Loading...
HomeMy WebLinkAbout2621 River Landing Dr (3)9 I r_ Q 1-u r-� A r Ut i c� v v v i ".> VVI -ALL r,[\L k -U i vhk.i\ "t STOP FROM EDGE FOR FIRE STOP 23'-0 2 2'-6" 221-01 Total Truss LEXINGTON UNIT "A" Quantity = 1931 PRINCETON UNIT "B" PRINCETON UNIT "B" W z U VON THIS 15 A TRUSS PLACEMENT PLAN, ITS INTENDED TO AID IN THE INSTALLATION OF TRUSSES, ENGINEERED TRUSS DRAWINGS AND ARCHITECTURALS SUPERCEDE THIS DOCUMENT. HEEL=G 3/1 PLUMB CU 12 / I I V I i I I I I I I 7r— I I I I I I I REIFER TO ENf PACK FOR CONNECTION. CJ5 ° CJ3 LO U CJ1 U TYPICAL 7SETBACK CORNER5ET LABELING AND SPACING NANGEK CHAKT 4 L = HTU 26 (S I MPSON) k- HHUS26-2 (S I MPSON) Labeled End Mark ATTENTION! C�91 FF�' DON'T LIFT SINGLE TRUSSES WITH SPANS LONGER THAN 30' BY THE PEAK CONSULT SCSI -B1 30' Span r less SOP ad 60' B4 an 60 degrees �. .� or less l 1/2 2/3 to 1/2 i line i Spon npprox. I T.Ilne' span approx. T REFER TO BCSI —B1 Truss Aust be set this way if crane used. Truss is an example, your truss may not match. Insist crane operator sets truss this way. General Notes 1) All parallel chord trusses, flat trusses and flat girders have the top chord partially painted green to be installed green side up. All hangers to be Simpson HTU26 unless otherwise 2) noted. All truss spacing is 24" O.C. unless otherwise 3) noted. Per Truss Plate Institute BCSI—B1 recommendation 4) permanent X—bracing should be placed at a maximum spacing 15' O.C. across the span, to be repeated at a maximum of 20' between each X—brace throughout the structure. Please refer to BCSI-131 for any additional bracing deta Is. ROOF LOADING SCHEDULE TCLL = 20 PSF TCDL - 7 PSF BCLL = * PSF BCDL = 10 PSF TOTAL = 37 PSF DURATION = 1.25 % WIND SPD/TYPE = 140 ENCLOSED BLDG EXPOSURE = C USAGE = RESIDENTIAL CAT II WIND IMPORTANCE FACTOR = 1 UPLIFTS BASED ON = 9.2 PSF DESIGN CRITERIA FBC 2010 TPI 2007 Truss member design & connector plates are designed for ASCE 7-1.0 and maximum forces from both components and claddings and main wind force resisting systems. * These trusses have been reviewed to carry an additional 109 psf non -concurrent bottom chord live load. FLOOR LOADING SCHEDULE TCLL = PSF TCDL = PSF BCDL _ PSF TOTAL = PSF ALL REACTIONS AND UPLIFTS ARE SHOWN ON ENGINEERING, WALL KEY SEPERATION WALL TO ROOF DECK LOAD# DESCRIPTION INIT, DATE R/01 CREATED FROM 6PA TJC 3/9/2012 RA01 NEW CODE, WIND, LUMBER, PRJ TJC 8/8/2032 RB01 LC2 TJC 2/13/13 CARPENTER BUILDER :MI HOMES PROJECT :RIVERVIEW TOWNHOMES MODEL :7 UNIT BLDG - ELEV. A CCA PROJ/MODEL/ALT QY8/7PA (ROOF) ALT DESC: OTC : LOT :43 BLOCK :37 DESIGNER PAGE .TDS DATE of 4 .05/15 2009 1 1 LAN# SCALE�� N143506P1 p N1443506P1Lc Mandill/19/2013 4.50 M CONTRACTORS OF AMERICA 3900 AVENUE G. N. W. WINTER HAVEN FLORIDA 33880 PHCINE, ( 800) 959-8806 FAX; ( 863) 294-2488 BUILDER :MI HOMES PROJECT :RIVERVIEW TOWNHOMES MODEL :7 UNIT BLDG - ELEV. A CCA PROJ/MODEL/ALT QY8/7PA (ROOF) ALT DESC: OTC : LOT :43 BLOCK :37 DESIGNER PAGE .TDS DATE of 4 .05/15 2009 1 1 LAN# SCALE�� N143506P1 p N1443506P1Lc Mandill/19/2013 4.50 M