Loading...
HomeMy WebLinkAbout454 Sand Cove DrCITY OF SANFORD BLULDING & FIRE PREVENTION PERMIT APPLICATION tion No: Value: S Job Address: qJ q %%,\d CL) \_)z � r 1 y Q Historic District: Yes El No 9 v Parcel ID: i (�- ' d- U - J a • -3 0 c7 ^ G Q O - o U Uc Residential ❑ Commercial ❑ Type of Work: New 19 Addition ❑ Alteration ❑ Repair ❑ Demo ❑ Change of Use ❑ Move❑ Description of Work: ..L n s-E&Mo Q Q -,u -) S hp Cl RX 1 C> Plan Review Contact Person: l.6f) i R q�_n I s c, Title: Phone4n '55_� '8697 Fax: Email: 50n%b"'C q,;P (e7 ofMc t l - Lon -7 Property Owner Information Name Phone: Yfa - S S 1 5�-1 Street: LISL4 S Resident of property? City, State Zip: S "(-A 'Vr- L 39_723 Contractor Information Name Phone: Street: Fax: City, State Zip: State License No.: Architect/Engineer Information Name: Phone: Street: Fax: City, St, Zip: E-mail: Bonding Company: Mortgage Lender: Address: Address: WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet standards of all laws regulating construction in this jurisdiction. I understand that a separate permit must be secured for electrical work, plumbing, signs, wells, pools, furnaces, boilers, heaters, tanks, and air conditioners, etc. FBC 1053 Shall be inscribed with the date of application and the code in effect as of that date: 50' Edition (2014) Florida Building Code Revised: June 30, 2015 Permit Application q1 b NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. Acceptance of permit is verification that I will notify the owner of the property of the requirements of Florida Lien Law, FS 713. The City of Sanford requires payment of a plan review fee at the time of permit submittal. A copy of the executed contract is required in order to calculate a plan review charge and will be considered the estimated construction value of the job at the time of submittal. The actual construction value will be figured based on the current ICC Valuation Table in effect at the time the permit is issued, in accordance with local ordinance. Should calculated charges figured off the executed contract exceed the actual construction value, credit will be applied to your permit fees when the permit is issued. OWNER'S AFFIDAVIT: I certify that all of the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. SigXature of Notary -State of Florida Date signature of Contractor/Agent Date Print Contractor/Agent's Name Signature of Notary -State of Florida Date Owner/Agent is Personally KpNkn to Me or Contractor/Agent is Personally Known to Me or Produced ID Type of ID Produced ID . Type of 1D BELOW IS FOR OFFICE USE ONLY Permits Required: Building ❑ Electrical ❑ Mechanical ❑ Plumbing❑ Gas❑ Roof ❑ Construction Type: Occupancy Use: Total Sq Ft of Bldg: Min. Occupancy Lodd: Flood Zone: # of Stories: New Construction: Electric - # of Amps Plumbing - # of Fixtures Fire Sprinkler Permit: Yes ❑ No ❑ # of Heads Fire Alarm Permit: Yes ❑ No ❑ APPROVALS: ZONING: gL 6/8111(a UTILITIES: ENGINEERING: COMMENTS: FIRE: WASTE WATER: BUILDING: 5� L •� -(L 'Pf(Vu a'L-')M 5 t M4�zcks . Revised: June 30, 201 S Permit Application I 2.1 9 OWNER BUILDER STATEMENT/AFFIDAVIT Altamonte Springs, Casselberry, Lake Mary, Longwood, Oviedo, Sanford, Seminole County, Winter Springs Florida Statutes are quoted here in part for your information to indicate the authority for exemptions for homeowners from qualifying as contractors and to express any applicable restrictions and responsibilities. OWNERS MUST PERSONALLY APPEAR AT THE BUILDING DIVISION TO SIGN THIS DOCUMENT BY SIGNING THIS STATEMENT, I ATTEST THAT: (Initial to the left of each statement) Rev. 9.14.2009 I understand that state law requires construction to be done by a licensed contractor and have applied for an owner -builder permit under an exemption from the law. The exemption specifies that I, as the owner of the property listed, may act as my own contractor with certain restrictions even though I do not have a (1 V� license. I understand that building permits are not required to be signed by a property owner unless he or she is responsible for the construction and is not hiring a licensed contractor to assume responsibility. 1 understand that, as an owner -builder, I am the responsible party of record on a permit. 1 understand that I may protect myself from potential financial risk by hiring a licensed contractor and having the permit filed in his or her name instead of my own name. 1 also understand that a contractor is required by law to be licensed in Florida and to list his or her license numbers on all permit and contracts. 1 understand that 1 may build or improve a one -family or two-family residence or a farm outbuilding. 1 may also build or improve a commercial building if the costs do not exceed $75,000. The building or residence must be for my own use or occupancy. It may not be built or substantially improved for sale or lease. If a building or residence that I have built or substantially improved myself is sold or leased within in I year after the construction is complete, the law will presume that I built or substantially improved it for sale or lease, which violates this exemption. I understand that, as the owner -builder, I must provide direct, onsite supervision of the construction. 1 understand that I may not hire an unlicensed individual person to act as my contractor or to supervise persons working on my building or residence. It is my responsibility to ensure that the persons whom 1 employ have the licenses required by law and by city ordinance. 1 understand that it is a frequent practice of unlicensed persons to have the property owner obtain an owner -builder permit that erroneously implies that the property owner is providing his or her own labor and materials. 1, as an owner -builder, may be held liable and subjected to serious financial risk for any injuries sustained by an unlicensed person or his or her employees while working on my property. My homeowner's insurance may not provide coverage for those injuries. I am willfully acting as an owner - builder and am aware of the limits of my insurance coverage for injuries to workers on my property. 1 understand that 1 may not delegate the responsibility for supervising work to a licensed contractor who is not licensed to perform the work being done. Any person working on my building who Is not licensed must work under my direct supervision and must be employed by me, which means that I must comply with laws requiring the withholding of federal income tax and social security contributions n under the Federal Insurance Contributions Act (FICA) and must provide workers' compensation for the employee. I understand that my failure to follow these laws may subject me to serious financial risk. Rev. 9.14.2009 i i� Property 11 c)C) O l d rN and capable of performing i conditions specified above. Sig :7 -7 , do hereby state that I am qualified construction involved with the permit application filed and agree to the Form of Identification (Must be Photo ID) Date 5-31-�oi� A violation of this exemption is a misdemeanor of the first degree punishable by a term of imprisonment not exceeding 1 year and a $1,000.00 fine in addition to any civil penalties. In addition, the local permitting jurisdiction shall withhold final approval, revoke the permit, or pursue any action or remedy for unlicensed activity against the owner and any person performing work that requires licensure under the permit issued. Rev. 9.14.2009 agree that, as the party legally and financially responsible for this proposed construction activity, I will abide by all applicable laws and requirements that govern owner -builders as well as employers. I also understand that the construction must comply with all applicable laws, ordinances, building codes, and ►l' zoning regulations. I am of aware of construction practices and I have access to the Florida Building Codes. I understand that I may obtain more information regarding my obligations as an employer from the Internal Revenue Service, the United States Small Business Administration, the Florida Department of Financial Services, and the Florida Department of Revenue. 1 also understand that I may contact the Florida Construction Industry Licensing Board at 1-850487-1395 or at www.myflorida.com/dbpr/pro/cilb/ for more information about licensed contractors. I am aware of, and consent to, an owner -builder building permit applied for in my name and understand that I am the party legally and financially responsible for the proposed construction activity at the address listed below. I agree to notify the building department immediately of any additions, deletions, or changes to any of the information that I have provided on this disclosure or in the permit application package. Licensed contractors are regulated by laws designed to protect the public. If you contract with a person who does not have a license, the Construction Industry Licensing Board, the Department of Business and Professional Regulation and the building department may be unable to assist you with any financial loss that you sustain as a result of a complaint. Your only remedy against an unlicensed contractor may be in civil court. It is also important for you to understand that, if an unlicensed contractor or employee of an individual or firm is injured while working on your property, you may be held liable for damages. If you obtain an owner -builder permit and wish to hire a licensed contractor, you will be responsible for verifying whether the contractor is property licensed and the status of the contractor's workers' compensation coverage. Property 11 c)C) O l d rN and capable of performing i conditions specified above. Sig :7 -7 , do hereby state that I am qualified construction involved with the permit application filed and agree to the Form of Identification (Must be Photo ID) Date 5-31-�oi� A violation of this exemption is a misdemeanor of the first degree punishable by a term of imprisonment not exceeding 1 year and a $1,000.00 fine in addition to any civil penalties. In addition, the local permitting jurisdiction shall withhold final approval, revoke the permit, or pursue any action or remedy for unlicensed activity against the owner and any person performing work that requires licensure under the permit issued. Rev. 9.14.2009 mi REQUIRED INSPECTION SEQUENCE BP# 1 L. - t S %7 .address: Bet"LNG PERM&T min Mal Inspection Description Footer / Setback Stemwall Foundation / Form Board Survey Slab / Mono Slab Pre our Lintel / Tie Beam / Fill / Down Cell Sheathing — Walls Sheathing — Roof Roof Dry In Frame Insulation Rough In Firewall Screw Pattern Drywall / Sheetrock Lath Inspection Final Solar Final Roof Final Stucco / Siding Insulation Final Final Utility Building Final Door Final Window Final Screen Room Final Pool Screen Enclosure Mobile Home Building Final Pre -Demo Final Demo Final Single Family Residence Final Building Other REVISED: June 2014 IELECriucm, PERMIT Min I Max I Inspection Description Electric Underground Footer / Slab Steel Bond Electric Rough T.U.G. Pre -Power Final Electric Final l�Jlin max Inspection Description Plumbing Underpound - Plumbing Sewer Plumbing Tub Set Plumbing Final MI@CHANFCAL PERMIT Min Max Inspection Description Mechanical Rough Mechanical Final in Max Inspection Description Gas Underground Gas Rough Gas Final RECORD COPY 574'-� ztQ%#Ieek 0 &L A"--Aae .1�- o -rh t uat-wro-J Call Us First! 16819 REVIEWED FOR CODE COMPLIANCE PLANS EXAMINER _ G - Z' ae DATE SANFORD BUILDING DIVISION A PERMIT 136UED SHALL BE CONSTRUED TO BE A (CENSE TO PROCEED WITH THE WORK AND NOT AS AUTHORITY TO VIOLATE, CANCEL, ALTER OR SET ASIDE ANY OF THE PROVISIONS OF THE TECHNICAL BODES, NOR SHALL ISSUANCE OF A PERMIT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING A CORRECTION OF ERRORS IN PLANS, CONSTRUCTION OR VIOLATIONS OF THIS CODE DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll-free number: 1-800-577-9663 or email: customerservice@,backyardproductsitc.com Our staff is ready to provide assistance. April through October M - F 8:00 Ann to 8:00 PM EST Saturday 8:30 Ann to 4:30 PM EST November through March M - F 8:00 Ann to 5:00 PM EST SANFORD #16' 1557 (This page is intentionally left blank.) BACKYARD ......:=1:.':::.'ASSEMBLY MANUAL Ridgeview 8'x 10'(244 x 305 cm) 16819 111/29/2013 KEEP THIS MANUAL FOR FUTURE REFERENCE `: `: .:.:.:.:`:.`::: ::....::.::..................... ...................................................... ............ ........... ........................ ........................................................................................................::.... I IMPORTANTI READ INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING ASSEMBLY. I BEFORE YOU BEGIN • BUILDING RESTRICTIONS AND APPROVALS Be sure to check local building department and homeowners association for specific restrictions and\or requirements before building. • ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. • SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface. Recommended methods and materials to level your shed are listed on page 7. • CHECK ALL PARTS Inventory all parts listed on pages 4-6. Contact our Customer Service Team if any parts are missing or damaged. • ADDITIONAL MATERIALS You will need additional materials to complete your shed. See page 3 for required and optional materials and quantities. ........................................ - CUSTOMER SERVICE - Call: 1-800-577-9663 email: customerservice@backyardproductslic.com 1 ..................................................................................................................................................................................................................................................... :::::' TOOLS : ................................................... O Phillips Screwdriver ��8 O Drill/ Driver O Drill Bit O #2 philips Drive Bit O Hammer O Penal O Tape Measure O Square or O Level 7. ::::::. Optional O Chalk Line .� O Tool Belt/ M Nail Pouch O Utility Knife O Shingle Blades O Safety Glasses e O Caulk Gun O Nail Gun • Gun Nails O Exterior rated Wood Glue erg O Gloves O Ladder r O Clamps O Paint Tools ld Safety! Always use approved safety glasses during assembly. HELPFUL REMINDER SYMBOLS ..:.::.:..:: ::.:Look for thesesymbols for helpful reminders throughout thismanual. .. = Assistance Required; two or more people. = Ensure squareness. Q=Important required step or operation. Helpful assembly hint. 9�- = Mark part with pencil. V/BEGIN = Beginning of steps for assembly or installation. = Level ...................................................................... ::::: ORIENT LUMBER AND TRIM FOR BEST APPEARANCE :::::::::::::: Framing lumber is graded for structural strength and not appearance. Exterior trim is graded for one good side. Always install the material leaving the best edge and best surface visible. Please remember that these blemishes in no way negatively affect the strength or integrity of our product. ( See Fig A, B, C.) A 2 B .......................................................................................................................................................................................................................................................... .......................................................................................................................................................................................................................................................... . .......................................................................................................... ................................................................................................................................................................................................................................................. .......................................................................................................................................................................................................................................................... .......... ...................................................................................................................................... ...................................... NAL MATERIAL ADDIT/ O S .......................................................................... FOUNDATION OR FLOOR MATERIALS • This shed kit includes a complete wood floor frame system. It does not include the floor panels. • It does not include ANY leveling materials. • See the FLOOR LEVELING section on page 7 for recommended methods and suggested materials to properly level your floor, as this will vary depending on your specific site. REINFORCED WOOD FLOOR FRAME OPTIONAL ' :::: ::::' (OPTIONAL) IMPORTANTI The included floor has been designed for general use. Depending on your specific use you may want to construct a heavy duty floor frame by adding additional floor joists (shown below as shaded). Below is a list of additional materials (not included). ❑ x5 2 x 4 x 8- (5,1 x 10,2 x 243,8 cm) Treated Lumber Cut lumber to 2 x 4 x 93" (5.1 x 10,2 x 236,2 cm) Treated Lumber ❑ x20 ea. 3" (7,6 cm) hot dipped galvanized nails Optional 12" (30,5 cm) spacing ... :.FLOOR PANELSN T INCLUDED)......... : : ::---------------------------------------- : p,2 p x1 5/8 x 48 x 96' 5/8 x 23-7/8 x 96' (1,6 x 121,9 x 243,8 cm) (1,6 x 60,6 x 243,8 cm) Recommend Floor panels are minimum 5/8" (1,1 cm) thick. ::':: ::: : CO ETIN YOUR SHED Y i You will need these materials: ❑ 3 -TAB SHINGLES......................................6 Bundles ❑ 1" GALVANIZED ROOFING NAILS ... 3LBS For Shingles. ❑ PAINT FOR SIDING...................................2 Gallons ❑ PAINT FOR TRIM ........................... 1 Quart Use 100% acrylic latex exterior paint. (2) coats recommended. Use 100% acrylic latex exterior paint. ❑ CAULK.......................................................2 Tubes ❑ WOOD GLUE ...................... Exterior Rated Use acrylic latex exterior caulk that is paintable. .......................................................................................................................................................................... PTI O ONAL MATERIAL ❑ DRIP EDGE.....................24 Feet ❑ #15 ROOFING FELT To cover 125 Sq. Ft. of roof area 1" GALVANIZED ROOFING NAILS ... 1/4 Lb ❑ For roofing felt. REFER TO THE BACK OF THIS MANUEL AND THE MANUFACTURER'S INSTRUCTIONS FOR INSTALLATION OF SHINGLES, DRIP EDGE AND FELT. 91 .:..: PARTS IDENTIFICATION AND SIZES `::::`:;::: :: Part Identification is ❑ X2 ISL stamped on some parts. Treated lumber is stamped: WOOD SIZE CONVERSION CHART Nominal Board Size Actual Size X4 ISTL 12 x 4 x 44-1/2" (5,1 x 10,2 x 113,0 cm) 2' x 4. .................. 1-1/2' x 3-1/2'13,8 x 8,9 cm) Rs Rs TREATED 1"x 4' .................... 3/4' x 3-1/2' (1,9 x 8,9 cm) ❑ 2'x 3' .................. 1-1/2' x 2-1/2" (3,8 x 8,3 cm) • Check these locations for Part stamps 1"x 3" ......................3/4' x 2-1/2' (1,9 x 8,3 cm) ...................................................................................................................................... . ::::: ::::::::::•••::•PARTS LIST ...................................... .; :.; :..:i; INVENTORY YOUR PARTS beforeou begin. Y 9 We suggest sortingarts b the category the are listed in. ...........*:... .::::;:: `: O ❑ X2 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) Treated lumber is stamped: O ❑ X2 I ITIM= 12 x 4 x 72" (5,1 x 10,2 x 182,9 cm) ❑ X6 I MMffM 12 x 4 x 93" (5,1 x 10,2 x 236,2 cm) ❑ X2 © 2 x 4 x 20" (5,1 x 10,2 x 50,8 cm) `'N`' ❑ X2 ISL 12 x 4 x 36" (5,1 x 10,2 x 91,4 cm) J J ❑ X4 ISTL 12 x 4 x 44-1/2" (5,1 x 10,2 x 113,0 cm) Q 3 ❑ X4 2 x 4 x 68-1/2" (5,1 x 10,2 x 174,0 cm) ❑ X171AEA 12 x 4 x 68-13/16" (5,1 x 10,2 x 174,8 cm) ❑ X3 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) ❑ X10 6x24"(15,2x 61 cm) ❑ X12 F X7 FG -A -A-1 1 x 3 x 5" (2,5 x 7,6 x 12,7 cm) Gauge Block for 3/4" (1,9 cm) \ measurement. /y 3/4' SUB -ASSEMBLED TRUSS (1,9 CM) ❑ X2 IWO I 1 x 4 x 72" (2,5 x 10,2 x 182,9 cm) ❑ X1 IFEA 1 x 4 x 56" (2,6 x 10,2 x 142,2 cm) O p ❑ X2 100 12 x 3 x 69" (5,1 x 7,6 x 175,3 cm) Lj 4 -1 X8 I3/8 x 1-3/4 x 71-9/16" (1 x 4,4 x 181,8 cm) ❑ X2 11VS 112 x 4 x 35-3/4" (5,1 x 10,2 x 90,8 cm) ❑ X2 11AGA 112 x 4 x 35-13/16" (5,1 x 10,2 x 91,0 cm) ❑ X7 V FOR 1 19/32 x 2-1/2" x 35-3/4" (1,5 x 6,4 x 90,8 cm) ❑ X1 I FOL 1 19/32 x 2-1/2" x 35-3/4" (1,5 x 6,4 x 90,8 cm) ❑ X2 19/32 x 2-1/2" x 35-13/16" (1,5 x 6,4 x 91,0 cm) ❑ X1 I VWR 19/32 x 2-1/2" x 63" (1,5 x 6,4 x 160,0 cm) ❑ X7 I IFEIA 1 19/32 x 2-1/2" x 69-1/4" (1,5 x 6,4 x 175,9 cm) ❑ X1 I FAA 119/32 x 2-1/2" x 71-7/16" (1,5 x 6,4 x 181,5 cm) ❑ X1 19/32 x 3-1/2 x 35-3/4" (1,5 x 8,9 x 90,8 cm) El X1 19/32 x3-1/2 x 35-3/4" (1,5 x 8,9 x 90,8 cm) ...... El X2 . 19/32 x 3-1/2 x 35-15/16" (1,5 x 8,9 x 91,3 cm) ❑ X1 IFEA 1 x 4 x 56" (2,6 x 10,2 x 142,2 cm) O p ❑ X2 100 12 x 3 x 69" (5,1 x 7,6 x 175,3 cm) Lj 4 NOTE: Panel parts are not stamped with part identification. ox2 3/8 x 23-7/8 x 72' (1 x 60,6 x 182,9 cm) p x1 3/8 x 48 x 96" (1 x 121,9 x 243,8 cm) ❑ x1 LEFT DOOR ❑ x4 318x48x72" (1 x 121,9 x 182,9 cm) E-10 RIGHT DOOR 1:10 3/8x48 x96' (1 x 121,9 x 243,8 CM) 1:1 x2 3/8 x18-5/16 x 37-7/16' (1 x 46,5 x 95,1 cm) r-1 x2 3/8 x 18-5/16 x 37-7/16" (1 x 46,5 x 95,1 cm) 0x1 1:3x1 3/8x48x96' 3/8x48x96' (1 x 121,9 x 243,8 cm) (1 x 121,9 x 243,8 cm) ........................................................................................................................................................................................................................................................... ROOF PANEL S 1:1 X2 7/16 x 35-3/8 x 96" (1,1 x 89,9 x 243,8 cm) ox2 7/16 x 23-7/8 x 96' (1,1 x 60,6 x 243,8 cm) x2 7/16 x 11-1/2 x 96' (1,1 x 29,2 x 243,8 cm) Roof panels are 7/16" (1,1 cm) thick. 1:1 x2 7/16 x 23-7/8 x 35-3/8" (1,1 x 60,6 x 89,9 cm) 1:1 X2 7/16 x 23-7/8 x 23-7/8' (1,1 x 60,6 x 60,6 cm) X2 7/16 x 11-1/2 x 23.7/8" (1,1 x 29,2 x 60.6 cm) 5 T -HANDLE p A ................................................................................................................ .......................................................................... DOOR & VENT HARDWARE`—* .......... * ........ * ................... * ........ ................. .................................................................................... 0 0 A rl 0 %J 1" (2,5 cm) O Included with barrel bolt ................ ................................ *.,.,.,.,.,.*.,.,.,.,=.,.,.,.,.,.*.,.*.,.,.*.,.,.,.,:.,.*.,.*.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,,.,.,.=.,.,.,.,.,.,.,,,.,.,,,.*.,.,.*.*.,.,.,.,.,.,.,.,.,.,.*.,."I .............................................................................. .. ..... .......... ....................... :.. - . .*.,= 1.1.7.1.1.1.1.1.1.1-1.1, .1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.*.*.,.,: .......................... .................... .. ... ......... . : NAIL BOXES............. .................................... ... == : ......... ...................................... .......................................................................... ........... ................................................................................................ x5 BOXES n 3" (7,6 cm) U x2 BOXES 0 2" (5,1 cm) U ................................................................................................................................................... FASTENER/HARDWARE BAG ............................... ...... ............. I-- ........ ... .......... ..... .................. ............. ...................... .............................................................................................. X110 2" (5,0 cm) x115 1-1/2" (3,8 cm) EX50 3" (7,6 cm) l v 44444444444 El x60 + 2" (5,0 cm) x2 1-1/4"(3,2) C x60 + >VfflMV' ;y4- (19 MM) ........................................... ................................................ ........................................... .......... ...................................... ....................................................................... ...... ...... NOTES ......................... ................... ........................... ..... ............ =1.1.1.1.1.1.1.1.1.1.,.*.,.,.*".,.,.,.,.,.,.*.,.,.,.,.,.I.I.I.I.I.I.1.1.*.,.*.,.,.*=,.,.,.,.*.,.,.*.,.,.,.,.,.,.,.,.*.,.*.,.,.*.,.,.=,.'.'.*.'.'.*.'.'.'.'.'.'.'.'.'.'.'.'.'., ,.*:.*.,.*.,.,.,.,.,.*.,.,.,.,.,.,.,.,.,.,.I.I.I.I.I.I.I.I.I."'.,.'-'............-...-.-.-.-.-.....-.-........----.....................- ........................................ ............................................................................................ = .......................... =: .............. ... . ............... ....................................... .. ....................................... .................................................... LEVELING OPTIONS There are multiple ways to level your floor frame. Our recommended leveling method is shown below. Leveling materials are not included in this kit. PREFERRED METHOD - 4 X 4 TREATED RUNNERS • 3" (7,6 cm) Screws angled into 4 x 4. • (2) at each point frame and 4 x 4 touch. Measurements to centers of 4x4's.�' MATERIAL REQUIRED ❑ x2 4" x 4" x 10' (10,2 x 10,2 x 304,8 cm) Treated Lumber ��Z• Fasteners for Frame to 4" x 4". X44 (3"(7,6 cm) Screws shown as one option.) Minimum (24) 3" (7,6 cm) screws / exterior grade. QUse only wood treated for ground contact and fasteners approved for use with treated wood. QAlways support frame seams. Maximum between leveling Shingle 4x4 Runner 12" material locations. Level 12" (30.5 cm) (121 8" cm) —/ -- 1 cm) —1 zI� Shingle - k , Do not exceed 16" Gravel 2" Block (40,3 cm). LEVELING METHODS Gravel 4" Block 2x4 Treated Lumber 8" Block T!BlockW • Level under 4x4 runners only. • Locate leveling material 12" (30,5 cm) from ends of runners and no more than 48" (121,9 cm) apart. • Asphalt shingles should be used between 4x4 runners and blocks or treated lumber. Never use shingles in direct contact with ground. • For best results and aiding in water drainage use gravel under each concrete block. MATERIAL REQUIRED ❑ Gravel ❑ Solid Masonry Blocks in 1", 2", 4" or 8" thickness ❑ 2x4 Treated Lumber ❑ Asphalt Shingles QLeveling higher than 16" (40,3 cm) is not recommended. CONCRETE 0 If you are building your shed on concrete foundation see following page. CONCRETE FOUNDATION Your kit contains all materials to construct a wooden floor frame. If you choose to install your kit on a :::::`•::.:.'•::: concrete slab refer to the diagram below. Treated Sill Plate Building Size Actual Size A B C F710' 10' (243,8 cm x 304,8) 1 96" x 120 (243,8 cm 304,8) 1 120" (304,8 cm) 1 89" (226,1 cm) 1 96" (243,8 cm) Requires: ❑ x2 2" x 4" x 10' (2,1 x 10,2 x 304,8 cm) ❑ x2 2" x 4" x 8' (2,1 x 10,2 x 243,8 cm) ❑ x1 Caulk C� Q Allow new concrete slabs to cure for at least (7) days. 0 MUST be treated lumber. Q MUST be treated lumber. • A treated 2 x 4" (5,1 x 10,2 cm) sill plate is required when installing your shed on concrete. Hint: Use treated lumber in your kit or purchase full length treated lumber. • Use a high quality exterior grade caulk beneath all sill plates. • Fasten 2 x 4" (5,1 x 10,2 cm) sill plates to slab using approved concrete anchors (fasteners not included). • Check local code for concrete foundation requirements. ........................................................................................................................................................................................................................................................... NOTES :::::;::::::::::;:::`:::::: 8 ............................. .................................... ..... ................ F.' ........ ............... ... L.O.-O.R-.*..'."...'.'.'.'...'..'.,.*.,.,.,.*.,.,.,.,.,=1.1.1.1.1.*.,.,.,".,.I.I.I.I.I.I.I.I.I.I.I.I.I.I.I.I.I.1.1.*.,.,.,.,.,.'.'.'.'.'.'.'.'.=.,.,.=.,.,.1.1.1.111.1.1.1.1.1.1.*.*.",.*.,.,.,.'.*.'.*., ................................................................................................................................... I .................................... Parts Required: Note: Look for the Fasteners Required: X6 2x4x93" TREATED Stamp X28 3" Nails X2 2x4x72" X2 2x4x48" ASSEMBLY STEPS / NOTES: 1. Mark center of joists 24" on center. 2. Use two (2) 3" nails at each joist. Use (4) 3" Nails at seams. Angle nails at seams. 3Proceed t 41— A--- ~^-^ 1^ W 96" �::�:�:� FLOOR FRAME ;;�::�:::�:�:�:�::�:�:�:::�:::�:'�:�:;: :::::.:........................ I............................................................................................................................................. ..... ....... ............::::::: LEVEL AND SQUARE FLOOR FRAME 0 Before attaching floor decking, it is important to level and square the floor frame.:: A level and square floor frame is required to correctly construct your shed. Begin Q 1) See page 7 for the preferred floor leveling method. 2) Use level and check the frame is level before applying floor panels 3) Check for frame squareness by measuring diagonally across the corners. If the measurements are the same, the frame is square. The diagonal measurement will be approximately 153-11/16" (390,3 cm). 4) When the frame is level at ends of each runner. Move to the opposite end of the frame. Secure the frame to 4x4 runners with one fastener at ends of each runner making sure the frame remains square (Fig. A). 5) Once the floor is level and square fasten the frame at each point the frame contacts the 4x4 runners. 10 ............................................................................................................................................................................................................................................................ ............................................................................................................................................................................................................................................................. ............................................................................................................................................................................................................................................................ . E.................................................................................................................................................................................................................................................. ............................................................................................................................................................................................................................................................ ............................................................................................................................................................................................................................................................ . Parts Required: Fasteners Required: X1 % x 48 x 96" OSB Floor Panels Not Included x56 2" Nails ASSEMBLY STEPS / NOTES: Ensure your floor frame is square by installing one panel and squaring frame. 1. Attach the 48 x 96" panel with the rough side up (painted -grid lines side) with the 48"edge and comer flush to the floor frame (Fig A). Secure panel with two 2" nails in the comers. 2. Move to the opposite side. Using the long edge of the panel as a lever, move the panel side-to-side until the top comer is flush to the floor frame (Fig. B). Secure panel with two 2" nails in the comers. 3. Check the floor frame is square by measuring diagonally across the frame comers. If the measurements are the same your floor frame is square. The measurement will be approximately 153-11/16" (Fig. C) 4. Continue attaching the panel using 2" nails 6" apart on edges and 12" apart inside panel. Use a chalk line or use pre -painted grid lines to nail into joists under panel. 48"i - ir 4" I II I I II I I II I •I I•I I I .I I 6" I_ Fig. B Fig. C II 6' I 12" I I I I 'I I I •I . I I •I I I Flush I I .I I I I II I I II I 4w I II II I 6" I_ Fig. B Fig. C II ............................................................................................................................................................................................................................................................. ............................................................................................................................................................................................................................................................. . ............................................................................................................................................................................................................................................................. ............................................................................................................................................................................................................ ............................................................................................................................................................................................................................................................ . Parts Required: Fasteners Required: x1 % x 48 x 96" OSB Q Floor Panels Not Included x96 2" Nails x1 % x 23-7/8 x 96" OSB ASSEMBLY STEPS / NOTES: 5. Continue installing panels with rough side up (painted grid lines). 6. Use 2" nails 6" apart on the edges. Use the grid lines to nail 2" nails 12" apart on the inside of the panels. 7. You have finished attaching your floor panels. QIt is important that your completed floor is level before moving forward! 48" 238" �6"r 6"r . . . . . . . . . . . . . . . tj . . . 1I II I� II II� 1 I 1 6" II II I•I I� �� 6" 1 I I I I�. I I I 12" 1 1 I I 1 I I 6" II ' i I 9( • I 1 Flush I 1 Ij II I II II II II I I I � I Flush ri I' I II 11 I 11 II 1'I I I I I 12 � IMPORTANTI G 9 - Check the floor frame is level after installing floor panels. Re -level if needed. _� �_ • The floor should be used as a stable work surface for wall construction. • Organize your assembly procedure during the build process to avoid over -handling of the walls 13 .............................................................................................................................................................................................................................................................. ............................................................................................................................................................................................................................................................. . .............................................................................................................................................................................................................................................................. . Parts Required: X2 2x4 x96" X5 2 x 4 x 68-13/16"IAEA 0 ASSEMBLY STEPS / NOTES: 1. Orient parts on edge on floor as shown. Measure and mark. 2. Nail using two 3" nails at each connection. 68,1-2" AEA 14 Fasteners Required: X20 3" Nails 7116" ............................................................................................................................................................................................................................................................... ............................................................................................................................................................................................................................................................... ............................................................................................................................................................................................................................................................... .:::: ':::;:BAC: : : :: ......:.:: : i......:......::`. .. :` : Parts Required: Fasteners Required: X1 % x 48 x 96" Wall Panel G A X5 1-1/2" Nails GAUGE X45 2" Nails X1 Gusset BLOCK X2 3" Screws X1 2 x 4 x36" ISL X1 2 x 4 x 35-3/4" 1 VS ASSEMBLY STEPS / NOTES: 1. Center gable panel cleat (SL) at the top of the panel and against the wall framing. 2. Place a 2 x 4 (VS used here) and a gusset under SL to support part SL. 3. Angle two 3" screws through SL into the top plate of the wall frame. 4. Place panel on frame as shown with primed side facing up. 5. Use a 3/4" gauge block at inside edge of panel, and flush to outside edge. Panel is 1" down from bottom plate. SL 6. Nail using 2" nails 6" apart on edges and 12" apart inside panel. Gusset and VS underneath 96" / --- —------------- 12-—� r--------n---------,� 1-1/2" Nails 1w — 32 3"screws (2) 3. 4 48" 1.1 ds Primed Side Upll Y4" Gauge Block For squareness maintain 1" overhan at bottom and Y4" in center. 15 ........................................................................................................................................................................................................................................................... ............................................................................................................................................................................................................................................................ ..................................................................................................................�.n..►.................................................................................................................................... .K. Parts Required: Fasteners Required: X1 % x 48 x 96" Wall Panel X5 1-1 /2' Nails X42 2" Nails ASSEMBLY STEPS / NOTES: 1. Place panel on frame as shown with primed side facing up. 2. Keep panel flush to left panel. Panel is 1" down from bottom plate. 3. a 16 Nail into place using 2" nails 6" apart on edge and 12" apart —innI center. You have finished your Back Wall. I I Carefully flip the wall over. I Flush 48" .............................................................................................................................................................................................................................................................. .............................................................................................................................................................................................................................................................. .............................................................................................................................................................................................................................................................. Parts Required: Fasteners Required: X8 2 x 4 x 68-13/16" 1 AEA X40 3" Nails X4 2 x 4 x 68-1/2" 1 YF X4 2 x 4 x 44-1/2" STL ASSEMBLY STEPS / NOTES: !! YOU WILL BUILD TWO SIDE WALLS THE SAME !! 1. Orient parts on edge on floor as shown. Measure and mark. 2. Attach with 3" nails, two at each connection. Angle nails at seams. AEA Use (4) Nails at seams 17 113" 922" 682" 442" 202" 12" 681-2- 16 K4 ; 2 l 2 2 YFA X2 STL X2 113" 17 ............................................................................................................................................................................................................................................................... ......................................................................................................................................................................... ..............................................................................................................................................tt............................................................................................................... Parts Required: GAA Fasteners Required: X1 %e x 48 x 72" Wall panel �:X34 2" Nails GAUGE BLOCK ASSEMBLY STEPS / NOTES: 1. Place the 48 x 72" panel onto the wall frame with primed side up as shown. Use the gauge block ( GAA) to mark the 3/4" measurement on the wall stud and top plate. Secure panel with two 2" nails in the comers (Fig. A). 2. Move to the opposite end. Using the long edge of the panel as a lever move the panel side-to-side until you have a 3/4" measurement on the wall stud. Secure comer with two 2" nails (Fig. B). 3. Nail the panel using 2" nails 6" apart on edges and 12" apart inside panel. Gauge Block For squareness maintain a 3/a" space at the top and on stud. F4" 48" 4" I•I I II II I II I 1.1 I II I Primed Side Upll I I 3" II 4 II I'I I II 72" II Y4" Gauge II 12" I Block II I II� I 6" II I II II I —L I 1" Overhang at bottom ,(2) Nail k,,� Fig. A 18 Fig. B 3/4" (1,9 m) 18 Fig. B ............................................................................................................................................................................................................................................................ . ............................................................................................................................11....��..........**..�..���............................................................................................................ Parts Required: AA Fasteners Required: X3 % x 48 x 72" Wall panel X166 2" Nails X2 % x 23-7/8 x 72 Wall panel a OCK ASSEMBLY STEPS / NOTES: 1. Place the center 48 x 72" panel on frame as shown with primed side facing up. Nail the panel using 2" nails 6" apart on edges and 12" apart inside panel. Keep flush to the first panel and maintain 3/4" at top plate and stud. 2. Repeat this for the last panel. 3. Carefully flip the wall over and repeat steps to assemble the second Side Wall. %" Gauge Block 8 For squareness maintain 3/4" on each edge. %" Gauge Block Primed Side Upll 8 ill Primed Side Upll 19 .7.7.7.7. .................................................................................................................................................................. .............................. .... .......... .............. ** ........ .... =: ........... ..... .................................................... . . . .... . ................. = .............................................. .............................................. ................................................... Parts Required: Fasteners Required: X1 2 x4 x96" ITP X16 3" Nails X4 2 x 4 x 68-13/16" IAEA X10 2" Screws X2 2 x 4 x 20" X1 1 x4x56" IFEA ASSEMBLY STEPS / NOTES: 1. Orient parts on edge on floor as shown. Measure and mark. Attach with 3" nails, two at each connection. 2. Screw header with ten 2" screws through the header up into the top plate (Fig A). E 20 20- ABA 20" ABA 56" ............................................................................................................................................................................................................................................................. ........................................................................................................................................................................................................................................................... ................................................................................................................................................/....;...**..,.,.,............................................................................................. Parts Required: Fasteners Required: X1 % x 48 x 96" all Panel X5 1-1/2" Nails X36 2" Nails X1 Gusset X2 3" Screws X1 2x4x36" ISL X1 2 x 4 x 35-3/4" Ivs ASSEMBLY STEPS / NOTES: 1. Center gable panel cleat (SL) at the top of the panel and against the wall framing. Place a 2 x 4 ( VS used here) and a gusset under SL to support part SL. 2. Angle two 3" screws through SL into the top plate of the wall frame. 3. Place panel on frame, primed side up as shown and flush to outside edge. Panel is 1" down from bottom plate. 4. Nail using 2" nails 6" apart on edges and 12" apart inside panel. 96" SL 1a" Gusset and VS underneath 48" I 1-1/2" Nails 6" I 3"screws (2) I00 I I• 82- 6" L_ _J 1" Overhang 20" at bottom. 8 Primed Side Upll For squareness maintain flush. 21 Parts Required: Fasteners Required: X5 1-1/2" Nails X1 % x 48 x 96" Wall Panel X36 2" Nails X2 3" Screws X1 2 x 3 x 69" 00 Temporary Brace ASSEMBLY STEPS / NOTES: 1. Place the 48" x 96" panel onto the wall frame with primed side up as shown. Keep panel flush with the vertical door edge, and flush with the previous wall panel with a 1-1/2" space on framing. 2. Nail the panel using 2" nails 6" apart on edges, and 1-1/2" nails into SL. 3. Attach brace 00 with one 3" screw at each end to hold the 56" door opening. 4. You have finished your front wall. n Carefully flip the wall over. I 22 For squareness maintain flush at both edges, and 6" with other panel. 1j" Primed Side Upll — 56" Hold this Door Opening Measurement 6" 00 3" Screw at each end Hold 56" door opening by attaching brace 00 using two 3" screws. 1-1/2" Nails in SL I I .I I I .I I I I I 'I I I .I I I I I I I I I .I I I I .I I I I 6" I I I I �I I I I 'I I I I .I I I I 6" 1" Overhang • • _at bottom 2" Nails ............... *.'.'.'.'.' 'D G L ............................. .............. ..... .... . . .. W ..... X -A' -N. S.. ....... .................... * .............................. ............. =.* ......................................................................................................................... ............................................................. WHILE INSTALLING THE WALLS IT IS IMPORTANT TO BE AWARE OF THE FOLLOWING FRAMING CONDITIONS AND DIMENSIONS ... ALL WALLS ARE ... THE FINAL DIMENSIONS WILL BE EQUAL • LEVEL • FRONT TO BACK • PLUMB • SIDE TO SIDE • SQUARE • CORNER TO CORNER 4d These will be your final dimensions. Corner to corner dimensions are taken from the corners of the frame and not the panel. 23 ::::: :: :: .T�cI�Ei]ENt�► WALLS Parts Required: Fasteners Required: X1 Side Wall Assembly X10 3" Nails X1 2 x 3 x 69" Temporary Brace ® X22 2" Nails x2 3" Screws ASSEMBLY STEPS / NOTES: • • 1. Stand side wall on floor. Overhang is to bottom of panel. Center side wall on the 120" floor dimension. 2. Use 00 as a temporary brace. Secure with two 3" screws. 3. First, nail along lower edge of panel to floor frame using 2" nails 6" apart. Angle nail to hit floor frame (Fig. A, B). 4. Second, nail through the bottom plate using two 3" nails between studs. Angle nails to hit floor frame. (Fig. A.) 24 ils 6" acing verhang crews ............................................................................................................................................................................................................................................................. . ............................................................................................................................................................................................................................................................ .................................................................................................................t..�..ww....................*....-.-...... I.c.................................................................................................. Parts Required: Fasteners Required: X1 Back Wall Assembly X12 1-1/2" Nails X19 2" Nails X8 3" Nails X1 3" Screws ASSEMBLY STEPS / NOTES: It is important to secure the walls in the following order. 1 Center back wall side-to-side on the 96" floor dimension. Nail the lower comer to the floor frame with one 2" nail each. Angle the nails to hit the floor frame (Fig. A) 3' Screw from inside Framing is flush with the edge of the floor. 2. Be sure the measurement between the panel edges is consistent along the entire length. Then secure with one 2" nail in the upper comer (Fig. B). Nail along the side panel edge into the frame using 1-1/2" nails spaced 6" apart. Nail along bottom of panel using 2" nails 6" apart. Angle nail to hit floor frame (Fig. C). 3. From inside secure the back wall frame using two 3" nails between each stud, through the frame into the floor (Fig. C) and through the frame into the upper side wall rail (Fig D). 1-1/2' 2" Nail �% Angle into `floor frame Fig. A D nem 25 STAN�II�� �#t�LL� Parts Required: Fasteners Required: X1 Side Wall Assembly X1 3" Screws X12 1-1/2" Nails X27 2" Nails X10 3" Nails 1 Center side wall side-to-side on the 120" floor dimension. Nail the lower comer to the floor frame with one 2" nail each. Angle the nails to hit the floor frame (Fig. A & B) 2" Nail -7 Angle into floor frame 2. Be sure the measurement between the panel edges is consistent along the entire length. Then secure with one 2" nail in the upper comer (Fig. C). Nail along the side panel edge into the frame using 1-1/2" nails spaced 6" apart. Nail along bottom of panel using 2" nails 6" apart. Angle nail to hit floor frame (Fig. B). 3. From inside secure the side wall frame using two 3" nails between studs through the bottom plate into the floor. (Fig. B & E) Secure side wall top plate into back wall frame with 3" screw. (Fig D) 26 Fig. C Fig. D 3" Screw 3" Screws -- 2" Nail Same Measurement E ..................................................................................................................................................................................... ............................................................................................................................................................................................................................................................. Parts Required: Fasteners Required: X1 Front Wall Assembly X24 1-1/2" Nails X12 2" Nails x4 3" Nails x2 3" Screws ASSEMBLY STEPS / NOTES: • • It is important to secure the front wall in the following order. Begin by standing the front wall on the floor. 1. Center front wall on floor side-to-side. Check the 56" door opening is held before nailing. Nail the front wall flush to the floor using 2" nails 6" apart. Angle nails to hit floor frame (Fig. A). 2. Be sure the measurement between the panel edges is consistent along the entire length. Then secure with one 2" nail in the upper comer (Fig. B). Nail along the panel edge into the frame using 1-1/2" nails spaced 6" apart. 3. From inside secure the front wall frame using 3" screws through the frame into the upper side wall plate (Fig C), and two 3" nails between studs through the bottom plate into the floor (Fig A & D). Move to the opposite side and repeat process. Remove the temporary braces. You have finished standing your walls. Fig. A 2' Nail ►ent 27 Parts Required: A Fasteners Required: X12 Trusses �A X120 2" Nails GAUGE x2 3" Screws X10 Gussets � BLOCK ASSEMBLY STEPS / NOTES: 1. You will assemble (6) trusses. (2) trusses have only ONE gusset. (4) trusses have TWO gussets . Make a jig so trusses all have the same measurement using the shed floor and 3/" gauge block. 2. Measure 96" from the comer and screw down the Y4" gauge block securely. 3. Place truss parts in jig as shown. Apply glue to trusses where the gusset will fit (Fig B). The painted red ends of trusses must touch at the peak. Nail gusset to trusses with a Y" offset using twelve 2" nails in pattern shown. (Fig. A) 4. On TWO trusses install ONE gusset. On FOUR trusses flip over truss assembly and attach a SECOND gusset. 28 ........................................................................................................................................................... ............................................................................................................................................................................................................................................................. . ...................................................................................................................�....*....................................................................................................................................... Parts Required: Fasteners Required: X4 Truss Assemblies w/2 -Gussets X20 3" Screws X2 Truss Assembly w/1 -Gusset ASSEMBLY STEPS / NOTES: 1. Mark top of wall frames to measurement shown. 2. Locate end trusses flush against inside of wall panel (Fig A). Secure end truss to wall panel using one 3" screw straight down from top of truss into the top plate (Fig. B). Move to the opposite end and repeat to secure the other truss end. 3. Center middle trusses on marks. Hold truss end flush to outside wall frame (Fig. A) and secure using 3" screws angled through truss into top plate (Fig. B). Move to the opposite end and repeat to secure the other truss end. 4. Repeat steps to attach all trusses. 3" Screws at ends angled to hit top plate 24" From outside of truss 3" Screw angled to hit top plate Fig. B _ These measurements to center of trusses 24" 24" 24" 24" 1 From outside of truss Install end trusses Flush A 29 Parts Required: X2 Gable Panel Left X2 Gable Panel Right `.:. �A#3� PEELS. .... ,. a� Fasteners Required: X64 1-1/2" Nails ASSEMBLY STEPS / NOTES: 1. Using 1-1/2" nails spaced 6" apart, nail the front wall panel to the truss (Fig A). 2. Locate left gable panel flush with the edges of the left front wall panel and nail to the truss and gable panel cleat SL using 1-1/2" nails 6" apart. Do the same for the right gable panel (Fig. B). 3. Repeat steps for the opposite side. �31" Primed Side Out Flush — Seams line up 30 1-1/2' Nails 6" Fig. B • r• I I I I I"I I I I I I 6" Parts Required:AA Fasteners Required: X1 �V6 x 35-3/8 x 96" OSB Panel GAUGE X4 2" Nails BLOCK ASSEMBLY STEPS / NOTES: • • Roof panels may cause serious injury until securely fastened. 1. You must square the roof by attaching one panel first. You will use the panels' long edge as a lever to bring your roof into square. Commonly known as "racking". 2. Attach the 35-3/8 x 96" panel with the rough side up (painted -grid lines side) with a 3/4" measurement on the truss (Fig A) and the panel flush at the peak (Fig. B). Secure panel with two 2" nails in the comers. 3. Move to the opposite end. Using the long edge of the panel as a lever move the panel side-to-side until the top corner is flush to the peak (Fig. C) and to the outside of the truss (Fig. D). Secure panel with two 2" nails in the comers. Fig. Flush ush with truss edge 31 ............................................................................................................................................................................................................................................................. ..................................................................................................................... ............................................................................................................................................................................................................................................................. Parts Required: Fasteners Required: X1 '/,6 x 35-3/8 x 23-7/8" OSB Panel AA X69 2" Nails 3:- X1 3/6 x 23-7/8 x 96" OSB Panel GAUGE X1 ;6 x 23-7/8 x 23-7/8" OSB Panel ASSEMBLY STEPS / NOTES: End measurements from Roof panels may cause serious injury until securely OUTSIDE of wall panel fastened. 0 48" 24" 24" 24" 248 4. Keep spacing between the center of the Fig. E trusses at the lower edge of the panel, and secure with one 2" nail into each truss (Fig. E). 5. Move to the top of the panel and keep spacing between the center of the trusses. Secure with one 2" nail into each truss (Fig. E). Nail the roof panel using 2" nails 6" apart on edges and 12" apart inside panel. Attach the 35-3/8 x 23-7/8" roof panel flush to first panel along edge, flush with the peak (Fig. F), and flush with the truss edge (Fig G). Fig. G Flush with truss edge Flush Attach one lower 23-7/8 x 96" roof panel flush %% to the installed panel along the peak with a 3/4" measurement on the truss (Fig. -H & 1) and `% flush with the truss edge (Fig G). Flush Nail the roof panels using 2" nails 6" apart on truss e the outside and 12" apart on the inside. 6. At one end attach a 23-7/8 x 23-7/8" roof panel flush to the installed lower panel along the edge and the upper panel along the peak (Fig. H) and flush to the truss edge (Fig G). Nail the roof panel using 2" nails 6" apart. Fig. I 32 3/4" =I' 11610k,11011 I \\ I \� 2' NailsFlush �a Fig. F Flush —\ I.H ................................................................................................................................................. ........................................................................................................................................................................................................................................................... .......................................................................................................................................................................................................................................................... Parts Required: Fasteners Required: X2 '16 x 11-1/2 x 96" OSB Panel Q X1 X116 x 23-7/8 x 23-7/8" OSB Panel X97 2" Nails X2 %6 x 11-1/2 x 23-7/8" OSB Panel X1 '/6 x 35-3/8 x 23-7/8" OSB Panel X1 Y/6 x 35-3/8 x 96" OSB Panel GAA GAUGE X1 X/6 x 23-7/8 x 96" OSB Panel BLOCK ASSEMBLY STEPS / NOTES: Roof panels may cause serious injury until securely, f f 7. Attach roof panel 11-1/2" x 96" flush with the installed roof panel, and with a 3/4" measurement on the truss (Fig J) and flush with truss edge (Fig K). "Iy, 8. Attach the last roof panel with the installed roof par 9. Repeat process to install roof panels on the opposite side. Flush to gable panel il 33 �QLI.�41� Tl��. Parts Required: X2 1 x 4 x 72" WO ASSEMBLY STEPS / NOTES: 1. Locate collar tie on the truss shown. 2. Level and then nail using 2" nails. Collar tie on the backside of this truss Fasteners Required: X12 2" Nails 34 " Nails .............................................................................................................................................................................................................................................................. ............................................................................................................................................................................................................................................................... .............................................................................................................................................................................................................................................................. Parts Required: Fasteners Required: X1 Right Door GAA X4 3" Screws X1 Left Door 3:• X2 1-1/4" Screws GAUGE BLOCK X38 3/a" Screws X1 2x3x69" 100 1 ASSEMBLY STEPS / NOTES: 1. Reinforce the doors using 3/" screws from behind the door into the trim. Hint - lay doors flat (Fig. A) for easier screw installation. Install screws to the pattern shown (Fig B). 2. Flip doors back over and orient the doors together so the %" offset is to the same side (Top of door) as shown. Look for GREEN for LEFT door and RED for the RIGHT door. The bottom edges of the doors are flush. 3. Screw on temporary supports across the door trim (Fig C). Use 00 and GAA and tighten screws so the point is flush with the back of the door. (4) 3" Screws in 00 Tighten until screw pi is flush with back of d (2)1-1/4" Screws in GA II Tighten securely II Bottom of doors are flush — Hint! Lay doors flat and install screws from behind Q The %" offset is the top of the door Green -Left — 8" Offset ---W Red - Right — I 8 Ant oor A 8" Offset GAA 35 8" Offset GAA 35 .............................................................................................................................................................................................................................................................. . ............................................................................................................................................................................................................................................................... ............................................................................................................................................................................................................................................................ Parts Required: Fasteners Required: X1 1%2 x 2 Y2 x 63" WR X5 2" Finish Nails X1 2 x 3 x 69" 100 X10 3" Screws X1 Door Assembly ASSEMBLY STEPS / NOTES: 1. Mark the center of the 56" door opening. Then install 00 flush under siding using two 3" screws (Fig. A). The doors will rest on 00 for easier installation F4 3. 4 36 Place the door assembly on 00 with the %" gap centered on the mark (Fig. B). Screw hinge boards into wall framing using 3" screws spaced evenly as shown (Fig. C). 11 Make sure screws go into framing !! Locate trim WR centered over doors flush to hinge trim. Secure using five 2" finish nails 1/2" form bottom of trim (Fig. D). Remove the door braces, ledger board and door spacers. Check the doors swing properly. ""-6 •fie center door opening 3" Screw 2" Door spacing centered on mark Fig. B Center mark Flush under siding 0 WR Centered over door (5) 2" Finish nails 1/2" from bottom of trim Trim WR is flush to hinge trim and centered over door. 17-1/2" Fig. D (5) 3" Screws each side through hinge trim into framing Fig. C Remove door braces, ledger board and door spacers and check doors swing properly ............................................................................................................................................................................................................................................................. ........................................................................................................................................................................................................................................................... Parts Required: Fasteners Required: X2 2 x 3 x 69" 100 X14 2" Screws ASSEMBLY STEPS / NOTES: 1. With left door closed, center a weatherstrip 00 vertically on the left door in the door opening (Fig. A). 00 will offset the left door 1" OUT past the door (Fig. B). Secure 00 using seven 2" screws through outside trim into 00. 2. On the right door center 00 vertically in door opening (Fig. A). 00 will offset the right door 1" IN from the door trim (Fig. C). Secure 00 using seven 2" screws through outside. Fig. B Fla. C Fig. A 37 ................. ........................................................................................................... ­­­­­ ---------------------- ­­ ---- ­­ ----- - ::::::::::::::::::: 300 ::::::::::........ ::::::.:::;::::;::....::::::::::::::::`:`;:::::::; :::::::::.::::::: >.:::::::::::::: Parts Required: Fasteners Required: X2 Spring Loaded Bolts w/Screws X8 1" Screws X1 Door Handle X2 1-1/2" Screws ASSEMBLY STEPS / NOTES: 1. Place upper bolt onto 00 in open position with bolt end 1/4" down from frame. Bolt is open when loop is contacting base (Fig. A). Mark and pre -drill holes. 2. Install bolt with screws supplied and drill a 5/e" hole for bolt to extend into (Fig. A). 3. Place lower bolt onto 00 in open position with bolt end Y2" up from floor. Bolt is open when loop is contacting base. (Fig.B). Mark and pre -drill holes for screws. 4. Install bolt with screws supplied and drill a V16" hole for bolt to extend into (Fig. B) 5. Measure up 35-3/4" and drill a Y4" hole thru door and part 00 (Fig. C). Re -drill the hole larger with a 1/2 " drill. Be careful to avoid breaking thru 00. Attach handle with screws supplied. (Fig. D). 8 Keep drill square to avoid breaking through 38 Fig. A DLOCATE AND PREDRILL HOLES TO AVOID SPLITTING WOOD OVER DOOR FRAME 5116' Or01 for bolt 1' deep' i r 00 w•wmbeeti 2x3x69' oven P084- OPEN POSITION. FLOOR 5/16' Or1e for bolt 11r we eee bn � 1' deep. open paean 1-1/2" Screws ............. ................. .......... ............ .. ........ T- .1 ........... ...................... . . ... ........... ........ * ...... ** ....... .............. ...................... % ........................................ ................................... I .......................................... Parts Required: X2 'V32x3Y2 x 3515/6" X1 "Y32x3Y2 x 35 X1 "y32x3Y2 x 35 X2 2 x 4 x 35 x2 2 X 4 X 35 \AFA \ZHIR /ZHL IIAGA JIVS Angled End Angled End Fasteners Required: X16 2" Nails X16 2" Screws ASSEMBLY STEPS / NOTES: 1 Nail gable trim (ZHIR, ZHL, and AFA) to gable overhang (VS, AGA) as shown below with 2" nails. The nails will be going through the rough side with the primed side facing out. 2. Screw the gable assembly pieces to the front of the shed with 2" screws. Flush each piece with the top of the roof panels and seams are in line (Fig A). AFA " nails Ends painted RED Evenly spaced ZHR ZHL AGA VS rlmed side out AFA )rimed ;ide out 2" Screws Evenly spaces AGA FLUSH with top of roof %?Cal I IQ are in line 39 ....................................................................................................................... ........................................................... .............. ....................... ....................... = .......... .............................. ,.*.,.,.,.*.,.*.,.,.*.*.,.*:.,.,.,.*.,.,.*.,.,.,.,.,.*.*.,.,.,.,.*.,.,.,.,.,.*.I ............................................................ TRIM. .................. ......................................................................................................... Parts Required: Fasteners Required: X2 '9/2 x 2 Y2 x 3513/6" FCA X16 2" Finish Nails X1 '9/32 x 2 Y2 x 35 Y4" \FDR X1 '9/32 x 2 Y2 x 35 Y4" \FDL ASSEMBLY STEPS / NOTES: 1. Nail the rear gable trim pieces (FDR, FDL, FCA) to the back of the shed flush with the top of the roof panels (Fig A) using 2" finish nails. Primed side out. 2" Finish nails Evenly spaced 40 .4111.4-W In19 ....................................................... ................................................................................................................................................................................................................................................... ........................................................................................................................................................................................................................................................... O Parts Required: X8 Y x 1-3/4 x 71-9/16" Fasteners Required: X56 2" Finish Nails ASSEMBLY STEPS / NOTES: 1. Locate 71-9/16" trim on side wall flush to outside of the front wall panel (Fig A, B) and tight against roof (Fig. C) with primed side facing out. Install using 2" finish nails 12" apart. 2. Locate another 71-9/16" trim flush to side comer trim (Fig. B) and the tight against the gable trim (Fig.C) with primed side facing out. Install using 2" finish nails 12" apart. 3. Repeat process at other comers to install all trim pieces. Tight al and outsidc a" Side � 1 - �1 1 FlushFRONT `��_,/ Fig. B Maces i trims C 41 _ EsAl�l��� t�EE���C����►�. TR1# ........ Parts Required: X2 1%2 x 2-1/2 x 69-1/4" FBA X2 1%2 x 2-1/2 x 71-7/16" FAA Fasteners Required: X8 2" Finish Nails X16 3/4" Screws ASSEMBLY STEPS / NOTES: 1. Level the front horizontal gambrel trim ( FBA) with the primed side facing out, flush against the gambrel trim. 2. Using 2" finish nails, nail the trim into place with one nail on each end and two in the middle. Be sure the nails go into the truss and center gambrel connector (SL). 3. From INSIDE use eight 3/4" screws through the panel into the trim. The screws should be staggered 3/4" above and below the panel seam. 4. Repeat these steps to install the back horizontal gambrel trim ( FAA). (4) 2" Finish nails Primed side facing out Front I I I IZS �-� FBA I I 7. 4�� Flush I I Ba Flusl 42 (8) 3/4" Screw From inside FF 1W.ua -HpiM 'Wov-9 fr Primed side facing out w/ .nom vul cw From inside Flush Flush `......:P INTCAULK:­­­­­­*::` :::::::::>: `.:;::::.:.::::` :' :: :.. A & - NOT INCLUDED - ---------------------------- <%v • Use acrylic caulk that is paintable. Caulk at all horizontal and vertical seams, between the trim and walls, and all around the door trim. • Use a high quality exterior acrylic latex paint. When painting your building, there are a few key areas that can be easily overlooked that must be painted: • Bottom edge of all siding and trim • Inside of doors and all 4 edges Note: Prime all in -primed exterior wood before painting. (Follow directions provided by manufacturer.) ROOF FELT - NOT INCLUDED - :::: :: >::; ::?:::`::: :.:.:..:.:......:::1::1::1:.1.7.:::`: • Install felt flush to all roof edges overlapping 3". Use minimal amount of roofing nails to hold in place. OK to overlap at ridge. 3" OVER�P Flush Flush DRIP EDGE :': -NOT INCLUDED - 1 1.:.:.:.. ` .` .::: i.::::.:...:...iii.: .:......::::::: <:.......:.:.. • Install over roof on gable side (Fig. A). • Do not use nails on side of drip edge that hangs over side of building. • Only nail top of drip edge as shown. Roof Felt\ WM, Fi4. A Drip Ec Snip bottom side of drip edge and bend over to other side of roof. (Follow directions provided by manufacturer.) Edge flush to trim. 43 H/N LE S G S :�:�:�:�:�:.�:�:�:�:�:;`:..'::::::::::� • Follow directions provided by manufacturer and these instructions. ^�"' •�� LL- 8Famillarize yourself with a 3 -Tab Shingle. Notch SHINGLE NAIL Notch PATTERN 1" 1/2" Sealing Strip 1" (2,5 cm) F (1,3 cm) / -�:j (2.5 cm) Half A Rain Full Rain Slot Nails dsNEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS. */BEGIN 1. Install first starter row upside down and color up with a 1" overhang at back and bottom of roof panel. Use (4) nails per shingle. Starter row must be straight and level all the way across with lower edge of roof deck. NOTE: If you have installed drip egde install shingles flush with drip edge. FRONT OF BACK OF SHED I I SHED Shingle overlaps roof decking. (4) Nails 1" (2,5 cm) overhang past roof deck I 1" (2,5 cm) overhang Ijr or flush with drip edge. 2. Beginning at front of shed, install first row of shingles with notch at 1" past roof edge or flush with drip edge. 1" (2,5( Notch Drip Edge Notch 44 BACK OF SHED LFlush with starter row I ... ;:: .: .:::SHINGLES"" .continued... 3. Install second row of shingles flush at top of first row's rain slots. Ensure 1" overhang or flush to drip edge at front, stagger each row.. FRONT OF SHED 1" (2,5 cn Notch Flush with rain slots BACK OF SHED 4. Continue installing rows of shingles by staggering at front. Notch FRONT( SHED 1" (2,5 cm) Bend in roof Flush with rain slots BACK OF SHED Bend in roof 5. The shingle over the bend in the roof will be nailed down. You will need 3" to 4" of this shingle to extend downward over the bend for nailing. Look for either if the following: • If the rain slot of the shingle installed over the bend is ABOVE the bend and 3" to 4" of it overhangs down over the bend, continue shingling up to the peak. You have enough to nail the shingle down over the bend. FRONT OF SHED 3" to 4" (7.6 cm to 10cm) -Bond in roof Rain slot above bend Flush to rain slot • If the rain slot of the shingle installed over the bend is BELOW the bend, install the shingle over the bend and overlap the rain slot to get the 3" to 4" overlap. "Bend in roof FRONT OF SHED 3" to 4" (7.6 cm to 10cm) fin slot above bend the rain slot The shingle OVER the bend must be installed with 3" to 4" overlap AND the rain slot above the bend. aR H/N LE S G S in ��� cont ued... 6. After shingles are installed over bend, nail down overlap using two roofing nails per tab. 7. Continue installing rows of shingles to the peak. At the peak make sure there is a maximum of 5" or less to the rain slot, as shown below. If shingles overlap at ridge cut to peak with a utility knife. 5" Cut O y (12,7 cm) MAX. i—Top of rain slot. or less. ds• If more than 5" to rain slot you must Install another row of shingles. 8. Repeat steps 1 - 7 to shingle the opposite side of your roof. Trim shingles at ridge. 9. Once both sides are shingled you need to trim ends. Strike a chalk line 1" from the edge. 10. Using your shingle hooked blade carefully cut along the chalk line. FINISH 11. You have finished shingling your roof. Proceed to capping the ridge. 46 ....................................................................................................................................................................................................................................................... . ................................................................................................................................................................................................................................ ...................... . ..................................................I ......................... ..............................................................................................................................................I ....................... ` S GLE H/N RIDGE AP S RIG C You will finish off the top of the roof with a ridge cap made from shingles. ow -vom vti L -04BEGIN 1. Cut shingles into THREE pieces. Hint: Use cut-off pieces first. " 2" 2" (5 cm) (5 cm) (5 cm) 2,. 2" J J 2" r(5 cm) 'I (5 cm) I - I (5 cm) / \ /•fit# \ / \ i � Score shingle, f then snap -off angled cut. Weather Ses 20 to 22 ._. Note: You will need about 20 - 22 cut pieces.{P�ieces�' 2. Install first ridge cap flush to shingles at front, as shown. FRONT OF SHED 3. Install second ridge cap 5" back as shown. 5" 12,7 cm FRONT OF SHED (1) Nail per side through weather seal. Flush 47 SHINGLE - Ri d e Ca S .. . continued... 4. Continue installing ridge cap to back of roof. 5. Make sure there is 4" between the shingle color and edge of shingles. 4" 6. When you have 4" minimum of shingle color cut one piece to cap your roof. 7. Install flush to shingles. FINISH Trim cap off flush to shingles Flush to shingles 1. '.ut at top of rain slot. Cap 8. You have finished your ridge cap. 48 9 '_ .PROVO PLANS I .'SPT. s131 I(p O' stn e d u,An n��n;wenn S' se-tbacl�S .