Loading...
HomeMy WebLinkAbout2639 River Landing DrTotal Truss Quantity = 465. UNIT "A° I UNIT "B" I UNIT "B" N RAKED FORMED PAR oN 4'-10" All valley kits marked "VK" or "MVK" are conventionally framed. Please refer to engineering pack for details. THIS 15 A TRU55 PLACEMENT PLAN. ITS INTENDED TO AID IN THE INSTALLATION Of TRUSSES. ENGINEERED TRUSS DRAWINGS AND AIRCHITECTURALS SUPERCEDE TH15 DOCUMENT, PLUM' TRUSS HELD BACK 314" FOR PLYWOOD. Q0 KEEER TO ENO—. PACK FOR CONNECTION. CJ3 `c 0 Ln1 C-1 All Ull II '-01 "'— 21-0` TYPICAL 51 5ETBACK CORNER5ET LABELING AND 5PACING V w ON 1 12 12— PERMIT HANGED CHART J l = THA 422 (S I MPS❑N) J L- THAC422 (S I MPS❑N) Labeled End Mark ATTENTION! DON'T LIFT SINGLE TRUSSES WITH SPANS LONGER THAN 30' BY THE PEAK CONSULT BCSI -B1 30' Span or less SOr o 60' Span P 60 degrees �. .l or less I 1/2 I I 2/3 to 1/2 _I linen app.— ox.�l Ta liner span approx, REFER TO BCSI —B1 Truss must be set this way if crane used. Truss is an example, your truss may not match. Insist crane operator sets truss this way, General Notes 1) All parallel chord trusses, flat trusses and flat girders have the top chord partially painted green to be installed green side up. All hangers to be Simpson HTU26 unless otherwise 2) noted. All truss spacing is 24" O.C. unless otherwise 3) noted. Per Truss Plate Institute BCSI-131 recommendation 4) permanent X—bracing should be placed at a maximum spacing 15' O.C. across the span, to be repeated at a maximum of 20' between each X—brace throughout the structure. Please refer to BCSI-61 for any additional bracing details. ROOF LOADING SCHEDULE TCLL = 20 PSF TCDL = 7 PSF BCLL I PSF BCDL = 10 PSF TOTAL = 37 PSF DURATION = 1.25 % WIND SPD/TYPE = 140 ENCLOSED BLDG EXPOSURE = C USAGE = RESIDENTIAL CAT II WIND IMPORTANCE FACTOR = 1 UPLIFTS BASED ON = 9.2 PSF DESIGN CRITERIA FBC 2010 TPI 2007 Truss member design & connector plates are designed for ASCE 7-10 and maximum forces from both components and claddings and main wind force resisting systems. * These trusses have been reviewed to carry an additional 10# psf non -concurrent bottom chord live load. FLOOR LOADING SCHEDULE TCLL = 40 PSF TCDL = 10 PSF BCDL = 5 PSF TOTAL = 55 PSF ALL REACTIONS AND UPLIFTS ARE SHOWN ON ENGINEERING. WALL KEY —� 91-411 5EPERATION WALL TO ROOF DECK BUILDER :MI HOMES PROJECT :RIVERVIEW TOWNHOMES MODEL :7 UNIT BLDG — ELEV. B CCA PROJ/MODEL/ALT QY8/7PB (FLOORS) ALT DESC: OTC : LOT :50 BLOCK :44 DESIGNER I PAGE DATE of 2 05/22/2009 LAN# SCALE N150214P1 1 1/4 "=1' Mandigl/28/2012 1:55 PMN150214P1.dw 1. CARPENTER prd CONTRACTORS OF AMERICA 3900 AVENUE G. N. W. WINTER HAVEN FLORIDA 33880 PH❑NEI ( 800) 959-8806 FAX: ( 863) 294-2488 BUILDER :MI HOMES PROJECT :RIVERVIEW TOWNHOMES MODEL :7 UNIT BLDG — ELEV. B CCA PROJ/MODEL/ALT QY8/7PB (FLOORS) ALT DESC: OTC : LOT :50 BLOCK :44 DESIGNER I PAGE DATE of 2 05/22/2009 LAN# SCALE N150214P1 1 1/4 "=1' Mandigl/28/2012 1:55 PMN150214P1.dw