Loading...
HomeMy WebLinkAbout1225 Red Cleveland Blvd (a)-1 -11:-,-111: ' Yir 4k 'did -1_\: =9 1 r�l 1 01019 - CONTRACT CONSIDERATIONS I WORK INCLUDED - 1. ACCEPTED ALTERNATES WILL BE IDENTIFIED IN OWNER -CONTRACTOR AGREEMENT. COORDINATE RELATED WORK AND MODIFY SURROUNDING WORK AS REQUIRED. 2. CONTRACTOR SHALL SUBMIT A PRINTED SCHEDULE OF VALUES ON AIA FORM G703 - APPLICATION AND CERTIFICATE FOR PAYMENT CONTINUATION SHEET, IN DUPLICATE, WITHIN 15 DAYS AFTER DATE OF OWNER -CONTRACTOR AGREEMENT. 1 2 3. CONTRACTOR SHALL SUBMIT THREE COPIES OF EACH APPLICATION FOR PAYMENT TO THE ARCHITECT ON AIA FORM G702 - APPLICATION AND CERTIFICATE FOR PAYMENT AND AIA G703 - CONTINUATION SHEET, UTILIZING SCHEDULE OF VALUES. 4. CHANGE PROCEDURES: 1. THE ARCHITECT WILL ADVISE OF MINOR CHANGES IN THE WORK NOT INVOLVING AN ADJUSTMENT TO CONTRACT SUM OR CONTRACT TIME AS AUTHORIZED BY AIA A201, BY ISSUING SUPPLEMENTAL INSTRUCTIONS ON AIA FORM G710. 2. THE ARCHITECT MAY ISSUE A PROPOSAL REQUEST WHICH INCLUDES A DETAILED DESCRIPTION OF A PROPOSED CHANGE WITH SUPPLEMENTARY OR REVISED CONTRACT DOCUMENTS, A CHANGE IN CONTRACT TIME FOR EXECUTING THE CHANGE, WITH A STIPULATION OF ANY OVERTIME WORK REQUIRED AND THE PERIOD OF TIME DURING WHICH THE REQUESTED PRICE WILL BE CONSIDERED VALID. CONTRACTOR TO SUBMIT AN ESTIMATE WITHIN SEVEN CALENDAR DAYS. 3. THE CONTRACTOR MAY PROPOSE CHANGES BY SUBMITTING A REQUEST FOR CHANGE TO THE ARCHITECT, DESCRIBING THE PROPOSED CHANGE AND ITS FULL EFFECT ON THE WORK. INCLUDE A STATEMENT DESCRIBING THE REASON FOR THE CHANGE, AND THE EFFECT ON THE CONTRACT SUM AND CONTRACT TIME WITH FULL DOCUMENTATION AND A STATEMENT DESCRIBING THE EFFECT ON WORK BY SEPARATE OR OTHER CONTRACTORS. 4. THE ARCHITECT MAY ISSUE AIA FORM G713 CONSTRUCTION CHANGE DIRECTIVE, SIGNED BY THE OWNER, INSTRUCTING THE CONTRACTOR TO PROCEED WITH A CHANGE IN THE WORK, FOR SUBSEQUENT INCLUSION IN A CHANGE ORDER. DOCUMENT WILL DESCRIBE CHANGES IN THE WORK, AND DESIGNATE METHOD OF DETERMINING ANY CHANGE IN CONTRACT SUM OR CONTRACT TIME. CONTRACTOR SHALL PROMPTLY EXECUTE THE CHANGE. 5. TIME AND MATERIAL CHANGE ORDER: THE CONTRACTOR SHALL SUBMIT AN ITEMIZED ACCOUNT AND SUPPORTING DATA AFTER COMPLETION OF CHANGE, WITHIN TIME LIMITS INDICATED IN THE CONDITIONS OF THE CONTRACT. ARCHITECT WILL DETERMINE THE CHANGE ALLOWABLE IN CONTRACT SUM AND CONTRACT TIME AS PROVIDED IN THE CONTRACT DOCUMENTS. MAINTAIN DETAILED RECORDS OF WORK DONE ON TIME AND MATERIAL BASIS. PROVIDE FULL INFORMATION REQUIRED FOR EVALUATION OF PROPOSED CHANGES, AND TO SUBSTANTIATE COSTS FOR CHANGES IN THE WORK. 6. CONTRACTOR SHALL ISSUE CHANGE ORDERS, USING AIA G701 CHANGE ORDER, FOR SIGNATURES OF ALL PARTIES AS PROVIDED IN THE CONDITIONS OF THE CONTRACT. II MATERIALS - NOT USED III EXECUTION - NOT USED END OF SECTION 01019 01039 - COORDINATION AND MEETINGS I WORK INCLUDED - 1. VERIFY THAT UTILITY REQUIREMENTS AND CHARACTERISTICS OF OPERATING EQUIPMENT ARE COMPATIBLE WITH BUILDING UTILITIES. COORDINATE WORK OF VARIOUS SECTIONS HAVING INTERDEPENDENT RESPONSIBILITIES FOR INSTALLING, CONNECTING TO, AND PLACING IN SERVICE, SUCH EQUIPMENT. 2. COORDINATE SPACE REQUIREMENTS AND INSTALLATION OF MECHANICAL AND ELECTRICAL WORK WHICH ARE INDICATED DIAGRAMMATICALLY ON DRAWINGS. FOLLOW ROUTING SHOWN FOR PIPES, DUCTS, AND CONDUIT, AS CLOSELY AS PRACTICABLE. PLACE RUNS PARALLEL WITH LINE OF BUILDING. UTILIZE SPACES EFFICIENTLY TO MAXIMIZE ACCESSIBILITY FOR OTHER INSTALLATIONS, FOR MAINTENANCE, AND FOR REPAIR. 3. IN FINISHED AREAS EXCEPT AS OTHERWISE INDICATED, CONCEAL PIPES, DUCTS, AND WIRING WITHIN THE CONSTRUCTION. COORDINATE LOCATIONS OF FIXTURES AND OUTLETS WITH FINISH ELEMENTS. 4. AFTER OWNER OCCUPANCY OF PREMISES, ACCESS TO SPACE FOR CORRECTION OF DEFECTIVE WORK AND WORK NOT IN ACCORDANCE WITH CONTRACT DOCUMENTS (PUNCH LIST ITEMS), SHALL BE CONDUCTED AT TIMES OTHER THAN REGULAR WORKING HOURS UNLESS OTHERWISE CONSENTED TO BY THE OWNER. 5. PRE -CONSTRUCTION MEETING A. A PRE -CONSTRUCTION MEETING WILL BE SCHEDULED AT THE PROJECT SITE PRIOR TO CONTRACTOR OCCUPANCY. B. ATTENDANCE REQUIRED: AUTHORITY HAVING JURISDICTION, LANDLORD, OWNER, ARCHITECT, CONTRACTOR AND CONTRACTOR'S SUPERINTENDENT. C. AGENDA: 1. USE OF PREMISES BY OWNER AND CONTRACTOR. 2. SECURITY 3. TEMPORARY PROTECTION AND SAFETY 4. DUST AND NOISE PROTECTION 5. STAGING AREA, DELIVERY AND STORAGE OF MATERIALS 6. SCHEDULES AND PHASING OF THE WORK 7. CONTRACTOR PARKING 8. WORK HOURS 9. INSPECTION AND CERTIFICATE OF OCCUPANCY PROCEDURES 10. ANY SPECIFIC REQUIREMENTS BY AUTHORITY HAVING JURISDICTION, LANDLORD OR OWNER. D. CONTRACTOR SHALL RECORD MINUTES AND DISTRIBUTE COPIES WITHIN TWO BUSINESS DAYS AFTER MEETING TO PARTICIPANTS, WITH ONE COPY TO THE AUTHORITY HAVING JURISDICTION, LANDLORD, OWNER, ARCHITECT, ALL OTHER PARTICIPANTS AND THOSE AFFECTED BY DECISIONS MADE. 6. SITE MOBILIZATION MEETING A. ARCHITECT AND OWNER WILL SCHEDULE A MEETING AT THE PROJECT SITE PRIOR TO CONTRACTOR OCCUPANCY. B. ATTENDANCE REQUIRED: OWNER, ARCHITECT, SPECIAL CONSULTANTS, CONTRACTOR, CONTRACTOR'S SUPERINTENDENT, AND MAJOR SUBCONTRACTORS. C. AGENDA: 1. USE OF PREMISES BY OWNER AND CONTRACTOR. 2. OWNER'S REQUIREMENTS. 3. CONSTRUCTION FACILITIES AND CONTROLS PROVIDED BY OWNER. 4. TEMPORARY FACILITIES PROVIDED BY OWNER. 5. SECURITY AND HOUSEKEEPING PROCEDURES. 6. SCHEDULES. 7. PROCEDURES FOR TESTING. 8. PROCEDURES FOR MAINTAINING RECORD DOCUMENTS. 9. REQUIREMENTS FOR START-UP OF EQUIPMENT. 10. INSPECTION AND ACCEPTANCE OF EQUIPMENT PUT INTO SERVICE DURING CONSTRUCTION PERIOD. 2 ,Q D. CONTRACTOR SHALL RECORD MINUTES AND DISTRIBUTE COPIES WITHIN TWO BUSINESS DAYS AFTER MEETING TO PARTICIPANTS, WITH ONE COPY TO OWNER, ARCHITECT, OTHER PARTICIPANTS, AND THOSE AFFECTED BY DECISIONS MADE. 7. PROGRESS MEETINGS A. CONTRACTOR SHALL SCHEDULE AND ADMINISTER MEETINGS THROUGHOUT PROGRESS OF THE WORK AT MAXIMUM WEEKLY INTERVALS. B. CONTRACTOR SHALL MAKE ARRANGEMENTS FOR MEETINGS, PREPARE AGENDA WITH COPIES FOR PARTICIPANTS, PRESIDE AT MEETINGS. C. ATTENDANCE REQUIRED: JOB SUPERINTENDENT, MAJOR SUBCONTRACTORS AND SUPPLIERS, OWNER, ARCHITECT, AND CONSULTANTS APPROPRIATE TO AGENDA TOPICS FOR EACH MEETING. D. AGENDA: 1. REVIEW MINUTES OF PREVIOUS MEETING. 2. REVIEW PROGRESS OF WORK. 3. FIELD OBSERVATIONS, PROBLEMS, AND DECISIONS. 4. IDENTIFICATION OF PROBLEMS WHICH IMPEDE PLANNED PROGRESS. 5. REVIEW OF SUBMITTALS SCHEDULE AND STATUS OF SUBMITTALS. 6. REVIEW OF OFF-SITE FABRICATION AND DELIVERY SCHEDULES. 7. MAINTENANCE OF PROGRESS SCHEDULE. 8. CORRECTIVE MEASURES TO REGAIN PROJECTED SCHEDULES. 9. PLANNED PROGRESS DURING SUCCEEDING WORK PERIOD. 10. COORDINATION OF PROJECTED PROGRESS. 11. MAINTENANCE OF QUALITY AND WORK STANDARDS. 12. EFFECT OF PROPOSED CHANGES ON PROGRESS SCHEDULE AND COORDINATION. 13. OTHER BUSINESS RELATING TO WORK. E. CONTRACTOR SHALL RECORD MINUTES AND DISTRIBUTE COPIES WITHIN TWO BUSINESS DAYS AFTER MEETING TO PARTICIPANTS, WITH ONE COPY TO ARCHITECT, OWNER, PARTICIPANTS, AND THOSE AFFECTED BY DECISIONS MADE. 8. PRE -INSTALLATION MEETING A. WHEN REQUIRED IN INDIVIDUAL SPECIFICATION SECTIONS, CONVENE A PRE -INSTALLATION MEETING AT WORK SITE PRIOR TO COMMENCING WORK OF THE SECTION. B. REQUIRE ATTENDANCE OF PARTIES DIRECTLY AFFECTING, OR AFFECTED BY, WORK OF THE SPECIFIC SECTION. C. NOTIFY ARCHITECT FOUR BUSINESS DAYS IN ADVANCE OF MEETING DATE D. CONTRACTOR SHALL PREPARE AGENDA AND PRESIDE AT MEETING: 1. REVIEW CONDITIONS OF INSTALLATION, PREPARATION AND INSTALLATION PROCEDURES. 2. REVIEW COORDINATION WITH RELATED WORK. E. CONTRACTOR SHALL RECORD MINUTES AND DISTRIBUTE COPIES WITHIN TWO BUSINESS DAYS AFTER MEETING TO PARTICIPANTS, WITH ONE COPY TO ARCHITECT, OWNER, PARTICIPANTS, AND THOSE AFFECTED BY DECISIONS MADE. II MATERIALS - NOT USED III EXECUTION - NOT USED END OF SECTION 01039 01045 CUTTING AND PA I WORK INCLUDED - 1. THIS SECTION ESTABLISHES GENERAL REQUIREMENTS PERTAINING TO CUTTING INCLUDING FITTING, AND PATCHING OF ALL THE WORK, INCLUDING MISCELLANEOUS ARCHITECTURAL, STRUCTURAL MECHANICAL AND ELECTRICAL WORK REQUIRED OUTSIDE THE CONTRACT LIMIT LINE REQUIRED TO: 1. MAKE THE SEVERAL PARTS FIT PROPERLY, NEW AND EXISTING. 2. CORE DRILL FLOOR STRUCTURE AND SAWCUT FINISH FLOOR TOPPING FOR ELECTRICAL AND NEW FINISH FLOOR REQUIREMENTS. 3. UNCOVER WORK TO PROVIDE FOR THE INSTALLATION, INSPECTION, OR BOTH OF ILL-TIMED WORK. 4. REMOVE AND REPLACE WORK NOT CONFORMING TO REQUIREMENTS OF THE CONTRACT DOCUMENTS. 5. REMOVE AND REPLACE DEFECTIVE WORK. 6. CUT, REPAIR AND PATCH TO MATCH EXISTING WORK LEFT EXPOSED TO VIEW BY REMOVALS AND WHERE DAMAGED BY THIS CONTRACT WORK. 2. IN ADDITION TO OTHER REQUIREMENTS SPECIFIED, UPON THE ARCHITECT'S REQUEST, UNCOVER WORK TO PROVIDE FOR INSPECTION BY THE ARCHITECT OF COVERED WORK, AND REMOVE SAMPLES OF INSTALLED MATERIALS FOR TESTING. 3. DO NOT CUT OR ALTER WORK PERFORMED UNDER SEPARATE CONTRACT WITHOUT THE ARCHITECT'S WRITTEN PERMISSION. 4. PERFORM ALL CUTTING AND PATCHING IN STRICT ACCORDANCE WITH PERTINENT REQUIREMENTS OF THESE SPECIFICATIONS AND, IN THE EVENT THAT NO SUCH REQUIREMENTS ARE DETERMINED, IN CONFORMANCE WITH THE ARCHITECT'S WRITTEN DIRECTION. 5. PRIOR TO CUTTING WHICH AFFECTS THE STRUCTURAL SAFETY OR THE STRUCTURAL INTEGRITY OF THE BUILDING, SUBMIT A WRITTEN REQUEST TO THE ARCHITECT FOR PERMISSION TO PROCEED WITH CUTTING. DO NOT CUT ANY STRUCTURAL WALLS, SLABS OR FRAMING MEMBERS, INCLUDING ANY REINFORCING UNTIL PERMISSION IS RECEIVED IN WRITING. IF REINFORCEMENT IS ENCOUNTERED WHERE NOT EXPECTED DO NOT PROCEED WITH CUTTING WITHOUT NOTIFYING THE ARCHITECT AND RECEIVING WRITTEN PERMISSION TO PROCEED. 1 • PRIOR TO CUTTING (CORE BORING) EXISTING FLOOR SLABS CONTRACTOR SHALL VERIFY STRUCTURAL REINFORCING OF CONCRETE, IF UNKNOWN, BY APPROVED XRAY METHOD, OR APPROVED ALTERNATE, UNLESS PERMISSION TO PROCEED IS GIVEN BY BUILDING OWNER'S REPRESENTATIVE FOR KNOWN STRUCTURAL REINFORCEMENT LOCATIONS. DO NOT PROCEED WITH ANY CUTTING (CORE BORING) UNTIL WRITTEN AUTHORIZATION IS RECEIVED FROM BUILDING OWNER. 6. PRIOR TO CUTTING AND PATCHING PERFORMED PURSUANT TO THE ARCHITECT'S INSTRUCTIONS, SUBMIT COST ESTIMATE TO THE ARCHITECT. SECURE THE ARCHITECT'S ACCEPTANCE OF COST ESTIMATE AND TYPE OF COST REIMBURSEMENT BEFORE PROCEEDING WITH CUTTING AND PATCHING. 7. SUBMIT WRITTEN NOTICE TO THE ARCHITECT DESIGNATING TIME THE WORK WILL BE UNCOVERED, TO PROVIDE FOR THE ARCHITECT'S OBSERVATION.3 IF THIS DRAWING IS LESS THAN 22" X 34" IT IS A REDUCED SIZE DRAWING 4 II MATERIALS - 1. FOR REPLACEMENT OF WORK REMOVED, USE MATERIALS WHICH COMPLY WITH THE PERTINENT SECTIONS OF THESE SPECIFICATIONS. EXISTING AREAS ABUTTING NEW WORK OUTSIDE CONTRACT LIMIT LINE ARE TO MATCH EXISTING LIKE WORK IN MATERIAL AND FINISH: SEE SECTION 01400. III EXECUTION - 1. INSPECT EXISTING CONDITIONS, INCLUDING ELEMENTS SUBJECT TO MOVEMENT OR DAMAGE DURING CUTTING AND PATCHING. 2. AFTER UNCOVERING THE WORK, INSPECT CONDITIONS AFFECTING INSTALLATION OF THE NEW WORK. 3. IF UNCOVERED CONDITIONS ARE NOT AS ANTICIPATED, IMMEDIATELY NOTIFY THE ARCHITECT AND SECURE NEEDED DIRECTIONS. 4. DO NOT PROCEED IN AREAS OF DISCREPANCY UNTIL ALL SUCH DISCREPANCIES HAVE BEEN TRULY RESOLVED. 5. PROVIDE ALL REQUIRED PROTECTION INCLUDING, BUT NOT NECESSARILY LIMITED TO, SHORING, BRACING AND SUPPORT TO MAINTAIN STRUCTURAL INTEGRITY OF THE WORK. 6. PERFORM ALL WORK AS REQUIRED UNDER PERTINENT SECTIONS OF THESE SPECIFICATIONS. PERFORM CUTTING AND PATCHING BY METHODS WHICH WILL PREVENT DAMAGE TO OTHER PORTIONS OF THE WORK AND WILL PROVIDE PROPER SURFACES TO RECEIVE OR REPAIR NEW WORK. PERFORM FITTING AND ADJUSTMENT OF PRODUCTS TO PROVIDE FINISHED INSTALLATION COMPLYING WITH THE SPECIFIED TOLERANCES AND FINISHES. 7. CORE DRILL SLAB AND MAKE MINIMUM WIDTH AND RUN SAWCUT IN FINISH FLOOR TOPPING TO FLUSH FLOOR BOX LOCATIONS. ADJUST CORE DRILLING TO MISS SLAB REINFORCEMENT. PATCH TO MATCH FINISH FLOOR WHERE EXPOSED TO VIEW. END OF SECTION 01045 01090 - REFERENCE STANDARDS I WORK INCLUDED - 1. THROUGHOUT THE CONTRACT DOCUMENTS, REFERENCE IS MADE TO CODES AND STANDARDS WHICH ESTABLISH QUALITIES AND TYPES OF WORKMANSHIP AND MATERIALS, AND WHICH ESTABLISH METHODS FOR TESTING AND REPORTING ON THE PERTINENT CHARACTERISTICS. 2. ALL MATERIALS AND WORKMANSHIP ARE REQUIRED BY THESE CONTRACT DOCUMENTS TO MEET OR EXCEED ALL PERTINENT CODES AND STANDARDS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE MATERIALS AND WORKMANSHIP WHICH MEET OR EXCEED THE SPECIFICALLY NAMED CODE OR STANDARD. 3. IT IS ALSO THE CONTRACTOR'S RESPONSIBILITY, WHEN SO REQUIRED BY THE CONTRACT DOCUMENTS OR BY WRITTEN REQUEST FROM THE ARCHITECT, TO DELIVER TO THE ARCHITECT ALL REQUIRED PROOF THAT THE MATERIALS AND WORKMANSHIP, OR BOTH, MEET OR EXCEED THE REQUIREMENTS OF A SPECIFICALLY NAMED CODE OR STANDARD. SUCH PROOF SHALL BE IN THE FORM REQUESTED IN WRITING BY THE ARCHITECT, AND GENERALLY WILL BE REQUIRED TO BE COPIES OF A CERTIFIED REPORT OF TESTS CONDUCTED BY A TESTING AGENCY ACCEPTED FOR THAT PURPOSE BY THE ARCHITECT 4. SPECIFIC NAMING OF CODES OR STANDARDS OCCURS ON THE DRAWINGS AND IN OTHER SECTIONS OF THESE SPECIFICATIONS. 5. QUALITY ASSURANCE: 1. FAMILIARITY WITH PERTINENT CODES AND STANDARDS. 2. IN PROCURING ALL ITEMS USED IN THIS WORK, IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE DETAILED REQUIREMENTS OF THE SPECIFICALLY NAMED CODES AND STANDARDS AND TO VERIFY THAT THE ITEMS PROCURED FOR USE IN THIS WORK MEET OR EXCEED THE SPECIFIED REQUIREMENTS. 3. THE ARCHITECT RESERVES THE RIGHT TO REJECT ITEMS INCORPORATED INTO THE WORK WHICH FAIL TO MEET THE SPECIFIED MINIMUM REQUIREMENTS. THE ARCHITECT FURTHER RESERVES THE RIGHT, AND WITHOUT PREJUDICE TO OTHER RECOURSE THE ARCHITECT MAY TAKE, TO ACCEPT NON -COMPLYING ITEMS SUBJECT TO AN ADJUSTMENT IN THE CONTRACT AMOUNT AS ACCEPTED BY THE ARCHITECT AND THE OWNER. II MATERIALS - 1. REFERENCE STANDARDS: 1. REFERENCE STANDARDS LISTED IN THESE SPECIFICATIONS INCLUDE, BUT ARE NOT NECESSARILY LIMITED TO, THE LATEST EDITIONS OF STANDARDS PROMULGATED BY THE FOLLOWING AGENCIES AND ORGANIZATIONS: AAMA AMERICAN ARCHITECTURAL MANUFACTURER'S ASSOCIATION 2700 RIVER ROAD, SUITE 118, DES PLAINS, IL (312) 699-7310 ACT AMERICAN CONCRETE INSTITUTE P.O. BOX 19150 REDFOLD STATION DETROIT, MI 48219 AIA AMERICAN INSTITUTE OF ARCHITECTS 1735 NEW YORK AVE. NW, WASHINGTON, DC 20006 (202) 626-7474 AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION 400 N. MICHIGAN AVE. 8TH FLR., CHICAGO, IL 60611 (312) 670-2400 AISI AMERICAN IRON AND STEEL INSTITUTE 1000 16TH ST. NW, WASHINGTON, DC 20036 (202) 452-7100 AITC AMERICAN INSTITUTE OF TIMBER CONSTRUCTION 333 W. HAMPDEN AVE. ENGLEWOOD, CO 80110 (303) 761-3212 ALSC AMERICAN LUMBER STANDARDS COMMITTEE P.O. BOX 210, GERMANTOWN, MD 20874 (301) 972-1700 AMCA AIR MOVEMENT AND CONTROL ASSOCIATION 30 W. UNIVERSITY DRIVE, ARLINGTON HEIGHTS, IL 60004 (312) 394-0150 ANSI AMERICAN NATIONAL STANDARDS INSTITUTE 1430 BROADWAY, NEW YORK, NY 10018 (212) 354-3300 APA AMERICAN PLYWOOD ASSOCIATION P.O. BOX 1170, TACOMA, WA 98411 (206) 565-6600 4 5 ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE 1501 WILSON BLVD., ARLINGTON, VA 22209 (703) 524-8800 ASC ADHESIVE AND SEALANT COUNCIL 1600 WILSON BLVD., SUITE 910, ARLINGTON, VA 22209 (703) 841-1112 ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIRCONDITIONING ENGINEERS 1791 TULLIE CIRCLE, NE, ATLANTA, GA 30329 (404) 636-8400 ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS 345 E. 47TH ST., NEW YORK, NY 10017 (212) 705-7722 ASPE AMERICAN SOCIETY OF PLUMBING ENGINEERS 15233 VENTURA BLVD., SUITE 811, SHERMAN OAKS, CA 91403 (213) 783-4845 ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS 1916 RACE ST., PHILADELPHIA, PA 19103 (215) 299-5400 AWI AMERICAN WOODWORK INSTITUTE 1952 ISAAC NEWTON SQUARE, RESTON, VA 20190 (703) 733-0600 AWPA AMERICAN WOOD PRESERVERS ASSOCIATION 7735 OLD GEORGETOWN RD. BETHESDA, MD 20014 AWS AMERICAN WELDING SOCIETY P.O. BOX 351040, 550 LEJUNE RD., NW, MIAMI, FL 33135 (305) 443-9353 AWWA AMERICAN WATER WORKS ASSOCIATION, INC. 6666 W. QUINCY AVE., DENVER, CO 80235 (303) 794-7711 BOCA BASIC NATIONAL BUILDING CODE BUILDING OFFICIALS AND CODE ADMINISTRATIONS INTER. INC. 4051 W. FLOSSMOOR RD., COUNTRY CLUB HILLS, IL 60477-5795 (708) 799-2300 BHMA BUILDER'S HARDWARE MANUFACTURER'S ASSOCIATION 60 E. 42ND ST., ROOM 511, NEW YORK, NY 10165 (212) 682-8142 FGMA FLAT GLASS MARKETING ASSOCIATION 3310 HARRISON ST., TOPEKA, KS 66611 (913) 266-7013 IEEE INSTITUTE OF ELECTRICAL AND ELECTRONIC ENGINEERS, INC. 345 E. 47TH ST., NEW YORK, NY 10017 (212) 705-7900 MCAA MECHANICAL CONTRACTOR'S ASSOCIATION OF AMERICA 5530 WISCONSIN ANE., SUITE 250, CHEVY CHASE, MD 20815 (301) 654-7960 NAAMM NATIONAL ASSOCIATION OF ARCHITECTURAL METAL MANUFACTURERS 221 N, LASALLE ST., CHICAGO, IL 60601 (312) 346-1600 NBS NATIONAL BUREAU OF STANDARDS -U.S. DEPARTMENT OF COMMERCE GAITHERSBURG, MD 20234 (301) 921-1000 NEC NATIONAL ELECTRICAL CODE-NFPA BATTERYMARCH PARK, QUINCY, MA 02269 (617) 770-3300 NECA NATIONAL ELECTRICAL CONTRACTORS ASSOCIATION 7315 WISCONSIN AVE., BETHESDA, MD 20814 (301) 657-3110 NEMA NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION 2101 L ST., NW, WASHINGTON, DC 20037 (202) 457-8400 NFPA NATIONAL FIRE PROTECTION ASSOCIATION BATTERYMARCH PARK, QUINCY, MA 02269 (617) 770-3300 NHLA NATIONAL HARDWARE LUMBER ASSOCIATION P.O. BOX 34518, MEMPHIS, TN 38104 (901) 377-1818 NMC NATIONAL MECHANICAL CODE-BOCA 4051 W. FLOSSMOOR RD., COUNTRY CLUB HILLS, IL 60477-5795 (708) 799-2300 NPC NATIONAL PLUMBING CODE-BOCA 4051 W. FLOSSMOOR RD., COUNTRY CLUB HILLS, IL 60477-5795 (708) 799-2300 OSHA OCCUPATIONAL SAFETY HEALTH ADMINISTRATION U.S. DEPARTMENT OF LABOR WASHINGTON, DC 20402 SMACNA SHEEP METAL AND AIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION P.O. BOX 70, MERRIFIELD,VA 22116 (703) 790-9890 SSPC STEEL STRUCTURES PAINTING COUNCIL 4400 5TH AVE„ PITTSBURGH, PA 15213 (412) 578-3327 TCA TILE COUNCIL OF AMERICA, INC. P.O. BOX 326, PRINCETON, NJ 08540 (609) 921-7050 UL UNDERWRITER'S LABORATORIES 333 PFINGSTEN RD., NORTHBROOK, IL 60062 (312) 272-8800 III EXECUTION - NOT USED 5 in A AI 01010 - SUMMARY OF WORK I WORK INCLUDED - 1. WORK INCLUDED: TENANT FIT OUT OF RETAIL SPACE, INCLUDING NEW PARTITIONS, ELECTRICAL & FINISHES AS FURTHER DEFINED IN THE CONTRACT DOCUMENTS. 2. ALL WORK TO BE CONDUCTED AS QUIETLY AS POSSIBLE AND WITH a. ao A MINIMUM AMOUNT OF NOISE OR DUST. W, :♦v w 3. WHERE THE SCOPE OF THE WORK OF THE CONTRACTOR CALLS FOR SERVICE CONNECTIONS, SUPPORTS OR INSTALLATION OF ANY ITEM F-Y N Q (11o OR GROUP OF ITEMS BEING FURNISHED BY OTHER CONTRACTS, THE w OMISSION OF ANY GIVEN ITEM FROM THE DRAWINGS OF THIS D PARTICULAR CONTRACT SHALL NOT RELIEVE THE CONTRACTOR OF m 0 Z Z Mo a THE RESPONSIBILITY FOR INSTALLING, CONNECTING OR SUPPORTING SUCH ITEM AT NO INCREASE IN CONTRACT. 4. THE CONTRACTOR SHALL BE BOUND TO THE BUILDING RULES AS TO Q IXZ N THE HOURS OF WORK, USE OF THE ELEVATORS AND STAIRS, L) STORAGE AND REMOVAL OF DEBRIS, ETC. ALL WORK SHALL BE PERFORMED AS EXPEDITIOUSLY AS POSSIBLE. THE CONTRACT PRICE MUST INCLUDE ANY AND ALL CONSIDERATION OF THE BUILDING RULES. NO EXTRA CHARGES WILL BE ADDED AFTER CONTRACT SIGNING. 5. THE CONTRACTOR AND SUBCONTRACTORS SHALL PERFORM THEIR WORK IN A MANNER THAT WILL CAUSE THE LEAST INTERFERENCE TO THE OPERATION OF THE PRESENT TENANTS AND TO THE PUBLIC. 6. SUBJECT TO THE CONDITIONS ELSEWHERE STATED HEREIN, THE AREAS TO BE OCCUPIED BY THE PERMANENT CONSTRUCTION WILL BE MADE AVAILABLE TO THE CONTRACTOR UPON THE COMMENCEMENT OF THE CONTRACTOR'S FIRST OPERATIONS AT THE CONSTRUCTION SITE. THE CONTRACTOR WILL PROVIDE PROTECTION OF COMMON AREAS AS NECESSARY, SUBJECT TO THE REVIEW AND THE ACCEPTANCE OF THE OWNER AND ARCHITECT. a 7. THE CONTRACTOR SHALL COOPERATE WITH AND COORDINATE THEIR OPERATIONS WITH THOSE OF THE OWNER AND ALL TENANTS. THE CONTRACTOR SHALL SO PLAN AND CONDUCT THEIR OPERATIONS AS w Lu TO WORK IN HARMONY WITH OTHERS ENGAGED AT THE CONSTRUCTION SITE AND NOT TO DELAY, ENDANGER OR INTERFERE N w p N w WITH THE OPERATIONS OF OTHERS (WHETHER OR NOT SPECIFICALLY QZ MENTIONED ABOVE), ALL TO THE BEST INTERESTS OF THE OWNER AND THE PUBLIC AND AS MAY BE DIRECTED BY THE OWNER, s >- co Z M TENANTS AND ARCHITECT. DO 8. THE CONTRACTOR SHALL NOT INTERFERE WITH GENERAL PUBLIC Ia- ACCESS AND EGRESS. INTRODUCTION OF MATERIALS AND ACCESS F- w O rn C AND EGRESS OF THE WORKFORCE SHALL BE RESTRICTED TO SUCH PLACES AND IN SUCH MANNER AS ACCEPTED BY THE OWNER, Z TENANT AND ARCHITECT. N z a. 9. ALL WORK IS REQUIRED TO BE COORDINATED WITH TENANT ., OPERATIONS THROUGH THE ARCHITECT. THE CONTRACTOR WILL BE U PERMITTED TO WORK DURING NORMAL WORKING HOURS ONLY TO THE EXTENT THAT SUCH OPERATION DOES NOT INTERFERE SIGNIFICANTLY WITH OPERATIONS. WORK WITHIN ANY AREA ENCLOSED BY PERMANENT CONSTRUCTION PARTITION WILL BE PERMITTED DURING ALL HOURS PROVIDED THAT NOISE LEVELS ARE ACCEPTABLE TO THE OWNER, TENANTS AND THE ARCHITECT. 10. PROVIDE SUCH EQUIPMENT AND FACILITIES AS ARE NECESSARY OR REQUIRED, IN CASE OF ACCIDENT, FOR FIRST AID SERVICE TO ANY WHO MAY BE INJURED IN THE PROGRESS OF THE WORK, AND O HAVE STANDING ARRANGEMENTS FOR THE REMOVAL AND HOSPITAL TREATMENT OF ANY EMPLOYEES WHO MAY BE INJURED OR WHO Q J MAY BECOME ILL. COMPLY WITH OCCUPATIONAL SAFETY AND HEALTH STANDARDS ISSUED BY THE SECRETARY OF LABOR PURSUANT TO THE WILLIAMS -STEIGER OCCUPATIONAL SAFETY AND p0Q HEALTH ACT OF 1970 AND AS AMENDED. 11. WORK BY OWNER 1. THE OWNER MAY AWARD SEPARATE CONTRACTS WHICH WILL Q Q Ir COMMENCE DURING WORK UNDER THIS CONTRACT. THESE Q Z CONTRACTS INCLUDE, BUT NOT NECESSARILY LIMITED TO: Zai TELEPHONES, ELECTRONIC EQUIPMENT, WIRING, SIGNAL AND COMMUNICATION CIRCUITS. 2• ITEMS NOTED 'NIC' (NOT IN CONTRACT), WILL BE FURNISHED AND Rot0 Agz INSTALLED BY OWNER. of0O 3. FOR ITEMS FURNISHED BY OWNER FOR FINAL CONNECTION BY 0 CONTRACTOR. REFER TO DRAWINGS. 6 12. OWNER SUPPLIED PRODUCTS HOZ Z 1. THE FOLLOWING ABBREVIATIONS ARE UTILIZED IN THE CONTRACT W DOCUMENTS: A. OS01 - OWNER SUPPLIED OWNER INSTALLED. Q 00 B OSCI - OWNER SUPPLIED CONTRACTOR INSTALLED. 0 2. OWNER'S RESPONSIBILITIES: (OS01 & OSCI) A. ARRANGE FOR AND DELIVER OWNER REVIEWED SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES, TO THE cr) CONTRACTOR. B. ARRANGE AND PAY FOR PRODUCT DELIVERY TO SITE. C. ON DELIVERY, INSPECT PRODUCTS JOINTLY WITH THE CONTRACTOR. D. SUBMIT CLAIMS FOR TRANSPORTATION DAMAGE AND REPLACE O DAMAGED, DEFECTIVE, OR DEFICIENT ITEMS. E. ARRANGE FOR MANUFACTURERS' WARRANTIES, INSPECTIONS, AND SERVICE. 3. CONTRACTOR'S RESPONSIBILITIES: (OS01 & OSCI) A. REVIEW OWNER REVIEWED SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. B. RECEIVE, UNLOAD AND UNCRATE PRODUCTS AT THE SITE; INSPECT FOR COMPLETENESS OR DAMAGE, JOINTLY WITH OWNER. C. HANDLE AND STORE PRODUCTS. D. REPAIR OR REPLACE ITEMS DAMAGED AFTER RECEIPT. EE E• INSTALL AND FINISH PRODUCTS. (OSCI ONLY) CL °i 4. ITEMS SUPPLIED TO SITE AND INSTALLED BY OWNER (OS01): I? A. ITEMS AS INDICATED ON THE DRAWINGS. co N 5. ITEMS SUPPLIED BY OWNER FOR INSTALLATION BY CONTRACTOR Ld (OSCI): N o A. ITEMS AS INDICATED ON THE DRAWINGS. z Z II MATERIALS - NOT USED 0 a, III EXECUTION - NOT USED A co i END OF SECTION 01010 01019 - CONTRACT CONSIDERATIONS I WORK INCLUDED - 1. ACCEPTED ALTERNATES WILL BE IDENTIFIED IN OWNER -CONTRACTOR AGREEMENT. COORDINATE RELATED WORK AND MODIFY SURROUNDING WORK AS REQUIRED. 2. CONTRACTOR SHALL SUBMIT A PRINTED SCHEDULE OF VALUES ON AIA FORM G703 - APPLICATION AND CERTIFICATE FOR PAYMENT CONTINUATION SHEET, IN DUPLICATE, WITHIN 15 DAYS AFTER DATE OF OWNER -CONTRACTOR AGREEMENT. 1 2 3. CONTRACTOR SHALL SUBMIT THREE COPIES OF EACH APPLICATION FOR PAYMENT TO THE ARCHITECT ON AIA FORM G702 - APPLICATION AND CERTIFICATE FOR PAYMENT AND AIA G703 - CONTINUATION SHEET, UTILIZING SCHEDULE OF VALUES. 4. CHANGE PROCEDURES: 1. THE ARCHITECT WILL ADVISE OF MINOR CHANGES IN THE WORK NOT INVOLVING AN ADJUSTMENT TO CONTRACT SUM OR CONTRACT TIME AS AUTHORIZED BY AIA A201, BY ISSUING SUPPLEMENTAL INSTRUCTIONS ON AIA FORM G710. 2. THE ARCHITECT MAY ISSUE A PROPOSAL REQUEST WHICH INCLUDES A DETAILED DESCRIPTION OF A PROPOSED CHANGE WITH SUPPLEMENTARY OR REVISED CONTRACT DOCUMENTS, A CHANGE IN CONTRACT TIME FOR EXECUTING THE CHANGE, WITH A STIPULATION OF ANY OVERTIME WORK REQUIRED AND THE PERIOD OF TIME DURING WHICH THE REQUESTED PRICE WILL BE CONSIDERED VALID. CONTRACTOR TO SUBMIT AN ESTIMATE WITHIN SEVEN CALENDAR DAYS. 3. THE CONTRACTOR MAY PROPOSE CHANGES BY SUBMITTING A REQUEST FOR CHANGE TO THE ARCHITECT, DESCRIBING THE PROPOSED CHANGE AND ITS FULL EFFECT ON THE WORK. INCLUDE A STATEMENT DESCRIBING THE REASON FOR THE CHANGE, AND THE EFFECT ON THE CONTRACT SUM AND CONTRACT TIME WITH FULL DOCUMENTATION AND A STATEMENT DESCRIBING THE EFFECT ON WORK BY SEPARATE OR OTHER CONTRACTORS. 4. THE ARCHITECT MAY ISSUE AIA FORM G713 CONSTRUCTION CHANGE DIRECTIVE, SIGNED BY THE OWNER, INSTRUCTING THE CONTRACTOR TO PROCEED WITH A CHANGE IN THE WORK, FOR SUBSEQUENT INCLUSION IN A CHANGE ORDER. DOCUMENT WILL DESCRIBE CHANGES IN THE WORK, AND DESIGNATE METHOD OF DETERMINING ANY CHANGE IN CONTRACT SUM OR CONTRACT TIME. CONTRACTOR SHALL PROMPTLY EXECUTE THE CHANGE. 5. TIME AND MATERIAL CHANGE ORDER: THE CONTRACTOR SHALL SUBMIT AN ITEMIZED ACCOUNT AND SUPPORTING DATA AFTER COMPLETION OF CHANGE, WITHIN TIME LIMITS INDICATED IN THE CONDITIONS OF THE CONTRACT. ARCHITECT WILL DETERMINE THE CHANGE ALLOWABLE IN CONTRACT SUM AND CONTRACT TIME AS PROVIDED IN THE CONTRACT DOCUMENTS. MAINTAIN DETAILED RECORDS OF WORK DONE ON TIME AND MATERIAL BASIS. PROVIDE FULL INFORMATION REQUIRED FOR EVALUATION OF PROPOSED CHANGES, AND TO SUBSTANTIATE COSTS FOR CHANGES IN THE WORK. 6. CONTRACTOR SHALL ISSUE CHANGE ORDERS, USING AIA G701 CHANGE ORDER, FOR SIGNATURES OF ALL PARTIES AS PROVIDED IN THE CONDITIONS OF THE CONTRACT. II MATERIALS - NOT USED III EXECUTION - NOT USED END OF SECTION 01019 01039 - COORDINATION AND MEETINGS I WORK INCLUDED - 1. VERIFY THAT UTILITY REQUIREMENTS AND CHARACTERISTICS OF OPERATING EQUIPMENT ARE COMPATIBLE WITH BUILDING UTILITIES. COORDINATE WORK OF VARIOUS SECTIONS HAVING INTERDEPENDENT RESPONSIBILITIES FOR INSTALLING, CONNECTING TO, AND PLACING IN SERVICE, SUCH EQUIPMENT. 2. COORDINATE SPACE REQUIREMENTS AND INSTALLATION OF MECHANICAL AND ELECTRICAL WORK WHICH ARE INDICATED DIAGRAMMATICALLY ON DRAWINGS. FOLLOW ROUTING SHOWN FOR PIPES, DUCTS, AND CONDUIT, AS CLOSELY AS PRACTICABLE. PLACE RUNS PARALLEL WITH LINE OF BUILDING. UTILIZE SPACES EFFICIENTLY TO MAXIMIZE ACCESSIBILITY FOR OTHER INSTALLATIONS, FOR MAINTENANCE, AND FOR REPAIR. 3. IN FINISHED AREAS EXCEPT AS OTHERWISE INDICATED, CONCEAL PIPES, DUCTS, AND WIRING WITHIN THE CONSTRUCTION. COORDINATE LOCATIONS OF FIXTURES AND OUTLETS WITH FINISH ELEMENTS. 4. AFTER OWNER OCCUPANCY OF PREMISES, ACCESS TO SPACE FOR CORRECTION OF DEFECTIVE WORK AND WORK NOT IN ACCORDANCE WITH CONTRACT DOCUMENTS (PUNCH LIST ITEMS), SHALL BE CONDUCTED AT TIMES OTHER THAN REGULAR WORKING HOURS UNLESS OTHERWISE CONSENTED TO BY THE OWNER. 5. PRE -CONSTRUCTION MEETING A. A PRE -CONSTRUCTION MEETING WILL BE SCHEDULED AT THE PROJECT SITE PRIOR TO CONTRACTOR OCCUPANCY. B. ATTENDANCE REQUIRED: AUTHORITY HAVING JURISDICTION, LANDLORD, OWNER, ARCHITECT, CONTRACTOR AND CONTRACTOR'S SUPERINTENDENT. C. AGENDA: 1. USE OF PREMISES BY OWNER AND CONTRACTOR. 2. SECURITY 3. TEMPORARY PROTECTION AND SAFETY 4. DUST AND NOISE PROTECTION 5. STAGING AREA, DELIVERY AND STORAGE OF MATERIALS 6. SCHEDULES AND PHASING OF THE WORK 7. CONTRACTOR PARKING 8. WORK HOURS 9. INSPECTION AND CERTIFICATE OF OCCUPANCY PROCEDURES 10. ANY SPECIFIC REQUIREMENTS BY AUTHORITY HAVING JURISDICTION, LANDLORD OR OWNER. D. CONTRACTOR SHALL RECORD MINUTES AND DISTRIBUTE COPIES WITHIN TWO BUSINESS DAYS AFTER MEETING TO PARTICIPANTS, WITH ONE COPY TO THE AUTHORITY HAVING JURISDICTION, LANDLORD, OWNER, ARCHITECT, ALL OTHER PARTICIPANTS AND THOSE AFFECTED BY DECISIONS MADE. 6. SITE MOBILIZATION MEETING A. ARCHITECT AND OWNER WILL SCHEDULE A MEETING AT THE PROJECT SITE PRIOR TO CONTRACTOR OCCUPANCY. B. ATTENDANCE REQUIRED: OWNER, ARCHITECT, SPECIAL CONSULTANTS, CONTRACTOR, CONTRACTOR'S SUPERINTENDENT, AND MAJOR SUBCONTRACTORS. C. AGENDA: 1. USE OF PREMISES BY OWNER AND CONTRACTOR. 2. OWNER'S REQUIREMENTS. 3. CONSTRUCTION FACILITIES AND CONTROLS PROVIDED BY OWNER. 4. TEMPORARY FACILITIES PROVIDED BY OWNER. 5. SECURITY AND HOUSEKEEPING PROCEDURES. 6. SCHEDULES. 7. PROCEDURES FOR TESTING. 8. PROCEDURES FOR MAINTAINING RECORD DOCUMENTS. 9. REQUIREMENTS FOR START-UP OF EQUIPMENT. 10. INSPECTION AND ACCEPTANCE OF EQUIPMENT PUT INTO SERVICE DURING CONSTRUCTION PERIOD. 2 ,Q D. CONTRACTOR SHALL RECORD MINUTES AND DISTRIBUTE COPIES WITHIN TWO BUSINESS DAYS AFTER MEETING TO PARTICIPANTS, WITH ONE COPY TO OWNER, ARCHITECT, OTHER PARTICIPANTS, AND THOSE AFFECTED BY DECISIONS MADE. 7. PROGRESS MEETINGS A. CONTRACTOR SHALL SCHEDULE AND ADMINISTER MEETINGS THROUGHOUT PROGRESS OF THE WORK AT MAXIMUM WEEKLY INTERVALS. B. CONTRACTOR SHALL MAKE ARRANGEMENTS FOR MEETINGS, PREPARE AGENDA WITH COPIES FOR PARTICIPANTS, PRESIDE AT MEETINGS. C. ATTENDANCE REQUIRED: JOB SUPERINTENDENT, MAJOR SUBCONTRACTORS AND SUPPLIERS, OWNER, ARCHITECT, AND CONSULTANTS APPROPRIATE TO AGENDA TOPICS FOR EACH MEETING. D. AGENDA: 1. REVIEW MINUTES OF PREVIOUS MEETING. 2. REVIEW PROGRESS OF WORK. 3. FIELD OBSERVATIONS, PROBLEMS, AND DECISIONS. 4. IDENTIFICATION OF PROBLEMS WHICH IMPEDE PLANNED PROGRESS. 5. REVIEW OF SUBMITTALS SCHEDULE AND STATUS OF SUBMITTALS. 6. REVIEW OF OFF-SITE FABRICATION AND DELIVERY SCHEDULES. 7. MAINTENANCE OF PROGRESS SCHEDULE. 8. CORRECTIVE MEASURES TO REGAIN PROJECTED SCHEDULES. 9. PLANNED PROGRESS DURING SUCCEEDING WORK PERIOD. 10. COORDINATION OF PROJECTED PROGRESS. 11. MAINTENANCE OF QUALITY AND WORK STANDARDS. 12. EFFECT OF PROPOSED CHANGES ON PROGRESS SCHEDULE AND COORDINATION. 13. OTHER BUSINESS RELATING TO WORK. E. CONTRACTOR SHALL RECORD MINUTES AND DISTRIBUTE COPIES WITHIN TWO BUSINESS DAYS AFTER MEETING TO PARTICIPANTS, WITH ONE COPY TO ARCHITECT, OWNER, PARTICIPANTS, AND THOSE AFFECTED BY DECISIONS MADE. 8. PRE -INSTALLATION MEETING A. WHEN REQUIRED IN INDIVIDUAL SPECIFICATION SECTIONS, CONVENE A PRE -INSTALLATION MEETING AT WORK SITE PRIOR TO COMMENCING WORK OF THE SECTION. B. REQUIRE ATTENDANCE OF PARTIES DIRECTLY AFFECTING, OR AFFECTED BY, WORK OF THE SPECIFIC SECTION. C. NOTIFY ARCHITECT FOUR BUSINESS DAYS IN ADVANCE OF MEETING DATE D. CONTRACTOR SHALL PREPARE AGENDA AND PRESIDE AT MEETING: 1. REVIEW CONDITIONS OF INSTALLATION, PREPARATION AND INSTALLATION PROCEDURES. 2. REVIEW COORDINATION WITH RELATED WORK. E. CONTRACTOR SHALL RECORD MINUTES AND DISTRIBUTE COPIES WITHIN TWO BUSINESS DAYS AFTER MEETING TO PARTICIPANTS, WITH ONE COPY TO ARCHITECT, OWNER, PARTICIPANTS, AND THOSE AFFECTED BY DECISIONS MADE. II MATERIALS - NOT USED III EXECUTION - NOT USED END OF SECTION 01039 01045 CUTTING AND PA I WORK INCLUDED - 1. THIS SECTION ESTABLISHES GENERAL REQUIREMENTS PERTAINING TO CUTTING INCLUDING FITTING, AND PATCHING OF ALL THE WORK, INCLUDING MISCELLANEOUS ARCHITECTURAL, STRUCTURAL MECHANICAL AND ELECTRICAL WORK REQUIRED OUTSIDE THE CONTRACT LIMIT LINE REQUIRED TO: 1. MAKE THE SEVERAL PARTS FIT PROPERLY, NEW AND EXISTING. 2. CORE DRILL FLOOR STRUCTURE AND SAWCUT FINISH FLOOR TOPPING FOR ELECTRICAL AND NEW FINISH FLOOR REQUIREMENTS. 3. UNCOVER WORK TO PROVIDE FOR THE INSTALLATION, INSPECTION, OR BOTH OF ILL-TIMED WORK. 4. REMOVE AND REPLACE WORK NOT CONFORMING TO REQUIREMENTS OF THE CONTRACT DOCUMENTS. 5. REMOVE AND REPLACE DEFECTIVE WORK. 6. CUT, REPAIR AND PATCH TO MATCH EXISTING WORK LEFT EXPOSED TO VIEW BY REMOVALS AND WHERE DAMAGED BY THIS CONTRACT WORK. 2. IN ADDITION TO OTHER REQUIREMENTS SPECIFIED, UPON THE ARCHITECT'S REQUEST, UNCOVER WORK TO PROVIDE FOR INSPECTION BY THE ARCHITECT OF COVERED WORK, AND REMOVE SAMPLES OF INSTALLED MATERIALS FOR TESTING. 3. DO NOT CUT OR ALTER WORK PERFORMED UNDER SEPARATE CONTRACT WITHOUT THE ARCHITECT'S WRITTEN PERMISSION. 4. PERFORM ALL CUTTING AND PATCHING IN STRICT ACCORDANCE WITH PERTINENT REQUIREMENTS OF THESE SPECIFICATIONS AND, IN THE EVENT THAT NO SUCH REQUIREMENTS ARE DETERMINED, IN CONFORMANCE WITH THE ARCHITECT'S WRITTEN DIRECTION. 5. PRIOR TO CUTTING WHICH AFFECTS THE STRUCTURAL SAFETY OR THE STRUCTURAL INTEGRITY OF THE BUILDING, SUBMIT A WRITTEN REQUEST TO THE ARCHITECT FOR PERMISSION TO PROCEED WITH CUTTING. DO NOT CUT ANY STRUCTURAL WALLS, SLABS OR FRAMING MEMBERS, INCLUDING ANY REINFORCING UNTIL PERMISSION IS RECEIVED IN WRITING. IF REINFORCEMENT IS ENCOUNTERED WHERE NOT EXPECTED DO NOT PROCEED WITH CUTTING WITHOUT NOTIFYING THE ARCHITECT AND RECEIVING WRITTEN PERMISSION TO PROCEED. 1 • PRIOR TO CUTTING (CORE BORING) EXISTING FLOOR SLABS CONTRACTOR SHALL VERIFY STRUCTURAL REINFORCING OF CONCRETE, IF UNKNOWN, BY APPROVED XRAY METHOD, OR APPROVED ALTERNATE, UNLESS PERMISSION TO PROCEED IS GIVEN BY BUILDING OWNER'S REPRESENTATIVE FOR KNOWN STRUCTURAL REINFORCEMENT LOCATIONS. DO NOT PROCEED WITH ANY CUTTING (CORE BORING) UNTIL WRITTEN AUTHORIZATION IS RECEIVED FROM BUILDING OWNER. 6. PRIOR TO CUTTING AND PATCHING PERFORMED PURSUANT TO THE ARCHITECT'S INSTRUCTIONS, SUBMIT COST ESTIMATE TO THE ARCHITECT. SECURE THE ARCHITECT'S ACCEPTANCE OF COST ESTIMATE AND TYPE OF COST REIMBURSEMENT BEFORE PROCEEDING WITH CUTTING AND PATCHING. 7. SUBMIT WRITTEN NOTICE TO THE ARCHITECT DESIGNATING TIME THE WORK WILL BE UNCOVERED, TO PROVIDE FOR THE ARCHITECT'S OBSERVATION.3 IF THIS DRAWING IS LESS THAN 22" X 34" IT IS A REDUCED SIZE DRAWING 4 II MATERIALS - 1. FOR REPLACEMENT OF WORK REMOVED, USE MATERIALS WHICH COMPLY WITH THE PERTINENT SECTIONS OF THESE SPECIFICATIONS. EXISTING AREAS ABUTTING NEW WORK OUTSIDE CONTRACT LIMIT LINE ARE TO MATCH EXISTING LIKE WORK IN MATERIAL AND FINISH: SEE SECTION 01400. III EXECUTION - 1. INSPECT EXISTING CONDITIONS, INCLUDING ELEMENTS SUBJECT TO MOVEMENT OR DAMAGE DURING CUTTING AND PATCHING. 2. AFTER UNCOVERING THE WORK, INSPECT CONDITIONS AFFECTING INSTALLATION OF THE NEW WORK. 3. IF UNCOVERED CONDITIONS ARE NOT AS ANTICIPATED, IMMEDIATELY NOTIFY THE ARCHITECT AND SECURE NEEDED DIRECTIONS. 4. DO NOT PROCEED IN AREAS OF DISCREPANCY UNTIL ALL SUCH DISCREPANCIES HAVE BEEN TRULY RESOLVED. 5. PROVIDE ALL REQUIRED PROTECTION INCLUDING, BUT NOT NECESSARILY LIMITED TO, SHORING, BRACING AND SUPPORT TO MAINTAIN STRUCTURAL INTEGRITY OF THE WORK. 6. PERFORM ALL WORK AS REQUIRED UNDER PERTINENT SECTIONS OF THESE SPECIFICATIONS. PERFORM CUTTING AND PATCHING BY METHODS WHICH WILL PREVENT DAMAGE TO OTHER PORTIONS OF THE WORK AND WILL PROVIDE PROPER SURFACES TO RECEIVE OR REPAIR NEW WORK. PERFORM FITTING AND ADJUSTMENT OF PRODUCTS TO PROVIDE FINISHED INSTALLATION COMPLYING WITH THE SPECIFIED TOLERANCES AND FINISHES. 7. CORE DRILL SLAB AND MAKE MINIMUM WIDTH AND RUN SAWCUT IN FINISH FLOOR TOPPING TO FLUSH FLOOR BOX LOCATIONS. ADJUST CORE DRILLING TO MISS SLAB REINFORCEMENT. PATCH TO MATCH FINISH FLOOR WHERE EXPOSED TO VIEW. END OF SECTION 01045 01090 - REFERENCE STANDARDS I WORK INCLUDED - 1. THROUGHOUT THE CONTRACT DOCUMENTS, REFERENCE IS MADE TO CODES AND STANDARDS WHICH ESTABLISH QUALITIES AND TYPES OF WORKMANSHIP AND MATERIALS, AND WHICH ESTABLISH METHODS FOR TESTING AND REPORTING ON THE PERTINENT CHARACTERISTICS. 2. ALL MATERIALS AND WORKMANSHIP ARE REQUIRED BY THESE CONTRACT DOCUMENTS TO MEET OR EXCEED ALL PERTINENT CODES AND STANDARDS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE MATERIALS AND WORKMANSHIP WHICH MEET OR EXCEED THE SPECIFICALLY NAMED CODE OR STANDARD. 3. IT IS ALSO THE CONTRACTOR'S RESPONSIBILITY, WHEN SO REQUIRED BY THE CONTRACT DOCUMENTS OR BY WRITTEN REQUEST FROM THE ARCHITECT, TO DELIVER TO THE ARCHITECT ALL REQUIRED PROOF THAT THE MATERIALS AND WORKMANSHIP, OR BOTH, MEET OR EXCEED THE REQUIREMENTS OF A SPECIFICALLY NAMED CODE OR STANDARD. SUCH PROOF SHALL BE IN THE FORM REQUESTED IN WRITING BY THE ARCHITECT, AND GENERALLY WILL BE REQUIRED TO BE COPIES OF A CERTIFIED REPORT OF TESTS CONDUCTED BY A TESTING AGENCY ACCEPTED FOR THAT PURPOSE BY THE ARCHITECT 4. SPECIFIC NAMING OF CODES OR STANDARDS OCCURS ON THE DRAWINGS AND IN OTHER SECTIONS OF THESE SPECIFICATIONS. 5. QUALITY ASSURANCE: 1. FAMILIARITY WITH PERTINENT CODES AND STANDARDS. 2. IN PROCURING ALL ITEMS USED IN THIS WORK, IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE DETAILED REQUIREMENTS OF THE SPECIFICALLY NAMED CODES AND STANDARDS AND TO VERIFY THAT THE ITEMS PROCURED FOR USE IN THIS WORK MEET OR EXCEED THE SPECIFIED REQUIREMENTS. 3. THE ARCHITECT RESERVES THE RIGHT TO REJECT ITEMS INCORPORATED INTO THE WORK WHICH FAIL TO MEET THE SPECIFIED MINIMUM REQUIREMENTS. THE ARCHITECT FURTHER RESERVES THE RIGHT, AND WITHOUT PREJUDICE TO OTHER RECOURSE THE ARCHITECT MAY TAKE, TO ACCEPT NON -COMPLYING ITEMS SUBJECT TO AN ADJUSTMENT IN THE CONTRACT AMOUNT AS ACCEPTED BY THE ARCHITECT AND THE OWNER. II MATERIALS - 1. REFERENCE STANDARDS: 1. REFERENCE STANDARDS LISTED IN THESE SPECIFICATIONS INCLUDE, BUT ARE NOT NECESSARILY LIMITED TO, THE LATEST EDITIONS OF STANDARDS PROMULGATED BY THE FOLLOWING AGENCIES AND ORGANIZATIONS: AAMA AMERICAN ARCHITECTURAL MANUFACTURER'S ASSOCIATION 2700 RIVER ROAD, SUITE 118, DES PLAINS, IL (312) 699-7310 ACT AMERICAN CONCRETE INSTITUTE P.O. BOX 19150 REDFOLD STATION DETROIT, MI 48219 AIA AMERICAN INSTITUTE OF ARCHITECTS 1735 NEW YORK AVE. NW, WASHINGTON, DC 20006 (202) 626-7474 AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION 400 N. MICHIGAN AVE. 8TH FLR., CHICAGO, IL 60611 (312) 670-2400 AISI AMERICAN IRON AND STEEL INSTITUTE 1000 16TH ST. NW, WASHINGTON, DC 20036 (202) 452-7100 AITC AMERICAN INSTITUTE OF TIMBER CONSTRUCTION 333 W. HAMPDEN AVE. ENGLEWOOD, CO 80110 (303) 761-3212 ALSC AMERICAN LUMBER STANDARDS COMMITTEE P.O. BOX 210, GERMANTOWN, MD 20874 (301) 972-1700 AMCA AIR MOVEMENT AND CONTROL ASSOCIATION 30 W. UNIVERSITY DRIVE, ARLINGTON HEIGHTS, IL 60004 (312) 394-0150 ANSI AMERICAN NATIONAL STANDARDS INSTITUTE 1430 BROADWAY, NEW YORK, NY 10018 (212) 354-3300 APA AMERICAN PLYWOOD ASSOCIATION P.O. BOX 1170, TACOMA, WA 98411 (206) 565-6600 4 5 ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE 1501 WILSON BLVD., ARLINGTON, VA 22209 (703) 524-8800 ASC ADHESIVE AND SEALANT COUNCIL 1600 WILSON BLVD., SUITE 910, ARLINGTON, VA 22209 (703) 841-1112 ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIRCONDITIONING ENGINEERS 1791 TULLIE CIRCLE, NE, ATLANTA, GA 30329 (404) 636-8400 ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS 345 E. 47TH ST., NEW YORK, NY 10017 (212) 705-7722 ASPE AMERICAN SOCIETY OF PLUMBING ENGINEERS 15233 VENTURA BLVD., SUITE 811, SHERMAN OAKS, CA 91403 (213) 783-4845 ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS 1916 RACE ST., PHILADELPHIA, PA 19103 (215) 299-5400 AWI AMERICAN WOODWORK INSTITUTE 1952 ISAAC NEWTON SQUARE, RESTON, VA 20190 (703) 733-0600 AWPA AMERICAN WOOD PRESERVERS ASSOCIATION 7735 OLD GEORGETOWN RD. BETHESDA, MD 20014 AWS AMERICAN WELDING SOCIETY P.O. BOX 351040, 550 LEJUNE RD., NW, MIAMI, FL 33135 (305) 443-9353 AWWA AMERICAN WATER WORKS ASSOCIATION, INC. 6666 W. QUINCY AVE., DENVER, CO 80235 (303) 794-7711 BOCA BASIC NATIONAL BUILDING CODE BUILDING OFFICIALS AND CODE ADMINISTRATIONS INTER. INC. 4051 W. FLOSSMOOR RD., COUNTRY CLUB HILLS, IL 60477-5795 (708) 799-2300 BHMA BUILDER'S HARDWARE MANUFACTURER'S ASSOCIATION 60 E. 42ND ST., ROOM 511, NEW YORK, NY 10165 (212) 682-8142 FGMA FLAT GLASS MARKETING ASSOCIATION 3310 HARRISON ST., TOPEKA, KS 66611 (913) 266-7013 IEEE INSTITUTE OF ELECTRICAL AND ELECTRONIC ENGINEERS, INC. 345 E. 47TH ST., NEW YORK, NY 10017 (212) 705-7900 MCAA MECHANICAL CONTRACTOR'S ASSOCIATION OF AMERICA 5530 WISCONSIN ANE., SUITE 250, CHEVY CHASE, MD 20815 (301) 654-7960 NAAMM NATIONAL ASSOCIATION OF ARCHITECTURAL METAL MANUFACTURERS 221 N, LASALLE ST., CHICAGO, IL 60601 (312) 346-1600 NBS NATIONAL BUREAU OF STANDARDS -U.S. DEPARTMENT OF COMMERCE GAITHERSBURG, MD 20234 (301) 921-1000 NEC NATIONAL ELECTRICAL CODE-NFPA BATTERYMARCH PARK, QUINCY, MA 02269 (617) 770-3300 NECA NATIONAL ELECTRICAL CONTRACTORS ASSOCIATION 7315 WISCONSIN AVE., BETHESDA, MD 20814 (301) 657-3110 NEMA NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION 2101 L ST., NW, WASHINGTON, DC 20037 (202) 457-8400 NFPA NATIONAL FIRE PROTECTION ASSOCIATION BATTERYMARCH PARK, QUINCY, MA 02269 (617) 770-3300 NHLA NATIONAL HARDWARE LUMBER ASSOCIATION P.O. BOX 34518, MEMPHIS, TN 38104 (901) 377-1818 NMC NATIONAL MECHANICAL CODE-BOCA 4051 W. FLOSSMOOR RD., COUNTRY CLUB HILLS, IL 60477-5795 (708) 799-2300 NPC NATIONAL PLUMBING CODE-BOCA 4051 W. FLOSSMOOR RD., COUNTRY CLUB HILLS, IL 60477-5795 (708) 799-2300 OSHA OCCUPATIONAL SAFETY HEALTH ADMINISTRATION U.S. DEPARTMENT OF LABOR WASHINGTON, DC 20402 SMACNA SHEEP METAL AND AIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION P.O. BOX 70, MERRIFIELD,VA 22116 (703) 790-9890 SSPC STEEL STRUCTURES PAINTING COUNCIL 4400 5TH AVE„ PITTSBURGH, PA 15213 (412) 578-3327 TCA TILE COUNCIL OF AMERICA, INC. P.O. BOX 326, PRINCETON, NJ 08540 (609) 921-7050 UL UNDERWRITER'S LABORATORIES 333 PFINGSTEN RD., NORTHBROOK, IL 60062 (312) 272-8800 III EXECUTION - NOT USED 5 in A AI r* a. ao W, :♦v w w w v - Z 5 Z F-Y N Q (11o w ZO (O co o U m 0 Z Z Mo a N Ci = Q IXZ N L) m 0 1V c OV a � co w Lu cfl C� z Z N w p N w QZ o LL F s >- co Z M z DO M v Ia- 0 F- w O rn N_ N LJ N Z <•;�;,• N z a. O ., U F- A O p Q Q J D_ Q LL J Z p0Q 0 Q Q Ir Q Z zZ0 O�u Zai ZZ Ix Rot0 Agz of0O 0 W Ix LL HOZ Z W Z C/) Q 00 0 ZO cr) 2Z F- O Z O F_ Z cr O U) U) U) w o m m 0 0 r- 00 N w 6 N Q Q z O_ cl) w Y w Q g PROJ NO: P703080244 SCALE: AS NOTED DATE: DESIGNED BY: DRAWN BY: E. OUTHAVONG CHECKED BY: SHEET TITLE: GENERAL GENERAL REQUIREMENTS 01010 - 01090 SHEET NO. G001 SHEET OF r* X C 0 A 1 1 2 1 3 1 4 1 5 01300 SUBMITTALS AND SUBSTITUTIONS: 01310 CONSTRUCTION SCHEDULE: 01410 TESTING: 01500 - CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS I WORK INCLUDED - I WORK INCLUDED - III EXECUTION - I WORK INCLUDED - I WORK INCLUDED - W 0 1. SUBMIT SHOP DRAWINGS ON ALL FABRICATED ITEMS. 1. TO ASSURE ADEQUATE PLANNING AND EXECUTION OF THE WORK, 1. PRELIMINARY ANALYSIS: 1. COOPERATE WITH THE OWNER'S SELECTED TESTING LABORATORY 1. PROVIDE TEMPORARY ELECTRIC FEEDER FROM EXISTING BUILDING w SO THAT THE WORK IS COMPLETED WITHIN THE NUMBER OF AND ALL OTHERS RESPONSIBLE FOR TESTING AND INSPECTING THE Z Z N � ELECTRICAL SERVICE AT LOCATION AS DIRECTED. DO NOT 2. SUBMIT SAMPLES OF ALL FINISH MATERIALS. CALENDAR DAYS ALLOWED IN THE CONTRACT, AND TO ASSIST THE 1. SHOW ALL ACTIVITIES OF THE CONTRACTOR UNDER THIS WORK WORK. DISRUPT OWNER'S NEED FOR CONTINUOUS SERVICE. Qinc nOaLL ARCHITECT IN APPRAISING THE REASONABLENESS OF THE FOR THE PERIOD BETWEEN RECEIPT OF NOTICE TO PROCEED COMPLEMENT EXISTING POWER SERVICE CAPACITY AND 3• SUBMIT MANUFACTURER'S LITERATURE ON ALL MATERIALS NOT PROPOSED SCHEDULE AND IN EVALUATING PROGRESS OF THE AND SUBMITTAL OF CONSTRUCTION SCHEDULE REQUIRED. 2. PROVIDE OTHER TESTING AND INSPECTING AS SPECIFIED TO BE CHARACTERISTICS AS REQUIRED. PROVIDE POWER OUTLETS FOR INCLUDED IN THE SHOP DRAWING OR SAMPLE SUBMITTALS. WORK, PREPARE AND MAINTAIN THE SCHEDULES AND REPORTS FURNISHED BY THE CONTRACTOR IN THIS SECTION AND/OR IN CONSTRUCTION OPERATIONS, WITH BRANCH WIRING AND DESCRIBED IN THIS SECTION. 2• SHOW CONTRACTOR'S GENERAL APPROACH TO THE REMAINDER OTHER SECTIONS OF THESE SPECIFICATION AND ON THE DRAWINGS, DISTRIBUTION BOXES LOCATED AT EACH FLOOR, AS REQUIRED. 4. SUBMIT ALL ADDITIONAL REQUIREMENTS AS SPECIFIED ON THE ,ct) C" u OF THE WORK. INCLUDING SITEWORK, STRUCTURAL, MECHANICAL AND ELECTRICAL w O PROVIDE FLEXIBLE POWER CORDS AS REQUIRED. PROVIDE MAIN co to DRAWINGS INCLUDING STRUCTURAL, MECHANICAL AND ELECTRICAL 2. "DAY" USED THROUGHOUT THE CONTRACT, UNLESS OTHERWISE p N DRAWINGS. SERVICE DISCONNECT AND OVERCURRENT PROTECTION AT 00 DRAWINGS. STATED, MEANS "CALENDAR DAY". 3. SHOW COST OF ALL ACTIVITIES SCHEDULED FOR PERFORMANCE U) to o Z ch CONVENIENT LOCATION. t- O CO J oo(n U BEFORE SUBMITTAL AND ACCEPTANCE OF THE CONSTRUCTION 3. WHERE NO TESTING REQUIREMENTS ARE DESCRIBED, BUT THE U) 5. PROVIDE ON-SITE OR SHOP MOCK-UPS WHERE REQUESTED BY 3. COORDINATE ALL WORK AND SCHEDULING WITH THE OWNER, AND SCHEDULE. OWNER DECIDES THAT TESTING IS REQUIRED, THE OWNER MAY 2. PERMANENT CONVENIENCE RECEPTACLES MAY NOT BE UTILIZED p THE ARCHITECT. MOCK-UPS ACCEPTED BY THE ARCHITECT MAY THEIR USE OF THE SITE: DIRECT THAT SUCH TESTING BE PERFORMED UNDER CURRENT H DURING CONSTRUCTION, UNLESS AGREED TO BY OWNER. Q REMAIN IN PLACE OR BE USED AS THE FINISH PRODUCT. 4. SUBMITTALS SHALL BE IN ACCORDANCE WITH THE ABOVE STANDARDS FOR TESTING. PAYMENT FOR SUCH TESTING WILL BE 0 p O'� 1. PHASING OF THE WORK 1- of CONSTRUCTION SCHEDULE. MADE AS DESCRIBED IN THIS SECTION. 3. PROVIDE AND MAINTAIN LIGHTING FOR CONSTRUCTION 6. SUBMIT CONSTRUCTION SCHEDULE AND A SUBMITTALS SCHEDULE 2. SECURITY cr) 00Q OPERATIONS TO ACHIEVE A MINIMUM LIGHTING LEVEL OF 4 00 IN COORDINATION WITH THE PHASING OF THE WORK. 3. TEMPORARY PROTECTION AND SAFETY 5. AS SOON AS PRACTICABLE AFTER RECEIPT OF NOTICE TO 4. THE OWNER WILL SELECT A PRE -QUALIFIED INDEPENDENT WATT/SQ FT. MAINTAIN LIGHTING AND PROVIDE ROUTINE REPAIRS. QZZ0 0 4. STAGING AREA, DELIVERY AND STORAGE OF MATERIALS PROCEED, COMPLETE THE CONSTRUCTION ANALYSIS TESTING LABORATORY. a (A 2 0« FN� 7. PRIOR TO EACH SUBMITTAL, CAREFULLY REVIEW AND COORDINATE 5. DUST AND NOISE PROTECTION W Z0LL DESCRIBED ABOVE, IN PRELIMINARY FORM. MEET WITH THE ��� 4. PERMANENT BUILDING LIGHTING MAY NOT BE UTILIZED DURING ALL ASPECTS OF EACH ITEM BEING SUBMITTED TO VERIFY THAT 6. CONTRACTOR'S PARKING AREA Z O7 ARCHITECT, REVIEW CONTENTS OF PROPOSED CONSTRUCTION 5. THE OWNER WILL PAY FOR INITIAL SERVICES OF THE TESTING J (/� 0 EACH ITEM AND THE SUBMITTAL FOR IT CONFORMS IN ALL SCHEDULE, AND MAKE ALL REVISIONS AGREED UPON. SUBMIT LABORATORY AS FURTHER DESCRIBED IN THIS SECTION. z CONSTRUCTION, UNLESS AGREED TO BY OWNER. 2 RESPECTS WITH THE REQUIREMENTS OF THE CONTRACT 4. QUALITY ASSURANCE: IN ACCORDANCE WITH ABOVE. 5. UTILIZE OWNER'S EXISTING HEAT PLANT EXTEND AND ~ IX DOCUMENTS. BY AFFIXING THE CONTRACTOR'S SIGNATURE TO EACH 6. QUALITY ASSURANCE: SUPPLEMENT WITH TEMPORARY HEAT DEVICES AS NEEDED TO SUBMITTAL, CERTIFY THAT THIS COORDINATION HAS BEEN 1. THE CONSTRUCTION SCHEDULE AS ACCEPTED BY THE 2. MATERIALS STATUS REPORT: 1. THE TESTING LABORATORY WILL BE QUALIFIED TO THE MAINTAIN SPECIFIED CONDITIONS FOR CONSTRUCTION OPERATIONS. PERFORMED. ARCHITECT WILL BE AN INTEGRAL PART OF THE CONTRACT, z O AND WILL ESTABLISH INTERIM CONTRACT COMPLETION DATES 1. AS SOON AS PRACTICABLE AFTER RECEIPT OF NOTICE TO OWNER'S ACCEPTANCE IN ACCORDANCE WITH ASTM E329. H a 8. CERTIFY THAT ALL MATERIAL USED IN THE WORK COMPLY WITH FOR THE VARIOUS ACTIVITIES. PROCEED, COMPLETE THE CONSTRUCTION ANALYSIS DESCRIBED 6. PRIOR TO OPERATION OF PERMANENT EQUIPMENT FOR z O 0 ALL SPECIFIED PROVISIONS THEREOF. CERTIFICATION SHALL NOT BE ABOVE, IN PRELIMINARY FORM. MEET WITH THE ARCHITECT, 2. TESTING, WHEN REQUIRED, WILL BE IN ACCORDANCE WITH TEMPORARY HEATING PURPOSES, VERIFY THAT INSTALLATION IS CONSTRUED AS RELIEVING THE CONTRACTOR FROM FURNISHING 2. SHOULD ANY ACTIVITY NOT BE COMPLETED WITHIN 7 DAYS U) w o REVIEW CONTENTS OF PROPOSED MATERIALS STATUS REPORTS ALL PERTINENT CODES AND REGULATIONS AND WITH APPROVED FOR OPERATION, EQUIPMENT IS LUBRICATED AND SATISFACTORY MATERIALS IF, AFTER TESTS ARE PERFORMED ON AFTER DATED SCHEDULE DATE, THE ARCHITECT SHALL HAVE AND MAKE ALL REVISIONS TO FORMAT AGREED UPON. SELECTED STANDARDS OF ASTM. FILTERS ARE IN PLACE. PROVIDE AND PAY FOR OPERATION, SELECTED SAMPLES, THE MATERIAL IS FOUND TO NOT MEET THE RIGHT TO ORDER THE CONTRACTOR TO EXPEDITE MAINTENANCE, AND REGULAR REPLACEMENT OF FILTERS AND m 0 SPECIFIED REQUIREMENTS. COMPLETION OF THE ACTIVITY BY WHATEVER MEANS THE 7. PRODUCT HANDLING: WORN OR CONSUMED PARTS. ARCHITECT DEEMS APPROPRIATE AND NECESSARY, WITHOUT 3. REVISIONS: 9. SHOW ON EACH CERTIFICATION THE NAME AND LOCATION OF THE ADDITIONAL COMPENSATION TO THE CONTRACTOR. 1. PROMPTLY PROCESS AND DISTRIBUTE REQUIRED COPIES OF 7. MAINTAIN MINIMUM AMBIENT TEMPERATURE OF 50 DEGREES F IN WORK, THE NAME AND ADDRESS OF THE SUB -CONTRACTOR, 1. MAKE ONLY THOSE REVISIONS TO ACCEPTED CONSTRUCTION TEST REPORTS AND RELATED INSTRUCTIONS TO ENSURE AREAS WHERE CONSTRUCTION IS IN PROGRESS, UNLESS 0 0 QUANTITY AND DATE OR DATES OF SHIPMENT OR DELIVERY TO SCHEDULE AND MATERIALS STATUS REPORTS AS ARE ACCEPTED NECESSARY RE -TESTING AND REPLACEMENT OF MATERIALS INDICATED OTHERWISE IN SPECIFICATIONS. WHICH THE CERTIFICATE APPLIES, AND NAME OF THE 3. SHOULD ANY ACTIVITY BE 14 OR MORE DAYS BEHIND IN ADVANCE BY THE ARCHITECT. WITH THE LEAST POSSIBLE DELAY IN PROGRESS OF THE MANUFACTURING OR FABRICATING COMPANY. CERTIFICATION SHALL SCHEDULE THE ARCHITECT SHALL HAVE THE RIGHT TO WORK. 8. PROVIDE, MAINTAIN AND PAY FOR TELEPHONE SERVICE, FACSIMILE BE IN THE FORM OF A LETTER OR COMPANY STANDARD FORMS PERFORM THE ACTIVITY OR HAVE THE ACTIVITY PERFORMED BY SERVICE AND A DEDICATED TELEPHONE LINE TO FIELD OFFICE AT N CONTAINING ALL REQUIRED DATA. CERTIFICATES SHALL BE SIGNED WHATEVER METHOD THE ARCHITECT DEEMS APPROPRIATE END OF SECTION 01310 TIME OF PROJECT MOBILIZATION. BY AN OFFICER OF THE MANUFACTURING OF FABRICATING II MATERIALS - COMPANY. 4. COSTS INCURRED BY THE ARCHITECT IN CONNECTION WITH 9• EXISTING PUBLIC TOILET FACILITIES (MAINTAINED BY OTHERS) EXPEDITING CONSTRUCTION ACTIVITY UNDER THIS ARTICLE 1. PAYMENT FOR TESTING: ARE AVAILABLE IN THE BUILDING. CONTRACTOR WILL ACCEPT II MATERIALS - SHALL BE REIMBURSED TO THE ARCHITECT BY THE 01400 QUALITY CONTROL: RESPONSIBILITIES FOR AND VIGOROUSLY PROHIBIT THE CONTRACTOR. IT IS EXPRESSLY UNDERSTOOD AND AGREED a 1. THE OWNER WILL PAY FOR INITIAL TESTING SERVICES COMMITTING OF NUISANCE ON THE SITE OF THE WORK. 1. SUBMIT ALL SHOP DRAWINGS IN THE FORM OF,(1) SEPIA THAT FAILURE BY THE ARCHITECT TO EXERCISE THE OPTION TO I WORK INCLUDED - REQUESTED BY THE OWNER. PROJ NO: P703080244 TRANSPARENCY AND 2 BLUELINE PRINTS OF EACH DRAWING. ALL () EITHER ORDER THE CONTRACTOR TO EXPEDITE AN ACTIVITY BY 1. PERFORM ALL WORK IN ACCORDANCE WITH THE FLORIDA BUILDING 2. WHEN INITIAL TESTS INDICATE NONCOMPLIANCE WITH THE 10. PROVIDE TEMPORARY PARTITIONS AS INDICATED TO SEPARATE DRAWN BY: E. OUTHAVONG REVIEW COMMENTS WILL BE SHOWN ON THE SEPIA TRANSPARENCY OTHER MEANS SHALL NOT BE CONSIDERED PRECEDENT CODE LATEST EDITION, ALL LOCAL, STATE AND FEDERAL LAWS, CONTRACT DOCUMENTS, THE COSTS OF INITIAL TESTS WORK AREAS FROM OWNER AND TENANTS OCCUPIED AREAS, TO AND RETURNED TO THE CONTRACTOR. THE CONTRACTOR SHALL SETTING FOR ANY OTHER ACTIVITIES. GENERAL CODES AND ORDINANCES HAVING JURISDICTION OVER THE WORK, ASSOCIATED WITH NON- COMPLIANCE WILL BE DEDUCTED BY 01300 - 01900 PREVENT PENETRATION OF DUST AND MOISTURE INTO OWNER C MAKE AND DISTRIBUTE ALL PRINTS REQUIRED FOR THEIR 5. SUBMITTALS: SHEET INCLUDING ALL ADA ACCESSIBILITY GUIDELINES AND WITH ALL THE OWNER FROM THE CONTRACT SUM. AND TENANTS OCCUPIED AREAS, AND TO PREVENT DAMAGE TO EXISTING MATERIALS AND EQUIPMENT. PURPOSES. TRADE STANDARDS AND PRODUCT MANUFACTURE'S WRITTEN 2. SUBMIT ALL SAMPLES IN THE QUANTITY WHICH ARE REQUIRED TO 1. COMPLY WITH PROVISIONS OF SECTION 01300. INSTRUCTIONS. 3. WHEN INITIAL TESTS INDICATE NONCOMPLIANCE WITH THE 11. PROTECT INSTALLED WORK AND PROVIDE SPECIAL PROTECTION BE RETURNED PLUS 2 WHICH WILL BE RETAINED BY THE () 2. WITHIN 7 DAYS AFTER RECEIPT OF NOTICE TO PROCEED, 2. INDIVIDUAL REQUIREMENTS FOR QUALITY ASSURANCE ARE CONTRACT DOCUMENTS, ALL SUBSEQUENT RE -TESTING OCCASIONED BY THE NONCOMPLIANCE SHALL BE PERFORMED WHERE SPECIFIED IN INDIVIDUAL SPECIFICATION SECTIONS. REMOVABLE ARCHITECT. SUBMIT THREE COPIES OF A PRELIMINARY CONSTRUCTION DESCRIBED IN PERTINENT SECTIONS OF THESE SPECIFICATIONS BY THE SAME TESTING AGENCY AND THE COSTS THEREOF WILL PROVIDE TEMPORARY AND PROTECTION FOR INSTALLED PRODUCTS. CONTROL ACTIVITY IN IMMEDIATE WORK 3. SUBMIT THE NUMBER OF MANUFACTURER'S LITERATURE COPIES SCHEDULE, PLUS THREE COPIES OF PROPOSED FORMAT FOR INCLUDING STRUCTURAL, MECHANICAL AND ELECTRICAL WORK: SEE 'S', 'FP', 'Hs 'El BE DEDUCTED BY THE OWNER FROM THE CONTRACT SUM. AREA TO PREVENT DAMAGE. PROVIDE PROTECTIVE COVERINGS AT WHICH ARE REQUIRED TO BE RETURNED PLUS (2) COPIES WHICH MATERIALS STATUS REPORTS, PREPARED IN ACCORDANCE WITH AND DRAWINGS. 2. CODE COMPLIANCE TESTING: WALLS, PROJECTIONS, JAMBS, SILLS, AND SOFFITS OF WILL BE RETAINED BY THE ARCHITECT. PART III OF THIS SECTION. 3. IN CASE OF CONFLICT BETWEEN STANDARDS, THE MORE OPENINGS. PROTECT FINISHED FLOORS, STAIRS, AND OTHER 3. WITHIN 14 DAYS AFTER RECEIPT OF NOTICE TO PROCEED, STRINGENT REQUIREMENT SHALL GOVERN. IN ALL CASES WHERE 1. INSPECTIONS AND TESTS REQUIRED BY CODES OR SURFACES FROM TRAFFIC, DIRT, WEAR, DAMAGE, OR MOVEMENT 4. NOTIFY ARCHITECT IN ADVANCE FOR ON-SITE OR SHOP MOCK-UP SUBMIT THREE COPIES OF THE CONSTRUCTION SCHEDULE, THERE IS A DISCREPANCY WITHIN OR BETWEEN DRAWINGS AND ORDINANCES, OR BY PLAN APPROVAL AUTHORITY, AND WHICH OF HEAVY OBJECTS, BY PROTECTING WITH DURABLE SHEET REVIEW VISITS. SUBMIT CONSTRUCTION SCHEDULE AND SUBMITTALS SCHEDULE IN PREPARED IN ACCORDANCE WITH PART III OF THIS SECTION. SPECIFICATIONS IN QUALITY OR QUANTITY OF ANY ITEM, MATERIAL, ARE MADE BY A LEGALLY CONSTITUTED AUTHORITY, SHALL BE MATERIALS. 5. TYPE AND QUANTITIES TO BE DETERMINED AT THE PRE -CONSTRUCTION INSTALLATION DETAIL OR WORKMANSHIP THE CONTRACTOR SHALL PAID FOR BY THE CONTRACTOR UNLESS OTHERWISE PROVIDED � 12. PROHIBIT TRAFFIC OR STORAGE UPON WATERPROOFED OR MEETING. 4. ON THE FIRST WORK DAY OF EACH MONTH, FOLLOWING USE THE LARGER QUANTITY, OR BETTER QUALITY TO PRODUCE IN THE CONTRACT DOCUMENTS. ROOFED SURFACES. IF TRAFFIC OR ACTIVITY IS NECESSARY, SUBMITTAL DESCRIBED, SUBMIT THREE COPIES OF THE THE HIGHEST QUALITY FINISHED WORK.OBTAIN 3. CONTRACTOR'S CONVENIENT TESTING: RECOMMENDATIONS FOR PROTECTION FROM CONSTRUCTION SCHEDULE AND THREE COPIES OF THE WATERPROOFING OR ROOFING MATERIAL MANUFACTURER. 6. DO NOT SUBSTITUTE MATERIALS, EQUIPMENT, OR METHODS UNLESS MATERIALS STATUS REPORTS UPDATED AS DESCRIBED IN PART 4. PROVIDE AND REMOVE, IN COORDINATION WITH THE PHASING OF 1. INSPECTING AND TESTING PERFORMED EXCLUSIVELY FOR THE SUCH SUBSTITUTION HAS BEEN SPECIFICALLY ACCEPTED, IN III OF THIS SECTION. THE WORK ALL TEMPORARY BARRIERS AND WALLS REQUIRED FOR CONTRACTOR'S CONVENIENCE SHALL BE THE SOLE 13. PROVIDE A FIELD OFFICE WITHIN THE CONSTRUCTION AREA FOR WRITING, FOR THIS WORK BY THE ARCHITECT. WHERE THE PHRASE "OR "OR THE PHASING AND PROTECTION OF THE CONTRACT WORK. MAINTAIN ALL TEMPORARY FACILITIES AND CONTROLS AS LONG AS RESPONSIBILITY OF THE CONTRACTOR. ALL CONTRACTOR'S, SUPPLY AND STORAGE. PROVIDE SPACE FOR EQUAL" OR EQUAL AS ACCEPTED BY THE ARCHITECT" II MATERIALS - NEEDED FOR THE SAFE AND PROPER COMPLETION OF THE WORK. PROJECT MEETINGS, WITH ALL REQUIRED TABLE AND CHAIRS. OCCURS IN THE CONTRACT DOCUMENTS, DO NOT ASSUME THAT 4. INSPECTION BY OWNER'S PERSONNEL: THE FIELD OFFICE, INCLUDING FURNITURE, WILL REMAIN THE MATERIALS, EQUIPMENT, OR METHODS WILL BE ACCEPTED AS 1. CONSTRUCTION ANALYSIS: PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED FROM EQUAL UNLESS THE ITEM HAS BEEN SPECIFICALLY ACCEPTED FOR II MATERIALS - 1. FROM TIME TO TIME, PERSONNEL IN THE EMPLOY OF THE THE SITE AFTER COMPLETION OF THE WORK. THIS WORK BY THE ARCHITECT. THE DECISION OF THE ARCHITECT 1. GRAPHICALLY SHOW THE ORDER AND INTERDEPENDENCE OF OWNER MAY INSPECT THE WORK WHERE THE WORK IS IN SHALL BE FINAL. ALL ACTIVITIES NECESSARY TO COMPLETE THE WORK, AND THE 1. PRODUCTS USED IN THE WORK SHALL BE PRODUCED BY PROGRESS, BUT SHALL HAVE NO AUTHORITY TO DIRECT THE 14. REMOVE TEMPORARY UTILITIES, EQUIPMENT, FACILITIES, MATERIALS, SEQUENCE IN WHICH EACH ACTIVITY IS TO BE ACCOMPLISHED, MANUFACTURERS ENGAGED IN THE MANUFACTURE OF SIMILAR CONTRACTOR OR REQUEST CHANGES IN THE WORK EXCEPT PRIOR TO SUBSTANTIAL COMPLETION INSPECTION. III EXECUTION - AS PLANNED BY THE CONTRACTOR AND HIS PROJECT FIELD ITEMS AND WITH A HISTORY OF SUCCESSFUL PRODUCTION THROUGH THE ARCHITECT. SUPERINTENDENT IN COORDINATION WITH ALL ACCEPTABLE TO THE ARCHITECT. 15. CLEAN AND REPAIR DAMAGE CAUSED BY INSTALLATION OR USE 1. CONSECUTIVELY NUMBER ALL SUBMITTALS. ACCOMPANY EACH SUB -CONTRACTORS WHOSE WORK IS SHOWN ON THE DIAGRAM. III EXECUTION - OF TEMPORARY WORK. SUBMITTAL WITH A LETTER OF TRANSMITTAL CONTAINING ALL ACTIVITIES SHOWN ON THE DIAGRAM SHALL INCLUDE, BUT ARE 2. COMPLY WITH REFERENCED STANDARDS AND BE IN STRICT PERTINENT INFORMATION REQUIRED FOR IDENTIFICATION AND IN NOT NECESSARILY LIMITED TO: ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS. 1. COOPERATION WITH TESTING LABORATORY: 16. RESTORE EXISTING AND PERMANENT FACILITIES USED DURING REVIEWING THE SUBMITTAL. CONSTRUCTION TO ORIGINAL CONDITION. RESTORE PERMANENT 1. PROJECT MOBILIZATION 3. COMPATIBILITY OF ALL MATERIALS REQUIRED FOR INSTALLATION, 1. REPRESENTATIVES OF THE TESTING LABORATORY SHALL HAVE FACILITIES USED DURING CONSTRUCTION TO SPECIFIED CONDITION. 2. MAKE ALL SHOP DRAWINGS ACCURATELY TO SCALE, SUFFICIENTLY PROTECTION AND CLEANING OF THE MATERIALS SHALL BE ACCESS TO THE WORK AT ALL TIMES. PROVIDE FACILITIES FOR LARGE TO SHOW ALL PERTINENT METHODS AND MATERIALS OF 2. SUBMITTALS AND ACCEPTANCES VERIFIED WITH THE MANUFACTURERS OF THE MATERIALS TO BE SUCH ACCESS IN ORDER THAT THE LABORATORY MAY II MATERIALS - NOT USED B CONSTRUCTION. INDICATE ALL ADJACENT AND ABUTTING MATERIALS, INSTALLED, PROTECTED AND CLEANED. PERFORM ITS FUNCTION. NEW AND EXISTING. FULLY COORDINATE ALL CONDITIONS AND 3. PROCUREMENT OF EQUIPMENT AND CRITICAL MATERIALS DIMENSIONS IN THE FIELD. COORDINATE WITH ALL OTHER TRADES 2. SPECIMENS AND SAMPLES FOR TESTING, UNLESS OTHERWISE III EXECUTION - NOT USED INVOLVED. NOTE SUBCONTRACTOR OF OTHER TRADES INDICATED; 4. FABRICATION OF SPECIAL MATERIAL AND EQUIPMENT, AND III EXECUTION - PROVIDED IN THE CONTRACT DOCUMENTS, WILL BE TAKEN BY DO NOT USE THE TERM, "BY OTHERS". THEIR INSTALLATION AND TESTING 1. ALL WORK SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE THE TESTING PERSONNEL. SAMPLING EQUIPMENT AND 3. MAKE ALL SUBMITTALS IN GROUPS CONTAINING ALL ASSOCIATED 5. FINAL CLEAN-UP WITH, COORDINATED ACCEPTED SHOP DRAWINGS WHICH SHALL PERSONNEL WILL BE PROVIDED BY THE TESTING LABORATORY. ITEMS. PARTIAL SUBMITTALS MAY BE REJECTED. INCLUDE CORRECTIONS DUE TO FIELD CONDITION AND DIMENSION 2. SCHEDULES FOR TESTING: 6. FINAL INSPECTION AND TESTING VERIFICATIONS. DETAILS OF SHAPES, MATERIALS AND FINISHES END OF SECTION 01300 SHALL BE FOLLOWED INSOFAR AS THE ARCHITECTURAL DESIGN 1. BY ADVANCE DISCUSSION WITH THE TESTING LABORATORY 2. MATERIALS STATUS REPORTS: INTENT IS CONCERNED. DETAILS OF CONSTRUCTION, RELATION OF SELECTED BY THE OWNER, DETERMINE THE TIME REQUIRED COMPONENT SECTIONS, METHODS OF CONSTRUCTION NOT SHOWN FOR THE LABORATORY TO PERFORM ITS TEST AND TO ISSUE 1. THE CONTRACTOR'S STANDARD MATERIALS STATUS REPORT ON THE CONTRACT DOCUMENTS SHALL BE ESTABLISHED BY THE EACH OF ITS FINDINGS. FORM WILL BE ACCEPTABLE IF, IN THE ARCHITECT'S JUDGMENT, FABRICATOR AND THE INSTALLER WHO SHALL BE RESPONSIBLE IT PROVIDES SUFFICIENT PERTINENT DATA TO DETERMINE THAT FOR THE INTEGRITY, STRENGTH AND DURABILITY OF THE 2. PROVIDE REQUIRED TIME WITHIN THE CONSTRUCTION SCHEDULE. MATERIALS PROCUREMENT FLOW IS ADEQUATE FOR ALL NEEDS FABRICATION AND THE INSTALLATION OF THE WORK RESPECTIVELY. OF THE WORK. 2. THE INSTALLATION OF ALL WORK SHALL FOLLOW THE 3. WHEN CHANGES OF CONSTRUCTION SCHEDULE ARE NECESSARY 2. SHOW AT LEAST THE FOLLOWING INFORMATION: MANUFACTURER'S WRITTEN INSTRUCTIONS FOR SURFACE DURING CONSTRUCTION, COORDINATE SUCH CHANGES OF SCHEDULE WITH THE TESTING LABORATORY AS REQUIRED. PREPARATION, TEMPERATURE AND MOISTURE CONTROL, METHODS 1. ITEM DESCRIPTION, LISTED IN ACCORDANCE WITH SPECIFICATION OF INSTALLATION AND PROTECTION PROCEDURES. 4. WHEN THE TESTING LABORATORY IS READY TO TEST SECTION NUMBER IN WHICH ITEM IS CALLED FOR ACCORDING TO THE ESTABLISHED SCHEDULE, BUT IS 3. THE BLENDING OF NEW SURFACES, MATERIALS AND FINISHES WITH PREVENTED FROM TESTING OR TAKING SPECIMENS DUE TO SIMILAR SURFACES, MATERIALS AND FINISHES SHALL RESULT IN INCOMPLETENESS OF THE WORK, ALL EXTRA CHARGES FOR 2. PURCHASE ORDER NUMBER AND DATE OF ISSUE NO VISIBLE DEMARCATION BETWEEN EXISTING AND NEW WORK. K TESTING ATTRIBUTABLE TO THE DELAY MAY BE BACK -CHARGED HOLES, DAMAGE OR DEFORMATION RESULTING FROM REMOVALS BORNE THEY 3. VENDOR NAME UNDER THIS CONTRACT SHALL BE PATCHED TO THE SATISFACTION OWNER. OF THE OWNER. REPLACE WITH NEW MATERIALS OR FINISHES, OR 4. DATE SHIPPED, AND SHIPPING MEANS UTILIZED BOTH, TO MATCHED THOSE DAMAGED. 3. ALTERNATIVE INSPECTION PROCEDURE: 5. ESTIMATED DATE OF ARRIVAL AT JOB SITE 1. THE ARCHITECT SHALL HAVE THE RIGHT TO REQUIRE END OF SECTION 01400 ALTERNATIVE INSPECTION PROCEDURE OTHER THAN AS 6. ACTUAL DATE OF ARRIVAL AT JOB SITE, AND RECEIVING SPECIFIED WHEN, IN THE ARCHITECT'S JUDGMENT, OTHER REPORT NUMBER INSPECTIONS ARE REQUIRED TO DEMONSTRATE COMPLIANCE WITH THE CONTRACT DOCUMENTS. COSTS OF SUCH ALTERNATIVE INSPECTIONS WILL BE BORNE BY THE OWNER IF PRODUCTS ARE FOUND TO COMPLY; OTHERWISE, COSTS WILL BE BORNE BY THE CONTRACTOR. A END OF SECTION 01410 1 2 1 3 1 4 5 IF THIS DRAWING IS LESS THAN 22"X 34" IT IS A REDUCED SIZE DRAWING U LO a Elfw o w o W W 0 .. ,_ z Y z z Q o w O 3: 0 0 f-OOm0 U Z Z N � 2 Q co z N U Of m O 0 ® Qinc nOaLL ou 0)a p ,ct) C" u w O co to w YZ p N Z w w 0 N 00 � w OZ U) to o Z ch Q t- O CO J oo(n U j }p 7 04 U) 04 W N z O ••��• •.••.• '•' N z n. U H Q w0 0 p O'� �14 1- of Q z aQ WZ cr) 00Q 00 Qaw QZZ0 0 y N F- <Zo W a (A 2 0« FN� w W Z0LL 0 0 ��� w Q Z O7 J (/� 0 ZO V z 2 ~ ~ IX z O H a z O 0 U U) w o m 0 U) 0 0 0 Nw F- N 6 z O U) w a PROJ NO: P703080244 SCALE: AS NOTED DATE: DESIGNED BY: DRAWN BY: E. OUTHAVONG CHECKED BY: SHEET TITLE: GENERAL GENERAL REQUIREMENTS 01300 - 01900 SHEET NO. G002 SHEET OF m E a o) In M o N ud N 0 z 0 a 3 0 0 b 0 c� 0 U C A I:1 1 0a 1. THROUGHOUT THE CONSTRUCTION PERIOD USE ALL MEANS NECESSARY FOR THE SAFETY AND PROTECTION OF ALL PERSONS, PROPERTY AND MATERIALS BEFORE, DURING AND AFTER COMMENCEMENT OF THE WORK. 2. DOCUMENTS AFFECTING WORK OF THIS SECTION INCLUDE, BUT ARE NOT NECESSARILY LIMITED TO THE SECTIONS IN DIVISION 1 OF THESE SPECIFICATIONS AND ADDITIONAL PROCEDURES AS MAY BE PRESCRIBED IN OTHER SECTIONS OF THESE SPECIFICATIONS INCLUDING STRUCTURAL, MECHANICAL, AND ELECTRICAL WORK: SEE STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS AND SPECIFICATIONS. 3. INCLUDE WITHIN THE CONTRACTOR'S QUALITY ASSURANCE REQUIREMENTS SUCH PROCEDURES AS ARE REQUIRED TO ASSURE FULL PROTECTION OF THE WORK. 4. EXCEPT AS OTHERWISE ACCEPTED BY THE ARCHITECT, DETERMINE AND COMPLY WITH MANUFACTURER'S RECOMMENDATIONS ON PRODUCT HANDLING, STORAGE, AND PROTECTION. 5. DELIVER THE WORK TO THE JOB SITE PROPERLY CONTAINED AND IDENTIFIED IN SUCH QUANTITIES AND AT SUCH TIME AS TO ASSURE THE CONTINUITY OF THE INSTALLATION. 6. MAINTAIN PACKAGED MATERIALS WITH SEALS UNBROKEN AND LABELS INTACT UNTIL TIME OF USE. 7. PROMPTLY REMOVE DAMAGED MATERIALS AND UNSUITABLE ITEMS FROM THE JOB SITE, AND PROMPTLY REPLACE WITH MATERIALS MEETING THE SPECIFIED REQUIREMENTS, AT NO ADDITIONAL COST TO THE OWNER. II MATERIALS - NOT USED III EXECUTION - 1. PROTECT FINISHED SURFACES, INCLUDING JAMBS AND SOFFITS OF OPENINGS USED AS PASSAGEWAYS, THROUGHOUT WHICH EQUIPMENT AND MATERIALS ARE HANDLED. 2. PROVIDE PROTECTION FOR FINISHED FLOOR SURFACES IN TRAFFIC AREAS PRIOR TO ALLOWING EQUIPMENT OR MATERIALS TO BE MOVED OVER SUCH SURFACES. 3. MAINTAIN FINISHED SURFACES CLEAN, UNMARRED, AND SUITABLY PROTECTED UNTIL ACCEPTED BY OWNER. 4. IN THE EVENT OF DAMAGE, PROMPTLY MAKE REPLACEMENTS AND REPAIRS TO THE ACCEPTANCE OF THE ARCHITECT AND AT NO ADDITIONAL COST TO THE OWNER. 5. ADDITIONAL TIME REQUIRED TO SECURE REPLACEMENTS AND TO MAKE REPAIRS WILL NOT BE CONSIDERED BY THE ARCHITECT TO JUSTIFY AN EXTENSION IN THE CONTRACT TIME OF COMPLETION. END OF SECTION 01600 01700 CONTRACT CLOSEOUT: I WORK INCLUDED - 1. PROVIDE AN ORDERLY AND EFFICIENT TRANSFER OF THE COMPLETED WORK TO THE OWNER IN ACCORDANCE WITH THE CONTRACT DOCUMENT REQUIREMENTS INCLUDING BUT NOT NECESSARILY LIMITED TO THE GENERAL CONDITIONS, SUPPLEMENTARY CONDITIONS AND DIVISION 1 OF THESE SPECIFICATIONS. 2. QUALITY ASSURANCE: 1. PRIOR TO REQUESTING INSPECTION, USE ADEQUATE MEANS TO ASSURE THAT THE WORK IS COMPLETED IN ACCORDANCE WITH THE SPECIFIED REQUIREMENTS AND IS READY FOR REQUESTED INSPECTION. 2. PRIOR TO FINAL INSPECTION AND OCCUPANCY VERIFY THAT ALL PENETRATIONS, INCLUDING EXISTING, THROUGH FIRE RATED FLOORS/WALLS ARE PROPERLY SEALED. 3. SUBSTANTIAL COMPLETION: 1. WHEN THE CONTRACTOR CONSIDERS THE WORK, OR DESIGNATED PORTION THEREOF WHICH IS ACCEPTABLE TO THE OWNER IS SUBSTANTIALLY COMPLETE THE CONTRACTOR SHALL PREPARE FOR SUBMISSION TO THE ARCHITECT A LIST OF ITEMS TO BE COMPLETED OR CORRECTED. 2. THE DATE OF SUBSTANTIAL COMPLETION OF THE THE WORK, OR DESIGNATED PORTION THEREOF, IS THE DATE CERTIFIED BY THE ARCHITECT WHEN CONSTRUCTION IS SUFFICIENTLY COMPLETE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS SO THE OWNER CAN OCCUPY OR UTILIZE THE THE WORK, OR DESIGNATED PORTION THEREOF FOR THE USE WHICH IT IS INTENDED. 3. WITHIN A REASONABLE TIME AFTER RECEIPT OF THE LIST THE ARCHITECT WILL INSPECT TO DETERMINE THE STATUS OF COMPLETION. 4. FINAL COMPLETION: 1. UPON RECEIPT OF WRITTEN NOTICE FROM THE CONTRACTOR THAT THE WORK IS READY FOR FINAL INSPECTION AND ACCEPTANCE AND UPON RECEIPT OF A FINAL APPLICATION FOR PAYMENT, THE ARCHITECT WILL PROMPTLY MAKE SUCH INSPECTION. 2. THE CONTRACTOR SHALL CERTIFY THAT: 1. CONTRACT DOCUMENTS HAVE BEEN REVIEWED. 2. WORK HAS BEEN INSPECTED FOR COMPLIANCE WITH THE CONTRACT DOCUMENTS. 3. WORK HAS BEEN COMPLETED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. 4. EQUIPMENT AND SYSTEMS HAVE BEEN TESTED AS REQUIRED, AND ARE OPERATIONAL. 5. WORK IS COMPLETED AND READY FOR FINAL INSPECTION. 3. THE ARCHITECT WILL MAKE AN INSPECTION TO VERIFY STATUS OF COMPLETION. 4. WHEN THE ARCHITECT DETERMINES THAT THE WORK IS ACCEPTABLE UNDER THE CONTRACT DOCUMENTS, THE ARCHITECT WILL REQUEST THAT THE CONTRACTOR TO MAKE CLOSEOUT SUBMITTALS. 2 3 4 5. CLOSEOUT SUBMITTALS: 01720 PROJECT RECORD DOCUMENTS: I WORK INCLUDED - 1. CLOSEOUT SUBMITTALS INCLUDE, BUT NOT NECESSARILY LIMITED 1. THROUGHOUT PROGRESS OF THE WORK OF THIS CONTRACT, a � TO: MAINTAIN AN ACCURATE RECORD OF ALL CHANGES IN THE U � Y- 1. COMPUTER AIDED DRAFTED (CAD) "AS -BUILT" RECORD SETS zz CONTRACT DOCUMENTS, AS DESCRIBED BELOW. AND ASSOCIATED DISKS. c0 of ao4 0 C�a,U ? 2. OPERATION AND MAINTENANCE DATA. 2. UPON COMPLETION OF THE WORK OF THIS CONTRACT, TRANSFER w o Ix z N 3. WARRANTIES AND BONDS U�0Oj� BY COMPUTER AIDED DRAFTING (CAD), THE RECORDED CHANGES 4. KEYS AND KEYING SCHEDULE TO A SET OF RECORD CAD DOCUMENTS, AS DESCRIBED IN III 5. SPARE PARTS AND MATERIAL EXTRA STOCK BELOW. 6. EVIDENCE OF COMPLIANCE WITH GOVERNMENTAL AGENCIES HAVING JURISDICTION INCLUDING, BUT NOT NECESSARILY 3. THOROUGHLY COORDINATE ALL CHANGES WITHIN THE RECORD LIMITED TO - DOCUMENTS, MAKING ADEQUATE AND PROPER ENTRIES ON EACH PAGE OF SPECIFICATIONS AND EACH SHEET OF DRAWINGS AND 1. CERTIFICATES OF INSPECTION OTHER DOCUMENTS WHERE SUCH ENTRY IS REQUIRED TO OV a 2. CERTIFICATES OF OCCUPANCY PROPERLY SHOW CHANGE. ACCURACY OF RECORDS SHALL BE co w Lu SUCH THAT FUTURE SEARCH FOR ITEMS SHOWN IN THE CONTRACT 7. CERTIFICATES OF INSURANCE FOR PRODUCTS AND N wp N w DOCUMENTS MAY REASONABLY RELY ON INFORMATION OBTAINED COMPLETED OPERATIONS FROM THE ACCEPTED RECORD DOCUMENTS. � } o Z 8. LIST OF SUBCONTRACTORS, SERVICE ORGANIZATIONS AND O J PRINCIPAL VENDORS, INCLUDING NAMES ADDRESSES AND 4. MAKE ALL ENTRIES WITHIN 24 HOURS AFTER RECEIPT OF ••� TELEPHONE NUMBERS WHERE THEY CAN BE REACHED FOR Z O INFORMATION. N z a EMERGENCY SERVICE AT ALL TIMES INCLUDING NIGHTS, WEEKENDS AND HOLIDAYS. 5. IN ADVANCE OF THE ORLANDO SANFORD AUTHORITIES FINAL �Q INSPECTION THE CONTRACTOR SHALL SUBMIT THE FINAL RECORD II MATERIALS - NOT USED CAD DOCUMENTS TO THE ARCHITECT TO SECURE THE ARCHITECT'S O � Q ACCEPTANCE. III EXECUTION - NOT USED Q J Q d. Z II MATERIALS - END OF SECTION 01700 1. PROMPTLY FOLLOWING AWARD OF CONTRACT, SECURE FROM THE Q Q ARCHITECT, AT NO CHARGE TO THE CONTRACTOR, ONE COMPLETE Q Z z Z 0 SET OF ALL DOCUMENTS COMPOSING THE CONTRACT. 01710 CLEANING: O LV LL 2. AT A TIME NEAR THE COMPLETION OF THE WORK, PRIOR TO THE ZZ� I WORK INCLUDED - 0 REQUEST FOR FINAL INSPECTION, SECURE FROM THE ARCHITECT, LU LL AT NO CHARGE TO THE CONTRACTOR, CAD FILES ON DISK OF ALL 1. THROUGHOUT THE CONSTRUCTION PERIOD MAINTAIN THE JOB SITE DOCUMENTS INCLUDED IN THE CONTRACT. IN A STANDARD OF CLEANLINESS AS DESCRIBED IN THIS SECTION. J 07 0 III EXECUTION - 2. IN ADDITION TO STANDARDS DESCRIBED IN THIS SECTION, COMPLY cf)2z WITH ALL REQUIREMENTS FOR CLEANING UP AS DESCRIBED IN 1. IMMEDIATELY UPON RECEIPT OF THE JOB SET DESCRIBED ABOVE, VARIOUS SECTIONS OF THESE SPECIFICATIONS AND WITH ALL � � IDENTIFY EACH OF THE DOCUMENTS WITH THE TITLE "RECORD PERTINENT REQUIREMENTS OF TBI, AVAIRPROS AND ALL OTHER DOCUMENTS - JOB SET". GOVERNMENT AGENCIES HAVING JURISDICTION. 2. DO NOT USE THE JOB SET FOR ANY PURPOSE EXCEPT ENTRY OF 3. CONDUCT DAILY INSPECTION, AND MORE OFTEN IF NECESSARY, TO NEW DATA AND FOR REVIEW BY THE ARCHITECT, UNTIL START OF VERIFY THAT REQUIREMENTS OF CLEANLINESS ARE BEING MET. TRANSFER OF THE DATA TO FINAL RECORD CAD DOCUMENTS. 4. SUBMIT MANUFACTURER'S WRITTEN INSTRUCTIONS OF THE PROPER 3. MAINTAIN THE JOB SET AT THE SITE. CLEANING MATERIALS AND APPLICATIONS REQUIRED FOR THEIR PRODUCTS TO THE OWNER, PRIOR TO FINAL ACCEPTANCE. 4. IN MOST CASES ON THE DRAWINGS, ARRANGEMENT OF CONDUIT AND AND CIRCUITS, PIPING, DUCTS, AND OTHER SIMILAR ITEMS, IS H a_ SHOWN SCHEMATICALLY AND IS NOT INTENDED TO PORTRAY 11 MATERIALS - PRECISE PHYSICAL LAYOUT. FINAL PHYSICAL ARRANGEMENT IS AS DETERMINED BY THE CONTRACTOR SUBJECT TO THE ARCHITECT'S 1. PROVIDE ALL REQUIRED PERSONNEL, EQUIPMENT, AND MATERIALS a � ACCEPTANCE. HOWEVER, DESIGN OF FUTURE MODIFICATIONS OF TO MAINTAIN THE SPECIFIED STANDARD OF CLEANLINESS. THE FACILITY MAY REQUIRE ACCURATE INFORMATION AS TO THE FINAL PHYSICAL ARRANGEMENT OF ITEMS WHICH ARE SHOWN ONLY 2. USE ONLY THE CLEANING MATERIALS AND EQUIPMENT WHICH ARE Lu SCHEMATICALLY ON THE DRAWINGS. COMPATIBLE WITH THE SURFACE BEING CLEANED, AS RECOMMENDED BY THE MANUFACTURER OF THE SURFACE BEING 5. THE PURPOSE OF FINAL RECORD CAD DOCUMENTS IS TO PROVIDE CLEANED. FACTUAL INFORMATION REGARDING ALL ASPECTS OF THE WORK, BOTH CONCEALED AND VISIBLE, TO ENABLE FUTURE MODIFICATIONS OF DESIGN TO PROCEED WITHOUT LENGTHY AND EXPENSIVE SITE III EXECUTION - m D MEASUREMENT, INVESTIGATION, AND EXAMINATION. 1. RETAIN ALL STORED ITEMS IN AN ORDERLY ARRANGEMENT 6. FOLLOWING RECEIPT OF THE CAD FILES ON DISK DESCRIBED ALLOWING MAXIMUM ACCESS, NOT IMPEDING DRAINAGE OR TRAFFIC, ABOVE, AND PRIOR TO START OF TRANSFER OF RECORDED DATA AND PROVIDING THE REQUIRED PROTECTION OF MATERIALS. U) THERETO, SECURE A REVIEW BY THE ARCHITECT OF ALL RECORDED DATA. MAKE ALL REQUIRED REVISIONS. 2. DO NOT ALLOW THE ACCUMULATION OF SCRAP, DEBRIS, WASTE MATERIAL, AND OTHER ITEMS NOT REQUIRED FOR CONSTRUCTION 7. CAREFULLY TRANSFER ALL CHANGE DATA SHOWN ON THE JOB SET OF THIS WORK. OF RECORD DRAWINGS TO THE CORRESPONDING CAD FILES ON DISK, COORDINATING THE CHANGES AS REQUIRED, AND CLEARLY 3. AT LEAST ONCE A WEEK, AND MORE OFTEN IF NECESSARY, 0 V_ INDICATING AT EACH AFFECTED DETAIL AND OTHER DRAWING THE COMPLETELY REMOVE ALL SCRAP, DEBRIS, AND WASTE MATERIAL FULL DESCRIPTION OF ALL CHANGES MADE DURING CONSTRUCTION FROM THE JOB SITE. AND THE ACTUAL LOCATION OF ITEMS DESCRIBED ABOVE. CALL 0 ATTENTION TO EACH ENTRY BY DRAWING A "CLOUD" AROUND THE 4. PROVIDE ADEQUATE STORAGE FOR ALL ITEMS AWAITING REMOVAL AREA OR AREAS AFFECTED. MAKE ALL ENTRIES TO THE CAD FILES FROM THE JOB SITE, OBSERVING ALL REQUIREMENTS FOR FIRE ON DISK NEATLY AND CONSISTENTLY IN BOLD LINES AND TEXT. PROTECTION AND PROTECTION OF THE SITE AND THE OWNER'S NLU IDENTIFY EACH CAD DISK AND ALL OF THE DOCUMENTS WITHIN PROPERTY. WITH THE TITLE "AS -BUILT RECORD SET". 5. DAILY, AND MORE OFTEN IF NECESSARY, INSPECT THE SITE AND 8. SUBMIT THE COMPLETED TOTAL SET OF RECORD DOCUMENT CAD PICK UP ALL SCRAP, DEBRIS, AND WASTE MATERIAL. REMOVE ALL N FILES ON DISK, AND THREE (3) BOUND (STAPLED) SETS OF i� z SUCH ITEMS TO A PLACE DESIGNATED FOR THEIR STORAGE. ASSOCIATED PRINT-OUTS, IN NUMERICAL ORDER, TO THE MAINTAIN THE SITE IN A NEAT AND ORDERLY CONDITION AT ALL ARCHITECT AS DESCRIBED ABOVE. THE ARCHITECT MUST SUBMIT TIMES. r' TWO (2) SETS TO THE ORLANDO SANFORD AUTHORITIES TO O REQUEST FINAL NSPECTION. 6. WEEKLY, AND MORE OFTEN IF NECESSARY, SWEEP ALL INTERIOR SPACES CLEAN. "CLEAN", FOR THE PURPOSE OF THIS END OF SECTION 01720 � SUB -PARAGRAPH, SHALL BE INTERRUPTED AS MEANING FREE FROM DUST AND OTHER MATERIAL CAPABLE OF BEING REMOVED BY USE OF REASONABLE EFFORT AND HANDHELD BROOM. Y 7. FOLLOWING THE INSTALLATION OF FINISH FLOOR MATERIALS, CLEAN THE FINISH FLOOR DAILY (AND MORE OFTEN IF NECESSARY) AT ALL TIMES WHILE WORK IS BEING PERFORMED IN THE SPACE IN Q WHICH FINISH MATERIALS HAVE BEEN INSTALLED. "CLEAN", FOR THE PURPOSE OF THIS SUB -PARAGRAPH, SHALL BE INTERPRETED AS MEANING FREE FROM ALL FOREIGN MATERIAL WHICH, IN THE OPINION OF THE ARCHITECT, MAY BE INJURIOUS TO THE FINISH FLOOR MATERIAL. 8. EXCEPT AS OTHERWISE SPECIFICALLY PROVIDED, "CLEAN" (FOR THE PROJ NO: P703080244 PURPOSE OF THIS ARTICLE) SHALL BE INTERPRETED AS MEANING SCALE: AS NOTED DATE: THE LEVEL OF CLEANLINESS GENERALLY PROVIDED BY SKILLED DESIGNED BY: DRAWN BY: E. OUTHAVONG CLEANERS USING COMMERCIAL QUALITY BUILDING MAINTENANCE EQUIPMENT AND MATERIALS. SHEET TITLE: 9. PRIOR TO COMPLETION OF THE WORK, REMOVE FROM THE JOB GENERAL REQUIREMENTS SITE ALL TOOLS, SURPLUS MATERIALS, EQUIPMENT, SCRAP, DEBRIS 01600 - 01740 SHEET NO. AND WASTE. CONDUCT FINAL PROGRESS CLEANING AS DESCRIBED SHEET OF IN ABOVE. 10. VISUALLY INSPECT ALL SURFACES AND REMOVE ALL TRACES OF SOIL, WASTE MATERIAL, SMUDGES AND OTHER FOREIGN MATTER. REMOVE ALL TRACES OF SPLASHED MATERIALS FROM ADJACENT SURFACES. REMOVE ALL PAINT DROPPINGS, SPOTS, STAINS, AND DIRT FROM FINISHED SURFACES. USE ONLY SPECIFIED MATERIALS AND EQUIPMENT. 11. CLEAN ALL GLASS, BOTH SIDES, INCLUDING EXISTING GLASS TO REMAIN. REMOVE ALL LABELS. 12. TO ALL SURFACES REQUIRING THE ROUTINE APPLICATION OF BUFFED POLISH, APPLY THE POLISH RECOMMENDED BY THE MANUFACTURER OF THE MATERIAL BEING POLISHED. 13. SCHEDULE FINAL CLEANING, TO BE DONE BY A PROFESSIONAL CLEANING COMPANY, AS ACCEPTED BY THE ARCHITECT, TO ENABLE THE OWNER TO ACCEPT A COMPLETELY PROFESSIONALLY CLEANED PROJECT END OF SECTION 01710 3 IF THIS DRAWING IS LESS THAN 22" X 34" IT IS A REDUCED SIZE DRAWI 4 5 WORK INCLUDED - TO AID IN THE CONTINUED INSTRUCTION OF OPERATING AND MAINTENANCE PERSONNEL, AND TO PROVIDE A POSITIVE SOURCE OF INFORMATION REGARDING THE PRODUCTS INCORPORATED IN THE WORK, FURNISH AND DELIVER THE DATA DESCRIBED IN THIS SECTION AND IN PERTINENT SECTIONS OF THESE SPECIFICATIONS. 2. MAKE ALL SUBMITTALS IN STRICT ACCORDANCE WITH PROVISIONS OF SECTION 01300. 3. REQUIRED CONTENTS OF SUBMITTALS MAY ALSO BE AMPLIFIED IN PERTINENT OTHER SECTIONS OF THESE SPECIFICATIONS. 4. SUBMIT THREE COPIES OF THE FINAL MANUAL OR MANUALS TO D THE ARCHITECT PRIOR TO INDOCTRINATION OF OPERATION AND MAINTENANCE PERSONNEL. II MATERIALS - 1. WHERE INSTRUCTION MANUALS ARE REQUIRED TO BE SUBMITTED UNDER OTHER SECTIONS OF THESE SPECIFICATIONS, PREPARE IN ACCORDANCE WITH THE FOLLOWING: 1. FORMAT: SIZE 8 1/2- X 11 ". PAPER WHITE BOND, AT LEAST 20 LB. WEIGHT. TEXT NEATLY TYPEWRITTEN. DRAWINGS 11" IN HEIGHT PREFERABLE; BIND IN WITH TEXT; FOLDOUTS ACCEPTABLE; LARGER DRAWINGS ACCEPTABLE, BUT FOLD TO FIT WITHIN THE MANUAL AND PROVIDE A DRAWING POCKET INSIDE REAR COVER OR BIND IN WITH TEXT. 2. PROVIDE FRONT AND BACK COVERS FOR EACH MANUAL, USING DURABLE MATERIAL ACCEPTED BY THE ARCHITECT AND CLEARLY IDENTIFIED ON OR THROUGH THE FRONT COVER WITH AT LEAST THE FOLLOWING INFORMATION: 1. OPERATING AND MAINTENANCE INSTRUCTIONS 2. NAME OF CONTRACTOR 3. GENERAL SUBJECT OF THIS MANUAL 3. CONTENTS: 1. INCLUDE AT LEAST THE FOLLOWING: 1. IMMEDIATE INFORMATION AS TO THE LOCATION WITHIN THE MANUAL OF ALL EMERGENCY DATA REGARDING THE INSTALLATION. 2. COMPLETE INSTRUCTIONS REGARDING OPERATION AND MAINTENANCE OF ALL EQUIPMENT INVOLVED, INCLUDING LUBRICATION, DISASSEMBLY, AND RE -ASSEMBLY. 3. COMPLETE NOMENCLATURE AND PART NUMBER OF ALL REPLACEABLE PARTS, NAME AND ADDRESS OF NEAREST VENDOR, AND ALL OTHER PERTINENT DATA REGARDING PROCUREMENT PROCEDURE. 2. COPY OF ALL GUARANTEES AND WARRANTIES. 3. MANUFACTURER'S BULLETINS, CUTS, AND DESCRIPTIVE DATA, WHERE PERTINENT, CLEARLY INDICATING THE PRECISE ITEMS INCLUDED IN THIS INSTALLATION AND DELETING, OR OTHERWISE CLEARLY INDICATING, ALL MANUFACTURER' DATA WITH WHICH THIS INSTALLATION IS NOT CONCERNED. SUCH OTHER DATA AS REQUIRED IN PERTINENT OTHER SECTIONS OF THESE SPECIFICATIONS. EXECUTION - NOT USED END OF SECTION 01730 01740 WARRANTIES AND GUARANTEES: I WORK INCLUDED - 1. THIS SECTION COVERS PREPARING AND SUBMITTING MANUFACTURER'S WARRANTIES AND GUARANTEES REQUIRED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. MATERIALS - 11 1. IN ACCORDANCE WITH SECTION 01300, SUBMITTALS AND SUBSTITUTIONS - 1. SUBMIT BLANK WARRANTY AND GUARANTEE FORMS FOR ACCEPTANCE NOT LATER THAN 30 DAYS AND BEFORE THE ANTICIPATED FINAL ACCEPTANCE DATE. SUBMIT 4 COPIES OF EACH BLANK FORM, ONE COPY OF EACH FORM WILL BE RETURNED FOR CORRECTION OR FOR USE. 2. SUBMIT EXECUTED WARRANTY AND GUARANTEE FORMS FOR ACCEPTANCE NOT LATER THAN 10 DAYS BEFORE THE ANTICIPATED FINAL ACCEPTANCE DATE. SUBMIT 4 COPIES OF EACH EXECUTED FORM, ONE COPY OF EACH FORM WILL BE RETURNED FOR CORRECTION OR FOR USE. 3. ACCOMPANY BLANK AND EXECUTED FORMS WITH TRANSMITTAL FORM CONTAINING THE FOLLOWING INFORMATION - 1. ITEMS COVERED BY THE WARRANTY OR GUARANTEE 2. DATE SUBMITTED TO ARCHITECT 3. PROJECT TITLE AND NUMBER 4• SUPPLIER'S, MANUFACTURER'S OR SUBCONTRACTOR'S NAMES AND ADDRESSES III EXECUTION - NOT USED END OF SECTION 01740 5 C a A a � co o W w w tY U � Y- zz Q 0 od c0 of ao4 0 C�a,U ? Z N Cp c=n w o Ix z N U�0Oj� OV a 0) 0 CN co w Lu � z z N wp N w o w Bz � } o Z Fes- Z O J '�z c y F- w � O U) ••� N v w N Z O .�.� ••• N z a U H �Q Ill 0 O � Q ►�' Q J Q d. Z � p0� 0 Q Q Q Z z Z 0 O LV LL ►-� ZZ� AD's 0 �a� LU LL N� w F -0Z ZLL � J 07 0 U ZO cf)2z i --i Q UJ J � � 0 z O H a_ z O a � FDDo Lu m D U) lz0 0 V_ 0 NLU F- N Q i� z r' O � Y � Q PROJ NO: P703080244 SCALE: AS NOTED DATE: DESIGNED BY: DRAWN BY: E. OUTHAVONG CHECKED BY: SHEET TITLE: GENERAL GENERAL REQUIREMENTS 01600 - 01740 SHEET NO. G003 SHEET OF 911 C IN IA 1 02060 REMOVALS: I WORK INCLUDED - 1. RELATED DOCUMENTS: 1. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND DIVISION 1 GENERAL REQUIREMENTS, APPLY TO THIS SECTION. 2. EXAMINE ALL OTHER SECTIONS OF THE SPECIFICATIONS FOR REQUIREMENTS WHICH AFFECT WORK OF THIS SECTION WHETHER OR NOT SUCH WORK IS SPECIFICALLY MENTIONED IN THIS SECTION. 3. COORDINATE WORK WITH THAT OF ALL OTHER TRADES AFFECTING, OR AFFECTED BY WORK OF THIS SECTION. COOPERATE WITH SUCH TRADES TO ASSURE THE STEADY PROGRESS OF ALL PROJECT WORK. 2. SEE ARCHITECTURAL, MECHANICAL AND ELECTRICAL DRAWINGS FOR SPECIFIC REMOVALS AND REQUIREMENTS. 3. GENERAL REMOVALS AND RELOCATIONS: 1. REMOVE ALL ITEMS, MATERIALS AND FINISHES AS REQUIRED FOR THE INSTALLATION OF THE NEW WORK, OR THE RELOCATION OF EXISTING, AS DESCRIBED IN PERTINENT SECTIONS OF THESE SPECIFICATIONS AND/OR SHOWN ON THE DRAWINGS INCLUDING ALL EXISTING MISCELLANEOUS MECHANICAL AND ELECTRICAL ITEMS, DEVICES AND FIXTURES: SEE MECHANICAL AND ELECTRICAL DRAWINGS AND SPECIFICATIONS. 2. REMOVE ALL MISCELLANEOUS INCIDENTAL MATERIALS AND ITEMS IN CONFLICT WITH THE PROPER PREPARATION, INSTALLATION AND FINISHING OF THE NEW WORK. 4. ITEMS NOTED TO BE REMOVED SHALL BE REMOVED IN THEIR ENTIRETY, INCLUDING ALL INSTALLATION FASTENINGS, UNLESS OTHERWISE NOTED. ALL ABUTTING MATERIALS AND FINISHES SHALL BE PATCHED TO MATCH FOR NO NOTICEABLE REMOVAL INDICATIONS PER SECTION 01045. 5. REPAIR AND PATCH TO MATCH EXISTING WHERE LEFT EXPOSED TO VIEW OR DAMAGED BY REMOVALS: SEE SECTION 01045. 6. REMOVE ALL EXISTING DAMAGED AND MARRED FINISH MATERIALS AND REPLACE WITH NEW TO MATCH EXISTING. II MATERIALS - (NA) III EXECUTION - 1 . ALL REMOVALS AND DEMOLITION SHALL BE IN COMPLIANCE WITH THE STATE OF FLORDIA BUILDING CODE, THE ORLANDO SANFORD AVIATION AUTHORITY (OSAA) AND ALL APPLICABLE FEDERAL SAFETY REGULATIONS. ALL NEW INTERIOR FINISH MATERIALS MUST BE INSTALLED ON NON-COMBUSTIBLE SURFACES. WHERE NEW FINISH MATERIALS ARE TO BE INSTALLED ON EXISTING SURFACES ALL EXISTING FINISH MATERIALS, INCLUDING GLUE, BONDING AGENTS, ETC., MUST BE REMOVED PRIOR TO INSTALLATION OF ANY NEW MATERIAL. 2. IF ASBESTOS OR ANY OTHER HAZARDOUS MATERIALS ARE ENCOUNTERED, NOTIFY OWNERITENANT, HUDSON GROUP (HG), IN WRITING PRIOR TO PROCEEDING. STATE GOVERNING AUTHORITY'S APPROVED METHODS OF PROPER REMOVAL AND DISPOSAL PROCEDURES. UPON WRITTEN NOTICE TO PROCEED FROM THE OWNER/TENANT, THE HUDSON GROUP (HG), THESE METHODS AND PROCEDURES ARE TO BE STRICTLY FOLLOWED. 3. ALL MATERIALS AND ITEMS THAT ARE TO BE REUSED AND RELOCATED IN CONJUNCTION WITH THE NEW WORK SHALL BE CAREFULLY CUT AWAY FROM THE EXISTING ABUTTING WORK TRUE TO LINE AT THE NEAREST JOINT, SURFACE BREAK OR PATTERN LINE TO ENSURE NO NOTICEABLE DIFFERENCE BETWEEN NEW AND EXISTING TO REMAIN. REMOVALS SHALL BE KEPT TO A MINIMUM. MATERIALS TO BE REUSED AND RELOCATED SHALL BE PROPERLY HANDLED, TAGGED AND STORED TO PREVENT DAMAGING AND BREAKING. 4. CAREFULLY COORDINATE ALL TRADES TO ENSURE PROPER AND ADEQUATE INTERFACE OF THE WORK. 5. WHEN WORK IS STOPPED, PROVIDE AND MAINTAIN IN PLACE SUITABLE COVERINGS AND BARRIERS FOR PROTECTION OF THE WORK AND SAFETY FOR ALL PERSONNEL AND BUILDING USERS. 6. PROTECT ALL WORK, EXISTING AND NEW, FROM DAMAGE BY ANY CAUSE THROUGHOUT THE DEMOLITION OPERATIONS. PROTECTIVE COVERINGS OR BARRIERS SHALL NOT MAR, STAIN OR PENETRATE THE FINISHED WORK. 7. COORDINATE ALL STRUCTURAL WORK FOR THE PROPER PHASING, STAGING AND SEQUENCE OF REMOVAL REQUIREMENTS. 8. COORDINATE ANY AND ALL MECHANICAL AND ELECTRICAL WORK FOR THE PROPER DISCONNECTIONS, PROTECTIONS AND CAPPINGS: SEE MECHANICAL AND ELECTRICAL DRAWINGS. 1. PRIOR TO CUTTING (CORE BORING) EXISTING FLOOR SLABS VERIFY STRUCTURAL REINFORCING OF CONCRETE, IF UNKNOWN, BY APPROVED XRAY METHOD, OR ALTERNATE,: SEE SECTION 01045 OF THE GENERAL REQUIREMENTS. DO NOT PROCEED WITH ANY CUTTING (CORE BORING) UNTIL WRITTEN AUTHORIZATION IS RECEIVED FROM THE ORLANDO SANFORD AVIATION AUTHORITY (OSAA) THROUGH THE HUDSON GROUP (HG). 9. UNDERTAKE WHATEVER PRECAUTIONS ARE NECESSARY TO PREVENT EXCESSIVE DUST DURING DEMOLITION. 10. REMOVE ALL PORTIONS OF THE WORK IN A SAFE MANNER WITH CARE TO PREVENT DAMAGE TO ADJACENT AND REMAINING STRUCTURE, FINISHES OR ANY OTHER ITEMS OF THE HUDSON GROUP (HG) PROPERTY OR OTHER TENANT AREAS AND ORLANDO SANFORD AVIATION AUTHORITY (OSAA) PUBLIC SPACES AND PROPERTY. 11. ALL MATERIALS UNLESS NOTED TO BE REUSED OR TO BE SALVAGED SHALL BE REMOVED OFF THE PROPERTY TO AN AVAILABLE DUMP OR SITE OF THE CONTRACTOR'S OWN CHOOSING AND ARE TO BE PROPERLY AND RESPONSIBLY DISPOSED OF. 12. VERIFY SALVAGE REQUIREMENTS FOR ALL MATERIALS NOTED TO BE REMOVED WITH THE AIRPORT AUTHORITY (OSAA) AND THE HUDSON GROUP (HG). MATERIALS NOTED TO BE SALVAGED SHALL BE STORED PER AIRPORT AUTHORITY (OSAA) DIRECTIONS. 13. ALL REMOVALS SHALL LEAVE THE EXISTING SURFACES AND SUBSTRATES FREE AND CLEAN FOR THE PROPER PATCHING AND PREPARATION REQUIRED FOR THE SPECIFIED NEW MATERIALS AND FINISHES. 14. PERFORM ALL WORK IN ACCORDANCE WITH SECTIONS 01045, 01400, 01600 AND 01710 OF THESE SPECIFICATIONS. END OF SECTION 02060 1 2 03500 CEMENTITIOUS UNDERLAYMENT: I WORK INCLUDED - 1. RELATED DOCUMENTS: 1. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND DIVISION 1 GENERAL REQUIREMENTS, APPLY TO THIS SECTION. 2. EXAMINE ALL OTHER SECTIONS OF THE SPECIFICATIONS FOR REQUIREMENTS WHICH AFFECT WORK OF THIS SECTION WHETHER OR NOT SUCH WORK IS SPECIFICALLY MENTIONED IN THIS SECTION. 3. COORDINATE WORK WITH THAT OF ALL OTHER TRADES AFFECTING, OR AFFECTED BY WORK OF THIS SECTION. COOPERATE WITH SUCH TRADES TO ASSURE THE STEADY PROGRESS OF ALL PROJECT WORK. 2. PROVIDE AND INSTALL: 1. ALL FLASH PATCHING REQUIRED FOR THE PROPER INSTALLATION OF ALL FINISH FLOORING SECTIONS OF THESE SPECIFICATIONS. 2. ALL FLOOR LEVELING REQUIRED FOR FLOOR ELEVATIONS SHOWN. THE TILE FLOOR PATCHING FOR THE STORE SHALL BE LEVELED TO HEIGHT FOR A CONTINUOUS FLUSH CONDITION TO THE EXISTING FINISH FLOORING. 3. FILL ALL EXISTING UNUSED AND ABANDONED FLOOR PENETRATIONS. 3. PROVIDE MANUFACTURER'S PRODUCT DATA LITERATURE IN ACCORDANCE WITH SECTION 01300 OF THESE SPECIFICATIONS. 4. ALL WORK SHALL BE HIGHEST IN QUALITY IN COMPLIANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS AND APPLICABLE CODE REQUIREMENTS. 1. QUALIFIED EXPERIENCED INSTALLER (APPLICATOR) OF MATERIAL SPECIFIED, ACCEPTABLE TO THE MANUFACTURER, WHO HAS A SUCCESSFUL RECORD OF COMPLETING CEMENT - BASED UNDERLAYMENT APPLICATIONS SIMILAR IN MATERIAL AND EXTENT TO THAT REQUIRED FOR THIS PROJECT II MATERIALS - 1. UNDERLAYMENT: CEMENT BASED POLYMER -MODIFIED, SELF - LEVELING, FILL, PATCHING AND RESURFACING COMPOUND CAPABLE OF FEATHEREDGE TO SIX INCH THICKNESS AS MANUFACTURED BY: ARDEX, INC., K-15 SELF -LEVELING UNDERLAYMENT CONCRETE; CONSPEC MARKETING AND MANUFACTURING CO., INC., CONFLOW; L&M CONSTRUCTION CHEMICALS, INC., LEVELEX UNDERLAYMENT, OR ARCHITECT ACCEPTED EQUAL. SUPPLEMENT UNDERLAYMENT, WHERE REQUIRED, AT THICKNESS GREATER THAN 6" PER MANUFACTURER'S WRITTEN INSTRUCTIONS. 1. CEMENT BINDER: ASTM C 150, PORTLAND CEMENT, OR HYDRAULIC BLENDED CEMENT AS DEFINED BY ASTM C 219. COMPRESSIVE STRENGTH NOT LESS THAN 4100 PSI (28 MPA) AT 28 DAYS WHEN TESTED ACCORDING TO ASTM C 109/C 109M. 2. UNDERLAYMENT ADDITIVE: RESILIENT -EMULSION PRODUCT OF UNDERLAYMENT MANUFACTURER FORMULATED FOR USE WITH UNDERLAYMENT WHEN APPLIED TO SUBSTRATE AND CONDITIONS INDICATED. 2. AGGREGATE: WELL -GRADED, WASHED GRAVEL, 1/8 TO 1/4 INCH, OR COARSE SAND AS RECOMMENDED BY UNDERLAYMENT MANUFACTURER. 1. PROVIDE AGGREGATE WHEN RECOMMENDED IN WRITING BY UNDERLAYMENT MANUFACTURER FOR UNDERLAYMENT THICKNESS REQUIRED. 2. WATER: POTABLE AND AT A TEMPERATURE NOT MORE THAN 70°F. 3. PRIMER: PRODUCT OF UNDERLAYMENT MANUFACTURER, RECOMMENDED IN WRITING, FOR SUBSTRATE CONDITIONS AND APPLICATIONS INDICATED. III EXECUTION - 1 . EXAMINE SUBSTRATES, WITH INSTALLER PRESENT, FOR CONDITIONS AFFECTING PERFORMANCE OF UNDERLAYMENT INCLUDING SUBSTRATE MOISTURE CONTENT. BEGIN UNDERLAYMENT APPLICATION ONLY AFTER UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED. 2. PROPERLY PREPARE AND CLEAN SUBSTRATE, IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS FOR SUBSTRATE INDICATED PRIOR TO APPLICATION. PROVIDE CLEAN, DRY, NEUTRAL - PH SUBSTRATE FOR UNDERLAYMENT APPLICATION. 1. TREAT NON-MOVING SUBSTRATE CRACKS TO PREVENT CRACKS FROM TELEGRAPHING (REFLECTING) THROUGH UNDERLAYMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS. 1. FILL SUBSTRATE VOIDS TO PREVENT UNDERLAYMENT FROM LEAKING. 2. MECHANICALLY REMOVE LAITANCE, GLAZE, EFFLORESCENCE, CURING COMPOUNDS, FORM -RELEASE AGENTS, DUST, DIRT, GREASE, OIL, AND OTHER CONTAMINANTS THAT MIGHT IMPAIR UNDERLAYMENT BOND ACCORDING TO MANUFACTURER'S WRITTEN INSTRUCTIONS. 3. AFTER SUBSTRATE PREPARATION, TEST SUBSTRATE FOR ADHESION WITH UNDERLAYMENT ACCORDING TO MANUFACTURER'S WRITTEN INSTRUCTIONS. 3. MIX, APPLY AND CURE UNDERLAYMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS. 1. COORDINATE APPLICATION OF COMPONENTS TO PROVIDE OPTIMUM UNDERLAYMENT-TO-SUBSTRATE AND INTERCOAT ADHESION. 2. APPLY UNDERLAYMENT TO PRODUCE UNIFORM, LEVEL SURFACE. APPLY FINAL LAYER WITHOUT AGGREGATE TO PRODUCE A SMOOTH SURFACE. FEATHER EDGES TO MATCH ADJACENT FLOORING. 4. FIELD QUALITY CONTROL: 1. SLUMP TEST: IF SLUMP TEST IS RECOMMENDED IN WRITING BY MANUFACTURER, TEST UNDERLAYMENT FOR SLUMP AS IT IS PLACED FOR COMPLIANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS. 2. FIELD SAMPLES: TAKE AT LEAST THREE MOLDED -CUBE SAMPLES FROM EACH UNDERLAYMENT BATCH. TEST SAMPLES ACCORDING TO ASTM C 109/C 109M FOR COMPLIANCE WITH COMPRESSIVE -STRENGTH REQUIREMENTS. 2 3 5. DO NOT INSTALL (APPLY) FINISH FLOORING OVER UNDERLAYMENT UNTIL AFTER TIME PERIOD RECOMMENDED BY UNDERLAYMENT MANUFACTURER. 6. REMOVE AND REPLACE UNDERLAYMENT AREAS THAT EVIDENCE LACK OF BOND WITH SUBSTRATE, INCLUDING AREAS THAT EMIT A "HOLLOW" SOUND WHEN TAPPED. 7. PERFORM ALL WORK IN ACCORDANCE WITH SECTIONS 01045, 01400, 01600 AND 01710 OF THESE SPECIFICATIONS. END OF SECTION 03500 05500 MISCELLANEOUS METALS: I WORK INCLUDED - 1. RELATED DOCUMENTS: 1. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND DIVISION 1 GENERAL REQUIREMENTS, APPLY TO THIS SECTION. 2. EXAMINE ALL OTHER SECTIONS OF THE SPECIFICATIONS FOR REQUIREMENTS WHICH AFFECT WORK OF THIS SECTION WHETHER OR NOT SUCH WORK IS SPECIFICALLY MENTIONED IN THIS SECTION. 3. COORDINATE WORK WITH THAT OF ALL OTHER TRADES AFFECTING, OR AFFECTED BY WORK OF THIS SECTION. COOPERATE WITH SUCH TRADES TO ASSURE THE STEADY PROGRESS OF ALL PROJECT WORK. 2. PROVIDE AND INSTALL: 1. ALL MISCELLANEOUS METAL AS SCHEDULED AND SHOWN ON THE DRAWINGS AND/OR FOR FULL COMPLETION OF THE WORK. 1. ALL INCIDENTAL MATERIALS, INCLUDING BUT NOT LIMITED TO SUPPORT MEMBERS FOR LIGHT FIXTURE SUPPORT GRIDS, SPECIAL DOORS, ATTACHMENTS, FASTENERS, ANCHORAGE DEVICES AND ADHESIVES REQUIRED FOR THE INSTALLATION OF WORK FOR THIS AND ALL SECTIONS OF THESE SPECIFICATIONS INCLUDING MECHANICAL AND ELECTRICAL WORK: SEE MECHANICAL AND ELECTRICAL DRAWINGS. 3 PROVIDE COORDINATED SHOP DRAWINGS AND PRODUCT LITERATURE ON ALL ITEMS AND SAMPLES OF ALL FINISHES IN ACCORDANCE WITH SECTION 01300 OF THESE SPECIFICATIONS. 4. PROVIDE CLEANING DATA IN ACCORDANCE WITH SECTION 01710 OF THESE SPECIFICATIONS. INCLUDE RECOMMENDED CLEANING METHODS, CLEANING MATERIALS AND STAIN REMOVAL METHODS. 5. ALL WORK SHALL BE HIGHEST IN QUALITY IN COMPLIANCE WITH AISC, ASTM, MFMA, NAAMM, AWS, SSPC STANDARDS AND APPLICABLE CODE REQUIREMENTS. II MATERIALS - 1. ALL MISCELLANEOUS SUPPORT STEEL AND CLOSURE ITEM MATERIAL, FABRICATION AND ERECTION SHALL COMPLY WITH THE REQUIREMENTS OF THE AISC STANDARD SPECIFICATIONS FOR STRUCTURAL STEEL, WITH SUPPLEMENTS TO DATE. 1. IN FABRICATION OF ITEMS WHICH WILL BE EXPOSED TO VIEW, LIMIT MATERIALS TO THOSE WHICH ARE FREE FROM SURFACE BLEMISHES, PITTING, ROLLED TRADE NAMES, AND ROUGHNESS. 2. COMPLY WITH FOLLOWING STANDARDS, AS PERTINENT: 1. STEEL PLATES, SHAPES, AND BARS: ASTM A36 2. STEEL PLATES TO BE BENT OR COLD -FORMED: ASTM A283 3. STEEL TUBING (HOT -FORMED, WELDED, OR SEAMLESS): ASTM A501 4. STEEL BARS AND BAR -SIZE SHAPES: ASTM A306, GRADE 65. OR ASTM A36 5. COLD -FINISHED STEEL BARS: ASTM A108 6. COLD -ROLLED CARBON STEEL SHEETS: ASTM A336 7. GALVANIZED CARBON STEEL SHEETS: ASTM A526, WITH G90 ZINC COATING IN ACCORDANCE WITH ASTM A525 8. GRAY IRON CASTINGS: ASTM A48, CLASS 10 9. MALLEABLE IRON CASTINGS: ASTM A47 10. STEEL PIPE: ASTM A53 GRADE A, SCHEDULE 40, BLACK FINISH UNLESS OTHERWISE NOTED 11. CONCRETE INSERTS: 1. THREADED OR WEDGE TYPE GALVANIZED FERROUS CASTINGS OF MALLEABLE IRON COMPLYING WITH ASTM A27 2. PROVIDE REQUIRED BOLTS, SHIMS, AND WASHERS, HOT- DIP GALVANIZED IN ACCORDANCE WITH ASTM A153. 3. ALL STEEL SHALL BE SHOP PRIME FINISHED FOR CONCEALED ITEMS AND SCHEDULED FINISH FOR EXPOSED TO VIEW ITEMS. 1. PRIMER: USE "10-99 TNEMEC PRIMER" OR "RUSTOLEUM NUMBER 5769 PRIMER" 2. FOR REPAIR OF GALVANIZING, USE A HIGH ZINC -DUST CONTENT PAINT COMPLYING WITH MIL -21035. 4. THE CONTRACTOR SHALL FURNISH MILL TEST REPORTS FROM THE PRODUCER OF THE STEEL CERTIFYING THAT THE STEEL MEETS THE MINIMUM REQUIREMENTS AS DEFINED BY ASTM SPECIFICATIONS. 2. ALL WELDING SHALL BE IN ACCORDANCE WITH THE STANDARD CODE FOR ARC AND GAS WELDING IN BUILDING CONSTRUCTION OF THE AMERICAN WELDING SOCIETY. WELDING ELECTRODES SHALL CONFORM TO ASTM SPECIFICATIONS E-70XX. ALL BUTT WELDS SHALL BE 1005 PENETRATION WELDS AND FILLET WELDS SHALL BE A MINIMUM 3/16". 3. ALL FASTENERS, THREADED AND DRIVEN, SHALL BE THE BEST OF THEIR RESPECTIVE TYPE, GRADE AND CLASS AND SHALL BE USED IN SUFFICIENT NUMBERS AND CORRECT SIZES FOR THE PARTICULAR APPLICATIONS. ALL FASTENERS SHALL BE HIDDEN IN THE FINISHED WORK. FASTENERS FOR EXTERIOR USE AND WHERE BUILT INTO EXTERIOR WALLS SHALL BE ZINC COATED FASTENERS. 3 IF THIS DRAWING IS LESS THAN 22" X 34" IT IS A REDUCED SIZE DRAWING 4 4. ALL OTHER MISCELLANEOUS INCIDENTAL ITEMS AND MATERIALS IN TYPES SHOWN OR NOTED INCLUDING BUT NOT LIMITED TO; FASTENERS, ATTACHMENTS AND GROUT SHOWN, NOTED AND/OR REQUIRED FOR FULL COMPLETION OF THE WORK, SHALL BE OF QUALITY COMPARABLE AND COMPATIBLE TO MATERIALS SPECIFIED, SELECTED BY THE CONTRACTOR, SUBJECT TO ACCEPTANCE BY THE ARCHITECT. III EXECUTION - 1 . VERIFY THAT LOCATIONS TO RECEIVE ITEMS ARE PROPERLY PREPARED, DIMENSIONED AND READY FOR ITEM ATTACHMENT FOR A PERMANENT, RIGID INSTALLATION. 2. INSTALL ALL ITEMS IN ACCORDANCE WITH ACCEPTED SHOP DRAWINGS AND MANUFACTURER'S WRITTEN INSTRUCTIONS. PLUMB LEVEL AND TRUE WITHOUT DISTORTION, ALIGNED AND FITTED PROPERLY. COORDINATE WITH ALL BUILT-IN ITEMS OF OTHER SECTIONS OF THESE SPECIFICATIONS FOR CUTOUT LOCATIONS AND SIZE, SUPPORT AND ATTACHMENT REQUIREMENTS: 1. ARCHITECTURAL WOODWORK SECTION 06400 2. GYPSUM WALLBOARD SECTION 09250 3. MECHANICAL SEE 'P' DRAWINGS 4. ELECTRICAL SEE 'E' DRAWINGS 3. PROPERLY PROTECT ALL FINISH SURFACES UNTIL INSTALLATION COMPLETION AND JUST PRIOR TO ARCHITECT'S FINAL ACCEPTANCE. 4. PERFORM ALL WORK IN ACCORDANCE WITH SECTIONS 01045, 01400, 01600 AND 01710 OF THESE SPECIFICATIONS. END OF SECTION 05500 06100 CARPENTRY: I WORK INCLUDED - 1. RELATED DOCUMENTS: 1. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND DIVISION 1 GENERAL REQUIREMENTS, APPLY TO THIS SECTION. 2. EXAMINE ALL OTHER SECTIONS OF THE SPECIFICATIONS FOR REQUIREMENTS WHICH AFFECT WORK OF THIS SECTION WHETHER OR NOT SUCH WORK IS SPECIFICALLY MENTIONED IN THIS SECTION. 3. COORDINATE WORK WITH THAT OF ALL OTHER TRADES AFFECTING, OR AFFECTED BY WORK OF THIS SECTION. COOPERATE WITH SUCH TRADES TO ASSURE THE STEADY PROGRESS OF ALL PROJECT WORK. 2. PROVIDE AND INSTALL: 1. ALL ROUGH CARPENTRY INCLUDING BUT NOT LIMITED TO, WOOD BLOCKING, SUPPORT GROUNDS, FURRING, BACKBOARDS, ANCHORS AND ROUGH HARDWARE AND OTHER INCIDENTAL ROUGH CARPENTRY WORK AS REQUIRED FOR WORK OF ALL SECTIONS OF THESE SPECIFICATIONS INCLUDING MECHANICAL AND ELECTRICAL: SEE MECHANICAL AND ELECTRICAL DRAWINGS. 2. MISCELLANEOUS CUTTING AND PATCHING FOR ALL SECTIONS OF THESE SPECIFICATIONS INCLUDING MECHANICAL AND ELECTRICAL WORK: SEE SECTION 01045. 3. FIRESTOPPING AT ALL FLOOR AND WALL PENETRATIONS. PROVIDE UL DETAIL FOR EACH DIFFERENT INSTALLATION PROVIDED. 4. ALL TEMPORARY CONSTRUCTION REQUIREMENTS, INCLUDING BUT NOT LIMITED TO SCAFFOLDING, SCREENS, BARRIERS AND SUPPORTS FOR REMOVALS, RE -INSTALLATIONS AND NEW WORK, INCLUDING MECHANICAL AND ELECTRICAL WORK, IN COORDINATION WITH REQUIRED PHASING OF THE PROJECT. 5. ALL WOOD SHALL BE FIRE RETARDANT TREATED. 3. PROVIDE COORDINATED SHOP DRAWINGS AND SAMPLES OF ITEMS AS MAY BE REQUESTED BY THE ARCHITECT IN ACCORDANCE WITH SECTION 01300 OF THESE SPECIFICATIONS. 1. UPON COMPLETION OF THIS PORTION OF THE WORK, COMPLETE AND POST CERTIFICATES OF COMPLIANCE IN ACCORDANCE WITH PERTINENT REQUIREMENTS OF GOVERNMENTAL AGENCIES HAVING JURISDICTION. 4. ALL WORK SHALL BE HIGHEST IN QUALITY IN COMPLIANCE WITH ALSC, APA, AWPA, NHLA, PS 1, PS 20 AND APPLICABLE CODE REQUIREMENTS. TREAT ALL LUMBER AND WOOD WITH FIRE RETARDANT AS REQUIRED FOR TYPE, USE AND CODE. 1. IN ADDITION TO COMPLYING WITH PERTINENT CODES AND REGULATIONS OF GOVERNMENTAL AGENCIES HAVING JURISDICTION, UNLESS OTHERWISE SPECIFICALLY DIRECTED OR PERMITTED BY THE ARCHITECT COMPLY WITH: 1. "PRODUCT USE MANUAL" OF THE WESTERN WOOD PRODUCTS ASSOCIATION FOR SELECTION AND USE OF PRODUCTS INCLUDED IN THAT MANUAL; 2. "PLYWOOD SPECIFICATION AND GRADE GUIDE" OF THE AMERICAN PLYWOOD ASSOCIATION. 3. FLAMEPROOF LHC LUMBER FOR ALL BLOCKING AS PROVIDED BY OSMOSE WOOD PRESERVING, INC. 4. FLAMEPROOF LHC PLYWOOD FOR ALL SUBFLOORING AS PROVIDED BY OSMOSE WOOD PRESERVING, INC. II MATERIALS - 1 . ALL ROUGH CARPENTRY LUMBER SHALL BE CONSTRUCTION GRADE SEASONED, S4S DOUGLAS FIR OR WESTERN LARCH, SEASONED TO 10% OR LESS MOISTURE CONTENT. EACH PIECE SHALL BE GRADE STAMPED WITH OFFICIAL MARK OF RESPONSIBLE GRADING RULES ASSOCIATION. HIDDEN AND EXPOSED PLYWOOD, DFPA, INTERIOR AND EXTERIOR C -C GRADE MANUFACTURED IN ACCORDANCE WITH APA AND PS 1-66 STANDARDS. EACH PIECE SHALL BE GRADE STAMPED. 4 5 2. THREADED AND DRIVEN FASTENERS SHALL BE HOT -DIPPED GALVANIZED AFTER FABRICATION AND THE BEST OF THEIR RESPECTIVE TYPE, GRADE AND CLASS, AND SHALL BE USED IN SUFFICIENT NUMBER AND CORRECT SIZES FOR THE PARTICULAR APPLICATION. 3. ALL WOOD AND WOOD PRODUCTS SHALL BE FIRE RETARDANT TREATED IN COMPLIANCE WITH THE STATE OF TENNESSEE BUILDING CODE SECTION: PRESSURE TREATED WITH FIRE RETARDANT CHEMICALS, AND GRADE STAMPED, IN ACCORDANCE WITH REFERENCE STANDARDS CITED. 1. RS -3, LUMBER AWPA C20-1988 2. RS -4, PLYWOOD AWPA C27-1988 4. FIRESTOPPING: 1. 3M FIRE PROTECTION PRODUCTS, OR ARCHITECT ACCEPTED EQUIVALENT, FIRESTOPPING AND SMOKE -STOPPING SYSTEMS AND DEVICES AS LISTED IN THE UL FIRE RESISTANCE DIRECTORY FOR EACH RATED WALL AND FLOOR PENETRATION CONDITION. 5. ALL TEMPORARY SCAFFOLDING, SCREEN, BARRIER AND SUPPORT TYPES, MATERIALS, FINISHES AND THEIR LOCATIONS SHALL BE IN ACCORDANCE WITH THE METROPOLITAN NASHVILLE AIRORT AUTHORITY (MNAA) AND THE HUDSON GROUP (HG) CONSTRUCTION REQUIREMENTS AND ARE TO BE REVIEWED AND COORDINATED WITH THE MNAA AND/OR THE HG FOR ACCEPTANCE PRIOR TO COMMENCEMENT OF THE WORK. III EXECUTION - 1 . SET ALL ROUGH CARPENTRY WORK AND TEMPORARY CONSTRUCTION ACCURATELY TO REQUIRED LEVELS AND LINES WITH MEMBERS PLUMB AND TRUE AND ACCURATELY CUT AND FITTED. SECURELY ATTACH THE WORK TO SUBSTRATE BY ANCHORING AND FASTENING AS REQUIRED BY RECOGNIZED STANDARDS. TEMPORARY CONSTRUCTION ITEMS SHALL BE INSTALLED IN A WAY TO MINIMIZE MARRING AND DAMAGING EXISTING FINISHES. ALL SUCH MARRING AND DAMAGE SHALL BE CORRECTED, PATCH TO MATCH, TO NO NOTICEABLE DIFFERENCE PER SECTION 01400 OF THESE SPECIFICATIONS. 2. HANDLE, STORE AND INSTALL FIRE RETARDANT (FR -S) MATERIALS IN ACCORDANCE WITH MANUFACTURER'S DIRECTIONS AND AS REQUIRED TO MEET REQUIRED CLASSIFICATION OR RATING. 3. TEMPORARY SCAFFOLDING, SCREENS, BARRIERS AND SUPPORTS SHALL REMAIN IN PLACE UNTIL WORK IS COMPLETED. UPON COMPLETION OF THE WORK, OR PORTION THEREOF PER REQUIRED PHASING, REMOVE ITEMS IN THEIR ENTIRETY INCLUDING ALL FASTENINGS. PATCH TO MATCH AND CLEAN AND REPAIR ALL EXISTING SURFACES AFFECTED BY ITEM PLACEMENT AND SUPPORT INSTALLATION AND REMOVAL. RE -INSTALL APPLICABLE UNDAMAGED RE -USED ITEMS FOR SUCCEEDING PHASES. 4. APPLY FIRESTOPPING TO PROPERLY PREPARED CLEAN SUBSTRATE SURFACES FREE OF DIRT, DUST, GREASE, OIL, LOOSE MATERIAL, OR OTHER MATTER WHICH MAY AFFECT BOND OF FIRESTOPPING MATERIAL. APPLY PRIMER AND MATERIALS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND APPLY FIRESTOPPING MATERIAL IN SUFFICIENT THICKNESS TO ACHIEVE RATING OF SURFACE PENETRATED AND TO UNIFORM DENSITY AND TEXTURE. INSTALL MATERIAL AT FLOORS, WALLS OR PARTITION OPENINGS WHICH CONTAIN PENETRATING SLEEVES, PIPING, DUCTWORK, CONDUIT AND OTHER ITEMS REQUIRING FIRESTOPPING. 5. PERFORM ALL WORK IN ACCORDANCE WITH SECTIONS 01045, 01400, 01600 AND 01710 OF THESE SPECIFICATIONS. END OF SECTION 06100 5 a CI AI :4 U a 0 w i w0 w r Y Z z Q rn o atS caco O af co 0 �OOc")01 U Z Z N Ow Fw- 2 U H W cyi 0 Q W Z N W 0 0 = Q ® Q U-) (1) OV a p C) Ow W, (0 z p N_ 4)z wOp Lu p N LL Oz0 c Z M < 'o d U) O C° J vu w % N N N Zv 0 •;�,• • N Z d U QLu I4 0 0_ 0- Q O J 0_ Lu Z U1 p 0 Q O0 Q Q Q � ZOO 0 J y a.o F- IW- LL C)::) ZZW App O W W 0 NN w H Z < z J w O z0 U �z Q w � 0 z O F- a z O W U) m W o m 0 0 0 0 N ~ �n Q N Q Z O W Y w Q PROJ NO: P703080244 SCALE: AS NOTED DATE: DESIGNED BY: DRAWN BY: E. OUTHAVONG CHECKED BY: SHEET TITLE: ARCHITECTURAL SPECIFICATIONS 02060 - 06100 SHEET NO. A-001 SHEET OF :4 c a La U a� L a N 0 m 0 Z 0 06400 ARCHITECTURAL WOODWORK: I WORK INCLUDED - 1. RELATED DOCUMENTS: 1. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND DIVISION 1 GENERAL REQUIREMENTS, APPLY TO THIS SECTION. 2. EXAMINE ALL OTHER SECTIONS OF THE SPECIFICATIONS FOR REQUIREMENTS WHICH AFFECT WORK OF THIS SECTION WHETHER OR NOT SUCH WORK IS SPECIFICALLY MENTIONED IN THIS SECTION. D 3. COORDINATE WORK WITH THAT OF ALL OTHER TRADES AFFECTING, OR AFFECTED BY WORK OF THIS SECTION. COOPERATE WITH SUCH TRADES TO ASSURE THE STEADY PROGRESS OF ALL PROJECT WORK. 2. PROVIDE AND INSTALL: 1. ARCHITECTURAL WOODWORK ITEMS (AW) AND STORE FIXTURES (F) AS SCHEDULED AND SHOWN ON THE DRAWINGS: ITEMS 1. AW1 POCKET ENCLOSURES FOR SIDE FOLDING CLOSURE ASSEMBLIES 2. AW2 POCKET ENCLOSURES FOR SIDE FOLDING CLOSURE ASSEMBLIES 2. FIXTURES (NIC) 2. 3/4" THICK TEMPLATES FOR ALL PERIMETER WALL DISPLAYS, CASHWRAP AND OTHER AW UNITS, AS SHOWN ON THE PLANS. WOODWORK CONTRACTOR SHALL INSPECT THE SITE AND VERIFY EXISTING CONDITIONS AT THE TIME OF TEMPLATE INSTALLATION. 3. ALL MISCELLANEOUS INCIDENTAL ITEMS, INCLUDING BUT NOT LIMITED TO PLASTIC LAMINATE AND MELAMINE; WOOD VENEER AND HARDWOOD; METAL LAMINATE; CABINET AND DISPLAY CASE HARDWARE; METAL TRIM, CLADDING AND FRAMES; SLATWALL, SHEET PLASTIC, SOLID SURFACING, VINYL COVERED UPHPLSTERY, FABRIC COVERED PANEL, GLASS TILE, PAINT, FASTENERS, METAL STUD AND WOOD FRAMING, ANCHORAGE DEVICES, SEALANTS, FILLERS AND ADHESIVES AS REQUIRED FOR THE INSTALLATION OF THE SCHEDULED ITEMS AND AS C SHOWN ON THE DRAWINGS AND AS REQUIRED FOR FULL COMPLETION OF THE WORK 4. ACCEPTABLE ARCHITECTURAL WOODWORK CONTRACTORS: BUCKEYE FIXTURES 9467 ROYSTON HIGHWAY ROYSTON GA, 30662 ATTN: RICHARD SPEARMAN TEL: (706) 245-9794 FAX: (706) 246-9705 CONTINENTAL CONSOLIDATED INDUSTRIES 181 GREENWOOD STREET WORCESTER, MA 01607 ATT: JIM POWERS TEL: (508) 756-4372 FAX: (508) 753-1433 CREATIONS OF DALLAS 12750 PERIMETER DRIVE, SUITE #120 DALLAS, TX 7528 ATTN: ED SWIERCZEK TEL: (972) 686-7836 FAX: (972) 686-7589 MILL CREEK MANUFACTURING, INC. 7380 ROUTE 98 NORTH ARCADIA, NY 14007 ATTN: KEVIN WALTERS TEL: (585) 492- 3335 FAX: (585) 492-3349 SILVER STAR CABINETS 409 EVERGREEN DRIVE NORTH BONNEVILLE, WA 98639 ATT: MATT CALIFF OR BEN CALIFF TEL: (509) 427-8800 FAX: (509) 427-5068 B SOLID DETAILS 3101 SUMMIT AVE SUITE 300 PLANO, TX. 75074 ATT: MARK PRINCE TEL: (214) 437-6598 FAX: (972) 422-6387 SPARKS CUSTOM RETAIL 2828 CHARTER ROAD PHILADELPHIA, PA 19154 ATTN: MATT WOOD T: (215) 602-8056 FAX: (215) 676-8020 WOODWORKS RETAIL AND ARCHITECTURAL 64 EAST DUDLEY TOWN ROAD BLOOMFIELD, CT 06002 ATT: JACK GAJEWSKI OR RICK IRISH TEL: (860) 242-8223 FAX: (860) 242-6418 5. ACCEPTABLE ARCHITECTURAL WOODWORK INSTALLERS: ATLANTIC INSTALLATIONS 2258 HOLLY SPRINGS PARKWAY CANTON, GA 30115 ATT: RAIF LEWIS TEL: (770) 597-6101 E-MAIL atlanticinstallations@alltel.net GREENWOOD INSTALLERS, INC. P.O. BOX 70706 QUINSIG VILLAGE STATION WORCESTER, MA 01607 ATT: BILL TYNDALL, JR. TEL: (508) 831-7190 E-MAIL greenwoodinstall@charter.net A OR C/O CONTINENTAL CONSOLIDATED INDUSTRIES 181 GREENWOOD STREET WORCESTER, MA 01607 ATT: JIM POWERS TEL: (508) 756-4372 FAX: (508) 753-1433 jpowers@continentalconsolidated.com JDL CONTRACTING SERVICES 1176 PINEHURST DRIVE SMYRNA, GA 30080 ATT: WAYMON SNYDER CELL: (404) 421-3779 E-MAIL waymonsnyder@nsn.com �I RETAIL BUILDERS & INSTALLERS 3903 OLD VINEYARD ROAD WINSTON-SALEM, NC 27704 ATT: GERALD RYAN TEL: (336) 765-9559 CELL: (336) 345-5080 E-MAIL gryan04rbi@aol.com SOUTH GROUP 3216 CAPITAL CIRCLE NW TALLAHASSEE, FL 32303 ATT: PHILLIP MARQUIS TEL: (850) 514-3200 FAX: (850) 562-1861 E-MAIL phillip@southgroupinstallation.com 6. PROVIDE COORDINATED SHOP DRAWINGS OF ALL ITEMS, SAMPLES OF SLATWALL AND ALL FINISHES, INCLUDING WOOD VENEER FLITCHES, AND ON-SITE MOCK-UPS OF ALL ITEMS, WHERE REQUESTED, IN ACCORDANCE WITH SECTION 01300 OF THESE SPECIFICATIONS. 1. (3) 12 X 12 OR (3) 8X 10 FINISH SAMPLES. 7. PROVIDE CLEANING DATA IN ACCORDANCE WITH SECTION 01710 OF THESE SPECIFICATIONS. INCLUDE RECOMMENDED CLEANING METHODS, CLEANING MATERIALS AND STAIN REMOVAL METHODS. 8. ALL WORK SHALL BE HIGHEST IN QUALITY IN COMPLIANCE WITH AWI GRADES SPECIFIED AND APPLICABLE CODES. TREAT ALL LUMBER AND WOOD WITH FIRE RETARDANT AS REQUIRED FOR TYPE, USE AND CODE II MATERIALS - 1. PLYWOOD OR MEDIUM DENSITY FIBERBOARD/PLASTIC LAMINATE FACED CABINET WORK AND PANELS SHALL BE AWI PREMIUM GRADE QUALITY. USE FIRE RATED CORE MATERIAL AND FIRE RATED HORIZONTAL GRADE PLASTIC LAMINATES FOR ALL PLASTIC LAMINATE TYPES: (THE USE OF PVC IS NOT ALLOWED.) 1. PLASTIC LAMINATES: (ADHESIVES, BACKER SHEETS AND SUBSTRATES PER MANUFACTURER'S SPECIFICATIONS TO MAINTAIN MEA RATINGS) 1. PL1 FORMICA CLASS A #909-58 BLACK ASTM E-84 MATTE FINISH FLAME SPREAD 15 SMOKE DEVELOPED 20 2. DRAWER AND CABINET INTERIORS: 1. WHITE MELAMINE CABINET INTERIORS AND BALTIC BIRCH VENEER WITH CLEAR LACQUER FINISH DRAWERS 2. CABINETWORK AND PANELS TO BE VENEER FACED %" F.R. MDF WITH HARDWOOD EDGING AND SHALL BE AWI PREMIUM GRADE QUALITY FOR ALL WOOD VENEER TYPES. USE FIRE RATED CORE MATERIAL IN ALL CASES: 1. WD1 BROOKSIDE VENEERS (REP.:PAUL SPERA, 914-592-7636), QUARTERED WALNUT OR ACCEPTED EQUAL, WITH A CLOSED PORE LIGHTLY CLEAR SATIN LACQUER CATALYTIC FINISH TO MATCH TRANSYSTEMS' MEDIUM SAMPLE. ALL WOOD PANELED SURFACES ADJOINED OR BUTTING REVEALS ARE TO BE BOOK MATCHED WITH ALL GRAIN TO BE VERTICAL. 2. WD3 BROOKSIDE VENEERS (REP: PAUL SPERA, 914-592-7636), WHITE WASHED OAK WITH A CLOSED PORE LIGHTLY STAINED SATIN LACQUER CATALYTIC FINISH, TO MATCH TRANSYSTEMS' MEDIUM SAMPLE. ALL WOOD PANELED SURFACES ADJOINED OR BUTTING REVEALS ARE TO BE BOOK MATCHED WITH ALL GRAIN TO BE VERTICAL. 3. HARDWOOD: 1. WD2 SOLID QUARTERED WALNUT, STAINED AND FINISHED TO MATCH WD1. 2. WD4 SOLID QUARTERED WHITE OAK, STAINED AND FINISHED TO MATCH WD2. 3. WD5 SOLID QUARTERED WOOD, STAINED AND FINISHED TO MATCHE PAINT (TBD) 4. METAL: 1. MT2 20 GA STAINLESS STEEL, SATIN FINISH (INTERIOR FINISHES) 2. MT3 STYLMARK TRIM, ANONDIZED ALUMINUM, U CHANNEL 3. MT4 MOZ TEXTURED METAL PANEL 5. PAINT FINISH: 1. SHOP APPLIED AWI PREMIUM GRADE PAINT SYSTEM OP -4. (ROLLER OR BRUSH APPLICATION IS NOT ACCEPTABLE) 1. P2 BENJAMIN MOORE WHITE FLAT ALKYD PAINT FINISH AS NOTED AND DETAILED ON THE DRAWINGS. 2. P3 TIGER DRYLAC HAMMERTONE, #09/60660 POWDER COAT; COLOR: SEPIA 6. CASEWORK, CABINET, DISPLAY CASE, CLOSET, SHELVING, AND/OR DOOR HARDWARE AS NOTED ON THE DRAWINGS 7. GLASS: 1. GL1 3/8" THICK TEMPERED CLEAR GLASS, LOF, GLOBE AMERADA, PPG OR ARCHITECT ACCEPTED EQUAL, WITH ALL EDGES FLAT POLISHED, AS NOTED AND DETAILED ON THE DRAWINGS. 8. MISCELLANEOUS INCIDENTAL SUPPORT ITEMS IN TYPES, SHAPES AND SIZES AS SHOWN AND/OR REQUIRED WITH SHOP PRIME FINISH FOR CONCEALED ITEMS AND SCHEDULED FINISH FOR EXPOSED TO VIEW ITEMS. 9. ALL FASTENERS, THREADED AND DRIVEN, SHALL BE THE BEST OF THEIR RESPECTIVE TYPE, GRADE AND CLASS AND SHALL BE USED INSUFFICIENT NUMBERS AND CORRECT SIZES FOR THEIR PARTICULAR APPLICATIONS. ALL FASTENERS ARE TO BE CONCEALED IN THE FINISHED WORK. 10. SEALANT FOR INSTALLATION CAULKING OF ALL ARCHITECTURAL WOODWORK ITEMS SHALL BE TREMCO, OR ARCHITECT ACCEPTED EQUAL, HIGH PERFORMANCE SEALANT, BLACK, AND IN TYPE AND DETAIL PER MANUFACTURER'S WRITTEN RECOMMENDATIONS AND STANDARDS. COMPLY WITH SEALANT MANUFACTURER'S RECOMMENDATIONS FOR SELECTION OF CAULKING MATERIALS WHICH SUIT APPLICATIONS FOR INSTALLATION CONDITIONS. 11. ALL MISCELLANEOUS INCIDENTAL ITEMS IN TYPES SHOWN OR NOTED ON THE DRAWINGS AND AS REQUIRED FOR FULL COMPLETION OF THE WORK. 2 3 III EXECUTION - 1 . ALL FABRICATION, FINISHING, INSTALLATION, CLEANING AND PROTECTION OF ARCHITECTURAL WOODWORK SHALL BE GOVERNED BY APPLICABLE AWI STANDARDS. TO THE MAXIMUM EXTENT POSSIBLE, ASSEMBLE ALL ITEMS IN THE SHOP INCLUDING INSTALLATION OF THE NON -WOODWORK COMPONENTS. NO HORIZONTAL SEAMS OR JOINTS ARE ALLOWED IN ANY PANELS. 1. WOODWORK CONTRACTOR SHALL HAVE A QUALIFIED REPRESENTATIVE ON SITE THROUGHOUT THE INSTALLATION OF THE WORK OF THIS SECTION. 2. COORDINATE EXACT LOCATIONS AND SIZES OF ALL REQUIRED CUTOUTS AND SPACE REQUIREMENT DIMENSIONS. RELOCATE ALL EXISTING WALL MOUNTED ITEMS AND DEVICES TO REMAIN TO FACE OF NEW PANELING. 3. CONDITION WOODWORK TO AVERAGE PREVAILING HUMIDITY CONDITIONS IN INSTALLATION AREAS PRIOR TO INSTALLING. 4. DELIVERY OF WOODWORK ITEMS IS TO BE COORDINATED WITH THE GC. A MINIMUM OF TWO DELIVERIES ARE REQUIRED - FIRST DELIVERY SHALL INCLUDE PERIMETER ITEMS; SECOND DELIVERY SHALL INCLUDE CASHWRAP, FLOOR FIXTURING AND STOREFRONT COMPONENTS. COORDINATE DELIVERY ROUTES WITHIN THE FACILITY WITH BOTH THE GC AND THE FACILITY AUTHORITY. 5. INSTALL THE WORK PLUMB, LEVEL, TRUE AND STRAIGHT WITH NO DISTORTIONS. SHIM AS REQUIRED USING CONCEALED SHIMS AND/OR LEVELERS. INSTALL TO A TOLERANCE OF 1/8" IN 8'-0" FOR PLUMB AND LEVEL (INCLUDING COUNTERTOPS); AND WITH 1/16" MAXIMUM OFFSET IN FLUSH ADJOINING SURFACE, 1/8" MAXIMUM OFFSET IN REVEALED ADJOINING SURFACES. 6. SCRIBE AND CUT WORK TO FIT ADJOINING WORK, AND REFINISH CUT SURFACES OR REPAIR DAMAGED SURFACES AT CUTS. 7. ANCHOR TO BLOCKING BUILT-IN OR DIRECTLY ATTACHED TO SUBSTRATES. SECURE TO GROUNDS, STRIPPING AND BLOCKING WITH COUNTERSUNK, CONCEALED FASTENERS AND BLIND NAILING AS REQUIRED FOR COMPLETE INSTALLATION. EXCEPT WHERE PRE - FINISHED MATCHING FASTENER HEADS ARE REQUIRED, USE FINE FINISHING NAILS FOR EXPOSED NAILING, COUNTERSUNK AND FILLED FLUSH WITH WOODWORK, AND MATCHING FINAL FINISH WHERE TRANSPARENT FINISH IS INDICATED 8. PROPERLY APPLY SEALANT IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDED INSTALLATION PROCEDURES, MATERIALS AND DETAILS FULLY, NEATLY AND CAREFULLY, WITHIN CONFINES OF JOINT BETWEEN ARCHITECTURAL WOODWORK AND ABUTTING SURFACES. 9. SET ALL DOORS SQUARE, PLUMB, LEVEL AND TRUE, ALL IN ACCORDANCE WITH THE MANUFACTURER'S WRITTEN INSTRUCTIONS. DOORS SHALL OPERATE FREELY THROUGHOUT THEIR INTENDED PATH OF TRAVEL AND LOCK WITH ABSOLUTE MINIMUM FREE PLAY. ENSURE PROPER MINIMUM JOINT AND ALIGNMENT BETWEEN DOOR AND FRAME. 10. ADJUST AND CHECK EACH OPERATING ITEM OF HARDWARE AND EACH DOOR, EXISTING TO REMAIN AND NEW TO ENSURE PROPER OPERATION OF FUNCTION OF EVERY UNIT. REPLACE ANY UNIT WHICH CANNOT BE ADJUSTED TO OPERATE FREELY AND SMOOTHLY AS INTENDED FOR THE APPLICATION 11. MAKE FINAL CHECK AND ADJUSTMENT OF ALL HARDWARE ITEMS. CLEAN OPERATING ITEMS AS NECESSARY TO RESTORE PROPER FUNCTION AND FINISH OF HARDWARE AND DOORS. ADJUST DOOR CONTROL DEVICES TO COMPENSATE FOR FINAL OPERATION OF HEATING AND VENTILATING EQUIPMENT. 12. INSTRUCT OWNER'S PERSONNEL IN PROPER ADJUSTMENT AND MAINTENANCE OF HARDWARE FINISHES, DURING THE FINAL ADJUSTMENT OF HARDWARE. 13. APPLY FABRIC PANEL COVERING (FCP1) TO SOUND, SMOOTH, DRY AND PROPERLY PREPARED PANEL SURFACES BY DIRECT GLUE - DOWN METHOD USING MANUFACTURER'S RECOMMENDED ADHESIVE. ALL MATERIALS SHALL BE INSTALLED WITH TIGHT NEAT CORNERS SECURE, SMOOTH, WITHOUT WRINKLES, GAPS OR OVERLAPS. JOINTS ARE TO BE UN -NOTICEABLE. 1. VERIFY SUB -SURFACE COMPATIBILITY AND PREPARATION WITH MANUFACTURER'S RECOMMENDED ADHESIVE AND INSTALLATION PROCEDURES. 14. INSTALL GLASS TILE WORK TO PROPERLY PREPARED SUBSURFACE IN ACCORDANCE WITH THE TILE MANUFACTURER'S WRITTEN TECHNICAL INFORMATION, TILE COUNCIL OF AMERICA CONSTRUCTION HANDBOOK LATEST EDITION AND APPLICABLE ANSI STANDARDS FOR RECOMMENDED THINSET METHOD. 1. TILE SHALL BE ACCURATELY CUT TO PERIMETER CONDITIONS. 2. PREPARE AND LEVEL SUB -SURFACE AS REQUIRED FOR SMOOTH SOUND, LEVEL, PLUMB, FLUSH INSTALLATION. POLISH ALL CUT EXPOSED TO VIEW EDGES TO MATCH TILE FACE. 3. INSTALL PERIMETER TRIM AS REQUIRED FOR A CONTINUOUS SMOOTH SOUND, LEVEL, AND FLUSH INSTALLATION WITH A MINIMUM NUMBER OF TIGHT HAIRLINE BUTT JOINTS AS SHOWN AND DETAILED. 4. INSTALL TILE IN PATTERN INDICATED TO PROPERLY PREPARED SUBSURFACES WITH ALL JOINTS ALIKE AND IN ALIGNMENT, UNIFORM IN WIDTH NOTED, WATERTIGHT, WITHOUT VOIDS, CRACKS, EXCESS MORTAR, ADHESIVE OR GROUT. CUT TILE AS REQUIRED TO MAINTAIN PATTERN. 1. COORDINATE EXACT LOCATIONS AND SIZES OF ALL REQUIRED CUTOUT WITH OTHER SECTIONS OF THESE SPECIFICATIONS AND AS SHOWN AND NOTED ON THE DRAWINGS. 15. PERFORM ALL WORK IN ACCORDANCE WITH SECTIONS 01045, 01400, 01600 AND 01710 OF THESE SPECIFICATIONS. END OF SECTION 06400 3 IF THIS nRAWINr, IS I FSS THAN 92" X34" IT IS A REDUCED SIZE DRAWING 07250 FIREPROOFING: I WORK INCLUDED - 1. RELATED DOCUMENTS: 1. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND DIVISION 1 GENERAL REQUIREMENTS, APPLY TO THIS SECTION. 2. EXAMINE ALL OTHER SECTIONS OF THE SPECIFICATIONS FOR REQUIREMENTS WHICH AFFECT WORK OF THIS SECTION WHETHER OR NOT SUCH WORK IS SPECIFICALLY MENTIONED IN THIS SECTION. 3. COORDINATE WORK WITH THAT OF ALL OTHER TRADES AFFECTING, OR AFFECTED BY WORK OF THIS SECTION. COOPERATE WITH SUCH TRADES TO ASSURE THE STEADY PROGRESS OF ALL PROJECT WORK. 2. PROVIDE AND INSTALL: 1. FIREPROOFING TO REPLACE ALL DAMAGED, MISSING AND REMOVED FIREPROOFING FOR FULL COVERAGE OF STRUCTURAL ELEMENTS AS REQUIRED BY THE CURRENT APPLICABLE BUILDING CODE. 3. PROVIDE MANUFACTURER'S LITERATURE IN ACCORDANCE WITH SECTION 01300 OF THESE SPECIFICATIONS. 4. ALL WORK SHALL BE HIGHEST IN QUALITY IN COMPLIANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS AND APPLICABLE CODE REQUIREMENTS. II MATERIALS - 1. PRODUCTS SHALL MATCH EXISTING FIREPROOFING IN TYPE, QUALITY, COVERAGE, RATING AND APPLICATION PROCEDURE. III EXECUTION - 1 . ALL SURFACES SHALL BE PROPERLY PREPARED, CLEANED AND INSPECTED WITH ALL SUPPORT HANGERS AND ATTACHMENTS REQUIRED TO PENETRATE THE FIREPROOFING IN PLACE. 2. EQUIPMENT AND APPLICATION PROCEDURE SHALL CONFORM TO THE MATERIAL MANUFACTURER'S WRITTEN INSTRUCTIONS TO MATCH EXISTING. 3. INSTALLATION OF ALL SPRAYED -ON FIREPROOFING IS SUBJECT TO THE APPLICABLE BUILDING CODE REQUIREMENTS. 4. PERFORM ALL WORK IN ACCORDANCE WITH SECTIONS 01045, 01400, 01600 AND 01710 OF THESE SPECIFICATIONS. END OF SECTION 07250 07900 JOINT SEALERS: I WORK INCLUDED - 1. RELATED DOCUMENTS: 1. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND DIVISION 1 GENERAL REQUIREMENTS, APPLY TO THIS SECTION. 2. EXAMINE ALL OTHER SECTIONS OF THE SPECIFICATIONS FOR REQUIREMENTS WHICH AFFECT WORK OF THIS SECTION WHETHER OR NOT SUCH WORK IS SPECIFICALLY MENTIONED IN THIS SECTION. 3. COORDINATE WORK WITH THAT OF ALL OTHER TRADES AFFECTING, OR AFFECTED BY WORK OF THIS SECTION. COOPERATE WITH SUCH TRADES TO ASSURE THE STEADY PROGRESS OF ALL PROJECT WORK. 2. PROVIDE AND INSTALL: 1. ALL SEALANTS FOR THE INSTALLATION OF NEW WORK WHERE NOTED AND/OR REQUIRED INCLUDING ALL MECHANICAL AND ELECTRICAL WORK. 2. ALL ADHESIVES, BACK-UP MATERIALS AND INCIDENTAL MATERIALS REQUIRED FOR PROPER INSTALLATION OF THE ABOVE. 3. PROVIDE MANUFACTURER'S PRODUCT DATA LITERATURE ON ALL ITEMS, SAMPLES OF SEALANTS AND SAMPLES OF OTHER ITEMS AS MAY BE REQUESTED BY THE ARCHITECT IN ACCORDANCE WITH SECTION 01300 OF THESE SPECIFICATIONS. 4. PROVIDE CLEANING DATA IN ACCORDANCE WITH SECTION 01710 OF THESE SPECIFICATIONS. INCLUDE RECOMMENDED CLEANING METHODS, CLEANING MATERIALS AND STAIN REMOVAL METHODS. 5. ALL WORK SHALL BE HIGHEST IN QUALITY IN COMPLIANCE WITH SWRI, SEALANT GUIDE SPECIFICATION, IMIAC AND APPLICABLE CODE REQUIREMENTS AND SHALL BE OF THE HIGHEST QUALITY IN MATERIAL AND INSTALLATION STANDARDS FOR THE TYPE APPLICATION AND METHOD OF CONSTRUCTION IN ACCORDANCE WITH THE MANUFACTURER'S WRITTEN RECOMMENDATIONS TO ACHIEVE A WATERTIGHT INSTALLATION GUARANTEE AGAINST ALL DEFECTS IN MATERIAL AND WORKMANSHIP FOR A PERIOD OF TWO (2) YEARS. 11 MATERIALS - 1 . TREMCO, OR ARCHITECT ACCEPTED EQUAL, HIGH PERFORMANCE SEALANTS, IN, STANDARD COLORS SELECTED BY ARCHITECT AND IN TYPE AND DETAIL PER MANUFACTURER'S WRITTEN RECOMMENDATIONS AND STANDARDS. COMPLY WITH SEALANT MANUFACTURER'S RECOMMENDATIONS FOR SELECTION OF CAULKING MATERIALS WHICH SUIT APPLICATIONS FOR INSTALLATION CONDITIONS. 2. INCIDENTAL MATERIALS INCLUDING BUT NOT LIMITED TO BACK-UP MATERIALS, ADHESIVES, BOND BREAKERS, TAPE, PRIMERS AND FASTENERS REQUIRED AND COMPATIBLE AND IN ACCORDANCE WITH MATERIAL MANUFACTURER'S RECOMMENDATIONS. 4 5 III EXECUTION - 1 . PROPERLY PREPARE AND CLEAN ALL EXISTING AND NEW SURFACES TO RECEIVE APPLIED MATERIALS AND VERIFY THAT ALL SURFACES TO RECEIVE MATERIALS ARE PROPERLY PREPARED AND READY IN ACCORDANCE WITH MATERIAL MANUFACTURER'S WRITTEN INSTRUCTIONS. 2. PROPERLY APPLY ALL MATERIALS TO ALL SURFACES IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDED INSTALLATION PROCEDURES, MATERIALS AND DETAILS. 3. APPLY SEALANTS FULL AND CONTINUOUS NEATLY AND CAREFULLY, WITHIN CONFINES OF JOINT, WITH CONCAVE PROFILES, AT ALL JOINTS INDICATED AND/OR REQUIRED. END OF SECTION 07900 08300 SPECIAL DOORS: I WORK INCLUDED - 1. RELATED DOCUMENTS: 1. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND DIVISION 1, GENERAL REQUIREMENTS OF THESE SPECIFICATIONS, APPLY TO THIS SECTION. 2. EXAMINE ALL OTHER SECTIONS OF THE SPECIFICATIONS FOR REQUIREMENTS WHICH AFFECT WORK OF THIS SECTION WHETHER OR NOT SUCH WORK IS SPECIFICALLY MENTIONED IN THIS SECTION. 3. COORDINATE WORK WITH THAT OF ALL OTHER TRADES AFFECTING, OR AFFECTED BY WORK OF THIS SECTION. COOPERATE WITH SUCH TRADES TO ASSURE THE STEADY PROGRESS OF ALL PROJECT WORK. 2. PROVIDE AND INSTALL: 1. MANUALLY OPERATED SIDE FOLDING CLOSURE ASSEMBLY AS SHOWN AND SCHEDULED ON THE DRAWINGS: 1. 01 STOREFRONT ENTRANCE FOLDING CLOSURE W/Bl- PART LOCKING ASSEMBLY. SEE DRAWINGS FOR SIZE. 3. COORDINATE ALL WORK OF OTHER SECTIONS FOR THE ABOVE WORK. 4. PROVIDE COORDINATED SHOP DRAWINGS AND PRODUCT LITERATURE ON ALL ITEMS AND SAMPLES OF ALL FINISHES IN ACCORDANCE WITH SECTION 01300 OF THESE SPECIFICATIONS. 1. PROVIDE COORDINATED SHOP DRAWING FOR CLOSURE REQUIREMENTS, INCLUDING BUT NOT NECESSARILY LIMITED TO; SUPPORT FRAMING AND ENCLOSURE, PER CLOSURE MANUFACTURER'S LITERATURE. 5. PROVIDE CLEANING AND MAINTENANCE DATA IN ACCORDANCE WITH SECTIONS 01710 AND 01730 OF THESE SPECIFICATIONS. INCLUDE RECOMMENDED CLEANING METHODS, CLEANING MATERIALS, AND STAIN REMOVAL METHODS. 6. ALL WORK SHALL BE HIGHEST IN QUALITY IN COMPLIANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS AND APPLICABLE CODE REQUIREMENTS. II MATERIALS - 1. SIDE FOLDING CLOSURE ASSEMBLY: 1. MANUALLY OPERATED (BI -PARTING) ASSEMBLY WITH CLEAR ANODIZED MILL ALUMINUM (MT10) FINISH / PERFORATED CLEAR ANODIZED ALUMINUM PANEL CURTAIN. PROVIDE INSIDE/OUTSIDE CYLINDER LOCK WITH DUSTPROOF FLOOR STRIKE AND EGRESS DOORS FOR EMERGENCY EXIT. 1. DYNAFLAIR, (813-248-8100), MODEL "ELEGANCE -PP" III EXECUTION - 1 . INSTALLATION SHALL BE BY CLOSURE MANUFACTURER'S AUTHORIZED DISTRIBUTOR OR REPRESENTATIVE. 2. COORDINATE EXACT LOCATIONS AND SIZES OF ALL REQUIRED CUTOUTS, AND SPACE REQUIREMENTS AND DIMENSIONS FOR SUPPORT AND FINISH REQUIREMENTS WITH OTHER SECTIONS OF THESE SPECIFICATIONS AND AS SHOWN AND NOTED ON THE DRAWINGS: 1. MISCELLANEOUS METALS SECTION 05500 2. CARPENTRY SECTION 06100 3. ARCHITECTURAL WOODWORK SECTION 06400 3. SET DOOR SUPPORT, ENCLOSURES AND ABUTTING ADJACENT WORK SQUARE, PLUMB, LEVEL AND TRUE, ALL IN ACCORDANCE WITH THE CLOSURE MANUFACTURER'S WRITTEN INSTRUCTIONS. CURTAINS SHALL OPERATE FREELY THROUGHOUT THEIR INTENDED PATHS OF TRAVEL WITH ABSOLUTE MINIMUM FREEPLAY. ENSURE PROPER MINIMUM JOINT AND ALIGNMENT BETWEEN CURTAIN GUIDES AND STOREFRONT ENCLOSURES. 4. INSTRUCT TENANT/OWNER'S PERSONNEL IN PROPER ADJUSTMENT, OPERATION, AND MAINTENANCE OF CLOSURES, DURING THE FINAL ADJUSTMENT OF THE INSTALLATION. 5. PERFORM ALL WORK IN ACCORDANCE WITH SECTIONS 01045, 01400, 01600 AND 01710 IN DIVISION 1 OF THESE SPECIFICATIONS. END OF SECTION 08300 J FBI C AI c ' a co o Lu WW0 w Y Z z Q 0 o . w0 its9 oco � tY coo U 0 m 00 Z Z 0 N U N 7) 0 ® Quncnau. 0 0 2 0° a cM r(n v ow. (p z 0) N_ oz W 0 N w 0z oo V_ (n F_ V_ £ Z Z o M v IQ-- c''o w 0 J �+ 3..>_ N U) • • • N 3 w N Ziii• O•�� N Z a U I• - Q w o O � QQ J W Z cl) ooa Q Q Q z ZZo ow -j Zal, � `l OWN ZZ� QO'd W O u- ZOQ W Q Z W to Q O ZD cr) Z w� ^ H �O Z 0 H a Z 0 � ai m w o 2 m U) a 0 0 0 C) N w Lo c Q z O � Y w Q � g PROJ NO: P703080244 SCALE: AS NOTED DATE: DESIGNED BY: DRAWN BY: E. OUTHAVONG CHECKED BY: SHEET TITLE: ARCHITECTURAL SPECIFICATIONS 06400 - 08150 SHEET NO. A-002 SHEET OF c 1 08800 GLASS AND GLAZING: I WORK INCLUDED - 1. RELATED DOCUMENTS: 1. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND DIVISION 1 GENERAL REQUIREMENTS, APPLY TO THIS SECTION. 2. EXAMINE ALL OTHER SECTIONS OF THE SPECIFICATIONS FOR REQUIREMENTS WHICH AFFECT WORK OF THIS SECTION WHETHER OR NOT SUCH WORK IS SPECIFICALLY MENTIONED IN THIS SECTION. D 3. COORDINATE WORK WITH THAT OF ALL OTHER TRADES AFFECTING, OR AFFECTED BY WORK OF THIS SECTION. COOPERATE WITH SUCH TRADES TO ASSURE THE STEADY PROGRESS OF ALL PROJECT WORK. 3. PROVIDE AND INSTALL: 1. GLASS SHELVES 2. (2) GLASS STOREFRONT WINDOWS. SEE DRAWINGS FOR SIZES. 3. ALL FITTINGS, GLAZING MATERIALS, ATTACHMENT COMPONENTS, ACCESSORIES AND MISCELLANEOUS INCIDENTAL MATERIALS REQUIRED FOR THE INSTALLATION FOR THE ABOVE SYSTEMS. 4. PROVIDE COORDINATED SHOP DRAWINGS, PRODUCT LITERATURE AND FINISH SAMPLES ON ALL ITEMS FOR THE ABOVE IN ACCORDANCE WITH SECTION 01300 OF THESE SPECIFICATIONS. 5. PROVIDE CLEANING DATA IN ACCORDANCE WITH SECTION 01710 AND OF THESE SPECIFICATIONS. INCLUDE RECOMMENDED CLEANING METHODS, CLEANING MATERIALS, AND STAIN REMOVAL METHODS. 6. ALL WORK SHALL BE HIGHEST IN QUALITY IN COMPLIANCE WITH FGMA AND NAAMM WRITTEN INSTRUCTIONS, MANUFACTURER'S WRITTEN INSTRUCTIONS, AND APPLICABLE CODE REQUIREMENTS. II MATERIALS - 1. SHELVING: 1. GL1 3/8" TEMPERED GLASS SHELVES WITH ALL EDGES POLISHED C 2. STOREFRONT WINDOWS: 1. GL2 1/2" CLEAR TEMPERED GLASS PANELS WITH ALL EXPOSED TO VIEW GLASS VERTICAL EDGES POLISHED WITH 1/4" OPEN GAP JOINT BETWEEN PANELS AND TO ABUTTING CONSTRUCTION JOINTS, WITH SILVER SATIN STAINLESS STEEL CLAD (MT5) CONTINUOUS BOTTOM ALUMINUM RAILS AS SHOWN AND SCHEDULED ON THE DRAWINGS. 3. ALL GLAZING AND MISCELLANEOUS INCIDENTAL MATERIALS REQUIRED FOR THE INSTALLATION OF THE ABOVE ITEMS, SHALL BE APPROPRIATE TYPE FOR CONDITIONS USED AND COMPATIBLE WITH THE ABUTTING MATERIALS AND ACCEPTED BY THE ARCHITECT. 4. ALL COMPONENTS, ACCESSORIES AND MISCELLANEOUS INCIDENTAL MATERIALS REQUIRED FOR THE INSTALLATION OF THE ABOVE SYSTEM, SHALL BE APPROPRIATE TYPE FOR CONDITIONS USED AND COMPATIBLE WITH THE ABUTTING MATERIALS AND ACCEPTED BY THE ARCHITECT. III EXECUTION - 1. STOREFRONT WINDOW: 1. COORDINATE EXACT LOCATIONS AND SIZES OF ALL REQUIRED CUTOUTS, SUPPORT AND SPACE REQUIREMENTS AND DIMENSIONS WITH OTHER SECTIONS OF THESE SPECIFICATIONS AND AS SHOWN AND NOTED ON THE DRAWINGS: 1. MISCELLANEOUS METALS SECTION 05500 2. ARCHITECTURAL WOODWORK SECTION 06400 3. GYPSUM WALLBOARD SECTION 09250 4. ELECTRICAL SEE 'E' DRAWINGS B 2. SET ALL WORK SQUARE, PLUMB, LEVEL AND TRUE, ALL IN ACCORDANCE WITH THE MANUFACTURER'S WRITTEN INSTRUCTIONS. ASSEMBLY SHALL BE ANCHORED SECURELY TO ABUTTING CONSTRUCTION AND SUPPORT STEEL. CAULK WINDOW PERIMETER MEMBERS TO ABUTTING CONSTRUCTION FULL AND CONTINUOUS. ALL CAULKING SHALL BE NEATLY APPLIED WITHIN JOINT CONFINES TAKING CARE NOT TO MAR OR STAIN ABUTTING FINISH SURFACES OUTSIDE THE JOINT CONFINES: SEE SECTION 07900. 3. SET AND SEAL ALL GLASS IN FRAMES SQUARE, PLUMB, LEVEL, TRUE AND NEAT IN ACCORDANCE WITH THE GLASS MANUFACTURER'S WRITTEN INSTRUCTIONS, FGMA GLAZING MANUAL AND GLAZING MANUFACTURER'S WRITTEN RECOMMENDATIONS. 2. CLEAN ALL GLASS, BOTH SIDES, NEW AND EXISTING, IN ACCORDANCE WITH GLASS AND GLAZING MANUFACTURER'S WRITTEN INSTRUCTIONS. 3. PERFORM ALL WORK IN ACCORDANCE WITH SECTIONS 01045, 01400, 01600 AND 01710 OF THESE SPECIFICATIONS. END OF SECTION 08800 E a 0 It M co 0 N Ld N 8 z 0 a m A 0 4 K 09250 GYPSUM WALLBOARD: I WORK INCLUDED - 1. RELATED DOCUMENTS: 1. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND DIVISION 1 GENERAL REQUIREMENTS, APPLY TO THIS SECTION. 2. EXAMINE ALL OTHER SECTIONS OF THE SPECIFICATIONS FOR REQUIREMENTS WHICH AFFECT WORK OF THIS SECTION WHETHER OR NOT SUCH WORK IS SPECIFICALLY MENTIONED IN THIS SECTION. 3. COORDINATE WORK WITH THAT OF ALL OTHER TRADES AFFECTING, OR AFFECTED BY WORK OF THIS SECTION. COOPERATE WITH SUCH TRADES TO ASSURE THE STEADY PROGRESS OF ALL PROJECT WORK. 2. PROVIDE AND INSTALL: 1. PARTITION TYPES, CEILING AND FASCIA/SOFFITS AS SCHEDULED AND SHOWN ON THE DRAWINGS: 1. GWB6 GYPSUM BOARD SOFFIT 2. ACCESS DOORS WHERE REQUIRED IN GYPSUM WALLBOARD SOFFIT TO ACCESS WORK OF OTHER SECTIONS OF THESE SPECIFICATIONS, INCLUDING MECHANICAL AND ELECTRICAL WORK: SEE MECHANICAL AND ELECTRICAL DRAWINGS. 3. PATCHING TO MATCH EXISTING THROUGHOUT AS REQUIRED BY THE REMOVAL OF EXISTING WORK AND THE INSTALLATION OF NEW WORK. 4. SEAL AROUND ALL STRUCTURAL SHAPES, DUCTS, PIPES, AND OTHER PENETRATIONS THROUGH DEMISING WALLS IN AN AIR- TIGHT MANNER, WHERE THE SPACE ABOVE THE CEILING IS USED AS AN AIR PLENUM. 3. PROVIDE MANUFACTURER'S LITERATURE IN ACCORDANCE WITH SECTION 01300 OF THESE SPECIFICATIONS. 4. PROVIDE CLEANING DATA IN ACCORDANCE WITH SECTION 01710 AND OF THESE SPECIFICATIONS. INCLUDE RECOMMENDED CLEANING METHODS, CLEANING MATERIALS, STAIN REMOVAL METHODS. 5. ALL WORK SHALL BE HIGHEST IN QUALITY IN COMPLIANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS AND APPLICABLE CODE REQUIREMENTS. II MATERIALS - 1 . ALL GYPSUM WALLBOARD MATERIALS INCLUDING BUT NOT LIMITED TO: STEEL FRAMING COMPONENTS, REGULAR BOARD, FIRE RETARDANT (TYPE III GRADE X) BOARD, ADHESIVES, METAL TRIM, METAL TRIM ACCESSORIES, AND SEALANT, TAPE, JOINTING COMPOUND, CONTROL JOINTS, SKIM COAT AND MISCELLANEOUS INCIDENTAL MATERIALS REQUIRED FOR THE NEW WORK AND PATCHING OF EXISTING SHALL BE U.S. GYPSUM QUALITY OR ARCHITECT ACCEPTED EQUAL: 1. PROVIDE STANDARD PUNCHED STEEL STUDS AND TRACK OF THE SIZES AND SHAPES SHOWN ON THE DRAWINGS, EITHER ELECTROLYTIC ZINC COATING (ASTM DESIGNATION A 591, CLASS B) OR PAINTED WITH 1.0 MIL DRY FILM THICKNESS) RUST - INHIBITIVE ZINC CHROMATE PRIMER PAINT, AT MANUFACTURERS OPTION. ALL INTERIOR METAL STUDS, AND THEIR ATTENDANT TRACK, OVER 12'-0" IN HEIGHT SHALL BE 20 GAUGE. 2. USE ONLY ONE TYPE THROUGHOUT THE WORK, UNLESS OTHERWISE SHOWN ON THE DRAWINGS OR SPECIFICALLY ACCEPTED IN ADVANCE BY THE ARCHITECT. 3. PROVIDE ALL ACCESSORIES INCLUDING, BUT NOT NECESSARILY LIMITED TO, TRACKS, SCREWS, CLIPS, ANCHORS, FASTENING DEVICES, SOUND ATTENUATION PENCIL RODS AND RESILIENT CLIPS, AND OTHER ACCESSORIES REQUIRED FOR A COMPLETE AND PROPER INSTALLATION, AND AS RECOMMENDED BY THE MANUFACTURER OF THE STEEL STUDS. 4. PROVIDE A GOOD GRADE OF COMMERCIAL GROUT FOR LEVELING THE FLOOR RUNNER MEMBER OF STEEL STUD PARTITIONS AS REQUIRED 5. FURRING MEMBERS: SCREW-TYPE HAT -SHAPED FURRING CHANNELS OF 25 GAGE ZINC -COATED STEEL; COMPLY WITH ASTM C645. 6. FURRING ANCHORAGE: MANUFACTURER'S STANDARD STRAPS, CLIPS, BOLTS, OR SCREWS AS RECOMMENDED BY FURRING MANUFACTURER. 2. SUSPENSION SYSTEM MATERIALS: 1. BOLT 3 X 3 X 1/4 X 2 LONG SUPPORT ANGLES TO EXISTING STRUCTURAL CONCRETE OR SUPPLEMENT EXISTING INTERMEDIATE FRAMING MEMBERS AS REQUIRED FOR NEW SUSPENSION SYSTEM WITH UNISTRUT CHANNELS SCREW FASTENED TO EXISTING STRUCTURAL STEEL MEMBERS SPACED 4 FOOT 0 INCHES ON CENTER BETWEEN EXISTING STRUCTURAL MEMBERS. 2. SECURE TO SUPPORT ANGLES OR INTERMEDIATE FRAMING MEMBERS BY TIEING GUY WIRES OR INSERTING BENT END OF HANGER RODS THROUGH PRE -PUNCHED HOLES (4'-0" ON CENTERS IN INTERMEDIATE FRAMING MEMBERS) SIZED FOR NOT LESS THAN 3 TIMES THE HANGER DESIGN LOAD FOR THE STRUCTURAL CLASSIFICATION INDICATED; ASTM DESIGNATION C 635, TABLE 1, INDIRECT HUNG. 3. CEILING ATTACHMENT TO BUILDING SYSTEM SHALL BE THROUGH HANGER RODS, GUY WIRES, UNISTRUT AND STEEL CHANNELS AS SHOWN ON THE DRAWINGS: 1. HANGERS SHALL BE 1/4 INCH DIAMETER STEEL RODS. HANGER RODS SHALL BE GALVANIZED CONFORMING TO APPLICABLE PROVISIONS OF ASTM DESIGNATION A 123. 2. GUY WIRES SHALL BE 12 GAUGE WIRE. 3. UNISTRUT SHALL BE P-1001 WITH BEAM CLAMPS AND ANGLE FITTINGS. 4. STEEL CHANNELS: EITHER COLD ROLLED AT 0.475 LB. PER FT. OR HOT -ROLLED FOR SUPPORT OF CEILING RUNNERS WITH DEFLECTIONS LESS THAN 1/360 X SPANS; BUT IN NO CASE LESS THAN 1-1/2 INCH SECTION WEIGHING 0.475 POUNDS PER LINEAR FOOT, AND IN NO CASE LESS THAN REQUIRED BY GOVERNING REGULATIONS OR FOR FIRE RESISTANCE. 5. WIRE CLIPS: #9 SPRING STEEL. 3 3. KARP ASSOCIATES, INC., 888-926-1365, TYPE RDW (24" X 24", UNLESS OTHERWISE NOTED), PRIME PAINTED 16 GA. STEEL ACCESS DOOR (RECESSED 1") / 14 GA. STEEL FRAME WITH CONCEALED PIVOTING ROD HINGE AND SCREWDRIVER OPERATED LOCK, OR ARCHITECT ACCEPTED EQUIVALENT, FOR SIZE AND LOCATION SHOWN. FOR PIERCING FIRE RATED SURFACES USE ACCESS DOORS HAVING SAME RATING AS SURFACE PIERCED. II EXECUTION - 1 . INSTALL GYPSUM WALLBOARD WORK PLUMB, LEVEL, SQUARE AND TRUE WITHOUT DISTORTION, ALIGNED AND FITTED PROPERLY, TAPED FLUSH AND SMOOTH, ACCEPTABLE FOR APPLIED FINISHES IN ACCORDANCE WITH THE GYPSUM WALLBOARD MANUFACTURER'S WRITTEN TECHNICAL INFORMATION AND GYPSUM CONSTRUCTION HANDBOOK, LATEST EDITION. SURFACES TO RECEIVE PHOTO IMAGE MURALS, SEE SECTION 10400 OF THESE SPECIFICATIONS, SHALL HAVE A FINISHING LEVEL OF NOT LESS THAN 5. ALL EXTERNAL CORNERS ARE TO RECEIVE METAL CORNER BEADS, ALL INTERNAL CORNERS ARE TO RECEIVE CORNER REINFORCING TAPE AND ALL EXPOSED TO VIEW EDGES ARE TO RECEIVE METAL TRIM. EACH IS TO BE TAPED FLUSH AND SMOOTH TO ABUTTING GYPSUM WALLBOARD SURFACES. 2. COORDINATE FIRESTOPPING IN CONCEALED SPACES WITHIN PARTITIONS, WALLS AND FURRING AS REQUIRED BY THE STATE OF TENNESSEE BUILDING CODE: SEE FIRESTOPPING IN SECTION 06100. 3. EXISTING DEMISING WALLS ARE TO BE RETROFITTED AS REQUIRED TO MAINTAIN REQUIRED FIRE RATING. NEW WORK SHALL ACCOMMODATE EXISTING RELOCATED AND NEW BUILT-IN ELECTRICAL DEVICES: COORDINATE WITH ELECTRICAL DRAWINGS. 1. SEAL AROUND ALL STRUCTURAL, MECHANICAL AND ELECTRICAL PENETRATIONS THROUGH DEMISING WALLS AIR -TIGHT: SPACE ABOVE THE CEILING IS USED AS AN AIR PLENUM. 4. COORDINATE EXACT LOCATIONS AND SIZES OF ALL REQUIRED CUTOUTS, AND SPACE REQUIREMENTS AND DIMENSIONS FOR SUPPORT AND ENCLOSED ABUTTING MATERIAL REQUIREMENTS WITH OTHER SECTIONS OF THESE SPECIFICATIONS AND AS SHOWN AND NOTED ON THE DRAWINGS: 1. CARPENTRY SECTION 06100 2. ARCHITECTURAL WOODWORK SECTION 06400 3. MECHANICAL SEE 'FP' & 'H' DRAWINGS 4. ELECTRICAL SEE 'E' DRAWINGS 5. PERFORM ALL WORK IN ACCORDANCE WITH SECTIONS 01045, 01400, 01600 AND 01710 OF THESE SPECIFICATIONS. END OF SECTION 09250 09300 TILE: I WORK INCLUDED - 1. RELATED DOCUMENTS: 1. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND DIVISION 1 GENERAL REQUIREMENTS, APPLY TO THIS SECTION. 2. EXAMINE ALL OTHER SECTIONS OF THE SPECIFICATIONS FOR REQUIREMENTS WHICH AFFECT WORK OF THIS SECTION WHETHER OR NOT SUCH WORK IS SPECIFICALLY MENTIONED IN THIS SECTION. 3. COORDINATE WORK WITH THAT OF ALL OTHER TRADES AFFECTING, OR AFFECTED BY WORK OF THIS SECTION. COOPERATE WITH SUCH TRADES TO ASSURE THE STEADY PROGRESS OF ALL PROJECT WORK. 2. PROVIDE AND INSTALL: 1. STONE TILE FLOOR SURFACES AS SHOWN AND SCHEDULED ON THE DRAWINGS. 2. ANTI -FRACTURE MEMBRANE AND EPDXY AS REQUIRED FOR ABOVE STONE TILE FLOORING. 3. ALL SETTING MATERIALS AND INSTALLATION PRODUCTS INCLUDING BUT NOT LIMITED TO: GROUTS, MORTARS AND ADHESIVES FOR THINSET METHOD FOR ABOVE STONE TILE FLOORING. 4. TRANSITION STRIPS AS SHOWN ON THE DRAWINGS. 5. STONE TILE FLOORING SEALER. 3. PROVIDE COORDINATED LAYOUT INSTALLATION SHOP DRAWINGS OF ALL ITEMS AND SAMPLES OF GROUT TYPES IN ACCORDANCE WITH SECTION 01300 OF THESE SPECIFICATIONS. 4. SUBMIT CLEANING DATA IN ACCORDANCE WITH SECTION 01710 OF THESE SPECIFICATIONS. INCLUDE RECOMMENDED CLEANING METHODS, CLEANING MATERIALS AND STAIN REMOVAL METHODS. 5. ALL WORK SHALL BE HIGHEST QUALITY IN ACCORDANCE WITH THE LATEST RECOMMENDATIONS, STANDARDS AND REQUIREMENTS OF THE TILE COUNCIL OF AMERICA CONSTRUCTION HANDBOOK AND ANSI STANDARDS. II MATERIALS - 1. PROCELAIN TILE: 1. ST1 GRANITI FIANDRE NEW MARMI, CASCADIA (DARK BROWN) 12" X 12" X 3/8" FLOOR TILE 2. ST2 GRANITI FIANDRE NEW MARMI, OLYMPIA (LIGHT BEIGE) 12" X 12" X 3/8" FLOOR TILE REP.: LUCIA FRANCO (800) 296-9591 2. TILE GROUT: 1. G1 LATICRETE #39, MUSHROOM (LIGHT BEIGE) 2. ALL GROUT SHALL BE FORTIFIED WITH LATICRETE 1776 GROUT ADMIXTURE PLUS. 1 I 2 I 3 IF THIS DRAWING IS LESS THAN 22"X 34" IT IS A REDUCED SIZE DRAW 4 3. TRANSITION STRIPS: 1. TS1 1/4" STRAIGHT TRANSITION STRIP- SCHIENE-AE 30 SATIN ANODIZED ALUMINUM MFR.: SCHLUTER SYSTEMS 800-472-4588 4. ANTI -FRACTURE MEMBRANE (AT ENTIRE SUBSTRATE BELOW STONE TILE FLOORING): 1. ECB MEMBRANE, SELF -ADHERING ELASTOMERIC SHEET, 40 MILS THICK AS MADE BY N.A.C. PRODUCTS, CUYAHOGO FALLS, OH. OR ARCHITECT ACCEPTED EQUAL. 5. EPDXY: 1. PROVIDE EPDXY INJECTION TREATMENT FOR CRACKS COMPLETELY THROUGH THE SLAB AND THOSE FROM 0.0625 INCH UP TO 0.25 INCH IN WIDTH. 6. STONE TILE FLOORING SEALER: 1. MIRACLE SEALANT 511 IMPREGNATOR FOR SEALER AND SLIP RESISTANCE. 7. ALL SETTING MATERIALS AND INSTALLATION PRODUCTS INCLUDING BUT NOT LIMITED TO: GROUTS, MORTARS AND ADHESIVES SHALL BE PER STONE MANUFACTURER'S / SUPPLIER'S WRITTEN RECOMMENDATIONS FOR THINSET METHOD FOR SURFACES APPLIED TO AND IN STRICT ACCORDANCE WITH THE TILE COUNCIL OF AMERICA INSTALLATION STANDARDS. 1. SEE SECTION 03500 FOR LEVELING COMPOUNDS. III EXECUTION - 1 . INSTALL ALL TILE WORK TO PROPERLY PREPARED SUBSURFACE IN ACCORDANCE WITH THE STONE TILE MANUFACTURER'S WRITTEN TECHNICAL INFORMATION, TILE COUNCIL OF AMERICA CONSTRUCTION HANDBOOK LATEST EDITION AND APPLICABLE ANSI STANDARDS FOR RECOMMENDED THINSET METHOD. 1. TILE SHALL BE ACCURATELY CUT TO SITE MEASURED FLOOR PERIMETER AND WALL BASE CONDITIONS. 2. PREPARE AND LEVEL FLOOR WITH UNDERLAYMENT, SEE SECTION 03500, AS REQUIRED FOR SMOOTH, SOUND, LEVEL, PLUMB, FLUSH INSTALLATION. POLISH ALL CUT EXPOSED TO VIEW EDGES TO MATCH TILE FACE. VERIFY THAT THE NEW TILE FLOORING FOR THE STORE SHALL BE LEVELED TO HEIGHT FOR A CONTINUOUS FLUSH CONDITION TO EXISTING CONCOURSE FINISH FLOORING. 3. INSTALL TRANSITION STRIPS AS REQUIRED FOR A CONTINUOUS SMOOTH, SOUND, LEVEL, FLUSH INSTALLATION WITH A MINIMUM NUMBER OF TIGHT HAIRLINE BUTT JOINTS AS SHOWN AND DETAILED. 2. INSTALL ALL TILE IN PATTERN INDICATED TO PROPERLY PREPARED SUBSURFACES WITH ALL JOINTS ALIKE AND IN ALIGNMENT, UNIFORM IN WIDTH NOTED, 1/8", WATERTIGHT, WITHOUT VOIDS, CRACKS, EXCESS MORTAR, ADHESIVE OR GROUT. CUT TILE AS REQUIRED TO MAINTAIN SPECIFIED PATTERNS. SOUND FLOOR TILE AFTER SETTING AND REPLACE HOLLOW SOUNDING UNITS. 3. COORDINATE EXACT LOCATIONS AND SIZES OF ALL REQUIRED CUTOUT WITH OTHER SECTIONS OF THESE SPECIFICATIONS AND AS SHOWN AND NOTED ON THE DRAWINGS. CORE BORE TILE FOR ELECTRICAL FLUSH FLOOR RECEPTACLES FOR 1/8" MAXIMUM JOINT: 1. ELECTRICAL SEE 'E' DRAWINGS 4. DO NOT PERMIT TRAFFIC OVER FINISHED FLOOR SURFACE FOR (4) DAYS AFTER INSTALLATION. 5. PERFORM ALL WORK IN ACCORDANCE WITH SECTIONS 01045, 01400, 01600 AND 01710 OF THESE SPECIFICATIONS. END OF SECTION 09300 09500 ACOUSTICAL TREATMENT: I WORK INCLUDED - 1. RELATED DOCUMENTS: 1. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND DIVISION 1 GENERAL REQUIREMENTS, APPLY TO THIS SECTION. 2. EXAMINE ALL OTHER SECTIONS OF THE SPECIFICATIONS FOR REQUIREMENTS WHICH AFFECT WORK OF THIS SECTION WHETHER OR NOT SUCH WORK IS SPECIFICALLY MENTIONED IN THIS SECTION. 3. COORDINATE WORK WITH THAT OF ALL OTHER TRADES AFFECTING, OR AFFECTED BY WORK OF THIS SECTION. COOPERATE WITH SUCH TRADES TO ASSURE THE STEADY PROGRESS OF ALL PROJECT WORK. 2. PROVIDE AND INSTALL: 1. ACOUSTICAL CEILING PANELS, GRIDS, SEISMIC AND STANDARD SUSPENSION SYSTEMS AS SHOWN AND SCHEDULED ON THE DRAWINGS. 2. SUSPENSION SYSTEMS SHALL INCLUDE, BUT NOT BE LIMITED TO, UNISTRUT SUPPORT GRID, HANGER RODS, BLACK IRON, CLIPS, WALL ANGLES AND MISCELLANEOUS INCIDENTAL MATERIALS AS REQUIRED FOR INSTALLATION PER STATE OF TENNESSEE BUILDING CODE REQUIREMENTS 3. COORDINATE ALL CUTOUTS AND BUILT-IN REQUIREMENTS OF PERTINENT SECTIONS OF THESE SPECIFICATIONS, INCLUDING MECHANICAL AND ELECTRICAL: SEE'FP', 'H' AND 'E' DRAWINGS. 4. COORDINATE ALL SUSPENDED ENCLOSURES AND ABUTTING WALL CONDITIONS DESCRIBED IN PERTINENT SECTIONS OF THESE SPECIFICATIONS. /,, 5 5. PROVIDE FINISH SAMPLES AND MANUFACTURER'S LITERATURE ON ALL ITEMS IN ACCORDANCE WITH SECTION 01300 OF THESE SPECIFICATIONS. 6. SUBMIT CLEANING DATA IN ACCORDANCE WITH SECTION 01710 OF THESE SPECIFICATIONS. INCLUDE RECOMMENDED CLEANING METHODS, CLEANING MATERIALS AND STAIN REMOVAL METHODS. 7. ALL WORK SHALL BE HIGHEST IN QUALITY IN COMPLIANCE WITH CISCA WRITTEN INSTRUCTIONS AND APPLICABLE CODE REQUIREMENTS. II MATERIALS - 1. SUSPENDED ACOUSTICAL CEILING PANELS AND EXPOSED GRIDS TO FIT CEILING AREAS AND CONDITIONS: 1. ACP1 ARMSTRONG ULTIMA ACOUSTICAL CEILING SYSTEM CLASS A NO. 1912,24" X 24" X 3/4", ASTM E-1264 FINE TEXTURED ACOUSTICAL FLAME SPREAD CEILING PANELS, WHITE, SMOKE DEVELOPED BEVELED TEGULAR, WITH ARMSTRONG 15/16" SUPRAFINE EXPOSED TEE GRID, WHITE ARMSTRONG REP: DIANA HART (877) 276-7876 - OPTION 8 - EXT. 8089 dfhart@armstrong.com 2. ALL UNISTRUT SUPPORT GRID MEMBERS, CEILING BLACK IRON, HANGER WIRES, CLIPS AND ALL WALL MOLDING AND MISCELLANEOUS INCIDENTAL MATERIALS REQUIRED FOR THE INSTALLATION OF THE ABOVE ITEMS, COMPATIBLE WITH THE NEW MATERIALS, APPROVED BY THE MATERIAL MANUFACTURER AND IN ACCORDANCE WITH THE STATE OF TENNESSEE BUILDING CODE. III EXECUTION - 1 . INSTALL ACOUSTICAL CEILING PANELS, EXPOSED GRIDS AND TRIM REVEALS LEVEL AND TRUE TO FIT CEILING SUSPENSION AS SHOWN AND IN ACCORDANCE WITH THE CEILING MANUFACTURER'S WRITTEN INSTRUCTIONS. COORDINATE WITH NEW AND THE EXISTING DUCTWORK CONDITIONS, NEW LIGHTING FIXTURES, SPEAKERS AND SIGNAGE. INSTALL CEILING GRID TO SUSPENSION SYSTEM AS SHOWN AT CEILING HEIGHTS INDICATED. ANY DEVIATION SHALL BE BROUGHT TO THE ARCHITECT'S ATTENTION IMMEDIATELY. CAREFULLY CUT, SUPPORT AND INSTALL ALL PERIMETER PANELS WITH WALL MOLDING. TOUCH UP ALL EXPOSED TO VIEW CUT EDGES TO MATCH PANEL FACE. 2. PERFORM ALL WORK IN ACCORDANCE WITH SECTIONS 01045, 01400, 01600 AND 01710 OF THESE SPECIFICATIONS. END OF SECTION 09500 5 17 C AI 0°0)a H 0 IN o clf) p0� U Owc� w � Q d rn co VA`� N WZ W p N o0a F- w 66 Lu Lu'.. w Lu Z�Z �• 7 M MF- cd �° F- ti w 0 rn F¢- J O::)a u } N (n ��� W N Z •.,• N Z o. O C� to J N ol Z Z Z Q U)O o ZO � of Fn U) uv) w o A �g w� cOD U Z g 'mm Z N (DO H m Mo c=/) Lll 2 Q Z N U m 0 x c 0 0 m AI A 0°0)a H 0 IN o clf) p0� CN Owc� w � Q rn VA`� N WZ W p N o0a F- w 66 0 A Z Z�Z �• 7 M MF- cd �° F- ti w 0 rn F¢- J O::)a u } N (n ��� W N Z •.,• N Z o. O ••• U Q Z A Lu H 0 0 p0� � Q W J Z tr) o0a O 0 A QQ ZZ�O N O LijLL O::)a � �z� Aar 0 WOfz Z LL LL w Q Z Q U)O ZO � Z Fn U) uv) w o A �g w� 0 40 i z O p a z O Of Fn U) uv) w o g m D U) 0 0 0 N w U.)a N vi z O � Y w Q O g PROJ NO: P703080244 SCALE: AS NOTED DATE: DESIGNED BY: DRAWN BY: E. OUTHAVONG CHECKED BY: SHEET TITLE: ARCHITECTURAL SPECIFICATIONS 08300 - 09500 SHEET NO. A-003 SHEET OF 40 i E a 0 M 00 0 N L; N 0 z a 0 a 09900 PAINTING: I WORK INCLUDED - 1. RELATED DOCUMENTS: 1. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, a. INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND DIVISION 1 GENERAL REQUIREMENTS, APPLY TO THIS SECTION. 2. EXAMINE ALL OTHER SECTIONS OF THE SPECIFICATIONS FOR REQUIREMENTS WHICH AFFECT WORK OF THIS SECTION W w WHETHER OR NOT SUCH WORK IS SPECIFICALLY MENTIONED IN THIS SECTION. D coY z Q rn o 3. COORDINATE WORK WITH THAT OF ALL OTHER TRADES w o9 AFFECTING, OR AFFECTED BY WORK OF THIS SECTION. COOPERATE WITH SUCH TRADES TO ASSURE THE STEADY F- U PROGRESS OF ALL PROJECT WORK. 2. PROVIDE AND INSTALL: 1. PROPERLY PREPARE, PRIME AND FINISH PAINT ALL NEW AND EXISTING GYPSUM WALLBOARD WALL, CEILING, FASCIA AND 2 U SOFFIT SURFACES, NOT SCHEDULED TO BE COVERED BY FINISHES SPECIFIED IN OTHER SECTIONS OF THESE a Qo(f)aa SPECIFICATIONS, AS SCHEDULED AND SHOWN ON THE DRAWINGS. 2. PROPERLY PREPARE AND FINISH PAINT ALL MISCELLANEOUS INCIDENTAL MATERIALS AS NOTED ON THE DRAWINGS INCLUDING BUT NOT LIMITED TO, PIPING, CONDUIT, BOXES, PANELBOARDS, ETC. EXPOSED TO VIEW. 3. PROPERLY PREPARE AND FINISH PAINT EXISTING DAMAGED, MARRED OR WORN SURFACES TO REMAIN AND PATCH TO MATCH WORK AS REQUIRED FOR THE INSTALLATION OF NEW WORK, INCLUDING MECHANICAL AND ELECTRICAL. 3. PROVIDE FINISH SAMPLES OF EACH TYPE COLOR AND ON-SITE SAMPLE AREAS FOR REVIEW ACCEPTANCE BY THE ARCHITECT AS NOTED IN THIS SPECIFICATION IN ACCORDANCE WITH SECTION Qu 01300 OF THESE SPECIFICATIONS. rn 1. (4) 12 X 120R (4) 8X 10 FINISH SAMPLES. 4. PROVIDE CLEANING DATA IN ACCORDANCE WITH SECTION 01710 p AND OF THESE SPECIFICATIONS. INCLUDE RECOMMENDED G" CLEANING METHODS, CLEANING MATERIALS, AND STAIN REMOVAL C METHODS. 5. ALL WORK SHALL BE HIGHEST IN QUALITY IN COMPLIANCE WITH ti � MANUFACTURER'S WRITTEN SPECIFICATIONS AND APPLICABLE w Z CODE REQUIREMENTS. 6. WORK NOT INCLUDED: 1. UNLESS OTHERWISE INDICATED, PAINTING IS NOT REQUIRED ON SURFACES IN CONCEALED AREAS AND INACCESSIBLE AREAS SUCH AS FURRED SPACES, PIPE SPACES, AND DUCT SHAFTS. 2. METAL SURFACES OF ANODIZED ALUMINUM, STAINLESS STEEL, (n CHROMIUM PLATE, COPPER, BAKED ENAMEL, BRONZE, AND SIMILAR FINISHED MATERIALS WILL NOT REQUIRE PAINTING Z�N UNDER THIS SECTION EXCEPT AS MAY BE SO SPECIFIED. 3. DO NOT PAINT MOVING PARTS OF OPERATING UNITS, J MECHANICAL OR ELECTRICAL PARTS SUCH AS VALVE OPERATORS, LINKAGE, SENSING DEVICES, AND MOTOR SHAFTS, (n UNLESS OTHERWISE INDICATED. 4. DO NOT PAINT OVER REQUIRED LABELS OR EQUIPMENT Z O IDENTIFICATION, PERFORMANCE RATING, NAME, OR NOMENCLATURE PLATES. DO NOT PAINT FINISH HARDWARE U UNLESS PRIME COATED. 5. PAINTING SPECIFIED IN OTHER SECTIONS OF THESE SPECIFICATIONS: 1. SECTION 06400 ARCHITECTURAL WOODWORK 2. SECTION 10400 IDENTIFYING DEVICES II MATERIALS - 1. PAINT TYPES: B 1. P2 SPECIFIED IN SECTION 06400 2. P3 SPECIFIED IN SECTION 06400 3. P4 PAINT COLOR AND FINISH TO MATCH EXISTING LIKE FINISHED SURFACE 2. PRIMERS FOR THE ABOVE PAINT TYPES AS MANUFACTURED BY THE �a PAINT TYPE MANUFACTURER FOR SUBSTRATE TO BE PAINTED. 3. HEALTH SPEC LOW ODOR AND LOW VOLATILE ORGANIC Q COMPOUNDS (VOC) COMPLIANT MATERIALS ARE ONLY TO BE USED. DO NOT THIN ALKYD BASED MATERIALS OTHERWISE VOC RATING a- Lu WILL BE COMPROMISED. VOC PAINTS REQUIRE LONGER DRYING TIME. 4. UPON COMPLETION OF THE WORK OF THIS SECTION, DELIVER TO THE OWNER AND EXTRA STOCK EQUALING 10% EACH COLOR, TYPE AND CLASS OF PAINT USED IN THE WORK, TIGHTLY SEALING EACH CONTAINER, AND CLEARLY LABELING EACH CAN WITH CONTENTS Q AND LOCATION WHERE USED. III EXECUTION - 1 . EXAMINE SURFACES TO BE PAINTED AND REPORT ANY CONDITIONS Z THAT WOULD ADVERSELY AFFECT THE APPEARANCE OR PERFORMANCE OF THE PAINTING SYSTEMS. 2. PROPERLY PREPARE, CLEAN AND PRIME ALL EXISTING AND NEW SURFACE SUBSTRATES TO RECEIVE PAINTING SYSTEMS IN ACCORDANCE WITH THE MATERIAL MANUFACTURER'S WRITTEN 0 SPECIFICATIONS. PATCH, REPAIR AND FILL FLUSH ALL DAMAGE, 0 DEFECTS, AND OTHER MARRINGS TO EXISTING AND NEW SURFACES TO BE PAINTED. A 3. REMOVE ELECTRICAL PLATES, HARDWARE, LIGHT FIXTURE TRIM, SIGNS, ESCUTCHEONS AND FITTINGS PRIOR TO PREPARING O Z SURFACES OR FINISHING. SIGNS ARE TO BE REPLACED IN W LOCATIONS AS DIRECTED BY OWNER AFTER PAINT FINISH Z ACCEPTANCE. MASK OFF ALL MECHANICAL AND ELECTRICAL OPERATING DEVICES AND IDENTIFICATION MARKINGS, FIRE 07 PROTECTION SPECIALTIES, DOORS, FRAMES AND HARDWARE AND OTHER MISCELLANEOUS INCIDENTAL ITEMS AS REQUIRED AND ALL ABUTTING SURFACES SCHEDULED OR NOTED TO RECEIVE A O DIFFERENT PAINT TYPE OR FINISH. 2 4. APPLY PAINT COATS BY SPRAY, ROLLER AND BRUSH APPLICATION ONLY TO SOUND, SMOOTH, DRY AND PROPERLY PREPARED SURFACES IN A DUST FREE ENVIRONMENT IN ACCORDANCE WITH THE PAINT MANUFACTURER'S WRITTEN INSTRUCTIONS. FILL ALL DAMAGED, MARRED, SCRAPED AND DENTED SURFACES WITH APPROPRIATE FILLER MATERIAL, METAL OR WOOD, AND SAND/POLISH SMOOTH AND SMOOTH WITH ABUTTING SURFACES. ALL WORK SHALL RECEIVE ONE PRIME COAT AND TWO FINISH COATS. ALL COMPLETED WORK SHALL BE UNIFORM IN APPEARANCE AND COVERAGE, FREE OF HOLIDAYS, SPOTTING, LAPS, TOOL MARKS, RUNS, SAGS, OR OTHER SURFACE IMPERFECTIONS. 1. EXCEPT AS SPECIFICALLY OTHERWISE ACCEPTED BY THE ARCHITECT, CONFINE SPRAY APPLICATION TO METAL FRAMEWORK AND SIMILAR SURFACE WHERE HAND BRUSH WORK WOULD BE INFERIOR. 5. MISCELLANEOUS SURFACES AND PROCEDURES: 1. PAINT ALL DAMAGED EXISTING PAINT SURFACES COLOR AND FINISH TO MATCH EXISTING LIKE FINISHED SURFACE (P4). 2. HARDWARE: PAINT PRIME COATED HARDWARE TO MATCH ADJACENT SURFACES 3. ALUMINUM SURFACES SCHEDULED FOR PAINT FINISH: REMOVE SURFACE CONTAMINATION BY STEAM OR HIGH PRESSURE WATER. REMOVE OXIDATION WITH ACID ETCH AND SOLVENT WASHING. APPLY ETCHING PRIMER IMMEDIATELY FOLLOWING CLEANING. 4. SEAL WITH SHELLAC AND SEAL ALL MARKS WHICH MAY BLEED THROUGH SURFACE FINISHES. 6. PERFORM ALL WORK IN ACCORDANCE WITH SECTIONS 01045, 01400, 01600 AND 01710 OF THESE SPECIFICATIONS. END OF SECTION 09900 10400 IDENTIFYING DEVICES: I WORK INCLUDED - 1. RELATED DOCUMENTS: 1. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND DIVISION 1 GENERAL REQUIREMENTS, APPLY TO THIS SECTION. 2. EXAMINE ALL OTHER SECTIONS OF THE SPECIFICATIONS FOR REQUIREMENTS WHICH AFFECT WORK OF THIS SECTION WHETHER OR NOT SUCH WORK IS SPECIFICALLY MENTIONED IN THIS SECTION. 3. COORDINATE WORK WITH THAT OF ALL OTHER TRADES AFFECTING, OR AFFECTED BY WORK OF THIS SECTION. COOPERATE WITH SUCH TRADES TO ASSURE THE STEADY PROGRESS OF ALL PROJECT WORK. 2. PROVIDE AND INSTALL: 1. ALL SIGNS AS SCHEDULED AND SHOWN ON THE DRAWINGS: 1. ID1 "DISCOVER" VERTICAL STOREFRONT ENTRANCE LED ILLUMINATED SIGN 2. ID2 "DISCOVER" NON ILLUMINATED SIGN 3. ID3LOT "DISCOVER" CATEGORY SIGNS ACCEPTABLE SIGN MANUFACTURERS: 1. ANICOM SIGNS, INC. 134 JOSEPH ZATZMAN DRIVE DARTMOUTH, NS B3B IM4 CANADA CONTACT: JOHN GIGUERE TEL: 1(902) 468-8001 X303 FAX: 1(902) 468-8002 GIGUEREJ ANICOM.COM OR ARCHITECT ACCEPTED EQUAL. 2. ALL MOUNTING DEVICES, FASTENERS AND ADHESIVES REQUIRED FOR THE INSTALLATION OF THE ABOVE SIGNS AND MURALS. 3. PROVIDE COORDINATED SHOP DRAWINGS AND MANUFACTURER'S LITERATURE ON ALL ITEMS IN ACCORDANCE WITH SECTION 01320 OF THESE SPECIFICATIONS: 1. ALL FABRICATORS SHALL PROVIDE DETAILED SHOP DRAWINGS, INCLUDING BUT NOT LIMITED TO, SUPPORT, MOUNTING AND FASTENING METHODS, AND ALL ELECTRICAL REQUIREMENTS. 2. EXACT ARTWORK TO BE COORDINATED WITH THE ARCHITECT. 4. PROVIDE CLEANING DATA IN ACCORDANCE WITH SECTION 01710 AND OF THESE SPECIFICATIONS. INCLUDE RECOMMENDED CLEANING METHODS, CLEANING MATERIALS, AND STAIN REMOVAL METHODS. 5. ALL WORK SHALL BE HIGHEST IN QUALITY IN COMPLIANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS AND APPLICABLE CODE REQUIREMENTS. II MATERIALS 1. ALL SIGN MATERIALS AND FINISHES SHALL BE AS DESIGNED, DETAILED AND SPECIFIED IN SIGN PACKAGE PREPARED BY: TRANSYSTEMS CORPORATION 50 WASHINGTON STREEET SOUTH NORWALK, CT 06854 TEL. (203) 866-9221 FAX (203) 838-2436 2. ID1 "DISCOVER" STOREFRONT ENTRANCE LED ILLUMINATED SIGNS: 1. CUSTOM SIGNS TO DESIGN, SHAPE, DIMENSIONS, AND DETAIL SHOWN. 2 3 3. ID2 "DISCOVER" NON -ILLUMINATED INTERIOR SIGN: 1. CUSTOM SIGN TO DESIGN, SHAPE, DIMENSIONS, AND DETAIL SHOWN 4. ID3LOT"DISCOVER" CATEGORY SIGNS 1. CUSTOM SIGNS TO DESIGN, SHAPE, DIMENSIONS, AND DETAIL SHOWN 5. ID4 "DISCOVER" GLASS SAFETY MARKINGS: 1. VINYL SAFETY MARKINGS, 3M SCOTCH GRAPHIC FILM 7725SE #314 DUSTED CRYSTAL PRESSURE SENSITIVE TRANSLUCENT FILM GRAPHIC LOGOS, HG DEISIGN, PER MNAA REQUIREMENTS III EXECUTION - 1. COORDINATE EXACT LOCATIONS AND SIZES OF ALL REQUIRED CUTOUTS AND SPACE REQUIREMENTS AND DIMENSIONS WITH OTHER SECTIONS OF THESE SPECIFICATIONS AND AS NOTED ON THE DRAWINGS: 1. SECTION 06400 ARCHITECTURAL WOODWORK 2. SECTION 09250 GYPSUM WALLBOARD 3. SECTION 09900 PAINTING 4. SECTION 11130 AUDIOVISUAL EQUIPMENT 5. 'E' DRAWINGS ELECTRICAL 2. INSTALL ALL WORK TRUE PLUMB, RIGID AND PERMANENT IN ACCORDANCE WITH ACCEPTED SHOP DRAWINGS AND MANUFACTURER'S WRITTEN INSTRUCTIONS. 3. ALL MATERIALS SHALL BE APPLIED (ADHERED) TO PROPERLY PREPARED AND CLEANED SURFACES BY EXPERIENCED AND QUALIFIED INSTALLER IN STRICT ACCORDANCE WITH MANUFACTURER'S RECOMMENDED INSTALLATION PROCEDURES. THE FINISHED WORK SHALL BE NEAT IN APPEARANCE, WRINKLE AND GAP FREE AND FREE FROM DEFECTS FOR FULL AND COMPLETE COVERAGE. 4. CLEAN ALL MATERIALS IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS. 5. PROPERLY PROTECT ALL FINISH SURFACES UNTIL INSTALLATION COMPLETION AND JUST PRIOR TO ARCHITECT'S FINAL ACCEPTANCE. 6. PERFORM ALL WORK IN ACCORDANCE WITH SECTIONS 01045, 01400, 01600 AND 01710 OF THESE SPECIFICATIONS. END OF SECTION 10400 10550 FIRE PROTECTION SPECIALTIES: I WORK INCLUDED - 1. RELATED DOCUMENTS: 1. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND DIVISION 1 GENERAL REQUIREMENTS, APPLY TO THIS SECTION. 2. EXAMINE ALL OTHER SECTIONS OF THE SPECIFICATIONS FOR REQUIREMENTS WHICH AFFECT WORK OF THIS SECTION WHETHER OR NOT SUCH WORK IS SPECIFICALLY MENTIONED IN THIS SECTION. 3. COORDINATE WORK WITH THAT OF ALL OTHER TRADES AFFECTING, OR AFFECTED BY WORK OF THIS SECTION. COOPERATE WITH SUCH TRADES TO ASSURE THE STEADY PROGRESS OF ALL PROJECT WORK. 2. PROVIDE AND INSTALL: 1. FIRE EXTINGUISHER AND HOLDER IN LOCATION AS SHOWN AND NOTED ON THE DRAWINGS. 2. ALL MOUNTING DEVICES AND FASTENERS REQUIRED FOR THE INSTALLATION OF THE ABOVE ITEMS. 3. ALL SIGNAGE AS REQUIRED FOR THE ABOVE ITEMS AS REQUIRED BY THE GOVERNING AUTHORITY. 3. PROVIDE MANUFACTURER'S PRODUCT DATA LITERATURE ON ALL ITEMS IN ACCORDANCE WITH SECTION 01320 OF THESE SPECIFICATIONS. 4. PROVIDE CLEANING AND MAINTENANCE DATA IN ACCORDANCE WITH SECTIONS 01710 AND 01730 OF THESE SPECIFICATIONS. INCLUDE RECOMMENDED CLEANING METHODS, CLEANING MATERIALS, STAIN REMOVAL METHODS. 5. ALL WORK SHALL BE HIGHEST IN QUALITY IN COMPLIANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS AND APPLICABLE CODE REQUIREMENTS. II MATERIALS - 1. FPI WALL MOUNTED FIRE EXTINGUISHER AND HOLDER 1. LARSEN'S MANUFACTURING CO. TEN (10) POUND MULTI- PURPOSE DRY CHEMICAL, MP10, FIRE EXTINGUISHER WITH 1007 STANDARD BRACKET FOR WALL MOUNTING OR ARCHITECT ACCEPTED EQUAL. 2. ALL FASTENING MATERIALS AND MISCELLANEOUS INCIDENTAL MATERIALS FOR THE INSTALLATION OF THE ABOVE SHALL BE PER FIRE PROTECTION MANUFACTURER'S WRITTEN RECOMMENDATIONS. 3. FIRE EXTINGUISHER SIGNS FOR THE ABOVE. ALL SIGNS SHALL BE PER GOVERNING AUTHORITY REQUIREMENTS IN QUANTITY, TYPE, SIZE, COLOR AND LOCATIONS. 3 4 III EXECUTION 1. INSTALL NEW FIRE PROTECTION WORK IN ACCORDANCE WITH THE FIRE PROTECTION MANUFACTURER'S WRITTEN TECHNICAL INFORMATION AND GOVERNING AUTHORITIES INSTRUCTIONS. 1. SET HOLDER SQUARE, PLUMB, LEVEL AND TRUE, ALL IN ACCORDANCE WITH THE MANUFACTURER'S WRITTEN INSTRUCTIONS. HOLDER SHALL BE ANCHORED SECURELY TO ABUTTING CONSTRUCTION. FIRE EXTINGUISHER SIGNS WILL BE LOCATED AND MOUNTED AS DIRECTED. 2. COORDINATE INSTALLATION OF REQUIRED WOOD GROUNDS AND BLOCKING FOR A PERMANENT RIGID INSTALLATION WITH SECTION 06400 AND ALL OTHER SECTIONS OF THESE SPECIFICATIONS. 2. PERFORM ALL WORK IN ACCORDANCE WITH SECTIONS 01045, 01400, 01600 AND 01710 OF THESE SPECIFICATIONS. END OF SECTION 10550 11130 AUDIOVISUAL EQUIPMENT: I WORK INCLUDED - 1. RELATED DOCUMENTS: 1. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND DIVISION 1 GENERAL REQUIREMENTS, APPLY TO THIS SECTION. 2. EXAMINE ALL OTHER SECTIONS OF THE SPECIFICATIONS FOR REQUIREMENTS WHICH AFFECT WORK OF THIS SECTION WHETHER OR NOT SUCH WORK IS SPECIFICALLY MENTIONED IN THIS SECTION. 3. COORDINATE WORK WITH THAT OF ALL OTHER TRADES AFFECTING, OR AFFECTED BY WORK OF THIS SECTION. COOPERATE WITH SUCH TRADES TO ASSURE THE STEADY PROGRESS OF ALL PROJECT WORK. 2. PROVIDE AND INSTALL: 1. ALL POWER AND SIGNAL REQUIREMENTS AS REQUIRED FOR THE PROPER INSTALLATION AND OPERATION OF ALL ITEMS: SEE ELECTRICAL DRAWINGS. 2. ALL MISCELLANEOUS INCIDENTAL ITEMS, INCLUDING BUT NOT LIMITED TO CONDUIT, CONNECTIONS, BOXES, FASTENERS, ANCHORAGE DEVICES AND GROUNDS, AS REQUIRED FOR THE INSTALLATION OF THE AUDIOVISUAL ITEMS AS SHOWN ON THE DRAWINGS AND AS REQUIRED FOR FULL COMPLETION OF THE WORK. 3. ALL WORK SHALL BE HIGHEST IN QUALITY IN COMPLIANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS AND APPLICABLE CODES. II MATERIALS: 1. AV1 DVR FOR SECURITY SYSTEM: PROVIDE AND INSTALL. COORDINATE TYPE, SOURCE AND LOCATIONS WITH TENANT/OWNER. 2. ALL MISCELLANEOUS INCIDENTAL INSTALLATION ITEMS AS REQUIRED FOR FULL COMPLETION OF THE WORK. III EXECUTION - 1. COORDINATE EXACT LOCATIONS, SIZES AND SPACE REQUIREMENT DIMENSIONS FOR ALL ITEMS WITH WORK OF OTHER SECTIONS OF THESE SPECIFICATIONS, INCLUDING ELECTRICAL AND CABLE REQUIREMENTS. 2. INSTALL ALL ITEMS SQUARE, PLUMB, LEVEL AND TRUE, AND ANCHORED SECURELY WITH GROUNDS, ALL IN ACCORDANCE WITH THE MANUFACTURER'S WRITTEN INSTRUCTIONS. 3. ADJUST AND CHECK EACH OPERATING ITEM TO ENSURE PROPER OPERATION OF FUNCTION. NOTIFY OWNER ON ANY UNIT WHICH CANNOT BE ADJUSTED TO OPERATE PROPERLY. 4. MAKE FINAL CHECK AND ADJUSTMENT OF ALL ITEMS. CLEAN AS NECESSARY FOR PROPER FUNCTIONING AND VIEWING. 5. INSTRUCT OWNER'S PERSONNEL IN PROPER ADJUSTMENT AND MAINTENANCE OF ALL ITEMS, DURING THE FINAL ADJUSTMENT. 6. PERFORM ALL WORK IN ACCORDANCE WITH SECTIONS 01045, 01400, 01600 AND 01710 OF THESE SPECIFICATIONS. END OF SECTION 11132 4 I 12670 RUGS AND MATS: I WORK INCLUDED - 1. RELATED DOCUMENTS: 1. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND DIVISION 1 GENERAL REQUIREMENTS, APPLY TO THIS SECTION. 2. EXAMINE ALL OTHER SECTIONS OF THE SPECIFICATIONS FOR REQUIREMENTS WHICH AFFECT WORK OF THIS SECTION WHETHER OR NOT SUCH WORK IS SPECIFICALLY MENTIONED IN THIS SECTION. 3. COORDINATE WORK WITH THAT OF ALL OTHER TRADES AFFECTING, OR AFFECTED BY WORK OF THIS SECTION. COOPERATE WITH SUCH TRADES TO ASSURE THE STEADY PROGRESS OF ALL PROJECT WORK. 2. PROVIDE AND INSTALL: 1. ANTI -FATIGUE MAT AT CASHWRAP AS SHOWN ON THE DRAWINGS. 3. ALL SETTING MATERIALS AND ADHESIVES REQUIRED FOR THE INSTALLATION OF THE ABOVE. 4. PROVIDE MAT AND RUG JOINT LOCATION PLAN, FINISH SAMPLE AND MANUFACTURER'S LITERATURE ON ALL ITEMS IN ACCORDANCE WITH SECTION 01300 OF THESE SPECIFICATIONS. 5. PROVIDE CLEANING DATA IN ACCORDANCE WITH SECTION 01710 AND OF THESE SPECIFICATIONS. INCLUDE RECOMMENDED CLEANING METHODS, CLEANING MATERIALS, STAIN REMOVAL METHODS. 6. ALL WORK SHALL BE HIGHEST IN QUALITY IN COMPLIANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS AND APPLICABLE CODE REQUIREMENTS.II MATERIALS - 1 . MAT: 1. M1 MATS, INC. REMOVABLE ROLL -UP CUSHION EZE, BEIGE, 1/2" THICK, DURABLE MARBLEIZED VINYL ADHERED TO FOAM BACKING, CUT TO CUSTOM SIZES, MINIMUM JOINTS PER LOCATION, TO FIT AREAS SHOWN AND SCHEDULED. CONTACT: GREGG LEAK SUREWOOD INTERIOR MILLWORK 972-843-2800 2. ALL SETTING AND FLOOR LEVELING MATERIALS AND ANCHORAGE DEVICES USED FOR MAT SHALL BE COMPATIBLE TO THE SURFACES INSTALLED TO, EXISTING AND NEW, AS RECOMMENDED BY THE MAT MANUFACTURER. III EXECUTION - 1 . PREPARE AND LEVEL FLOOR SURFACE CONDITIONS REQUIRED FOR FLUSH, SMOOTH, LEVEL MAT INSTALLATIONS. 2. MAT SHALL BE INSTALLED PER MANUFACTURER'S WRITTEN INSTRUCTIONS. 3. AFTER MAT HAS BEEN INSTALLED AND CONTRACTOR HAS COMPLETED CLEANUP, THE CONTRACTOR SHALL PLACE HEAVY DUTY BUILDING PAPER OVER THE MAT, SECURED WITH (2) INCH MASKING TAPE, TO PROTECT THE MAT FROM SOIL AND DAMAGE. 4. PERFORM ALL WORK IN ACCORDANCE WITH SECTIONS 01045, 01400, 01600 AND 01710 OF THESE SPECIFICATIONS. END OF SECTION 12670 rim a AI a. co w c %'"- W w w F-- U 0 z coY z Q rn o w o9 0 o F- tY co F- U O O c�i rn ? Z N OR Q N 2 U z 3: 5 O ® a Qo(f)aa oO 2 O� Qu rn NNa p G" 0� w ti � w Z C� N z W p N n F- � w (n B z .Z_ cA } o Z�N c'z Y v, F- W I- J �+ o w � O N_ (n i, 04 W N Z O ������� ••• N Z a U H Q 0 w �a Q J a- Lu Q z U� p O Q p Q Q Ix QZ z Ow� Z N ap zLu LL n ZZ� 0 w� 0 LL H Z O Z W Z J 07 O z �g Q ~O z O H CL_ z O ix u Fn m Ly o m cn 0 0 0 o o N w In Q N z O U w Y Q PROJ NO: P703080244 SCALE: AS NOTED DATE: DESIGNED BY: DRAWN BY: E. OUTHAVONG CHECKED BY: SHEET TITLE: ARCHITECTURAL SPECIFICATIONS 09650 - 10550 SHEET NO. A-004 SHEET OF D C B A ELECT. 1 1 2 3'-0" 3'-0" REMOVALS PLAN ID—S CALE. 1 /4"=1'-0" I I HORIZONTAL IN KICK c HORIZONTAL IN KICK S2 I I I I< 2 N I r, I ICY II R I I Y I II I< I z I LJ I N I I III I I Ir-�`- I I z 1 11 1< FP I IIS �1 I I I I II< � II 0 I LJ I� A -2o1 L --J "' ` F -- - - - - - - -- q \V\Tm .,.., ------------ -502 41- AW1 (:2)- NEW WORK FLOOR PLAN SCALE. 1/4"= l' -O" E I9�,6 1.�✓�[R 3 3 4 TEMPORARY WORK SCHEDULE NEW WORK SCHEDULE (TEMPORARY WORK SHOWN IN BOLD SOLID LINES) (NEW WORK SHOWN IN BOLD SOLID LINES) TEMPORARY WORK: SPEC. SECT. 06100 PROVIDE AND INSTALL: UNLESS NOTED (OSCI) PROVIDE, INSTALL AND REMOVE:❑ 1 TEMPORARY PARTITION & DOOR OPENINGS, AS REQUIRED, INCLUDING ALL ASSOCIATED MECH. & ELECT. WORK. 2 PROTECTION AS REQUIRED FOR EXISTING FLOOR, WALL & CEILING FINISHES TO REMAIN. REMOVALS SCHEDULE O (REMOVALS SHOWN IN BOLD DASHED LINES) REMOVALS: SPEC. SECT. 02060 REMOVE: 1 EXIST'G. PARTITIONS IN THEIR ENTIRETY INCLUDING ALL ATTACHMENTS, SETTING MATERIALS AND ALL ASSOCIATED MECH. & ELEC. WORK. 2 EXIST'G SUSP. ACOUS. PANEL AND GWB CEILINGS IN THEIR ENTIRETY INCLUDING ALL SUSPENSION AND SUPPORT FRAMING MEMBERS AND ALL ASSOCIATED MECH. & ELEC. WORK. 3 EXIST'G DOORS AND FRAMES IN THIER ENTIRETY. 4 EXIST'G FLOOR FINISHES IN THIER ENTIRETY INCLUDING ALL ADHESIVES AND SETTING MATERIALS. 5 REMOVE ALL MEP. SEE MEP DRAWINGS.CAP PLUMBING FOR LATER USE 6 EXITING CANOPY AND ALL ASSOCIATED MEP WORK AND COLUMNS. REPAIR FLOOR AS REQUIRED. 7 REMOVE CEILING TO THE EXTEND SHOWN. PATCH AND REPAIR ALL AREAS OF WORK NOTES 1. SEE SPECIFICATION SECTION 02060, REMOVALS, FOR GENERAL REMOVALS & REMOVAL REQUIREMENTS. 2. REMOVE & REPLACE, PATCH TO MATCH, ALL FINISHES REQUIRED FOR MECH. AND ELECT. REMOVALS, INCLUDING REMOVALS OUTSIDE CONTRACT LIMIT LINE. 3. PROVIDE PROTECTION, AS REQUIRED, FOR EXISTING FLOOR, WALL AND CEILING FINISHES TO REMAIN. 4. REMOVE ALL EXISTING & MARRED FINISHES, AND AS REQUIRED FOR TEMPORARY WORK AND INSTALLATION OF THE NEW WORK, INCLUDING REMOVALS FOR BUILT-IN GROUNDS & SUPPORT BLOCKING. 5. SEE MECH. & ELECT. DRAWINGS FOR ALL MECH. & ELECT. TEMPORARY WORK, REMOVALS & REMOVAL REQUIREMENTS. 6. EXISTING TO REMAIN SHOWN IN LIGHT SOLID LINES. 7. SPACE IS TO BE BROOM CLEANED CLEAR SPACE, READY FOR NEW WORK INSTALLATION. 8. CONTRACTOR TO MINIMIZE DUST GENERATED DURING DEMOLITION AND REMOVALS. PROTECT RETURN DUCTS AND PLENUM FROM AIRBORNE DUST. 9. LOOSE DEBRIS SHALL BE DEPOSITED IN COVERED TRASH RECEPTACLES. NO LOOSE DEBRIS/TRASH SHALL BE LEFT ON ROOFS, SPACES OPEN TO THE AIRPORT OPERATIONS AREA (AOA), CONVEYANCE OR OPEN TRASH RECEPTACLES AT ANYTIME. Fl 5 SPEC. SECT. DET. SHT. ARCHITECTURAL WOODWORK 0 06400 AW1 SIDE FOLD'G. CLOSURE ENCLOS. SPECIAL DOORS Q 08300 D 01 STOREFRONT ENTRANCE SIDE FOLD'G. CLOSURE GYPSUM WALLBOARD O 09250 1 METAL STUD SUPPORT WALL 2. GYP. BD. CEILING 3 DISCOVER SOFFIT/FASCIA IDENTIFYING DEVICES ❑ 10400 ID1 "DISCOVER" VERTICAL STOREFRONT ENTRANCE LED SIGN ID2 "DISCOVER" NON -ILLUMINATED SIGN FIRE PROTECTION SPECIALTIES ❑ 10550 FP1 FIRE EXTINGUISHER & HOLDER MECHANICAL SEE 'FP', P & 'H' DWG's. . SPRINKLER ® AIR DIFFUSER z AIR RETURN C Fo THERMOSTAT ELECTRICAL SEE 'E' DWG'S. DUPLEX CONVENIENCE RECEPTACLE DOUBLE DUPLEX CONVENIENCE RECEPTACLE H TELEPHONE RECEPTACLE 0 RECESSED DOWN LIGHT PENDANT LIGHT ® 2'X 2' RECESSED FLUOR. TENANT SECURITY CAMERA LIGHT SWITCH NOTES: 1. SEE ELEVATION SHEET FOR WOODWORK ITEM AND FIXTURE LOCATIONS AND EXTENTS. 2. CONTRACTOR TO PROVIDE A THOROUGH PROFESSIONAL CLEANING (INCLUDING ALL WOODWORK ITEMS AND FIXTURES) PRIOR TO TURN OVER TO TENANT PER SPECIFICATION SECTION 017117, 3. CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE WITH WOODWORKER'S DELIVERY AND INSTALLATION, 4. ALL MECH. AND ELECT. ITEMS ARE NOTED AND SHOWN FOR LOCATION ONLY. SEE MECH. & ELECT. DRAWINGS FOR FULL SCOPE OF WORK, SPECIFICATIONS AND INSTALLATION REQUIREMENTS. 5. ALL DUPLEX CONVIENI ENCE RECEPTICLES VISIBLE TO PUBLIC TO HAVE S.S. FACE PLATES TO MATCH ADJ. SURFACE AND GRAY PLUGS. 5 BI A 0 0CL W (1) 000 0� A 0 OwLL Me LuZ 0w ° 0 WWo Z LL O go U O I SHEET TITLE: I ARCHITECTURAL REMOVAL & FLOOI PLANS SHEET NO. A-101 ISHEEr OF a LLzN�b3 W p $ =Z�7B Z m LL 0 0CL W (1) 000 0� A 0 OwLL Me LuZ 0w ° 0 WWo Z LL O go U O I SHEET TITLE: I ARCHITECTURAL REMOVAL & FLOOI PLANS SHEET NO. A-101 ISHEEr OF _1 L B A 1 3" C D LAnr TC\IDI ATC oonu m yr Mor' IILG FINISH FLOOR PLAN SCALE: 1/4"=l'—Om (: z CEILING PLAN SCALE. 1 /4" 1 E 3 1 4 1 5 NEW WORK SCHEDULE P703OWM FINISH SCHEDULE (NEW WORK SHOWN IN BOLD SOLID LINES) DESIGNED BY: DRAWN BY: E. OUTHAVONG cry �v PROVIDE AND INSTALUAPPLY NEW FINISHES: SPEC. SECT. PROVIDE AND INSTALL: UNLESS NOTED (OSCI) SPEC. SECT. DET. SHT. 06400 ARCHITECTURAL WOODWORK 0 06400 AW1 SIDE FOLD'G. CLOSURE ENCLOS. GL1 GLASS SHELVES AND CASHWRAP TOP CLEAR p GL2 '/" TEMPERED STOREFRONT GLASS SPECIAL DOORS CD 08300 MT2 BASE STAINLESS STEEL SILVER, SATIN 01 STOREFRONT ENTRANCE SIDE FOLD'G. CLOSURE I MT3 METAL SILVER, SATIN GYPSUM WALLBOARD O 09250 MT4 METAL BRONZE PATINA 1 METAL STUD SUPPORT WALL P2 PAINT WHITE, FLAT 2. GYP. BD. CEILING 3 DISCOVER SOFFIT/FASCIA P3 POWDER COAT SEPIA PL1 PLASTIC LAM. BLACK, MATTE IDENTIFYING DEVICES ❑ 10400 WD1 WOAD VENEER WALNUT ID1 "DISCOVER" VERTICAL STOREFRONT - ENTRANCE LED SIGN WD2 HARDWOOD TO MATCH WD1 STAINED AND FINISHED ID2 "DISCOVER" NON -ILLUMINATED SIGN WD3 WOOD VENEER WASHED OAK FIRE PROTECTION SPECIALTIES ❑ 10550 WD4 HARDWOOD TO MATCH WD3STAINED AND FINISHED FP1 FIRE EXTINGUISHER & HOLDER WD5 HARDWOOD PAINTED BEIGE MOLDING MECHANICAL SEE 'FP', P & 'H' DWG'S. • SPRINKLER ® AIR DIFFUSER z AIR RETURN Po THERMOSTAT EL8CTRICAL SEE'E' DWG'S. DUPLEX CONVENIENCE RECEPTACLE DOUBLE DUPLEX CONVENIENCE RECEPTACLE H TELEPHONE RECEPTACLE 0 RECESSED DOWN LIGHT PENDANT LIGHT ® 2'X 2' RECESSED FLUOR. TENANT SECURITY CAMERA LIGHT SWITCH PW NOTES: LE 1. SEE ELEVATION SHEET FOR WOODWORK ITEM AND FIXTURE LOCATIONS AND EXTENTS. 2. CONTRACTOR TO PROVIDE ATHOROUGH PROFESSIONAL CLEANING (INCLUDING ALL WOODWORK ITEMS AND FIXTURES) PRIOR TO TURN OVER TO TENANT PER SPECIFICATION SECTION 01710. 3. CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE WITH WOODWORKER'S DELIVERY AND INSTALLATION. 4. ALL MECH. AND ELECT. ITEMS ARE NOTED AND SHOWN FOR LOCATION ONLY. SEE MECH. & ELECT. DRAWINGS FOR FULL SCOPE OF WORK, SPECIFICATIONS AND INSTALLATION REQUIREMENTS. 5. ALL DUPLEX CONVIENIENCE RECEPTICLES VISIBLE TO PUBLIC TO HAVE S.S. FACE PLATES TO MATCH ADJ. SURFACE AND GRAY PLUGS. 3 4 09300 G1 GROUT LIGHT BEIGE ST1 PORCELAIN TILECASCADIA (DARK BROWN) ST2 PORCELAIN TILE OLYMPIA (LIGHT BEIGE) C TS2 TRANS. STRIPALUMINUM, SATIN ANONDIZED 09500 ACP1 ACOUSTICAL CEILING PANEL WH (WHITE) P3 PAINT (INTERIOR WALLS) 09900 P4 PAINT TO MATCH EXISTING FINISHES 12670 M1 ANTI -FATIGUE MAT BEIGE MARBEUD VINYL NOTES: 1. SPACES NOT WITHIN CONTRACT LIMIT LINE ARE NOT TO RECEIVE NEW FINISHES EXCEPT AS NOTED IN NOTE 2. 2. ALL SURFACES, NOT SCHEDULED, NOTED OR SHOWN TO RECEIVE NEW FINISHES, INCLUDING SPACES OUTSIDE CONTRACT LIMIT LINE FOR REQUIRED ELECTRICAL WORK SHALL BE FINISH PAINTED (P5) TO PATCH TO MA I CH EXISTING ABUTTING/ADJACENT LIKE WORK AS REQUIRED FOR REMOVALS AND THE INSTALLATION OF NEW WORK. 5 BI AI O° yyd G� W W Z N 0 lu N W$ LL r 6s } tyo J N N ««*� N Z «�«*.R« N 2 d P703OWM 4 DATE: DESIGNED BY: DRAWN BY: E. OUTHAVONG cry �v O° yyd G� W W Z N 0 lu N W$ LL r 6s } tyo J N N ««*� N Z «�«*.R« N 2 d PROJ NO: P703OWM SCALE: AS NOTED DATE: DESIGNED BY: DRAWN BY: E. OUTHAVONG CHECKED BY: I 1111110 PROJ NO: P703OWM SCALE: AS NOTED DATE: DESIGNED BY: DRAWN BY: E. OUTHAVONG CHECKED BY: SHEET TITLE: ARCHITECTURAL FLOOR &CEILING PLAN SHEET NO. A-102 smer OF E n N M co O O N L6 N O 2 C' N O 00 O A E a N M IT co O N N C I I I i � 0'-0" I I �.lo EXIST. CE NG - - II ,� EW STEEL STUD WD5 I I I BRACING AT ®4' N " I j TO STRUCTURE ABO' 16 OC MTL STUD—„ WALL 9,-6 _ i I GWB ACP NEW GYP BD `r L --I�' � ACP1 N WD3 �__...... EW GYP BD Fk” PAINTED WALL P3. 1 UNDERSIDE OF SLAE WD4 LIGHTING FIXTIURE. SEE SCHEDULE 1 SCALE: 1 "=1'-0" CEILING DETAIL WD1 MT2 3 J" 20 GA. 16"OC MTL STUD WALL 0 I FINISHED FLOOR 0'-0" tv MT2 119Vyw MT2 WINDOW DETAIL FRAME j" METAL REVEAL MT2 2 3 PANEL DETAIL SCALE: 1"=l' -O" k %J % SCALE: 1"=l' -O" XX _ A-502 J J v y v� 13 lot WD2 MT2 — _ WD2 A �RILLE ENCLOSURE DETAIL 6 . 1 "=1'-0" A. MTL (ACHED JCTURE ABOVE r GRILLE ENCLOSURE DETAIL SCALE: 1 "=1'-0" 4 EXISTING MTL. -a--� 7 GRILLE ENCLOSURE DETAIL SCALE. 1 —1 0 2 I 3 it 1 rilq wrim YYivgv 1? &.r-Qp 1 ntmi-A 4e- A J'+ 11 10 h r[r-%r014c ur%M"11'4V Fl 20 GA. MTL D ATTACHED STRUCTURE ABOVE PROVIDE FLAT D PLATE BRACE MEMBER ® 4'-0" .CP O.C. X" THREADED RODS 04'-0" O.C. z c w cc co xs ENTRY; 2'-0" O.C. MAX. IN POCKET _ 2x8 FIRE RATED—� -----_ _�- CONTINUOUS WOOD SUPPORT (— Ll — V GWB, P2 SIDE FOLDING GRILLE TRACK SIDE FOLDING GRILLE PANEL L----1 8 GRILLE DETAIL SCALE. 3 = l'—O" WD1 C MT2 GRILLE ENCLOSURE DETAIL SCALE: 1 "=1'—O" 4 9 GRILLE ENCLOSURE DETAIL SCALE. 1 -1 0 5 A a 0 w w 0 UJ z�v Y Z04 Q °1 z c w cc co xs C7 U z z N Hc=i)Ll 2 Q of z N C-) :3 0 � ® QLovOiCL U a 0 co W W co Q, 2 z N W (s N Lu 0 �o z U) oZ a Q Z F- ti J u w O N _ • N 3 N -gr LLJ O U QLLJ C) w O � Q J CLLLJ Z cf) p0Q o QQ� Q z Z o�ui z 0 � N za.2 ZZD 00 i -r-1 W 0 0 LL F— zz 0 Z w1 ✓ J (A Z 0 O c �Z �J n �--I F•- 0 z O a oU) U w m U) 0 0 0 N � W Q z O � W Y x Q PROJ NO: P703080244 SCALE: AS NOTED DATE: DESIGNED BY: DRAWN BY: E. OUTHAVONG CHECKED BY: SHEET TITLE: ARCHITECTURAL CONSTRUCTION DETAILS SHEET NO. A-501 SHEET OF 1 1 SECT, C—C 2'-0" W w 2 OF MTL. DECK 5/8" RUNNER ATTACH 0 STRUCT. ABOVE. -1/2- 20 GA. STUDS 4'-0" O.C. ATTACH STRUCTURE ABOVE & JILL HEIGHT STUDS. NE OF CEILING. LAYER EACH SIDE 5/8" 'YP. BOARD 5/8" STUD FULL EIGHT 16" O.C. ATTACH 0 FLOOR & CEILING UNNER. 3 5/8" RUNNER ATTACHED TO FLOOR STRUCT. TOP OF FINISH FLOOR. 2 SIDED SPACE WALL SCALE: 1" = 1'-0" 2 PARTITION TYPE PATCH EXIST'G EXISTING STEEL FIRE PROOFING STRUCTURE ABOVE AS REQ. (TYP.) UNISTRUT CHANNELS # P1001 ® 48" O UNISTRUT 1/40 GALV. STL. BEAM CLAMP GAT CLIP 4 HANGER ROD B1.5L CAT. ®4'-0P1379S " O.C. MAX. #16-59—SM —� TYPICAL SUSP. GWB CEILING SCALE: 1 1/2" = 1'-0" 1-1/2" C, R, 16 GA. STL. SUSPENSION CHANNEL 475# ® 4'-0" O.C. MAX. WIRE CLIP #9 SPRING STEEL 5/8" GWB ON FURRING CHANNELS ® 24" O.C. E 3 --------------------- PROVIDE VISQUEEN DUST BARRIER 20LBS. SAND BAGS TO BRACE STRUCTURE IN SEALED PLASTIC BAGS. PLACED EVERY 6'-0" — PROVIDE PROTECTION FOR EXISTING FLOORING 4 3 STEEL STUDS \ \ 16 OC BRACE TO \ \\ STUCTURE ABOVE \\ \ EXTEND GYP BOARD 6" TYP ACP1 FR WOOD CURVED TEMPLATE GWB/ACP CEILING DETAIL SCALE: 1"=l' -O" 3" S' 16" OC STUCTL EXTENE BOARD ACI ACP1 3 TEMP. PARTITION SCALE: 1" = 1'-0" FR W0, TEMPLE 3 PARTITION TYPE cw6/A• PATCH EXIST'G FIRE PROOFING AS REQ. (TYP.) 1/4 0 THREADED ROD 04'-0" O.C. MAX. GAT CLIP 4 BS&A CAT.# 16-59—SM 1-1/2" C.R. 16GA. ST'L SUSPENSION CHANNEL .475# ® 4'-0" O.C. MAX. SECT. A—A TYPICAL SUSPENDED ACOUSTICAL PANEL CEILING SCALE: 1 1/2" = l' -O" n IF THIS DRAWING IS LESS THAN 22" X 34" IT IS A WIRE CLIP #, SPRING STL., TYP. 4 EXISTING STEEL STRUCTUR ABOVE UNISTRUT CHANNELS O.C. UNISTRUT BEAM CLAMP # P1379S — LAY— I N AC PANEL CL' CL'G HT. SEE PLAN y Zan ACP1 CEILING DETAIL SCALE: 1"=l' -O" CEILING DETAIL SCALE: 1"=l'—O" A TO ABOVE ALL C F'm LATTICE STRIP TRIM TEMPORARY SIGNAGE: PROVIDE AIRPORT APPROVED SIGNAGE BOARD. z K MOUNT PER AIRPORT REQUIREMENTS, P7. 1— ATTACH WALL UNITS TO WALL TOP AND Q ® BOTTOM WITH MIN (2) 20 GAGE STEEL SCREWS 4' OC TYP Z TEMPORARY PARTITION TO BE CONSTRUCTED OF 1/2- THK. X xGYPSUM LJ BOARD, ON L O V a CONCOURSE SIDE ONLY, ON 2 1/2 - /2"METAL CN METAL STUDS AT 16" Ow W W O.C. FINISH PER z AIRPORT o oz REQUIREMENTS. ez �..� C/) o z ce) o� 2' X 4" J w }O o' N r HORIZONTAL N w N BRACING. •:::• •.• N z a 4" HIGH VINYL BASE 3 TO MATCH AIRPORT STANDARDS F- U) W CAULK FULL & CONT. Ill 0 ALL AROUND PERIMETER W/ ACOUS. SEALANT PROVIDE PROTECTION FOR EXISTING FLOORING 4 3 STEEL STUDS \ \ 16 OC BRACE TO \ \\ STUCTURE ABOVE \\ \ EXTEND GYP BOARD 6" TYP ACP1 FR WOOD CURVED TEMPLATE GWB/ACP CEILING DETAIL SCALE: 1"=l' -O" 3" S' 16" OC STUCTL EXTENE BOARD ACI ACP1 3 TEMP. PARTITION SCALE: 1" = 1'-0" FR W0, TEMPLE 3 PARTITION TYPE cw6/A• PATCH EXIST'G FIRE PROOFING AS REQ. (TYP.) 1/4 0 THREADED ROD 04'-0" O.C. MAX. GAT CLIP 4 BS&A CAT.# 16-59—SM 1-1/2" C.R. 16GA. ST'L SUSPENSION CHANNEL .475# ® 4'-0" O.C. MAX. SECT. A—A TYPICAL SUSPENDED ACOUSTICAL PANEL CEILING SCALE: 1 1/2" = l' -O" n IF THIS DRAWING IS LESS THAN 22" X 34" IT IS A WIRE CLIP #, SPRING STL., TYP. 4 EXISTING STEEL STRUCTUR ABOVE UNISTRUT CHANNELS O.C. UNISTRUT BEAM CLAMP # P1379S — LAY— I N AC PANEL CL' CL'G HT. SEE PLAN y Zan ACP1 CEILING DETAIL SCALE: 1"=l' -O" CEILING DETAIL SCALE: 1"=l'—O" A TO ABOVE ALL C F'm CL 00 w Y z z Q o K O wC(60 co,o O 0 m of U z z N o 2 Q ix z N 0 D 0 ® Qu)U)a O V a o) o CN Ow W W m z o, o oz _N UJ Uj p N ez �..� C/) o z ce) o� co J w }O o' N r U)��� N w N Z O •:::• •.• N z a U F- U) W R Ill 0 w 0 � Q J UJZ U1 p0Q O cl aaw Q z ZZO o w J Za:o �_ ~ " O� Aa- 1:4zz� 0 woo Z ZoQ W QZco J in 0 ZO cr) mz Q w� O z 0 a zCf- O cUn U)w cno m co 0 co N w �a � z° 66 0 ( w Y of a PROJ NO: P703080244 SCALE: AS NOTED DATE: DESIGNED BY: DRAWN BY: E. OUTHAVONG CHECKED BY: SHEET TITLE: ARCHITECTURAL CONSTRUCTION DETAILS SHEET NO. A-502 SHEET OF f 0 E CL N it M CD O N L6 N O Z v O 0 a o� 3 v v 0 E CL M O co O O N L6 N 0 z v 0 0 a o� 3 O WALL FIXT, N❑, DESCRIPTION SLATWALL SIZE (QTY PER FIXT,) FIXT, QTY QTY 220 n: � w 1 4 w Y 362 WZ � 2 2 coo o3<:�o GONDOLA FLOOR DISPLAY DISPLAY �ooM� U Z Z N O E Fw-- cA F=— 111 MO CN 194 � O O O Q 1 ® Q�ncnaw 365 FLOOR DISPLAY W/BINDS DISPLAY 2 SEE HARDWARE SCHEDULE a � G� U a � p N � W z ca rn � 10 � N w� N W O z � o � � � o Z m Z � N z o M Y � w O rn -J i� Z 3: r N N � N N Z d U Q uJ O O � � Q J <C a z U� pOQ O � Qac L�JI J -L O � J N „ za�o z O__ � � OWN zZ� Aar � who � � Zz� � Q� zo � � �z n W J O z 0 a z O � ai � W o m m 0 0 0 r- 0 N W � Q N � Z O � Y � ca G PROJ NO: P703080244 SCALE: AS NOTED DATE: DESIGNED BY: DRAWN BY: E. OUTHAVONG CHECKED BY: SHEET TITLE: ARCHITECTURAL INTERIORS FIXTURE PLAN SHEET NO. AI -101 SHEET OF 1 2 3 4 5Z5 0 191 192 191 193 191 192 191of z A D 20'-11 j" D 194 ;n 3'_01, 3,_1, 364 362 220 R 365 194 191 364 362 364 365 00 194 �' k' 361 363 361cn07, EQ EQ C FIXTURE PLAN SCALE: 1/4"=l'-O"al B B A A 1 2 3 4 5 11 IF THIS DRAWING IS LESS THAN 22" X 34" IT IS A REDUCED SIZE DRAWING FIXTURE SCHEDULE WALL FIXTURES - 100 SERIES FIXT, DESCRIPTION SLATWALL SIZE FIXT, COMMENTS N❑, (QTY PER FIXT.) CASHWRAPS - 200 SERIES FIXT, N❑, DESCRIPTION SLATWALL SIZE (QTY PER FIXT,) FIXT, QTY QTY 220 191 WALL DISPLAY 1 4 362 192 WALL DISPLAY 2 2 363 GONDOLA FLOOR DISPLAY DISPLAY 193 CK DISPLAY WITH ST❑RA E 1 364 194 WALL DISPLAY 3 1 365 CASHWRAPS - 200 SERIES FIXT, N❑, DESCRIPTION SLATWALL SIZE (QTY PER FIXT,) FIXT, QTY COMMENTS 220 2 REG CASHWRAP 1 SEE HARDWARE SCHEDULE FLOOR FIXTURES - 300 SERIES FIXT, N❑, DESCRIPTION SLATWALL SIZE (QTY PER FIXT,) FIXT, QTY COMMENTS 361 GLASS METAL TABLE DISPLAY 2 SEE HARDWARE SCHEDULE 362 TIERED SHELVES FLOOR DISPLAY 2 SEE HARDWARE SCHEDULE 363 GONDOLA FLOOR DISPLAY DISPLAY 1 SEE HARDWARE SCHEDULE 364 FLOOR DISPLAY DISPLAY 3 SEE HARDWARE SCHEDULE 365 FLOOR DISPLAY W/BINDS DISPLAY 2 SEE HARDWARE SCHEDULE E a v u'> O N Ld N O z -o 0 a ID IA 1 2 3 4 5 fr » 3 4)_01)p 3 � I _ —IN LO 4 DETAIL 3=1-010 TRANSITION AS REQUIRED. <ING WD2 3/4" F.R. PLYWOOD WITH WD1 VENEER FINISH WD2 SIGN HOLDER ------------ 4 I AI -501 I I I �— MT2 I i I I I L----------- J 3 SECTION 1 2 3 IF THIS DRAWING 15 LESS THAN 22" X 34" IT IS A REDUCED SIZE DRAWI O rn PLAN 3/4" F.R. PLYWOOD W WD3 WOOD VENEER FINISH, TYP. 1/2" METAL FRAME, ALL SIDES 3/4" F.R. PLYWOOD W/ WD2 WOOD VENEER FINISH, TYP. 3/4" F.R PLYWOOD NAILING PANELS WOOD BLOCKING WD2, TYP. 2 tLtVH I IVIV 4 5 CONTINUOUS MOLDING GLASS SHELVING WITH POWDER COAT METAL FRAME FLUSH METAL STANDARDS C A CL two co W 04Y 13, z otS z Q o O Q' 000 C) w U . rn z z 0 0 N = U Q z N 0 O XX X o O m Q OV a 0) 0 CN �r W W to 0� z z w p W N N o w (q 6z D C3 } p Z 'CO) M I- J �'")0 0 w O �? N U) i • t W •:::• N Z N Z d O ••• U H Q W- 0 0 p� J 0_ Z U� p O Q Q Q Q ZZ0 0w� r N W a N Z Z ,,ww wo CC 0 0 O Z Z w QZ(a J (n O z0 � 2 Z Q � � 0 z O CL z O x U) 55 U) w o m 0 0 0 0 o w N Lb F - Q N66Q z r r O U Y w ca G PROJ NO: P703080244 SCALE: AS NOTED DATE: 05/20/08 DESIGNED BY: DRAWN BY: E. OUTHAVONG CHECKED BY: SHEET TITLE: ARCHITECTURAL INTERIOR FIXTURE 191 SHEET NO. AI -501 SHEET OF � 2 3 192 WALL DISPLAY 5 DETAIL c3"=1'-0" "I �4" F.R. PLYWOOD W/ WD1 VENEER WD2 SIGN HOLDER & SIGN WD2 r -IN Ln TRANSITION AS REQUIRED. <ING 4 DETAIL 3 =1 1 -0 5 AI -501 WD2 I I I I I 3/4" F.R. PLYWOOD WITH I I WD1 VENEER FINISH I I I I WD2 I i I SIGN HOLDER I I I I I I IL - - - L--- ---J A------------ 4 I AI -501 I I MT2 -IN I Ln Ixx I I I I I I L----------- J 3 SECTION 1-1/2"=1'-0" 1 2 IF THIS DRAWING IS L 3" PLAN 1-1/2"=1'-0" ELEVATION 3 K 34" IT IS A REDUCE I / c ivi t= I r%L. FRAME, ALL SIDES 4 8 —o1» 4 5 3/4" F.R. PLYWOOD W/ WD2 WOOD VENEER FINISH, TYP. D 3/4" F.R PLYWOOD NAILING PANELS WOOD BLOCKING Mi ON a i Id WD2 C0 0 n U a co W w�U� Z Y Wz Q "I o O 0 ad00 o E-OOco00)) U Z Z N co 2 Q Z cV o O Oz ® Q to fn (L LL OV a O L Lu Li � t) Z z N W p N w W Bz U £}o Z M M Q'z J )0 w F -W ~ CD O 0� �?� N r N� W N Z ••�• •i i• N z a. U F - Q w0 O p F- Q z aQ W Z cf) p0Q O< <p Q z�0 Ow� N N ZQ+U Lu O�4 ZZ� AaN K O wwZ < Z J 07 O z0 � 2z n uJ uJJ 0 z O H a_ Z O Fr cs Fn U) w o m D 0 0 0 N NF- w u-, Q c O Z �- O � Y � W PROJ NO: P703080244 SCALE: AS NOTED DATE: 05/20/08 _ DESIGNED BY: DRAWN BY: E. OUTHAVONG CHECKED BY: SHEET TITLE: ARCHITECTURAL INTERIOR FIXTURE 192 SHEET NO. AI -502 SHEET OF 193 WALL DISPLAY ID IA 2 3 4 5 5" 6' — 6" 5" 2 )2 i TYP. TYP. 01 ,� PLAN 1-1/29'= 1 ' -0" MT1 \— WD2 —\ CABINET ABOVE 7'_417 ------------------------------------- COUNTER TOP ELEVATION 2 1-1/2"=1'-0" 3 4 I 5 IF THIS DRAWING IS I FSS THAN 92"X 34" IT IS A RFDUCFD SIZE DRAWING WD2, TYP. D 3/4" F.R PLYWOOD WOOD BLOCKING �b'1�7d C 11 U C. co �o W .'` Z WD1 ZO W 06 � to co � cr � � WD3 (7 rn ? Z C', coo = Q z N U cc f) Ox 0 0 m Q SLIDE 1 x_72» WD3 ,_72» Q V2-71)) 5„ MT2 ELEVATION 2 1-1/2"=1'-0" 3 4 I 5 IF THIS DRAWING IS I FSS THAN 92"X 34" IT IS A RFDUCFD SIZE DRAWING WD2, TYP. D 3/4" F.R PLYWOOD WOOD BLOCKING �b'1�7d C 11 r U C. co �o W .'` Z w w V N Y ZO W 06 � to co � cr � � U (7 rn ? Z C', coo = Q z N U cc f) Ox 0 0 m Q ® Q Lo m a w OV � a d CN wco w 0) Z Z N F- T- W p N �w of 00 •- F- Z �� � O Z car) 'o v m o J )o w rn N r U).. v W N z • •- N z d O ••" U H Q w0 0 Z ¢Q Wz t/) p0¢ O aQof Z ow° Zai z ? 4 AO O ww° zz¢ z c/) -j C/) 0 zo cr) 2z ^w r) J F - 0 Z O a zof O cl) Fn U) w o m D U) 0 0 0 0 N w U-) Q N Z O � Y w Q PROJ NO: P703080244 SCALE: AS NOTED DATE: 05/20/08 DESIGNED BY: DRAWN BY: E. OUTHAVONG CHECKED BY: SHEET TITLE: ARCHITECTURAL INTERIOR FIXTURE 193 SHEET NO. AI -503 SHEET OF r E M fD Go 0 N Ld N 0 z -o iv 0 CL 3 Lo v o s w ar X U. s U� M Y L U N OO co O 1 2 3 4 5 12'-2„ 194 WALL DISPLAY D G L 1 G L 1 3'-0" 3'-0" 3'-0" 3'-0" PLAN 1 " 1-1/2"=1'-0" B 0 00 IA SPLAY NDER _ FRAME WD1 MT2 (: 3 SECTION 1-1 /2"= 1 —0 11 2 /DER FRAME WD1 MT2 2 tLtVA I IUN 1-1 /2"=1 '-0" 3 4 5 IF THIS DRAWING IS LESS THAN 22"X 34" IT IS A REDUCED SIZE DRAWING WD2 WD2 C A U a co t- o LLJw w w U z h Y N � WQ .6 ca ao0 F' � oho. O C-) rn ? Z o Coo F- N (n LLI 0 = Q d' Z N Oz ® W ¢acnaw o O a c OV a CA o Nco & l* w w ti (o o z Z N w O N W w oz F } o p Z ch Q 'o fn O tD J � �0 W >- � N (A ��r CN W N Z O ������� ���. N z a U Q w0 O pof � � Q J W Z U) p0< Op QQ� Q z Zzz0 O J y za�o _ �- H LL OWN '-� z z Qg 0 wWo z�< Z J U) Zp Z Q ~O z O F- a_ z O of cUn U W o m D U) 0 0 0 ao o w N Lc) Q N 6 z O U Y w a PROJ NO: P703080244 SCALE: AS NOTED DATE: 05/20/08 DESIGNED BY: DRAWN BY: E. OUTHAVONG CHECKED BY: SHEET TITLE: ARCHITECTURAL INTERIOR FIXTURE 194 SHEET NO. AI -504 SHEET OF 1 362 TIERED FLOOR FIXTURE I I ■� IA 2 3 4 5 4,_0„ DETAIL OF UNDERSIDE OF SHELF 1-1 /2"=1 '-0" 4 DETAIL 1-1 /2"=1'-0" 3 SECTION _ 1-1/209= 1 '-0" 2 3 IF THIS DRAWING IS LESS THAN 22" X WD2 4"x4" METAL TUBE METAL SLEEVE WD1, TYP. D2, TYP. SIZE DRAWING (: D PLAN 1-1 /2"=1'-0" 4"x4" VERTICAL TUBE, 45' ANGLE —'I " SHELF SUPPPORT I— ISL =1 —U 4 5 P-1 01 A 11 A .. . ........ U 0 w o ww WX U Y N ZO W 0 � co app w-00 O U C� o ? Z N 00 HW MO N O 0 2 ® Q In fn / OV O a N. p LN tt Li w c� p Z Z N w p N LU QZ � p LL (/1 Er} o 0 Z Z Dz M F- ti W rn J V 0 N _ U) N Z � W O •�•��� •�* N Z a U QIll w 0 O p� w F -Q J W Z V) p0Q O0 <<R Q Zz0 O J w H Z 04 I` Lu LL I.- U O�N Z AW L W LL O ��[_ -LL ?°a Z W Qa`l) 0 QO / V \ Z cl) 2z 0 z 0 F- CL 0 Ixz n / w o \ \ m m 0 0 0 0 o w N L6 Q N Q Z (: D PLAN 1-1 /2"=1'-0" 4"x4" VERTICAL TUBE, 45' ANGLE —'I " SHELF SUPPPORT I— ISL =1 —U 4 5 P-1 01 A 11 A .. . ........ U 0 w o ww WX U Y N ZO W 0 � co app w-00 O U C� o ? Z N 00 HW MO N O 0 2 ® Q In fn OV O a N. p LN tt Li w c� p Z Z N w p N LU QZ � p LL (/1 Er} o 0 Z Z Dz M F- ti W rn J V 0 N _ U) N Z � W O •�•��� •�* N Z a U QIll w 0 O p� w F -Q J W Z V) p0Q O0 <<R Q Zz0 O J w H Z 04 I` Lu LL I.- U O�N Z AW L W LL O ��[_ -LL ?°a Z W Qa`l) 0 QO r Z cl) 2z 0 z 0 F- CL 0 Ixz n � w o m m 0 0 0 0 o w N L6 Q N Q Z r v- 0 � Y � Q PROJ NO: P703080244_____ SCALE: AS NOTED DATE: 05/20/08 DESIGNED BY: DRAWN BY: E. OUTHAVONG CHECKED BY: SHEET TITLE: ARCHITECTURAL INTERIOR FIXTURE 362 SHEET NO AI -505 SHEET OF 11 C A 2 GENERAL NOTES 1. ALL WORK, PLANS AND CALCULATIONS ARE TO BE PERFORMED IN ACCORDANCE WITH THE APPLICABLE RULES AND REGULATIONS ALL GOVERNING AGENCIES INCLUDING BUT NOT LIMITED TO THE CODES AND REGULATIONS AS SET FORTH BY THE FLORIDA FIRE PREVENTION CODE, NFPA 101, 2004 EDITION, LIFE SAFETY CODE, NFPA 101 , 2C EDITION, AUTOMATIC SPRINKLER SYSTEMS, NFPA 12, 2002 EDITION, NATIONAL FIRE ALARM CODE, NFPA 70, 2005 EDITION AND ALL AUTHORITIES HAVING JURISDICTIONS. 2. SPRINKLER CONTRACTOR SHALL SUBMIT A COMPLETE SET OF PLANS, CALCULATIONS AND SPECIFICATIONS FOR THE FIRE SUPPRESSION SYSTEM FOR APPROVAL BY THE ENGINEER AND FIRE SUB -CODE OFFICIAL. 3. SPRINKLER CONTRACTOR SHALL COMPLY WITH REQUIREMENTS OF OWNER'S INSURANCE UNDERWRITER FOR SUBMITTALS, APPROVALS, MATERIALS, INSTALLATION, INSPECTIONS AND TESTING. 4. INSTALLER'S QUALIFICATIONS: A QUALIFIED FIRM THAT IS EXPERIENCED (MINIMUM OF 5 PREVIOUS PROJECTS SIMILAR IN SIZE AND SCOPE TO THE PROJECT) IN SUCH WORK, FAMILIAR WITH PRECAUTIONS WITH THE REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION. REQUIRED, AND IN COMPLIANCE 5. BEFORE SUBMITTING PROPOSAL, BIDDERS SHALL CAREFULLY EXAMINE EXISTING FIELD CONDITIONS AND CONTRACT DRAWINGS OF ALL TRADES. SUBMISSION OF PROPOSAL WILL BE CONSTRUED AS EVIDENCE THAT REQUIRED EXAMINATION HAS BEEN MADE. LATER, CLAIMS FOR EXTRA LABOR, EQUIPMENT AND MATERIALS REQUIRED DUE TO EXISTING FIELD CONDITIONS, WHICH COULD HAVE BEEN FORESEEN, WILL NOT BE RECOGNIZED. 6. ALL EXISTING PIPING IS SHOWN IN APPROXIMATE LOCATIONS ONLY. CONTRACTOR TO VERIFY IN FIELD ALL SIZES, LOCATIONS AND ELEVATIONS OF ALL NEW CONNECTION POINTS TO EXISTING PIPING. COORDINATE HIS WORK WITH ALL OTHER TRADES. 7. PROVIDE, AT NO EXTRA COST, ALL ADDITIONAL PIPING AND FITTINGS REQUIRED TO OFFSET SYSTEM TO AVOID EXISTING/NEW STRUCTURAL, ARCHITECTURAL, MECHANICAL AND ELECTRICAL INTERFERENCE, WHETHER INDICATED OR NOT, BEFORE INSTALLING WORK. 8. CONTRACTOR TO VERIFY ALL DIMENSIONS IN FIELD PRIOR TO CONSTRUCTION, AND REPORT TO ENGINEER ALL ERRORS, DISCREPANCIES, OMISSIONS, DEFECTS, OR UNUSUAL CONDITIONS BEFORE COMMENCING CONSTRUCTION. 9. CONTRACTOR TO SECURE ALL NECESSARY PERMITS REQUIRED FOR THE STIPULATED WORK PRIOR TO COMMENCING WITH CONSTRUCTION OR DEMOLITION. 10. ALL ASBESTOS REMOVAL, PLUMBING, ELECTRICAL, WELDING WORK, ETC. TO BE PERFORMED BY LICENSED CONTRACTORS. 11. ALL CONTRACTORS, WORKMEN, AND AGENTS WORKING AT OR VISITING THE SITE SHALL BE COVERED BY ALL NECESSARY STATUTORY INSURANCE INCLUDING LIABILITY, WORKMEN'S COMPENSATION, DISABILITY, ETC.. 12. ALL WORK SHALL BE PERFORMED IN A NEAT, CLEAN, ORDERLY MANNER AND THE SITE KEPT CLEAN FROM DUST AND DEBRIS AT ALL TIMES. 13. PROVIDE ALL TEMPORARY LIGHTING, POWER, WATER, WATERPROOFING, ETC.. AS REQUIRED AND NECESSARY UNLESS OTHERWISE SPECIFIED. 14. PROVIDE ALL NECESSARY SHORING, BRIDGING, BARRICADES, SIGNS, ETC., TO INSURE PROJECT SAFETY AT ALL TIMES. 15. ALL WORK, INCLUDING TESTING AND TEMPORARY SHUT DOWN OF SERVICES, IS TO BE COORDINATED WITH OWNER'S SCHEDULE FOR DELIVERIES, WORKDAYS, TIMES, ETC.. 16. ALL NEW WORK TO BE THOROUGHLY TIED AND BONDED TO EXISTING WORK. 17. ALL PATCHING AND JOINING SHALL BE NEAT, CLEAN AND SQUARE, MATCHING ADJACENT SURFACES IN FINISH AND TEXTURE. SPRINKLER CONTRACTOR SHALL BE RESPONSIBLE FOR ANY CUTTING, PATCHING AND/OR REMOVAL OF CEILING TILES ETC. HE SHALL RESTORE ALL AREAS AS A RESULT OF THE FIRE PROTECTION INSTALLATION TO MATCH EXISTING CONDITIONS. 18. ALL FIRE RETARDANT MATERIALS SHALL BEAR STAMPS, SEALS AND/OR PERMANENT LABELS AS REQUIRED. AFFIDAVITS SHALL BE FURNISHED WHERE REQUESTED. 19. ALL WORK TO BE PLUMB, LEVEL AND OF THE BEST WORKMAMSHIP. 20. ALL NEW PIPING SHALL BE RUN CLOSE TO BEAMS, WALLS AND SLABS, SQUARE TO BUILDING CONSTRUCTION, CONCEALED ABOVE HUNG CEILINGS AND WITHIN FURRED SPACES. 21. CONTRACTOR TO FULLY COORDINATE HIS WORK AND EFFORTS WITH OTHER TRADES TO INSURE A PROPER, DIMENSIONALLY ACCURATE JOB IN ALL RESPECTS TO RELATED WORK. CONTRACTOR SHALL COORDINATE COMPLETE SPRINKLER LAYOUT WITH CEILINGS, LIGHTING, HVAC DIFFUSERS AND SURROUNDING OBSTRUCTION. 22. SPRINKLER HEADS SHALL BE CHROME PLATED IN FINISHED SPACES, EXPOSED TO VIEW. ROUGH BRONZE FINISH FOR HEADS IN UNFINISHED SPACES AND NOT EXPOSED TO VIEW. 23. SPRINKLER HEADS - FUSIBLE LINK TYPE, PROVIDE HEADS WITH NOMINAL 1/2" DISCHARGE ORIFICE FOR ORDINARY TEMPERATURE RANGE. IN ALL MECHANICAL EQUIPMENT ROOMS AND/OR BOILER ROOMS 24. THE SPRINKLER CONTRACTOR SHALL MAKE AN ALLOWANCE TO A MINIMUM OF 20% ADDITIONAL SPRINKLER HEADS TO BE INSTALLED AS TO PROVIDE ADEQUATE COVERAGE DUE TO ANY OBSTRUCTIONS, DUCTWORK, PIPING, ETC. INSTALLED DURING CONSTRUCTION WHICH MAY ALTER THE ORIGINAL SPRINKLER DESIGN. 25. THE JOB SHALL BE ADEQUATELY STAFFED AT ALL TIMES TO INSURE CONTINUITY AND PROGRESS, WITH ALL PHASES/SEGMENTS OF WORK PROPERLY COORDINATED. 26. ALL DEFECTIVE OR UNACCEPTABLE WORK SHALL BE REMOVED AND REPLACED TOGETHER WITH SURROUNDING AFFECTED AREAS AT NO ADDITIONAL EXPENSE TO THE OWNER. 27. CONTRACTOR TO SUBMIT SHOP DRAWINGS AND SAMPLES FOR ENGINEER APPROVAL WHERE REQUIRED BY DOCUMENTS PRIOR TO PROCEEDING WITH WORK. 28. ALL WORK, UNLESS OTHERWISE SPECIFIED, TO BE GUARANTEED FOR A MINIMUM OF ONE YEAR FROM FINAL ACCEPTANCE. 29. ANY AND ALL TESTING AS DEEMED NECESSARY BY THE ENGINEER SO AS TO VERIFY PRODUCT AND MATERIAL COMPLIANCE WITH THE DRAWINGS IS TO BE PERFORMED BY THE CONTRACTOR VIA CERTIFIED TESTING LABORATORIES AT NO COST TO THE OWNER 30. ANY CONFLICT BETWEEN THE SPECIFICATIONS AND DRAWINGS IS TO BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO WORK. 31. COORDINATE ALL TRADES DUE TO TIGHT CONDITIONS. LOCATIONS OF ALL M.E.P. & F.P. LINES IS SCHEMATIC AND WILL BE DETERMINED BY ARCHITECTURAL PLANS. G.C. TO COORDINATE WITH ARCHITECT. 32. ALL M.E.P. LINES, SUCH AS RISERS, PLUMBING, LEADERS, STACKS, WASTE, HEATING, ELECTRICAL AND FIRE PROTECTION LINES, ETC., SHALL BE CONCEALED. CONSULT WITH ARCHITECT FOR APPROVAL DURING LAYOUT STAGES IN ORDER TO LOCATE BOXING. 33. ALL M.E.P. LINES IN AREAS WITHOUT HUNG CEILINGS MUST BE LOCATED AT PARTITION AND BOXED IN TO CREATE BEAM EFFECT, (WALL TO WALL). CONSULT WITH ARCHITECT FOR APPROVAL DURING LAYOUT STAGES IN ORDER TO LOCATE BOXING. TENANT SAFETY NOTES (FOR WORK IN OCCUPIED BUILDINGS ONLY) 1. CONSTRUCTION WORK WILL BE CONFINED TO THE BUILDING INTERIOR AND WILL NOT CREATE DUST, DIRT, OR OTHER SUCH INCONVENIENCES TO THE APARTMENT UNITS WITHIN THE BUILDINGS. 2. CONSTRUCTION WORK WILL NOT BLOCK HALLWAYS OR MEANS OF EGRESS FOR TENANTS OF THE BUILDING. 3. CONSTRUCTION OPERATION WILL NOT INVOLVE INTERRUPTIONS OF WATER OR ELECTRICAL SERVICES TO TENANTS OF THE BUILDING. 4. CONSTRUCTION OPERATION WILL BE CONFINED TO NORMAL WORKING HOURS; 9:00 AM THROUGH 5 PM, MONDAY THROUGH FRIDAY, EXCEPT LEGAL HOLIDAYS UNLESS AUTHORIZED IN WRITING BY THE OWNERS. 3 SPRINKLER DESIGN CRITERIA FOR HYDRAULIC CALCULATIONS 1. ALL SPRINKLER SYSTEMS THROUGHOUT SCOPE OF WORK SHALL BE HYDRAULICALLY CALCULATED (BY FIRE PROTECTION SPRINKLER CONTRACTOR) ON COORDINATED SHOP DRAWINGS. 2. SPRINKLER SYSTEM LAYOUT AND CALCULATIONS SHALL COMPLY WITH NEPA-13, LOCAL BUILDING CODE, LOCAL FIRE DEPARTMENT, OWNERS INSURANCE UNDERWRITERS AND ALL OTHER AUTHORITIES HAVING JURISDICTIONS. 3. HYDRAULIC SIZING CRITERIA: HYDRAULIC CALCULATION, USE TO DETERMINE PIPE SIZES SHALL BE REQUIRED BY THE AUTHORITIES HAVING JURISDICTION AND SHALL BE CALCULATED AS FOLLOWS: 1. OCCUPANCY CLASSIFICATION: = LIGHT HAZARD, ORDINARY HAZARD 2. DENSITY = 00.10 GPM/SQ.FT, 0.15 GPM/SQ.FT. 3. AREA OF APPLICATION = 1,500 SQ.FT, 2,000 SQ.FT. (MOST REMOTE) 4. COVERAGE/SPRINKLER = 225 SQ.FT., 130 SQ.FT. 5. STORAGE SPACES & MER SHALL BE CONSIDERED ORDINARY HAZARD -GROUP 1 AND THE COVERAGE/SPRINKLER SHALL 130 SQ.FT. OR LESS. 4. THE CONTRACTOR SHALL BE RESPONSIBLE TO PREPARE HYDRAULIC CALCULATIONS AND OBTAIN APPROVAL FROM ALL AUTHORITIES HAVING JURISDICTION OVER THE SPRINKLER WORK, INCLUDING THE OWNERS INSURANCE CO. IN ADDITION, OBTAIN AGENCY APPROVALS FOR HYDRAULICS PRIOR TO INSTALLATION OF NEW WORK. 5. MINIMUM PRESSURE AT ANY SPRINKLER HEAD SHALL BE AS REQUIRED FOR THE MINIMUM DISCHARGE OF THE HEAD, BUT IN NO CASE LESS THAN 7 PSI. BRANCH PIPE SIZE SCHEDULE NUMBER OF SPRINKLER HEADS ON THE PIPE PIPE SIZE 1 HEAD 1" 2 & 3 HEADS 11/" 4 AND 5 HEADS 14' 6 AND UP TO 10 HEADS 2" 11 AND UP TO 20 HEADS 2-1/2- 21 AND UP TO 40 HEADS 3" 41 AND UP TO 65 HEADS 4" NOTES: 1. PIPE SIZES AS SHOWN ARE MINIMUM SIZES ALLOWABLE AND ARE FOR BRANCH PIPING ONLY. REFER TO FLOOR PLAN FOR ACTUAL SIZES. 2. REFER TO FLOOR PLAN FOR THE SIZES OF FEED MAIN, VALVE ASSEMBLY, LOOP AND/OR CROSS MAIN PIPING. IF THIS nRAWINr, IS I FSS THAN 22" X.14" IT IS A U WING 4 5 DRAWING LIST SP -001 SPRINKLER SYMBOLS, NOTES AND DRAWING LIST SP -101 SPRINKLER FLOOR PLAN SP -201 SPRINKLER DETAILS SHEET FP -301 SPRINKLER SPECIFICATIONS SYMBOL LIST NEW CONCEALED TYPE SPRINKLER HEAD 1" RELOCATE EXISTING SPRINKLER HEAD AND ARM OVER TO NEW SPRINKLER HEAD 0.E EXISTING CONCEALED TYPE SPRINKLER HEAD TO REMAIN OE EXISTING UPRIGHT TYPE SPRINKLER HEAD TO REMAIN REMOVE EXISTING SPRINKLER HEAD EXISTING SPRINKLER PIPING TO REMAIN NEW SPRINKLER PIPING X >< EXISTING SPRINKLER PIPING TO BE REMOVE co o CONNECT NEW PIPING TO EXISTING SPRK SPRINKLER ABP AUTOMATIC BALL DRIP GOAA GREATER ORLANDO AVIATION AUTHORITY A A 66 H Z J D co Z O U w 0 u Q 66 z O W X I- cl) of LU 0 CL � Q J UJ Z 0OQ J 1- Q Q � ZOwO Q ILL Z 0 o Q 0 LLJ ILL H'Z Z u- Q QQ(!1 J (n ZO Z Lli � QJ 0 PROJ NO: 1498.S05 SCALE: 1/4" = 1'-0" DATE: 12/CIM&08 DESIGNED BY: OG DRAWN BY: DR CHECKED BY: OG rn 0 M 0 rn _N Lu p N w U) L >: Mo Z Y a W rn ?: N_ Nt W N N Z a z O I- a_ z a O (f) 65 w o m 0 U) 0- o 0 0 0 o w N lA Q N O YIQ I SHEET TITLE: I SPRINKLER SYMBOLS, NOTES & DRAWING LIST SHEET NO. SP -001 SHEET F toU v �1 C103w a W co o U Y ZZ Ow Q .0 `�h co otS U z Z Co o O co cn = Q W N Z N w 2 ¢�cnaw o ® z I- cl) of LU 0 CL � Q J UJ Z 0OQ J 1- Q Q � ZOwO Q ILL Z 0 o Q 0 LLJ ILL H'Z Z u- Q QQ(!1 J (n ZO Z Lli � QJ 0 PROJ NO: 1498.S05 SCALE: 1/4" = 1'-0" DATE: 12/CIM&08 DESIGNED BY: OG DRAWN BY: DR CHECKED BY: OG rn 0 M 0 rn _N Lu p N w U) L >: Mo Z Y a W rn ?: N_ Nt W N N Z a z O I- a_ z a O (f) 65 w o m 0 U) 0- o 0 0 0 o w N lA Q N O YIQ I SHEET TITLE: I SPRINKLER SYMBOLS, NOTES & DRAWING LIST SHEET NO. SP -001 SHEET 04 04 9 Go 0 I 2 3 4 5 E a coo y w w wx �- coo Z 0YN co -iCM4 w z z < CD 7 T-1-7 . . . . . .... .... 0 o?s 10co 0 z co NOTES: -.7 J 17 V 7- �Z_ z - LU X co I-- LLj q 1. CONTRACTOR TO VERIFY SPARE SPRINKLER HEADS KEPT ON SITE IS m F- < U) w z clj OF SAME KIND AS NEW INSTALLED . IF NEED, PROVIDE SPARE HEADS II 0 p o D D Ix 1: AND ESCUTCHEON PLATES FOR SPACE. SPARE HEADS QUANITY < (L SHALL BE AS PER NFPA REQUIPMENTS. (V$ 2. ALL WORK, PLANS AND CALCULATIONS ARE TO BE PERFORMED IN F91--07 F- -1 R 11 1 11 ACCORDANCE WITH THE APPLICABLE RULES AND REGULATIONS ALL ---EX EX -- GOVERNING AGENCIES INCLUDING BUT NOT LIMITED TO THE CODES AND REGULATIONS AS SET FORTH BY THE FLORIDA FIRE PREVENTION CODE, NFPA 101, 2004 EDITION, LIFE SAFETY CODE, NFPA 101 , 2003 EDITION, [> AUTOMATIC SPRINKLER SYSTEMS, NFPA 12, 2002 EDITION, NATIONAL FIRE 11' F 0 0 ALARM CODE, NFPA 72, 2002 EDITION AND ALL AUTHORITIES HAVING L -J JURISDICTIONS. UN L -1 S 2) XPRINKLER SYSTEM 0 of 0 MAN Umma Docummm ift A 0 "IQ 0 0 0 EX EX N 0 O R C, a' -o" w r 0 IL ow 0 F7III co oll z F- cl� W Lu 0 LL: 0 -- — -------------- - -- 0 fD oz U) i; >� (0 ;-j 0 Z 0ce) F- cv) Z -:E z o F- (DO w >- U CV C,4 U) <4> .4. W N Z o4z a: 0 c c /-4--NSPRINKLER FLOOR PLAN "-�SCA�LE- 1�/4"=l co 41 16, W Ld 0 CL Ell < W Z 0 < p 0 < < Ix oho > — W LL 0 < z w 0 0 w W LL z0 z LL < Z U) c/) 0 z < W —i 0 B B z 0 CL z x0 0 C/) U) W U) N� co 0 0 w 04 6 < N z 0 w < Y PROJ NO: 1498.S05 SCALE: 1/4" = V-0" DATE: 12/014BO-08 DESIGNED BY: OG A A DRAWN BY: DR CHECKED BY: OG SHEET TITLE: SPRINKLER FLOOR PLAN SHEET NO. SP -101 2 1 1 4 1 5 ISHEET OF IF THIS DRAWING IS LESS THAN 22" X 34" IT IS A REDUCED SIZE DRAWING E m o N N u'i N O z a 0 0 a 1 2 3 4 5 c IA 1" DIA. NIPPLE MIN. 4" LENGTH EXIST. BRANCH MINIMUM "T" 1"X1"X1" »Tl WOOD WEDGEABLE PENDENT SPRINKLER HEAD (SEE SPECIFICATION & DWG. FOR TYPE) HANGER REQUIRED FOR ARMOVERS OVER 24" "C" CLAMP "DROP NIPPLE 9" X 1/2" COUPLING SUSPENDED CEILING SPRINKLER HEAD CONNECTION FOR SUSPENDED CEILING NOT TO SCALE EXISTING WF STEEL MEMBER STEEL RESTRAINING STRAP ROD (SIZE AS REQUIRED) SPRINKLER PIPE CLEVIS HANGER TYPICAL HANGER DETAILS NOT TO SCALE NOTES: 1. CLEVIS HANGERS REQUIRED ON PIPING LARGER THAN 1" 2. GENERAL PURPOSE HANGERS MAY BE USED ON 1" SPRINKLER PIPING ONLY. 3. MAX DISTANCE BETWEEN HANGERS ON PIPING 1 1/4" AND SMALLER: 12' 4. MAX DISTANCE BETWEEN HANGERS ON PIPING 1 1/2" AND LARGER: 15' 1/2' DIA, P MAX, 4' LE EXIST, BRAS WITH 1/2' OUTLET BF 1/ 1/ JI I\11 Y1\LLI\ 1 ILr'IL JVJI LIILLL (SEE SPECIFICATION CEILING & DWG, FOR TYPE) SPRINKLER HEAD CONNECTION FOR SUSPENDED CEILING NOT TO SCALE % I A r%I rn ARM -OVER DETAIL NOT TO SCALE EXISTING I BRANCH MAIN 1"0 SYSTEM DROP NIPPLE I �-- 1 " x 1/2 Qu 0)COUPLING Na M Cu' _ W 0) /1. - _N - - --- z W p N ig QZ i U)o t L>: � EXISTING SPRINKLER ~ '.�� o z c� SUSPENDED CEILING HEAD TO BE BE REMOVED z rDZ � I— ()o 07 0 CD J w NEW SPRINKLER HEAD •• U w N RELIABLE MDL. G4—FR zz •,� ,* N z a U SPRINKLER ARM OVER DETAIL C NOT TO SCALE H WO w CL 0 w L.L TERMINATE SLEEVE STANDARD WEIGHT STEEL PIPE a Q FLUSH WITH FINISHED SLEEVE OF SIZE TO PASS PIPE uJ z WALL SURFACES ANNULAR SPACE BETWEEN PIPE 0 AND SLEEVE TO BE PACKED WITH J p cl MINERAL WOOL AND SEALED. W Z Z Q ow > O WLL I,_a O I'K U Zz� cl) W0O w LL FINISHED ESCUTCHEON PLATE FLUSH Q Q z AGAINST WALL AND OF SIZE TO z LL Q 1/2" CLEAR MAXIMUM COMPLETELY COVER OPENING (TYPICAL z (n FOR EACH SIDE). Q Q J (n QO FINISHED WALL SURFACE. Z CONCEALED PIPING PIPING EXPOSED TO VIEW W J O SCHEMATIC OF PIPING PENETRATION THRU FIRE RATED WALL NTS B ED z 0 E_ - a_ z L) U O cn w c o co m D co 0 0 0 o CD N w Lo Q N Q � r z 0 U Y W � Q PROJ NO: 1498.SO5 SCALE: 1/4" = 1'-0" DATE: 12/@IM&08 DESIGNED BY: OG A DRAWN BY: DR CHECKED BY: OG SHEET TITLE: SPRINKLER DETALIS SHEET NO. SP -201 SHEET OF IF THIS DRAWING IS LESS THAN 22" X 34" IT IS A REDUCED SIZE DRAWING C13 E 422 d co c W0 uJ Lu Z U N Y VARIES VARIES Q J Lo w O � o * I 1/2' X 1' -- U z z o 'o wi=NM RED, ELBOW �-- EXISTING ELBOW ~ < w N _ ¢ z D 1" ELBOW D poop . w � ® QLncn NEW 1"0 PIPE NIPPLE c IA 1" DIA. NIPPLE MIN. 4" LENGTH EXIST. BRANCH MINIMUM "T" 1"X1"X1" »Tl WOOD WEDGEABLE PENDENT SPRINKLER HEAD (SEE SPECIFICATION & DWG. FOR TYPE) HANGER REQUIRED FOR ARMOVERS OVER 24" "C" CLAMP "DROP NIPPLE 9" X 1/2" COUPLING SUSPENDED CEILING SPRINKLER HEAD CONNECTION FOR SUSPENDED CEILING NOT TO SCALE EXISTING WF STEEL MEMBER STEEL RESTRAINING STRAP ROD (SIZE AS REQUIRED) SPRINKLER PIPE CLEVIS HANGER TYPICAL HANGER DETAILS NOT TO SCALE NOTES: 1. CLEVIS HANGERS REQUIRED ON PIPING LARGER THAN 1" 2. GENERAL PURPOSE HANGERS MAY BE USED ON 1" SPRINKLER PIPING ONLY. 3. MAX DISTANCE BETWEEN HANGERS ON PIPING 1 1/4" AND SMALLER: 12' 4. MAX DISTANCE BETWEEN HANGERS ON PIPING 1 1/2" AND LARGER: 15' 1/2' DIA, P MAX, 4' LE EXIST, BRAS WITH 1/2' OUTLET BF 1/ 1/ JI I\11 Y1\LLI\ 1 ILr'IL JVJI LIILLL (SEE SPECIFICATION CEILING & DWG, FOR TYPE) SPRINKLER HEAD CONNECTION FOR SUSPENDED CEILING NOT TO SCALE % I A r%I rn ARM -OVER DETAIL NOT TO SCALE EXISTING I BRANCH MAIN 1"0 SYSTEM DROP NIPPLE I �-- 1 " x 1/2 Qu 0)COUPLING Na M Cu' _ W 0) /1. - _N - - --- z W p N ig QZ i U)o t L>: � EXISTING SPRINKLER ~ '.�� o z c� SUSPENDED CEILING HEAD TO BE BE REMOVED z rDZ � I— ()o 07 0 CD J w NEW SPRINKLER HEAD •• U w N RELIABLE MDL. G4—FR zz •,� ,* N z a U SPRINKLER ARM OVER DETAIL C NOT TO SCALE H WO w CL 0 w L.L TERMINATE SLEEVE STANDARD WEIGHT STEEL PIPE a Q FLUSH WITH FINISHED SLEEVE OF SIZE TO PASS PIPE uJ z WALL SURFACES ANNULAR SPACE BETWEEN PIPE 0 AND SLEEVE TO BE PACKED WITH J p cl MINERAL WOOL AND SEALED. W Z Z Q ow > O WLL I,_a O I'K U Zz� cl) W0O w LL FINISHED ESCUTCHEON PLATE FLUSH Q Q z AGAINST WALL AND OF SIZE TO z LL Q 1/2" CLEAR MAXIMUM COMPLETELY COVER OPENING (TYPICAL z (n FOR EACH SIDE). Q Q J (n QO FINISHED WALL SURFACE. Z CONCEALED PIPING PIPING EXPOSED TO VIEW W J O SCHEMATIC OF PIPING PENETRATION THRU FIRE RATED WALL NTS B ED z 0 E_ - a_ z L) U O cn w c o co m D co 0 0 0 o CD N w Lo Q N Q � r z 0 U Y W � Q PROJ NO: 1498.SO5 SCALE: 1/4" = 1'-0" DATE: 12/@IM&08 DESIGNED BY: OG A DRAWN BY: DR CHECKED BY: OG SHEET TITLE: SPRINKLER DETALIS SHEET NO. SP -201 SHEET OF IF THIS DRAWING IS LESS THAN 22" X 34" IT IS A REDUCED SIZE DRAWING E cc N 0 0 0 N Ld N 0 z a 0 a IR IC IA 1 PART I - GENERAL 1.01 REQUIREMENTS A. THE CONTRACTOR SHALL HAVE EXPERIENCE ON AT LEAST (2) PROJECTS INVOLVING QUANTITIES AND COMPLEXITIES AT LEAST EQUAL TO THOSE REQUIRED UNDER THIS PROJECT. B. ALL WORK, PLANS AND CALCULATIONS ARE TO BE PERFORMED IN ACCORDANCE WITH THE APPLICABLE RULES AND REGULATIONS ALL GOVERNING AGENCIES INCLUDING BUT NOT LIMITED TO THE CODES AND REGULATIONS AS SET FORTH BY THE FLORIDA FIRE PREVENTION CODE, NFPA 101, 2004 EDITION, LIFE SAFETY CODE, NFPA 101 , 2003 EDITION, AUTOMATIC SPRINKLER SYSTEMS, NFPA 12, 2002 EDITION, NATIONAL FIRE ALARM CODE, NFPA 72, 2002 EDITION AND ALL AUTHORITIES HAVING JURISDICTIONS. C. FIRE PROTECTION ENGINEERING DOCUMENTS SHALL COMPLY WITH FLORIDA STATUTES F.S. 471.008, AND F.S. 471.003(2). DESIGN DOCUMENTS FOR FIRE PROTECTION SYSTEMS SHALL BE CREATED PROR TO BIDDING AND SHALL BE SUBMITTED FOR PERMITTING PUPOSES AT THE SAME TIME AS ALL OTHER DISCIPLINES, IN ACCORDANCE WITH F.S. 633.551(2). DESIGNS SHALL COMPLY WITH THE DIVISION OF STATE FIRE MARSHAL UNIFORM FIRE SAFETY RULES AND STANDARDS CHAPTER 4A-46, THE SOUTH FLORIDA BUILDING CODE, THE FLORIDA FIRE PREVENTION CODE, MOST CURRENT EDITION ADOPTED BY LAW AND THE TENANT DESIGN HANDBOOK FOR THE ORLANDO INTERNATIONAL AIRPORT DESIGN CRITERIA. D. BEFORE SUBMITTING HIS BID, THE SPRINKLER CONTRACTOR SHALL VISIT THE SITE AND SHALL FULLY FAMILIARIZE HIMSELF WITH THE STRUCTURAL LAYOUT OF THE EXISTING BEAMS IN RELATIONSHIP TO THE NEW HVAC DUCT LAYOUT AND NEW LIGHTING FIXTURES AND HUNG CEILING HEIGHTS AND BECOME FAMILIAR WITH THE DIFFICULTIES THAT WILL ATTEND THE EXECUTION OF THIS WORK. CONTRACTOR SHALL PERFORM THIS PRIOR TO SUBMITTING HIS PROPOSAL. SUBMISSION OF A PROPOSAL WILL BE CONSTRUED AS EVIDENCE THAT SUCH AN EXAMINATION HAS BEEN MADE, AND LATER CLAIMS WILL NOT BE RECOGNIZED FOR EXTRA LABOR, EQUIPMENT OR MATERIALS REQUIRED BECAUSE OF DIFFICULTIES ENCOUNTERED WHICH COULD HAVE BEEN FORESEEN HAD SUCH AN EXAMINATION BEEN MADE. E. UPON REVIEW OF SPRINKLER DRAWINGS PRIOR TO SUBMITTING HIS PROPOSAL, THE SPRINKLER CONTRACTOR SHALL INFORM ARCHITECT AND/OR ENGINEER OF ANY DISCREPANCIES OR REQUEST ARIFICATION IN WRITING, IF NECESSARY, CONCERNING THE INTENT OF THE PLANS AND SPECIFICATIONS TO PROVIDE A COMPLETE SPRINKLER INSTALLATION. LATER CLAIMS WILL NOT BE RECOGNIZED FOR EXTRA LABOR, EQUIPMENT OR MATERIALS SHOULD SUCH PROCEDURE NOT BE FOLLOWED. F. THE SCHEDULING OF THE SPRINKLER WORK SHALL BE COORDINATED WITH THE GOAA'S, WITH THER CONTRACTORS AND WITH THE CLIENT. G. NECESSARY SHUT -DOWNS OF BASE BUILDING SPRINKLER SYSTEM MUST BE COORDINATED WITH THE AIRPORT ENGINEERING AND THE ORLANDO INERNATIONAL AIRPORT FIRE DEPARTMENT AVIATION UNIT, FSST SECTION. REQUESTS FOR SHUT -DOWNS SHALL BE SUBMITTED NOT LESS THAN FIVE WORKING DAYS PRIOR TO SHUT -DOWN DATE, AND SHALL STATE EXPECTED LENGTHS OF SHUTDOWNS. H. TENANTS CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE THAT ALL SPRINKLERS ARE CAPPED AND SEALED THE END OF EACH NIGHT. THE SYSTEM WILL BE ACTIVATED EACH NIGHT AND THROUGHOUT THE WEEKENDS. ANY DAMAGES TO PROPERTY AND/OR PERSONS WILL BE THE RESPONSIBILITY OF THE TENANT'S CONTRACTOR. ANY SPRINKLER WORK BEING CONDUCTED BETWEEN 2230 AND 0500 MUST BE SCHEDULED WITH GOAA'S. CONTACT THE COORDINATION SITE OFFICE FOR FURTHER PROCEDURES AND SCHEDULED DRAIN -DOWN DATES AND TIMES. 1.02 WORK INCLUDED A. WORK SHALL INCLUDE ALL SPRINKLER WORK FURNISHED AND INSTALLED FOR THE CLIENT. 1. ALL WORK SHALL COMPLY WITH THE DIVISION OF STATE FIRE MARSHAL UNIFORM FIRE SAFTERY RULES AND STANDARDS CHAPTER 4A-46, THE SOUTH FLORIDA BUILDING CODE, AND THE FLORIDA FIRE PREVENTION CODE AND GOAA TENANT HANDBOOK . 2. WORK SHALL ALSO INCLUDE THE REMOVAL OF EXISTING SPRINKLER PIPING, HEADS, AND SUPPORTS AS NOTED. B. SPRINKLER HEAD LAYOUT SHALL BE BASED ON THE LOCATIONS INDICATED ON THE PLANS, AND SHALL BE INSTALLED WITH NO TOLERANCE FROM THE CENTER OR CEILING TILE. THE SPRINKLER CONTRACTOR SHALL COORDINATE HIS WORK WITH EXISTING CONDITIONS AND WITH WORK OF ALL OTHER CONTRACTORS. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY CONFLICTS IN WRITING BETWEEN THE OTHER TRADES BEFORE INSTALLATION OF THE SPRINKLER SYSTEM. C. SPRINKLER SYSTEM SHALL BE: 1. A HYDRAULICALLY DESIGNED SYSTEM IN ACCORDANCE WITH THE STANDARDS OF THE NATIONAL FIRE PROTECTION ASSOCIATION. 2. DESIGN SYSTEM TO CONFORM WITH BUILDING STRUCTURAL, MECHANICAL AND ELECTRICAL SYSTEMS, EITHER EXISTING OR PROPOSED. 2 1 3 D. THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL LOCATION OF WORK. SCALED DIMENSIONS SHALL NOT BE USED. ANY DIMENSIONS NOT SHOWN SHALL BE OBTAINED FROM THE ARCHITECTURAL DRAWINGS. FOR EXACT LOCATIONS, MOUNTING HEIGHTS, ETC., REFER TO ARCHITECTURAL DRAWINGS AND DETAILS. ALL DIMENSIONS, ETC., SHALL BE VERIFIED BY FIELD CHECK. 1.03 SHOP DRAWINGS AND DATA A. THE CONTRACTOR SHALL SUBMIT, FOR APPROVAL, FULLY COORDINATED SHOP DRAWINGS, CAPACITY DATA, HYDRAULIC CALCULATIONS AND CATALOG CUTS OF THE FOLLOWING: 1. PIPE AND FITTINGS 2. SPRINKLER HEADS 3. HANGERS AND SUPPORTS 4. SPRINKLER AND PIPING LAYOUT 5. HYDRAULIC CALCULATIONS 1.04 BUILDING DEPARTMENT FILING. PERMITS. AND CERTIFICATES A. THE SPRINKLER CONTRACTOR SHALL FILE ALL REQUIRED DRAWINGS AND SPECIFICATIONS WITH THE LOCAL BUILDING DEPARTMENT AND BE RESPONSIBLE FOR OBTAINING FINAL APPROVAL. 1.05 INSPECTION AND TESTING A. THE SPRINKLER SYSTEM SHALL BE INSPECTED AND TESTED IN ACCORDANCE WITH THE REQUIREMENTS OF NFPA 13 AND NFPA 24 AND SHALL INCLUDE THE USE OF NFPA FORMS 85A AND 85B. B. THE SPRINKLER SYSTEM SHALL BE SUBJECTED TO A HYDROSTATIC PRESSURE TEST FOR A PERIOD OF TWO HOURS AT A PRESSURE OF AT LEAST 200 PSIG OR 50 PSI IN EXCESS OF THE MAXIMUM PRESSURE TO BE MAINTAINED WHEN THE MAXIMUM PRESSURE IN THE SYSTEM IS IN EXCESS OF 150 PSI AS PER NFPA. C. BEFORE SPRINKLER SYSTEM IS CONCEALED, THE BUILDING DEPARTMENT SHALL BE NOTIFIED THAT THE SYSTEM IS READY FOR INSPECTION AND TESTING. TESTS SHALL BE CONDUCTED IN THE PRESENCE OF INSPECTORS HAVING JURISDICTION AND THE ENGINEER OF RECORD. 1.06 FLUSHING A. ALL FIRE PROTECTION PIPING SHALL BE FLUSHED OUT IN ACCORDANCE WITH REQUIREMENT OF THE NATIONAL FIRE PROTECTION ASSOCIATION PAMPHLET NO. 13 AND 14, LATEST EDITION. PART 2 - MATERIALS 2.01 GENERAL A. THE SPRINKLER SYSTEM SHALL BE COMPLETE WITH ALL PIPE, FITTINGS, VALVES, DRAINAGE SYSTEM AND VALVES, SPRINKLER HEADS, HANGERS AND SUPPORTS, ALSO MISCELLANEOUS WORK ITEMS, SUCH AS, SIGNS AS REQUIRED, VALVE TAGS, ETC., AND ALL OTHER RELATED EQUIPMENT, APPARATUS, AND MATERIAL ITEMS NECESSARY FOR COMPLETE, SATISFACTORY OPERATING AND APPROVED TYPE SYSTEM. B. ALL PIPE FITTINGS, HANGERS, SUPPORTS, SPRINKLER HEADS, ETC., SHALL CONFORM TO THE BOCA BUILDING CODE AND NATIONAL FIRE PROTECTION ASSOCIATION'S REQUIREMENTS AS TO TYPES OF MATERIALS, ARRANGEMENT, SIZES, AND INSTALLATION EXCEPT THAT NO FACE OR FLUSH BUSHING SHALL BE USED. REDUCING FITTINGS SHALL BE PROVIDED IN LIEU OF BUSHINGS. 2.02 SPRINKLER PIPING A. ALL SPRINKLER PIPING SHALL BE SCHEDULE 40 BLACK STEEL PIPE PAINTED ASTM -53 RED WITH 150 LB BLACK MALLEABLE IRON SCREWED FITTINGS OR GROOVED PIOPE COUPLINGS TESTED AND APPROVED BY FACTORY MUTUAL. USE GALVANIZED STEEL PIPE WHERE EXPOSED TO WEATHER. 2.03 SPRINKLER HEADS A. CONCEALED SPRINKLER HEADS - RELIABLE MODEL 'G4FR', FM APPROVED AND UL LISTED, ADJUSTABLE TYPE. HEADS SHALL BE 1/2" STANDARD ORIFICE WITH 1/2" NPT THREAD,165 DEG. TEMPERATURE RATING. 2.04 TAMPER SWITCHES A. WHERE INDICATED ON THE DRAWINGS, FURNISH AND INSTALL VALVE TAMPER SWITCHES FOR SUPERVISION OF O.S.& Y. SHUT OFF VALVES. TAMPER SWITCHES SHALL BE ADT, ITT GRINNELL CORP., AUTO -CALL OR APPROVED OTHER. 2.05 WATER FLOW DETECTOR A. WHERE INDICATED ON THE DRAWINGS FURNISH AND INSTALL WATER FLOW ALARMS. WATER FLOW ALARMS SHALL BE PADDLE TYPE NON -CODED, RATED AT 120 VOLTS AD, 10 AMPS NORMALLY OPEN SWITCH, ACME TYPE 430 OR APPROVED OTHER. IF THIS DRAWIN(. IS I FSS THAN 99" X14" IT IS A RFDIJCFD SIZF DRAW 4 2.06 CUTTING AND PATCHING A. DO ALL CUTTING NECESSARY FOR THE INSTALLATION OF SPRINKLER WORK. ACCURATELY LAYOUT WORK FOR WHICH CUTTING IS REQUIRED, SO AS TO AVOID UNNECESSARY LARGE OPENINGS. CUTTING OF BEAMS, JOISTS, FLOORS OR WALLS OF THE BUILDING WILL NOT BE PERMITTED EXCEPT AFTER RECEIVING APPROVAL OF THE BUILDING MANAGER. B. ROUGH PATCHING WILL BE DONE BY THIS CONTRACTOR IN A MANNER TO ACCOMMODATE FINISHED PATCHING WORK. FINISHED PATCHING WILL BE DONE "UNDER ANOTHER SECTION OF THE SPECIFICATIONS". 2.07 INSERTS, HANGERS, ETC. A. ALL SPRINKLER PIPING SHALL BE SUBSTANTIALLY SUPPORTED AND SHALL COMPLY WITH THE STANDARDS OF THE NATIONAL FIRE PROTECTION ASSOCIATION FOR THE INSTALLATION OF SPRINKLER SYSTEMS AND AS REQUIRED BY THE STATE AND LOCAL CODE AND FACTORY MUTUAL. B. HANGERS AND THEIR COMPONENTS SHALL BE FERROUS. HANGERS SHALL BE ADJUSTABLE, FLAT IRON TYPE OR CLEVIS TYPE. C. SPRINKLER PIPING OR HANGERS SHALL NOT BE USED TO SUPPORT NON -SYSTEM COMPONENTS. D. SPRINKLER PIPING SHALL BE SUBSTANTIALLY SUPPORTED FROM THE BUILDING STRUCTURE WHICH MUST SUPPORT THE ADDED LOAD OF THE WATER -FILLED PIPE PLUS A MINIMUM OF 250 LBS. APPLIED AT THE POINT OF HANGING. E. SPRINKLER PIPING SHALL BE SUPPORTED INDEPENDENTLY OF THE CEILING SHEATHING. F. WHEN SPRINKLER PIPING IS INSTALLED BELOW DUCTWORK, PIPING SHALL BE SUBSTANTIALLY SUPPORTED FROM THE BUILDING STRUCTURE, NOT FROM THE DUCTWORK. G. MAXIMUM DISTANCE BETWEEN HANGERS SHALL NOT EXCEED 12 FT. FOR 1 AND 1-1/4 IN. SIZES OR 15 FT. FOR SIZES 1-1/2 IN. AND LARGER. H. EXPANSION SHIELDS FOR SUPPORTING PIPES UNDER CONCRETE CONSTRUCTION MAY BE USED IN A HORIZONTAL POSITION IN THE SIDES OF BEAMS. IN CONCRETE HAVING GRAVEL OR CRUSHED STONE AGGREGATE, EXPANSION SHIELDS MAY BE USED IN THE VERTICAL POSITION TO SUPPORT PIPES 4 IN. OR LESS IN DIAMETER. r:>�il:>•��Z�7:Z�I�P►��:i�7��7:�11►t�1_�I�F���t A. SPRINKLER COMBINATION TEST AND DRAIN VALVE SHALL BE AGF MODEL #1000 BRONZE TYPE. B. FURNISH AND INSTALL A ONE INCH INSPECTORS TEST VALVE ASSEMBLY WITH SIGHT GLASS AND A 1-1/4" SYSTEM DRAIN VALVE ALL IN ACCORDANCE WITH NFPA-13. 2.09 TEST AND DRAIN CONNECTIONS STAND A. PROVIDE TEST AND DRAIN ASSEMBLY DOWNSTREAM OF EACH WATERFLOW ALARM SWITCH, CONSISTING OF TEST AND DRAIN VALVES, SIGHT GLASS AND CALIBRATED ORIFICE, AND CONNECT IT TO DRAIN AS NOTED. 1. APPROVED COMPACT COMBINATION TEST -DRAIN FITTINGS WITH THREADED ENDS, SIMILAR TO VICTAULIC STYLE 718, MAY BE USED. 2.10 PRESSURE GAUGE A. ASHCROFT SERIES 1079, OR APPROVED OTHER, 4-1/2" DIA- METER, 0-200 P.S.I. RANGE, 20 P.S.I. INTERVALS. 2.11 ESCUTCHEONS A. PROVIDE ESCUTCHEONS ON ALL EXPOSED PIPING PASSING THROUGH WALLS, PARTITIONS, FLOORS AND CEILINGS. ESCUTCHEON SHALL BE HELD IN PLACE BY INTERNAL TENSION OR SET SCREW. 2.12 GUARANTEE A. GUARANTEE FOR A PERIOD OF ONE (1) YEAR FROM THE DATE OF ACCEPTANCE BY THE OWNER, ALL MATERIALS, APPARATUS AND WORKMANSHIP WHETHER FURNISHED BY HIMSELF OR BY HIS SUBCONTRACTORS AND HE SHALL REPLACE OR REPAIR IN A MANNER APPROVED BY THE ARCHITECTS, WITHOUT COST TO THE OWNER, ANY PART OR PARTS OF THE WORK WHICH MAY PROVE DEFECTIVE OR UNSATISFACTORY WITHIN THE PERIOD OF THE GUARANTEE. 2.13 AS -BUILT DRAWINGS A. PREPARE AND SUBMIT "AS -BUILT" DRAWINGS AT THE COMPLETION OF THE PROJECT. BUILDING NOTES 1. PROVIDE TEMPORARY FIRE PROTECTION DURING CONSTRUCTION 2. CONSTRUCTION SHALL COMPLY WITH THE REGULATIONS OF THE GOAA. 3. FIRE WATCH MAY BE REQUIRED BY INSPECTOR AT TIME OF INSPECTION. 5 0 C c O0 f- W E a N.0) w0 p 00 U w Q p..00 cw o coo wwf-- U LZ PWW Y Z w z O Q "I o 3:co 00 OILL ii O� ir 00 0 H U Z w Z O 0) N Z H O Y H N C Q 00 oa LL J Q U-) w z O I- ( - z af O vi w U o m U) 0 0 0 o w N In Q N Q 6 Z O � Y w Q PROJ NO: 1498.S05 SCALE: 1/4" = V-0" DATE: 12101428-08 DESIGNED BY: OG A DRAWN BY: DR CHECKED BY: OG SHEET TITLE: SPRINKLER SPECIFICATIONS SHEET NO. SP -301 SHEET OF O0 f- W a N.0) w0 p CN w Q w cD Q a- Lu Z p� z W p N_ N OZ � o OILL ii O� OzNz H FZ Z o Z ' w O Y ch st C Q 00 w LL J w N u) ase v W N Z •;•;*• N Z d O •.• U Z_ Z z O I- ( - z af O vi w U o m U) 0 0 0 o w N In Q N Q 6 Z O � Y w Q PROJ NO: 1498.S05 SCALE: 1/4" = V-0" DATE: 12101428-08 DESIGNED BY: OG A DRAWN BY: DR CHECKED BY: OG SHEET TITLE: SPRINKLER SPECIFICATIONS SHEET NO. SP -301 SHEET OF 07 f- W w0 w Q Q a- -� Q poo Z QQ� OILL O� OzNz I..V F- _j ��'1} ..N U Z - C Q woo'' w LL Z LL.Q Q Q Q � J QO Cn Z_ Z �g ~O z O I- ( - z af O vi w U o m U) 0 0 0 o w N In Q N Q 6 Z O � Y w Q PROJ NO: 1498.S05 SCALE: 1/4" = V-0" DATE: 12101428-08 DESIGNED BY: OG A DRAWN BY: DR CHECKED BY: OG SHEET TITLE: SPRINKLER SPECIFICATIONS SHEET NO. SP -301 SHEET OF IN C E M w 0 N Lo N 0 z 2 HVAC ABBREVIATIONS AC AIR CONDITIONING L LENGTH HVAC SYMBOLS LIST FOR SMOKE DETECTORS IN DUCTWORK. ACC AIR-C❑❑LED CONDENSING UNIT LAT LEAVING AIR TEMPERATURE CENTER LINE AD ACCESS DOOR ABOVE FINISHED FLOOR LBS POUNDS OR CFM CUBIC FEET PER MINUTE THERMOSTAT AFF LD LDB LINEAR DIFFUSER AL ALUMINUM LEAVING DRY BULB TEMP, [] SQUARE INCHES AP ACCESS PANEL LIN. FT. LR LINEAR FEET [ SQUARE FEET BDD BACKDRAFT DAMPER LINEAR RETURN No- FLOW DIRECTION BHP BRAKE HORSEPOWER BLACK IR❑N LWB LWT LEAVING WET BULB TEMP. - - - EXISTING TO REMAIN BI LEAVING WATER TEMPERATURE 0 PIPE UP BTU BTUH BRITISH THERMAL UNITS BTU PER H❑URMBH MAX MAXIMUM THOUSAND BTU PER HOUR -0 PIPE DOWN FD&AD FS wD 122CD ®x1� 300CFM FIRE DAMPER AND ACCESS DOOR COMBINATION FIRE & SMOKE DAMPER AND ACCESS DOOR CEILING SUPPLY DIFFUSER CC COILING COIL MCC MOTOR CONTROL CENTER CD CEILING DIFFUSER MER MECHANICAL EQUIPMENT ROOM CFM CG CUBIC FEET PER MINUTE CEILING GRILLE MHP MOTOR HORSE POWER MIN MINIMUM -- -- -- - MOTOR CLG CEILING CHORD OPERATED DAMPER CEILING REGISTER COPPER MOT NC NC NIC NO COD NOISE CRITERIA 1202CR Z t00CFM - CEILING RETURN REGISTER NEW DUCTWORK CR CU NORMALLY CLOSED NOT IN CONTRACT NORMALLY OPEN CU, FT, CUBIC FEET VTl- NEW VOLUME DAMPER CU. IN. CUBIC INCHES NO. NUMBER FIRE DAMPER CV CONSTANT VOLUME NTS NOT TO SCALE D DROP ❑AI OUTSIDE AIR INTAKE DB DIAM, 0 DRY BULB TEMPERATURE DIAMETER ❑D ❑V OUTSIDE DIAMETER NEW CONNECTION OUTLET VELOCITY DN DOWN PD PHC PSIA PRESSURE DROP PREHEAT C❑IL DWG DX DRAWING DIRECT EXPANSI❑N EXHAUST AIR ZOO 0 EXISTING TO REMOVED PSI ABSOLUTE EA PSIG PSI GAUGE P❑INT OF DISCONNECTION EAT EDB EF ENTERING AIR TEMPERATURE ENTERING DRY BULB TEMP, EXHAUST FAN R RA RF RISE RETURN AIR RETURN FAN ELEC, ELECTRIC RM ROOM ERC EQ ELECTRIC REHEAT C❑IL RPM REVOLUTI❑NS PER MINUTE EQUAL RH RELATIVE HUMIDITY EWB ENTERING WET BULB TEMP, RHC REHEAT C❑IL EWT F ENTERING WATER TEMP, FILTER SLD STRIPLINE LINEAR DIFFUSER STATIC PRESSURE SP °F DEGREES FAHRENHEIT SPEC SPECIFICATI❑N FC FLEXIBLE CONNECTI❑N FIRE DAMPER SR SS SUPPLY REGISTER FD STAINLESS STEEL FA FREE AREA (SQ. FT.) FACE AREA T -STAT TEMP THERMOMETER F.A. FLA TEMPERATURE FULL LOAD AMPERES TG TOP GRILLE FPM FL, DR. FIN FL FSD FEET PER MINUTE FLOOR DRAIN TR TRF TOP REGISTER TRANSFER FAN FINISHED FLOOR FIRE & SMOKE DAMPER -------------- TYP, TYPICAL TOILET EXHAUST TX FT FEET UH UNIT HEATER FTR FINNED TUBE RADIATION V VOLTS GPH GALLONS PER HOUR GALLONS PER MINUTE W W/ WIDTH WITH GPM H HC HEIGHT HEATING C❑IL W/❑ WITHOUT WET BULB TEMPERATURE WB HR HOUR WG WATER GAUGE HUM HV HUMIDIFIER HEATING AND VENTILATING FREQUENCY (HERTZ) WMS WIRE MESH SCREEN VARIABLE AIR VOLUME BOX VAV VD HZ VOLUME DAMPER IN kW IN OR INCHES KILOWATT CONNECT TO EXISTING P❑INT OF DISCONNECTION FA 3 4 MECHANICAL CONTRACTOR NOTES: 1. MECHANICAL CONTRACTOR IS RESPONSIBLE FOR ALL DUNNAGE, SUPPORTS, INSTALLATION, LEVELING, METHODS OF HANGING, SUPPLEMENTAL STEEL AND REINFORCEMENTS, ETC. THAT WILL BE REQUIRED FOR ALL MECHANICAL EQUIPMENT UTILIZED FOR THIS PROJECT. 2. SIGNED AND SEALED DOCUMENTS PROVIDED BY THE LICENSED STRUCTURAL ENGINEER TO BE SUBMITTED FOR FINAL APPROVAL TO THE ARCHITECT OF RECORD, PRIOR TO ACTUAL EQUIPMENT INSTALLATION. GENERAL NOTES: 1. THE CONTRACTOR SHALL VISIT THE PREMISES TO DETERMINE EXISTING CONDITIONS AND COMPARE SAME WITH CONTRACT DRAWINGS AND SPECIFICATIONS. THE CONTRACTOR IS TO SATISFY HIMSELF OF ALL CONDITIONS PRIOR TO THE SUBMISSION OF A BID PROPOSAL. NO ALLOWANCE WILL BE MADE FOR FAILURE TO COMPLY WITH THESE REQUIREMENTS AND A BID PROPOSAL SHALL BE CONSTRUED AS EVIDENCE HE HAS DONE SO. 2. ALL HVAC WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN PIPING AND DUCTS (INCLUDING DIVIDED DUCTS) AND TRANSITIONS AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER. 3. VERIFY ALL EQUIPMENT CONNECTIONS WITH MANUFACTURER'S CERTIFIED DRAWINGS. VERIFY AND PROVIDE DUCT TRANSITIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND COORDINATE ALL DIMENSIONS BEFORE FABRICATION. 4. COORDINATE DUCTWORK WITH APPROVED SUBMISSION OF SUPPLY, RETURN & EXHAUST AIR TERMINAL UNIT SIZES AND ASSOCIATED INLET AND OUTLET CONNECTIONS. 5. PROVIDE ACCESS FOR SMOKE DETECTORS IN DUCTWORK. 6. PROVIDE ACCESS PANELS UPSTREAM OF ALL ELBOWS WITH TURNING VANES AND ELECTRIC DUCT HEATERS. 7. PROVIDE ACCESS PANELS IN DUCTWORK FOR OPERATION, ADJUSTMENT & MAINTENANCE OF ALL FANS, VALVES AND MECHANICAL EQUIPMENT. 8. ACCESS DOORS INTO DUCTWORK SHALL NOT BE SMALLER THAN 24"X24" UNLESS DUCT SIZES DO NOT PERMIT. INDICATE SIZE AND LOCATIONS OF ALL ACCESS DOORS. 9. 24"X24" ACCESS PANELS IN FINISHED CONSTRUCTION SHALL BE PROVIDED FOR MAINTENANCE OF ALL HVAC EQUIPMENT IN ALL AREAS WITH INACCESSIBLE CEILINGS. M-001 M-101 M-201 M-301 10. FOR AREAS WITH INACCESSIBLE CEILINGS, VOLUME DAMPERS SHALL HAVE METAL FLEXIBLE CABLE OPERATORS FOR REMOTE OPERATION OF VOLUME DAMPER THROUGH FACE OF AIR OUTLETS. 11. PROVIDE VOLUME DAMPERS IN ALL SUPPLY, RETURN AND EXHAUST BRANCH DUCTWORK. PROVIDE ONE (1) VOLUME DAMPER FOR EACH SUPPLY DIFFUSER AND RETURN GRILLE. 12. ALL AIR OUTLETS (DIFFUSERS, GRILLES, REGISTERS, LINEAR DIFFUSERS, ETC.) SHALL BE COORDINATED WITH THE ARCHITECTURAL CEILING PLAN (LIGHTS, SPRINKLER HEADS, CEILING GRID) AND WITH REVIEWED AND APPROVED AIR OUTLET SUBMITTAL. 13. ARCHITECT TO REVIEW AND APPROVE FACE SIZE AND EXACT LOCATION OF ALL AIR OUTLETS (DIFFUSERS, GRILLES, REGISTERS, ETC.) AND COORDINATE WITH EQUIPMENT MANUFACTURER REQUIREMENTS. 14. ALL DIFFUSER AND REGISTER LOCATIONS IN SUSPENDED CEILING SHALL BE COORDINATED WITH REFLECTED CEILING PLANS AND ELECTRICAL PLANS BEFORE INSTALLATION. 15. ARCHITECT TO REVIEW AND APPROVE LOCATION OF ALL THERMOSTATS IN CONJUNCTION WITH FINAL EQUIPMENT LAYOUT. 16. PROVIDE FLEXIBLE DUCT CONNECTIONS ON ALL DUCTS CONNECTING TO FANS OR AIR HANDLING UNITS. 17. THE INSIDE OF ALL DUCTWORK VISIBLE THROUGH A GRILLE OR DIFFUSER SHALL BE PAINTED FLAT BLACK. 18. SHEETMETAL SHOP DRAWINGS CAN BE RELEASED FOR FABRICATION ONLY AFTER SHEETMETAL SHOP STANDARDS HAVE BEEN REVIEWED AND APPROVED. 19. SHEETMETAL SHOP DRAWINGS MUST BE COORDINATED WITH ALL TRADES (MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION, ETC.) BEFORE FABRICATION. 20. PROVIDE CEILING AND DUCT ACCESS DOORS FOR REHEAT COILS, IF ANY. 21. CONTRACTOR TO COORDINATE DUCT LOCATIONS WITH STRUCTURAL STEEL AND ARCHITECTURAL DRAWINGS OF THE AREA. 22. PROVIDE BRANCH CONNECTION TAPS AS INDICATED IN DETAIL ON DETAIL DRAWINGS. ANY OTHER TAP BRANCH CONNECTIONS ARE NOT ACCEPTABLE. 23. ALL DUCT SIZES SHOWN ARE CLEAR INSIDE DIMENSIONS. 24. ALL CONDENSATE DRAIN LINES FROM EACH UNIT SHALL BE PIPED FULL SIZE OF THE UNIT DRAIN OUTLET, WITH P -TRAP, AND TERMINATED AT THE NEAREST DRAIN OR SLOP SINK. 25. ALL EQUIPMENT, PIPING, DUCTWORK, ETC. SHALL BE SUPPORTED AS DETAILED AND SPECIFIED. ADDITIONAL SUPPORT SHALL BE PROVIDED AS REQUIRED TO PROVIDE VIBRATION -FREE INSTALLATION. 26. ALL FIRE AND FIRE/SMOKE DAMPERS MUST BE INSTALLED IN STRICT ACCORDANCE WITH THE LATEST UL REQUIREMENTS, PER THE CONDITIONS OF THEIR LISTING AND THE MANUFACTURER'S INSTALLATION REQUIREMENTS. 27. SMOKE DETECTORS SHALL BE FURNISHED AND WIRED BY THE ELECTRICAL CONTRACTOR. MECHANICAL CONTRACTOR IS RESPONSIBLE FOR MOUNTING THE SMOKE DETECTORS IN DUCTWORK AS SHOWN ON PLANS. 28. ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH NEC AND ELECTRICAL PROJECT SPECIFICATIONS. 29. PROVIDE, AS REQUIRED BY CODE (LOCAL OR NATIONAL), ANY ADDITIONAL FIRE DAMPERS, SMOKE DAMPERS, ACCESS PANELS, OR SPECIAL SUPPORTS NOT SHOWN ON PLANS AT NO ADDITIONAL COST TO OWNER. 30. ANY EXISTING EQUIPMENT, DUCTWORK, ETC. WHICH IS NOT SHOWN TO BE REMOVED, BUT INTERFERES WITH THE NEW CONSTRUCTION, IS TO BE REMOVED BY THE CONTRACTOR. 31. THE CONTRACTOR SHALL REMOVE, RELOCATE, REPLACE, ADJUST, ADAPT AND MODIFY EXISTING EQUIPMENT AND/OR SYSTEM AS REQUIRED BY THE DRAWINGS OR SPECIFICATIONS AND AS MAY BE REQUIRED WHEN SUCH WORK IS UNCOVERED AND FOUND TO INTERFERE WITH THE COMPLETION OF WORK IN THE CONTRACT WITHOUT ADDITIONAL COST TO THE OWNER. 32. THE CONTRACTOR IS TO BALANCE ALL DUCT SYSTEMS AND PROVIDE ALL NECESSARY BELTS, PULLEYS, SHEAVES, ETC. TO ACHIEVE THE DESIGN AIR QUANTITIES. NEWLY DESIGNED AREAS SHALL BE BALANCED TO THE INDICATED AIR QUANTITIES ON THE DRAWINGS. ALL EXISTING AREAS SHALL BE REBALANCED TO THE ORIGINAL DESIGN REQUIREMENTS. ALL BALANCED AIR QUANTITIES ARE TO BE WITHIN 5% OF DESIGN AIR QUANTITIES. 33. ALL SQUARE ELBOWS ON DUCTWORK ARE TO HAVE DOUBLE THICKNESS TURNING VANES. 34. CONTRACTOR IS TO PROVIDE MANUAL DAMPERS IN EACH SPLIT OR TAP CONNECTION TO TRUNK DUCTS FOR BALANCING PURPOSES, EACH PROVIDED WITH OPERATOR AND LOCKING DEVICE. INSTALL DIVERTING VANES AT BRANCHES CONNECTED INTO THE MAIN WITHOUT A NECK. 35. THE CONTRACTOR SHALL COORDINATE OPENINGS IN THE EXTERIOR WALLS OR ROOFS FOR THE INSTALLATION OF OUTSIDE AIR LOUVERS OR GOOSENECKS. 36. FIRE STOPPING SHALL BE INSTALLED AT ALL PENETRATIONS OF FIRE RATED CONSTRUCTION. 37. AFTER FINAL TESTS AND ADJUSTMENTS, FULLY INSTRUCT OWNER'S OPERATING PERSONNEL IN ALL DETAILS OF OPERATION FOR EQUIPMENT INSTALLED. A SIGNED RECEIPT WHICH SHALL BE OBTAINED FROM THE OPERATOR SHALL BE CONSTRUED AS EVIDENCE THAT INSTRUCTIONS WERE SATISFACTORY. 38. FURNISH TWO (2) COPIES OF WRITTEN DESCRIPTIONS OF ALL SYSTEMS COVERING ALL MANUAL OPERATING PROCEDURE, AUTOMATIC CONTROL DESCRIPTIONS AND AUTOMATIC CONTROL TEMPERATURE AND PRESSURE SETTINGS. WRITTEN DESCRIPTIONS SHALL INCLUDE LUBRICATION SCHEDULES, PARTS LISTS, PERFORMANCE SERVICES FOR EQUIPMENT, FILTER SIZE/QUANTITY SCHEDULE, ETC. WHEN MANUFACTURER'S STANDARD INSTRUCTIONS ARE UTILIZED, THEY SHALL BE CLEARLY MARKED TO INDICATE APPLICABILITY. 3 4 IF THIS DRAWING IS LESS THAN 22" X 34" IT IS A REDUCED SIZE DRAWING 5 HVAC DRAWING LIST MECHANICAL SYMBOL & DRAWING LIST, NOTES, & ABBREVIATIONS MECHANICAL AIR DISTRIBUTION & DEMO PLAN MECHANICAL DETAILS MECHANICAL SPECIFICATIONS 5 A C A F'm v� (00) U i y_..,....n a ao W o W Lu U F4 Y z Z ¢ - o W co 06 O coo O O ol �- O ri rn U Z z N co _ ¢ Z N X o =O Oz Q ® ¢ u, cn d l� c Sid PQM sEALM DOCWWM MA own OV � a O C) �t 0� W W z rn N_ 4)z W p N p� o cn 6 z X;>7 cn (co:' o Z M Q 'o W O CO J�/ 0 w >_04 N_ Z O ••«. "� N z a U H U) X CIL 0 w � Q J LLI Z p0Q �p QQ� > ZOO 0 ��� '0 VZ Z V/ P U) Q wp00�; Z L0 Z Q ZQ co J U) QO Z p Z Q LLJ J If 0 z O CL z O w ccl) U w o CIO 0 U) 0 0 0 co O w N �n � ¢ N Z O U Y w ¢ PROJ NO: 1498.S05 SCALE: DATE: 11-25-08 DESIGNED BY: JP DRAWN BY: JP CHECKED BY: MD SHEET TITLE: MECHANICAL SYMBOLS, NOTES & DRAWING LIST SHEET NO. M-001 SHEET OF ■l7 C t:3 E M 0 N Ld N 0 z 0 a CD -A x CD -A 1 CD -A 3 AY B AIR DISTRIBUTI❑N PLAN SCALE11/4"=1'-0" CD—A 3 AY B 2 CD—A () 6 (E) 14"0 k4 3 4 1 5 DEM❑LITI❑N PLAN SCALEi1/4"=1'-0" K 3 22" X 34" IT IS A REDUCED SIZE DIFFUSER/GRILLE SCHEDULE DESIGNATION MODULE NECK CFM MAX MAX PD MOUNTING MODEL MFGR, S SIZE, IN, SIZE NC (IN, WG.) TYPE CD -A 24x24 8" 150 <10 0.03 LAY -IN OMNI TITUS D NOTES: 1. BORDER TYPES SHALL BE IN ACCORDANCE WITH LATEST APPROVED ARCHITECTURAL REFLECTED CEILING PLAN FOR THE ROOM IN 2. SEE PLANS FOR LOCATION AND AIR QUANTITIES OF EACH AIR DEVICE. 3. ALL AIR DEVICES SHALL BE TESTED IN ACCORDANCE WITH ASHRAE STANDARD 70-91. 4. FINISH SHOULD BE PAINT ALUMINUM OR SILVER TO MATCH GRID (COORDINATE WITH ARCHITECT). 5. SUBMIT AIR BALANCING REPORT FOR ALL EXISTING EQUIPMENT AND DIFFUSERS SHOWN ON PLAN AND ANY DISCREPANCIES TO Efs CONTRACTOR NOTESi 1 LOCATION OF RETURN OPENING SHALL BE COORDINATED WITH BUILDING MANAGEMENT TO ENSURE PROPER RETURN AIR FLOW BACK TO EXISTING AC UNIT SUPPLYING SPACE. 2 CONTRACTOR TO VERIFY SUPPLY AIR INDICATED ON PLANS IS AVAILABLE. REPORT TO ENGINEER ANY DISCREPENCIES INVOLVING ALL AIR DISTRIBUTION EQUIPMENT, DUCTWORK, ETC. NOTE: PROVIDE FD/FSD ON ALL NEW & EXISTING DUCTWORK PENETRATING THROUGH NEW OR EXISTING RATED WALLS IN PROJECT SPACE. PROVIDE 18x12 TRANSFER GRILLE IF NEEDED. WITH FD/FSD THROUGH ANY NEW & EXISTING RATED WALLS TO HAVE PROPER RETURN AIR FLOW BACK TO SPACE. FRAMING OF DIFFUSER DETERMINED BY CEILING TYPE DEMOLITION NOTES 1. THE CONTRACTOR SHALL VISIT THE PREMISES TO DETERMINE EXISTING CONDITIONS AND COMPARE SAME WITH CONTRACT DRAWINGS AND SPECIFICATIONS. THE CONTRACTOR IS TO SATISFY HIMSELF OF ALL CONDITIONS PRIOR TO THE SUBMISSION OF A BID PROPOSAL FOR DEMOLITION. NO ALLOWANCE WILL BE MADE FOR FAILURE TO COMPLY WITH THESE REQUIREMENTS AND A BID PROPOSAL SHALL BE CONSTRUED AS EVIDENCE HE HAS DONE SO. 2. ANY EXISTING EQUIPMENT, DUCTWORK, A/C UNITS, ETC. WHICH IS NOT SHOWN TO BE REMOVED, BUT INTERFERES WITH THE NEW CONSTRUCTION IS TO BE REMOVED BY THE CONTRACTOR AT NO ADDITIONAL COST. 3. THE CONTRACTOR, PRIOR TO THE REMOVAL AND DEMOLITION WORK IS TO INFORM THE OWNER OF THE ITEMS BEING REMOVED AND TO DETERMINE IF THE OWNER WOULD LIKE TO TAKE POSSESSION OF IT. 4. CONTRACTOR SHALL DEMOLISH ALL HVAC EQUIPMENT, DUCTWORK, AND APPURTENANCES IN THE SPACE & ASSOCIATED CONDENSING UNITS. 5. SHOULD ANY QUESTION ARISE AS TO WHETHER OR NOT ANY PIPING, EQUIPMENT OR OTHER ITEM SHOULD BE REMOVED, OR REMAIN AS PRESENTLY INSTALLED, THIS CONTRACTOR SHALL REQUEST, IN WRITING, CLARIFICATION FROM THE ARCHITECT. 6. ANY DEMOLITION OF EXISTING EQUIPMENT SHALL INCLUDE THE REMOVAL OF THEIR RELATED CONTROLS AND CONTROL WIRING, SUPPORTS, DUCTWORK, PIPING, ALL CORRESPONDING ACCESSORIES AND PARTS, DUCTWORK AND ELECTRICAL POWER SUPPLY. 7. REMOVAL SHALL INCLUDE TAKING FROM THE PREMISES AND DISPOSAL OF REMOVED ITEMS TO THE LOCATION INDICATED BY THE OWNER OR BLDG, UNLESS OTHERWISE NOTED. 8. THIS CONTRACTOR SHALL CAP ALL REMAINING DUCTS, AT ALL POINTS OF DISCONNECTION, AIRTIGHT. 9. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR HIS WORK WITH ITS COMPLETION AND FINAL ACCEPTANCE AND SHALL REPLACE ANY OF THE SAME WHICH MAY BE DAMAGED, LOST OR STOLEN WITHOUT ADDITIONAL COST TO THE OWNER. 10. BEFORE PROCEEDING WITH ANY WORK IN OCCUPIED OR USED AREAS, THE CONTRACTOR SHALL APPLY TO THE OWNER OF BUILDING FACILITY ENGINEERS FOR PERMISSION TO ENTER SUCH AREAS. THE CONTRACTOR IS OBLIGED TO PERFORM HIS WORK ONLY AT THE TIME OR TIMES DESIGNATED BY THE OWNER OR BLDG. FACILITY ENGINEERS. THERE WILL BE NO ADDITIONAL COMPENSATION FOR THE WORK PERFORMED AFTER HOURS OR ON OFF -DAYS WITHOUT PRIOR WRITTEN APPROVAL. 11. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR THE FAILURE OF ANY DUCTWORK SYSTEM OR EQUIPMENT TO FUNCTION PROPERLY UPON COMPLETION OF HIS WORK UPON SAID SYSTEM OR EQUIPMENT. 12. DEMOLITION AND OTHER WORK WHICH CREATES DIRT AND/OR DISTURBING NOISE, MUST BE PERFORMED AT THE TIME AND MANNER DIRECTED BY THE OWNER OR BLDG. FACILITY ENGINEERS. THE DELIVERY, HANDLING, AND INSTALLING OF MATERIALS, EQUIPMENT AND DEBRIS MUST BE ARRANGED TO AVOID ANY INCONVENIENCE AND ANNOYANCE TO THE BUILDING AND OPERATION. CLEANING MUST BE CONTROLLED TO PREVENT DIRT AND DUST FROM INFILTRATING INTO ADJACENT TENANT OR MECHANICAL AREAS. WELDING OR BURNING MUST BE PERFORMED ONLY DURING TIMES SPECIFICALLY APPROVED BY THE FACILITIES AND MAINTENANCE ENGINEERS. 13. ALL RETURN AIR DUCT OPENINGS SHALL BE COVERED WITH TEMPORARY FILTER DURING THE DEMOLITION. 4 5 CI A AI 0 Q-) U � a � Lu Lu U Y Z Z Q o COO Lu 0 (100 C� 0)H O c� 0)U ? Z N oo = Q Z N 3 ' U O aa0= ® Qu,wCL f Lam' 7 IMMM eea,a oU ap (3) CN 0W W ca UA,w rn N WW W o N �0 O � &j oz c C) Z M Z �' c'u cM Y to J w O O� N_ s= N W N Z O •�•�.�. '•' N Z a U Cn of w0 CL � Q J W 00Q Z QQ� W > zzp Z #-,x O W w z z b ce co W0p LL Q z 0ZZ (n Q Q J cn ap Z 0 z Q J O z O a z 0 a vUj Fn Ly o m D U) 0 0 0 07 NLu F- U-) N z O W w Y w Q g PROD NO: 1498.S05 SCALE: DATE: 11-25-08 DESIGNED BY: JP DRAWN BY: JP CHECKED BY: MD SHEET TITLE: MECHANICAL AIR DISTRIBUION & DEMO PLAN SHEET NO. M-101 SHEET OF E M 0 0 N In N 0 z CD V. 0 a PROVIDE FOR EACH DAMPER 20 GAUGE OPPOSED ACTION > END 4"X 4"X 20 GAUGE DAMPERS– EDGES CRIMPED 1 /2"X1 /2' SUPPORTS RIVETED TO DUCT. IN CINDER CONCRETE SLABS OR IN AS SHOWN MAX. BLADE HEIGHT 2" REPUBLIC ARCH CONCRETE BEAMS USE APPROVED SCISSOR TYPE HANGER DUCT SLAB -7 HOOK (B.S.&A. FILE #A-61-63 SM.) LOW PRESSURE BALANCING DAMPER NOT TO SCALE DUCT ELBOW. I22_1PI21111 21/4 31/2" 21/4"R. 1 ^^I/IAI^ 1 I I^ TURNING VANE \ I NOTES: 1 ..... LOCKING LUGS TO BE INTEGRAL WITH THE TURNING VANE. 2 ..... MAXIMUM UNSUPPORTED FRAME LENGTH TO BE 48". 3 ..... FRAMES TO BE BOLTED OR RIVETED TO THE ELBOW. 4 ..... VANES AND FRAMES TO BE SAME GAUGE AS THE ELBOW (MINIMUM 20 GAUGE). VANED ELBOW 5 ..... SQUARE ELBOWS ARE TO BE USED ONLY WHEN SPECIFICALLY INDICATED ON THE DESIGN DRAWINGS. DOUBLE THICKNESS TURNING VANES FOR MITERED ELBOWS NOT TO SCALE SHEET METAL DUCT DAMPER TO DIFFUSEI NECK HUNG CEILING TYPICAL DIFFUSER CONNECTION IV V I I U 0%al_\LL 1 2 RETAINING ANGLES SHALL BE MINIMUM OF 1 1/2" x 1 1/2" x 1/8" SHALL OVERLAP WALL A MINIMUM OF ONE INCH ON ALL FOUR SIDES FIRESTAT DAMPER MOTOR RUSKIN FSD-60 BSA #176 -82 -SM AFIRE RATED CONSTRUCTION / • MAX. CLEARANCE 1/8" /LF. SEAL OPENING WITH MINERAL WOOL BOLT, WELDED, OR RIVET ANGLES TO SLEEVE AT A MAX. OF 12" AND WITH MINIMUM OF TWO CONNECTIONS IN EACH SIDE, TOP AND BOTTOM. STEEL SLEEVE– 14 GAUGE BOLT, WELD OR RIVET DAMPER TO SLEEVE ON SAME SPACING AS RETAINING ANGLES SHEETMETAL DUCTWORK BREAKAWAY DUCT CONNECTION. (TYP.) ACCESS DOOR SHALL BE NO LESSNOTES: THAN 20" x 20" UNLESS 6 MAX. ON ALL SIDES OTHERWISE APPROVED FIRESTAT AND DAMPER MOTOR TO BE OUTSIDE OF AIR STREAM. COMBINATION FIRE AND SMOKE DAMPER DETAIL NOT TO SCALE GENERAL NOTES: COMBINATION FIRE AND SMOKE DAMPERS (CFSD): 1. FURNISH AND INSTALL COMBINATION FIRE AND SMOKE DAMPERS WHERE INDICATED ON THE DRAWINGS. 2. DAMPERS ARE TO BE 1-1/2 HOUR UL 555 RATED AND UL 555S CLASSIFICATION FOR CFSD. 3. PROVIDE FIRESTAT AND ELECTRIC OPERATOR FOR EACH CFSD. 4. OPERATION: DAMPER SHALL BE CLOSED UPON RECEIVING A SIGNAL FROM THE FIRE ALARM PANEL AND/OR IN RESPONSE TO LOCAL FIRE/SMOKE SIGNAL. WHEN DAMPER IS CLOSED IN RESPONSE TO SMOKE OR FIRE, A MANUAL OVERRIDE SIGNAL FROM THE FIRE ALARM PANEL SHALL OPEN THE DAMPER IF REQUIRED. DAMPER OPERATION CAPABILITIES ARE MAINTAINED REGARDLESS OF PRESENCE OF FIRE OR SMOKE CONDITIONS. 5. MANUFACTURER: CFSD RUSKIN MODEL FSD 60 OR APPROVED EQUAL. 6. INSTALL DUCT DETECTORS (FURNISHED BY E.C.) FOR ALL CFSD'S. LOCATE DUCT DETECTORS UPSTREAM OF THE DAMPERS IN THE DIRECTION OF AIR FLOW. COORDINATE ALL WORK WITH ELECTRICAL CONTRACTOR. 3 IF THIS DRAWING IS LESS THAN 22" X 34" IT IS A REDUCED SIZE DRAWING 4 AIR FLOW CLINCH COLLAR MAIN DUCT. 45' 1/3 W, ---- 6"MIN. W (BRANCH r DUCT WIDTH) END BEARING AIR FLOW J ' PROVIDE VOLUME DAMPER IN MAIN DUCT WHEN THERE ARE NO FURTHER BRANCH TAKE–OFFS. HAND DAMPER REGULATOR E WITH LOCKING TYPE INDICATOR QUADRANT NOTES: 1. SEE PLANS FOR DUCT SIZES. 2. SEE BALANCING DAMPER CONSTRUCTION DETAIL. TYPICAL DETAIL OF RECTANGULAR DUCT TAP (WITH VOLUME DAMPERS) NOT TO SCALE 5 CI D A Com. EXPANSION BOLT II E MINIMUM SIZE 1/4"– u 20 GAUGE QUADRANT 8" SQUARE ROD WITH �VASHER A. MOUNTING BRACKET ON AT EACH END. #390 -58 --SS M OR #390 Z INSULATED DUCT ONLY. DUCT #480-64–SM OR DUCT SECURE TO 06 #481-64–SM.) REINFORCING — o FOR STONE RODS. H PROVIDE BEARINGS AT CONCRETE ONLY. w 0 0 2 BOTH ENDS (GRIND ® Q Lo U) d w ROD ROUND.) FASTEN TO SIDES OF J DUCTS UNDER 48" WIDE, t 1/8" x 1 "GALVANIZED IRON OVER 48" WIDE TURN DAMPER REGULATOR– HANGERS 8'-0" ON CENTER UNDER BOTTOM FOR 2" WITH LOCKING TYPE INDICATOR QUADRANT. DAMPER ROD CLIP. FOR DUCTS 4 SQ.FT. AND UNDER, 4'-0" ON CENTER AND FASTEN. ONE REGULATOR FOR FOR DUCTS OVER 4 SQ.FT. IN coW EACH TWO BLADES. z AREA. HANGERS SHALL BE 0z w p N SAME MATERIAL AS DUCTWORK Lu NOTE OPPOSED ACTION Bz z m FOR DUCTS OVER 29" WIDE LINKAGE ASSEMBLY. TYPICAL DUCT HANGING DETAIL AND/OR OVER 12" HIGH. N • N N z O NOT TO SCALE LOW PRESSURE BALANCING DAMPER NOT TO SCALE DUCT ELBOW. I22_1PI21111 21/4 31/2" 21/4"R. 1 ^^I/IAI^ 1 I I^ TURNING VANE \ I NOTES: 1 ..... LOCKING LUGS TO BE INTEGRAL WITH THE TURNING VANE. 2 ..... MAXIMUM UNSUPPORTED FRAME LENGTH TO BE 48". 3 ..... FRAMES TO BE BOLTED OR RIVETED TO THE ELBOW. 4 ..... VANES AND FRAMES TO BE SAME GAUGE AS THE ELBOW (MINIMUM 20 GAUGE). VANED ELBOW 5 ..... SQUARE ELBOWS ARE TO BE USED ONLY WHEN SPECIFICALLY INDICATED ON THE DESIGN DRAWINGS. DOUBLE THICKNESS TURNING VANES FOR MITERED ELBOWS NOT TO SCALE SHEET METAL DUCT DAMPER TO DIFFUSEI NECK HUNG CEILING TYPICAL DIFFUSER CONNECTION IV V I I U 0%al_\LL 1 2 RETAINING ANGLES SHALL BE MINIMUM OF 1 1/2" x 1 1/2" x 1/8" SHALL OVERLAP WALL A MINIMUM OF ONE INCH ON ALL FOUR SIDES FIRESTAT DAMPER MOTOR RUSKIN FSD-60 BSA #176 -82 -SM AFIRE RATED CONSTRUCTION / • MAX. CLEARANCE 1/8" /LF. SEAL OPENING WITH MINERAL WOOL BOLT, WELDED, OR RIVET ANGLES TO SLEEVE AT A MAX. OF 12" AND WITH MINIMUM OF TWO CONNECTIONS IN EACH SIDE, TOP AND BOTTOM. STEEL SLEEVE– 14 GAUGE BOLT, WELD OR RIVET DAMPER TO SLEEVE ON SAME SPACING AS RETAINING ANGLES SHEETMETAL DUCTWORK BREAKAWAY DUCT CONNECTION. (TYP.) ACCESS DOOR SHALL BE NO LESSNOTES: THAN 20" x 20" UNLESS 6 MAX. ON ALL SIDES OTHERWISE APPROVED FIRESTAT AND DAMPER MOTOR TO BE OUTSIDE OF AIR STREAM. COMBINATION FIRE AND SMOKE DAMPER DETAIL NOT TO SCALE GENERAL NOTES: COMBINATION FIRE AND SMOKE DAMPERS (CFSD): 1. FURNISH AND INSTALL COMBINATION FIRE AND SMOKE DAMPERS WHERE INDICATED ON THE DRAWINGS. 2. DAMPERS ARE TO BE 1-1/2 HOUR UL 555 RATED AND UL 555S CLASSIFICATION FOR CFSD. 3. PROVIDE FIRESTAT AND ELECTRIC OPERATOR FOR EACH CFSD. 4. OPERATION: DAMPER SHALL BE CLOSED UPON RECEIVING A SIGNAL FROM THE FIRE ALARM PANEL AND/OR IN RESPONSE TO LOCAL FIRE/SMOKE SIGNAL. WHEN DAMPER IS CLOSED IN RESPONSE TO SMOKE OR FIRE, A MANUAL OVERRIDE SIGNAL FROM THE FIRE ALARM PANEL SHALL OPEN THE DAMPER IF REQUIRED. DAMPER OPERATION CAPABILITIES ARE MAINTAINED REGARDLESS OF PRESENCE OF FIRE OR SMOKE CONDITIONS. 5. MANUFACTURER: CFSD RUSKIN MODEL FSD 60 OR APPROVED EQUAL. 6. INSTALL DUCT DETECTORS (FURNISHED BY E.C.) FOR ALL CFSD'S. LOCATE DUCT DETECTORS UPSTREAM OF THE DAMPERS IN THE DIRECTION OF AIR FLOW. COORDINATE ALL WORK WITH ELECTRICAL CONTRACTOR. 3 IF THIS DRAWING IS LESS THAN 22" X 34" IT IS A REDUCED SIZE DRAWING 4 AIR FLOW CLINCH COLLAR MAIN DUCT. 45' 1/3 W, ---- 6"MIN. W (BRANCH r DUCT WIDTH) END BEARING AIR FLOW J ' PROVIDE VOLUME DAMPER IN MAIN DUCT WHEN THERE ARE NO FURTHER BRANCH TAKE–OFFS. HAND DAMPER REGULATOR E WITH LOCKING TYPE INDICATOR QUADRANT NOTES: 1. SEE PLANS FOR DUCT SIZES. 2. SEE BALANCING DAMPER CONSTRUCTION DETAIL. TYPICAL DETAIL OF RECTANGULAR DUCT TAP (WITH VOLUME DAMPERS) NOT TO SCALE 5 CI D A El Com. E C U u') 4 a co 1- o w c/7 w ►— U Z Y N wp�ca00 06 F- af 0` 00. o U 0rn Z Z N H w �- 6iO N w 0 0 2 ® Q Lo U) d w J 1 t Z' MMMOM Woo ooWRK& JIMM OV a m p 0LdIo W coW z rn N 0z w p N Lu w w1100 F_ U) Bz z m Z '� M w o -� O0 N • N N z O •;•;• ••' N z a. U 07 LU O 0�CL 0 IY Q QJ a Q z C)0< QQ� 00 O Lij LL L 0 V Z Z° Q WOf� r ?0Z Q� Z 0 Z J LLJ ~CIf O z 0 z 0 C) U) � w o m D 0 0 0 o N w LO Q c o z �- 0 � > Y o: w � Q g PROJ NO: 1498.S05 SCALE: DATE: 11-25-08 DESIGNED BY: JP DRAWN BY: JP CHECKED BY: MD SHEET TITLE: MECHANICAL DETAILS SHEET NO. M-201 SHEET OF El O IF THIS DRAWING IS LESS THAN 22" X 34" IT IS A REDUCED SIZE DRAWING 5 1. GENERAL B. VOLUME2DAMPERS - GALVANIZED STEEL, PER SMACNA HVAC DUCT CONSTRUCTION STANDARDS, 2. SUBMIT A CERTIFIED TEST REPORT INDICATING THE FOLLOWING: 1985, FIRST EDITION. PROVIDE BEARING AT ONE END OF DAMPER WITH ROD AND QUADRANT, - TEMPERATURE OF AIR AT TRUNK DUCT. U� A. WORK INCLUDES HVAC WORK AT DISCOVER, TERMINAL A, INTERNATIONAL DEPARTURES, WITH LEVER AND LOCKSCREW AT OPPOSITE END. INSTALL WITH LEVERS ACCESSIBLE. - TEMPERATURE OF AIR LEAVING OUTLETS. ORLANDO SANFORD INTERNATIONAL AIRPORT, SANFORD, FL, 32773 - QUANTITY OF AIR AT EACH OUTLET AFTER BALANCING. COMM C. ACCESS DOORS - INSULATED AND UN -INSULATED, SAME AS DUCT, MINIMUM 18"X12", UNLESS - AIR QUANTITY AT TRUNK DUCTS MEASURED THROUGH A DUCT TRAVERSE AND a 00 B. ALL WORK SHALL COMPLY WITH REQUIREMENTS OF THE FLORIDA STATE BUILDING CODE, WITH OTHERWISE APPROVED, HINGED WITH LATCH SIMILAR TO VENTLOCK NO. 100. DUCT ACCESS COINCIDENT STATIC PRESSURE. C t- o LOCAL AMENDMENTS, BUILDING MANAGEMENT, ALL APPLICABLE CODES REFER TO GOAA, AND DOORS SHALL BE PROVIDED AT ALL FIRE DAMPERS, SMOKE DAMPERS, AUTOMATIC DAMPERS, - SUPPLY AND RETURN STATIC PRESSURE FOR ALL AIR CONDITIONING UNITS, FANS, AND w w ALL AUTHORITIES HAVING JURISDICTION. UPSTREAM & DOWNSTREAM OF MECHANICAL EQUIPMENT INSTALLED IN DUCTWORK, AND WHERE AIR FILTRATION DEVICES. C Z Y N REQUIRED FOR SERVICING, ADJUSTING AND MAINTENANCE. - WATER QUANTITY AND TEMPERATURE AT ALL BOILERS. _j rn �, C. PRIOR TO SUBMISSION OF HIS/HER BID, THIS CONTRACTOR SHALL VISIT THE JOB SITE TO -FAN MOTOR AND AIR CONDITIONING UNIT AMPERAGES. z z O a o o o ASCERTAIN THE ACTUAL FIELD CONDITIONS AS THEY RELATE TO THE WORK AS INDICATED ON � od O � � O rn THE DRAWINGS AND DESCRIBED HEREIN. DISCREPANCIES, IF ANY, SHALL BE BROUGHT TO THE 1FOR ACCESS DOORS REQUIRED FOR VOLUME DAMPERS DISCONNECT SWITCHES HVAC . v z co Z N0o ARCHITECT'S AND ENGINEER'S ATTENTION PRIOR TO SUBMISSION OF HIS BID, AND IF NOT EQUIPMENT AND ACCESSORIES, MECHANICAL CONTRACTOR SHALL COORDINATE ACCESS 10. DIFFUSERS, GRILLES, AND REGISTERS DOORS IN SHEETROCK CEILING/WALLS WITH G.C. AND ARCHITECT. THE ACCESS DOORS~ Q N RESOLVED TO HIS SATISFACTION, SHALL BE A WRITTEN QUALIFICATION OF HIS/HER BID. AFTER SHALL BE SPECIFIED BY THE ARCHITECT AND PROVIDED BY THE G.C.. MINIMUM A. 4 -WAY & 3 -WAY BLOW SUPPLY AIR DIFFUSERS SHALL BE BASED ON TITUS MODEL OMNI AND = w o D z 0O Oz D THE SIGNING OF CONTRACTS, NO ALLOWANCE SHALL BE MADE TO THE CONTRACTOR DUE TO RECOMMENDED SIZE IS 24"X24". LARGER SIZE SHALL BE PROVIDED TO FACILITATE REMOVAL SHALL BE EQUIPPED WITH OPPOSED BLADE DAMPERS. D ANY MISUNDERSTANDING OF THE CONDITIONS PERTAINING TO THE SITE.Q OF LARGER EQUPIMENT FOR REPLACEMENT. ® Lo (n a w B. REGISTERS AND EXHAUST AIR GRILLES SHALL BE BASED ON TITUS MODEL 350RL AND SHALL D. PRIOR TO SUBMISSION OF HIS/HER FORMAL BID, THIS CONTRACTOR SHALL REVIEW ALL D. TURNING VANES - GALVANIZED STEEL, SMALL DOUBLE THICKNESS VANES, WITH 2" INSIDE BE EQUIPPED WITH OPPOSED BLADE DAMPERS. DRAWINGS AND SPECIFICATIONS OF THE ENTIRE PROJECT INCLUDING GENERAL CONSTRUCTION, RADIUS. DEMOLITION, ELECTRICAL, MECHANICAL AND PLUMBING AND HE/SHE SHALL NOTIFY THE C. REGISTERS AND GRILLES SHALL BE COMPATIBLE WITH CEILING CONSTRUCTION IN WHICH THEY GENERAL CONTRACTOR OF WORK REQUIRED IN HIS/HER BID WHICH IS INDICATED OR IMPLIED E. FLEXIBLE CONNECTIONS AT FANS SHALL BE NEOPRENE COATED GLASS FABRIC, 30 OZ. PER ARE INSTALLED. IN OTHER SECTIONS OF THE WORK. SQUARE YARD WITH SEWED AND CEMENTED SEAMS, SIMILAR TO VENT FABRICS, INC. D. FINISH SHALL BE AS SPECIFIED BY THE ARCHITECT. CONTRACTOR TO COORDINATE MOUNTING E. INSTALL WORK IN A NEAT WORKMANLIKE MANNER READILY ACCESSIBLE FOR OPERATION, F. ALL FLEXIBLE CONNECTIONS AND DUCTWORK SHALL CONFORM TO THE REQUIREMENTS FOR TYPE WITH CEILING TYPE. MAINTENANCE AND REPAIR. CLASS 0 OR CLASS 1 CONNECTORS WHEN TESTED AND APPROVED IN ACCORDANCE WITH UL J' 181/96. FLEXIBLE DUCT RUNS SHALL NOT EXCEED THREE (3) FEET IN LENGTH. l !J F. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF WORK AND APPROXIMATE LOCATION OF EQUIPMENT. REFER TO ARCHITECTURAL DRAWINGS FOR ALL G. DUCT ELBOWS IN GALVANIZED DUCTS SHALL BE FULL RADIUS, MITERED WITH TURNING VANES, r dL DIMENSIONS AND COORDINATE FINAL LOCATIONS OF DIFFUSERS, GRILLES AND REGISTERS WITH OR SHORT RADIUS ELBOWS WITH SPLITTERS. ALL SQUARE ELBOWS, IF ACCEPTED BY ARCHITECT, REFLECTED CEILING PLANS. ALL WORK SHALL BE COORDINATED WITH OTHER TRADES IN SHOP SHALL BE PROVIDED WITH TURNING VANES MAXIMUM 4 -INCH OR CENTER. — DRAWINGS AND AGAIN PRIOR TO COMMENCEMENT OF WORK TO AVOID CONFLICT. SUBMIT0a 0)�� COORDINATED SHOP DRAWINGS FOR REVIEW. H. DUCTS SHALL BE SEALED AND TESTED, CLASS B" AND PERFORM PRESSURE TEST. CN M G. ALL MATERIALS AND WORKMANSHIP SHALL BE GUARANTEED FOR A PERIOD OF ONE (1) YEAR OW rn FROM DATE OF FINAL ACCEPTANCE OF THIS WORK. FINAL ACCEPTANCE SHALL BE DEFINED AS 6. INSULATION UE ~ 04 THE TIME AT WHICH THE MECHANICAL WORK IS TAKEN OVER AND ACCEPTED BY THE OWNER, mW w o N AND IS UNDER CARE, CUSTODY AND CONTROL OF THE OWNER. ENGAGE THE SERVICES OF AS TESTED BY PROCEDURE ASTM -E-84, NFPA 225 AND UL 723 NOT EXCEEDING A FLAME N, o VARIOUS MANUFACTURERS SUPPLYING THE EQUIPMENT FOR THE PROPER START-UP AND SPREAD OF 25 AND SMOKE DEVELOPED INDEX OF 50. OZ U OPERATION OF THE AIR CONDITIONING SYSTEMS. INSTRUCT THE OWNER'S PERSONNEL IN THE A. DUCTWORK - FIBROUS GLASS BLANKET, FOIL -SCRIM KRAFT FACING, 1 -INCH THICK INSULATION H }; } M Z M PROPER OPERATION AND SERVICING OF THE SYSTEM. SHALL BE APPLIED TO ALL EXISTING SUPPLY AIR DUCTWORK WHERE NOT INTERNALLY LINED, Z 'i AND TO ALL NEW SUPPLY AIR DUCTWORK WHERE NOT INTERNALLY LINED. THE MINIMUM ()o " w O >_ � H. CONTRACTOR SHALL CARRY PUBLIC LIABILITY AND WORKMEN'S COMPENSATION AS REQUIRED THERMAL RESISTANCE SHALL BE EQUIVALENT TO R-5 PER INCH OR GREATER. ? N FOR THE COMPLETE INSTALLATION OF THE CONTRACT WORK. THIS CONTRACTOR SHALL SUBMIT . N N SATISFACTORY PROOF TO THE OWNER OF THE AFOREMENTIONED COVERAGE. B. ACOUSTICAL DUCT LINING - PROVIDE ACOUSTICAL DUCT LINER AS FOLLOWS: 10 FEET O •;�'•,+ N z DOWNSTREAM a OF FAN POWERED/VAV BOXES, RETURN AIR 10 FEET FROM FAN, TRANSFER AIR •'*' I. "PROVIDE" IN THIS DOCUMENT MEANS FURNISH AND INSTALL. DUCTS, OTHER DUCTWORK AS INDICATED ON PLANS.. MATERIAL SHALL BE FIBERGLASS, MINIMUM U C 3 LB. DENSITY, 1 INCH THICKNESS, MAXIMUM 0.26 K FACTOR AT 75-F MEAN TEMPERATURE C J. THE "GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION" AIA DOCUMENT A201 WITH NEOPRENE COATED FINISH AND STENCILED IN ACCORDANCE WITH NFPA 90. IT SHALL BE FOURTEENTH EDITION, AUGUST 1997, AND THE ARCHITECT'S SPECIFICATIONS, AS APPLICABLE, SIMILAR TO JOHNS -MANVILLE LINACOUSTIC, OR AN APPROVED EQUAL. ALL SOUND -LINING, ARE PART OF THIS CONTRACT. ADHESIVES, FACES AND ACCESSORIES TO BE APPLIED IN ACCORDANCE WITH MANUFACTURERS a RECOMMENDATIONS, EXCEPT AS OTHERWISE NOTED. W O 2. SCOPE OF WORK 7. ELECTRICAL WORK F Q A. PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, SHOP DRAWINGS AND CONTRACTOR'S SERVICES A. ELECTRICAL POWER WIRING SHALL BE PROVIDED BY ELECTRICAL CONTRACTOR. CONTROL WIRING J Q NECESSARY FOR COMPLETE, SAFE INSTALLATION OF ALL WORK EXPLAINED HEREIN AND SHOWN SHALL BE BY DIV 17 AND SHALL BE DEFINED AS ANY 12V, 24V, OR 120V WIRING INSTALLED CL z ON THE DRAWINGS, IN FULL CONFORMITY WITH THE REQUIREMENTS OF ALL APPLICABLE FOR PURPOSES OTHER THAN PROVIDING PRIMARY ELECTRICAL POWER TO EQUIPMENT. p O Q ELECTRICAL AND GOAA CODES AND OF ALL AUTHORITIES HAVING JURISDICTION. D B. MOTOR STARTERS SHALL BE FURNISHED BY HVAC CONTRACTOR AND INSTALLED BY ELECTRICAL �i Q Q w B. SECURE CERTIFICATES PAY ALL FEES AND CHARGES FOR ALL WORK INSTALLED, CERTIFYING CONTRACTOR. PROVIDE COMBINATION STARTER WITH FUSED DISCONNECT SWITCH AND Z Z 0 COMPLIANCE OF ALL GOVERNING AUTHORITIES. CONTRACTOR TO PERFORM REQUIRED HAND -OFF -AUTO SWITCH FOR ALL HVAC EQUIPMENT. > O w -J CONTROLLED INSPECTION. DELIVER CERTIFICATES TO OWNER BEFORE FILING. _ 0 �- Ill LL n 8. SHOP DRAWINGS u z Z 3. CONNECTIONS TO EXISTING WORK a o + 6 A. SUBMIT SHOP STANDARDS FOR DUCT CONSTRUCTION. SUBMIT A SEPIA AND TWO (2) PRINTS OF QH A. PLAN INSTALLATION OF NEW WORK AND CONNECTIONS TO EXISTING WORK TO ENSURE SHEET METAL AND/OR PIPING COORDINATED SHOP DRAWINGS, CERTIFIED IN WRITING BY ALL Z O LL Q MINIMUM INTERFERENCE WITH REGULAR OPERATION OF EXISTING FACILITIES. ALL SYSTEM TRADES THAT COORDINATION HAS BEEN ESTABLISHED. SUBMIT CERTIFIED EQUIPMENT CUTS WITH cwo SHUTDOWNS AFFECTING OTHER AREAS SHALL BE COORDINATED WITH BUILDING OWNER. CONSTRUCTION WIRING DIAGRAMS AND AUTOMATIC TEMPERATURE CONTROL SHOP DRAWINGS. Q Q SUBMIT TWO (2) BOOK -BOUND OPERATING AND SERVICE MANUALS WHICH SHALL INCLUDE U) B. CONNECT NEW WORK TO EXISTING WORK IN NEAT AND APPROVED MANNER. RESTORE EXISTING COPIES OF ALL SHOP DRAWINGS. SUBMITTAL SHALL INCLUDE, BUT NOT BE LIMITED TO THE Z O WORK DISTURBED WHILE INSTALLING NEW WORK TO ACCEPTABLE CONDITION AS DETERMINED FOLLOWING: ARCHITECT. - DUCTWORK AND PIPING, %" SCALE. z z BY - CERTIFIED AIR BALANCING REPORT. W - DIFFUSERS, REGISTERS, GRILLES, AND VIBRATION ISOLATORS. 4. REMOVAL AND RELOCATION OF EXISTING WORK - EQUIPMENT AND EQUIPMENT SUPPORTS (VAV BOXES, EXHAUST/RETURN FANS, PIPING, 0 ETC.). A. DISCONNECT, REMOVE, AND/OR RELOCATE EXISTING MATERIAL, EQUIPMENT AND OTHER WORK - AUTOMATIC TEMPERATURE CONTROLS FOR ALL EQUIPMENT, DIAGRAM AND SEQUENCE OF B AS NOTED OR REQUIRED FOR PROPER INSTALLATION OF NEW SYSTEM. DISPOSE OF REMOVED OPERATION WITH CATALOG CUT SHEETS OF ALL COMPONENTS. B MATERIAL. EQUIPMENT TO BE TURNED OVER TO OWNER UNLESS OTHERWISE SPECIFIED. EQUIPMENT AND MATERIAL NOT ACCEPTED BY OWNER SHALL BE DISPOSED OF PROPERLY AS 9. CLEANING, BALANCING AND ADJUSTMENT PER ALL AUTHORITIES HAVING JURISDICTION. A. RESTORE FINISHED SURFACE, IF DAMAGED, AND DELIVER ENTIRE INSTALLATION IN AN APPROVED B. REMOVAL AND RELOCATION OF CERTAIN EXISTING WORK SHALL BE NECESSARY FOR THE CONDITION. SATISFACTORY PERFORMANCE OF THE GENERAL WORK. ALL EXISTING CONDITIONS ARE NOT zz COMPLETELY DETAILED ON DRAWINGS. CONTRACTOR SHALL SURVEY SITE AND MAKE ALL B. SET MODULATION OF OUTSIDE, RETURN AND SPILL AIR DAMPERS TO PROVIDE THE AIR NECESSARY CHANGES REQUIRED, BASED ON EXISTING CONDITIONS, FOR PROPER INSTALLATION QUANTITIES AS SHOWN ON DRAWINGS. a_ OF NEW WORK. C. AIR BALANCING WORK SHALL BE PERFORMED BY AN INDEPENDENT AABC CERTIFIED COMPANY, O cvn C. GENERAL CONTRACTOR TO REMOVE ALL CEILING IN AREAS WHERE NEW DUCTWORK IS NOT ASSOCIATED WITH THE CONTRACTOR. THE AIR BALANCING COMPANY SHALL PERFORM TEST F55 o INSTALLED OR EXISTING DUCTWORK IS ALTERED, AS PER ARCHITECT'S INSTRUCTIONS. IN ACCORDANCE WITH SMACNA AND SHALL INCLUDE THE FOLLOWING: m D. ALL NECESSARY CUTTING AND PATCHING FOR HVAC WORK SHALL BE PERFORMED BY THIS 1. TEST, ADJUST AND BALANCE AIR DISTRIBUTION SYSTEMS TO PROVIDE AIR QUANTITIES WITHIN CONTRACTOR AND COORDINATED WITH BUILDING OWNER SO AS TO MINIMIZE DISRUPTION OF PLUS OR MINUS 5%. o EXISTING TENANTS AND SERVICES. RESTORE TO MATCH EXISTING CONDITIONS.co o 5. DUCTWORK N w A. RECTANGULAR AND ROUND DUCTWORK SHALL BE GALVANIZED STEEL, FABRICATED AND N p INSTALLED IN ACCORDANCE WITH SMACNA 1995 HVAC DUCT CONSTRUCTION STANDARDS - z `- METAL AND FLEXIBLE; AND 1985 HVAC AIR DUCT LEAKAGE TEST MANUAL. ALL NEW AND O EXISTING SEAMS AND JOINTS SHALL BE CAULKED AND TAPED. ALL NEW DUCT SIZES SHOWN Y ARE CLEAR INSIDE DIMENSION. w PROJ NO: 1498.S05 SCALE: DATE: 11-25-08 DESIGNED BY: JP A A IDRAWN BY: JP CHECKED BY: MD SHEET TITLE: MECHANICAL SPECIFICATIONS SHEET NO. M-301 12 3 4 5 SHEET OF IF THIS DRAWING IS LESS THAN 22" X 34" IT IS A REDUCED SIZE DRAWING E N S N 0 z 0 a 3 y Lo 0 cn v 0 0 C A 1 ELECTRICAL SPECIFICATIONS: 1. FURNISH ALL REQUIRED LABOR, MATERIALS, EQUIPMENT AND CONTRACTORS SERVICES NECESSARY FOR THE COMPLETE INSTALLATION OF ELECTRICAL ITEMS AS INDICATED ON THE DRAWINGS, INCLUDING BUT NOT LIMITED TO THE FOLLOWING: A. LIGHT FIXTURES AND LAMPS. B. WIRING DEVICES. C. NEW CONDUIT AND BRANCH CIRCUIT WIRING. D. NEW PANELBOARDS. E. CUTTING, CHANNELLING AND CHASING REQUIRED TO ACCOMMODATE THE INSTALLATION OF ELECTRICAL WORK AND ROUGH PATCHING. 2. DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL ARRANGEMENT OF SYSTEMS AND WORK. CONTRACTOR SHALL FURNISH ALL NECESSARY OUTLETS, SUPPORTS, FITTINGS AND ACCESSORIES TO FULFILL APPLICABLE CODES, REGULATIONS BUILDING STANDARDS AND THE BEST PRACTICE OF THE TRADE FOR THE INSTALLATION OF ELECTRICAL WORK. 3. THE ELECTRICAL WORK SHALL COMPLY WITH THE REQUIREMENTS OF THE ORLANDO INTERNATIONAL AIRPORT TENANT DESIGN CRITERIA, NATIONAL ELECTRICAL CODE OF THE NFPA-NEC, STANDARD OF THE NATIONAL BOARD OF UNDERWRITERS, OSHA, THE BUILDING MANAGEMENT STANDARDS, MDAD AND ALL AUTHORITIES HAVING JURISDICTION. THE CONTRACTOR SHALL SECURE ALL CERTIFICATES OF REQUIRED ORDINANCES, AND DELIVER THEM TO THE OWNER'S REPRESENTATIVE. 4. THE CONTRACTOR SHALL HAVE HAD EXPERIENCE ON AT LEAST (2) PROJECTS INVOLVING QUANTITIES AND COMPLEXITIES AT LEAST EQUAL TO THOSE REQUIRED UNDER THIS PROJECT. THE CONTRACTOR SHALL VISIT AND EXAMINE CAREFULLY THE AREAS AFFECTED BY THIS WORK TO BECOME FAMILIAR WITH EXISTING CONDITIONS AND WITH DIFFICULTIES THAT WILL ATTEND THE EXECUTION OF THIS WORK. THE CONTRACTOR SHALL PERFORM THIS P T SUBMITTING HIS PROPOSAL. THIS WILL BE CONSTRUED AS EVIDENCE THAT PRIOR 0 BMITIIN S SUCH AN EXAMINATION HAS BEEN MADE, AND LATER CLAIMS WILL NOT BE RECOGNIZED FOR EXTRA LABOR, EQUIPMENT, OR MATERIALS REQUIRED BECAUSE OF DIFFICULTIES ENCOUNTERED WHICH COULD HAVE BEEN FORESEEN HAD SUCH AN EXAMINATION BEEN MADE. 5. UPON REVIEW OF ELECTRICAL DRAWINGS PRIOR TO SUBMITTING HIS PROPOSAL, THE ELECTRICAL CONTRACTOR SHALL INFORM THE ARCHITECT AND/OR ENGINEER OF ANY DISCREPANCIES OR REQUEST CLARIFICATION, IF NECESSARY, CONCERNING THE INTENT OF THE PLANS AND SPECIFICATIONS TO PROVIDE A COMPLETE ELECTRICAL INSTALLATION. LATER CLAIMS WILL NOT BE RECOGNIZED FOR EXTRA LABOR, EQUIPMENT OR MATERIALS SHOULD SUCH PROCEDURE NOT BE FOLLOWED. 6. THE CONTRACTOR SHALL COORDINATE HIS WORK WITH OTHER CONTRACTORS WHOSE WORK MIGHT AFFECT THIS INSTALLATION. CONTRACTORS SHALL ARRANGE ALL PARTS OF THIS WORK AND EQUIPMENT IN PROPER RELATION TO THE WORK AND EQUIPMENT OF OTHERS AND WITH BUILDING CONSTRUCTION AND ARCHITECTURAL FINISH SO THAT IT WILL HARMONIZE IN SERVICE,AND APPEARANCE. 7. THE DRAWINGS INDICATE SIZE AND GENERAL LOCATION OF WORK. SCALED DIMENSIONS SHALL NOT BE USED. THE EXACT LOCATION AND ELEVATION OF ALL RECEPTACLES, SWITCHES, LIGHTING FIXTURES, ETC., SHALL BE DETERMINED FROM THE ARCHITECTS DRAWINGS. 8. TEMPORARY LIGHT AND POWER A. PROVIDE A TEMPORARY LIGHT AND POWER SYSTEM THROUGHOUT THE RENOVATION, IN ALL ROOMS, AREAS, SPACES, SHAFTS, LOFTS, ATTICS AND VAULTS IN WHICH WORK IS TO BE PERFORMED AND IN ALL ANCILLARY STRUCTURES OF A PERMANENT OR TEMPORARY NATURE WHICH ARE USED TO PROVIDE STORAGE, EQUIPMENT, PERSONNEL OR SUPPORT SERVICES, AND A SITE LIGHTING SYSTEM TO PROVIDE A SAFE, SECURE CONSTRUCTION SITE IN ACCORDANCE WITH OSHA REQUIREMENTS. B. WHERE CONTRACT WORK IS TO BE PERFORMED IN EXISTING BUILDINGS, THE TEMPORARY LIGHT AND POWER SYSTEM SHALL CONSIST OF THE USE OF THE LIGHTS, PANELS, FEEDERS, RECEPTACLES, AND BRANCH CIRCUIT WIRING THAT PRESENTLY EXISTS IN THE BUILDING TO THE EXTENT THAT IT MEET THE NEEDS OF A TEMPORARY LIGHT AND POWER SYSTEM. IF THESE FACILITIES DO NOT MEET DESIRED NEEDS, OR IF CONSTRUCTION IN AN AREA OF THE EXISTING BUILDING IS EXTENSIVE, OR IF THESE EXISTING FACILITIES ARE DEMOLISHED OR REMOVED THEN THE CONTRACTOR SHALL PROVIDE ALTERNATE TEMPORARY LIGHT AND POWER FACILITIES IN THOSE AREAS SIMILAR TO THAT REQUIRED FOR NEW CONSTRUCTION. 9. DEMOLITION NOTES: A. FOR ALL RENOVATED AREAS THE ELECTRICAL CONTRACTOR SHALL DISCONNECT FROM SOURCE AND REMOVE ALL EXISTING WIRING DEVICES, LIGHTING FIXTURES, ETC WHICH ARE NOT INDICATED TO REMAIN. COORDINATE ALL REMOVALS WITH THE ARCHITECT. THE ELECTRICAL CONTRACTOR SHALL REMOVE ALL CONDUITS AND WIRING LEFT ABANDONED DUE TO THE REMOVAL OF LIGHTING FIXTURES, WIRING DEVICES ETC. ALL ABANDONED CONDUIT SHALL BE REMOVED BACK TO THE OVERCURRENT DEVICE SERVING THE DEMOLISHED CIRCUIT. B. ELECTRICAL CONTRACTOR SHALL MAINTAIN THE CONTINUITY OF CIRCUIT WIRING FOR EXISTING DEVICES, ETC. THAT ARE TO REMAIN. WHERE EXISTING OUTLETS ARE NOT AT THE CIRCUIT DEAD END, PICK UP AND EXTEND CIRCUITS TO OUTLETS TO REMAIN. THIS WORK SHALL BE PERFORMED AT NO ADDITIONAL EXPENSE TO THE OWNER. WHERE A WIRING DEVICE IS TO BE REMOVED AND THE WALL IS TO REMAIN, THE ELECTRICAL CONTRACTOR SHALL DISCONNECT BRANCH WIRING FROM THE SOURCE AND FILL IN THE OUTLET BOX. BLANK PLATES WILL NOT BE PERMITTED. C. WHERE EXISTING WIRING, WHICH IS TO REMAIN, IS LEFT EXPOSED DUE TO DEMOLITION, THE ELECTRICAL CONTRACTOR SHALL REMOVE THE EXPOSED PORTIONS AND EXTEND NEW CONDUIT AND WIRING CONCEALED TO OUTLETS TO REMAIN. D. COORDINATE REMOVALS WITH OTHER TRADES WHERE APPLICABLE. REFER TO ARCHITECTURAL DRAWING FOR AREAS WHICH ARE NOT IN CONTRACT. E. SPARE CIRCUIT BREAKERS MADE AVAILABLE DUE TO DEMOLITION SHALL BE DESIGNATED ON PANELBOARD DIRECTORIES. F. THE ELECTRICAL CONTRACTOR SHALL REMOVE ALL VOICE AND DATA WIRING LEFT ABANDONED DUE TO DEMOLITION. 10.CUTTING AND PATCHING: A. ALL CUTTING AND PATCHING REQUIRED FOR EQUIPMENT INCLUDED IN THESE SPECIFICATIONS SHALL BE DONE BY THIS CONTRACTOR. IF CUTTING IS DONE DUE TO FAILURE TO PERFORM PRELIMINARY ROUGHING WORK, THIS CONTRACTOR WILL BE RESPONSIBLE FOR THE COST OF THE ADDITIONAL PATCHING. B. IN AREAS WHERE NEW WALLS OR PARTITIONS ARE REQUIRED THE CONTRACTOR SHALL FURNISH AND LOCATE ALL REQUIRED SLEEVES AND INSERTS BEFORE THE WALLS OR PARTITIONS ARE CONSTRUCTED. WHERE SLEEVES AND INSERTS WERE NOT INSTALLED OR WHERE SLEEVES AND INSERTS WERE INCORRECTLY LOCATED, THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COST OF ANY REQUIRED CUTTING AND PATCHING. C. THIS CONTRACTOR SHALL NOT DO ANY CUTTING THAT MAY IMPAIR THE STRENGTH OF BUILDING CONSTRUCTION. NO OUTLETS, SWITCHES OR SIMILAR DEVICES SHALL BE PERMITTED TO BE CHOPPED INTO ANY CORE WALL. NO HOLES, EXCEPT FOR SMALL SCREWS MAY BE DRILLED IN BEAMS OR OTHER STRUCTURAL MEMBERS WITHOUT OBTAINING PRIOR APPROVAL. ALL WORK SHALL BE DONE IN A NEAT MANNER BY MECHANICS SKILLED IN THEIR TRADES AND AS APPROVED. 11. LIGHTING FIXTURES: GENERAL: A. LIGHTING FIXTURES SHALL BE AS SPECIFIED ON THE LIGHTING FIXTURE SCHEDULE. ALL LIGHTING FIXTURES AND LAMPS SHALL BE FURNISHED AND INSTALLED BY THE ELECTRICAL CONTRACTOR. Sur -INGS, SADDLE HANGARS, AND TIE BARS SHALL BE MADE OF FORMED OR ROLLED METAL SHAPES WITH THE REQUISITE RIGIDITY AND STRENGTH TO MAINTAIN CONTINUOUS ALIGNMENT OF THE INSTALLED FIXTURE. B. FIXTURES SHALL BE ATTACHED TO CEILING SUPPORTING MEMBERS, AND SHALL NOT DEPEND UPON LATHING OR PLASTER FOR ALIGNMENT OR SUPPORT. FIXTURES IN SUSPENDED CEILINGS SHALL BE SUPPORTED BY SADDLE HANGARS OR TIE -BARS ATTACHED TO RUNNERS OR BETWEEN CROSSBARS OF CEILING SYSTEMS. MOUNTING SPLINES OR OTHER POSITIVE MEANS OF MAINTAINING ALIGNMENT AND RIGIDITY SHALL BE PROVIDED. SUPPORTING MEMBERS SHALL BE SURFACED PASSIVATED, AND SHALL BE PRIMED OR PAINT DIPPED TO RESIST CORROSION. FASTENING DEVICES SHALL BE OF A POSITIVE, LOCKING TYPE, AND SHALL NOT REQUIRE THE USE OF SPECIAL TOOLS TO APPLY OR REMOVE. TIE WIRES SHALL NOT BE USED IN PLACE OF FASTENING DEVICES. LIGHTING FIXTURE HOOKUP WIRE: A. SPLICES SHALL NOT BE PERMITTED IN ANY RUN OF FIXTURE HOOKUP WIRE. B. CONNECTIONS TO BRANCH CIRCUIT CONDUCTORS AND TO EXISTING FIXTURE WIRING SHALL BE MADE BY INSULATED SPRING CONNECTORS OR CRIMP TYPE CONNECTORS. LIGHTING FIXTURE LAMPS: A. LAMPS SHALL BE THOSE MANUFACTURED BY GENERAL ELECTRIC CO. WESTINGHOUSE ELECTRIC CORP. OR SYLVANIA ELECTRIC PRODUCTS INC.. ALL FLUORESCENT LAMPS SHALL BE WARM WHITE, WATT MISER WHERE APPLICABLE. INCANDESCENT LAMPS SHALL BE RATED AT 125 VOLTS EXCEPT WHERE OTHERWISE NOTED. B. THE CONTRACTOR SHALL INSTALL NEW LAMPS IN ALL NEW FIXTURES. C. PRIOR TO THE ISSUANCE OF THE CERTIFICATION OF FINAL COMPLETION, ALL LAMPS WHICH ARE MISSING, BROKEN OR BURNT OUT SHALL BE FURNISHED AND REPLACED BY THE ELECTRICAL CONTRACTOR TO THE SATISFACTION OF THE ARCHITECT. INSTALLATION AND LOCATION OF LIGHTING FIXTURES: A. FIXTURE LOCATIONS AS INDICATED ON THE ELECTRICAL DRAWINGS ARE GENERALIZED AND APPROXIMATE. THE CONTRACTOR SHALL CAREFULLY VERIFY FIXTURE LOCATIONS WITH ARCHITECTURAL PLANS, REFLECTED CEILING PLANS AND OTHER REFERENCE DATA PRIOR TO INSTALLATION. B. WIRING BETWEEN FLUORESCENT LAMPHOLDERS AND ASSOCIATED OPERATION AND STARTING EQUIPMENT SHALL BE OF THE SAME OR HEAVIER GAUGE THAT THE LEADS FURNISHED WITH THE APPROVED TYPES OF BALLASTS AND SHALL HAVE EQUAL OR BETTER INSULATING AND HEAT -RESISTING CHARACTERISTICS. ALL OTHER WIRING WITHIN FLUORESCENT LIGHTING FIXTURES OR FROM THE FIXTURE TO THE SPLICE SHALL CONFORM TO THE LATEST PUBLISHED ISSUE OF THE NATIONAL ELECTRICAL CODE. C. UNLESS OTHERWISE SPECIFIED OR SHOWN ON THE DRAWINGS, ALL WIRING IN CONJUNCTION WITH INCANDESCENT FIXTURES SHALL CONFORM TO THE REQUIREMENTS OF THE NATIONAL ELECTRIC CODE. AND SHALL NOT BE LESS THAN NO. 16 GAUGE. WIRING SHALL BE PROTECTED WITH TAPE OR TUBING AT ALL POINTS WHERE ABRASION IS LIABLE TO OCCUR. WIRING SHALL BE CONCEALED WITHIN FIXTURE CONSTRUCTION, EXCEPT WHERE THE FIXTURE DESIGN OR MOUNTING DICTATES OTHERWISE. D. CONNECTIONS TO TERMINALS OF LAMPHOLDERS AND OTHER ACCESSORIES SHALL BE MADE IN A NEAT AND WORKMAN LIKE MANNER AND SHALL BE ELECTRICALLY AND MECHANICALLY SECURE WITH NO LOOSE ENDS PROTRUDING. THE NUMBER OF WIRES EXTENDING TO OR FROM THE TERMINALS OF A LAMPHOLDER OR OTHER ACCESSORY SHALL NOT EXCEED THE NUMBER WHICH THE ACCESSORY IS DESIGNED TO ACCOMMODATE. E. JOINTS IN WIRING WITHIN LIGHTING FIXTURES AND CONNECTIONS OF THE FIXTURE WIRING TO THE WIRING IN THE BUILDING SHALL BE SO SPLICED THAT THEY WILL BE MECHANICALLY AND ELECTRICALLY SECURED AND THEN SOLDERED AND TAPED TO PROVIDE INSULATION EQUAL TO THAT OF THE CONDUCTORS BEING JOINED. IN LIEU OF SOLDER AND TAPE, APPROVED TYPES OF ADEQUATELY INSULATED SOLDERLESS PRESSURE CRIMP TYPE CONNECTORS MAY BE FURNISHED, PROVIDED SIZES USED, METHOD OF APPLICATION, AND TOOLS EMPLOYED ARE IN ACCORDANCE WITH THE CONNECTOR MANUFACTURERS RECOMMENDATIONS. 12. CIRCUIT BREAKER TYPE PANELBOARDS: A. CIRCUIT BREAKERS SHALL BE BOLTED TO THE PANELBOARD COPPER BUS BARS WHICH SHALL BE PROPORTIONED FOR A CURRENT DENSITY OF 1000 AMPERES PER SQUARE INCH OF CROSS SECTIONAL AREA. PROVIDE A COPPER GROUND BUS IN PANELS WHERE INDICATED. CIRCUIT BREAKERS SHALL BE QUICK -MAKE, QUICK -BREAK COMPENSATED FOR AMBIENT TEMPERATURES AND SHALL HAVE A MINIMUM SHORT CIRCUIT RATING OF 10,000 AMPERES SYMMETRICAL OR HIGHER WHERE NOTED. B. CABINET SHALL BE MADE OF SHEET METAL "BENT -UP" OR RIVETED OR BOLTED TOGETHER WITH EXTERIOR ANGLE IRON FRAME CABINET SHALL BE OF SUFFICIENT SIZE TO ALLOW A GUTTER AT LEAST 4" IN WIDTH ENTIRELY SURROUNDING EACH SECTION OF THE BOARD. INCREASE SIZE TO ACCOMMODATE THE FEEDER SIZE. PANELBOARDS SHALL BE SURFACE OR FLUSH TYPE AS INDICATED ON THE DRAWINGS. PANELBOARDS SHALL BE PAINTED WITH 2 COATS OF GREY ENAMEL. C. PROVIDE CODE GAUGE STEEL DOORS AND TRIMS FOR ALL PANEL BOARD BOXES. TRIMS SHALL BE ATTACHED DIRECTLY TO BOX BY INDICATING TYPE CLAMPS ATTACHED THROUGH HOLES IN TRIM AND SUPPORTING BOX FRAME. PROVIDE LOCKS AND HINGES. BY SQUARE D GENERAL ELECTRIC OR APPROVED E D. PANELS SHALL BE AS MANUFACTURED Q UAL. Q E. A TYPE WRITTEN LIST OF CIRCUITS SHOWING CLEARLY THE POINTS SUPPLIED BY EACH CIRCUIT SHALL BE INSTALLED ON THE INSIDE OF EACH PANELBOARD DOOR. THIS LIST SHALL BE MOUNTED IN A STEEL FRAME UNDER A PLASTIC WINDOW. EACH PANEL SHALL BE EXTERNALLY TAGGED WITH A PERMANENT LAMACOID PLATE INDICATING PANEL IDENTIFICATION AND VOLTAGE. F. PHASE LEGS OF ALL PANELS (NEW AND EXISTING) SHALL BE BALANCED AT SUPPLY POINT. ANY PANEL FOUND WITH UNBALANCED LOADS SHALL HAVE ITS CIRCUITS REARRANGED AS REQUIRED TO BALANCE PHASE LEGS. 13. SAFETY SWITCHES: A. UNLESS OTHERWISE NOTED, SWITCHES SHALL BE "QUICK MAKE", "QUICK BREAK", HEAVY DUTY TYPE SAFETY SWITCHES FUSED OR NON FUSED AS INDICATED ON THE DRAWINGS. PROVIDE ALL FUSES AS INDICATED OR REQUIRED BY EQUIPMENT MANUFACTURER. B. SWITCHES SHALL BE AS MANUFACTURED BY GENERAL ELECTRIC, ITE, WESTINGHOUSE, OR SQUARE D C. FUSES FOR SWITCHES SHALL BE CURRENT LIMITING TYPE WITH A MINIMUM INTERRUPTING CAPACITY OF 200,000 AMPERES RMS AND OF THE CONTINUOUS CURRENT RATINGS AS INDICTED ON THE DRAWINGS OR AS RECOMMENDED BY THE MANUFACTURER. 14. RACEWAYS AND BOXES: A. NO OUTLETS OR SWITCHES OR SIMILAR DEVICES SHALL BE PERMITTED TO BE CHOPPED INTO ANY CORE WALL. B. WHERE SIZES OF RACEWAYS OR BOXES ARE NOT INDICATED, THE CONTRACTOR SHALL SIZE THESE ITEMS AS REQUIRED FOR THE INSTALLATION. C. FLEXIBLE METAL CONDUIT SHALL BE USED FOR THE FINAL CONNECTION OF LIGHTING FIXTURES AND WIRING DEVICES TO BE INSTALLED IN HUNG CEILINGS OR IN REMOVABLE HOLLOW METAL CONSTRUCTION. D. ALL CONDUIT AND TUBING SHALL BE CUT SQUARE AND REAMED AT THE ENDS. RED LEAD SHALL BE APPLIED TO ALL EXPOSED THREADS AFTER JOINTS HAVE BEEN MADE UP CLEAN AND TIGHT. E. CONDUIT AND TUBING RUNS SHALL BE MECHANICALLY AND ELECTRICALLY CONTINUOUS FROM SERVICES STARTING TO ALL OUTLETS. CONDUIT SHALL ENTER AND BE SECURELY CONNECTED TO CABINET, JUNCTION BOX OR OUTLET BOX BY MEANS OF LOCKNUTS ON THE OUTSIDE AND INSIDE AND AN INSULATED BUSHING ON THE INSIDE. IN TUBING OR FLEXIBLE METAL CONDUIT, THE ONE COMPRESSION LOCKNUT SHALL BE MADE WRENCH -TIGHT. ALL LOCKNUTS SHALL BE THE BONDING TYPE WITH SHARP EDGES FOR DIGGING INTO THE METAL ENCLOSURE AND SHALL BE INSTALLED IN SUCH A MANNER THAT WILL ASSURE A LOCKING AND ELECTRICALLY CONTINUOUS INSTALLATION. LOCKNUTS AND BUSHINGS WILL NOT BE REQUIRED WHERE CONDUITS ARE SCREWED INTO TAPPED CONNECTIONS. F. ALL VERTICAL RUNS OF CONDUIT OR TUBING TERMINATING IN THE BOTTOM OF WALL BOXES OR CABINETS OR SIMILAR LOCATIONS, SHALL BE PROTECTED FROM THE ENTRANCE OF FOREIGN MATERIAL PRIOR TO THE INSTALLATION OF CONDUCTORS. G. UNLESS OTHERWISE SPECIFIED, ALL CONDUIT AND TUBING SHALL BE INSTALLED CONCEALED. IN GENERAL, ALL CONDUIT AND TUBING SHALL BE RUN IN HUNG CEILINGS AND FURRED SPACES WHERE THEY EXIST. WHERE CONDUIT IS RUN EXPOSED, IT SHALL BE SECURELY SUPPORTED WITH ZINC COATED MALLEABLE IRON PIPE STRAPS OR OTHER APPROVED METALS. H. EVERY CONDUIT SYSTEM SHALL BE INSTALLED COMPLETE BEFORE ANY CONDUCTORS ARE DRAWN IN. WIRE PULLING LUBRICANTS, WHEN UTILIZED, SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF UNDERWRITER'S LABORATORIES, INC., APPLICABLE TO THE SPECIFIC CONDUCTOR OR CABLE INSULA110N AND RACEWAY MATERIAL. I. MINIMUM CONDUIT SIZE SHALL BE 3/4". MAXIMUM SIZE FOR EMT IS 2". J. WHERE REQUIRED AND WHERE APPROVED BY THE ARCHITECT, EXTRA DEEP OR EXTRA SHALLOW OUTLET BOXES SHALL BE USED TO FACILITATE THE INSTALLATION OF THE CONDUIT SYSTEM. 15. ALL COMMUNICATIONS WIRING SHALL BE IN CONDUIT PER MCO REQUIREMENTS. EMPTY CONDUIT FOR NEW TELEPHONE/COMPUTER OUTLETS IN PARTITIONS SHALL BE 1" THIN WALL RUN CONCEALED IN WALLS WHEREVER POSSIBLE. PROVIDE LARGER CONDUITS FOR DATA/COMMUNICATION STUB -UPS WHERE INDICATED ON THE DRAWINGS. FURNISH PULL WIRE IN CONDUITS. ALL TELEPHONE/DATA WIRING SHALL BE INCLUDED IN THE ELECTRICAL CONTRACTOR'S BID PER VAA SPECIFICATIONS. SEE ADDITIONAL NOTES ON THIS DRAWING. 3 I 4 16. CONDUCTORS: A. ALL CONDUCTORS SHALL BE TINNED SINGLE CONDUCTOR COPPER, TYPE THHN INSULATED, 600 VOLT RATED INSULATION AND A MINIMUM OF 98% CONDUCTIVITY. B. THE MINIMUM WIRE SIZE FOR BRANCH CIRCUIT WIRING SHALL BE NO. 12 AWG EXCEPT 120 VOLT CIRCUITS OVER 100' IN LENGTH SHALL BE NO. 10 AWG. C. CONDUCTORS NO. 10 AND LARGER SHALL BE STRANDED. D. 120/208 VOLT SYSTEM: PHASE "A" -BLACK, PHASE "B"- RED, PHASE "C" -BLUE, NEUTRAL -WHITE; 277/480 VOLT SYSTEM: PHASE "A" -BROWN, PHASE "B" -ORANGE, PHASE "C" -YELLOW, NEUTRAL -WHITE. E. ALL WIRES SHALL BE IDENTIFIED BY CIRCUITS IN ALL CABINETS, BOXES, WIRING TROUGHS AND OTHER ENCLOSURES, AND AT ALL TERMINAL POINTS, I.E. RECEPTACLES ETC.. THE CIRCUIT DESIGNATIONS SHALL BE AS SHOWN ON THE CONTRACT DRAWINGS OR AS DIRECTED BY THE ARCHITECT. TAGS SHALL BE ATTACHED TO WIRES SO THAT THEY WILL BE READILY VISIBLE. BRADY B-500 VINYL CLOTH WIRE AND TERMINAL MARKERS SHALL BE USED FOR ALL WIRE IDENTIFICATION. F. LEAVE ALL WIRES WITH SUFFICIENT SLACK AT TERMINAL ENDS FOR CONVENIENT LOCATIONS TO DEVICES, AND FOR CONVENIENT SERVICING. MAKE SPLICES IN FEEDER TAPS IN PANEL BOX GUTTERS WITH PRESSURE TYPE CONNECTORS - BURNDY, NEPCO, OR O.Z. WITH COMPOSITION INSULATING COVERS. G. SPLICES IN BRANCH WIRING SHALL BE TWISTED AND MADE MECHANICALLY TIGHT, THEN SECURE WITH 3M SCOTCHLOCK OR THOMAS AND BETTS PIGTAIL CONNECTORS, CRIMP TYPE CONNECTIONS SHALL NOT BE USED. H. THE COLOR OF SWITCH LEGS MUST MATCH PHASE CIRCUIT COLOR. 5 ELECTRICAL DEMOLITION NOTES: 1. THE CONTRACTOR SHALL VISIT THE PREMISES AND COMPARE SAME WITH A FULL SET OF BID DOCUMENTS AND SPECIFICATIONS AND SATISFY HIMSELF OF THE CONDITIONS EXISTING AT THE BUILDING BEFORE DELIVERY OF HIS PROPOSAL. NO ADDITIONAL ALLOWANCE WILL BE MADE TO THE CONTRACTOR DUE TO HIS NEGLECT OR FAILURE TO COMPLY WITH THE SPECIFIED REQUIREMENTS. 2. NOTES AND GRAPHIC REPRESENTATIONS SHALL NOT LIMIT THE EXTENT OF DEMOLITION REQUIRED. CONTRACTOR SHALL VISIT THE SITE, CAREFULLY EXAMINE EXISTING CONDITIONS AND SHALL PERFORM ALL DEMOLITION REQUIRED TO ACHIEVE THE FINAL DESIGN INTENT AS REQUIRED BY THE CONTRACT DOCUMENTS. EXTENT OF ALL DEMOLITION WORK SHALL BE COORDINATED WITH THE ARCHITECT. 3. ALL WORK REQUIRED TO REMAIN IN SERVICE BUT INTERFERING WITH THE ALTERATIONS SHALL BE RELOCATED AND RECONNECTED USING MATERIALS AND STANDARDS OF THIS CONTRACT. 4. EQUIPMENT AND WIRING TO BE REMOVED SHALL BE DE -ENERGIZED PRIOR TO ANY DEMOLITION WORK. TEMPORARY LIGHTING SHALL BE PROVIDED ON THE ENTIRE FLOOR BEING DEMOLISHED UNTIL THE WORK IS DONE. 5 EQUIPMENT INDICATED TO BE REMOVED SHALL BE TAKEN FROM THE SITE AND CONTRACTOR, UNLESS THE CONTRACTOR ADVISES THE OWNER OF MISSING TRIMS, COVERS, ETC. PRIOR TO THE START OF WORK. 25. THE CONTRACTOR SHALL PREPARE AND SUBMIT TO THE ARCHITECT FOR APPROVAL (6) SETS OF DETAILED SHOP DRAWINGS, CATALOG CUTS AND WIRING DIAGRAMS WHERE APPLICABLE. ANY SUBSTITUTIONS TO ELECTRICAL ITEMS DESCRIBED ON THIS CONTRACTOR WILL ONLY BE PERMITTED UPON WRITTEN APPROVAL BY THE ARCHITECT. SHOP DRAWINGS AND CATALOG CUTS WILL BE REQUIRED FOR THE FOLLOWING: A. LIGHT FIXTURES B. PANELBOARD C. FIRE ALARM DEVICES 26. ELECTRICAL CONTRACTOR SHALL PROVIDE AS-BUILTS PER MASSPORT AND TENANT STANDARDS. CONTRACTOR FIELD MARK-UPS ARE NOT ADEQUATE. IF THIS DRAWING IS LESS THAN 22" X 34" IT IS A D SIZE DRAWING ELECTRICAL DRAWING LIST DISPOSED OF IN ACCORDANCE WITH APPLICABLE LAWS AND ENVIRONMENTAL 17. GROUNDING: E-101 REGULATIONS. EQUIPMENT REQUIRED TO BE TURNED OVER TO THE OWNER SHALL E-102 C❑MMUNICATI❑N PLAN, NOTES & SPECIFICATI❑NS BE PLACED IN A MUTUALLY ACCEPTABLE LOCATION. A. METAL RACEWAYS, METAL ENCLOSURES OF ELECTRICAL DEVICES AND EQUIPMENT, LIGHTING STANDARDS 6. FOR FEEDERS AND BRANCH CIRCUITS THAT ARE TO BE REMOVED - CONDUIT AND SUPPORTS SHALL BE AND OTHER EQUIPMENT SHALL BE COMPLETELY GROUNDED IN AN APPROVED MANNER. REMOVED TO THE PANEL OF ORIGINAL OR THE BOUNDARY OF THE PROJECT AREA. WIRING SHALL BE B. PROPER HARDWARE FOR A COMPLETE GROUNDING SYSTEM SHALL BE INSTALLED BY THE CONTRACTOR. REMOVED TO THE PANEL OF ORIGIN. WHERE EMPTY CONDUITS REMAIN, INSTALL A PULL STRING AND IDENTIFY C. THE SERVICE SYSTEM NEUTRAL CONDUCTOR SHALL NOT BE BONDED TO EQUIPMENT GROUND AT ANY AT BOTH ENDS. POINT IN THE SYSTEM, EXCEPT AT THE SUBSTATION. D. WHEREVER A GROUND CONDUCTOR IS REQUIRED, A SEPARATE DEDICATED GROUND WIRE SHALL BE 7. FOR FEEDERS AND BRANCH CIRCUITS THAT ARE TO BE RE -USED -REMOVE CONDUIT AND WIRING TO INSTALLED. LOCATIONS WHICH AVOID CONFLICTS WITH NEW WORK. INSTALL JUNCTION BOXES, TAPE OFF CONDUCTORS E. GROUNDFAULT PROTECTION SHALL BE PROVIDED AS INDICATED ON THE DRAWINGS AND FOR ALL AND IDENTIFY WITH PANEL AND CIRCUIT NUMBER. RECEPTACLES AND EQUIPMENT LOCATED WITHIN 6' OF RUNNING WATER. 8. FOR FEEDERS AND BRANCH CIRCUITS THAT ARE TO BE ABANDONED - DISCONNECT, TAPE OFF CONDUCTORS F. GROUND WIRE REQUIRED IN ALL CONDUIT PER DGM. AT BOTH ENDS AND IDENTIFY. PROVIDE JUNCTION BOXES AT BOTH ENDS. 9. PROVIDE BLANK COVER PLATES AT OPEN BOXES WHERE EXISTING RECEPTACLES OR 18. WIRING DEVICES: ELECTRICAL DEVICES ARE REMOVED FROM ENCLOSURES, INDUCTION UNITS OR SURFACES NOT INDICATED TO BE REPAIRED OR REFINISHED. A. WIRING DEVICES SHALL BE OF THE SPECIFICATION GRADE. ALL DEVICES SHALL BE FLUSH MOUNTED 10. THE REMOVAL OF ALL FIRE ALARM, COMMUNICATIONS, DATA AND SECURITY UNLESS OTHERWISE NOTED. COLOR OF DEVICE PLATE SHALL BE AS DIRECTED BY THE ARCHITECT. B. ALL CONVENIENCE RECEPTACLES SHALL BE OF THE GROUNDING TYPE. EQUIPMENT AND ASSOCIATED CABLING SHALL BE COORDINATED WITH BUILDING C. SINGLE POLE TOGGLE SWITCHES SHALL BE RATED 277 VOLT, 20 AMPERES, QUIET OPERATION, COLOR OF OPERATING PERSONNEL. EXISTING BASE BUILDING FIRE ALARM SYSTEM DEVICE PLATE SHALL BE AS DIRECTED BY THE ARCHITECT. SHALL REMAIN IN OPERATION DURING BOTH DEMOLITION AND CONSTRUCTION D. SWITCH AND RECEPTACLE PLATES SHALL BE PLUMB AND SHALL FIT FLAT AGAINST THE WALL. STAGES OF THIS PROJECT. E. PROVIDE MULTIGANG FACEPLATES WHERE MULTIPLE SWITCHES AND/OR DIMMERS ARE INDICATED. 11. PROVIDE ADDITIONAL SUPPORT FOR ALL EXISTING CONDUITS, LOW VOLTAGE F. WHERE SWITCHES AND DIMMERS ARE GANGED, PROVIDE SWITCHES BY SAME MANUFACTURER AS DIMMER CABLING AND DEVICES TO REMAIN WHICH ARE AFFECTED BY DEMOLITION OF EXISTING CEILINGS AND PARTITIONS. WITH MULTIGANG FACEPLATE. 12. ALL WORK SHALL BE PROPERLY IDENTIFIED AFTER DEMOLITION, UPDATE ALL PANEL 19. FIRE ALARM SYSTEM: SCHEDULES TO REFLECT EQUIPMENT AND CIRCUIT REMOVALS. 13. THE WORK SHALL INCLUDE THE FURNISHINGS OF ALL MATERIAL CUTTINGS, A. WHERE CONSTRUCTION INTERFERES WITH EXISTING FIRE ALARM EQUIPMENT, OR IT IS LOCATED ON EXTENSIONS, CONNECTIONS, REPAIRING, ADAPTING AND OTHER WORK INCIDENTAL EXISTING WALLS TO BE DEMOLISHED, IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO NOTIFY THE THERE TO, TOGETHER WITH SUCH TEMPORARY CONNECTIONS AS MAY BE REQUIRED. BUILDING OWNER AND RELOCATE IT AT THE OWNERS DIRECTION. DO NOT REMOVE F/A DEVICES UNLESS 14. THE WORK SHALL INCLUDE THE REMOVAL OF MATERIALS AS DIRECTED. PRIOR TO DIRECTED TO DO SO BY THE BUILDING. IT IS THIS CONTRACTOR'S RESPONSIBILITY TO MAINTAIN FIRE ALARM REMOVING EQUIPMENT AND MATERIALS FROM PROJECT SITE, THE OWNER'S SPEAKERS, SMOKE DETECTORS AND OTHER FIRE SAFETY DEVICES IN OPERATION AT ALL TIMES. MANAGER WILL INSPECT AND ADVISE WHICH ITEMS WILL BE RESTORED. 15. REMOVAL OF EXISTING EQUIPMENT SHALL BE COORDINATED WITH REMOVAL AND IF ANY PERMANENT BUILDING INSTALLATIONS SUCH AS SMOKE DETECTORS, CORRIDOR PA SYSTEMS, FIRE PARTITIONS. ALARM STATIONS, ELEVATOR SIGNS, LIGHTING IN ELECTRIC OR PORTERS CLOSETS, PIPE SHAFTS, ELECTRIC CABS, ETC. ARE TO BE ALTERED OR RELOCATED, THE BUILDING MANAGEMENT OFFICE SHALL BE NOTIFIED 16 . THIS CONTRACTOR SHALL BE RESPONSIBLE FOR ASCERTAINING WHICH EXISTING BEFORE PROCEEDING. CIRCUITS ARE CONNECTED TO EXISTING EQUIPMENT TO REMAIN AND SHALL MAINTAIN CONTINUITY OF SERVICE TO SUCH EQUIPMENT WITH EITHER NEW CIRCUITING OR THE ELECTRICAL CONTRACTOR MUST COORDINATE THE COMPLETE INSTALLATION WITH THE BUILDIN'S FIRE EXTENSION OF EXISTING CIRCUITING (TOILETS, JANITOR'S CLOSETS, SERVICE ELEVATOR I CONTRACTOR MUST SUBMIT WIRING DAGRAMS PRODUCED BY ALARM SYSTEM CONTRACTOR. THE ELECTRICAL L LOBBY AND RECEPTACLES IN CORE CORRIDORS). WHERE PORTIONS OF EXISTING THE BASE BUILDING FA CONTRACTOR) TO THE ENGINEER FOR ANY MODIFICATIONS TO THE FIRE ALARM BRANCH CIRCUITS ARE REMOVED, MAINTAIN THE CONTINUITY OF CIRCUITING TO SYSTEM. THE ELECTRICAL CONTRACTORS BID SHALL INCLUDE TESTING BY THE BASE BUILDING FA REMAINING DEVICES. CONTRACTOR. 17. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR ASCERTAINING WHICH EXISTING CIRCUITS ARE CONNECTED TO CONSTANT CIRCUITS (NIGHT LIGHTS, EXIT LIGHTS, ETC.). 20. ALL CONTROL WIRING ASSOCIATED WITH MECHANICAL EQUIPMENT SHALL BE PROVIDED BY THE 18. THIS CONTRACTOR SHALL PROVIDE ADEQUATE TEMPORARY LIGHT AND POWER TO MECHANICAL CONTRACTOR. INSURE THE SAFETY OF PERSONNEL AND POWER REQUIREMENTS OF THE VARIOUS 21. OPENINGS AROUND ELECTRICAL PENETRATIONS THROUGH FIRE RESISTANCE RATED WALLS, PARTITIONS, TRADES. FLOORS OR CEILINGS SHALL BE FIRE STOPPED USING APPROVED METHODS. 19. WHEN REMOVING EXISTING ELECTRICAL AND TELEPHONE FLOOR OUTLETS, THIS CONTRACTOR SHALL PATCH 22. ALL WORK SHALL BE GUARANTEED AGAINST DEFECTS FOR A PERIOD OF ONE YEAR FROM THE DATE OF OPENING FLUSH WITH FLOOR WITH SUITABLE MATERIALS TO MATCH EXISTING, ALSO REMOVE ALL DEBRIS AND FINAL ACCEPTANCE OF THE INSTALLATION. EXISTING WIRE AND CABLE NO LONGER BEING USED. THIS CONTRACTOR SHALL MAINTAIN CONTINUITY OF 23. POWER INTERRUPTION NOTE: SERVICE TO EXISTING OUTLETS WHICH ARE TO REMAIN. 20. THIS CONTRACTOR SHALL MAINTAIN CONTINUITY OF SERVICE TO EXISTING BUILDING ELECTRICAL POWER MUST BE SHUT OFF PRIOR TO THE CONTRACTOR PERFORMING ANY WORK IN RACEWAYS FIRE ALARM SYSTEM. (COORDINATED WITH BUILDING MANAGER.) WITH LIVE ELECTRICAL CIRCUITS OR ANY OTHER LIVE ELECTRICAL CIRCUITS OR EQUIPMENT. WHEN SWITCHES 21. THIS CONTRACTOR SHALL REMOVE ALL EXISTING POWER AND COMMUNICATION/TEL. WIRES FROM HUNG OR CIRCUIT BREAKERS ARE OPENED FOR WORK ON ELECTRICAL EQUIPMENT OR WIRING, SIGNS OR TAGS CEILING AND CONVECTOR SPACE THAT IS NO LONGER IN USE. SHOULD BE INSTALLED AT THE SWITCH OR BREAKER STATING THAT WORK IS BEING PERFORMED ON THEM. 22 WHERE PRESENT WORK IS DAMAGED IN THE EXECUTION OF THIS CONTRACT, OR INCLUDE THE TIME, DATE AND CONTRACTOR'S NAME ON THE SIGN OR TAG. IF DEVICE IS LOCKABLE IT WHERE OPENINGS ARE LEFT DUE TO THE REMOVAL OF PIPES, EQUIPMENT OR SHOULD BE PADLOCKED. APPARATUS, THE SAME SHALL BE REPAIRED TO CORRESPOND IN MATERIALS, 24. FINAL CLEANUP AND FIELD TESTS: QUALITY, SHAPE AND FINISH WITH THAT OF SIMILAR AND ADJOINING WORK, UNLESS OTHERWISE CALLED FOR. AFTER COMPLE11ON OF THE FINAL INSTALLATION: 23. ALL PANELBOARDS AND ANY OTHER EQUIPMENT IN AREAS TO BE DEMOLISHED ARE TO REMAIN UNLESS OTHERWISE NOTED. A. THE CONTRACTOR, BEFORE FINAL ACCEPTANCE WILL BE GRANTED, SHALL CLEAN ALL LIGHTING FIXTURES, 24. CONTRACTOR IS TO DISCONNECT AND REMOVE ONLY WIRING AND RACEWAY SERVING GLASSWARE, PANELBOARDS, CABINETS, DEVICE PLATES AND ALL OTHER ITEMS INSTALLED UNDER THIS FLOOR AREAS OF DEMOLITION. DO NOT REMOVE ANY BASE BUILDING HOMERUN CONDUITS. CONTRACT AND SHALL INSURE THAT ALL DIRECTORIES ARE IN PLACE WITH COMPLETED OR REVISED SCHEDULES AND ALL IDENTIFICATIONS AND MARKINGS OF EQUIPMENT, CABLES AND OTHER ITEMS ARE 25. ALL LIGHTING AND POWER CIRCUITRY CONDUIT AND WIRING NO LONGER IN USE, SHALL BE REMOVED BACK ( ) COMPLETED. TO THE PANELBOARD. B. THE CONTRACTOR SHALL REPAIR OR REPLACE AS DIRECTED BY THE ARCHITECT, AT NO ADDITIONAL COST 26. WHERE REMOVAL OF EXISTING ELECTRICAL EQUIPMENT WILL RESULT IN OUTAGES IN TO THE OWNER, ANY ITEM DAMAGED DUE TO INSTALLATION, RELOCATION OR REINSTALLATION. AREAS NOT TO BE DEMOLISHED, THE CONTRACTOR SHALL COORDINATE IN ADVANCE C. IN ADDITION TO OTHER TESTS WHICH MAY BE REQUIRED IN THE VARIOUS OTHER DISCIPLINES, THE AND OBTAIN THE WRITTEN APPROVAL OF THE BUILDING MANAGER. CONTRACTOR SHALL PERFORM FIELD TESTS IN THE PRESENCE OF THE ARCHITECT, TO DEMONSTRATE THE 27. UNLESS OTHERWISE NOTED, DISCONNECT AND REMOVE ALL EXISTING LIGHTING RELIABILITY OF THE ELECTRICAL INSTALLATION. GIVE THE ARCHITECT 48 HOURS NOTICE IN ADVANCE OF SUCH FIXTURES, RECEPTACLES, OUTLETS AND OTHER ELECTRICAL DEVICES ALONG WITH TESTS. THE FOLLOWING FIELD TESTS SHALL BE PERFORMED BY THE CONTRACTOR: ASSOCIATED WIRING, CONDUIT RACEWAYS, BOXES, AND SUPPORTS ON WALLS TO BE 1. OPERATE ALL ELECTRICAL EQUIPMENT FOR A PERIOD OF 24 HOURS, UNLESS OTHERWISE SPECIFIED BY THE ARCHITECT. DEMOLISHED OR WHERE IN CONFLICT WITH NEW CONSTRUCTION. EXISTING 2. SHOULD THE FOREGOING TESTS REVEAL ANY DEFECTS, PROMPTLY CORRECT SUCH DEFECTS AND RERUN ELECTRICAL DEVICES SHALL INCLUDE, BUT NOT BE LIMITED TO, TEL/DATA OUTLETS, THE TESTS UNTIL THE ENTIRE INSTALLATION IS SATISFACTORY IN ALL RESPECTS. LIGHTING SWITCHES, RECEPTACLES, ETC. D. THE ELECTRICAL CONTRACTOR WILL BE RESPONSIBLE FOR INSTALLING ALL PANEL TRIMS, COVERS ETC., IN THE SPECIFIED WORK AREAS WHETHER OR NOT THE TRIMS, COVERS, ETC WERE REMOVED BY THE CONTRACTOR, UNLESS THE CONTRACTOR ADVISES THE OWNER OF MISSING TRIMS, COVERS, ETC. PRIOR TO THE START OF WORK. 25. THE CONTRACTOR SHALL PREPARE AND SUBMIT TO THE ARCHITECT FOR APPROVAL (6) SETS OF DETAILED SHOP DRAWINGS, CATALOG CUTS AND WIRING DIAGRAMS WHERE APPLICABLE. ANY SUBSTITUTIONS TO ELECTRICAL ITEMS DESCRIBED ON THIS CONTRACTOR WILL ONLY BE PERMITTED UPON WRITTEN APPROVAL BY THE ARCHITECT. SHOP DRAWINGS AND CATALOG CUTS WILL BE REQUIRED FOR THE FOLLOWING: A. LIGHT FIXTURES B. PANELBOARD C. FIRE ALARM DEVICES 26. ELECTRICAL CONTRACTOR SHALL PROVIDE AS-BUILTS PER MASSPORT AND TENANT STANDARDS. CONTRACTOR FIELD MARK-UPS ARE NOT ADEQUATE. IF THIS DRAWING IS LESS THAN 22" X 34" IT IS A D SIZE DRAWING Am iq A 66 z O U) > w a U a co W W Z 0 Z 0o Bz DN 00 0 U .1�y , •`, U a � � w w LU W W IX V .- Y N w p 3 00 of co o (~j Z Z Mo coo, N 2 Q Z N U0 ¢u0r,cn LL 07 W Q J a Q Z p0Q D Q Q w w_ oj W u- 1- zW W W LL Z LL Q Q Q (A a U) Z o Z Q LLJ J F- 0 PROJ NO: 1498.SO5 SCALE: 1/4" = 1'-0" DATE: 11 /2142&08 DESIGNED BY: WW DRAWN BY: WW CHECKED BY: JG wo wo tY C/)O s >: M Z � Y U)a w 0 NLLU N Z rn O co C.0 rn CV N n cc 0 M ti q N_ N rl z O (L_ z a O w Fn o m D cn 0 0 o N w U-) Q N a Y CC Q I SHEET TITLE: I ELECTRICAL SCHEDULES & DRAWING LIST SHEET NO. E-001 SHEET OF ELECTRICAL DRAWING LIST E-001 ELECTRICAL SPECIFICATI❑NS, DEM❑LITI❑N NOTES AND DRAWING LIST E-101 ELECTRICAL POWER & LIGHTING PLANS, NOTES & DETAILS E-102 C❑MMUNICATI❑N PLAN, NOTES & SPECIFICATI❑NS E-201 ELECTRICAL SCHEDULES, SYMBOL LIST & DETAILS Am iq A 66 z O U) > w a U a co W W Z 0 Z 0o Bz DN 00 0 U .1�y , •`, U a � � w w LU W W IX V .- Y N w p 3 00 of co o (~j Z Z Mo coo, N 2 Q Z N U0 ¢u0r,cn LL 07 W Q J a Q Z p0Q D Q Q w w_ oj W u- 1- zW W W LL Z LL Q Q Q (A a U) Z o Z Q LLJ J F- 0 PROJ NO: 1498.SO5 SCALE: 1/4" = 1'-0" DATE: 11 /2142&08 DESIGNED BY: WW DRAWN BY: WW CHECKED BY: JG wo wo tY C/)O s >: M Z � Y U)a w 0 NLLU N Z rn O co C.0 rn CV N n cc 0 M ti q N_ N rl z O (L_ z a O w Fn o m D cn 0 0 o N w U-) Q N a Y CC Q I SHEET TITLE: I ELECTRICAL SCHEDULES & DRAWING LIST SHEET NO. E-001 SHEET OF C IC W. E N ro 0 0 N L6 N 0 z 0 0 a a v ui 0 a v 0 0 0 6 LIGHTING CONTACTOR, SEE SEE N❑TE 9. r ELEC. PANEL BT 1 Y F _ -71_ #10 g II r III F- _ J _j L===-1 I oIII ��III III LJIII #9 2 # -----��-_-�+`�-��-----� ----------- lfll - IN KICK #il � v � IG/SS r-_= — I� R II #12 #13 \ III III / ----------L nELECTRICAL POWER PLAN � SCALE: 1/4"=1 '-0" 0 4' 8' 1(O POWER NOTES: IN KICK 1. FOR EXACT LOCATION AND MOUNTING HEIGHTS OF ALL RECEPTACLES, TELEPHONE AND DATA OUTLETS, SEE ARCHITECTURAL DRAWINGS. 2. CONTRACTOR SHALL FURNISH AND INSTALL ALL REQUIRED CONDUITS, WIRES, ARMORED CABLE AND BOXES TO ENERGIZE EQUIPMENT AND DEVICES INDICATED. 3. ALL BRANCH WIRING SHALL BE CONCEALED IN WALLS AND ABOVE HUNG CEILING, U.O.N. 4. CONTRACTOR SHALL MAINTAIN CONTINUITY IN ALL EXISTING CIRCUITRY TO REMAIN WHICH IS AFFECTED BY THE SCOPE OF WORK. CONTRACTOR TO FURNISH AND INSTALL ALL NECESSARY WIRES, CONDUITS AND JUNCTION BOXES REQUIRED TO KEEP CONTINUITY. 5. CONTRACTOR SHALL COORDINATE WITH OTHER TRADES AND FIELD CONDITIONS FOR CONDUITS ROUTING AND ELECTRICAL CONNECTIONS TO OTHER TRADES' EQUIPMENT. 6. THE ELECTRICAL CONTRACTOR SHALL PATCH PAINT, AND RESTORE EXISTING CEILINGS, SOFFITS, WALLS, AND OTHER FINISHES THAT WERE DISTURBED AND/OR DAMAGED DUE TO THEIR WORK. 7. ALL CIRCUITS ON THIS PLAN SHALL BE ROUTED TO PANEL 'BT' (#) UNLESS OTHERWISE NOTED. 8. ALL SLAB PENETRATIONS AND CORE DRILLING NEED TO BE X-RAYED BY A LICENSED TECH. AND APPROVED BY THE BUILDING MANAGEMENT. 9. CONTRACTOR TO PROVIDE 6 -POLE MACHANICALLY HELD LIGHTING CONTACTOR. SQUARE D MODEL #LXG800. ROUTE CIRCUITS #5, 7, 8, 9 THROUGH CONTACTOR. CONTACTOR COIL CIRCUIT SHOULD BE BT# 14. 1 1 2 3 3 4 1 5 IF THIS DRAWING IS LESS THAN 22" X 34" IT IS A REDUCED SIZE DRAWING J -BOX EXTENDED INT❑/ INF❑ SIGN, COORDINATE EXACT L❑CATION W/SIGN VENDOR] CONTROLLED BY TOGGLE SWITCH. nELECTRICAL LIGHTING PLAN SCALE: 0 4' 8' 16' LIGHTING NOTES: 1. FOR EXACT LOCATION AND MOUNTING HEIGHTS OF ALL LIGHTING FIXTURES, SWITCHES AND JUNCTION BOXES SEE ARCHITECTURAL DRAWINGS. 2. CONTRACTOR SHALL FURNISH AND INSTALL ALL REQUIRED CONDUIT, WIRE AND BOXES AS WELL AS CEILING OUTLETS AND WHIPS TO ENERGIZE ALL LIGHTING FIXTURES. 3. ALL BRANCH CIRCUIT WIRING SHALL BE RUN CONCEALED IN WALLS AND ABOVE HUNG CEILING, U.O.N. 4. CONTRACTOR SHALL MAINTAIN CONTINUITY IN ALL EXISTING CIRCUITRY TO REMAIN, WHICH IS AFFECTED BY THE SCOPE OF WORK AND PHASING. CONTRACTOR TO FURNISH AND INSTALL ALL NECESSARY WIRES, CONDUITS AND JUNCTION BOXES REQUIRED TO KEEP CONTINUITY. 5 LIGHTING FIXTURES USED AS NIGHT LIGHT DESIGNATED 'NL' AND EXIT LIGHTS SHALL NOT BE SWITCHED, PROVIDE SWITCHING DUTY RATED BREAKERS. 6. ALL LIGHTING FIXTURES SHALL BE CIRCUITED TO NEW PANEL 'BT' (#) UNLESS OTHERWISE NOTED. POLARIZED CONNECTOR BATTERY INVERTER/ BALLAST ALLAST NEUTRAL TO SWITCHED LEG ADDITIONAL UNSWITCHED LEG FIXTURES SOURCE WALL SWITCH TEST SWITCH OR DIMMER WIRING DIAGRAM - EMERGENCY LIGHTS NO SCALE 1. FIXTURES DESIGNATED FOR EMERGENCY EGRESS LIGHTING MAY BE SWITCHED OFF AS INDICATED ON THE DRAWINGS WITHOUT ENERGIZING LAMPS THROUGH THE EMERGENCY BATTERY PACK. WHEN NORMAL POWER FAILS EMERGENCY LIGHTS WILL BE ENERGIZED VIA BATTERY PACK REGARDLESS OF SWITCH POSITION. 2. ALL EMERGENCY FIXTURES WHICH ARE CONTROLLED WITH A TOGGLE SWITCH MUST BE PROVIDED WITH AN UNSWITCHED HOT LEG AS A SENSOR FOR THE INVERTER CIRCUIT. 3. EXIT LIGHTS AND NIGHTLIGHTS SHALL BE ENERGIZED AT ALL TIMES. 4 1 5 Loll CI a 17 003 E � U 0 a 0 o � Ww C� Wz I Y z zz < 0 o cfl o 00 (� 0 o ci rn Z Z N 00 H U LIJ o U Cr Z N O 0:o 0 Q = Ln a U. SE—MIN p0 a 0) 0 U) La w w co z 0 N ~r W W N Lu � LL B z F (�? U) }:co, Z M Z eco M Y 'l: -i vu to W O N_ N N N Z•��:!° O `•' ,. z n. U WO � Q J as Z wp O Q QQcl 2 OWO OWN O U < Z Q z0Q QQcn J (n ZO — 0 Z � g uj O z O H a z O tV U w o m U) 0 0 0 0 N W �a N D z O U W Y Q PROJ NO: 1498.S05 SCALE: 1/4" = V-0" DATE: 11 /21MB-08 DESIGNED BY: WW DRAWN BY: WW CHECKED BY: JG SHEET TITLE: ELECTRICAL POWER & LIGHTING PLANS, NOTES & DETAILS SHEET NO. E-101 SHEET OF M 04 0 0 N Ld N 0 Z v (D 0 a 3 Ly Ln 0 OD o) V 0 0 CAMERA, OWNER SUPPLY, CONTRACTOR INSTALL PROVIDE 1/2' CONDUIT TO TERMINATE W/OCTAG❑N BOX W/ROUND PLASTER RING TO DVR. (TYP. FOR 2) ------------ ----- ____-_- ------------- 6 ELEC, I II I PANEL r HORIZONTAL IN KICK HORIZONTAL IN KICK I II I I I BT 2 v I II II I II I ? R III LJ III I I I I z �=---JIB--JI I N III r III L_J I I N I II I 0 II L L _J _J II I 1 0 1 I I I I I `----J I II I I I I I � III III � � III III � - - - - - - - - - - nCOMMUNICATION PLAN SCALE: 1/4"=1'-0" 0 41 8' 16 DATA & COMMUNICATION SPECIFICATIONS COMMUNICATION: 1. PULL FOUR (4) YELLOW CAT5E CABLES WHICH INCLUDES ONE (1) CABLE FOR VOICE AND (3) FOR DATA FROM BUILDING TELECOM ROOM TO CASHWRAP. 2. TERMINATE THREE (3) SEPARATE PHONE LINES INTO THREE (3) SEPARATE RJ11 JACK WALL PLATE ON THE LOWER SECTION ON THE CASHWRAP REGISTER #1 LOCATION. 3. TERMINATE ONE (1) ADDITIONAL PHONE LINE INTO A RJ1 1 WALL PLATE ON THE LOWER SECTION OF EACH ADDITIONAL CASHWRAP REGISTER LOCATION. 4. INDICATE WITH A LABEL EACH PHONE NUMBER ON THE RJ11 WALL PLATE. 5. CERTIFY CONTINUITY OF EACH PHONE LINE. 6. FOLLOW ALL LOCAL AND/OR BUILDING CODES AND ADJUST THE ABOVE INSTALLATION TO MEET THOSE CODES. DATA: 1. RUN ONE (1) 5E PATCH LINE FROM EACH REGISTER BACK TO OWNER SUPPLIED HUB LOCATED AT LOWER SECTION AT REGISTER #1; TERMINATE WITH MALE RJ45 AT BOTH ENDS. 2. OWNER WILL PROVIDE AND INSTALL ALL CASH REGISTERS, MODEMS AND HUBS CONTRACTOR TO COORDINATE LOCATIONS WITH OWNER. 3. ALL DATA CABLE RUN UNDER THE CASHWRAP TO BE IN CONDUIT, TERMINATE CONDUIT ON THE LOWER SHELF AT EACH CASH REGISTER LOCATION. PROVIDE ENOUGH CABLE TO REACH TO THE TOP OF THE CASHWRAP AND PLUG INTO THE CASH REGISTER. PROVIDE 12" OF SLACK AT THE MODEM HUB END OF EACH CABLE. 4. LABEL EACH CABLE AT THE MODEM HUB END. 5. CERTIFY CONTINUITY OF EACH DATA CABLE. 6. FOLLOW ALL LOCAL AND/OR BUILDING CODES AND ADJUST ABOVE INSTALLATION TO MEET THOSE CODES. POWER: 1. PROVIDE ONE (1) QUAD 120V, 20AMP ISOLATED GROUND DEDICATED CIRCUIT ON THE LOWER SECTION OF THE CASHWRAP AT REGISTER #1 LOCATION. 2. PROVIDE ONE (1) DUPLEX 120V, 20 AMP ISOLATED GROUND DEDICATED CIRCUIT ON THE LOWER SECTION OF THE CASHWRAP AT EACH ADDITIONAL REGISTER. 3. CERTIFY CONTINUITY OF EACH OUTLET. KEY RJ11 SURFACE JACK a RJ45 SURFACE JACK & DUPLEX 120V, 20A, IG ISOLATED IG GROUND, DEDICATED CIRCUIT LEGEND REG CASH REGISTER CR CREDIT CARD MACHINE TEL TELEPHONE MOD MODEM IG ISOLATED GROUND DUPLEX RECEPTACLE 120V, 20A, DEDICATED CIRCUIT. PROVIDE ONE IG CIRCUIT AT EACH CASHWRAP AND IN TELEPHONE CLOSET, 22" X 34" IT IS A REDUCED SIZE Security Specification- Hudson Security System A.Installation- Security equipment to be supplied by Hudson installed by Contractor 1. Hudson's Loss Prevention Division to Provide: • Contact: David Ruben Hudson Group Loss Prevention Phone:310. 904-4377 • Items to be provided (1) All camera cabling (a) RG59 video with 18-2 power hybrid wire (2) All DVR recorders (Digital Video Recorder) (a) Manufactured by Everfocus (3) All DVR lockboxes (4) All Cameras (a) Manufactured by Everfocus (5) All Camera power supply (a) Manufactured by Everfocus • Final Camera placement, termination and installation to be by Hudson Los Prevention Division 2. Responsibility of Contractor • All work to be done per local building code requirements. • Provide and install all power outlets, per plans • Provide and install all conduits, junction boxes and core drilling, as required and shown per plans • Pull all owner supplied wringing (1) all camera cabling runs will be continuous to termination at both ends; no splicing will be acceptable. • Rough in camera locations to be coordinated with Hudson Lost Prevention Division • Contractor to provide and install one CAD5e cable from phone block to DVR location. 3.Local Building Code requirements take presidencies over this document. Report any conflicts to the Architect. B.Camera Placement 1. General • Before rough in is placed make sure line of sight is unobstructed from such this as soffits, signage, light fixtures, ect.. • Provide 2'-0" of extra cabling at each camera for final wiring and termination. 2.Power supply • Power supply to be located next to DVR. Contact Hudson Loss Prevention for dimensions. 3.General Store Camera Security Placement: • Provide rough in as shown on drawings. • Verify Camera line of sight is free from any obstructions and direct lighting. 4.Cash Register Placement: • See attached Figure 2A, for rough -in placement. • Before rough in placed maker sure light of sight is free and unobstructed from any obstructions such as soffits, signage or light fixtures. 5.%• Verify Camera Line of sight is free from any obstructions and direct lighting. rd Lid Ceiling • Rough in requirements. (1) Provide flush mounted Junction Box with a minimum of two feet of extra cabling for final wiring and install. (a) Junction box to be smaller than Diameter of Camera housing to prevent j -box being exposed after final install. (2) Verify final placement with Hudson Loss Prevention Division 6.T -bar • Rough in requirements (1) Provide one junction box 6" above suspended ceiling with 6'-0' of 1/i" or -" flex conduit for the flexibility of final camera placement. (a) Secure per Local building code requirements C.DVR (Digital Video Recorder) 1. All DVR's to be located inside the Cash Wrap unless other wise specified on plans. • If DVD located other than Cash Wrap, provide a 24" x 24" wall mounted shelve. (1) shelf to be finished with a white melamine and located as shown or directed. (2) shelf to be able to support a minimum of 50 pounds. 2.Power • Provide one 15 amp fourplex outlet on a dedicated circuit. Locate on back wall behind DVR recorder. 3.Lock Box • Hudson Loss Prevention Division to provide Contractor with exact location, area to be a minimum to be a minimum of 24"W x 24"D x 8"H. • Locate a min. of 4" in front of Power outlet • Secure box per manufactures requirements. 4.Cabling *At DVR termination provide a minimum of 6' of extra cabling length for termination D. Conduit requirement 1. All cabling runs to be continuous, no splicing will be acceptable. 2.Conduit with single lines • Provide a %" or -" conduit., or minimum size allowed by local building codes. 3.Conduit with multiple lines • At conversion of all single lines above ceiling,provide a 6"x 6" Junction box • Where 4 cables are required be encased in a single conduit provide 1 %" diameter conduit. • Where 8 cables are required to be encased in a single conduit provide a 2" diameter conduit • Where 16 cables are required, run 2, 2" diameter conduits to house 8 cables each. 4.Core Drilling or Trenching • If Core Drilling or Trenching will need to be provide (1) Install per local building requirements. (2) X-ray existing slab prior to coring floor. WIRING NOTE: ALL LOW VOLTAGE SECURITY, DATA, TELEPHONE AND A/V CABLES ARE TO BE PLENUM RATED AND INSTALLED IN CONDUIT AS A FACILITY REQUIREMENT. L U U') a cooWW CO W04U Y 01 Z Q W a00 WWco H- U rn O ch rn Z Z N co IW- C) W F_ W M � iN� O O O Q ® QU,cnaw V- uq DOCUMM Jdm J. O� a � p co OW W W YZ rn N Z W p N QZ F_ oo c!)�EE � Y o O Z Z �'^)0 �j M O W F- J �+ W N ♦ Z N N N Z a O U H WO �a J Q W Z 00 Q Qac zZOu; 0 cc Z O W ILL I- F-- U ? Z Con" U) W 0 LL Q z0ZZ ' w Q Q J 07 QO Z 0 Z �a W _J ~0 Z O n~. Z O W U)o (A Ly m 0 0 00 N W La N � 6 Z O Y � Q PROJ NO: 1498.S05 SCALE: 1/4" = V-0" DATE: 1111IMB-08 DESIGNED BY: WW DRAWN BY: WW CHECKED BY: JG SHEET TITLE: COMMUNICATION PLAN, NOTES & SPECIFICATIONS SHEET NO. E-102 SHEET OF L L IC IC IA 2 3 SYMBOLS LIST SYMBOL DESCRIPTION PP#,I, HOMERUN TO PANELBOARD. PANEL AND CIRCUIT NUMBERS AS INDICATED. �--1 REMARKS; FIXTURE DESCRIPTION 20A-277VOLT SINGLE POLE TOGGLE SWITCH - HUBBELL #1201. WHERE PANEL DESIGNATION: LOCATION: U SWITCHES ARE INDICATED, PROVIDE SINGLE MULTIGANG FACEPLATE. 2EP3GX-3BX40-W33P- WHERE SHOWN, NUMBER INDICATES CIRCUIT NUMBER.125V-20A GENERAL GENERAL PURPOSE DUPLEX RECEPTACLE. HUBBELL #5362. q IG/SS 125V -20A ISOLATED GROUND/SURGE SUPPRESSION DUPLEX RECEPTACLE, BT WITH LIGHT AND CONTROLLABLE ALARM. HUBBELL #IG5362S (BLUE). Z (PROVIDE DOUBLE DUPLEX WHERE INDICATED AS QUAD.) QHO IZONTAL SERVICE: 120/208 3 4 MAINS: 225 AMPS SHOWN, NUMBER INDICATES CIRCUIT NUMBER n MOUNTING TYPE: PROVIDE MATCHING RECEPTACLE, PLUG AND CORD SET. SURFACE NEUTRAL a DJ BUS: FULL V (NEW) MAJIN CIR=REAKER: *Hot 100 AMPS GROUNDING: EQUIPMENT GROUND BUS: YES FIRE ALARM SYSTEM MANUAL PULL STATION MAJN LUU-5 ONLY: GENERAL NO c SELECTED BY THE ARCHITECT WATTSTOPPER DW -100 OR APPROVED } Pq Pq ISOLATED GROUND BUS: YES SERVICE TO: MOUNTED OCCUPANCY SENSOR. WATT STOPPER DT -300. SEE TRIP NO. A B C NO. TRIP EXISTING RELOCATED E SERVICE TO: LIGHTING 589 20 1 1738 2 20 1320 0 LIGHTING LIGHTING 1000 20 3` '<<,�� 1580 4 20 800 2,9W LED SIGNAGE 45V LINE ARCHITECTURAL EDGE -LIT EXITS, WALL MOUNTED *Hot Btk/Brr Pack Red a) Y 3 CASE DISPLAY LIGHTING 720 20 5°' 1330 6 20 610 EM/NUEXITS CASE DISPLAY LIGHTING 1080 20 7 Ann 1800 "t ° ' ` $q" +' 8 20 720 CASE DISPLAY LIGHTING CASE DISPLAY LIGHTING 720 20 9 1440{, 10 20 720 HORIZONTAL IN KICKS (4) Power *Hot Blk/Br Pack Red L 3 Y 3 IG/SS RECEP. 360 20 11 720 12 20 360 QUAD (1) QUAD. (1) 360 20 13 560�1���w��°`n x'� 14 20 200 CONTACTOR COIL Neutral Wht Red BZ -100 a LIGHTING 1000 20 15 0 16 20 0 _y 3N 3 SPARE W �" Pq pq Control Output SPARE 0 20 17 „',�',v''". x4'" ` °�a 0 18 20 0 SPARE +24VDC Sensor Control Output SPARE 0 20 19 0 20 20 0 SPARE SPARE 0 20 21 r 0 y., 22 20 0 1. Connect only SPARE the voltage being used. Cap unused power supply wire. 2. Wire up to 10 BZ -100 s in Parallel 3. Occupancy Sensors controlling Multiple Circuits using BZ -100. SPACE LIGHTING CONTROL DIAGRAM SPARE 0 20 23 "£ 0 24 20 0 SPARE SPARE 0 20 25 0 26 20 0 SPARE rt SPARE 0 20 �,4id 43a, 28 20 0 SPARE SPARE 0 20 29 ;., € r ,, 0 30 20 0 SPARE SEC.1 TOTAL (VA) DEMAND FACTORS DEMAND LOAD (VA) CONNECTED LIGHTING LOAD (VA): 9279 9279 125% 11598.75 CONNECTED RECEPTACLE LOAD (VA): 1080 1080 Ist 10kVA + 50% REMAINDE 1080 CONNECTED KITCHEN LOAD (VA): 0 0 80% 0 CONNECTED MISC. LOAD (VA): 200 200 100% 200 CONNECTED ELEC. HEAT LOAD (VA): 0 0 40% 0 CONNECTED A/C LOAD (VA): 0 0 80% 0 PANEL TOTAL DEMAND LOAD (kVA): 12.87875 PANEL TOTAL DEMAND LOAD (AMPS): 36 PRECENT SPARE : 25% PANEL TOTAL AMPACITY (AMPS): 45 mad 3 SYMBOLS LIST SYMBOL DESCRIPTION PP#,I, HOMERUN TO PANELBOARD. PANEL AND CIRCUIT NUMBERS AS INDICATED. �--1 NEW CONDUIT AND WIRING, RUN CONCEALED IN WALLS OR ABOVE CEILING. FIXTURE DESCRIPTION 20A-277VOLT SINGLE POLE TOGGLE SWITCH - HUBBELL #1201. WHERE a INDICATED, LOWER CASE LETTER INDICATES CONTROL. (WHERE MULTIPLE U SWITCHES ARE INDICATED, PROVIDE SINGLE MULTIGANG FACEPLATE. 2EP3GX-3BX40-W33P- WHERE SHOWN, NUMBER INDICATES CIRCUIT NUMBER.125V-20A GENERAL GENERAL PURPOSE DUPLEX RECEPTACLE. HUBBELL #5362. q IG/SS 125V -20A ISOLATED GROUND/SURGE SUPPRESSION DUPLEX RECEPTACLE, 0) WITH LIGHT AND CONTROLLABLE ALARM. HUBBELL #IG5362S (BLUE). Z (PROVIDE DOUBLE DUPLEX WHERE INDICATED AS QUAD.) QHO IZONTAL 15A,125V LUTRON LUMEA2 CAT#LTR-15H-BL+LT-1H-BL (BLACK) WHERE KICK SHOWN, NUMBER INDICATES CIRCUIT NUMBER n 20A, 250V NEMA TYPE 6-20R RECEPTACLE FOR PLASMA SCREEN. 7f PROVIDE MATCHING RECEPTACLE, PLUG AND CORD SET. (iD m JUNCTION BOX, WALL AND CEILING MOUNTED, RESPECTIVELY. a DJ SAFETY DISCONNECT SWITCH, FUSED AND NON-FUSED RESPECTIVELY. V TELEPHONE OUTLET. SEE COMMUNICATION DWG E-301 FOR EXACT Power LOCATION AND INFORMATION *Hot FIRE ALARM SYSTEM COMBINATION HORN/STROBE (BUILDING STANDARD) ® FIRE ALARM SYSTEM MANUAL PULL STATION �$ SMOKE DETECTOR GENERAL DECORATOR AUTOMATIC/MANUAL WALL SWITCH. COLOR AS c SELECTED BY THE ARCHITECT WATTSTOPPER DW -100 OR APPROVED } Pq Pq EQUAL WHITE TRIM (40A15) MOUNTED OCCUPANCY SENSOR. WATT STOPPER DT -300. SEE SCEILING WIRING DIAGRAM SHEET E-2. A.F.F. ABOVE FINISHED FLOOR. RE EXISTING RELOCATED E EXISTING N NEW LIGHTING FIXTURE SCHEDULE MARK SYMBOL MANUFACTURER MODEL NO. LAMP USE & AREA FIXTURE DESCRIPTION B1 Power Packs ® U COOPER LIGHTING 2EP3GX-3BX40-W33P- (3) 40W BIAX GENERAL 2'X2' PARABOLIC 9 CELL ALL WHITE 1 Local L 0) n Z 120V-WTR-EB51 U Y N z B1/EM ® COOPER LIGHTING 2EP3GX-3BX40-W33P- 3 40W BIAX () EMERGENCY 2'X2' PARABOLIC 9 CELL ALL WHITE BZ -100 d U 120V-WTR-EB51 Power SAME AS 61 *Hot F1 O CON -TECH LIGHTING RL20-CTR2002-CLR-P CLEAR SPECULAR ALUMINUM REFLECTOR, GENERAL COMPACT 4" INCANDESCENT DOWNLIGHT HOUSING FOR NEW 1� pa } Pq Pq w O WHITE TRIM (40A15) DOWNLIGHTS CONSTRUCTION APPLICATIONS. P1- N F❑RECAST F1932-68 (1) 75W MEDIUM ABOVE SUSPENSE PENDANT IS CRYSTAL COLOR, FIXTURE IS • Off o U BASE A-19 LAMP CASHWRAP PROVIDED WITH 6 FEET OF FIELD-CUTTABLE CABLE, T1 0 CON -TECH LIGHTING CTL-619-P-LA19351 () 10OW A-19 PERIMETER WALLS TRACK LIGHTNG X1 MCPHILBEN 45VL W 1 RC 2,9W LED EXIT SIGN 45V LINE ARCHITECTURAL EDGE -LIT EXITS, WALL MOUNTED LIGHTING NOTES: 1. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN FOR DIMENSIONED LOCATION OF ALL LIGHTING FIXTURES. 2. NO LIGHTING FIXTURE SUBSTITUTION WITHOUT WRITTEN APPROVAL OF THE ARCHITECT. 3. PROVIDE ALL REQUIRED TRIM, HOUSING, ROUGH -IN KITS ETC., FOR ALL FIXTURES APPROPRIATE FOR TYPES OF CEILING FIXTURES WILL BE MOUNTED IN. 4. ALL LIGHTING FIXTURES ARE 120 VOLT. 5. FOR ALL EXIT LIGHTS AND EMERGENCY EGRESS LIGHTS SEE EMERGENCY LIGHTING DIAGRAM ON DRAWING E-101. 6. ALL LIGHTING FIXTURES FURNISHED AND INSTALLED BY THE ELECTRICAL CONTRACTOR. SEE ARCHITECTURAL DRAWINGS FOR LIGHTING FIXTURE SPECIFICATIONS. i IF THIS DRAWING IS LESS THAN 22" X 34" IT IS A REDU NG 4 1 5 CONNECT POWER PACK TO UNSWITCHED LTG CIRCUIT (TYPICAL) F - a) **to other BZ -100 W0 Of p Power Packs U Q Lo Neutral Ccs a a 1 Local L 0) n Z Off o U Y N z Switch a d Neutral Wht Red o �tf U BZ -100 d U U Power Z *Hot Blk/Br Pack Red Q m Z N OOy[ 3 N Y F— 1� pa } Pq Pq w O � U) U) Neutral N Z « Local L 4 0 • Off o U Switch a d Neutral WhtRed LLJ ~O J BZ -100 c Power *Hot Btk/Brr Pack Red a) Y 3 Neutral Local L Off o Switch a d Neutral Wht Red BZ -100 b Power *Hot Blk/Br Pack Red L 3 Y 3 Neutral Local L Off Switch a d Neutral Wht Red BZ -100 a Power *Hot Blk/Br Pack Red L _y 3N 3 W �" Pq pq Control Output WATTSTOPPER Common 24VDC Ceiling MTD DT -300 +24VDC Sensor Control Output WATTSTOPPER Common 24VDC Ceiling MTD DT -300 +24VDC Sensor Note: 1. Connect only the supply for the voltage being used. Cap unused power supply wire. 2. Wire up to 10 BZ -100 s in Parallel 3. Occupancy Sensors controlling Multiple Circuits using BZ -100. SPACE LIGHTING CONTROL DIAGRAM NOT TO SCALE m wo m C013 OV F - a) a W0 Of p C" L U Q Lo Ccs a a 1 0) n Z Z U Y N z w p � It o o �tf U cc O co O ch rn U U z Z N Co Lu a Z 2 U Q m Z N OOy[ Ir� F— 1� J v0 iii z O W PROJ NO: 1498.S05 SCALE: 1/4" = V-0" DATE: 11/2142&08 DESIGNED BY: WW A DRAWN BY: WW CHECKED BY: JG SHEET TITLE: ELECTRICAL SCHEDULES, DETAILS & SYMBOL LIST SHEET NO. E-201 SHEET OF z O H a O uvi Lu ( o m 0 0 00 N w to Q N Q Y a OV F - a) a W0 Of p C" L Q W ti � Q as W 0) z Z N z W p N � OZ o u: �O LU J LL U H J o Z Z o Z J M c h i c'Z F— ti to J v0 w O � U) U) v w N Z « N z 4 0 • U 2Z W Q iii z O W PROJ NO: 1498.S05 SCALE: 1/4" = V-0" DATE: 11/2142&08 DESIGNED BY: WW A DRAWN BY: WW CHECKED BY: JG SHEET TITLE: ELECTRICAL SCHEDULES, DETAILS & SYMBOL LIST SHEET NO. E-201 SHEET OF z O H a O uvi Lu ( o m 0 0 00 N w to Q N Q Y a F - W0 Of CL Q Q as J p0� Z Q z Q � 0 O �O LU J LL U z?�O ►�, w00 LL i Q z Q Q U) J Q0 (/) Z0 2Z W Q LLJ ~O J iii z O W PROJ NO: 1498.S05 SCALE: 1/4" = V-0" DATE: 11/2142&08 DESIGNED BY: WW A DRAWN BY: WW CHECKED BY: JG SHEET TITLE: ELECTRICAL SCHEDULES, DETAILS & SYMBOL LIST SHEET NO. E-201 SHEET OF z O H a O uvi Lu ( o m 0 0 00 N w to Q N Q Y a