Loading...
HomeMy WebLinkAbout113 Spanish Bay DrSEP 2 0 2016 B CITY OF SANFORD BUILDING & FIRE PREVENTION PERMIT APPLICATION Application No: Documented Construction Value: S Job Address: l 1-3 r>hM b VQ r 1,-L J Historic District: Yes No 9--' Parcel ID: 33-19-30-517-0000-0820 Residential X Commercial Type of Work: New Addition Alteration ® Repair Demo Change of Use Move De ription of Work: Reroofing o V 1 I. jo.'V a Plan Review Contact Person:. "A <_e__ Title: ' Phone: Fax: ?4q —2i7T OptO Email:l 0%C LC(tv.Ga-e yWtw C Property Owner Information Name IAI c N a,e, ' G (,L' Phone: (386) 717-1832 Street: 113 Spanish Bay Dr. Resident of property? : 6 w r--.fv? City, State Zip: Contractor Information Name Robert P. Kornahrens Phone: (407) 322-1555 Street: 200 Northstar Ct. Fax: (407) 322-0100 City, State Zip: Sanford FL. 32771 State License No.: C012,024413 Architect/Engineer Information Name: Street: City, St, Zip: Bonding Company: Address: Phone: Fax: E-mail: Mortgage Lender: Address: —' WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet standards of all laws regulating construction in this jurisdiction. I understand that a separate permit must be secured for electrical work, plumbing, signs, wells, pools, furnaces, boilers, heaters, tanks, and air conditioners, etc. FBC 105.3 Shall be inscribed with the date of application and the code in effect as of that date: 5" Edition (2014) Florida Building Code Revised: June 30, 2015 Permit Application NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. Acceptance of permit is verification that I will notify the owner of the property of the requirements of Florida Lien Law, FS 713. The City of Sanford requires payment of a plan review fee at the time of permit submittal. A copy of the executed contract is required in order to calculate a plan review charge and will be considered the estimated construction value of the job at the time of submittal. The actual construction value will be figured based on the current ICC Valuation Table in effect at the time the permit is issued, in accordance with local ordinance. Should calculated charges figured off the executed contract exceed the actual construction value, credit will be applied to your permit fees when the permit is issued. OWNER'S AFFIDAVIT: I certify that all of the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. gna ure of O gent Date Print Owner/Agent's Name gn U.[ : -Staff ate MY COMMISSION # FF912961 EXPIRES August 25,.2019 w0) 398 Ct5 FloridsNoN vic*-. Signature of Contractor/Agent Date Ro.be+ ?t ZwJ&h6r-fts int Contractor/Agent' ame l gy Signature of Notary -State of Florida DAWN EMERY Y COMMISSION # FF072573 EXPIRES: January 26,2018 Owner/Agent is Personally Known to Me or rgf is -k - Pi Produced ID 1% Type of M Fh. O/L _ Produced ID Type BELOW IS FOR OFFICE USE ONLY Date Known to Me or Permits Required: Building ® Electrical Mechanical Plumbing Gas[] Roof Construction Type: Total Sq Ft of Bldg: Occupancy Use: Min. Occupancy Load: New Construction: Electric - # of Amps Fire Sprinkler Permit: Yes No APPROVALS: ZONING: ENGINEERING: COMMENTS: Flood Zone: of Stories: Plumbing - # of Fixtures of Heads Fire Alarm Permit: Yes No UTILITIES: WASTE WATER: FIRE: BUILDING: Revised: June 30, 2015 Permit Application SCPA Parcel View: 33-19-30-517-0000-0820 Page 1 of 2 Property Record Card PrNME Davi son, CFA Parcel: 33-19-30-517-0000-0820 R"j Owner: KNIGHT MICHAEL W & CASEY J scMwcxc xrY FeoHnn Property Address: 113 SPANISH BAY DR SANFORD, FL 32771 Parcel Information j Value Summary Parcel 33-19-30-517-0000-0820 Owner KNIGHT MICHAEL W & CASEY J Property Address 113 SPANISH BAY DR SANFORD, FL 32771 Mailing 113 SPANISH BAY DR SANFORD, FL 32771 Subdivision Name MO Y O PH 1 A REPLAT Tax Distri S1-SANFOR DOR Use C de 01-SINGLE FAMILY Exemptions 0-HOMESTEAD(2004) 2016 Working Values 2015 Certified Values Valuation Method Cost/Market Cost/Market Number of Buildings 1 1 Depreciated Bldg Value 150,834 138,464 Depreciated EXFT Value 751 801 Land Value (Market) 33,000 28,000 Land Value Ag Just/Market Value "` 184,585 167,265 Portability Adj Save Our Homes Adj 62,391 45,920 Amendment 1 Adj P&G Adj Iso 0 Assessed Value 1 $122,194 121,345 Tax Amount without SOH: $2,582.74 2015 Tax Bill Amount $1,648.19 Tax Estimator Save Our Homes Savings: $934.55 Does NOT INCLUDE Non Ad Valorem Assessments Taxing Authority Assessment Value Exempt Values Taxable Value County General Fund 122,194 50,000 72,194 Schools- 122,194 25,000 97,194 City Sanford 122,194 50,000 72,194 SJWM(Saint Johns Water Management) 122,194 50,000 72,194 County Bonds 122,194 - 50,000 72,194 Sales Description Date Book Page Amount Qualified Vac/Imp WARRANTY DEED 10/1/2003 05085 0070 176,000 Yes Improved SPECIAL WARRANTY DEED 4/1/2001 04070 1814 127,000 Yes Improved WARRANTY DEED 7/1/2000 03901 1243 165,500 No Vacant Find Comparable Sales Land Method Frontage Depth Units Units Price Land Value 33,000LOT1 $33,000.001 Building Information Description Year Built Fixtures Bed Bath Base Area Total SF Living SF Ext Wall Adj Value Repl Value Appendages Actual/Effective i 1 SINGLE 2001 9 4 1 2_5 1,120 2,614 3 2,170 CB/STUCCO 1 $150,834 1 $159,192 Description Area FAMILY FINISH 1050.00 http://parceldetail.scpafl.org/ParcelDetailInfo.aspx?PID=33193051700000820 7/28/2016 EXPERIENCE MATTERS. Millli. ADVANCED = P,00FINW. ESTABLISH EO 1983 Florida's Premiere Commercial Roofing Contractor Committed to Quality To: Olympus Insurance 7 World Trade Center 250 Greenwich Street, Suite 7 New York, NY 10007 Date: August 1, 2016 Job Name: Michael Knight Address: 113 Spanish Bay Drive Sanford, FL 32771 Reference: Re -roof residence CLAIM# OLIN16070245 We are pleased to submit the following proposal for your consideration on the above referenced premises as follows. We agree to provide all labor, material, tools, equipment and proper insurance with excess liability of eleven (11) million dollars. PERMITTING AND TESTING Permitting and testing that is required to secure a roofing permit is included in our bid proposal. The following test will be completed in order to pull your permit: Florida Product Approval NOA for the proposed system. Provide roof attachment and engineered fastening pattern in accordance with ASCE 7-02 and Florida Building Code 2010 Edition Roof Application Standard RAS 117. Notice of Commencement filing with the county and fees before the start of the project. Notice of Termination will be filed at the end of the project upon final payment. WORKSCOPE PREPARATORY WORK 1. Cut and remove all existing roofing down to the plywood deck. Remove only as much roofing in one working day period that can be replaced. Water cut off to be installed at the end of each working day to assure a watertight condition. 2. Replace any rotten wood decking as needed with like kind materials. This proposal includes 128 square feet ( 4 sheets) of plywood. Any rotten plywood in excess of this amount will be at a cost of $50.00 per sheet. All decking to be re -nailed per the Florida Building code requirements. 3. Remove existing solar panels from roof and re -install upon completion if required. Page 1 of 5 4. Remove roofing debris and cart away to the local dumpsite or landfill. 5. Broom clean the entire roof. Remove all dust and dirt and thoroughly clean with a power air blower. UNDERLAYMENT: 1. Furnish and install one (1) layer of D226 Type II organic felt starting at the low point of the roof and proceeding in shingle fashion up to the ridge. All sheet to be mechanically fastened utilizing Roofing Simplex nails according to the current building code requirements. 2. Furnish and install self -adhering sacrificial membrane at all valleys and transitions. FLASHINGS: 3. Shop fabricate and install new galvanized metal drip edge around the perimeter of all buildings. Color to be selected by owner. New metal to be mechanically fastened every 4" utilizing 1 /14" ring shank roofing nails. 4. Furnish and install new lead boots at all plumbing vents. New lead to beset in mastic and flashed per the manufacturer's recommendations. New lead boots to be painted to match the color of the shingles. 5. Furnish and install new metal roof vents as needed. Color to match new shingles as close as possible. 6. Shop fabricate and install new metal "L" flashing as needed at the side and head walls of each building. New metal to be set in mastic and flashed per the manufacturer's recommendations. 7. Furnish and install new ridge vents at the previous locations. SHINGLES: Furnish and install new Certainteed shingles or equivalent as per the manufacturer's recommendations. New shingles type (3-tab or Architectrual) to match what was existing. All shingles to be mechanically fastened utilizing 1 %" roofing nails as per the Florida Building Code requirements. Standard color to be selected by owner. Furnish and install new ridge cap shingles as recommended by manufacturer. GUARANTEE Thirty Year warranty from Certainteed or shingle manufacturer. WARRANTY Five (5) year warranty on materials and labor by Advanced Roofing, Inc. QUOTATION FORTHE SUM OF: .............................................................................................................$8,580.00 Page 2 of 5 Our work is done in a workmanlike manner by trained, qualified mechanics using the latest technical equipment for the job. Principals supervise all jobs and upon completion, also inspect and evaluate the premises and workmanship. As always, ADVANCED ROOFING, INC. is "Committed to Quality". Every safety precaution will be taken to protect owner, pedestrian, property and landscaping. All work areas will be cleaned daily and equipment will be removed immediately upon completion of the day Please be advised that the amount quoted in this proposal has been reduced by the amount of any applicable rebates. The contractor shall receive all rebates, in which Owner agrees to execute any documents necessary for the contractor to recover payment for services. Our work is done in a workmanlike manner by trained, qualified mechanics using the latest technical equipment for the job. During the course of the job the progress, workmanship and housekeeping is documented and reviewed by management for quality control. As always, ADVANCED ROOFING, INC. is "Committed to Quality". Safety and protection of the property is our concern ad we take precautions to protect people and property from damage or injury during the course of the job. All work areas will be cleaned daily and equipment will be removed immediately upon completion of work. TERMS OF PAYMENT Payment upon completion. ATTENTION PROPERTY OWNERS - DON'T JEOPARDIZE YOUR INSURANCE We are fully and properly insured, in addition with our base coverage of 1 million, 2 million aggregate, we also carry an addition $10,000,000 in excess coverage. Proof of insurance will be sent upon request. It is in the best interest of the owner to make sure a contractor carries the amount of insurance as stated above and ask for proof. Thank you for the opportunity to bid on this work. Should you have any questions or require any additional information, please do not hesitate to call. All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Any alteration or deviation from above specifications involving extra costs will be executed only upon written order, and will become an extra charge over and above the estimate. All agreements continent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado, and other necessary insurance. Authorized Signature: Jason Carruth NOTE: This proposal may be withdrawn by us if not accepted within Thirty (30) days. Owner is responsible for asbestos testing and related cost to remove. Acceptance of Proposal The undersigned as (check oneQ OwnEU Authorized agent of Owner hereby accepts and agrees to the prices, specifications and conditions indicated above and on the reverse side of this contract. Accepted: ............................................................................. Signature: .......... ....................................................... I.............................. Date: ...................................................................................... Signature:................................................................................................ Terms & Conditions on last page(s) apply. State License: CCC 02441? Page 3 of 5 Contract Terms & Conditions The following provisions form part of the contract between the parties hereto. Advanced Roofing, Inc. will be referred to as "Advanced" GUARANTEE: Unless otherwise provided in the body of this contract, re -roofing jobs are guaranteed by ARI Insurance, Inc. for two years, the premium for which is included in the contract amount. The guarantee covers any defect in workmanship or in materials supplied by Advanced which cause a leak to the premises. The guarantee does not cover actions beyond the control of Advanced, including but not limited to windstorms, hurricanes, tornados, lightning, plant or animal life, such as termites, damage caused by Owner or other parties, or work done by parties not under the control of Advanced. Mechanical and electrical modifications are not part of Advanced 's responsibility unless included in the scope of work otherwise described herein. The extent of this guarantee shall not exceed the contract amount paid to Advanced Roofing and shall not extend to consequential damages. Claims made under this guarantee shall be made to ARI Insurance, Inc. c/o Advanced Roofing, Inc. Advanced Roofing is authorized to photograph the property in order to determine the scope of services, marketing, or other purposes associated with the project. CLAIMS: All claims for nonfulfillment of the contract shall be made within 30 days from completion of the work. Advanced reserves the right to correct any condition for which it is responsible including damage to other property. In the event others repair or attempt to repair any problem with the work done by Advanced, unless authorized by Advanced in writing, all guarantees and warranties associated with this project shall be void and of no other further force and effect. Advanced shall not be liable for any cost of work or repairs to its work done by others unless previously authorized by Advanced in writing. PAYMENT: Owner has represented to Advanced that it has the funds available to make payment and has further agreed to supply financial records satisfactory to Advanced, prior to commencement of construction. If Advanced in its sole discretion is not satisfied with Owner's current or future ability to pay it may terminate this contract. Final payment is due on the completion of the job and is a condition precedent to any warranty or guarantee obligation of Advanced or ARI Insurance, Inc. Any release, lien waiver or warranty issued pursuant to this project is delivered in escrow subject to payment and may be cancelled for nonpayment. Advanced's right to payment is not contingent upon the acceptance of work done by others and over which Advanced has no control. The prevailing party in any litigation, arbitration or mediation relating to this agreement shall be entitled to recover its reasonable attorneys' fees from the other party for all matters, including, but not limited to appeals. Broward County, Florida, shall be proper venue for any litigation involving this agreement. Interest shall be due on all amounts not paid within 30 days of the date due at eighteen percent per annum from the date payment was due. Owner hereby expressly consents to the exclusive personal jurisdiction of the state and federal courts located in Broward County, Florida for any lawsuit filed arising from or related to this Agreement and waives any argument that any such court lacks jurisdiction or that venue in such forum is not convenient. In the event Owner commences any action arising under this Agreement in another jurisdiction or venue, Advanced shall, at its sole option, be entitled to have the case transferred to one of the jurisdictions and venues above stated, or if such transfer cannot be accomplished under applicable law, Owner consents to have such case dismissed without prejudice. REBATES: Please be advised that the contract price has been reduced by the amount of any applicable rebates. The contractor shall receive all rebates, in which Owner agrees to execute any documents necessary for the contractor to recover payment for same. UNFORESEEN CONDITIONS: This proposal is limited to the scope of work described and does not include structural issues which may be discovered during the course of the work. In the event that unforeseen conditions arise that were not apparent upon visual inspection, such additional work shall be performed on a time and material basis over the price stated in this contract. Examples of conditions which will be considered an unforeseen condition giving rise to an increase in the cost of the job would be the discovery of additional roofs during tear -off; or that the original roof was solidly mopped to the deck; deck replacement; deck securement/fastening; deck minimum gauge or deck conditions requiring repair beyond proposal allowance, or any other condition that Advanced should not reasonably have anticipated from visual inspection and included in the price provided for in the contract. OWNER RESPONSIBILITIES: Unless otherwise provided for in the body of this contract, Owner is responsible for any of the following conditions: Asbestos testing and removal expenses, if any; wind uplift and moisture testing if required; engineering and attachment or enhancement of the existing/proposed roof deck system and any structural component of the building; the condition of the existing/proposed deck slope, structural integrity of the deck, method of attachment of the deck, buried conduits, and equipment below the deck or any other structural deficiencies which may contribute to preventing positive drainage on the roof surface; Waterproofing of the building envelope, including windows, doors, or other areas outside the scope of work performed by Advanced. Owner may be responsible for moving or otherwise protecting signs, lighting antennas, satellite dishes or other property or equipment which interferes with the reroofing of the property and agrees not to hold Advanced liable for damage to same unless Advanced accepted the responsibility therefore. PRE-CONSTRUTION INSPECTION/LEAKS: Roofs ready for replacement are generally leaky and holding water which may, through no fault of Advanced, leak into the building during the course of the re -roofing process. Advanced shall use best roofing practices to minimize the risk of leaks but owner agrees not to hold it liable for leaks not directly caused as a result of negligent practices. Additionally, interior damage generally pre-exists commencement of the re -roofing project. Owner agrees to provide access to all interior areas and top floor units in order for the parties to document pre-existing damage. The risk is upon Owner, who agrees to indemnify and hold Advanced harmless, against any claim by Owner or any other party seeking to hold Advanced liable for damages where Advanced was not provided access during its pre -construction inspections to the areas in question. Owner also shall have the responsibility to notify its residents of the steps that must be taken to protect their property, which will be contained in the Start -Up letter provided by Advanced. Owner shall also provide the staging area and cooperate to inform and assist in preventing residents or others from entering that area or any area under construction. PRICES QUOTED ARE FOR GALVANIZED flashing, eves drip and gravel stop unless otherwise specified. UPLIFT STANDARDS: All roofing systems will be installed in accordance with both the manufacturer's specifications and building code. Advanced does offer uplift guarantees but unless otherwise specified in this proposal post installation pressures are not guaranteed. EXISTING PROPERTY OR EQUIPMENT: Unless otherwise specified in this contract, Advanced shall not be liable for damage to property or equipment, including signs, lighting fixtures, antennas, satellite dishes or other equipment at the property which is reasonably at risk from the work performed by Advanced. Any expenses incurred by Advanced to protect said property shall be paid for by Owner. Page 4 of 5 r RISK OF DAMAGE: It can be expected that the work will cause vibration, which could cause damage to the building or its contents. The Owner is in the best position to secure said property or, in the case of others who occupy interior units, to advise them of the need to do so. Advanced does not assume any risk and shall not be held liable for damage to stained, cracked or damaged ceilings or ceiling components, cracked or damaged plaster, insulation, acoustical tile or personal property or fixtures within or about the building(s), cracks in driveways, curbs and sidewalks or soffit repair or replacement. Additionally, Advanced shall not be liable for damage to parked vehicles or property located in or about the staging area assigned for its use, or for any damage or injury for respiratory problems which may result from the odors associated with its work. The Owner shall advise its tenants and employees of these risks and concerns and take such action as it deems reasonable. DELAYS: Advanced shall not be liable in any respect for any delays caused by strikes, labor disputes, court injunctions, actions by the Owner or by third parties, Acts of God, or other conditions outside of its control. In the event Advanced must remobilize as a result of any action for which the Owner is responsible, or due to weather or other conditions not the responsibility of Advanced, Advanced shall be entitled to an increase of the contract price attributed thereto. If it is necessary to perform additional work in order to protect the property from adverse weather, or to repair work damaged by adverse weather, Advanced will be entitled to a change order for reimbursement for same. MATERIAL PRICE CHANGES: Due to extreme volatility in asphalt prices, the price set forth in this proposal/contract applies only to orders for asphalt products that are ordered and paid for within thirty (30) days of the date of this proposal/contract. All other orders shall be subject to change based upon changes in the price of asphalt -related products charged to Advanced. Similarly, if there is an increase in the price of steel products, isocyanurate insulation or other materials to be used on this project subsequent to making this proposal/contract, the price set forth in this proposal/contract shall be increased to reflect the additional cost to Advanced, who will submit written documentation of the increased charges. A fuel surcharge can be added if the price of fuel increases by more than 5% between the time the contract is signed and commencement. BREACH: In the event Owner terminates or breaches this contract, or if a condition attributable to Owner or Owner's property arises that prevents Advanced from fulfilling the contract, Advanced shall be entitled to be paid that percentage of the contract price as the percentage of work performed; plus for work not performed, all expenses incurred in preparing to perform same, mobilization expenses and profit which would have been realized had the work been completed. If the contract is canceled as a result of strike, labor dispute or conditions not the fault of or attributable to either party hereto, Advanced shall be entitled to recover from Owner that percentage of the contract price as the percentage of work performed; plus for work not performed, all expenses incurred in preparing to perform same, mobilization expenses or other expenses incurred related to the project but not profit for work not performed. NO ORAL PROMISES: There are no promises, representations or understandings outside of this instrument which instrument represents the complete agreement between the parties. No modification of this contract shall be valid unless in writing, signed by the party against whom the change is asserted. Any notification required by this contract shall be made in writing. LIMITATION OF LIABILITY: Advanced Roofing is not liable for any claim for injury or damages, whether based upon a contractual, statutory or tort theory, which result from: (a) natural disasters including but not limited to lightning, windstorm, hail, hurricane, tornado, wind gale force or greater; (b) misuse, neglect, or unauthorized alterations of the roofing system or as a result of or connected with materials supplied or installed by others; (c) exposure to damaging substances such as oil, solvents etc.; (d) failure of the substrate, surface or materials under the roof; (e) improper drainage; (f) lack of recommended maintenance; (g) damage resulting from water entry from any portion of the building structure which is not a part of the roofing system, or (h) any claim related in any way to damage or injuries from mold, spores, fungus, any organic pathogen or exposure to toxic or noxious substances fumes or vapors. Advanced Roofing shall have no obligation under this Contract until all bills for installation, service, and materials have been paid for in full. The Owner will, at its expense initiate an ongoing maintenance program to include keeping all pitch pans filled with mastic, maintaining caulk or sealant around all roof penetrations, cap metal, cover plates, gravel stops, counterflashings, termination bars, exterior scuppers, gutters, down spouts and leader heads, and keeping the roof free of vegetation, trash and debris and such other miscellaneous items necessary to maintain the serviceability of the roofing system. If this roofing system is covered under a manufacturer's Warranty, Advanced is not liable for the provisions thereof. The warranty and liability of Advanced Roofing shall only accrue to and be for the benefit of the original Owner named herein, and is NOT assignable or transferable without prior written approval and inspection by Advanced Roofing. TO THE FULLEST EXTENT PERMITTED BY APPLICABLE LAW, ADVANCED ROOFING, INC. DISCLAIMS ANY IMPLIED WARRANTY, INCLUDING THE WARRANTY OF MERCHANTABILITY AND THE WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE, OR LIMITS SUCH WARRANTY TO THE DURATION AND TO THE EXTENT OF THE EXPRESS WARRANTY REPRESENTED BY THIS WARRANTY. Advanced Roofing's exclusive responsibility and liability under this warranty has been transferred to ARI Insurance, Inc. and, in the case of a new roof, to make repairs that may be necessary to maintain the roofing system in a watertight condition for the length of Advanced Roofing's warranty period; and in the case of a repair, to repair any additional leaks which result from faulty repair work done by Advanced Roofing. (Owner acknowledges that leaks may come from more than one possible source and that Advanced Roofing does not guarantee that it's repair will stop leaks not associated with the area repaired by it.) Advanced Roofing shall not be liable for its own negligence, or under theories of statutory or strict liability or any other theory of liability other than the exclusive liability set forth in this warranty which Owner agrees is it sole remedy notwithstanding the type or category of damages claimed. Under any circumstance, Advanced Roofing will not be liable for any personal injury claims, or claims for consequential damages to the structure (upon which the roofing system is affixed) or its contents, loss of time or profits or any inconvenience or expense incurred by Owner. Any change to the provisions of this section must be in writing and signed by a corporate officer of Advanced Roofing, Inc. ANY CLAIMS FOR CONSTRUCTION DEFECTS ARE SUBJECT TO THE NOTICE AND CURE PROVISIONS OF CHAPTER SS8, FLORIDA STATUTES Page 5 of 5 Permit Number: Folio/Parcel ID #: ye? .5y ' 4) ? 7 :? -- r s''z-fit Prepared by: c Return to: _ % 4Ch- cio AA. JUPj P. S. 20 r NOTICE OF COMMENCEMENT State of Florida, County of-}sceoia -'W° ` Y; The undersigned hereby gives notice that improvement will be made to certain real property, and in accor .1At 4 with Chapter 713, Florida Statutes, the following information is provided in this Notice of Commencement. 1. Description of property (legal description of the p ,pert , and street address if available) 2. General descripti6n of improverrient A, Uj v o 3. Owner informat'on or Lessee information if the Lessee contracted for the improvement a Name%<V. G 41 el r:l - Address , L3 S'ir ` Y. 5"t 3t':-r Q,-; - ' i Y . G G a 4 0 Interest in Propertyi e LL Name and address of fee simple titleholder (if different from Owner listed above) a Name Addresses J 4. Contractor LL o 0 rrC Name'u-vt- t-'` r Telephone Number 116'1 Address z t 7 v to 5. Surety (if applicable, a c py of the payment bond is attached Name - Telephone Number Address Amount of Bond $ 6. Lender Name . 3 Telephone Number Z4Address 7. Persons within the State of Florida designated by Owner upon whom notices or other documents may be served as provided by §713.13(1)(a)7, F orida Statutes. Name A Telephone Number _--- — Address ' 8. In addition to himself or herself, Owner designates the following to receive a copy of the Lienor's Notice as provided in §713.13(1)(b), Florida St at es. Name Number Address r;TTelephone 9. Expiration date of notice of commencemenf(the expiration date will be 1 year from the date of recording unless a different date is specified) WARNING TO OWNER: ANY PAYMENTS MADE BY THE OWNER AFTER THE EXPIRATION OF THE NOTICE OF COMMENCEMENT ARE CONSIDERED IMPROPER PAYMENTS UNDER CHAPTER 713, PART I, SECTION 713.13, FLORIDA STATUTES, AND CAN RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR-ENQER OR-" ATTORNEY -BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF COMMENCEMENT. 6ignatuf(-' of'O'w—ner or re'ssee, or Owner's or Lessee's Autiorized Officer/Director/Partner/Manager Signatory's Title/Office The foregoing instrument was acknowledged before me this ' , `day of -i" 11"o1' by m nt year name of person as c j,i' f't for Type of authority, e.g., officer, trustee, attorney in fact Name of party on behalf of whom instrument was executed Signature of Notary Public - State Florida Personally Known OR Produced ID Type of ID Produced Print, type, or stamp commissioned name of Notary Public JAMES P. KEN14EDY MY COMMISSION A' FF912961 EXPIRES August 25. 2019 dUr1399- 0t53 FknN tJoldySr.icr.uxn Form content revised: 01/23/14 CITY OF SANFORD BUILDING SERVICES Residential Re -Roof Hurricane Mitigation Inspection Affidavit Permit #: 4 - a o I, Advanced Roofing hereby acknowledge that I personally inspected Roof deck nailing and/or k Secondary water barrier work at // s Sin i s I l->Gv Or. and have determined that the work Job She Address) was done according to the Hurricane Mitigation Retrofit Manual. (based on 553.844 F.S.) I certify that my statements herein are true and accurate to the best of my belief and that I fullyunderstandthatmakinganyfalsestatementsinwritingwiththeintenttomisleadapublicservantinthe performance of his or her official duty shall constitute a misdemeanor of the second degree pursuant toSection837.06 F.S. op Signature of Contractor Robert P Kornahranc Printed Name of Contractor ter-- Date C'00024413 License # License Type: General Building Residential Q Roofing Contractor or any individual certified in accordance with F.S. 468 to make such an inspection. STATE OF FLORIDA COUNTY OF. ,, c, /r , Sworn to (or affirmed) and subscribed before me this 2L day of , 20 /, byZ4PKMaf,. , who is C"Personally Known tom or has Produced (type ofidetification) z% p & as identification. P_ If ell (SEAL) ignature of Notary Pub is State of Florida Print/Type/Stamp Name of Notary Public 407) JAMESR KENNEDY MY COMMISSION # FF912961 oa ,.• EXPIRES August 25.2019 398- C153 FkxidallolarysWVica.cvn 3