARD (1/2' DENS -GLASS) 'W"�'-CONC. FILLED REINF. SAWCUT APPROX. 4'W.x24"H. OPENING SHOWER DRAIN FOR TILE SHOWER INSTALLATION WAPL°SECTION PER TYP. IN WALL WHERE THE USE OF A SHOWER PAN LINER IS �� NOTES: NOT REQUIRED I "MIN. I AS --DRILLED HOLE TO BE ADJACENT TO NON -AIR CONDITIONED I OF R R P I CLEANED PRIOR TO MORTAR BED AT WALL i I DISPENSING ADHESIVE W/GALV. METAL LATH . 3000 PSI FILLED CELLL/ WW/ --EPDXY ADHESIVE TO TILE FLOOR SYSTEM #5 REBAR HIGH STRENGTH TYPE N \ --REBAR DOWEL MUST RIDGE i BE CLEAN AND OIL FREE " i I SAWCUT 1' W. DPN. IN SAWCUT APPROX. A I WALL FROM TOP TO 4 W.x24 " H. OPENING II REFER TO HEADER II BOTTOM FOR FULL HT IN WALL 2 REBAR PLACEMENT INTO WOOD TRUSSES 0 24 O.C. LL SLID W/ 25" MIN. LAP II GROUT TOP OF SLAB OF REBARS � I� - - --� - - - - ( DIA. x 6" DP. HOLE W/ 2'-0" O.H. OR 2x4x8 SISTER w F{N #5 BAR DOWEL SET,IN EPDXY ADHESIVE ADDED REINF. FILLED BLOCK CELL DETAIL 2ND STY. SHOWER DETAIL N.T.S. `-MORTAR BED AT WALL W/GALV. METAL LATH SHOWER DRAIN RECEPTOR - TOP OF DRAIN 2" MIN. BELOW F.F. LEVEL 1 ST STY. SHOWER DETAIL N.T.S. Ai 1V�� ,1I.i �`� ✓>/l. t � `'`'''�'F �'y'`:.,.� � (cam B_ "P �`- � j � ��i,/_r ,YE,7::1,a. .,7u. .sS R•G°Ts-� .3�f;PsPh5� f Aiw SHEA THOVGC& l?` Ove—, 70 t rr fir..' S TN TRUSSES .` ` ! E 5s.- fQ . LA C-44AL JAS£ ! 1 As LIL-SION t l iAC-Si'rfc l'J r� i -'' i s{ I' SECTION AND rt r , , LA LFP/ L -- 171 STANDARD END DROPPED TOP CHORD END ` - ` kTUR"*F{ SECTION Ae-A SECTIO -C NOTES - I) ACTUAL BRACING REQIIIREI NTS WILL VARYDUE TO WIND LOAD, CODE CRITERIA, BUILDING HEIGHT, TRUSS SPAM, WEB LUMBER GRADE/SPICIES/ON CENTER SPACING AND OTHER VARIABLES. BRACING (ANIS ATTACHMENT) REQU;REMENTS SHOULD BE DESIGNED FOR EACH SPECIFIC JOB. 2) CO3NNECION BETWEEN BOTTOM CHORD OF GABLE END TRUSS AND WALL, AS WELL AS T14E GES=GN AND SP-:Clr'r.ATION OF TEMPORARY AND PERMANENT BRACING OF THE ROOF SYSTEM IS THE RESPONSIBILITY OF THE BUILDING DESIGNER. 0 TYP. GABLE END TRUSS DETAIL N.T.S. 4' 5' INCL P.T. WOOD FURRING OR WOOD SHOWER DOOR OR SHOWER INSTALLATION DETAILS) OVER 15# FELT (2' SIDE LAP / 4' END LAP AND FRAME WALL ASSEMBLY ENCLOSURE W/FRAME SET IN ROOF EDGE ROOF O.H. ,� TILE WALL SYSTEM FULL BED OF SILICONE ROOF TRUSSES OR 2x RAFTERS COATED CLASS MAT WATER-RESISTANT SEALANT - CENTER ON 0 - - - - - - 2 - - - -\01n2 GYPSUM BACKER BOARD (1/2' DENS -GLASS) MARBLE SILL & WALL BEYOND SEE ROOF PLAN SHOWER DRAIN FOR TILE SHOWER INSTALLATION I i IF PROVIDED I i � I WHERE THE USE OF A SHOWER PAN LINER IS FLOOR TILE R-11 INSULATION AT ALL WALLS NOT REQUIRED I i 0 [n21,111 ADJACENT TO NON -AIR CONDITIONED MARBLE SILL II MORTAR BED AT WALL SPACES PSON DSP AT16 O.C. W/GALV. METAL LATH . - - - - - - - - - - 2 �uwL' o O m TILE FLOOR SYSTEM _ 1/2' \ N \ MORTAR BED RIDGE �—+ Q MIN. THICKNESS 1-1/2" " co MIN. SLOPE 1/4' PER FT. A `-MORTAR BED AT WALL W/GALV. METAL LATH SHOWER DRAIN RECEPTOR - TOP OF DRAIN 2" MIN. BELOW F.F. LEVEL 1 ST STY. SHOWER DETAIL N.T.S. Ai 1V�� ,1I.i �`� ✓>/l. t � `'`'''�'F �'y'`:.,.� � (cam B_ "P �`- � j � ��i,/_r ,YE,7::1,a. .,7u. .sS R•G°Ts-� .3�f;PsPh5� f Aiw SHEA THOVGC& l?` Ove—, 70 t rr fir..' S TN TRUSSES .` ` ! E 5s.- fQ . LA C-44AL JAS£ ! 1 As LIL-SION t l iAC-Si'rfc l'J r� i -'' i s{ I' SECTION AND rt r , , LA LFP/ L -- 171 STANDARD END DROPPED TOP CHORD END ` - ` kTUR"*F{ SECTION Ae-A SECTIO -C NOTES - I) ACTUAL BRACING REQIIIREI NTS WILL VARYDUE TO WIND LOAD, CODE CRITERIA, BUILDING HEIGHT, TRUSS SPAM, WEB LUMBER GRADE/SPICIES/ON CENTER SPACING AND OTHER VARIABLES. BRACING (ANIS ATTACHMENT) REQU;REMENTS SHOULD BE DESIGNED FOR EACH SPECIFIC JOB. 2) CO3NNECION BETWEEN BOTTOM CHORD OF GABLE END TRUSS AND WALL, AS WELL AS T14E GES=GN AND SP-:Clr'r.ATION OF TEMPORARY AND PERMANENT BRACING OF THE ROOF SYSTEM IS THE RESPONSIBILITY OF THE BUILDING DESIGNER. 0 TYP. GABLE END TRUSS DETAIL N.T.S. 4' 5' INCL SHINGLES (ATTACH W/ GALV. METAL ROOFING NAILS PER MANUF. USE (2) MTSM16 STRAPS FOR UPLIFT VALUES 1720 LBS. OR LESS INSTALLATION DETAILS) OVER 15# FELT (2' SIDE LAP / 4' END LAP AND UPLIFT VALUES OVER 1720 LBS. REQUIRE LETTER FROM ARCHITECT OR ENGINEER CAP NAILS AT 12' O.C.-EDGE, 24" Q.C.-FIELD) ON 7/16' SPAN RATED ROOF EDGE ROOF O.H. ,� STRUCTURAL SHEATHING (SEE ROOF NAILING PATTERN) AND PRE-ENG'RED HURR. STRAP AT EA. TRUSS ROOF TRUSSES OR 2x RAFTERS PRE-ENG'RED ROOF OR FLOOR TRUSSES HURR. STRAP AT EA. TRUSS SEE 12 0 - - - - - - 2 - - - -\01n2 000,0 ROOF PLAN PER "SPH4' AT EA. STUD TO REFER TO SUBD. SPECIFICATIONS SEE ROOF PLAN NNECT W/ (2)16d MIN. COMMONS SEE ROOF PLAN FOR REQ'D. COURSE -FILL W/ CONC. AND 1-#5 � I BAR CONT 8 KNOCKOUT 6 12 R-11 INSULATION AT ALL WALLS TOE -NAILED TO TOP PLATE STRAP MEMBER TOP COURSE REBAR AT EA. REINF. CONC. 0 [n21,111 ADJACENT TO NON -AIR CONDITIONED TOP6C(X1RSE W/ CONC. II LOADS) SPACES PSON DSP AT16 O.C. ° - - - - - - - - - - 2 �uwL' o O m VENTED SOFFIT Z AND 1-#5 BAR CONT O.C. (MAX.) "SP2" AT EA. STUD TO TOP PLATE ACROSS HDR. SPAN _O Q RIDGE �—+ Q p " co AT EXTERIOR WALLS (U �H4 AT M co Lo tV II REFER TO HEADER L L J F- 2 I W WOOD TRUSSES 0 24 O.C. INTERIOR WALLS) oU) II SCHED. FOR SIZES - - --� - - - - ( ROOF W/ 2'-0" O.H. OR 2x4x8 SISTER w O ����`� W 4' O I OO EDGE (SEE ROOF FRAMING PLAN F- 0 0 2x CONT. STAGGERED I C/) DO NOT SCALE PRINTS! CONSTRUCTION SHALL BE PER INDICATED DIMENSIONS 'Z O O I c� I O 22 d FOR LOCATION) ti MID -WALL BLOCKING (WALLS OVER 10' H. --PROVIDE I 'LSTA24" STRAP AT 1 i HDR. STUD TO BEAM 2 2 2O DRIP EDO OVER BLKG. AT 4-0 O.C. MAX.) I (2) STRAPS EA. SIDE O3 O3 5' INCL. 3/4' PRIME TRIM 1/2' GYPSUM BD. R-38 INSULATION A 2x STUDS AT 16 O.C. SEE i W/ (4) OR MORE TRUSSES ROOF O.H. FASCIA BOARD ON 2x 2'-°" WALL AND ROOF FRAM ING NO ACROSS OPNG. O1 ZONE 1 - USE 8d °RINGSHANK" NAILS @ 12" O.C. (FIELD) 6" O.C. (EDGE) SUBFASCIA PRE-ENG'D. CONC. LINTEL FOR SPECIES I NOTE. O2 ZONE 2 - USE 8d "RINGSHANK° NAILS @ 6" O.C. (FIELD/EDGE) ABV. TYP. WOW. AND DOOR OPNCS. i O ZONE 3 - USE 8d "RINGSHANK" NAILS @ 4" O.C. (FIELD/EDGE) SEE PLANS FOR LOCATIONS AND TYPES TRUSS TO PLATE ANCHOR, STUD TO I I TOP OR SILL PLATE ANCHORS, ROOF NAILING PATTERN CONT. ALUMINUM VENTED SOFFIT . 'SP2' AT EASTUD TO SILL 6" MAX. AND BOLTS TO SLAB NOT REQUIRED i AT INTERIOR BEARING NOTED NOTES: 1. EXTEND ROOF 1'-0" BEYOND WIDTH OF POOL OR SERVICE DOOR PLATE AT EXTERIOR WALLS (USE .WALLS ON PLANS AS SUPPORTING GRAVITY NOTE: ALL PLYWOOD ROOF SHEATHING SHALL HAVE A 'PANEL OPENINGS @ EACH SIDE U.N.O. SPH4 AT INTERIOR WALLS) LOADS ONLY (NO UPLIFT LOADS) SPAN RATING" OF 32/16. 2. EXTEND ROOF 2'-0" BEYOND WIDTH OF S.G.D. OPENINGS NUMBER OF STUD 0 EACH SIDE U.N.O. 5/8" EXP. BOLTS (4' EMBED.) TO PLATE CONNECTORS TO 8" 7/ CEMENT AT 32' O.C. MAX. W/ 2' SQ. WASHERS MATCH NUMBER OF STRAPS PLASTER DETAIL O F 0 N E STORY ROOF PROVIDE •SPH6' STRAP AT 2x6 STUDS ABOVE OPNG. PAPER BACK LATH. IN LIEU OF "SPH4" STRAPS BUILDING MAP OVERHANG @ EXTERIOR DOORS 1 -STY. FRAME BRG. WALL () N.T.S. STRAPS AND BOLTS NOT REQUIRED AT INTERIOR BEARING WALLS WALL SHEATHING NOTED ON PLANS AS SUPPORTING GRAVITY LOADS ONLY (NO UPLIFT LOADS) PEEL AND STICK MEMBRANE FLASHING 8x8x16 CONC. KNOCKOUT ALUMINUM WINDOW PROVIDE SOLID 20 BLKG. BTWN. 25" MIN. LAP BLK. TOP COURSE -FILL W/ CONC. & 1-#5 BAR CONT. FRAME SET IN CONT. TOP/BOT RAILS FOR SOLID NAILING BED OF SEALANT OF STRAP PROVIDE 2x4 BLKG. BTWN. FLR. SIMPSON 'MSTAM24" STRAP W/ TRUSS- CONNECT TO BLK. W/ (4) N EXTERIOR WINDOW HEAD 5 1/4'x2 1 4' MASONRY SCREWS 4' 2 1/4OCK WALL AND 0.145 DIA.x3' L POWDER ACTUATED FASTENERS- PLACE BLKG. ALONG � 5 REBAR W/ STD. HOOK (9)104 COMMONS TO FLR. TRUSS-,,,, SIDE OF GABLE END FLR. TRUSSES SCALE: 2" - 1'-0" REINF. CONC. FILLED CELL #5 VERT. REBAR 25' MIN. LAP ALUMINUM WINDOW FRAME SET IN CONT z W g w o u II #5 REBAR W/ STD. HOOK BED OF SEALANT N CONC. FILLED REINF. TOP BLOCK WALL HT. TRANSITION DETAIL PEEL AND SUCK MEMBRANE BLK. COURSE PER TYP. FLASHING WALL SECTION BUILDING WRAP MISSED FLOOR TRUSS METAL OR VINYL TRIM WALL SHEATHING CONTROL / EXPANSION JOINT TO BLK. WALL STRAP 7/8' CEMENT PLASTER PAPER BACK LATH PROVIDE (1) "MSTAM24" FOR ER. "HETA20" STRAP SPECIFIED PAPER BACK LATH 24" NODE PEEL &STICK 7/8° CEMENT MEMBRANE OR #15 FELT PLASTER FLASHING SIMPSON 'MTSM16" STRAP W/ BUILDING WRAP (TYVEK) (4) 1/4"x2 1/4" TAPCONS TO WALL SHEATHING EXTERIOR WINDOW SILL BLOCK WALL AND (7)10d n COMMONS TO TRUSS i I ROOF TRUSS SCALE: 2" - 1'-0" ALUMINUM WINDOW 1-7/8" CEMENT PLASTER FRAME SET IN CONT. BED OF SEALANT PAPER BACK LATH PEEL AND STICK MEMBRAN FLASH NC (TYVEK) WRAP WALL SHEATHING EXTERIOR WINDOW JAMB SCALE: 2" - 1'-O" �DBL 2x P.T. BLOCKNG EL - VERT. REINF. CONC. AT 6' NAILS AT 6' O.C. FILLED CELL W/'BRJ n 1/2" EXP. BOLT AT 24' O.C. VERT. (2 3/4" EMBED.) W/ 2 -SQ. WASHER REINF. FILLED TOP BLOCK COURSE II SIMPSON "SP2' AT EA. STUD AT II EXTERIOR WALLS USE SPH4 (AT CONC. BLK. INTERIOR BEARING WALLS) WALL PER TYP. WALL SECTION II ATTACH EXT. SHEATHING TO STUDS PLATES PER STRUCTURAL NOTES VERT. REINF. CONC. FILLED CELL W/ 1 BAR AT EXT FRAME WALL TO BLOCK WALL, PROVIDE 2x P.T. W/ IJ2' EXP. BOLT AT 24" O.C. VERT. (4 EMBED.) W/ 2' SQ. WASHERS PROVIDE 1 1/2' EDGE DISTANCE FOR BOLTS Q II N SIMPSON "SP2' AT EA. STUD AT EXTERIOR WALLS (USE SPH4 AT INTERIOR BEARING WALLS) TOP OF SLAB II N I 8" EXT. FRAME WALL TO BLOCK WALL CONNECTION DETAIL APPLICABLE TO ALL EXTERIOR FRAME WALLS ONLY UNLESS OTHERWISE NOTED ON FLOOR PLAN � I1 �I zI INSTALL ADD'L. STRAP LJ cnDIAGONALLY FROM EA. N I OTHER FOR SINGLE CONC. FILLED REINF. TOP MEMBER TRUSS BLK. COURSE PER TYP. WALL SECTION MISSED ROOF TRUSS TO BLK. WALL STRAP DETAIL @CONTROL I EXPANSION JOINT USE (1) MTSM16 STRAP FOR UPLIFT VALUES 860 LBS. OR LESS SHINGLES (ATTACH W/ GALV. METAL ROOFING NAILS PER MANUF. USE (2) MTSM16 STRAPS FOR UPLIFT VALUES 1720 LBS. OR LESS INSTALLATION DETAILS) OVER 15# FELT (2' SIDE LAP / 4' END LAP AND UPLIFT VALUES OVER 1720 LBS. REQUIRE LETTER FROM ARCHITECT OR ENGINEER CAP NAILS AT 12' O.C.-EDGE, 24" Q.C.-FIELD) ON 7/16' SPAN RATED HURR. ANCHOR AT EA. TRUSS TO TOP PLATE ALUMINUM OR 5/4' PRIME TRIM STRUCTURAL SHEATHING (SEE ROOF NAILING PATTERN) AND PRE-ENG'RED AT 4" O.C. REMAINDER AT 7" O.C. ROOF TRUSSES AT 24" O.C. PRE-ENG'RED ROOF OR FLOOR TRUSSES HURR. STRAP AT EA. TRUSS SEE 12 AT 24' O.C. 000,0 ROOF PLAN PER "SPH4' AT EA. STUD TO REFER TO SUBD. SPECIFICATIONS 8x8x16 CONC. KNOCKOUT BLK. TOP ELEV. R-38 INSULATION CONNECT EA. TRUSS BOT. COURSE -FILL W/ CONC. AND 1-#5 CHORD W/ (2)164 MIN. �R-38 INSULATION BAR CONT COMMONS TOE -NAILED TO TOP PLATE 'IlDRIP EDGE OVER _�� FASCIA 1 "mil FASCIA MATERIAL TO BE ^`10 2" GYPSUM BD. W DIAPHRAM AREA FASTEN 5d NAIL / a o 1/2" GYPSUM BD. J HURR. ANCHOR AT EA. TRUSS TO TOP PLATE ALUMINUM OR 5/4' PRIME TRIM Ir AT 4" O.C. REMAINDER AT 7" O.C. DBL. 2x TOP PLATE SEE FRMG. PLANS BOARD OVER 2x4/2x6 SUBFASCIA ENERGY CALCULATION FOR R -VALUE TRUSS TO PLATE ANCHOR, STUD TO TOP OR SILL 3 �Wo "SPH4' AT EA. STUD TO REFER TO SUBD. SPECIFICATIONS II PRE-ENG'RED. PRECAST CONC. LINTEL ABV. TYP. TOP PLATE FOR FASCIA MATERIAL a WDW. AND DOOR OPNGS. SEE PLANS FOR R-11 INSULATION AT ALL WALLS o TOP COURSE REBAR AT EA. REINF. CONC. LOCATIONS AND TYPES ADJACENT TO NON -AIR CONDITIONED II LOADS) SPACES CONT. ALUM. ° 1/2" DRYWALL OVER 1x2 P.T. (MIN.) AT 24" �uwL' o O m VENTED SOFFIT Z I O.C. (MAX.) 1/2" DRYWALL - 2x STUDS 0 16' O.C. 12 SPF OR BETTER C3- CORE -FILL 500 FOAM INSULATION IN ALL a o � I ° OPEN CMU WALL CELLS - REFER TO NOTE: ENERGY CALCULATION FOR R -VALUE TRUSS TO PLATE ANCHOR, STUD TO TOP OR SILL 3 �Wo ii PLATE ANCHORS, AND BOLTS TO SLAB NOT REQUIRED TEXTURED CEMENT FINISH OVER II #5 VERT. BAR TIED INTO #5 BAR DOWEL AND AT INTERIOR BEARING WALLS NOTED ON PLANS AS 8x8x16 CONC. BLOCK o TOP COURSE REBAR AT EA. REINF. CONC. SUPPORTING GRAVITY LOADS ONLY (NO UPLIFT O FILLED BLOCK CELL AS LOCATED PER PLANS LOADS) c� z M W Coo "SP"TYPE ANCHOR AT EA. 2x P.T. SILL PLATE STUD TO SILL PLATE 5/8' EXP. BOLTS (4" EMBED.) AT 24" O.C. MAX. 3 1/2" MIN. CONC. SLAB (2500 PSI) W/ W/ 2' SQ. WASHERS @ CONT. BRG WALLS FIBERMESH OR 6x6 10/10 WN OVER VAPOR BARRIER CLEAN COMPACTED TERMIl"'. o o TREATED ALL THICKEND SLAB FOOTING PER SLAB PLAN TYP. INT. BRG. WALL SECTION SCALE: 1 1/2"=l' -O" �I PRECAST WDW. SILL - TYP. AT STD. WDW. OPNG. J 4' MIN. 3 1/2" MIN. CONC. SLAB (2500 PSI) W/ `V INi FIBERMESH OR 6x6 10/10 WWM OVER VAPOR BARRIER u 0o II FINISH GRADE CLEAN COMPACTED TERMITE TREATED FILL N uo 0 MONOLITHIC SLAB EDGE FOOTING #5 BAR DOWEL TIED TO FTG. REBAR 16' PER SLAB PLAN AT EA. REINF. FILLED CELL AS MIN. LOCATED PER SLAB PLAN TYP. EXT. BLOCK WALL SECTION SCALE: 1/2"=l' -O" FLASHING: ROOF do WALL FLASHING SHALL BE ALUM. OR GALV. METAL W/ FASTENERS MAX. 16" O.C. LATEST REVISION DATE TO MASTER: 07-01-12 ' D2 M/I ORLANDO � 1 C� C Q Woo �Wo o O c O c� z M W Coo U cu W �uwL' o O m Z F--=cn!:2, _ Q W = O~ U cy)� co C- - I _O Q ��cvLL- �—+ Q p co M co Lo tV L L J F- LL I W w W V oU) w W F- 0 0 I C/) DO NOT SCALE PRINTS! CONSTRUCTION SHALL BE PER INDICATED DIMENSIONS ONLY, ANY DISCREPENCIES TO BE REPORTED TO M/I HOMES FOR CLARIFICATI ' D2 M/I ORLANDO