Loading...
HomeMy WebLinkAbout4792 FLU 5.77 Acres - 6498 Ronald Reagan Blvd.Ordinance No. 2024-4792 An Ordinance of the City of Sanford, Florida amending the City of Sanford Comprehensive Plan, as previously amended; providing for amendment of the Future Land Use Map of the Future Land Use Element of the City of Sanford Comprehensive Plan relative to certain real property, approximately 5.77 acres in size, owned by Christian Sharing Center Inc. and Dale & Company LLC (Tax Parcel Identification Numbers 13-20-30-300-0160-0000 and 13-20-30-300- 040A-0000), said property being addressed as 6498 North Ronald Reagan Boulevard; providing for the future land use designation to be amended from Low -Density Residential -Single -Family (LDRSF) and Neighborhood Commercial to General Commercial (GC); providing for legislative findings and intent; providing for assignment of the land use designation for the property; providing for severability; providing for ratification of prior acts of the City; providing for conflicts; providing for codification and directions to the code codifier and providing for an effective date. Whereas, the fee simple title owners of the real property that is the subject of this Ordinance are The Christian Sharing Center Inc., of Longwood, which has a large number of officers and directors, and Dale & Company LLC, of Casselberry, which has four managers/members (collectively the "Property Owner"); and Whereas, the subject real property is assigned Tax Parcel Identification Numbers 13-20-30-300-0160-0000 and 13-20-30-300-040A-0000, as assigned by the Seminole County Property Appraiser; and Whereas, the subject real property is a site 5.77 acres in size and is addressed as 6498 North Ronald Boulevard and located on the west side of Ronald Reagan Boulevard between Bedford Road and Tucker Drive; and Whereas, a Citizens Awareness and Participation Plan (CAPP) meeting was held on December 12, 2023, and a copy of the CAPP report was provided to the City, which report has been found to be satisfactory to the City; and Whereas, the applicant's request is to amend the future land use designation currently assigned to the subject property from Low -Density Residential -Single -Family (LDRSF) and Neighborhood Commercial to General Commercial (GC); and Whereas, the Property Owner also has submitted a companion application to rezone the subject property from the Agriculture (AG) and Restricted (RC -1) Commercial zoning districts/classifications to the Planned Development (PD) zoning district/classification; and Whereas, the City of Sanford's Planning and Zoning Commission, as the City's local planning agency, held a public hearing on June 6, 2024, to consider amending the Future Land Use Map of the Future Land Use Element of the City of Sanford Comprehensive Plan and recommended approval of the proposed Future Land Use Map amendment to the Comprehensive Plan for the subject property; and Whereas, Section 163.3187, Florida Statutes, relates to the amendment of adopted local government comprehensive plans and sets forth certain requirements relating to small scale amendments, and which are related to proposed small scale development activities and provides, among other things, that such amendments may be approved without regard to statutory limits on the frequency of consideration of amendments to the City of Sanford Comprehensive Plan; and Whereas, the City of Sanford has complied with all requirements and procedures of Florida law in processing this amendment to the City of Sanford Comprehensive Plan including, but not limited to, Section 163.3187, Florida Statutes; and Whereas, the City of Sanford has complied with Florida's Community Planning Act which was amended during the 2021 Legislative Session by the passage of Committee Substitute for Committee Substitute for Committee Substitute for House 21 Bill Number 59 (initially codified as Chapter Number 2021-195, Laws of Florida) to require every city and county within the State "to include in its comprehensive plan a property rights element" (Section 163.3177(6)(i)1, Florida Statutes). Now, therefore, be it enacted by the People of the City of Sanford, Florida: Section 1. Legislative Findings and Intent. (a). The City of Sanford has complied with all requirements and procedures of Florida law in processing and advertising this Ordinance. (b). The City Commission of the City of Sanford adopts the recitals (whereas clauses) of this Ordinance as legislative findings. (c). This Ordinance is internally consistent with the goals, objectives and policies of the Comprehensive Plan of the City of Sanford and the proposed Comprehensive Plan amendment does not trigger any urban indicators and adoption of this amendment will discourage the proliferation of urban sprawl within the City of Sanford. Section 2. Amendment to Future Land Use Map; Incorporation of Maps, Sketches and Legal Descriptions. (a). The Future Land Use Plan Element of the Comprehensive Plan of the City of Sanford and the City's Future Land Use Map is hereby amended by changing the future land use designation from Low -Density Residential -Single -Family (LDRSF) and Neighborhood Commercial to General Commercial (GC) regarding the real property which is the subject of this Ordinance as set forth herein. (b). The property which is the subject of this Comprehensive Plan amendment is assigned Tax Parcel Identification Numbers 13-20-30-300-0160-0000 and 13-20-30- 300-040A-0000 by the Seminole County Property Appraiser. 31;x, 1 1'- (c). Any maps, sketches and legal descriptions attached to this Ordinance are hereby ratified and affirmed and incorporated into this Ordinance as a substantive part of this Ordinance, but the land which is the subject of this Ordinance consists of Tax Parcel Identification Numbers 13-20-30-300-0160-0000 and 13-20-30-300-040A-0000 as assigned by the Seminole County Property Appraiser. Section 3. Implementing Administrative Actions. The City Manager, or designee, is hereby authorized to implement the provisions of this Ordinance as deemed appropriate and warranted. Section 4. Ratification of Prior Actions. The prior actions of the City Commission and its agencies in enacting and causing amendments to the Comprehensive Plan of the City of Sanford, as well as the implementation thereof, are hereby ratified and affirmed. Section 5. Severability. If any section, sentence, phrase, word, or portion of this Ordinance proves to be invalid, unlawful or unconstitutional, it shall not be held to impair the validity or effect of any other action or part of this Ordinance. Section 6. Conflicts. All ordinances or parts of ordinances in conflict herewith are hereby repealed. Section 7. Scrivener's Errors. Typographical errors and other matters of a similar nature that do not affect the intent of this Ordinance, as determined by the City Clerk and City Attorney, may be corrected with the endorsement of the City Manager, or designee, without the need for a public hearing. Section 8. Codification/Instructions to Code Codifier. It is the intention of the City Commission of the City of Sanford, Florida, and it is hereby ordained that the 41 provisions of this Ordinance shall become and be made a part of the codified version of the City of Sanford Comprehensive Plan and/or the Code of Ordinances of the City of Sanford, Florida in terms of amending the Future Land Use Map of the City. Section 9. Effective Date. The small scale Comprehensive Plan amendment set forth herein shall not become effective, in accordance with Section 163.3187(5)(c), Florida Statutes, until 31 days after the enactment of this Ordinance. If challenged within 30 days after enactment, the small-scale amendment set forth in this Ordinance shall not become effective until the State land planning agency or the Administration Commission, respectively, issues a final order determining that the subject small-scale amendment is in compliance with controlling State law; provided, however, that this Ordinance shall not take effect until the annexation ordinance annexing the property that is the subject of this Ordinance is final. Passed and adopted this 12th day of August, 2024. Attest: City Commission of the City of Sanford, Florida / / _ By:1Ohq(1ft1, W, FC��Y :,•B Traci Houchin, MMC, FCRM , :.;;. -Art:odruff City Clerk~Mayor:`'{t Approved as to form and legality: <� y By:, _, a William L. Colbert, Esquire City Attorney �Pp1FORp � u fsT.1811 •' �' Business Impact Estimate This form should be included in agenda packet for the item under which the proposed ordinance is to be considered, and must be posted on the City's website by the time notice of the proposed ordinance is published. Comprehensive Plan Amendment of the Future Land Use Map designation of 6489 N Ronal Reagan Boulevard: The City is of the view that the following exception(s) to the Business Impact Estimate requirement, that are checked off in a box below, apply to the above -referenced proposed ordinance. Although, the City is implementing the procedure required by statutory law to ensure that no inadvertent procedural issue could impact the enactment of the proposed ordinance. ❑ The proposed ordinance is required for compliance with Federal or State law or regulation; ❑ The proposed ordinance relates to the issuance or refinancing of debt; ❑ The proposed ordinance relates to the adoption of budgets or budget amendments, including revenue sources necessary to fund the budget; ❑ The proposed ordinance is required to implement a contract or an agreement, including, but not limited to, any Federal, State, local, or private grant, or other financial assistance accepted by the ❑ The proposed ordinance is an emergency ordinance; ❑ The ordinance relates to procurement; or ❑x The proposed ordinance is enacted to implement the following: a. Part II of Chapter 163, Florida Statutes, relating to growth policy, county and municipal planning, and land development regulation, including zoning, development orders, development agreements and development permits; b. Sections 190.005 and 190.046, Florida Statutes, regarding community development districts; c. Section 553.73, Florida Statutes, relating to the Florida Building Code; or d. Section 633.202, Florida Statutes, relating to the Florida Fire Prevention Code. 11Page In accordance with the provisions of controlling law, even notwithstanding the fact that, an exemption noted above may apply, the City hereby publishes the following information: 1. Summary of the proposed ordinance (must include statement of the public purpose, such as serving the public health, safety, morals, and welfare): The proposed ordinance is intended to incorporate the subject property into the City of Sanford in order to obtain water and sewer for a 79 -unit obtainable housing development. The proposed use is intended to provide obtainable housing which will benefit the public health, safety, morals, and welfare of the city as a whole. 2. Estimate of direct economic impact of the proposed ordinance on private, for-profit businesses in the City: When annexed into the City, the property will be assed the City of Sanford Millage rate and will result in additional Revenue to the City. 3. Estimate of direct compliance costs that businesses may reasonably incur: The applicant will be responsible for all permitting fees. 4. Any new charge or fee imposed by the proposed ordinance: When annexed into the City, the property will be assessed the City of Sanford Millage rate in addition to the County Taxes. 5. Estimate of the City's regulatory costs, including estimated revenues from any new charges or fees to cover such costs: It is impossible to quantify any potential regulatory costs of the proposed development. 6. Good faith estimate of the number of businesses likely to be impacted by the proposed ordinance: It is unknown if any businesses will be impacted by the development of the site. 7. Additional information Not applicable. CITY OF 10111,FST FLORIDA CITY COMMISSION MEMORANDUM 24-209 AUGUST 12, 2024 AGENDA To: PREPARED BY: SUBMITTED BY: SUBJECT: WS_ RM X Item Nol . A 1� Honorable Mayor and Members of the City Commission Eileen Hinson, AICP, Director of Planning Norton N. Bonaparte, Jr., ICMA-CM, City Manager Amend the Future Land Use from Low -Density Residential -Single -Family (LDRSF) and Neighborhood Commercial to General Commercial (GC) on 5.77 acres at project address 6498 North Ronald Reagan Boulevard. STRATEGIC PRIORITIES: ❑ Unify Downtown & the Waterfront ❑ Promote the City's Distinct Culture ❑ Update Regulatory Framework ❑ Redevelop and Revitalize Disadvantaged Communities SYNOPSIS: A request to amend the Future Land Use from Low -Density Residential -Single -Family (LDRSF) and Neighborhood Commercial (NC) to General Commercial (GC) on 5.77 acres at project address 6498 North Ronald Reagan Boulevard has been received. The property owners are Christian Sharing Center Inc. and Dale & Company LLC. The applicant, Daniel Ryan with the Christian Sharing Center is the applicant who completed the Citizens Awareness and Participation Plan CAPP meeting that was held December 12, 2023. A copy of the report is attached, which is satisfactory to the City. The Affidavit of Ownership and Designation of Agent forms are attached, and other information is available to ensure that all potential conflicts of interests are capable of being discerned. FISCAL/STAFFING STATEMENT: The property owner, assessed tax value, total tax bill, and property status for 2024 is shown below: Parcel Number Assessed Value Tax Bill Property Status (2024) (2024) 13-20-30-300-0160- $218,248 $1,064 Vacant Commercial 0000 13-20-30-300-040A- $246,103 $1,200 Single Family 0000 It is the applicant's intent to develop the property into a 79 unit multiple -family community with no commercial activity. The proposed development will facilitate new residential construction, assisting in providing much needed housing to accommodate the City of Sanford growth. Thus, generating additional tax revenue to the City. No additional staffing is anticipated if the land use amendment is approved. BACKGROUND: The two parcels, totaling 5.77 -acres, are located on the west side of Ronald Reagan Boulevard between Bedford Road and Tucker Drive. The properties are currently zoned AG, Agriculture and RC -1, Restricted Commercial with the Future Land Use designations of LDR-SF, Low Density Residential Single -Family and NC, Neighborhood Commercial. The applicant is seeking to amend the Future Land Use designation from Low -Density Residential - Single -Family (LDRSF) and Neighborhood Commercial (NC) to General Commercial (GC) Its important to note that Ronald Reagan Boulevard is classified as a Minor Arterial road and a commercial corridor. The subject property is surrounded by single-family to the west and north, mobile home park to the east, and a vacant property to the south which is under review to be developed as a commercial kennel. Comprehensive Plan Staff has outlined relevant Goals, Objectives, and Policies (GOP's) that support the proposed land use amendment: Objective FLU 1.1: Implement the Future Land Use Map Series. The City shall adopt and implement the Future Use Map (FLUM) series in the Future Land Use Element goals of the Comprehensive Plan. The maximum density and Floor Area Ratio for the General Commercial future land use is as follows: LAND USE DESIGNATIONS MAP SYMBOL DENSITY/INTENSITY (MAXIMUM) General Commercial, Office GC 0.50 FAR Policy FLU 1.3.6: Designate General Commercial Development (GC). The General Commercial (GC) areas are designated on the Future Land Use Map for purposes of accommodating community -oriented retail sales and services; highway -oriented sales and services; and other general commercial activities. The General Commercial designation generally shall be located in highly accessible areas adjacent to major thoroughfares which possess necessary location, site, and market requirements. The maximum intensity of General Commercial development measured as a floor area ratio is 0.50. All new development within General Commercial designated areas shall be required to comply with performance criteria. The General Commercial area is not generally intended to accommodate manufacturing, processing, or assembly of goods, sales and service of heavy commercial vehicle and equipment, or related services or maintenance activities; warehousing; uses requiring extensive outside storage; or other activities which may generate nuisance impacts, including glare, smoke or other air pollutants, noise, vibration or major fire hazards, or other impacts generally associated with more intensive industrial uses. The provision of residential must result in a no net increase in demand for public facilities (not including schools) greater than that which would be required for general commercial uses. The City will coordinate with the School Board regarding residential development within this district as required in the Public -School Facilities Element to ensure the availability of adequate school facilities. It should be noted that if the property were zoned GC -2, the applicant would be allowed multi- family up to 20 dwelling units per acre. The corresponding General Commercial (GC -2) zoning classification allows up to 20 dwelling units per acre. The applicant is proposing 13.7 units per acre. Staff finds the requested Comprehensive Plan Amendment to be consistent with the City of Sanford Comprehensive Plan. LEGAL REVIEW: This matter is not a quasi-judicial matter as amendments to local government comprehensive plans are legislative in nature. If a proposal to amend the City's Comprehensive Plan is to be recommended for denial, it would be appropriate to state the reason for such a recommendation to be considered by the City Commission - such as the proposal is internally inconsistent with a goal, objective or policy of the Comprehensive Plan or inconsistent with controlling State law or the like. When lands are subject to the provisions of the City/County JPA; the City is bound to adhere to the provisions of the JPA. Also, Section 171.062, Florida Statutes, pertaining to the effects of annexations or contractions, anticipates that cities will expeditiously incorporate annexed properties into their comprehensive plans and land development regulations upon being located within the city limits of the annexing municipality. The City Commission approved the first reading of Ordinance No. 2024-4792, with a three to two vote on June 24, 2024. The City Clerk published notice of the 2nd Public Hearing in the Sanford Herald on June 26, 2024. The City Commission continued the 2nd Public Hearing of Ordinance No. 2024-4792 to July 22, 2024, on July 8, 2024. The City Commission continued the 2nd Public Hearing of Ordinance No. 2024-4792 to August 12, 2024, on July 22, 2024. RECOMMENDATION: Staff finds that the small-scale land use amendment is appropriate and suitable for the subject site and is compatible with the surrounding land uses and is consistent with the City of Sanford Comprehensive Plan, Joint Planning Agreement, East Lake Mary Small Area Study, and Chapter 163 of Florida Statutes. At the June 6, 2024, Planning and Zoning Commission meeting per the recommendation of Staff, the Planning and Zoning Commission recommended the City Commission adopt Ordinance No. 2024-4792, to amend the Future Land Use from Low -Density Residential -Single -Family (LDRSF) and Neighborhood Commercial (NC) to General Commercial (GC) on 5.77 acres at project address 6498 North Ronald Boulevard. Additional comments or recommendations may be presented by staff at the meeting. SUGGESTED MOTION: "I move to adopt Ordinance No. 2024-4792." Attachments: Project Information Sheet CPA Map Site Aerial Map Affidavit of Ownership CAPP Report Traffic Impact Analysis School Capacity Letter Ordinance No. 2024-4792 yFORp c�0 FST. 18�� • • WS_ RM X Item Nol . A CITY COMMISSION MEMORANDUM 24209 AUGUST 12, 2024 AGENDA TO: Honorable Mayor and Members of the City Commission PREPARED BY: Eileen Hinson, AICP, Director of Planning SUBMITTED BY: Norton N. Bonaparte, Jr., ICMA-CM, City Manager SUBJECT: Amend the Future Land Use from Low -Density Residential -Single -Family (LDRSF) and Neighborhood Commercial to General Commercial (GC) on 5.77 acres at project address 6498 North Ronald Reagan Boulevard. STRATEGIC PRIORITIES: ❑ Unify Downtown & the Waterfront ❑ Promote the City's Distinct Culture ❑ Update Regulatory Framework ❑ Redevelop and Revitalize Disadvantaged Communities SYNOPSIS: A request to amend the Future Land Use from Low -Density Residential -Single -Family (LDRSF) and Neighborhood Commercial (NC) to General Commercial (GC) on 5.77 acres at project address 6498 North Ronald Reagan Boulevard has been received. The property owners are Christian Sharing Center Inc. and Dale & Company LLC. The applicant, Daniel Ryan with the Christian Sharing Center is the applicant who completed the Citizens Awareness and Participation Plan CAPP meeting that was held December 12, 2023. A copy of the report is attached, which is satisfactory to the City. The Affidavit of Ownership and Designation of Agent forms are attached, and other information is available to ensure that all potential conflicts of interests are capable of being discerned. F'ISCALISTAFFING STATEMENT: The property owner, assessed tax value, total tax bill, and property status for 2024 is shown below: Parcel Number Assessed Value Tax Bill Property Status (2024) (2024) 13-20-30-300-0160- $218,248 $1,064 Vacant Commercial 0000 13-20-30-300-040A- $246,103 $1,200 Single Family 0000 It is the applicant's intent to develop the property into a 79 unit multiple -family community with no commercial activity. The proposed development will facilitate new residential construction, assisting in providing much needed housing to accommodate the City of Sanford growth. Thus, generating additional tax revenue to the City. No additional staffing is anticipated if the land use amendment is approved. BACKGROUND: The two parcels, totaling 5.77 -acres, are located on the west side of Ronald Reagan Boulevard between Bedford Road and Tucker Drive. The properties are currently zoned AG, Agriculture and RC -1, Restricted Commercial with the Future Land Use designations of LDR-SF, Low Density Residential Single -Family and NC, Neighborhood Commercial. The applicant is seeking to amend the Future Land Use designation from Low -Density Residential - Single -Family (LDRSF) and Neighborhood Commercial (NC) to General Commercial (GC) Its important to note that Ronald Reagan Boulevard is classified as a Minor Arterial road and a commercial corridor. The subject property is surrounded by single-family to the west and north, mobile home park to the east, and a vacant property to the south which is under review to be developed as a commercial kennel. Comprehensive Plan Staff has outlined relevant Goals, Objectives, and Policies (GOP's) that support the proposed land use amendment: Objective FLU 1.1: Implement the Future Land Use Map Series. The City shall adopt and implement the Future Use Map (FLUM) series in the Future Land Use Element goals of the Comprehensive Plan. The maximum density and Floor Area Ratio for the General Commercial future land use is as follows: LAND USE DESIGNATIONS MAP SYMBOL DENSITY/INTENSITY (MAXIMUM) General Commercial, Office GC 0.50 FAR Policy FLU 1.3.6: Designate General Commercial Development (GC). The General Commercial (GC) areas are designated on the Future Land Use Map for purposes of accommodating community -oriented retail sales and services; highway -oriented sales and services; and other general commercial activities. The General Commercial designation generally shall be located in highly accessible areas adjacent to major thoroughfares which possess necessary location, site, and market requirements. The maximum intensity of General Commercial development measured as a floor area ratio is 0.50. All new development within General Commercial designated areas shall be required to comply with performance criteria. The General Commercial area is not generally intended to accommodate manufacturing, processing, or assembly of goods, sales and service of heavy commercial vehicle and equipment, or related services or maintenance activities; warehousing; uses requiring extensive outside storage; or other activities which may generate nuisance impacts, including glare, smoke or other air pollutants, noise, vibration or major fire hazards, or other impacts generally associated with more intensive industrial uses. The provision of residential must result in a no net increase in demand for public facilities (not including schools) greater than that which would be required for general commercial uses. The City will coordinate with the School Board regarding residential development within this district as required in the Public -School Facilities Element to ensure the availability of adequate school facilities. It should be noted that if the property were zoned GC -2, the applicant would be allowed multi- family up to 20 dwelling units per acre. The corresponding General Commercial (GC -2) zoning classification allows up to 20 dwelling units per acre. The applicant is proposing 13.7 units per acre. Staff finds the requested Comprehensive Plan Amendment to be consistent with the City of Sanford Comprehensive Plan. LEGAL REVIEW: This matter is not a quasi-judicial matter as amendments to local government comprehensive plans are legislative in nature. If a proposal to amend the City's Comprehensive Plan is to be recommended for denial, it would be appropriate to state the reason for such a recommendation to be considered by the City Commission - such as the proposal is internally inconsistent with a goal, objective or policy of the Comprehensive Plan or inconsistent with controlling State law or the like. When lands are subject to the provisions of the City/County JPA; the City is bound to adhere to the provisions of the JPA. Also, Section 171.062, Florida Statutes, pertaining to the effects of annexations or contractions, anticipates that cities will expeditiously incorporate annexed properties into their comprehensive plans and land development regulations upon being located within the city limits of the annexing municipality. The City Commission approved the first reading of Ordinance No. 2024-4792, with a three to two vote on June 24, 2024. The City Clerk published notice of the 2nd Public Hearing in the Sanford Herald on June 26, 2024. The City Commission continued the 2nd Public Hearing of Ordinance No. 2024-4792 to July 22, 2024, on July 8, 2024. The City Commission continued the 2nd Public Hearing of Ordinance No. 2024-4792 to August 12, 2024, on July 22, 2024. RECOMMENDATION: Staff finds that the small-scale land use amendment is appropriate and suitable for the subject site and is compatible with the surrounding land uses and is consistent with the City of Sanford Comprehensive Plan, Joint Planning Agreement, East Lake Mary Small Area Study, and Chapter 163 of Florida Statutes. At the June 6, 2024, Planning and Zoning Commission meeting per the recommendation of Staff, the Planning and Zoning Commission recommended the City Commission adopt Ordinance No. 2024-4792, to amend the Future Land Use from Low -Density Residential -Single -Family (LDRSF) and Neighborhood Commercial (NC) to General Commercial (GC) on 5.77 acres at project address 6498 North Ronald Boulevard. Additional comments or recommendations may be presented by staff at the meeting. SUGGESTED MOTION: "I move to adopt Ordinance No. 2024-4792." Attachments: Project Information Sheet CPA Map Site Aerial Map Affidavit of Ownership CAPP Report Traffic Impact Analysis School Capacity Letter Ordinance No. 2024-4792 PROJECT INFORMATION -- 6498 NORTH RONALD BOULEVARD COMPREHENSIVE PLAN AMENDMENT Requested Action: Proposed Use: Project Address: Current County Zoning: Existing Land Use: Tax Parcel Numbers: Site Area: Amend the future land use from Low -Density Residential -Single -Family (LDRSF) and Neighborhood Commercial to General Commercial (GC) on 5.77 acres at project address 6498 North Ronald Boulevard. Multi -family 6498 North Ronald Boulevard AG, Agriculture and RC -1, Restricted Commercial Vacant Commercial, Single Family 13-20-30-300-0160-0000 & 13-20-30-300-040A-0000 5.77 acres Property Owners: Christian Sharing Center Inc. 600 North Highway 17-92, Suite 130 Longwood, FL 32750 Dale & Company LLC 1080 Crystal Bowl Circle Casselberry, FL 32707 Applicant/Agent: Daniel Ryan Christian Sharing Center Inc. 600 North Highway 17-92, Suite 130 Longwood, FL 32750 Phone: (407) 496-6406 Email: danxyan@thesharingcenter.org CAPP Meeting: A CAPP (Citizens Awareness and Participation Plan) meeting was held on December 12, 2023. COMPREHENSIVE PLAN COMPLIANCE REVIEW Planning staff has reviewed the request and has determined the use and proposed improvements to be consistent with the Goals, Objectives and Policies of the Comprehensive Plan. Current Future Land Use: Low -Density Residential -Single -Family (LDRSF) and Neighborhood Commercial (NC) Proposed Future Land Use: City of Sanford General Commercial (GC) V. t: 50 EXETT+ER COURT I Ir e. ' �y '~.a / yy,,,,.. ��'.I9L..t1'; E � i_ �y •��" 1M���. 1-�. � }' 'S = gp;IpppCIRCIFCOURT �`�� 31 LUI ' Rn MIT DOWNING STREET Lie., ��ug i'" , +.�;' ✓ � it a �+ e. �F.yp� pRNE § Pet ` ;fa.e', r`' ew a WndN 16 SITE.w WLh'6� may4:.r �y % Ale 0. 1 m MON OEsHARBOR+PLA�,CE. n. J AA f � , Z xx h } -t i. .,v. „ y°`+ • 93 tib RIDGE PLACE ;moi }{°C �� • CANARY LAKE COURTS Site s,, !�Y 6498 North Ronald Reagan Boulevard; '� ' ' ? j 13-20-30-300-040A-0000 & �' � - b s 1w. F ��y r , .. SWE:S CREST 13-20-30-300-0160-0000 ;��*�TUCKERtANE �r Asia Five Points Village Community Meeting 12/12/2023 • Traffic o Why can't there be a traffic light put in to help alleviate traffic issues? o Traffic is already bumper to bumper. o There have been accidents in this area due to the amount of traffic and the blind curve. o People are already using Tucker Road as a cut through, and the apartments will add more cars. ■ Will construction add to that traffic with the crews using Tucker to get around traffic also? o Will there be a turn lane into the complex or will people have to pass it and then do a U- turn. o There is already a lot of noise from the cars from Ronald Reagan and 17-92 and this complex will just add more noise. • Trees/Wildlife o What will happen to the power lines already in the easement between houses and the vacant land? ■ There is already power and spectrum issues whenever there are storms. ■ Will the apartments use the current power grid? • Can the power grid be updated to accommodate the new apartments? o What will happen to the Gopher turtles that currently live on the property as they are a protected species? o How much of the tree line will have to be cut to build the town house apartments? ■ Will there be permits pulled to cut down the trees? ■ Oxygen comes from the trees and there is concern with so many trees being taken down. o What will happen to the animals and rodents that currently live in the woods? ■ Who will pay for the pest control for the rats and snakes that will relocate to the current homes when the land gets cleared? ■ There are kids and animals that live in the neighborhood and what happens if they get bit? o Will the land clearing cause flooding for the current residents? o Can we keep some of the trees to use as a buffer between the wall and the houses? • Wall o How high will the wall be around the apartments? ■ Is 6 foot the maximum/minimum the wall can be or can it be higher as kids can scale over a 6 foot wall pretty easily. o How close to the current property lines will the wall be built? o Can the wall be built first? • Meeting o Who gets the mail notices for these type meetings? o The timeframe for today's meeting was not good for people to be able to attend after work. o No one from the mobile home park got the letter. o When is the next meeting and who can they contact at the City of Sanford to complain about this development? ■ They have already talked to the County Commissioners about the single-family homes being built and they feel like they were not heard, especially by Commissioner Zembower. • It seemed like it was just lip service and went in one ear and out the other as the County Commissioners already had their minds made up before the meeting started. • Crime/Security o Will there be security on site? o Will the lights from the apartments shine into the backyards of the current houses? o How high up will the apartments be as there is concern about people being able to see into the windows and showers of the homes. o Drugs are already an issue in the area and these apartments will bring more drugs and crime to the area. ■ There have been drug deals that have gone on in front of the church. o The homes are going to be devalued due to the increased crime and drugs. o What will stop these apartments from turning into slums like the ones off Sunland? ■ Those apartments started out looking nice but after 6 months turned into high areas of drugs and crime. ■ Those residents throw trash into the yards of the homeowners and have torn down the wall that was built. ■ We moved to this area to get away from apartments like that one and now you are building a second one. ■ What will stop the new apartments from being just as bad as those? o There are already people who are coming into the backyards so this will bring more unwanted attention to the area. o Will all these units be section 8 housing as that will bring in even more drugs and crime to the area? • Additional o When will construction begin? ■ With the construction of the single-family homes starting next year will both builds be going on at the same time or will they be back-to-back so there is nonstop stop construction for the next few years? o Will there be multiple families allowed to rent one of the units? o Will the current sewer and water be shared with the apartments? 4,M,SXKF0RD AFFIDAVIT OF OWNERSHIP AND DESIGNATION OF AGENT � , FLORIDA w .sanfordfl.gov Please use additional sheets as needed. If any additional sheets are attached to this document, please sign here and note below: I. Ownership 1 Nina Yon , hereby attest to ownership of the property described below: Tax Parcel Number(s): 13-20-30-300-040A-0000 Address of Property: CR 427, Sanford, FL 32773 for which this rezoning and land use change application is submitted to the City of Sanford. II. Designation of Applicant's Agent (leave blank if not applicable) As the owner/applicant of the above designated property for which this affidavit is submitted, I designate the below named individual as my agent in all matters pertaining to the application process. In authorizing the agent named below to represent me, or my company, I attest that the application is made in good faith and that all information contained in the application is accurate and complete to the best of my personal knowledge. Applicant's Agent (Print): Daniel Ryan Signature: Agent Address: 600 N. Hwy 17-92, suite 130, Longwood, FL 32750 Email: dan.ryan@thesharingcenter.org Phone: 407-496-6406 Fax: 111. Notice to Owner A. All changes in Ownership and/or Applicant's Agent prior to final action of the City shall require a new affidavit. If ownership changes, the new owner assumes all obligations related to the filing application process. B. If the Owner intends for the authority of the Applicant's Agent to be limited in any manner, please indicate the limitations(s) below. (i.e.: limited to obtaining a certificate of concurrency; limited to obtaining a land use compliance certificate, etc.) The owner of the real property associated with this application or procurement activity is a (check one) ❑ Individual ❑ Corporation ❑ Land Trust ❑ Partnership ❑ Limited Liability Company e Other (describe): 501 C3 Not for profit 1. List all natural persons who have an ownership interest in the property, which is the subject matter of this petition, by name and address. 2. For each corporation, list the name, address, and title of each officer; the name and address of each director of the corporation; and the name and address of each shareholder who owns two percent (2%) or more of the stock of the corporation. Shareholders need not be disclosed if a corporation's stock are traded publicly on any national stock exchange. 3. In the case of a trust, list the name and address of each trustee and the name and address of the beneficiaries of the trust and the percentage of interest of each beneficiary. If any trustee or beneficiary of a trust is a corporation, please provide the information required in paragraph 2 above. Name of Trust: 4. For partnerships, including limited partnerships, list the name and address of each principal in the partnership, including general or limited partners. If any partner is a corporation, please provide the information required in paragraph 2 above. For each limited liability company, list the name, address, and title of each manager or managing member; and the name and address of each additional member with two percent (2%) or more membership interest. If any member with two percent (2%) or more membership interest, manager, or managing member is a corporation, trust or partnership, please provide the information required in paragraphs 2, 3 and/or 4 above. Name of LLC: 6. In the circumstances of a contract for purchase, list the name and address of each contract purchaser. If the purchaser is a corporation, trust, partnership, or LLC, provide the information required for those entities in paragraphs 2, 3, 4 and/or 5 above. Name of Purchaser: Date of Contract: NAME TITLE/OFFICE/TRUSTEE OR BENEFICIARY ADDRESS % OF INTEREST Nina Yon President & CEO 600 N. Hwy 17-92, suite 130. Longwood FL 32750 0 Gail Bittman Board Chair 600 N. Hwy 17-92, suite 130. Longwood FL 32750 0 Steve Reed Past Chair 600 N. Hwy 17-92, suite 130. Longwood FL 32750 0 Ron Davoli Vice -Chair External 600 N. Hwy 17-92, suite 130. Longwood FL 32750 0 Michelle Smith Vice -Chair Internal 600 N. Hwy 17-92, suite 130. Longwood FL 32750 0 Michael Heald Treasurer 600 N. Hwy 17-92, suite 130. Longwood FL 32750 0 Mary Sherris Secretary 600 N. Hwy 17-92, suite 130. Longwood FL 32750 0 (Use additional sheets for more space.) 7. As to any type of owner referred to above, a change of ownership occurring subsequent to the execution of this document, shall be disclosed in writing to the City prior to any action being taken by the City as to the matter relative to which this document pertains. 8. 1 affirm that the above representations are true and are based upon my personal knowledge and belief after all reasonable inquiry. I understand that any failure to make mandated disclosures is grounds for the subject rezone, future land use amendment, special exception, or variance involved with this Application to become void or for the submission for a procurement activity to be non- responsive. I certify that I am legally authorized to execute this Affidavit and to bind the Applicant or Vendor to the disclosures herein. 4/3/2023 Date STATE OF FLORIDA COUNTY OF Seminole Sworn to (or affirmed) and subscribed before me by Nina Yon on this 4th day of April 2023 Signature of Notary Public /P) Personally Known X OR Produced Identification Type of Identification Produced Affidavit of Ownership - January 2015 Owner, Agent, Applicant Signature Print, Type or Stamp Name of Notary Public vtirrnnrvw�.:rvt;;.,ry w, �vi:.T+-:� MICI{Y L. MYRICI{ %1Y COMMSSION P HH 19097Q ?°Fn�a EXPIRES: December 10, 2025 . CITY OF I SANFORD AFFIDAVIT OF OWNERSHIP AND DESIGNATION OF AGENT f 10410A v .sanfordfl.gov Please use additional sheets as needed. If any additional sheets are attached to this document, please sign here and note below: I. Ownership 1 Dale & Company LLC hereby attest to ownership of the property described below: Tax Parcel Number(s): 13-20-30-300-0160-000 Address of Property: 6498 N. Ronald Reagan Blvd, Sanford, FL 32773 for which this rezoning and land use change application is submitted to the City of Sanford. II. Designation of Applicant's Agent (leave blank if not applicable) As the owner/applicant of the above designated property for which this affidavit is submitted, I designate the below named iridividual as my agent in all matters pertaining to the application process. In authorizing the agent named below to represent me, or my company, I attest that the application is made in good faith and that all information contained in the application is accurate and complete to the best of my personal knowledge. Applicant's Agent (Print): Daniel Ryan Signature: 1\. Agent Address: 600 N. Hwy 17-92, suite 130, Longwood, FL 32750 Email: dan.ryan@thesharingcenter.org Phone: 407-496-6406 Fax: III. Notice to Owner A. All changes in Ownership and/or Applicant's Agent prior to final action of the City shall require a new affidavit. If ownership changes, the new owner assumes all obligations related to the filing application process. B. If the Owner intends for the authority of the Applicant's Agent to be limited in any manner, please indicate the limitations(s) below. (i.e.: limited to obtaining a certificate of concurrency; limited to obtaining a land use compliance certificate, etc.) The owner of the real property associated with this application or procurement activity is a (check one) o Individual o Corporation o Land Trust o Partnership rx"Limited Liability Company o Other (describe): I. List all natural persons who have an ownership interest in the property, which is the subject matter of this petition, by name and address. 2. For each corporation, list the name, address, and title of each officer; the name and address of each director of the corporation; and the name and address of each shareholder who owns two percent (2%) or more of the stock of the corporation. Shareholders need not be disclosed if a corporation's stock are traded publicly on any national stock exchange. 3. In the case of a trust, list the name and address of each trustee and the name and address of the beneficiaries of the trust and the percentage of interest of each beneficiary. If any trustee or beneficiary of a trust is a corporation, please provide the information required in paragraph 2 above. Name of Trust: 4. For partnerships, including limited partnerships, list the name and address of each principal in the partnership, including general or limited partners. If any partner is a corporation, please provide the information required in paragraph 2 above. 5. For each limited liability company, list the name, address, and title of each manager or managing member; and the name and address of each additional member with two percent (2%) or more membership interest. If any member with two percent (2%) or more membership interest, manager, or managing member is a corporation, trust or partnership, please provide the information required in paragraphs 2, 3 and/or 4 above. Name of LLC: Dale & Company LLC 6. In the circumstances of a _contract for purchase, list the name and address of each contract purchaser. If the purchaser is a corporation, trust, partnership, or LLC, provide the information required for those entities in paragraphs 2, 3, 4 and/or 5 above. Name of Purchaser: The Christian Sharing Center Date of Contract: 12-28-2022 NAME TITLE/OFFICEITRUSTEE ADDRESS % OF OR BENEFICIARY INTEREST M E20A 1080 �t (Use additional sheets for more space.) 7. As to any type of owner referred to above, a change of ownership occurring subsequent to the execution of this document, shall be disclosed in writing to the City prior to any action being taken by the City as to the matter relative to which this document pertains. 8. 1 affirm that the above representations are true and are based upon my personal knowledge and belief after all reasonable inquiry. I understand that any failure to make mandated disclosures is grounds for the subject rezone, future land use amendment, special exception, or variance involved with this Application to become void or for the submission for a procurement activity to be non- responsive. I certify that I am legally authorized to execute this Affidavit and to bind the Applicant or Vendor to the disclosures herein. v3/ate ate Owner, Agent, Applicant Signature H&914 Igor 1i ccvnpa,y i, c , STATE OF FLORIDA A' COUNTY OF 5<- qL(( tv 0 �— Sworn to (or affirmed) and subscribed before me byPikk A•(Akeda,A on this 3 day of t-PdZ I L_, 20 (j . SignaQtureo XW C'�� Personally Known OR Produced Identification Type of Identification Produced Affidavit of Ownership - January 2015 Print, Type or Stamp Name of Notary Public DEBORAH L, BAUER t' NOTARY FAX •:T"E C,' "LCRIOA COY -MISSION' Z'435151 �h�' �� N!y Cammsscn � •e. �it�5/i024 C I VIL ENGINEERS CENTRAL FLORIDA ENGINEERING CONSULTANTS, LLC INFRASTRUCTURE CONSULTANTS Bridging Communities: Proposal for Affordable Workforce Housing The Sharing Commons at 5 Points We seek to address the need for additional workforce housing with this Land Use Change Request from Neighborhood Commercial (pid 040A) and Agriculture (pid 0160) to General Commercial. We are seeking this change to a compatible Land Use, in order to allow for the Sharing Center's 79 -unit apartment complex, aiming to help fill the gap in more affordable options amidst rising market rates. Like other communities, Sanford, a city of history and progress, faces a challenge of affordability. At the heart of this proposal is the essence of community. It recognizes that affordable housing is not just about brick and mortar; it is about creating spaces where Lives intertwine, where dreams find fertile ground to grow. This proposed 79 -unit apartment complex is more than just structures — it is a promise to bridge the gap, to bring together diverse backgrounds and aspirations under one roof. The Sharing Commons at Five Points symbolizes hope, bridging divides and offering stability and dignity to those who keep Sanford thriving. It's not just a Land Use change; it's a commitment to change lives. It's about recognizing that the true wealth of a city lies not just in its buildings but in the strength of its community. Let this proposed 79 -unit apartment complex stand as a testament to Sanford's unwavering spirit, its resilience, and its commitment to building a future where all can thrive. 1111 N. RONALD REAGAN BOULEVARD SUITE 101 • LONGWOOD, FLORIDA 32750 PHONE (407) 599-7010 MAIL @FLORIDAENG.COM P W N 11-' O l0 00 W (`ry (D ll//"\ Co, Q 1 o iv j� i � fin' � •'��\ I��\ C I� - I V ID w Lon r rh j � \ N 10 t i ' v i (D m n Z Q) c a cl 1 uj CCC III v G CL CL J Five Points Village City of Sanford, Florida TRAFFIC IMPACT STUDY Prepared for: The Sharing Center 600 N YUS Highway 17-92, Suite 130 Longwood, FL 32750 Prepared by: PTG Premier Traffic Group PremierTrafficGroup@gmail.com 350 E Crown Point Road, Suite 1100 Winter Garden, FL 34787 April 2024 EXECUTIVE SUMMARY This traffic analysis is being conducted to assess the impact of the proposed Five Points Village 79 townhome development located north of CR 427/N Ronald Reagan Boulevard approximately 200 feet southwest of Carriage Cove Way/Bedford Road in the City of Sanford, Florida. The analysis included a determination of project trip generation, a review of existing and projected roadway and intersection capacity and a review of access operations. The results of the traffic analysis are summarized as follows: • The proposed development will generate a total of 581 daily trips of which 47 and 55 will occur during the AM and PM peak hour, respectively. • Access to the site will be provided via a right-in/right-out access driveway connection onto CR 427/N Ronald Reagan Boulevard. • An analysis of the study roadway segments indicates that the study roadway segments currently operate adequately within their adopted Level of Service standard and are projected to continue to do so upon buildout of the proposed development. • An analysis of the study intersections indicates that the study intersections currently operate adequately within their adopted Level of Service standard and are projected to continue to do so upon buildout of the proposed development. • The existing southbound left turn lane at the CR 427 and Meeting Place intersection and the exiting northbound left turn storage lane length at the CR 427 and Bedford Road intersection were analyzed to be adequate in length to accommodate the proposed development. Based on the analyses conducted, approval of the proposed project is requested from a transportation perspective since the project does not adversely impact any of the study roadway segments or intersections. PROFESSIONAL ENGINEERING CERTIFICATION I hereby certify that I am a Professional Engineer properly registered in the State of Florida practicing with Premier Traffic Group a dba of Karma Consultancy, LLC. and that I have supervised the preparation and approve the evaluation, findings, opinions, conclusions, and technical advice hereby reported for: PROJECT: Five Points Village LOCATION: City of Sanford, Florida I acknowledge that the procedures and references used to develop the results contained in these computations are standard to the professional practice of Transportation Engineering as applied through professional judgment and experience. NAME: Vasu T.`PqryJ, P.E. #: Flori4A N9. 7 JJ'j�P. DATE: A �itTl f..:�'�� 5�• e� .790 ylr SIGNATURE. ` C,' fiC ORO- IIltl��� TABLE OF CONTENTS 1.0 INTRODUCTION...............................................................................................................1 1.1 Data and Methodology................................................................................................................................1 1.2 Study Area.........................................................................................................................................................2 1.3 Planned and Programmed Improvements............................................................................................2 2.0 EXISTING TRAFFIC CONDITIONS.................................................................................... 3 2.1 Roadway Segment Analysis........................................................................................................................3 2.2 Intersection Capacity Analysis...................................................................................................................3 3.0 TRIP GENERATION........................................................................................................... 5 3.1 Trip Generation...............................................................................................................................................5 3.2 Trip Distribution/Assignment....................................................................................................................5 4.0 PROJECTED TRAFFIC CONDITIONS................................................................................ 7 4.1 Background Traffic Projection...................................................................................................................7 4.2 Roadway Segment Analysis........................................................................................................................7 4.3 Intersection Capacity Analysis...................................................................................................................8 4.4 Turn Lane Analysis.........................................................................................................................................9 5.0 STUDY CONCLUSIONS...................................................................................................11 Appendix A: Preliminary Concept Plan Appendix B: Methodology Coordination Appendix C: Seminole County CMS Appendix D: Traffic Volumes Appendix E: Existing Intersection Analysis Output Appendix F: Historical Trends Analysis Appendix G: Projected Intersection Analysis Output Appendix H: Turn Lane Analysis I LIST OF TABLES Table 1: Existing Roadway Segment Capacity Analysis.......... Table 2: Existing Intersection Capacity Analysis ........................ Table 3: Trip Generation..................................................................... Table 4: Projected Roadway Segment Capacity Analysis...... Table 5: Projected Intersection Capacity Analysis .................... Figure 1: Project Location Map.......... Figure 2: Trip Distribution Map.......... ............................................................................................... 3 ............................................................................................... 4 ............................................................................................... 5 ............................................................................................... 8 9 LIST OF FIGURES 11 ..........................................1 .......................................... 6 1.0 INTRODUCTION The proposed Five Points Village 79 townhome development is located north of CR 427/N Ronald Reagan Boulevard approximately 200 feet southwest of Carriage Cove Way/Bedford Road in the City of Sanford, Florida. Figure 1 depicts the site location and the surrounding transportation network. Access to the site will be provided via a right-in/right-out access driveway connection onto CR 427/N Ronald Reagan Boulevard. A preliminary concept plan is included in Appendix A. 1.1 Data and Methodology Data used in the analysis consisted of site plan/development information provided by the Project Engineers, AM and PM peak hour intersection traffic counts obtained by PTG and roadway segment traffic volumes obtained from Seminole County and the Florida Department of Transportation (FDOT). The analysis was conducted in accordance with the Traffic Impact Analysis (TIA) Methodology Memorandum prepared for the project. A copy of the methodology coordination is provided in Appendix B. i I If e'wy Blvd Esporta Fonesjo Y/4k04 -v. f�y.v ovy oNd f ei'eb i f f 9w. -AM Ui.e M, ftp � k Flo WE Dg i� w4 e4 � t✓tmr�; o , �� wrm v <• 1 -mile ---____— ,,.,C. Semmole Countyn �•r. Records Center ``�*•'• %%% a ElokeNWy�Nd E , •C� Figure 1: Project Location Map Traffic Impact Analysis Five Points Village 1 April 2024 i M. 1r,N •• Figure 1: Project Location Map Traffic Impact Analysis Five Points Village 1 April 2024 1.2 Study Area The study facilities to be considered in the analysis are listed below. The study area was derived by identifying the roadway segments within a 1 -mile radius and major intersections within a 1/4 - mile radius as discussed in the Seminole County Traffic Impact Guidelines dated 05/07/2023. Study Segments • 059: CR 427 from Sanford Avenue to Sunland Drive • 060: CR 427 from Sunland Drive to County Home Road • 337: CR 427 from Keyes Court to E Lake Mary Boulevard • 150: Lake Mary Boulevard from Country Club to US 17-92 • 150b: E Lake Mary Boulevard from US 17-92 to SR 417 Ramps • 152: E Lake Mary Boulevard from CR 427 to Marquette Avenue • 151 a: E Lake Mary Boulevard from SR 417 Ramps to CR 427 • 62a: CR 427 from Silkwood Court to US 17-92 • 344: US 17-92 from CR 427 to Lake Mary Boulevard • 345: US 17-92 from Lake Mary Boulevard to Airport Boulevard Study Intersections • CR 427/N Ronald Reagan Boulevard and Carriage Cove Way/Bedford Road • CR 427/N Ronald Reagan Boulevard and Meeting Place • CR 427/N Ronald Reagan Boulevard and Project Access 1.3 Planned and Programmed Improvements Based on discussions and review of data documented by FDOT, Seminole County and MetoPlan Orlando, there are no pertinent roadway capacity improvements that were planned and programmed within three (3) years of the project buildout. Traffic Impact Analysis Five Points Village 2 April 2024 2.0 EXISTING TRAFFIC CONDITIONS Existing conditions in the vicinity of the site were analyzed to establish a baseline for the traffic conditions prevailing in the vicinity of the proposed development. The analysis included a review of the existing roadway segment capacities and an analysis of the intersection operations at the study intersections. 2.1 Roadway Segment Analysis Table 1 summarizes the existing roadway segment capacity analysis for study segment. The existing roadway segment conditions were analyzed by comparing the existing traffic volumes observed on the study roadway segments to the service volumes at the adopted Level of Service (LOS) standard for the roadway segments. The LOS data was obtained from the latest Seminole County Transportation Management System Spreadsheet, excerpts of which are included in Appendix C. Table 1: Existing Roadway Segment Capacity Analysis Seg ID Roadway Segment Location Lanes PH Dir Capacity Existing Vol Comm Trips Total Vol LOS Stnd Met? 59 CR 427 Sanford Ave to Sunland Dr 4D 42,560 24,403 126 24,529 Yes 60 CR 427 Sunland Or to County Home Rd 4D 42,560 26,024 1109 27,133 Yes 377 CR 427 Keyes Court to E Lake Mary Blvd 4D 42,560 29,531 306 29,837 Yes 150 Lake Mary Blvd Country Club to US 17-92 4D 42,560 21,311 2273 23,584 Yes 150b E Lake Mary Blvd US 17-92 to SR 417 Ramps 4D 42,560 20,902 4923 25,825 Yes 152 E Lake Mary Blvd CR 427 to Marquette Ave 4D 42,560 21,311 2273 23,584 Yes 151a E Lake MaryBlvd SR 417 Ramps to CR 427 4D 42,560 20,005 9335 29,340 Yes 62a CR 427 Silkwood Ct to US 17-92 4D 42,560 14,889 0 14,889 Yes 344 US 17-92 CR 427 to Lake Mary Blvd 4D 48,000 22,744 466 23,210 Yes 345 US 17-92 Lake Mary Blvd to Airport Blvd 4D 48,000 22,744 0 22,744 Yes The analysis indicates that the study roadway segments currently operate adequately within their adopted Level of Service (LOS) standard. 2.2 Intersection Capacity Analysis Table 2 summarizes the results of the existing intersection capacity analysis. The existing intersection capacity analysis was conducted for the AM and PM peak hour using the Synchro Traffic Impact Analysis Five Points Village 3 April 2024 software and the methods of the Highway Capacity Manual (HCM). The turning movement count data and the existing AM and PM peak hour Turning Movement Volumes are the are included in Appendix D. It should be noted that the raw turning movement counts were not adjusted to peak season volumes using a seasonal adjustment factor obtained from the FDOT Traffic Online website as the traffic conducted were conducted during the peak season. Table 2: Existing Intersection Capacity Analysis Intersection Control Time EB WB NB SB Period Delay LOS Delay LOS Delay LOS Delay LOS CR 427 & Bedford Rd Stop AM 38.9 E 50.6 F 0.1 A 0.2 A PM 1 45.4 E 106.8 F 0.2 A 1.0 A CR 427 & Meeting PI Stop AM -- -- 28.4 D 0.0 A 0.0 A PM -- -- 35.4 E 0.0 A 0.1 A The analysis indicates that the study intersections operate adequately during the AM and PM peak hour period. It should be noted that minor street approaches of the CR 427 and Bedford Road intersection experiences Level of Service F conditions which is a function of the stop - controlled side street approaches to the CR 427 mainline. The detailed Synchro worksheets are included in Appendix E. Traffic Impact Analysis Five Points Village 4 April 2024 3. 0 TRIP GENERATION To determine the impact of this development, an analysis of its trip generation characteristics was conducted. This included a determination of the trips to be generated as well as their distribution and assignment to the surrounding roadways. The estimated project buildout is 2026. 3.1 Trip Generation Table 3 summarizes the trip generation analysis conducted using information published by the Institute of Transportation Engineers (ITE) in the Trip Generation Manual, 11th Edition. The calculation indicated that the proposed development would generate a total of 581 daily trips of which 47 and 55 will occur during the AM and PM peak hour, respectively. The ITE Trip Generation graphs are included as part of the Methodology Memorandum in Appendix B. Table 3: Trip Generation ITE Code Land Use Size Daily AM Peak Hour PM Peak Hour Rate Trips Rate Enter Exit Total Rate Enter Exit Total 220 Multi -Family (Low -Rise) 79 DUs 7.36 581 0.6 1 11 1 36 47 0.69 35 20 1 55 Note: ITE Trip generation equation used as the R -squared value is greater than 0.7 3.2 Trip Distribution/Assignment The trip distribution pattern was derived using historically available traffic counts, knowledge of the travel pattern in the area and engineering/planning judgement. Figure 2 provides the trip distribution developed for this project. Using this trip distribution pattern, project trips were assigned to the surrounding study roadway network. Traffic Impact Analysis Five Points Village 5 April 2024 � .rrrr +� �•v IIIA' �,tT'�`� • `��,` i '. fro ' SR,,. emieconole CanCounlyter. „ Nrk R h*°Y,yY Glvd;` E take M E lak Fes° ♦ a» Esporta t••i1neIi ® W Lx/:f �lpY.a Y.,Ary 6iVA v.`j ♦♦ 1 Lry�yv � SITI a c j t � S A /�,Y ♦ ^x e►��9 Shsle�c yx,i,, i P � ♦ > lilfanr In 0'•l .4n!xm a % siA � t Spring 'ricadNs Seveiiiy Adventist♦ Q`i(S ♦,, III iryN i n j Figure 2: Trip Distribution Map Traffic Impact Analysis Five Points Village 6 April 2024 4.0 PROJECTED TRAFFIC CONDITIONS An analysis of projected conditions was conducted to determine the proposed development's impact on the roadway segment capacities and to evaluate the operations of the study intersections. The project buildout year for the analysis is 2026. 4.1 Background Traffic Projection Projected traffic volumes consist of background traffic combined with site generated traffic. Typically, background traffic volumes are determined by expanding existing peak hour traffic volumes to the buildout year using an annual growth rate. A historical trend analysis was conducted based on the Annual Average Daily Traffic (AADT) data obtained from the MOT Traffic Online website in the vicinity of the project (see Appendix F). The trend analysis indicated negligible growth, therefore a nominal annual growth rate of 2% was utilized for the analysis. This growth rate was applied to the existing traffic volumes as appropriate in order to determine the projected background volumes in the project buildout year. 4.2 Roadway Segment Analysis Table 4 summarizes the results of the projected study roadway segment capacity analysis. The Projected roadway segment conditions were analyzed by comparing the projected traffic volumes on the study segments to their respective service volumes at the adopted Level of Service (LOS) standard. The total projected traffic volume is composed of background traffic and project trips. Projected background traffic was estimated using the annual growth rate discussed in the previous section. Traffic Impact Analysis Five Points Village 7 April 2024 Table 4: Projected Roadway Segment Capacity Analysis Seg ID Roadway Segment Location Lanes PH Dir Capacity Trip Dist project Vol Total Vol LOS Stnd Met? 59 CR 427 Sanford Ave to Sunland Dr 4D 42,560 60% 349 26,216 Yes 60 CR 427 Sunland Dr to County Home Rd 4D 42,560 40% 232 27,817 Yes 377 CR 427 Keyes Court to E Lake Mary Blvd 4D 42,560 30% 174 31,477 Yes 150 Lake Mary Blvd Country Club to US 17-92 4D 42,560 15% 87 22,677 Yes 150b E Lake Mary Blvd US 17-92 to SR 417 Ramps 4D 42,560 20% 116 22,272 Yes 152 E Lake Mary Blvd CR 427 to Marquette Ave 4D 42,560 5% 29 22,619 Yes 151a E Lake Mary Blvd SR 417 Ramps to CR 427 4D 42,560 15% 87 21,292 Yes 62a CR 427 Silkwood Ct to US 17-92 4D 42,560 20% 116 15,898 Yes 344 US 17-92 CR 427 to Lake Mary Blvd 4D 48,000 60% 349 24,458 Yes 345 US 17-92 Lake Mary Blvd to Airport Blvd 4D 48,000 15% 87 24,196 Yes wore: iorai vol = zuz4 rxtsrmg vol x II+(z%x j years),/ + Protect vol The analysis indicates that the study roadway segments currently operate adequately within their adopted Level of Service (LOS). 4.3 Intersection Capacity Analysis Table 5 summarizes the results of the projected intersection capacity analysis. The projected intersection capacity and operational analysis was conducted using the Synchro software and the methods of the Highway Capacity Manual (HCM) and was performed for the AM and PM peak hours. The projected volumes for the intersection capacity and operations analysis were calculated as previously discussed. Projected background traffic was estimated using the annual growth rate as previously discussed. The projected peak hour volumes are also provided Appendix D. Traffic Impact Analysis Five Points Village 8 April 2024 Table 5: Projected Intersection Capacity Analysis Intersection Control Time EB WB NB SB Period Delay LOS Delay LOS Delay LOS Delay LOS CR 427 & Bedford Rd Stop AM 45.0 E 71.0 F 0.1 A 0.2 A PM 59.4 F 162.8 F 0.3 A 1.0 A CR 427 & Meeting PI Stop AM -- -- 36.7 E 0.0 A 0.2 A PM -- -- 42.1 E 0.0 A 0.3 A CR 427 & Project Access Stop AM 15.7 C -- - 0.0 A 0.0 A PM 11.9 B -- -- 0.0 A 0.0 A The analysis indicates that the study intersections are projected to continue to operate adequately during both the AM and PM peak hour period. The CR 427 and Bedfrod Road minor street approaches will continue to operate at Level of Service F conditions. The Synchro analysis worksheets are included in Appendix G. 4.4 Turn Lane Analysis CR 427 and Meeting Place Intersection A review was conducted to assess the adequacy of the existing exclusive southbound left turn storage lane length at the CR 427 and Meeting Place intersection. The review was conducted to ensure that sufficient storage is available to serve the projected traffic volumes. Total Turn Lane Length Required = Vehicular Deceleration Distance + Queue Storage Deceleration @ 45 mph = 185' (incl. 50' taper), per FDOT Design Standards, (see Appendix H) Queue = 95th percentile queue from Synchro = 0.1 vehicles, use 2 vehicles for queue = 50' Total Turn Lane Length Required = 185' + 50' = 235' (incl. 50' taper) Existing turn lane length = 300' (incl. 50' taper) In summary, based on this analysis the existing exclusive southbound left turn storage lane length at the CR 427 and Meeting Place intersection is adequate in length to accommodate the proposed development. CR 427 and Bedford Road Intersection A review was conducted to assess the adequacy of the existing exclusive northbound left turn storage lane length at the CR 427 and Bedford Road intersection. The review was conducted to ensure that sufficient storage is available to serve the projected traffic volumes. Total Turn Lane Length Required = Vehicular Deceleration Distance + Queue Storage Traffic Impact Analysis Five Points Village 9 April 2024 Deceleration @ 45 mph = 185' (incl. 50' taper), per FDOT Design Standards, , (see Appendix H) Queue = 95th percentile queue from Synchro = 0.2 vehicles, use 2 vehicles for queue = 50' Total Turn Lane Length Required = 185' + 50' = 235' (incl. 50' taper) Existing turn lane length = 340' (incl. 50' taper) In summary, based on this analysis the existing exclusive northbound left turn storage lane length at the CR 427 and Bedford Road intersection is adequate in length to accommodate the proposed development. Traffic Impact Analysis Five Points Village 10 April 2024 5. 0 STUDY CONCLUSIONS This traffic analysis is being conducted to assess the impact of the proposed Five Points Village 79 townhome development located north of CR 427/N Ronald Reagan Boulevard approximately 200 feet southwest of Carriage Cove Way/Bedford Road in the City of Sanford, Florida. The analysis included a determination of project trip generation, a review of existing and projected roadway and intersection capacity and a review of access operations. The results of the traffic analysis are summarized as follows: • The proposed development will generate a total of 581 daily trips of which 47 and 55 will occur during the AM and PM peak hour, respectively. • Access to the site will be provided via a right-in/right-out access driveway connection onto CR 427/N Ronald Reagan Boulevard. • An analysis of the study roadway segments indicates that the study roadway segments currently operate adequately within their adopted Level of Service standard and are projected to continue to do so upon buildout of the proposed development. • An analysis of the study intersections indicates that the study intersections currently operate adequately within their adopted Level of Service standard and are projected to continue to do so upon buildout of the proposed development. • The existing southbound left turn lane at the CR 427 and Meeting Place intersection and the exiting northbound left turn storage lane length at the CR 427 and Bedford Road intersection were analyzed to be adequate in length to accommodate the proposed development. Based on the analyses conducted, approval of the proposed project is requested from a transportation perspective since the project does not adversely impact any of the study roadway segments or intersections. Trac Impact Analysis Five Points Village 11 April 2024 APPENDIX Appendix A: Preliminary Concept Plan m v .. z w v m„v� -fa< y m m N n Y. o � IN ti IN s g ! S F v bnxne.�nu��¢m — CENTRAL FLORIDA ENL7NEERINC CONSULTANTS, LLC 0"N Gg—g-(wd Numiq LdgweG, flwl 32— (wr)sue vmn se= mAwWG ME MASTER PLAN FIVE POINTS VILLAGE, PD City of Sanford, Florida � I Novo M VE HM ,9 'x3 V Er I m N In A Y — o 1 mm A } L �E • � TUCKER DR. c N 4 66' ROW m i f � Y -I R R A R A R R j i 3 m v .. z w v m„v� -fa< y m m N n Y. o � IN ti IN s g ! S F v bnxne.�nu��¢m — CENTRAL FLORIDA ENL7NEERINC CONSULTANTS, LLC 0"N Gg—g-(wd Numiq LdgweG, flwl 32— (wr)sue vmn se= mAwWG ME MASTER PLAN FIVE POINTS VILLAGE, PD City of Sanford, Florida wv rz ma M VE Z5 S [ m mm � �E • � e bN >�� c m i f � Y -I R R A R A R R j i 3 m v .. z w v m„v� -fa< y m m N n Y. o � IN ti IN wqg Y +� g ! S F v bnxne.�nu��¢m — CENTRAL FLORIDA ENL7NEERINC CONSULTANTS, LLC 0"N Gg—g-(wd Numiq LdgweG, flwl 32— (wr)sue vmn se= mAwWG ME MASTER PLAN FIVE POINTS VILLAGE, PD City of Sanford, Florida wv rz ma Appendix B: Methodology Coordination PTC Premier T rafr:o Group METHODOLOGY MEMORANDUM RE: Five Points Village, City of Sanford Traffic Impact Analysis Methodology 03/15/2024 Job # 24159 The following is a methodology outline for the Traffic Impact Analysis (TIA) for the above -referenced project. In general, the TIA will conform to the methodology requirements and guidelines documented by the City of Sanford, Seminole County and the Florida Department of Transportation (FDOT). Project Description This traffic analysis is being conducted to assess the impact of the proposed Five Points Village residential development located north of CR 427/N Ronald Reagan Boulevard approximately 200 feet southwest of Carriage Cove Way/Bedford Road in the City of Sanford, Florida. The proposed project comprises 79 Townhomes. Figure 1 depicts the site location and the surrounding transportation network. ■ i I I Espona hlaesyo I tab, f 1 1 ;♦ 1 -mile ----- Figure 1: Project Location Map Site Access Access to the site will be provided via a right-in/right-out access driveway connection onto CR 427/N Ronald Reagan Boulevard. Attachment A provides the preliminary site plan. Mailing: 15155 W Colonial Drive, # 784852, Winter Garden, FL 34787 1 Physical: 350 E Crown Point Road, Suite 1100, Winter Garden, FL 34787 PremierTrafficGroup@amail.com I C 321-948-9594 . `♦ Scnunole counlrQ J♦r:. Record, censor LLhS ♦,♦ E lake, MM M'vd E lake, C� v e,�,�vY ♦ L� Ree. e,-„! 1/4 -mile ♦♦ ' 1 1 ED 1 ; 1 ; ,/ t SITE ! 1 ♦♦♦ I � aP��F ars,_ / r - --- r � I i r 1 -mile ----- Figure 1: Project Location Map Site Access Access to the site will be provided via a right-in/right-out access driveway connection onto CR 427/N Ronald Reagan Boulevard. Attachment A provides the preliminary site plan. Mailing: 15155 W Colonial Drive, # 784852, Winter Garden, FL 34787 1 Physical: 350 E Crown Point Road, Suite 1100, Winter Garden, FL 34787 PremierTrafficGroup@amail.com I C 321-948-9594 Five Points Village Traffic Impact Analysis Methodology 03/15/2024 Page 2 of 3 Trip Generation Table 1 summarizes the trip generation analysis conducted using information published by the Institute of Transportation Engineers (ITE) in the Trip Generation Manual, 77th Edition. The calculation revealed that the proposed development will generate a total of 581 daily trips of which 47 and 55 will occur during the AM and PM peak hour, respectively. The ITE Trip Generation graphs are included for reference in Attachment B. Table 1: Trip Generation ITE Code Land Use Size Daily AM Peak Hour PM Peak Hour Rate Trips Rate Enter Exit Total Rate Enter Exit Total 220 Multi -Family (Low -Rise) 79 DUs 7.36 581 0.6 11 36 47 0.69 35 1 20 1 55 Trip Distribution The trip distribution pattern was derived using existing traffic counts and knowledge of the traffic patterns in the area to develop a distribution pattern. The trip distribution map is provided in Figure 2. Using this trip distribution pattern, project trips were assigned to the surrounding study roadway network. Supporting traffic data is provided in Attachment C. - ® -----— �Nlrom Blvd Com ARd Seminole Counly i (>�rk Rewrds Center i! kwy Blvd %% E Lake M E Lake O�y % .n Esporta Flnesy� W � � -. „.- Me Mary Blvd r s ; i ® i - - 1.. _ tyke Annie D+ qty Roae HT~ I Clyde r.. —: Dr r' Blur/ L ad.!e Cr eeIg-W.y 1 S SITE 0 H 1 "'e—way AP 1 0� Qeaa o g z.. vole w.y shales / 4 e a � ' nrrsrr Ln dv; ealem T40 5 % Spring Mead% -s j Severity Advenlist%`, aQo� 0 _ o.,„ay rrye,Ln NRonald Rea90" 1 -mile Figure 2: Trip Distribution Map Five Points Village Traffic Impact Analysis Methodology 03/15/2024 Page 3 of 3 Study Area The study facilities to be considered in the analysis are listed below. The study area was derived by identifying the roadway segments within a 1 -mile radius and major intersections within a 1/4 -mile radius as discussed in the Seminole County Traffic Impact Guidelines dated 05/07/2023. Study Segments • 059: CR 427 from Sanford Avenue to Sunland Drive • 060: CR 427 from Sunland Drive to County Home Road • 377: CR 427 from Keyes Court to E Lake Mary Boulevard • 150: Lake Mary Boulevard from Country Club to US 17-92 • 150b: E Lake Mary Boulevard from US 17-92 to SR 417 Ramps • 152: E Lake Mary Boulevard from CR 427 to Marquette Avenue • 151 a: E Lake Mary Boulevard from SR 417 Ramps to CR 427 • 62a: CR 427 from Silkwood Court to US 17-92 • 344: US 17-92 from CR 427 to Lake Mary Boulevard • 345: US 17-92 from Lake Mary Boulevard to Airport Boulevard Study Intersections • CR 427/N Ronald Reagan Boulevard and Carriage Cove Way/Bedford Road • CR 427/N Ronald Reagan Boulevard and Meeting Place • CR 427/N Ronald Reagan Boulevard and Project Access Projected Conditions Analysis The projected conditions analysis will be conducted within the following framework: • Counts: Traffic counts will be obtained during the AM and PM peak period and adjusted using a peak season factor as necessary. • Growth Factors: Growth factors, derived from historical traffic volume data, and committed trips will be applied to existing traffic counts to develop projected/buildout background traffic volumes. • Analysis Periods: Analyses will be performed for existing (2024) and projected/buildout conditions (2026). • Projected Conditions Traffic. Project buildout traffic volumes will be added to the future background traffic volumes to obtain total project/buildout traffic volumes. • Roadway Analysis: Roadways segments will be evaluated using the Seminole County service volume capacities, as applicable. • Intersection Analysis: Intersection capacity analysis will be performed using the latest operational analysis procedures documented in the Highway Capacity Manual as applied using the Synchro software. • Turn Lane Analysis: Turn Lane analysis will be performed for all the site access driveways based on Section 1.3 of the Seminole County Public Works Engineering manual (dated 07/24/2013) and designed based on FDOT requirements. Traffic Impact Study Report The traffic report prepared will summarize the study procedures, analyses and recommendations. END Attachment A Preliminary Site Plan ti m m �N _ zi I I N� -CENTRAL FLORIDA ENGINEERING CONSULTANTS, LLC ow xaae­v 1­, msm. im �m ww(lmlrsue a na.mmal>e°.aam ®I+. am °RAMS °u MASTER PLAN FIVE POINTS VILLAGE, PD City of Sanford. Florida m. K I I NM ,9 •x3 D ' N W S TUCKER DR. 66' ROW � O •G � pppp Irf - ao ti m m �N nl' i ;@"k a -CENTRAL FLORIDA ENGINEERING CONSULTANTS, LLC ow xaae­v 1­, msm. im �m ww(lmlrsue a na.mmal>e°.aam ®I+. am °RAMS °u MASTER PLAN FIVE POINTS VILLAGE, PD City of Sanford. Florida m. K .w a :mz Attachment B Trip Generation Information Land Use: 220 Multifamily Housing (Low -Rise) Description Low-rise multifamily housing includes apartments, townhouses, and condominiums located within the same building with at least three other dwelling units and that have two or three floors (levels). Various configurations fit this description, including walkup apartment, mansion apartment, and stacked townhouse. • A walkup apartment typically is two or three floors in height with dwelling units that are accessed by a single or multiple entrances with stairways and hallways. • A mansion apartment is a single structure that contains several apartments within what appears to be a single-family dwelling unit. • A fourplex is a single two-story structure with two matching dwelling units on the ground and second floors. Access to the individual units is typically internal to the structure and provided through a central entry and stairway. • A stacked townhouse is designed to match the external appearance of a townhouse. But, unlike a townhouse dwelling unit that only shares walls with an adjoining unit, the stacked townhouse units share both floors and walls. Access to the individual units is typically internal to the structure and provided through a central entry and stairway. Multifamily housing (mid -rise) (Land Use 221), multifamily housing (high-rise) (Land Use 222), affordable housing (Land Use 223), and off -campus student apartment (low-rise) (Land Use 225) are related land uses. Land Use Subcategory Data are presented for two subcategories for this land use: (1) not close to rail transit and (2) close to rail transit. A site is considered close to rail transit if the walking distance between the residential site entrance and the closest rail transit station entrance is 1/2 mile or less. Additional Data For the three sites for which both the number of residents and the number of occupied dwelling units were available, there were an average of 2.72 residents per occupied dwelling unit. For the two sites for which the numbers of both total dwelling units and occupied dwelling units were available, an average of 96.2 percent of the total dwelling units were occupied. The technical appendices provide supporting information on time -of -day distributions for this land use. The appendices can be accessed through either the ITETripGen web app or the trip 252 Trip Generation Manual 11th Edition • Volume 3 Wei generation resource page on the ITE website (https://www.ite.org/technical-resources/topics/trip- ..................................................................................... and -parkin, generation/). For the three sites for which data were provided for both occupied dwelling units and residents, there was an average of 2.72 residents per occupied dwelling unit. It is expected that the number of bedrooms and number of residents are likely correlated to the trips generated by a residential site. To assist in future analysis, trip generation studies of all multifamily housing should attempt to obtain information on occupancy rate and on the mix of residential unit sizes (i.e., number of units by number of bedrooms at the site complex). The sites were surveyed in the 1980s, the 1990s, the 2000s, the 2010s, and the 2020s in British Columbia (CAN), California, Delaware, Florida, Georgia, Illinois, Indiana, Maine, Maryland, Massachusetts, Minnesota, New Jersey, Ontario (CAN), Oregon, Pennsylvania, South Carolina, South Dakota, Tennessee, Texas, Utah, and Washington. Source Numbers 188, 204, 237, 300, 305, 306, 320, 321, 357, 390, 412, 525, 530, 579, 583, 638, 864, 866, 896, 901, 903, 904, 936, 939, 944, 946, 947, 948, 963, 964, 966, 967, 1012, 1013, 1014, 1036, 1047, 1056, 1071,1076 ECrr General Urban/Suburban and Rural (Land Uses 000-399) 253 Multifamily Housing (Low -Rise) Not Close to Rail Transit (220) Vehicle Trip Ends vs: Dwelling Units On a: Weekday Setting/Location: General Urban/Suburban Number of Studies: 22 Avg. Num. of Dwelling Units: 229 Directional Distribution: 50% entering, 50% exiting Vehicle Trip Generation per Dwelling Unit Average Rate Range of Rates Standard Deviation 6.74 2.46-12.50 1.79 Data Plot and Equation 4000 X 3000 X X N � Lu X �X N CL F 2000 ^------------------- ........:........... ................. F X X X X X: X 1000 X X X X 0 0 100 200 300 400 500 X = Number of Dwelling Units X Study Site Fitted Curve — — — — - Average Rate Fitted Curve Equation: T = 6.41(X) + 75.31 R'= 0.86 254 Trip Generation Manual 11th Edition • Volume 3 WE Multifamily Housing (Low -Rise) Not Close to Rail Transit (220) Vehicle Trip Ends vs: Dwelling Units On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. Setting/Location: General Urban/Suburban Number of Studies: 49 Avg. Num. of Dwelling Units: 249 Directional Distribution: 24% entering, 76% exiting Vehicle Trip Generation per Dwelling Unit Average Rate Range of Rates Standard Deviation 0.40 0.13-0.73 0.12 Data Plot and Equation N C W N d H 300 200 X ............ 100 X Z / / X x �l X 0 0 1000 X = Number of Dwelling Units X Study Site Fitted Curve Fitted Curve Equation: T = 0.31(X) + 22.85 — — — — - Average Rate Rz= 0.79 2000 ,`er General Urban/Suburban and Rural (Land Uses 000-399) 255 / / / X / / / / / X ....................../_......._. -- X Y/ X / X X / / X / X/ X Z / / X x �l X 0 0 1000 X = Number of Dwelling Units X Study Site Fitted Curve Fitted Curve Equation: T = 0.31(X) + 22.85 — — — — - Average Rate Rz= 0.79 2000 ,`er General Urban/Suburban and Rural (Land Uses 000-399) 255 Multifamily Housing (Low -Rise) Not Close to Rail Transit (220) Vehicle Trip Ends vs: Dwelling Units On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. Setting/Location: General Urban/Suburban Number of Studies: 59 Avg. Num. of Dwelling Units: 241 Directional Distribution: 63% entering, 37% exiting venicie i rip veneration per uweiiing unit Average Rate Range of Rates Standard Deviation 0.51 0.08-1.04 0.15 uata clot ana 500 I 400 300 c W c F F 200 100 uation X X X X X X K X /1 ° 0 1000 X = Number of Dwelling Units X Study Site Fitted Curve Fitted Curve Equation: T = 0.43(X) + 20.55 - - - - - Average Rate Rz= 0.84 2000 256 Trip Generation Manual 11th Edition • Volume 3 WE 7' i i i /X: /1 ° 0 1000 X = Number of Dwelling Units X Study Site Fitted Curve Fitted Curve Equation: T = 0.43(X) + 20.55 - - - - - Average Rate Rz= 0.84 2000 256 Trip Generation Manual 11th Edition • Volume 3 WE 7' Attachment C Area Traffic Counts x [7 � H 11 O r Cn C/) �HC(nn F3 II II II H H n] cn (7 zHMO G) i n .g H010 zxza H dy H F< C J x�Kd K '.b y `• Ll W t7 AHC II N H y O H H z tJ H y H ['j r zn m Cf) rnHCl) H H Z II II H JyHxF-3 x1XH[7 d H ;U • xxd ro rol�tn u HxlxlrJ O H U) Cn Cl) F< H F3 F3 [7 H H inHH� C7 C7 ;U xl N H x II II H w CD 7 z0H CNCL'] >zz r0y C x w FG CJ Cn H H H C�7 N N N N N N N N N N N N I K Oo0000oOOOOO I t'J NN W.A(n m JO 10 CD N) I I I F-` H H H H N N N N N NN 1 6l d>6101m CD ONN W W N I N N W Cil N (n (JI O O O O O i 0 0 0 0 0 0 0 0 0 0 0 0 1 C7 O O O O O O O O O O o O I H (-1 n7nn7�C]C]C]FJ C]h7 (� I I zzzzzzzzzzzzId I w I CJ J J JNNOOH`H i—F- I n N N1.0 O H 0 0 0 0 0 0 0 1 H O O O O O O O O O O O O I H 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 z I H w � O cn to cn cn to In Cn cn Cn I d I H I H HHHHHH I CJ NOD NNNOOHHNNH I n .11.AIt, cn�cncn00000 I H O O O O O O O O O O O O I H 00000000000010 Iz a 1 � 1x ro I � 10 to to to 10 to to to to w w w 0 0 0 0 0 0 0 0 0 0 0 0 1 0 C) O O O o O O O o 0 0 o I ;U iw I N (n N cii (n (n in (n o (n (n (n (n I b OIN IO N(I7 W 016110 .A .� W 1 O 0 0 0 0 0 0 0 0 0 0 0 0 1 ;U 1 H I hl HNNNH H Hi �rl N OO U7 J(n W ON I n IH 100 NON O J 1 O 0 0 0 0 0 0 0 0 0 0 0 0 1 'u to H H C7 N O J J I (7 ;U N J x x G) z m H Q Cl) I H J N R Cn t'7 z 0 r M m X ro E O ro O Cf) H tJ r H O H O Cl) N ro N O t7 xl t+7 � °zn H z nCnH � H r�0 H 'TJ H CA H1 d H y 'o Cn Cl) m 10 1000 0N;j U11 H H y C+7 H O z N N N N N N N N N N N N N N N I �< 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 Di OOHH I--'--'h-'HH HHHNNN I ,>1 N IO OHN w U701J W LOO H`N I 'o Cn H H N J 0 O co I r x C C7 n 0 C z H FG J J I H z 0 r M H NzrJ C) C/) N ro NOl7 � lel Hyy to H ;d z0zz n Cn H ry0 HN H W H C7H� � ro 1000 0102 H1F-I� nH M H 0 z x � I I y W NNW W NNNN Io Io IoW W W I O to to W W O N.P. 0 m 61 W N N I F-3 ray 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 r O O o O o O O o O O O O O O O 1 H �V I � nnron10�x�nronrotnnro 1 W I C/) HcCnn �Dl II II II zzzzztlCJL]tUL=it]L]tJL7L=7 I C7 I H G) N C) X H H H H H Ol Ol m OD IO to to to lO w I n H Oro WUIUIJJ(.JIt. (nloNlolo(nJ W 1 H 5� C7C.,' 0000000000000001 H H l7H OOOOOOOOOOOOOOO 1 z xCJI{d 1 J N >N dye II NH �3 W C/) (n co cn :4:E S- :2 5;:E S-.':2 1 0 O CAH NH;L4' L' HHF Ht -I (n Ln V7lO11OlOIOIONOD I n .7 HN Ly ` JIt, .Am -.3 W lo(n W J JLI) (n O1 1 H Cn 0 0 0 0 0 0 0 0 0 O O O O O O I H [J 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 CnmF3U] I z II 11 I N Z '-i H M y wx"m . Nmt I ry I x II HPd� n0 H ',zJ ;d N W W WIO 1.0 IO IO l0 l0 10 10 1 10 10 10 I n O HH I L-jLAw J01000000000000001 O CA U]U] W to N 000000000000 I C I-3 1-31-3 L'7HH UU)jF3F-3y I t7 t J t_? ... I rJ � N Cn (n (n Cn Cn (n Cn U1 Cn (n (n (n N (n I '.TJ CJ HI-Ili NW0a-X,wNNI NHH I n y IH N II II H J(n lO OIW IQ Ln W 016110 A A W I O W N O1 N 000000000000 I iil CD z 0 H cxam r0 H I H I EDE tC N N W W N IO W W W N N Cn Cn Cn J JJ W W.A .A .A W W I O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 h7 C2] W H H H N Cn H H N J 0 O co I r x C C7 n 0 C z H FG J J I H z 0 r M H NzrJ C) C/) N ro NOl7 � lel Hyy to H ;d z0zz n Cn H ry0 HN H W H C7H� � ro 1000 0102 H1F-I� nH M H 0 z r y0 N z o O W�0, Nro N O 0 7J LTJ (n H ;a °zzx H z n (n y r>0 H tTl H �yH�I ',c1 W Zn � ro ro00 Orox HF11-iy n y LTJ H O z N N N N N N N N N N N N N N N N I K w n 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I m H O O O O h` H H H H H H F- H H N N N I .> y (-- -.J N ko CD H N W.A U161 J 00 lfl O H N I .. y K C:) •• CD x I o J I J J ftj d HHF--'F'HH F--- H F,FN NN I N W N H N N.A .P 61 M O O lO N N I I I ('? 61W O F-' O J J F� w w O N U161 O O I F-3 ry 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O I d r Cn L� O O O o o o o 0 0 0 0 0 0 0 0 0 1 y > M 00 n nonnnnronronnn iwnti z Cl) O (n r �3CCl) n t� II II II t+J t J L 1 L 1 C 1 C J t+7 L�] t�7 tai t 7 t�] t�J t�] t+i t�7 I C7 H H ro wn zH�Jo HH HH I [ay C �] rx] ("j x SOI OIN (n 6161 C31 (t CD l00010NN I n d HOro WWMJUlMMMiOpOOornoo 1 y $� .x z C' 0 0 0 0 0 0 O O o 0 0 0 0 0 0 o I H H 0 y O O O O O O O O O O O O O O O O 0 O H K M I �C L'7 K C7 KxJ� I D>- N H xJ cn �] II `L"L::2':E:EF,�.5'.`L'S'.,F.,� OHH H� �Z F, y �+ Lay F.3 'Sj (S1J JOl (56161) J W w OOoo0 I n 0 H.. Lay r W o.A.P WHH Lo .r, CII O Cn Ulo 00 I y :r (/2 O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 H H 0000000000000000 i 0 0 U) m F-3 Un II II H N Z I L7 ro xxd.. ro 1x � I v ro Mu � I� H .ro '.-d'] lfl (D W W Flo C010 -,o CO to w ko low ko I n OH . . . I y gvMLay�o OJ61Q70000000000001 O C/)Mm 10W1flN000000000000 I 'O Ky 1-33 Ly H H Cal LTi �7 I Cn Cn Ln UI UI UI I Cn Cn (JI I Cn CI UI CII (n CII U n CI m X �� NNHF NN w JI P W NNH NF -1H I n y Iy PIN II II H PJ(n 10 O1 (b lfl N(n W 616110 A A W I O w HU761Cn000000000000 I ZI CDzo Cxal� LL�OH I H �x I I hJ [n t{ H H H NHNNH I [J WOO 6I.AJJJJF-BOO .P .n .Pww I n 1-3 �7 N F-' N W UI H H 6161 W J J J OO I O O O O O O Cl O O O O O O O O O O I ;d C1 W H 7CH y H tJ r y0 N z o O W�0, Nro N O 0 7J LTJ (n H ;a °zzx H z n (n y r>0 H tTl H �yH�I ',c1 W Zn � ro ro00 Orox HF11-iy n y LTJ H O z r y0 H OV]� N O u x y ro C/) H W zzx H z >yy r�vo y hl H W y dy�y H n � ro ro00 Orox 7drJy y H n y tJ H 0 z NN NN NN N N N N N N I IC U] n 000000000000 I m H 0 F- H H H H H H H H N N N I> H a N N wa, Nm JO Io CD z F-3 K J .. X- J h I H l6 I V7 J ftj u I y UI Cn(n Cn(n 016101 J 0161 n Ul U7 H N c0 .A to to O W to m I F-3 rx] 000000000000 O r 000000000000 n oNnonnnmmnnnl H m i z y O a C/) r x yCCAn t� z HII II II z zzzzzzzzzz d to x H hi C/I n O G: rJ n (n Ln Ln Ln 016161 6161) I n y 0 tid cn H NI'D Irl �D �10 W wm I y N :2: x z a O 0 0 0 0 0 0 0 0 0 1 H H Cly 000000000000 1 O y 1-14 m I z xCJ�<tj I 7 6 L'7 y y tJ O Uy� II r N H H I N H N ��Hz i� Hy a I N L7y�N I n H'.M Iy tl 00(D 00000000 I O FG Mm y CA I z Fa y I b7 II II H N Z I C 0 Co �3 � d �xHM n d H ;U �• xl xxd I >F I ro �i t l 11 1 h] J x1�y I H;U 7d 'TJ i6 io io�o ko 1�0iowao Co 6000 I n n 0 H I y W WC]C+W 0000000000001 O m OCA V) 000000000000 I C7HHy F3 � Co H>1 AHy I d tJ tJ xl I io io io kD io io io io ko ko w I m x CA wto to to to co WW c0 co co I n N II II H koioiowioioiow W io I O W 00000000 000 I Oatm� z0�3 cxam �zz roy Iy a�x t J I I K] [J NNNNI-'.A.A.A 1-100 I n : '�J .A 07 ao N Cn Cl OD l 0 00000000 000 1 xJ tJ co y H F-3 N r y0 H OV]� N O u x y ro C/) H W zzx H z >yy r�vo y hl H W y dy�y H n � ro ro00 Orox 7drJy y H n y tJ H 0 z x H n7 G) co �3 CD n � II II II H H h] Cn n z H M O OF30ro �xzc H C7 F3 H K L7 x�Kd t+7 ;d N �LIJ HEn II N H H O H H C- F' H C H [] r in ` Cn 61 H Cn H H z I II H y H x ;aXHm u H "a I. xxd ro KK 0 H i1 c co wtw K H H H LTJ H H �-3 cnHH� �o tJ N oEn H PIN II II H w O z O H Cxa� �zx rOH Lzx to K tJ tJ Cn H H H tJ NNNNNNNNNNN I K Cn n 0 0 0 0 0 0 0 0 0 0 0 I M H 0 F- +F - F- -' HHHHHNNN I .> H c N W.PC7161JCAl00HN i �7 C+] z .. y K J •• J I H l0 I rn J I N N N N N N w w w w w l I I N O H W 6110 N.P H O O I 000 Ui O U7000Ln C17 I d (n h7 O O O O O o 0 0 0 0 0 L'7nnonnnnnnn I H I z H O c r x � z ro wwwwwwww Ww I u Cn H I H to x I ,71 C 1 I m 0 N N N N N N W W W W I n rJ NOF - ' W 6110 m 1 HO 1 H N OOO (JI C) U1000 U1 I H O O O O O O O O O o 0 1 0 Iz 1 IH ro H O i d � 1 H x I tJ I H I H ;i7 00 0000000010 K I Z I [b I N C d n I � I I x •� I N I hi J I � ` to l0 to w,,6 l0 to bo N CA W I n 00000000000 I 0 C+7 00000000000 I ;o .P ID (7 I d i rJ I'D 0�10 w O ko i �o io io w w io I C7 io io �o io �o io I O 000o OO I U H H H H N N N O Cb (b N •A I 000 0 1 �1 H H R H H H I H•AX •P HO i n I H Ut JOOJ O H I O 0 0 0 Co 0 0 i W 11 r HO H o En NOu to y xJ 0 O �zz nCnH t7'>0 HtJ H Cf) H U H H H zi m Cn t� ro ro00 Oroz w m F3 H H Cxj H C+7 H 0 z N NNNNNNNNNNN I F< (n n 000000000000 I tJ H O HH`HHHHF--`NHNNN I 'y H a HN W.ACn01�IN(00HN I 'o LJ z .. y K H N z u O N > N O 0 °x °z tNJ H z nCnH r�P0 H 11 H W H U7 3 ynz m ro y 11 ftl 0F3 nH tJ H 0 z x � I I C7 I y H (n (n (n cn cn a1 o1 1 (') U'i UIH N(w w C) w mO .P l0 l0Ol0 d> 1 y ry OOOO00000000 I C7 p r O o 0 Co 0 o 0 0 0 0 0 0 1 H I n1JnnnnnnmC)nn I (A I HCcnn y IH HroU]n 1 z zHtJ0 I tJ G] rJ n:K Ln (n cn Cnm mm mdlJ I n H Ohl (n H- N) ko X,(Dw W (0 01 1 H E x z a O 0 0 0 0 0 0 0 0 0 I H H 0 y O O o 0 0 0 0 0 0 0 0 0 1 0 H K tJ I z xC1 CC7 1 �7 KLl I oC7 >tJ U y W II FO I K7 1-3 C I tJ tJHD�l I n H •• tJ r I H Cn • I H [J 0 0 0 0 0 0 0 0 0 0 0 1 0 Cn rn F-3 I z F3 y I II II H I N Z I TSH xF3 0H'0•- xxd � 1x I ro t�J t�J 11 :UN 1010(0(0(0(0(0 l0 co co 0o co I n 0tJ mJ o 000000000000 1 0 (n(n(n o00000000000 1 x1 F<G 3HH N H H 7y tJ to to l0 to w w w to l0ww I 10 l0 10 10 10 10 10 10 10 10 10 I n F3 . . . . . I H x II II H to to to to to to l0 10 to w kD I 0 W 00000000 000 oCrJ� z 0 H cxam N O H I H CN= I I n7 (/] K HHHHHHNN NHH I tJ NNNNH.AIt, .p N00 I n �J .0 Cl L11 J N �I O F--` .P I O 00000000 000 I CJ Cl) H H H tJ H N z u O N > N O 0 °x °z tNJ H z nCnH r�P0 H 11 H W H U7 3 ynz m ro y 11 ftl 0F3 nH tJ H 0 z x � H n H FTJ O r .. n W HHCcnn H II II II H ftl U]n zHMO c')ron:4 H O ro H x C7 F3 H K LJ m m >M U H C II N H H O H H z ~ LTJ �3 H • LTJ r W co m F3 co � II II H z �HxH W H LTJ C7Hw xxo ro KK �t-I m II H ;U xl "lj O H x1 L1 m w W W W KH3 3H LJ H H c inF3HH� L7 r� z z • L1 m x �o En H x u II H w C) z0H cxcL� roH cn K [�7 LXJ W H H H m N N N N N N N N N N N N N N N N I K O O O O O O O O O O O O O O O O I LJ O O O H N H H H H H F- H H N N N I .•Y J00 lO OHNW "A 0101 J CO 100 HN I 'o I 1 WW W W W W W W W oA.A Ln U7.A U1 U1 N F -•F -`NO W �]N Ul O F- M W M I y J.P J W H 0000 d>�,DO.A H lO J I 'y 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 l d 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o I H onnnmmnnnnnnnnnnI z z z z z z z z z z z z z z z z l d I H I `x1 HF-•HHHHHF�HNNNNNNN I Lam] J J m Cn Ul M U7 m OO HN UI U7 W H I n OOJ W Ln C) o Cn Cn W 100JOlOW I H N O Ul Cn U1 O 000001 O O Ln Cn UI I H 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 I H I in in in V] Cn in V] V] W Zn (n (n w W w (n I d I H I � J J OI(n N m OF OI OOH N OF Ln W H W I n w J w M U1 O O U1 U1 w 10 O J O lO W I H 070 N 070700000 U1 O O U7 U1 U1 I H 000000000000000010 I z 0 I �F Ix I I n7 H H H H H H H H H H I H w w N O O O O O OlO IO W w N00 I n COO O 10 U7 Ul U7 Ul N 07000000 I O HN J CO 000000000000 1 ;1J r.. 1 11 Cn U7 Cn OF Ul Ul cn U7 Cn Cn (n Ln Ul Ul 1J1 (n I ',b 10 07 01 10 0 00 0 10 10 U7��.nN�T I n I H oH•HcncncnH.cmcnco,Arnrnrnw I O w10J.p00000000000o I :� IH I N H H H H H H H H F-• H H N H H H F-' I w W H H N N N NF ---.A.0 .P O H 00 1 n . I H 0010101 .D OD OO N UI J N J W;z, I O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O I W n 0 C z H K x H Nz0 O Cn b N to NOu `xJ L J xHro H y wHZJ Oox z z m H z n co H � H r�0 H W H C7 H H H n xJ [n to L-7 ro ro00 Oroz H H > n H LTJ H 0 z x C) H H hm O r �cCl)n H II II II H ny Cl) n zHt•70 GlhlQX H O 10 :2xza H d H H K t+7 xtJKl7 y tJ•• ;Uy� II N H H H t•7 H Ham• r�r t'] Cn rn H Cn H H Z II II H �HCC� xxHr� CJHx1•• xxo homtK+i II Hx1 ;U �J 0 H in w cn KHHH L'7H H (AHHy tJ tJ;tl tJ x'a En H x II II H w C) a h] Cxat� �zx NOH azx DIz Cn K t7 z1 tJ Cn H H H tJ N N N N N N N N N N N N N N N N I K 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 M O O O F- H H H H H H H H H N N N I J m lO O H N wIrl (.n 0I J W(OOHN I I I OJCn (77 .p N61 �A JCn OI CA W N Nl0 I (nOU7000(n(nOUI(nCD Ln(nLn W I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 H z%�zz2i%.2,7,z%.zzzzzz i C7 I ;A H NHHHHHHHHHNHHHH I ti] (O(O J JmmOmW W mO JmmN 1 C] (n CD Ln(n(nooCnOo(n(no(n(no I H O O O O O O O O O O O O O O O O I H 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 I z I H in (n Cn in U] W Cn w Cn (n (n (n in (n CA Zn I d H00 OOJJ010�071OJ ODJ 610l O1.P I C7 000cncn0(noo(nocn(noocn I H 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o I H O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 1 O 1z m I �F Ix I I (0 m o m (o (o (o (o (o (o (o (o (o (o (o (o I CZ . I H O J OI C0000000000000 1 0 (0 W(0 N o 00000000000 I 'O I N (n (-n (-n Ln N(n(n Cn(n Cn(n Cn(n(n V1 Ln I NN H H NN W .A XA W NN H I Ci .0 J(n(001 N(ON N w OI OI(O .A .P W I O H(n Ol Cn O 000 o o 000000 I 'U I H Him (n (n M (n .A (P P N .P Vi VF N W M N I n HNA JNUI(010 F-'6101NH W HUl I O O O O O O O O O O O O O O O O O I W C) 0 a z H K H Nzt7 O Cl) b N00 Hyy Cl) H ;a OON �zz nCnH r>0 H n7 H w H U H Hoz xi Cn (D L-1 ro ro00 ONz HH C) H t'7 H O z H O co > NO l7 xHro H 'Jy •.>y Cl) y ;j ,roOZm H z >Hy r>0 y N H to H 0 F-3 ynz � ro ro00 Oroz y H ny L'7 H O z NNNNNNNNNNN I FG Cn n 0 0 0 0 0 0 0 0 0 0 0 I m H 0 F' F-• F' F- F-• F- F-• H N N N I 'v y C N W ." 1n M -I W IO O H N I ',J N z .. y K J .. � J I v J 'fl y N N N N N N W W W W W I I I n N O H W 6110 N.A N O O I F-3 by 000cnocnOoocnUl I d fn hi 00000000000 F3 r 07 � i M G) mnnnnnnnnnn1 H co I z F3 O a In r C Cf) � ;U II II II zzzzzzzzzz I d z H HrJCnn I ,o tJ G) h] n NNNNNN W W W W I n z y0ro NOF -'W 6110N r, C) I y :E x z a 0001n O (P 0001n I H H CJ 00000000000 1 0 y FC n 1 z xt=iKd 1 ro H K;U�` I y CJ O U � II y H O H I F -I '> 1-' a I m C 1 my> I n H'•Nr Iy Cn1. H m 0 0 0 Co 0 0 0 0 0 0 1 0 'o Cn6,y(n 1 z k y y I II II N W Z �H i YH xH cJ UXHti d H ;U— n xxd I � z roNM II 1 ro N I > J H �J .Fd �' J 10 l0 l0 10 10 lO lO ao Oo Co N I n O H I H ;UmmL o o000000000o I O Cn Cncn(n OO0000o0000 17a m F<yHy � CJ H H 10 UO CnHy� I d • m to to l0 16 l0 16 I .� 16/6/016 1010 1 n y . . I y I H WII 0000 00 I z0F3 Cxa F' 'yzz NNN O r O HI y a9x NWN c I 7 O O O O Cn 1{ HNNN H H I CJ H .A .A .fA H O I n � IH ;U cn�oo� 0H I O 0000 00 1 7o to y H 0 H m H O co > NO l7 xHro H 'Jy •.>y Cl) y ;j ,roOZm H z >Hy r>0 y N H to H 0 F-3 ynz � ro ro00 Oroz y H ny L'7 H O z Appendix C: Seminole County CMS a .H a. o ,c CD C7 CD O' 0 4D O N CD N � N � O O N C N CCD a H 0 z b rTl 0 CD C) r� CD I ri' va CDw a CD 0 o' 0 DD 0 �n CD O "d CCD q ,t 0 CD N 00 CCD O CD Oma, 0 o, czD o o a CD `< H o LA N Q\ LA O N O 01 N �l \O O •P 0 0 T o o CCD czD aCD co H CD c CL h d y o 4�1 W N 0 O � N 00 O\ N (.A l0 O ON czD o o a CD `< H o LA N Q\ LA O N O 01 N �l \O O •P 0 0 T CD a a' CD 5 J W H 0 o o CCD CD c CL h d 00 4�1 W N Q\ O CD a a' CD 5 J W H 0 o � CD C7 CD 0 0 CD CD ti � C N CDN CD O N C N a a y 0 CD 0 b iTl p W CD 0 CD C� 0 M as 0 0 OQ CL n 0 0 0 o' 0 �-n CD O p O N UC �t CD CD C CD 0 0 " 0 a rn i ez w m o o czD a � CD `� y a r a — y mh w h (D LA N w N — CD N N Ch W Q\ W O 00 ol� O O P. m a or CD C� w 00 00 00 0" 0 H 0 0 0 czD a CD `� y a r a — y mh w h (D 0o N -P N N — CD �O N Ch W Q\ W O 00 a or CD C� w 00 00 00 0" 0 H 0 o o czD a CD — y mh N cn a1 00 O1 -11. O O a or CD C� w 00 00 00 0" 0 H 0 I n N J W W N J cn f: a O O P CL r CD H `.�. 0 o J O O �O O O \O 00 to O J W N z N O O r = p H O O O CDD ~� H CD 0 . o OCi N O O 00 O 110 a O O P CL r CD H `.�. 0 o J O O �O O O \O 00 to O J W N z N O O r = p H O a..H o � C7 o' Cr, W CD O CD N CD N O N C N P. CD a H O z O b tTj p CD O 0 C) O M ao CD It a 0 0 c� 0 o' O �-n CDO O w N -11 CDm CCD ~ O OCD N C 0 � CLCD rn moo >�.� > CD '. H o 5 Y w o 4�1 0 0 0 cNii 0 oho N � O W r + 00 00 01 00 O O O \O w CN a moo >�.� > CD '. o 5 Y w o 4�1 0 0 0 cNii 0 oho N � O W 00 00 w .p v, I �4ooC) > '. 5 Y C� 3 0 0 0 0 .r 00 00 O O O O O O z C a-' CD N J O H 0 o � w d �:t. (-Do � o c N CD N � N � O O N C N CD cr 0 0 p m aCD 'C3 n n � � � N N N � w v, v, N O C\ w W C\ O — 9 HE 5 5 T � �CD CD ar Q r (] p� N O n ON (71, Oo OW O vNi N O O O O 5 T � �CD CD ar Q r (] p� N O n ON (71, Oo O O N z CD K 0 n 0 t�J CD (T4 n (D 0 0 0 C 0 o w C UQ CD CD CCDD U, W CIt CD 0 CD N moa aCD CD H �at"a H 0 � CD �' C7 0 to Ch N 00 W 00 O O Ch a1 J ol� N O N CDoo aCD CD H 0 � CD �' C7 0 00 W th -P Ch ON F -- 00 O O1 W N �o W N Vi O CD O N O w Ch o\ O O (h moo aCD 0 � 00 W th -P Ch ON F -- 00 O O1 O -A H 0 C C,- o � F--1 OA c'D � O CD a� CD N O N 0 O O N CDC N a CL cr CDz b rTj Pl 0 o o a N `C A N 00 N O O 00 ON Uh a 0 o o a n � CD J N � O\ LA 00 J O1 00 -, O O %�O 9 C J N y O b i� K cn CD0 CDO CD CD R. n O K3 C3 0 o' O �-n CD d �-d C OD O O li ,D w CD 0 CD oma, O O r- a cD o w N ONi 01 �O O O v, 0 NO O r- w �. CD a CDCD y CD y b w w 0 C4 CD cD N00 N D1 w O O w w N all O CA w O N v, 0 rd y 0 w �. CD CDCD y a y b w w 0 C4 CD cD N00 N D1 w O O w y 0 Appendix D: Traffic Volumes INTERSECTION TRAFFIC VOLUMES Inti 1: CR 427 & Carriage Cove Way/Bedford Road AM Peak Hour Carriage Cove Wy Bedford Rd n c u `Background + <Pass -By Vol>+ ( Project Vol) = Total Volume Meeting PI 2u/0 4O■ - Subject Intersection 'SF applied = 0.92 TRIP DISTRIBUTION % Source: Premier Traffic Group 'Growth rate applied = 1.04 PROJECTED VOLUMES N N I^ I. N 73 m N N E-0 49 r� 8� T I 2- 23 23 a + N � N h N n Note: +/- errors due to rounding 70 N 73 m N 0 m N F— 0 EJ 47 I 149 EJ Lam' 8 I 8 T r 2 2 22 --7it m 23 'SF applied = 0.92 TRIP DISTRIBUTION % Source: Premier Traffic Group 'Growth rate applied = 1.04 PROJECTED VOLUMES N N I^ I. N 73 m N N E-0 49 r� 8� T I 2- 23 23 a + N � N h N n Note: +/- errors due to rounding Source: Premler Trac Group INTERSECTION TRAFFIC VOLUMES Intx 2: CR 427 & Meeting PI ra AM Peak Hour Carriage Cove Wy _I Bedford Rd v Subject Intersection SITE u Access RVR. Meeting PI *Background + <Pass -By Vol> + ( Project Vol) = Total Volume 2024 VOLUMES 2026 VOLUMES N X11 � 411 IIn 0I0 �In F— 0 Io I� 15 I2 t� 1 y 16 0 1 T 0 1 T r 0� o m 0- 0 0� 0� 'SF applied = 0.92 Gra with rate applied = 1.04 TRIP DISTRIBUTION % PROJECTED VOLUMES N II V � N v + E— O F— O IV IOO I� I+ 16 0 V R + r Note: +/- errors due to rounding Source: Premler Trac Group INTERSECTION TRAFFIC VOLUMES Intx 3: CR 427 &Project Access O AM Peak Hour I Carriage Cove Wy Bedford Rd 'Background + <Pass -By Vol> + ( Project Vol) = Total Volume ®-SubjectIntersection TRIP DISTRIBUTION % PROJECTED VOLUMES Source: Premler Troffc Group INTERSECTION TRAFFIC VOLUMES Intx 1: CR 427 & Carriage Cove Way/Bedford Road O PM Peak Hour "Background + <Pass -By Vol> + ( Project Vol) = Total Volume 1:1 - Subject Intersection TRIP DISTRIBUTION % PROJECTED VOLUMES Source: Premier Traffic Group Source: Premier Traffic Group INTERSECTION TRAFFIC VOLUMES Int(2-. CR 427 & Meeting PI PM Peak Hour O Carriage Cove Wy I Bedford Rd ® Subject Intersection a SITE V Access gUgo Meeting PI `Background + <Pass -By Vol> + ( Project Vol) = Total Volume 2024 VOLUMES 2026 VOLUMES o 4,_6 �6 0 0 Io INm I� 0—� OQ 0 0 o� 'SF applied = 0.92 ��-Gr�owthrate applied= 1.04 TRIP DISTRIBUTION % PROJECTED VOLUMES N N W N m + + 6 0 I T T6 0� I v 0—� oQ 0� N Q + M r Note: +/- errors due to rounding Source: Premier Traffic Group Source: Premier Trak Group INTERSECTION TRAFFIC VOLUMES Intx 3: CR 427 & Project Access y PM Peak Hour Carriage Cove Wy I Bedford Rd n Subject Intersection SITE e u Access wao Meeting PI 'Background + <Pass -By Vol> + ( Project Vol) = Total Volume 2024 VOLUMES 2026 VOLUMES o �0 �0 o clOr E— 0 o0 iI� Io Io 0---J, � T r 0 0� o M o 0� 0� v SF applied = 0.92'Growth rate applied = 1.04 TRIP DISTRIBUTION % PROJECTED VOLUMES o II 0 �– a`I"o 0 Io Io Io 0 �1Tr� 0� 0 100 0+(20)=20 N II M N Note: +/_ errors due to rounding Source: Premier Trak Group � I I I I I � �i I w � � 15 MINUTE TURNING MOVEMENT COUNTS (Cars and Trucks) DATE: March 28, 2024 (Thursday) CITY: Sanford LATITUDE: 0 LOCATION: CR 427 & Carriage Cove Wy/Bedford Rd COUNTY: Seminole LONGITUDE: 0 CR 427 i CR 427 Carriage Cove Wy Bedford Rd TIME NORTHBOUND SOUTHBOUND N/S EASTBOUND WESTBOUND E/W GRAND BEGIN L T R U-turn TOTAL L T R U-turn TOTAL TOTAL L T I R I U-turn I TOTAL11 L I T I R U-turn TOTAL TOTAL TOTAL 07:00 AM 1 137 4 1 1 143 11 3 280 2 1 286 429 1 0 7 0 8 11 8 0 14 0 22 30 459 07:15 AM 1 171 3 0 175 8 330 2 0 340 515 1 0 7 0 8 15 0 21 0 36 44 559 07:30 AM 3 181 4 0 188 5 306 Z 1 314 502 3 1 8 0 12 16 0 22 0 38 50 552 07:45 AM 0 193 3 0 196 5 333 0 2 340 536 2 0 2 0 4 3 �P12 0 18 0 31 35 571 TOTAL 5 682 14 1 702 21 1,249 6 4 1,280 1,982 7 1 24 0 32 0 75 0 127 159 2,141 08:00 AM 0 213 4 0 217 6 306 1 1 314 531 3 1 7 0 11 7 0 15 0 22 33 564 08:15 AM 0 195 3 0 198 5 317 2 0 324 522 2 1 5 0 8 8 0 15 0 23 31 553 08:30 AM 0 174 4 0 178 5 293 2 1 301 479 2 1 4 0 7 11 0 20 0 31 38 517 08:45 AM 0 160 2 0 162 3 278 0 1 282 444 3 1 3 0 7 8 0 14 0 22 29 473 TOTAL 0 742 13 0 755 19 1,194 5 3 1,221 1,976 10 4 19 0 33 34 0 64 0 98 131 2,107 04:00 PM 3 248 10 0 261 14 210 2 1 227 488 3 0 5 0 8 5 0 11 0 16 24 1 512 04:15 PM 7 249 9 2 267F2! 1 183 2 1 207 474 1 0 3 0 4 4 0 4 0 8 12 486 04:30 PM 6 286 15 0 3070 195 5 2 222 529 3 0 4 0 7 1012023 30 559 04:45 PM 7 297 13 0 3178 190 2 1 211 528 1 1 2 0 4 8 1 13 0 22 26 554 TOTAL 23 1,080 47 2 1,1523 778 11 5 867 2,019 8 1 14 0 23 27 2 1 40 0 69 92 2,111 05:00 PM 1 9 313 15 2 339 1 17 204 1 4 226 565 0 0 6 0 6 717 0 25 31 596 05:15 PM 4 314 12 0 330�1: 209 3 1 231 561 4 0 3 0 7 10 0 22 29 590 05:30 PM 3 285 15 0 303 210 3 3 235 538 1 0 0 0 1 jjj30a2 13 0 21 22 560 05:45 PM 5 274 9 0 2885 175 4 1 195 483 1 0 4 0 5 9 0 13 18 501 TOTAL 21 1,186 51 2 1,2609 798 11 9 887 2,147 6 0 13 0 19 49 0 81 100 2,247 AM Peak Peak Hour Factor. 0.983 WASAMto 06:15 AM 4 758 14 0 776 24 1,275 5 4 1,308 2,084 9 2 24 0 35 51 0 76 0 127 162 2,246 PM Peak Peak Hour Factor. 0.965 04AS PM to 05A5 PM 1209 55 2 1,289 72 813 9 9 903 2,192 6 1 11 0 18 34 3 53 0 90 108 2,300 PM I I 9 813 72 SouthboundI 9 I i I AM I 5 1,275 24 4 16 y v tJ AM ._._._._. --------- PM ._._._._._._._._._._-_-_ I ___F 9S E 0 3 c o V 51 34 a Carnage Cove Wy I 4 0 0a' c 69 71 Seaford �y 1 2 4 I 11.......24—y__ -----•------------------- ------- Pi AM - ry F T I v 0 4 758 14 AM 1 ' 2 23 1,209 1 55 PM North ound 15 MINUTE TURNING MOVEMENT COUNTS (Cars and Trucks) DATE: March 28, 2024 (Thursday) CITY: Sanford LATITUDE: 0 LOCATION: CR 427 & Meeting Place COUNTY. Seminole LONGITUDE: 0 CR 427 CR 427 Meeting PI Meeting PI TIME NORTHBOUND SOUTHBOUND N/S EASTBOUND WESTBOUND E/W GRAND BEGIN TOTAL TOTAL L T R U-turn TOTAL L T R U-turn TOTAL TOTAL L T R U-turn TOTAL L T R U-turn TOTAL 0 142 2 0 144 2 295 0 09740 0 0448 M 0 175 1 0 176 1 35200 353 529 0 0 0534 Z07:00M M 0 188 3 0 191 2 330 0 0 332 523 0 0 0530 M 0 196 1 0 197 1 348 0 0 349 546 0555 0 707 7 0 708 6 1,325 0 0 1,331 2,039 0 0 0 0 0 10 0 14 0 28 28 2,067 08:00 AM 0 217 2 0 219 2 320 0 0 322 541 0 0 0 0 0 3 0 2 0 5 5 546 08:15 AM 0 198 1 0 199 0 330 0 0 330 529 0 0 0 0 0 4 0 3 0 7 7 536 08:30 AM 0 178 2 0 180 1 308 0 0 309 489 0 0 0 _ 0 0 _ _ 3 _ _ 0 _ _ _ 4 _ 0 _ 7- 7 _ _ 496 0845 AM 0 162 3 0 165 3 289 0 0 292 457 0 0 0 0 0 5 0 5 0 10 10 467 TOTAL 0 755 8 0 763 6 1,247 0 0 1,253 2,016 0 0 0 0 0 15 0 14 0 29 1 29 2,045 04:00 PM 0 261 3 0 264 5 220 0 0 225 489 0 0 0 0 0 2 0 2 0 04:15 PM 0 265 2 0 267 4 190 0 0 194 461000 002 0 4 0 467 04:30 PM 0 307 1 0 308 3 209 0 0 212 520 0 0 0 0 0 1 0 2 0 A44 523 04:45 PM 0 317 3 0 320 1 200 0 0 201 521 0 0 0 0 0 1 0 4 0 526 TOTAL 0 1,150 9 0 1,159 13 819 0 0 832 1991 0 0 0 0 0 6 0 12 0 2,009 05:00 PM 0 337 3 0 340 5 217 0 0 222 562 0 0 0 0 0 2 0 2 0 4 4 566 05:15 PM 0 330 4 0 334 3 223 0 0 226 560 0 0 0 0 0 1 0 1 0 2 2 PM 0 303 2 0 305 2 218 0 0 220 525 0 0 0 003 0 0 0 3 3 05:45 PM 0 288 3 0 291 2 183 0 0 185 476 0 0 0 0 0 1 0 2 0 3 3 WS6205:30 TOTAL 0 1,258 1 12 0 1,270 12 841 0 0 853 2,123 0 0 0 0 0 7 0 5 01212 AM Peak Peak Hour Factor: 0.976 0720 AMto 06:30 AM 0 799 7 0 806 5 1,328 0 0 1,333 2,139 0 0 0 0 0 16 0 12 0 28 28 2,167 PM Peak Peak Hour Factor: 0.964 04AS PM toPM 0 1,287 12 0 1,299 11 858 0 0 869 2,168 0 0 0 0 0 7 0 7 0 14 14 2,182 OSAS Southbound PM t 1 0 858 11 I i AM 1 0 0. 1,328 5 0 t I y I AM .72—.—.—.—.-7 PM .—.—.—.. _.—.—.—.—.—.—.—.—.—.—.—.—•— ---F _ E 0 0 a I[ 16 7 Mee0ng Pt q 0,gyp o0 0 0 0 to 71 MeetingPI 3 0 0 0 4 °------- ° v— —�PM 7� AM � --------------------------- I e 0 0 791 7 I AM 1 z I 1 0 0 1,287 12 PM I North ound 2022 PEAK SEASON FACTOR CATEGORY REPORT - REPORT TYPE: ALL CATEGORY: 7700 SEMINOLE COUNTYWIDE MOCF: 0.93 WEEK DATES SF PSCF --------------------------------------------- 1 01/01/2022 - 01/01/2022 1.00 1.08 2 01/02/2022 - 01/08/2022 1.03 1.11 3 01/09/2022 - 01/15/2022 1.05 1.13 4 01/16/2022 - 01/22/2022 1.03 1.11 5 01/23/2022 - 01/29/2022 1.01 1.09 6 01/30/2022 - 02/05/2022 0.98 1.05 7 02/06/2022 - 02/12/2022 0.96 1.03 * 8 02/13/2022 - 02/19/2022 0.94 1.01 * 9 02/20/2022 - 02/26/2022 0.93 1.00 *10 02/27/2022 - 03/05/2022 0.93 1.00 *11 03/06/2022 - 03/12/2022 0.92 0.99 *12 03/13/2022 - 03/19/2022 0.91 0.98 *13 03/20/2022 - 03/26/2022 0.92 0.99 *14 03/27/2022 - 04/02/2022 0.92 0.99 *15 04/03/2022 - 04/09/2022 0.93 1.00 *16 04/10/2022 - 04/16/2022 0.93 1.00 *17 04/17/2022 - 04/23/2022 0.94 1.01 *18 04/24/2022 - 04/30/2022 0.94 1.01 *19 05/01/2022 - 05/07/2022 0.95 1.02 *20 05/08/2022 - 05/14/2022 0.95 1.02 21 05/15/2022 - 05/21/2022 0.96 1.03 22 05/22/2022 - 05/28/2022 0.97 1.04 23 05/29/2022 - 06/04/2022 0.98 1.05 24 06/05/2022 - 06/11/2022 0.99 1.06 25 06/12/2022 - 06/18/2022 1.00 1.08 26 06/19/2022 - 06/25/2022 1.00 1.08 27 06/26/2022 - 07/02/2022 1.00 1.08 28 07/03/2022 - 07/09/2022 0.99 1.06 29 07/10/2022 - 07/16/2022 0.99 1.06 30 07/17/2022 - 07/23/2022 0.99 1.06 31 07/24/2022 - 07/30/2022 0.98 1.05 32 07/31/2022 - 08/06/2022 0.98 1.05 33 08/07/2022 - 08/13/2022 0.97 1.04 34 08/14/2022 - 08/20/2022 0.97 1.04 35 08/21/2022 - 08/27/2022 0.99 1.06 36 08/28/2022 - 09/03/2022 1.01 1.09 37 09/04/2022 - 09/10/2022 1.02 1.10 38 09/11/2022 - 09/17/2022 1.04 1.12 39 09/18/2022 - 09/24/2022 1.10 1.18 40 09/25/2022 - 10/01/2022 1.16 1.25 41 10/02/2022 - 10/08/2022 1.22 1.31 42 10/09/2022 - 10/15/2022 1.28 1.38 43 10/16/2022 - 10/22/2022 1.23 1.32 44 10/23/2022 - 10/29/2022 1.18 1.27 45 10/30/2022 - 11/05/2022 1.14 1.23 46 11/06/2022 - 11/12/2022 1.09 1.17 47 11/13/2022 - 11/19/2022 1.04 1.12 48 11/20/2022 - 11/26/2022 1.03 1.11 49 11/27/2022 - 12/03/2022 1.02 1.10 50 12/04/2022 - 12/10/2022 1.01 1.09 51 12/11/2022 - 12/17/2022 1.00 1.08 52 12/18/2022 - 12/24/2022 1.03 1.11 53 12/25/2022 - 12/31/2022 1.05 1.13 * PEAK SEASON 23 -FEB -2023 09:11:22 830UPD 5_7700_PKSEASON.TXT Appendix E: Existing Intersection Analysis Output HCM 6th TWSC 1: CR 427 & Bedfrod Rd 04/04/2024 Intersection Int Delay, s/veh 3.6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations T+ T.) 0 ) t T., Traffic Vol, veh/h 8 2 22 47 0 70 4 697 13 22 1173 8 Future Vol, veh/h 8 2 22 47 0 70 4 697 13 22 1173 8 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - None - None - None Storage Length 140 - 140 - 340 - 340 Veh in Median Storage, # - 0 - 0 - - 0 - - 0 Grade, % - 0 - 0 - - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 9 2 24 51 0 76 4 758 14 24 1275 9 Major/Minor Minor2 Minorl Majorl Major2 Conflicting Flow All 1715 2108 642 1460 2105 386 1284 0 0 772 0 0 Stage 1328 1328 - 773 773 - - - - - - - Stage 2 387 780 - 687 1332 - - - - - Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 - - 4.14 Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 - - - - Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 - - - Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 - 2.22 Pot Cap -1 Maneuver 58 51 417 90 51 612 536 839 Stage 164 223 - 358 407 - - - Stage 2 608 404 - 403 222 - - - Platoon blocked, % - Mov Cap -1 Maneuver 49 49 417 80 49 612 536 839 Mov Cap -2 Maneuver 49 49 - 80 49 - - - - - Stage1 163 217 - 355 404 - - Stage 2 528 401 - 365 216 - - - Approach EB WB NB SB HCM Control Delay, s 38.9 50.6 0.1 0.2 HCM LOS E F Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLnlWBLn2 SBL SBT SBR Capacity (veh/h) 536 49 256 80 612 839 HCM Lane V/C Ratio 0.008 0.177 0.102 0.639 0.124 0.029 HCM Control Delay (s) 11.8 93.7 20.7 108.5 11.7 9.4 HCM Lane LOS B - F C F B A - HCM 95th %tile Q(veh) 0 0.6 0.3 2.9 0.4 0.1 - Traffic Analysis 9:46 pm 04/04/2024 Existing AM Synchro 11 Report PTG Page 1 HCM 6th TWSC 2: CR 427 & Meeting PI 04/0412024 Intersection Int Delay, s/veh 0.4 Movement WBL WBR NBT NBR SBL SBT Lane Configurations r fl� j tt Traffic Vol, veh/h 15 11 735 6 5 1222 Future Vol, veh/h 15 11 735 6 5 1222 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None None - None Storage Length 100 0 270 - Veh in Median Storage, # 0 - 0 - 0 Grade, % 0 - 0 - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 16 12 799 7 5 1328 Major/Minor Minorl Majorl Major2 Conflicting Flow All 1477 403 0 0 806 0 Stage 1 803 - - - - - Stage 2 674 - - - - Critical Hdwy 6.84 6.94 - - 4.14 Critical Hdwy Stg 1 5.84 - - - Critical Hdwy Stg 2 5.84 - Follow-up Hdwy 3.52 3.32 2.22 - Pot Cap -1 Maneuver 117 597 814 Stage 1 401 - - - Stage 2 468 - - Platoon blocked, % - Mov Cap -1 Maneuver 116 597 814 Mov Cap -2 Maneuver 116 - - - Stage 1 401 Stage 2 465 - - Approach WB NB SB HCM Control Delay, s 28.4 0 0 HCM LOS D Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT Capacity (veh/h) 116 597 814 HCM Lane V/C Ratio - 0.141 0.02 0.007 HCM Control Delay (s) 41 11.2 9.5 HCM Lane LOS - E B A HCM 95th %tile Q(veh) 0.5 0.1 0 Traffic Analysis 9:46 pm 04/04/2024 Existing AM Synchro 11 Report PTG Page 2 HCM 6th TWSC 1: CR 427 & Bedfrod Rd 0410412024 Intersection Int Delay, s/veh 5.1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations T+ fii 1� ) 0 ) 0 Traffic Vol, veh/h 6 1 10 31 3 49 21 1112 52 66 748 17 Future Vol, veh/h 6 1 10 31 3 49 21 1112 52 66 748 17 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - None - None - None - None Storage Length 140 - - 140 340 - - 340 - Veh in Median Storage, # - 0 - - 0 - 0 - - 0 Grade, % - 0 - - 0 - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 7 1 11 34 3 53 23 1209 57 72 813 18 Major/Minor Minor2 Minorl Majorl Major2 Conflicting Flow All 1618 2278 416 1835 2259 633 831 0 0 1266 0 0 Stage 966 966 - 1284 1284 - - - - - - - Stage 2 652 1312 - 551 975 - - - - Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 4.14 - Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 - - - - Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 - - - Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 - 2.22 Pot Cap -1 Maneuver 69 39 585 47 41 422 797 - 545 Stage 273 331 - 174 234 - - - - - Stage 2 423 227 - 486 328 - - - - Platoon blocked, % - - Mov Cap -1 Maneuver 49 33 585 40 35 422 797 - 545 Mov Cap -2 Maneuver 49 33 - 40 35 - - - - - Stage 1 265 287 169 227 - Stage 2 354 220 412 285 - - - Approach EB WB NB SB HCM Control Delay, s 45.4 106.8 0.2 1 HCM LOS E F Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLnlWBLn2 SBL SBT SBR Capacity (veh/h) 797 49 232 40 258 545 HCM Lane V/C Ratio 0.029 - 0.133 0.052 0.842 0.219 0.132 HCM Control Delay (s) 9.7 - 89.4 21.4 247.6 22.8 12.6 HCM Lane LOS A F C F C B - HCM 95th %tile Q(veh) 0.1 0.4 0.2 3.2 0.8 0.5 Traffic Analysis Existing PM Synchro 11 Report PTG Page 1 HCM 6th TWSC 2: CR 427 & Meeting PI 04/04/2024 Intersection Int Delay, s/veh Movement 0.3 WBL WBR NBT NBR SBL SBT Lane Configurations `21 f t T.) Stage 1 j tt Traffic Vol, veh/h 6 6 1184 11 10 789 Future Vol, veh/h 6 6 1184 11 10 789 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None 2.22 None - None Storage Length 100 0 - Stage 1 270 - Veh in Median Storage, # 0 - 0 Stage 2 - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 7 7 1287 12 11 858 Major/Minor Minorl Majorl Major2 Conflicting Flow All 1744 650 0 0 1299 0 Stage 1 1293 - - - - - Stage 2 451 - - - - Critical Hdwy 6.84 6.94 4.14 - Critical Hdwy Stg 1 5.84 - - Critical Hdwy Stg 2 5.84 - - Follow-up Hdwy 3.52 3.32 - 2.22 Pot Cap -1 Maneuver 78 412 - 529 Stage 1 221 - - - Stage 2 609 - - Platoon blocked, % Mov Cap -1 Maneuver 76 412 529 Mov Cap -2 Maneuver 76 - - - Stage 1 221 - Stage 2 596 - - Approach WB NB SB HCM Control Delay, s 35.4 0 0.1 HCM LOS E Minor Lane/Major Mvmt NBT NBRWBLnlWBLn2 SBL SBT Capacity (vehlh) 76 412 529 HCM Lane V/C Ratio - - 0.086 0.016 0.021 HCM Control Delay (s) - 56.8 13.9 11.9 HCM Lane LOS - - F B B HCM 95th %tile Q(veh) 0.3 0 0.1 Traffic Analysis Existing PM Synchro 11 Report PTG Page 2 Appendix F: Historical Trends Analysis CD CL_ 0 CDCL .Z1 = D) _ C x 07 a N S = N O d • n 7 CD CD c) a. CD w O .� _ =r n fD A CD Df CDD N N tO O 00 (D N o 0 0 0 Average Daily Traffic (Vehicles/Day) O O O O O O O O O O O O O O O O O O O N O OD N O N W _ I o O O CD N Ci CDCD N = CD O p, au m n O C 7 N O W W O T o Z R �k O 0 n N 4 'Z Z1 fl1 CD 3 N Z ' a C O L to N n O O m � O 0 0 0 0 0 - N N N P.N O O W � N N N N N 0 Z Z N W W N N O Z w o 0 0 0 o D C • D D • o 0 0 0 0 3 0 0 0 0 0^ ' v N N N N N N N• N, N N N N N f'D O • Co 00. O 01 -P� W N = 0 0 0 0 00000 CL 0 0 0 0 0 0 0 0�- O T o Z R �k O 0 n N 4 'Z Z1 fl1 CD 3 N Z ' a C O L to N n H Nzrd O Cny N b N O t7 U M H W H � � Cn y 7d Ozz nCl) y C�0 y rl H co F33 CH] ' a Cn Cl) m ro r000 0Flzo ;d Fl y yH> n y tl H O z N N N N N N N N N N N N I K w n 000000000000 I C1 H 0 F-` H H H F- H H H H N N N I> y a i" W CnT�IM DC)F- Z F3 K Du .. x o I J J �+y t� HHHHHNNNNNNN I •,b y 01 01 61 01 0 ooNN W W N O NN W Cn OD (n Cn o 0000 y 1-1 000000000000 I C7 n Cn O t7t o0000000000o 1 y ;o m C�11n11(DnnnI-jnn1n I N z O 1-3CEn0 � t1 ;d II II II zzzZzzzzzzzz I C7 7d y I H L1 HNCnn I ;U > z.HMOm G) n 4l�ro JJ J ODm OOHH F- HF-' I O > y 0 mooLooH000000o I y z x'zc 000000000000 I H H 1J 000000000000 1 O y3 N I z W x�1Kd I y y(1wM a cn H Cn I N HH Cn Cn Cn Cn Cn Cn Cl) Cn Cn Cn Cn Cn I u o�i y a I--`i--'HHHHH I L�T1 l0 C1 y',b 00 OD m m OD O O H H N N H I n N H JP .P �A Ln J Ln U7 0 0 0 0 0 I H • in000000000000 I H R, Cl O O O O O O O O O O O O I O cn rn y cn I z cn y y I L7 II II H i N H z > H x O �UH;UL3J Crl xxd I � H ;U w 1 ko w koI n K 0 H I y ;dL'aM;o 000000000000 I O I Cn Cn Cn 000000000000 FGyF3H O C1 H H N 'i 7d��Fl tl CnCJF3xl u En I FC xl C=1 Cn N Cn Cn Cn cn cn Cn cn Cn cn Cn I y CI JC '7Jy NN W �A .P W NNHNHH m I y �h" II II H 61001,6 NCn W 61m LO �P �A W O W 00000000(D000 I C:) z0y cNC:N >zx rt0y I y a z x I m z I '=1 Cl) K,' F-'F'H HHH H I Cl NNF-`NOO Ln -1N CO ON I n y I y '�7 W W .A N N t,p ON OOD OJ I O 0 0 0 0 0 0 0 0 0 0 0 0 I W tl Cn H H H Cl H Nzrd O Cny N b N O t7 U M H W H � � Cn y 7d Ozz nCl) y C�0 y rl H co F33 CH] ' a Cn Cl) m ro r000 0Flzo ;d Fl y yH> n y tl H O z Appendix G: Projected Intersection Analysis Output HCM 6th TWSC 1: CR 427 & Bedfrod Rd 04/04/2024 Intersection Int Delay, s/veh Movement 4.8 EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 1556 T+ 414 '� T 0 ) tT-> 1389 )1 0 838 Traffic Vol, veh/h 8 2 23 49 0 73 8 747 14 23 1227 8 Future Vol, veh/h 8 2 23 49 0 73 8 747 14 23 1227 8 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - 3.52 None - 2.22 None - 2.22 None - 42 None Storage Length 140 587 - 140 800 340 150 - 340 - 380 Veh in Median Storage, # - 0 - - 0 578 - 0 - - 0 - Grade, % - 0 - - 0 - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 9 2 25 53 0 79 9 812 15 25 1334 9 Major/Minor Minor2 Minorl Majorl Major2 Conflicting Flow All 1813 2234 672 1556 2231 414 1343 0 0 827 0 0 Stage 1389 1389 - 838 838 - - - - - - - Stage 2 424 845 - 718 1393 - - - - - Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 4.14 - Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 - - - - Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 - - - - Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 - 2.22 Pot Cap -1 Maneuver 49 42 398 77 42 587 509 - 800 Stage 150 208 - 327 380 - - - - Stage 2 578 377 - 386 207 - - - Platoon blocked, % - - Mov Cap -1 Maneuver 41 40 398 67 40 587 509 - 800 Mov Cap -2 Maneuver 41 40 - 67 40 - - - - Stage 1 147 202 321 373 - Stage 2 491 370 347 201 - - Approach EB WB NB SB HCM Control Delay, s 45 71 0.1 0.2 HCM LOS E F Minor LanelMajor Mvmt NBL NBT NBR EBLn1 EBLn2WBLnlWBLn2 SBL SBT SBR Capacity (veh/h) 509 41 232 67 587 800 HCM Lane V/C Ratio 0.017 - 0.212 0.117 0.795 0.135 0.031 - HCM Control Delay (s) 12.2 - 115 22.6 158.7 12.1 9.6 - HCM Lane LOS B - - F C F B A HCM 95th %tile Q(veh) 0.1 0.7 0.4 3.7 0.5 0.1 Traffic Analysis Projected AM Synchro 11 Report PTG Page 1 HCM 6th TWSC 2: CR 427 & Meeting PI 04/04/2024 Intersection Int Delay, s/veh 0.6 Movement WBL WBR NBT NBR SBL SBT Lane Configurations rj r tT-> Conflicting Flow All ) t Traffic Vol, veh/h 16 11 768 6 27 1285 Future Vol, veh/h 16 11 768 6 27 1285 Conflicting Peds, 4/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 100 0 - 270 - Veh in Median Storage, # 0 - 0 93 - 0 Grade, % 0 - 0 Stage 2 - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 17 12 835 7 29 1397 Major/Minor Minorl Majorl Major2 Conflicting Flow All 1596 421 0 0 842 0 Stage 1 839 - - - - - Stage 2 757 - - - - Critical Hdwy 6.84 6.94 - - 4.14 Critical Hdwy Stg 1 5.84 - Critical Hdwy Stg 2 5.84 - Follow-up Hdwy 3.52 3.32 - 2.22 Pot Cap -1 Maneuver 97 581 - 789 Stage 1 384 - Stage 2 424 - Platoon blocked, % Mov Cap -1 Maneuver 93 581 789 Mov Cap -2 Maneuver 93 - - - - Stage 1 384 - - Stage 2 408 - - - Approach WB HCM Control Delay, s 35.7 HCM LOS E Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th °/stile Q(veh Traffic Analysis Projected AM PTG NB SB 0 0.2 NBT NBRWBLnlWBLn2 SBL SBT 93 581 789 - 0.187 0.021 0.037 - 52.4 11.3 9.7 - F B A 0.6 0.1 0.1 Synchro 11 Report Page 2 HCM 6th TWSC 3: CR 427 & Access 0410412024 Intersection Int Delay, s/veh 0.3 Movement EBL EBR NBL NBT SBT SBR Lane Configurations r Major2 tt tT4 708 Traffic Vol, vehlh 0 36 0 769 1292 11 Future Vol, veh/h 0 36 0 769 1292 11 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Critical Hdwy Stg 2 Stop Free Free Free Free RT Channelized 3.32 None - None 0 None Storage Length 0 0 - 0 - Veh in Median Storage, # 0 - 0 0 0 Grade, % 0 - Mov Cap -1 Maneuver 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 39 0 836 1404 12 Major/Minor Minor2 Majorl Major2 Conflicting Flow All 708 - 0 0 Stage 1 - - - Stage 2 - - - - Critical Hdwy 6.94 Critical Hdwy Stg 1 - - Critical Hdwy Stg 2 - Follow-up Hdwy - 3.32 - Pot Cap -1 Maneuver 0 377 0 Stage 1 0 - 0 Stage 2 0 - 0 Platoon blocked, % Mov Cap -1 Maneuver - 377 - Mov Cap -2 Maneuver - - - - Stage 1 Stage 2 - - - Approach EB NB SB HCM Control Delay, s 15.7 0 0 HCM LOS C Minor Lane/Major Mvmt NBT EBLn1 SBT SBR Capacity (vehlh) 377 HCM Lane V/C Ratio - 0.104 - HCM Control Delay (s) 15.7 HCM Lane LOS C HCM 95th %tile Q(veh) 0.3 Traffic Analysis Projected AM Synchro 11 Report PTG Page 3 HCM 6th TWSC 1: CR 427 & Bedfrod Rd 04/04/2024 Intersection Int Delay, s/veh 7.2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 1 0.146 HCM Control Delay (s) ) T 25.2$392.3 1 t11 HCM Lane LOS ) +T+ D F Traffic Vol, veh/h 6 1 10 32 3 51 36 1168 54 69 799 18 Future Vol, veh/h 6 1 10 32 3 51 36 1168 54 69 799 18 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - None - None - None - None Storage Length 140 140 - 340 - 340 Veh in Median Storage, # - 0 - 0 - - 0 - - 0 Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 7 1 11 35 3 55 39 1270 59 75 868 20 Major/Minor Minor2 Minorl Majorl Major2 Conflicting Flow All 1743 2435 444 1963 2416 665 888 0 0 1329 0 0 Stage 1028 1028 - 1378 1378 - - - - - - - Stage 2 715 1407 - 585 1038 - - - - Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 - 4.14 Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 - - - - - Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 - - - Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 - 2.22 Pot Cap -1 Maneuver 55 31 561 38 32 403 758 515 Stage 1 251 310 - 152 210 - - - Stage 2 388 204 - 464 306 - - - Platoon blocked, % - - Mov Cap -1 Maneuver 37 25 561 -31 26 403 758 515 Mov Cap -2 Maneuver 37 25 - -31 26 - - - - Stage1 238 265 144 199 Stage 2 312 194 387 261 - - Approach EB WB NB SB HCM Control Delay, s 59.4 162.8 0.3 1 HCM LOS F F Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1WBLn2 SBL SBT SBR Capacity (veh/h) 758 37 190 31 223 515 HCM Lane V/C Ratio 0.052 0.176 0.063 1.122 0.263 0.146 HCM Control Delay (s) 10 122.1 25.2$392.3 26.8 13.2 HCM Lane LOS B - F D F D B - HCM 95th %tile Q(veh) 0.2 0.6 0.2 3.9 1 0.5 Notes -: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined ": All major volume in platoon Traffic Analysis Projected PM Synchro 11 Report PTG Page 1 HCM 6th TWSC 2: CR 427 & Meeting PI 0410412024 Intersection Int Delay, s/veh 0.4 Movement WBL WBR NBT NBR SBL SBT Lane Configurations r +T ) tt Traffic Vol, veh/h 6 6 1245 11 22 829 Future Vol, veh/h 6 6 1245 11 22 829 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 100 0 2.22 - 270 - Veh in Median Storage, # 0 - 0 Stage - 0 Grade, % 0 - 0 575 - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 7 7 1353 12 24 901 Major/Minor Minorl Majorl Major2 Conflicting Flow All 1858 683 0 0 1365 0 Stage 1 1359 - - - - - Stage 2 499 - - - - Critical Hdwy 6.84 6.94 - 4.14 - Critical Hdwy Stg 1 5.84 - - - - Critical Hdwy Stg 2 5.84 - - - Follow-up Hdwy 3.52 3.32 - 2.22 - Pot Cap -1 Maneuver 65 392 - 499 Stage 204 - - Stage 2 575 - - Platoon blocked, % - Mov Cap -1 Maneuver 62 392 499 Mov Cap -2 Maneuver 62 - - - - Stage 1 204 - - Stage 2 547 - - - Approach WB NB SB HCM Control Delay, s 42.1 0 0.3 HCM LOS E Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT Capacity (veh/h) 62 392 499 HCM Lane V/C Ratio - 0.105 0.017 0.048 HCM Control Delay (s) - 69.8 14.3 12.6 HCM Lane LOS - F B B HCM 95th %tile Q(veh) 0.3 0.1 0.2 Traffic Analysis Projected PM Synchro 11 Report PTG Page 2 3: CR 427 & Access 0410412024 Intersection Int Delay, s/veh Movement 0.1 EBL EBR NBL NBT SBT SBR Lane Configurations 0 0 r - tt tT - - Traffic Vol, veh/h 0 20 0 1259 821 35 Future Vol, veh/h 0 20 0 1259 821 35 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized None 0 None 0 None Storage Length 0 0 - - - - Veh in Median Storage, # 0 - Mov Cap -1 Maneuver 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 22 0 1368 892 38 Major/Minor Minor2 Majorl Major2 Conflicting Flow All - 465 0 0 Stage 1 - - - - Stage 2 - - - Critical Hdwy - 6.94 Critical Hdwy Stg 1 - - - Critical Hdwy Stg 2 - - Follow-up Hdwy - 3.32 - Pot Cap -1 Maneuver 0 544 0 Stage 1 0 - 0 Stage 2 0 - 0 Platoon blocked, % Mov Cap -1 Maneuver - 544 - - Mov Cap -2 Maneuver - - - Stage 1 - - Stage 2 - - - - Approach EB NB SB HCM Control Delay, s 11.9 0 0 HCM LOS B Minor Lane/Major Mvmt NBT EBLn1 SBT SBR Capacity (veh/h) 544 - HCM Lane V/C Ratio - 0.04 - HCM Control Delay (s) - 11.9 HCM Lane LOS - B HCM 95th %tile Q(veh) 0.1 Traffic Analysis Projected PM Synchro 11 Report PTG Page 3 Appendix H: Turn Lane Analysis IO/1013 5.0— FM ,Ore —,pro/erls�stardarOSVoaO•aY�0030p-s�00301-01.Jgn 14 A �- ^ to D W N C) y Z, m T ...... dG. T �o aye a y, _ - - T G) ELn Z C. Ln x y _ n Y 3 3 n a o 3 o Z REVISION T I "' _ a e t? 1~71 ^ f' rn - y n o 2 U) zo8 Wa A no ��r meati �° T _ Ln rn rri CO arn t a� my T m m n fLn T J m - - C _ ➢ o o n > n o m v p ^ m y I o n 1 l/1 �, xan 1 k yl 0 G1 T Z O ow� Ln ry 2 O nom<m i1 a� � n➢ D c ... (/1 a -mc W ? - om <Oa DR ➢_meta DR a E AAa nC D '�° A Aa nes Ames nn EZ ➢ -1 �- — ¢ t, S y n C � ¢ N � y ¢ {� � y T n mo m o ° " y TLn ° n T A Q r I— r^ n r— to n -- y z 4 T v �— CID �— an D v o m y o e p m ^ _ o m a o > A � wA '^ A WA '�`➢ � ➢ to lA w z urn ➢ yy 4y W 3 � � a C int A a o^ Z QNNo�oQ _ n m p �m � 2 co T o^ Z O o�m � R 4 1n n es o a o 3 o rn Q4y4111 Seminole County Public Schools School Impact Analysis School Capacity Determination (Non -Binding) ' To: Dan Ryan, The Christian Sharing Center, Inc * 407-260-9155 * dan.ryan@thesharingcenter.org Eileen Hinson, AICP, City of Sanford * 407-688-5147 * Eileen. Hinson(d,)sanfordfl.gov From: Jordan Smith, AICP, PP, Facilities Planner, Seminole County Public Schools Date: March 20, 2024 RE: Sharing Common (Sanford) Seminole County Public Schools (SCPS), in reviewing the above request, has determined that if approved, the FLUM designation and/or zoning will generate school age children. Description: Proposed Rezone from AG, Agriculture and RC -1, Restricted Commercial to PD, Planned Development and Comprehensive Plan Amendment from LDRSF, Low Density Residential Single Family to MDR, Medium Density Residential of +/5.77 acres generally located ADJACENT TO 6498 N. Ronald Reagan Boulevard (for Find My School reference) within the jurisdiction of the City of Sanford. The applicant is requesting a change to the zoning to allow a maximum of 79 multi -family residential units, to be developed within the proposed land use and zoning designations. Parcel ID (s) #: 13-20-30-300-040A-0000, 13-20-30-300-0160-0000 This review and evaluation is performed on proposed future land use changes, rezones and conditional uses, unplatted parcels, or projects that have not received final entitlement approval. This evaluation does not guarantee that the developments subject to this declaration are exempt from, or determined to meet the school concurrency requirements effective as of January 1, 2008. Changes in enrollment, capacity, any newly platted developments, and any subsequent final development approvals may affect the provision of concurrent school facilities at the point of final subdivision approval, including the potential of not meeting statutory concurrency requirements based on future conditions. Based on information received from the jurisdiction and the application for the request, SCPS staff has summarized the potential school enrollment impacts in the following tables: CSA Capacity: DEVELOPMENT IMPACT ON STUDENT GENERATION BY CSA AFFECTED CSAs CSA E-10 CSA M-1 CSA H-1 CAPACITY 2,660 5,732 7,739 3 -YEAR PROGRAM CAPACITY - - - ENROLLMENT 2,132 4,535 6,599 AVAILABLE CAPACITY 528 1,197 1,140 SCALD RESERVATIONS TO DATE 503 602 805 SIA -Sharing Commons 14 6 8 REMAINING CAPACITY 1 1110 589 T5 327 haps-//scminalcschools sharepoint comlsites'i'aciliticsplanningiSltared Dl mcamf\ew Uircctoricsi lanningMe%clnpment trackinUO SIAs'SIA 20242--06_SIA Sharing Commonsr\oticc - Sharing Commons doer Comments CSA Evaluation: At this point, the students generated at the three CSA levels would be able to be accommodated without exceeding the adopted levels of service (LOS) for each CSA by school type, or there is adjacent capacity to meet LOS as allowed by interlocal agreement. Any planned expansions/additions in the current five-year capital plan would provide additional student capacity to relieve the affected schools is reflected in this review. Zoned School Enrollment: For informational purposes, the below table indicates the analysis based on the individual school zones within the CSA under current conditions. At this point, the potential students generated WILL be able to be accommodated without exceeding the adopted Levels of Service (LOS) for the currently zoned schools. Any planned expansions/additions that would provide additional student capacity contained in the current five-year capital plan and scheduled to be completed within the next three years are included in this review. ZONEDSCHOOL ELEMENTARY SCHOOLS Region 3 Hamilton Midway Pine Crest CSA E-10 CAPACITY 2,660 754 1,046 860 2,660 3 -YEAR PROGRAM CAPACITY 2,682 3,917 6,599 AVAILABLE CAPACITY - ENROLLMENT 2,132 658 804 670 2,132 AVAILABLE CAPACITY 528 96 242 190 528 SCALD RESERVATIONS TO DATE 503 182 2081 185 503 SIA - Sharing Commons 14 - - 1 14 REMAINING CAPACITY 10 961E) 24210 190 11 Region 3 Elementary Schools include Hamilton, Midway, and Pine Crest ZONEDSCHOOL MIDDLE SCHOOLS Greenwood Lakes Markham Woods Millennium Sanford CSA M-1 CAPACITY 1,268 1,260 1,757 1,447 5,732 3 -YEAR PROGRAM CAPACITY 2,682 3,917 6,599 AVAILABLE CAPACITY - ENROLLMENT 943 882 1,336 1,374 4,535 AVAILABLE CAPACITY 325 378 421 73 1,197 SCALD RESERVATIONS TO DATE 27 182 2081 185 602 SIA - Sharing Commons 6 -I 1 1 6 REMAINING CAPACITY 0 29210 19610 21310 (112) C) 589 ZONEDSCHOOL HIGH SCHOOLS Lake Mary Seminole CSA H-1 CAPACITY 2,805 4,934 7,739 3 -YEAR PROGRAM CAPACITY - ENROLLMENT 2,682 3,917 6,599 AVAILABLE CAPACITY 123 1,017 - 1,140 SCALD RESERVATIONS TO DATE 17 788 805 SIA - Sharing Commons 8 - 8 REMAINING CAPACITY 10, 98 10 229 10 327 httpsl/scminolcschools shnrcpoint.cum/sitcs/Facililicsplanninl./Sharcd DocumcrosNcw nircctoric-Jl'InnningrDcvclopmcnt tracking/0 SlAs/SIA 202424-06_SIA Shnring CommonJNoticc - Sharing Commons.docx Terms and Definitions: Capacity: The amount of satisfactory permanent student stations as calculated on the date of the second FDOE count in October of the current school year. The number of students that can be satisfactorily accommodated in a room at any given time and which, is typically a lesser percentage of the total number of student stations. NOTE: Capacity is ONLY a measure of student stations, not of enrollment. Concurrency Service Area (CSA): A geographic unit promulgated by the School Board and adopted by local governments within which the level of service is measured when an application for residential development is reviewed for school concurrency purposes. The CSA listed represents the area that the capacity is considered and student assignment may be in a CSA adjacent to the project. Enrollment: For the purposes of concurrency review, the enrollment level is established each year as per Public School Interlocal Agreement Section 12.4 A, which sets the level on the date of the second full time equivalent (FTE) survey for FDOE, generally taken in mid-October. Programmed 3 Year Additions: New permanent school capacity within the CSA, which will be in place or under actual construction within the first three years of the current SCPS Capital Improvement Plan. Remaining Capacity: The capacity available for future development after the addition of any programmed capacity and less the reserved capacity. Reserved Capacity: The total number of student stations reserved in the respective CSA's that are assigned to projects via a SCALD certificate. School Size: For planning purposes, each public school district must determine the maximum size of future elementary, middle and high schools. Existing school size is determined solely through FISH data. Seminole County Public Schools has established the sizes of future schools (with the exception of special centers and magnet schools) as follows: i) Elementary: 780 student stations ii) Middle: 1500 student stations iii) High: 2,800 student stations School Attendance Zone: The established geographic area that identifies school assignments pursuant to Board Policy for each District school or region of schools, other than county wide magnet schools. Students shall attend the school(s) serving their residential or regional attendance zone unless otherwise permitted by Board Policy Students Generated by Project: is determined by applying the current SCPS student generation rate (calculated in the 2017 Impact Fee Study) to the number and type of units proposed. The number of units is determined using information provided by the jurisdiction and/or from the applicant's request. If no actual unit count is provided the unit count is then estimated based on the maximum allowable density under the existing/proposed future land use designation. Eventual Student assignment may not be to the school in closest proximity to the proposed residential development. Utilization: A State Board Rule prescribed percentage of student stations that a room (and proportionately, a school and school district) can satisfactorily accommodate at any given time. From a school/campus analysis perspective, "utilization" is determined as the percentage of school enrollment to capacity. Current DOE established K-12 utilization factors are as follows: Elementary 95%, Middle 90%, High 95% haps//scminolcschools sharcpoim cam/sires/FnciliticsPlanning/Sltarcd Do rncros[Nm Dirworics/PlnnningfDecclopmcnt tmckinWO SIA.%tSI A 2024f-7-14)6 SIA Staring CommonsNoticc- Sharing Connnons doc.- City of Sanford Comprehensive Plan Amendment Site: 6498 North Ronald Reagan Boulevard Parcel(s): 13-20-30-300-040A-0000 & 13-20-30-300-0160-0000 Proposed Future Land Use: General Commercial (GC) 5.77 Acres Existing Land Use Current Future Land Use Seminole County Existing Land Use commercial Seminole County Current Future Land Institutional Use Public - Other �] Commercial I__ ] Residential - Mobile Home Low -Density Residential l� Residential -Single Family 0 Planned Development Commercial -Vacant County Owned Public/ (� Other Vacant Quasi -Public l� Residential - vacant.i Recreation Mo. IE Sanford Current Future Land Use Mobile Home m 7-1 ROCKY 3F RIDGE Low Density Res. Single Family Neighborhood a� Commercial Sanford Future Land Use Mobile Home Low Density Res. Single Family Neighborhood Commercial Q General Commercial Existing Land Use WYNN'DRiIVE — - 00�' F UJI o Qi / o�NOVSE 3 COVRC �� W— m Mo. IE HARBOR PLACE ;v m 7-1 ROCKY 3F RIDGE S a� RIDGE 3� A�� CANARYILAKE r COURT Current Future Land Use WYNN'DRN j Y 00, F o 8 N00se `F s Ld SE .0 m MONROE HARBOR �, PLACE w m 7-1 ROCKY 3F RIDGE S m ROCKY RIDGE 3 PrACE ��� CANARY rn.y LAKE'COURT O Proposed Future Land Use Y > WYNN'DRIVE� W 0 0 U 0 a F o 8 N00se `F s GGD v MONROE HARBOR � IPL.ACE �QQ9 O w m 7-1 ROCKY 3F RIDGE �0 PLACE CANARY -LAKE COURT -,'. i R 1. 1 4 "A COURT. DCETER COU�RT� e -.'1.; i'y r '`"iY._s'e%e1 „�' �i. . ;� �'• •p ``zz '�� - y�S' � �•� �f' 2 �� ><F �+ �°!C .s ti CI KENT COURT 9i Y p ROLE -- Z BA ,,� v'"t'. ��. may[{, �. �• ;. - t;-�- � ' DOWNING STREET �" G1�' �• -� iii!. �J� F� �.'F ikV TE N DRNE L }t ,,$ ,� e4 w 4 � w i" A, +� SI , r a., oR J ti tag tag .i ii.�Yl •A� � C ® 7C Ism )t ZZ MONROE HARE{OR+PLACE,. (� �$ :f ry k INj- at. :��sec!y,}y °''R.^.•'XI'. W m I Al y ,l ROCKYe RIDGE PLACE •'Mk _ ' CANARYLLAKE COURT � L Site 6498 North Ronald Reagan Boulevard_ SHADES CREST t 13-20-30-300-040A-0000 & - 13-20-30-300-0160-0000 ,. °TUCKERVLANE`� Y r i _ .r. a;i '�. `7 si �` - . .c .}tw -.. a'�fT: R^ e._. 'MI6 .'- 7CITY OF ,SAIVFORD AFFIDAVIT OF OWNERSHIP AND DESIGNATION OF AGENT FLORIDA www.sanfordfl.gov Please use additional sheets as needed. If any additional sheets are attached to this document, please sign here and note below: Ownership Nina Yon Tax Parcel Number(s): 13-20-30-300-040A-0000 Address of Property: CR 427, Sanford, FL 32773 for which this rezoning and land use change , hereby attest to ownership of the property described below: II. Designation of Applicant's Agent (leave blank if not applicable) application is submitted to the City of Sanford. As the owner/applicant of the above designated property for which this affidavit is submitted, I designate the below named individual as my agent in all matters pertaining to the application process. In authorizing the agent named below to represent me, or my company, I attest that the application is made in good faith and that all information contained in the application is accurate and complete to the best of my personal knowledge. Applicant's Agent (Print): Daniel Ryan Signature: Agent Address: 600 N. Hwy 17-92, suite 130, Longwood, FL 32750 Email: dan.ryan@thesharingcenter.org III. Notice to Owner Phone: 407-496-6406 Fax: A. All changes in Ownership and/or Applicant's Agent prior to final action of the City shall require a new affidavit. If ownership changes, the new owner assumes all obligations related to the filing application process. B. If the Owner intends for the authority of the Applicant's Agent to be limited in any manner, please indicate the limitations(s) below. (i.e.: limited to obtaining a certificate of concurrency; limited to obtaining a land use compliance certificate, etc.) The owner of the real property associated with this application or procurement activity is a (check one) ❑ Individual ❑ Corporation ❑ Land Trust ❑ Partnership ❑ Limited Liability Company a Other (describe): 501 C3 Not for profit 1. List all natural persons who have an ownership interest in the property, which is the subject matter of this petition, by name and address. 2. For each corporation, list the name, address, and title of each officer; the name and address of each director of the corporation; and the name and address of each shareholder who owns two percent (2%) or more of the stock of the corporation. Shareholders need not be disclosed if a corporation's stock are traded publicly on any national stock exchange. 3. In the case of a trust, list the name and address of each trustee and the name and address of the beneficiaries of the trust and the percentage of interest of each beneficiary. If any trustee or beneficiary of a trust is a corporation, please provide the information required in paragraph 2 above. Name of Trust: 4. For partnerships, including limited partnerships, list the name and address of each principal in the partnership, including general or limited partners. If any partner is a corporation, please provide the information required in paragraph 2 above. 5. For each limited liability company, list the name, address, and title of each manager or managing member; and the name and address of each additional member with two percent (2%) or more membership interest. If any member with two percent (2%) or more membership interest, manager, or managing member is a corporation, trust or partnership, please provide the information required in paragraphs 2, 3 and/oro above. Name of LLC: 6. In the circumstances of a contract for purchase, list the name and address of each contract purchaser. If the purchaser is a corporation, trust, partnership, or LLC, provide the information required for those entities in paragraphs 2, 3, 4 and/or 5 above. Name of Purchaser: Date of Contract: NAME TITLE/OFFICE/TRUSTEE OR BENEFICIARY ADDRESS % OF INTEREST Nina Yon President & CEO 600 N. Hwy 17-92, suite 130. Longwood FL 32750 0 Gail Bittman Board Chair 600 N. Hwy 17-92, suite 130. Longwood FL 32750 0 Steve Reed Past Chair 600 N. Hwy 17-92, suite 130. Longwood FL 32750 0 Ron Davoli Vice -Chair External 600 N. Hwy 17-92, suite 130. Longwood FL 32750 0 Michelle Smith Vice -Chair Internal 600 N. Hwy 17-92, suite 130. Longwood FL 32750 0 Michael Heald Treasurer 600 N. Hwy 17-92, suite 130. Longwood FL 32750 0 Mary Sherris Secretary 600 N. Hwy 17-92, suite 130. Longwood FL 32750 0 (Use additional sheets for more space.) 7. As to any type of owner referred to above, a change of ownership occurring subsequent to the execution of this document, shall be disclosed in writing to the City prior to any action being taken by the City as to the matter relative to which this document pertains. 8. 1 affirm that the above representations are true and are based upon my personal knowledge and belief after all reasonable inquiry. I understand that any failure to make mandated disclosures is grounds for the subject rezone, future land use amendment, special exception, or variance involved with this Application to become void or for the submission for a procurement activity to be non- responsive. I certify that I am legally authorized to execute this Affidavit and to bind the Applicant or Vendor to the disclosures herein. 4/3/2023 Date STATE OF FLORIDA COUNTY OF Seminole Sworn to (or affirmed) and subscribed before me by Nina Yon on this 4th day of April 2023 Signature of Notary Public Personally Known X OR Produced Identification Type of Identification Produced Affidavit of Ownership - January 2015 Owner, Agent, Applicant Signature Print, Type or Stamp Name of Notary Public =°"RYP°MICIC�Decembcr 5 MY COM �y EXPIRE CITY or SANFORD AFFIDAVIT OF OWNERSHIP AND DESIGNATION OF AGENT f L0.41RA v .sanfordfl.gov Please use additional sheets as needed. If any additional sheets are attached to this document, please sign here and note below: I. Ownership I, Dale & Company LLC hereby attest to ownership of the property described below: Tax Parcel Number(s): 13-20-30-300-0160-000 Address of Property: 6498 N. Ronald Reagan Blvd, Sanford, FL 32773 for which this rezoning and land use change application is submitted to the City of Sanford. Ii. Designation of Applicant's Agent (leave blank if not applicable) As the owner/applicant of the above designated property for'which this affidavit is submitted, I designate the below named individual as my agent in all matters pertaining to the application process. In authorizing the agent named below to represent me, or my company, I attest that the application is made in good faith and that all information contained in the application is accurate anis complete to the best of my personal knowledge. Applicant's Agent (Print): Daniel Ryan Signature:l� Agent Address: 600 N. Hwy 17-92, suite 130, Longwood, FL 32750 Email: dan.ryan@thesharingcenter.org Phone: 407-496-6406 Fax: Ill. Notice to Owner A. All changes in Ownership and/or Applicant's Agent prior to final action of the City shall require a new affidavit. If ownership changes, the new owner assumes all obligations related to the filing application process. B. If the Owner intends for the authority of the Applicant's Agent to be limited in any manner, please indicate the limitations(s) below. (i.e.: limited to obtaining a certificate of concurrency; limited to obtaining a land use compliance certificate, etc.) The owner of the real property associated with this application or procurement activity is a (check one) ❑ Individual o Corporation o Land Trust o Partnership Zimited Liability Company ❑ Other (describe): 1. List all natural persons who have an ownership interest in the property, which is the subject matter of this petition, by name and address. 2. For each corporation, list the name, address, and title of each officer; the name and address of each director of the corporation; and the name and address of each shareholder who owns two percent (2%) or more of the stock of the corporation. Shareholders need not be disclosed if a corporation's stock are traded publicly on any national stock exchange. 3. In the case of a trust, list the name and address of each trustee and the name and address of the beneficiaries of the trust and the percentage of interest of each beneficiary. If any trustee or beneficiary of a trust is a corporation, please provide the information required in paragraph 2 above. Name of Trust: 4. For partnerships, including limited partnerships, list the name and address of each principal in the partnership, including general or limited partners. If any partner is a corporation, please provide the information required in paragraph 2 above. 5. For each limited liability company, list the name, address, and title of each manager or managing member; and the name and address of each additional member with two percent (2%) or more membership interest. If any member with two percent (2%) or more membership interest, manager, or managing member is a corporation, trust or partnership, please provide the information required in paragraphs 2, 3 and/or 4 above. Name of LLC: Dale & Company LLC 6. In the circumstances of a contract for purchase, list the name and address of each contract purchaser. If the purchaser is a corporation, trust, partnership, or LLC, provide the information required for those entities in paragraphs 2, 3, 4 and/or 5 above. Name of Purchaser: The Christian Sharing Center Date of Contract: 12.28.2022 NAME TITLE/OFFICE/TRUSTEE OR BENEFICIARY ADDRESS % OF INTEREST M b i0 u y (Use additional sheets for more space.) 7. As to any type of owner referred to above, a change of ownership occurring subsequent to the execution of this document, shall be disclosed in writing to the City prior to any action being taken by the City as to the matter relative to which this document pertains. 8. 1 affirm that the above representations are true and are based upon my personal knowledge and belief after all reasonable inquiry. I understand that any failure to make mandated disclosures is grounds for the subject rezone, future land use amendment, special exception, or variance involved with this Application to become void or for the submission for a procurement activity to be non- responsive. I certify that I am legally authorized to execute this Affidavit and to bind the Applicant or Vendor to the disclosures herein. t/te Owner, Agent, Applicant Signature H&911 For 'D*STATE OF FLORIDA COUNTY OF SC (�(( �J0 L Sworn to (or affirmed) and subscribed before me by446't_ i�"(A(�v/ 'h on this 3 day of k PA f L_ , 20 a 3 Signature o ofa(�U Pers onally Known OR Produced Identification Type of Identification Produced Affdawl of Ovmership - January 2015 Print, Type or Stamp Name of Notary Public DEBORAH L. BAUER /£ r NOTARY F J31- P --r- U URIDA - y sscn cnG • ik5r024 2 C I V IL EN GIN E E R S CENTRAL FLORIDA ENGINEERING CONSULTANTS, LLC INFRASTRUCTURE CONSULTANTS Bridging Communities: Proposal for Affordable Workforce Housing The Sharing Commons at 5 Points We seek to address the need for additional workforce housing with this Land Use Change Request from Neighborhood Commercial (pid 040A) and Agriculture (pid 0160) to General Commercial. We are seeking this change to a compatible Land Use, in order to allow for the Sharing Center's 79 -unit apartment complex, aiming to help fill the gap in more affordable options amidst rising market rates. Like other communities, Sanford, a city of history and progress, faces a challenge of affordability. At the heart of this proposal is the essence of community. It recognizes that affordable housing is not just about brick and mortar; it is about creating spaces where Lives intertwine, where dreams find fertile ground to grow. This proposed 79 -unit apartment complex is more than just structures — it is a promise to bridge the gap, to bring together diverse backgrounds and aspirations under one roof. The Sharing Commons at Five Points symbolizes hope, bridging divides and offering stability and dignity to those who keep Sanford thriving. It's not just a Land Use change; it's a commitment to change lives. It's about recognizing that the true wealth of a city lies not just in its buildings but in the strength of its community. Let this proposed 79 -unit apartment complex stand as a testament to Sanford's unwavering spirit, its resilience, and its commitment to building a future where all can thrive. 1111 N. RONALD REAGAN BOULEVARD • SUITE 101 • LONGWOOD, FLORIDA 32750 PHONE (407) 599-7010 • MAIL@FLORIDAENG.COM W N F -A O lD 00 V 61 U'i P W N 1!— ' tD roo ns \ 'a N Vin• I� i 13 i iSIIJGi,� j QID ebe En N� I I I � I I 1 vvv �=r;rD Z I p(Dj I Di m 13 n Q S V�i ' � 3 i 1 1 Five Points Village City of Sanford, Florida TRAFFIC IMPACT STUDY Prepared for: The Sharing Center 600 N YUS Highway 17-92, Suite 130 Longwood, FL 32750 Prepared by: PTG Premier Traffic Group PremierTrafficGroup@gmail.com 350 E Crown Point Road, Suite 1100 Winter Garden, FL 34787 April 2024 EXECUTIVE SUMMARY This traffic analysis is being conducted to assess the impact of the proposed Five Points Village 79 townhome development located north of CR 427/N Ronald Reagan Boulevard approximately 200 feet southwest of Carriage Cove Way/Bedford Road in the City of Sanford, Florida. The analysis included a determination of project trip generation, a review of existing and projected roadway and intersection capacity and a review of access operations. The results of the traffic analysis are summarized as follows: • The proposed development will generate a total of 581 daily trips of which 47 and 55 will occur during the AM and PM peak hour, respectively. • Access to the site will be provided via a right-in/right-out access driveway connection onto CR 427/N Ronald Reagan Boulevard. • An analysis of the study roadway segments indicates that the study roadway segments currently operate adequately within their adopted Level of Service standard and are projected to continue to do so upon buildout of the proposed development. • An analysis of the study intersections indicates that the study intersections currently operate adequately within their adopted Level of Service standard and are projected to continue to do so upon buildout of the proposed development. • The existing southbound left turn lane at the CR 427 and Meeting Place intersection and the exiting northbound left turn storage lane length at the CR 427 and Bedford Road intersection were analyzed to be adequate in length to accommodate the proposed development. Based on the analyses conducted, approval of the proposed project is requested from a transportation perspective since the project does not adversely impact any of the study roadway segments or intersections. PROFESSIONAL ENGINEERING CERTIFICATION I hereby certify that I am a Professional Engineer properly registered in the State of Florida practicing with Premier Traffic Group a dba of Karma Consultancy, LLC. and that I have supervised the preparation and approve the evaluation, findings, opinions, conclusions, and technical advice hereby reported for: PROJECT: Five Points Village LOCATION: City of Sanford, Florida I acknowledge that the procedures and references used to develop the results contained in these computations are standard to the professional practice of Transportation Engineering as applied through professional judgment and experience. NAME: Vasu T.`PRrg4ud„Q� f��, P.E. #: Florid'' N9.7 �Do DATE: A rbr..tL'��� SF� Yjj �a • TW SIGNATURE: ` ) � C�' F(pR10r • .� TABLE OF CONTENTS 1.0 INTRODUCTION............................................................................................................... 1 1.1 Data and Methodology................................................................................................................................1 1.2 Study Area.........................................................................................................................................................2 1.3 Planned and Programmed Improvements............................................................................................2 2.0 EXISTING TRAFFIC CONDITIONS....................................................................................3 2.1 Roadway Segment Analysis........................................................................................................................3 2.2 Intersection Capacity Analysis...................................................................................................................3 3.0 TRIP GENERATION........................................................................................................... 5 3.1 Trip Generation...............................................................................................................................................5 3.2 Trip Distribution/Assignment....................................................................................................................5 4.0 PROJECTED TRAFFIC CONDITIONS................................................................................ 7 4.1 Background Traffic Projection...................................................................................................................7 4.2 Roadway Segment Analysis........................................................................................................................7 4.3 Intersection Capacity Analysis...................................................................................................................8 4.4 Turn Lane Analysis.........................................................................................................................................9 5.0 STUDY CONCLUSIONS...................................................................................................11 Appendix A: Preliminary Concept Plan Appendix B: Methodology Coordination Appendix C: Seminole County CMS Appendix D: Traffic Volumes Appendix E: Existing Intersection Analysis Output Appendix F: Historical Trends Analysis Appendix G: Projected Intersection Analysis Output Appendix H: Turn Lane Analysis i LIST OF TABLES Table 1: Existing Roadway Segment Capacity Analysis.........................................................................................................3 Table 2: Existing Intersection Capacity Analysis.......................................................................................................................4 Table3: Trip Generation....................................................................................................................................................................5 Table 4: Projected Roadway Segment Capacity Analysis.....................................................................................................8 Table 5: Projected Intersection Capacity Analysis...................................................................................................................9 Figure 1: Project Location Map............ Figure 2: Trip Distribution Map............ LIST OF FIGURES 11 .......................................................................................1 ....................................................................................... 6 1.0 INTRODUCTION The proposed Five Points Village 79 townhome development is located north of CR 427/N Ronald Reagan Boulevard approximately 200 feet southwest of Carriage Cove Way/Bedford Road in the City of Sanford, Florida. Figure 1 depicts the site location and the surrounding transportation network. Access to the site will be provided via a right-in/right-out access driveway connection onto CR 427/N Ronald Reagan Boulevard. A preliminary concept plan is included in Appendix A. 1.1 Data and Methodology Data used in the analysis consisted of site plan/development information provided by the Project Engineers, AM and PM peak hour intersection traffic counts obtained by PTG and roadway segment traffic volumes obtained from Seminole County and the Florida Department of Transportation (FDOT). The analysis was conducted in accordance with the Traffic Impact Analysis (TIA) Methodology Memorandum prepared for the project. A copy of the methodology coordination is provided in Appendix B. Figure 1: Project Location Map Traffic Impact Analysis Five Points Village 1 April 2024 •• Sem,nole CQ Recordx Center _ pWYBAC •Elaka lA.iry�M E4 • e �"� � "(�' E*wW FnneVQ` t • V! �o4M1>rY Okd U '1 �I/die _ IL / d Q4e ... 1 SM I Q E spnny Sc:en4li'dayhdvcnlc:\, SHG N Rauld Reo9>e �- 1 -mile ---___-- Figure 1: Project Location Map Traffic Impact Analysis Five Points Village 1 April 2024 1.2 Study Area The study facilities to be considered in the analysis are listed below. The study area was derived by identifying the roadway segments within a 1 -mile radius and major intersections within a 1/4 - mile radius as discussed in the Seminole County Traffic Impact Guidelines dated 05/07/2023. Study Segments • 059: CR 427 from Sanford Avenue to Sunland Drive • 060: CR 427 from Sunland Drive to County Home Road • 337: CR 427 from Keyes Court to E Lake Mary Boulevard • 150: Lake Mary Boulevard from Country Club to US 17-92 • 150b: E Lake Mary Boulevard from US 17-92 to SR 417 Ramps • 152: E Lake Mary Boulevard from CR 427 to Marquette Avenue • 151a: E Lake Mary Boulevard from SR 417 Ramps to CR 427 • 62a: CR 427 from Silkwood Court to US 17-92 • 344: US 17-92 from CR 427 to Lake Mary Boulevard • 345: US 17-92 from Lake Mary Boulevard to Airport Boulevard Study Intersections • CR 427/N Ronald Reagan Boulevard and Carriage Cove Way/Bedford Road • CR 427/N Ronald Reagan Boulevard and Meeting Place • CR 427/N Ronald Reagan Boulevard and Project Access 1.3 Planned and Programmed Improvements Based on discussions and review of data documented by FDOT, Seminole County and MetoPlan Orlando, there are no pertinent roadway capacity improvements that were planned and programmed within three (3) years of the project buildout. Traffic Impact Analysis Five Points Village 2 April 2024 2.0 EXISTING TRAFFIC CONDITIONS Existing conditions in the vicinity of the site were analyzed to establish a baseline for the traffic conditions prevailing in the vicinity of the proposed development. The analysis included a review of the existing roadway segment capacities and an analysis of the intersection operations at the study intersections. 2.1 Roadway Segment Analysis Table 1 summarizes the existing roadway segment capacity analysis for study segment. The existing roadway segment conditions were analyzed by comparing the existing traffic volumes observed on the study roadway segments to the service volumes at the adopted Level of Service (LOS) standard for the roadway segments. The LOS data was obtained from the latest Seminole County Transportation Management System Spreadsheet, excerpts of which are included in Appendix C. Table 1: Existing Roadway Segment Capacity Analysis Seg ID Roadway Segment Location Lanes PH Dir Capacity Existing Vol Comm Trips Total Vol LOS Stnd Met? 59 CR 427 Sanford Ave to Sunland Dr 4D 42,560 24,403 126 24,529 Yes 60 CR 427 Sunland Dr to County Home Rd 4D 42,560 26,024 1109 27,133 Yes 377 CR 427 Keyes Court to E Lake Mary Blvd 4D 42,560 29,531 306 29,837 Yes 150 Lake Mary Blvd Country Club to US 17-92 4D 42,560 21,311 2273 23,584 Yes 150b E Lake Mary Blvd US 17-92 to SR 417 Ramps 4D 42,560 20,902 4923 25,825 Yes 152 E Lake Mary Blvd CR 427 to Marquette Ave 4D 42,560 21,311 2273 23,584 Yes 151a E Lake Mary Blvd SR 417 Ramps to CR 427 4D 42,560 20,005 9335 29,340 Yes 62a CR 427 Silkwood Ct to US 17-92 4D 42,560 14,889 0 14,889 Yes 344 US 17-92 CR 427 to Lake Mary Blvd 4D 48,000 22,744 466 23,210 Yes 345 US 17-92 Lake Mary Blvd to Airport Blvd 4D 48,000 22,744 0 22,744 Yes The analysis indicates that the study roadway segments currently operate adequately within their adopted Level of Service (LOS) standard. 2.2 Intersection Capacity Analysis Table 2 summarizes the results of the existing intersection capacity analysis. The existing intersection capacity analysis was conducted for the AM and PM peak hour using the Synchro Traffic Impact Analysis Five Points Village 3 April 2024 software and the methods of the Highway Capacity Manual (HCM). The turning movement count data and the existing AM and PM peak hour Turning Movement Volumes are the are included in Appendix D. It should be noted that the raw turning movement counts were not adjusted to peak season volumes using a seasonal adjustment factor obtained from the FDOT Traffic Online website as the traffic conducted were conducted during the peak season. Table 2: Existing Intersection Capacity Analysis Intersection Control Time EB WB NB SB Period Delay LOS Delay LOS Delay LOS Delay LOS CR 427 & Bedford Rd Stop AM 38.9 E 50.6 F 0.1 A 0.2 A PM 1 45.4 E 106.8 F 0.2 A 1.0 A CR 427 & Meeting PI Stop AM -- -- 28.4 D 0.0 A 0.0 A PM -- -- 35.4 E 0.0 A 0.1 A The analysis indicates that the study intersections operate adequately during the AM and PM peak hour period. It should be noted that minor street approaches of the CR 427 and Bedford Road intersection experiences Level of Service F conditions which is a function of the stop - controlled side street approaches to the CR 427 mainline. The detailed Synchro worksheets are included in Appendix E. Traffic Impact Analysis Five Points Village 4 April 2024 3. 0 TRIP GENERATION To determine the impact of this development, an analysis of its trip generation characteristics was conducted. This included a determination of the trips to be generated as well as their distribution and assignment to the surrounding roadways. The estimated project buildout is 2026. 3.1 Trip Generation Table 3 summarizes the trip generation analysis conducted using information published by the Institute of Transportation Engineers (ITE) in the Trip Generation Manual, 77th Edition. The calculation indicated that the proposed development would generate a total of 581 daily trips of which 47 and 55 will occur during the AM and PM peak hour, respectively. The ITE Trip Generation graphs are included as part of the Methodology Memorandum in Appendix B. Table 3: Trip Generation ITE Code Land Use Size Daily AM Peak Hour PM Peak Hour Rate Trips Rate Enter Exit Total Rate JEnterl Exit Total 220 Multi -Family (Low -Rise) 79 DUs 7.36 581 0.6 1 11 36 1 47 0.69 1 35 1 20 1 55 Note: ITE Trip generation equation used as the R -squared value is greater than 0.7 3.2 Trip Distribution/Assignment The trip distribution pattern was derived using historically available traffic counts, knowledge of the travel pattern in the area and engineering/planning judgement. Figure 2 provides the trip distribution developed for this project. Using this trip distribution pattern, project trips were assigned to the surrounding study roadway network. Traffic Impact Analysis Five Points Village 5 April 2024 f� -------- --- Figure 2: Trip Distribution Map ♦ Seminole County Records Centel. E Lako % % 0 Traffic Impact Analysis Five Points Village 6 ApH12024 4. 0 PROJECTED TRAFFIC CONDITIONS An analysis of projected conditions was conducted to determine the proposed development's impact on the roadway segment capacities and to evaluate the operations of the study intersections. The project buildout year for the analysis is 2026. 4.1 Background Traffic Projection Projected traffic volumes consist of background traffic combined with site generated traffic. Typically, background traffic volumes are determined by expanding existing peak hour traffic volumes to the buildout year using an annual growth rate. A historical trend analysis was conducted based on the Annual Average Daily Traffic (AADT) data obtained from the MOT Traffic Online website in the vicinity of the project (see Appendix F). The trend analysis indicated negligible growth, therefore a nominal annual growth rate of 2% was utilized for the analysis. This growth rate was applied to the existing traffic volumes as appropriate in order to determine the projected background volumes in the project buildout year. 4.2 Roadway Segment Analysis Table 4 summarizes the results of the projected study roadway segment capacity analysis. The Projected roadway segment conditions were analyzed by comparing the projected traffic volumes on the study segments to their respective service volumes at the adopted Level of Service (LOS) standard. The total projected traffic volume is composed of background traffic and project trips. Projected background traffic was estimated using the annual growth rate discussed in the previous section. Trac Impact Analysis Five Points Village 7 April 2024 Table 4: Projected Roadway Segment Capacity Analysis Seg ID Roadway Segment Location Lanes PH Dir Capacity Trip Dist Project Vol Total Vol LOS Stnd Met? 59 CR 427 Sanford Ave to Sunland Dr 4D 42,560 60% 349 26,216 Yes 60 CR 427 Sunland Dr to County Home Rd 4D 42,560 40% 232 27,817 Yes 377 CR 427 Keyes Court to E Lake Mary Blvd 4D 42,560 30% 174 31,477 Yes 150 Lake Mary Blvd Country Club to US 17-92 4D 42,560 15% 87 22,677 Yes 150b E Lake Mary Blvd US 17-92 to SR 417 Ramps 4D 42,560 20% 116 22,272 Yes 152 E Lake Mary Blvd CR 427 to Marquette Ave 4D 42,560 5% 29 22,619 Yes 151a E Lake Mary Blvd SR 417 Ramps to CR 427 4D 42,560 15% 87 21,292 Yes 62a CR 427 Silkwood Ct to US 17-92 4D 42,560 20% 116 15,898 Yes 344 US 17-92 CR 427 to Lake Mary Blvd 4D 48,000 60% 349 24,458 Yes 345 US 17-92 Lake Mary Blvd to Airport Blvd 4D 48,000 15% 87 24,196 Yes Note: Total Vol = 2024 Existing Vol x [1+(2%x 3 years)] + Project Vol The analysis indicates that the study roadway segments currently operate adequately within their adopted Level of Service (LOS). 4.3 Intersection Capacity Analysis Table 5 summarizes the results of the projected intersection capacity analysis. The projected intersection capacity and operational analysis was conducted using the Synchro software and the methods of the Highway Capacity Manual (HCM) and was performed for the AM and PM peak hours. The projected volumes for the intersection capacity and operations analysis were calculated as previously discussed. Projected background traffic was estimated using the annual growth rate as previously discussed. The projected peak hour volumes are also provided Appendix D. Traffic Impact Analysis Five Points Village 8 April 2024 Table 5: Projected Intersection Capacity Analysis Intersection Control Time EB WB NB SB Period Delay LOS Delay LOS Delay LOS Delay LOS CR 427 & Bedford Rd Stop AM 45.0 E 71.0 F 0.1 A 0.2 A PM 59.4 F 162.8 F 0.3 A 1.0 A CR 427 & Meeting PI Stop AM -- -- 36.7 E 0.0 A 0.2 A PM — -- 42.1 E 0.0 A 0.3 A CR 427 & Project Access Stop AM 15.7 C - -- 0.0 A 0.0 A PM 11.9 B -- -- 0.0 A 0.0 A The analysis indicates that the study intersections are projected to continue to operate adequately during both the AM and PM peak hour period. The CR 427 and Bedfrod Road minor street approaches will continue to operate at Level of Service F conditions. The Synchro analysis worksheets are included in Appendix G. 4.4 Turn Lane Analysis CR 427 and Meetina Place Intersection A review was conducted to assess the adequacy of the existing exclusive southbound left turn storage lane length at the CR 427 and Meeting Place intersection. The review was conducted to ensure that sufficient storage is available to serve the projected traffic volumes. Total Turn Lane Length Required = Vehicular Deceleration Distance + Queue Storage Deceleration @ 45 mph = 185' (incl. 50' taper), per FDOT Design Standards, (see Appendix H) Queue = 951h percentile queue from Synchro = 0.1 vehicles, use 2 vehicles for queue = 50' Total Turn Lane Length Required = 185' + 50' = 235' (incl. 50' taper) Existing turn lane length = 300' (incl. 50' taper) In summary, based on this analysis the existing exclusive southbound left turn storage lane length at the CR 427 and Meeting Place intersection is adequate in length to accommodate the proposed development. CR 427 and Bedford Road Intersection A review was conducted to assess the adequacy of the existing exclusive northbound left turn storage lane length at the CR 427 and Bedford Road intersection. The review was conducted to ensure that sufficient storage is available to serve the projected traffic volumes. Total Turn Lane Length Required = Vehicular Deceleration Distance + Queue Storage Traffic Impact Analysis Five Points Village 9 April 2024 Deceleration @ 45 mph = 185' (incl. 50' taper), per MOT Design Standards, , (see Appendix H) Queue = 951h percentile queue from Synchro = 0.2 vehicles, use 2 vehicles for queue = 50' Total Turn Lane Length Required = 185' + 50' = 235' (incl. 50' taper) Existing turn lane length = 340' (incl. 50' taper) In summary, based on this analysis the existing exclusive northbound left turn storage lane length at the CR 427 and Bedford Road intersection is adequate in length to accommodate the proposed development. Traffic Impact Analysis Five Points Village 10 Apri 1 2024 5.0 STUDY CONCLUSIONS This traffic analysis is being conducted to assess the impact of the proposed Five Points Village 79 townhome development located north of CR 427/N Ronald Reagan Boulevard approximately 200 feet southwest of Carriage Cove Way/Bedford Road in the City of Sanford, Florida. The analysis included a determination of project trip generation, a review of existing and projected roadway and intersection capacity and a review of access operations. The results of the traffic analysis are summarized as follows: • The proposed development will generate a total of 581 daily trips of which 47 and 55 will occur during the AM and PM peak hour, respectively. • Access to the site will be provided via a right-in/right-out access driveway connection onto CR 427/N Ronald Reagan Boulevard. • An analysis of the study roadway segments indicates that the study roadway segments currently operate adequately within their adopted Level of Service standard and are projected to continue to do so upon buildout of the proposed development. • An analysis of the study intersections indicates that the study intersections currently operate adequately within their adopted Level of Service standard and are projected to continue to do so upon buildout of the proposed development. • The existing southbound left turn lane at the CR 427 and Meeting Place intersection and the exiting northbound left turn storage lane length at the CR 427 and Bedford Road intersection were analyzed to be adequate in length to accommodate the proposed development. Based on the analyses conducted, approval of the proposed project is requested from a transportation perspective since the project does not adversely impact any of the study roadway segments or intersections. Traffic Impact Analysis Five Points Village 11 April 2024 APPENDIX Appendix A: Preliminary Concept Plan i�'\\-\\, reaaea�s���m� tm��e�eee� Own 9phJ 9f9C4N, � f B(�a 0 o 4 e'"+y �'�yt �P+L'� \ _ g'' �� •_',mss-L� �y�sA ����� a � a��'4eB.�lq'•� m m a o Oho ..� ig ---e --- _P c _ _ m N Ego TUCKER DR. +t 3!Eggg g 66' ROW Hip i�'\\-\\, reaaea�s���m� tm��e�eee� Own 9phJ 9f9C4N, � f B(�a 0 o 4 e'"+y �'�yt �P+L'� \ _ g'' �� •_',mss-L� �y�sA ����� a � a��'4eB.�lq'•� m m a o Oho ..� ig ---e --- _P c _ _ m z;;; Ego 3!Eggg Hip tn m _ a Appendix B: Methodology Coordination PT(; Premier Traffic Group METHODOLOGY MEMORANDUM RE: Five Points Village, City of Sanford Traffic Impact Analysis Methodology 03/15/2024 Job # 24159 The following is a methodology outline for the Traffic Impact Analysis (TIA) for the above -referenced project. In general, the TIA will conform to the methodology requirements and guidelines documented by the City of Sanford, Seminole County and the Florida Department of Transportation (FDOT). Project Description This traffic analysis is being conducted to assess the impact of the proposed Five Points Village residential development located north of CR 427/N Ronald Reagan Boulevard approximately 200 feet southwest of Carriage Cove Way/Bedford Road in the City of Sanford, Florida. The proposed project comprises 79 Townhomes. Figure 1 depicts the site location and the surrounding transportation network. Esporna v W 1 I � ♦ I� ♦ is ♦ ♦% Sunny hlead�Ys 1 :vrrenVi Q;ry tdsr.Ne��` Ri I waa," 84d Ewa % Seminole CoumyQ Retards Center E lako Mair E Laka KI 1 L 1 L.. 1 -mile Figure 1: Project Location Map Site Access Access to the site will be provided via a right-in/right-out access driveway connection onto CR 427/N Ronald Reagan Boulevard. Attachment A provides the preliminary site plan. Mailing: 151 SS W Colonial Drive, # 784852, Winter Garden, FL 34787 I Physical: 350 E Crown Point Road, Suite 1100, Winter Garden, FL 34787 PremierTrafficGroup@bamail.com I C 321-948-9594 Five Points Village Traffic Impact Analysis Methodology 03/15/2024 Page 2of3 Trip Generation Table 1 summarizes the trip generation analysis conducted using information published by the Institute of Transportation Engineers (ITE) in the Trip Generation Manua(, 11th Edition. The calculation revealed that the proposed development will generate a total of 581 daily trips of which 47 and 55 will occur during the AM and PM peak hour, respectively. The ITE Trip Generation graphs are included for reference in Attachment B. Table 1: Trip Generation ITE Code Land Use Size Daily AM Peak Hour I PM Peak Hour Rate Trips Rate Enter Exit Total Rate Enter Exit Total 220 Multi -Family (Low -Rise) 79 DUs 7.36 581 0.6 1 11 1 36 47 0.69 35 20 1 55 Trip Distribution The trip distribution pattern was derived using existing traffic counts and knowledge of the traffic patterns in the area to develop a distribution pattern. The trip distribution map is provided in Figure 2. Using this trip distribution pattern, project trips were assigned to the surrounding study roadway network. Supporting traffic data is provided in Attachment C. -19 fir•°" ac,. /: I Esporta Fitnes; W L4<ru / ry8/vd / Oke gnnie ! q„ on: ' 1 1 1 a o, 0qy N Ronald Reagal 9 A d 0 '` ® nam emd Com MI Rd Se-in-1.C eminole County t lvd N,k Records Center reM B�1 E Lake M E ® ® y \ Mary Blvd e \ Figure 2: Trip Distribution Map K,higan St c 1 �9 plhNm Or <_] � f`w.r irrA �� � �� tr?�eR!+rrCr endYir Gay !a 1 i Clydesdale C+ IC nWay 3` F SITE 5 a, 1 a .:I: Way 9`aQe �1a� Shades ^ / ® n TO., L. Y ` ,3OA,nay Sl p"�', Fryrr Ln' —Wynn 1-mile—�_�_—��_ Figure 2: Trip Distribution Map K,higan St Five Points Village Traffic Impact Analysis Methodology 03/15/2024 Page 3 of 3 Study Area The study facilities to be considered in the analysis are listed below. The study area was derived by identifying the roadway segments within a 1 -mile radius and major intersections within a 1/4 -mile radius as discussed in the Seminole County Traffic Impact Guidelines dated 05/07/2023. Study Segments • 059: CR 427 from Sanford Avenue to Sunland Drive • 060: CR 427 from Sunland Drive to County Home Road • 377: CR 427 from Keyes Court to E Lake Mary Boulevard • 150: Lake Mary Boulevard from Country Club to US 17-92 • 150b: E Lake Mary Boulevard from US 17-92 to SR 417 Ramps • 152: E Lake Mary Boulevard from CR 427 to Marquette Avenue • 151 a: E Lake Mary Boulevard from SR 417 Ramps to CR 427 • 62a: CR 427 from Silkwood Court to US 17-92 • 344: US 17-92 from CR 427 to Lake Mary Boulevard • 345: US 17-92 from Lake Mary Boulevard to Airport Boulevard Study Intersections • CR 427/N Ronald Reagan Boulevard and Carriage Cove Way/Bedford Road • CR 427/N Ronald Reagan Boulevard and Meeting Place • CR 427/N Ronald Reagan Boulevard and Project Access Projected Conditions Analysis The projected conditions analysis will be conducted within the following framework: • Counts: Traffic counts will be obtained during the AM and PM peak period and adjusted using a peak season factor as necessary. • Growth Factors: Growth factors, derived from historical traffic volume data, and committed trips will be applied to existing traffic counts to develop projected/buildout background traffic volumes. • Analysis Periods: Analyses will be performed for existing (2024) and projected/buildout conditions (2026). • Projected Conditions Traffic: Project buildout traffic volumes will be added to the future background traffic volumes to obtain total project/buildout traffic volumes. • Roadway Analysis: Roadways segments will be evaluated using the Seminole County service volume capacities, as applicable. • Intersection Analysis: Intersection capacity analysis will be performed using the latest operational analysis procedures documented in the Highway Capacity Manual as applied using the Synchro software. • Turn Lane Analysis: Turn Lane analysis will be performed for all the site access driveways based on Section 1.3 of the Seminole County Public Works Engineering manual (dated 07/24/2013) and designed based on FDOT requirements. Traffic Impact Study Report The traffic report prepared will summarize the study procedures, analyses and recommendations. END Attachment A Preliminary Site Plan F 1 � y if Ti$ �CEEJTRAL FLORIDA ENGINEERING CONSULTANTS, LLC auw snnF MASTER PLAN I,., m :9 � G'i fngne.9nq - Lmtl q nq till �nx.ae x ed a ma, im ,.0�. 7°�„„ ;,,� FIVE POINTS VILLAGE, PD City of Sanford, Florida c 5' 3 - mmd ='sm VIM .9 •z3 m i .t -- - TUCKER DR. 9, 66' ROW �o m 7p. 3x go go >$ x L� • • � sN 3 � _� m �� Q��A v 0 ✓� O u \ u u 11 - --` IMI u le 1 � y if Ti$ �CEEJTRAL FLORIDA ENGINEERING CONSULTANTS, LLC auw snnF MASTER PLAN I,., m :9 � G'i fngne.9nq - Lmtl q nq till �nx.ae x ed a ma, im ,.0�. 7°�„„ ;,,� FIVE POINTS VILLAGE, PD City of Sanford, Florida c 5' 3 - mmd ='sm 7p. 3x go go >$ x L� • • � sN 3 � _� m �� Q��A 1 � y if Ti$ �CEEJTRAL FLORIDA ENGINEERING CONSULTANTS, LLC auw snnF MASTER PLAN I,., m :9 � G'i fngne.9nq - Lmtl q nq till �nx.ae x ed a ma, im ,.0�. 7°�„„ ;,,� FIVE POINTS VILLAGE, PD City of Sanford, Florida Attachment B Trip Generation Information Land Use: 220 Multifamily Housing (Low -Rise) Description Low-rise multifamily housing includes apartments, townhouses, and condominiums located within the same building with at least three other dwelling units and that have two or three floors (levels). Various configurations fit this description, including walkup apartment, mansion apartment, and stacked townhouse. • A walkup apartment typically is two or three floors in height with dwelling units that are accessed by a single or multiple entrances with stairways and hallways. • A mansion apartment is a single structure that contains several apartments within what appears to be a single-family dwelling unit. • A fourplex is a single two-story structure with two matching dwelling units on the ground and second floors. Access to the individual units is typically internal to the structure and provided through a central entry and stairway. • A stacked townhouse is designed to match the external appearance of a townhouse. But, unlike a townhouse dwelling unit that only shares walls with an adjoining unit, the stacked townhouse units share both floors and walls. Access to the individual units is typically internal to the structure and provided through a central entry and stairway. Multifamily housing (mid -rise) (Land Use 221), multifamily housing (high-rise) (Land Use 222), affordable housing (Land Use 223), and off -campus student apartment (low-rise) (Land Use 225) are related land uses. Land Use Subcategory Data are presented for two subcategories for this land use: (1) not close to rail transit and (2) close to rail transit. A site is considered close to rail transit if the walking distance between the residential site entrance and the closest rail transit station entrance is 1/2 mile or less. Additional Data For the three sites for which both the number of residents and the number of occupied dwelling units were available, there were an average of 2.72 residents per occupied dwelling unit. For the two sites for which the numbers of both total dwelling units and occupied dwelling units were available, an average of 96.2 percent of the total dwelling units were occupied. The technical appendices provide supporting information on time -of -day distributions for this land use. The appendices can be accessed through either the ITETripGen web app or the trip 252 Trip Generation Manual 11th Edition • Volume 3� generation resource page on the ITE website (https://www.ite.org/technical-resources/topics/trip: and -parking -generation/). ........................................ For the three sites for which data were provided for both occupied dwelling units and residents, there was an average of 2.72 residents per occupied dwelling unit. It is expected that the number of bedrooms and number of residents are likely correlated to the trips generated by a residential site. To assist in future analysis, trip generation studies of all multifamily housing should attempt to obtain information on occupancy rate and on the mix of residential unit sizes (i.e., number of units by number of bedrooms at the site complex). The sites were surveyed in the 1980s, the 1990s, the 2000s, the 2010s, and the 2020s in British Columbia (CAN), California, Delaware, Florida, Georgia, Illinois, Indiana, Maine, Maryland, Massachusetts, Minnesota, New Jersey, Ontario (CAN), Oregon, Pennsylvania, South Carolina, South Dakota, Tennessee, Texas, Utah, and Washington. Source Numbers 188, 204, 237, 300, 305, 306, 320, 321, 357, 390, 412, 525, 530, 579, 583, 638, 864, 866, 896, 901, 903, 904, 936, 939, 944, 946, 947, 948, 963, 964, 966, 967, 1012, 1013, 1014, 1036, 1047, 1056, 1071,1076 REI General Urban/Suburban and Rural (Land Uses 000-399) 253 Multifamily Housing (Low -Rise) Not Close to Rail Transit (220) Vehicle Trip Ends vs: Dwelling Units On a: Weekday Setting/Location: General Urban/Suburban Number of Studies: 22 Avg. Num. of Dwelling Units: 229 Directional Distribution: 50% entering, 50% exiting Vehicle Trip Generation per Dwelling Unit Average Rate Range of Rates Standard Deviation 6.74 2.46-12.50 1.79 udLd riUL dna r_yuduUn 4000 301 N 'O C W N CL F- 201 F- 101 0 0 100 200 300 X = Number of Dwelling Units X Study Site Fitted Curve Fitted Curve Equation: T = 6.41(X) + 75.31 — — — — - Average Rate R2= 0.86 254 Trip Generation Manual 11th Edition • Volume 3 E 500 Multifamily Housing (Low -Rise) Not Close to Rail Transit (220) Vehicle Trip Ends vs: Dwelling Units On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. Setting/Location: General Urban/Suburban Number of Studies: 49 Avg. Num. of Dwelling Units: 249 Directional Distribution: 24% entering, 76% exiting Vehicle Trip Generation per Dwelling Unit Average Rate Range of Rates Standard Deviation 0.40 0.13-0.73 0.12 Data Plot and Equation 300 200 100 X X 0 0 1000 2000 X = Number of Dwelling Units X Study Site Fitted Curve - - - - - Average Rate Fitted Curve Equation: T = 0.31(X) + 22.85 R== 0.79 ,`u. 7' General Urban/Suburban and Rural (Land Uses 000-399) 255 i i X xiC � X ..... ......... _ ............ X� X X � X X, X X 0 0 1000 2000 X = Number of Dwelling Units X Study Site Fitted Curve - - - - - Average Rate Fitted Curve Equation: T = 0.31(X) + 22.85 R== 0.79 ,`u. 7' General Urban/Suburban and Rural (Land Uses 000-399) 255 Multifamily Housing (Low -Rise) Not Close to Rail Transit (220) Vehicle Trip Ends vs: Dwelling Units On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. Setting/Location: General Urban/Suburban Number of Studies: 59 Avg. Num. of Dwelling Units: 241 Directional Distribution: 63% entering, 37% exiting Vehicle Trip Generation per Dwelling Unit Average Rate Range of Rates Standard Deviation 0.51 0.08-1.04 0.15 Data Plot and Equation 500 400 U) 300 W F F 200 100 X X X -- - - X.. ,X.. X X X X ° 0 1000 X = Number of Dwelling Units X Study Site Fitted Curve Fitted Curve Equation: T = 0.43(X) + 20.55 - - - - - Average Rate Rz= 0.84 2000 256 Trip Generation Manual 11th Edition • Volume 3 Itu. T, i i X _............... _... ------ -- .:-....._. i i i i X i X �� X X X i i i i X X ° 0 1000 X = Number of Dwelling Units X Study Site Fitted Curve Fitted Curve Equation: T = 0.43(X) + 20.55 - - - - - Average Rate Rz= 0.84 2000 256 Trip Generation Manual 11th Edition • Volume 3 Itu. Attachment C Area Traffic Counts r HO H N z d oma Nro NO C7 xHb m H ;3 0z:9 H z ncnH r>0 F-3 Fl H in H � H xo Cn Cf) N ro 0Oy H H > O H L7 H O z N N N N N N N N N N N N I K m 0 0 0 0 0 0 0 0 Co 0 0 0 I m H H H H H H H H F- F- N N N I> H HN W.A UI d>J m Io OHN I ' j m m C) I J rxj u H H H H H N N N N N N N I ':, y 61010161 OlOONNW WN I I C) N N W UI m UI UI 0 0 0 0 0 1 y rxj O O o 0 o 0 0 0 0 0 0 0 I d n 0 r O o 0 0 0 0 0 0 0 0 0 0 I H 'u :d > I I O C)Nnt-jmonn jn in I to I N F-3 c Co n x1 � II II II zzzzzzzzzzzz I d ;U y I H trwJ H '-j Cn 0 'Zi H M O HHH{-'H HH I Clj Gi O N n2: J -I -I m m O O F- F -'H H H I n H OFd mmlOOH000O000 I H z C 0000000000 00 I H H C7H OOOo o 0000000 1 O HK m I z to x [1 1- 0 I H z Hod I z >m�� c pa Cn Lei II m F73 W I H m to m m V] Cn Cn m to U] to m i d o H H � z I HH 4' F--`HF-'HHRH I l0 M m y> mmmmm(D CD H I n N Ham. syr .A.c.cIn-lIncnoo0oo I F3 Cp • 000000000000 H fh [=j 000000000000 1 O (n 6) H Cl) I z to y y I C1 II II H � N H Z %1XHF3 r C7HxO•. xxd I � Ix � ro�F-4u iftl HW �o hj to to to to to to to to to to to to I l7 K 0 H 1 H lyM m000000000000 I O i (a En En 000000000000 I $C1 K F3 F-3 F3 O C1HH F=j CnHyy d Ci t1 U N Ut UlLT' LY' Ln N Ut N U7 U7 Ln I 'rI H C'j'JC jJtn NN W.P.PW NNHNHH I n ti y 1 H x II II H 61 m lO N U W m m"0P P W 1 0 W 0 0 0 0 0 0 0 0 0 0 0 0 1 'O oChj� z 0 H cPIS cm �zz r O H I H cox I z K H H H H i --`H F� [+j NNHNOO U7 -I U7 W ON I n �y. . . . . . . 1 H jy W W .A N N 100N Om 0 -I 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 "d CA H H H N r HO H N z d oma Nro NO C7 xHb m H ;3 0z:9 H z ncnH r>0 F-3 Fl H in H � H xo Cn Cf) N ro 0Oy H H > O H L7 H O z H Nzl7 O U) > N 10 N)0u xHro Cn t�3 xO ozx H z C]wH > H r>'0 H �l H w H t3 H Herz �i ro 1000 O1iz H H y C) H LTi H 0 z N NNN N N NN N N NN N NN I FC to 000000000000000 I LTi H O O H H H H H H H H H H N N N I> H W IoOHN W J�CnM-i W 100H11) 1 ;ii LTi J x o x I O I OD rj t7 I--'Hh-`HHHI--'HHH I WNNW WNNN N IO IO IOW co W I I C) O IO IO W W O N.AIrl 00101 W N A I H ty 0 0 0 0 0 0 0 0 0 0 0 0 0 C. 0 1 t7 r 0 r o 0 0 0 0 o O O O o 0 o O O O 1 H y hi I x .. G) c)nroc)roNxM()roc) ftjrnnro I t=i W I zn• • H�cCnC) II II II zzzzzL+7LT mt-ILTiL=1MDiMm t7 H i FA w H � J to C) z H LTi O I tTi C Gi FTi C) .x H H H H N m m m m (D O lfl lO lfl lfl 1 n t7 H 0 10 w Cn U -_j -_j w .P (n IO N IO Io Cn -1 0D 1 H ` ,'. z r-. 000000000000000 I H H t7 H C. 0 0 0 0 C. 0 0 0 0 0 0 0 0 0 1 O O H FG LTi I z xLT]Kd I w `• F✓ dl K � � i LTi � LTi � xiyN II NH H U) U) U)CnU):E5.:E: :E:z:z:8:8 1 t7 O H I H 0 1x 10 �z HH C 1 C1 LTi H y HHNHHCnCPCnIOI'D OIoO00W I C] a H`• LTi r -_j "I .P m ON -j N I0 Cn 00 �1-I W Cnm 1 H U) cn` • O O O O O O O O O O O O O O O I H I L=7 000000000000000 I 0 F- W m P-3 (n Wa>H(n I z J H H I yII IIH I N to z I N > H "lj F3 xxHLTi x t7 H ;0,- 0`•FG F<FG 1 H "Rd 7o'J CA N m to l0 ko Lo l0 to %D lfl ID lfl lO to I C) 0 HI H "RC1 LTi LTi Zi Jd> W 0000000000001 O U]Cn U) W IO N O 00000000000 I jl FCHHH LTi H H (n W H '-3 I d LTi LT7 ',U I > ... 1 ni ' a LTi Cn Cn Cn Cn Cn to Cn Cn N CP Cn CP CP Cn Cn I > LTi x 'o U) N F, N N W .P .A W N N H N I C) H. . 1 H N II II H JNlflm to NCn W O1 O110 ...� W I O W U'i M Cn 000000000000 I 'o CD -I z 0 H c x C:m �zx H C :E x I L=i z I 10 U1 tC H H H 1 ',b LTi Ln W W W N N Cn Cn y 1 H lJ N NO ;_ :A �I J J Co Co A C P W W I O O O O O O O O O O O O O O O O I ',a LJ U) H 7rH y H Lei H Nzl7 O U) > N 10 N)0u xHro Cn t�3 xO ozx H z C]wH > H r>'0 H �l H w H t3 H Herz �i ro 1000 O1iz H H y C) H LTi H 0 z H O c N ro NOCJ M H ro 00x Hzz nWy by r>0 y 11 H Cl) y H C3 H nz C7 to CD � ro ro00 0 hi U HHS n 1-3 M H 0 z N N N N N N N N N N N N N N N N I FG w n 0000000000000000 I L�j H 0 OOO F-F-`F'h•H F -•F -•F, - HNNN I > y G" J M l00HN W.G Ut d>J W IOOHN I ',U m z y C O •• F O 7r I O J I J J TJ d HF-- HHHF-H HF HF'NNHNN I y NW JC N H N N.A .P m OU O O Ifl N N I I I n 61 W OH OOJ-,J W 7O O U7 070100 I H t�J O O O O O O O O O O O O O O O o I C7 Li En 0 t -I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 r3 c� nnnnnnronronnnroCnnro1 m H C/) I z O F-3ccnn i0 II II II L7 t] [T] C7 L+7 CJ C7 CJ C1 L1 L'] CJ C1 L7 LJ LT] I d H I H b7 HKJ En C) i �a ti z H M O H H H H I n c nN n m6161U7U7O1d16161Nw00wNN I n tJ y Oro W W 61J076161OO1O,A0000100 I H ` z C, O O O O O O O O O O O O O O O O I H H C7 0000000000000000 1 O O H < m I z xL�F<r 1 H `• H J K :� b 1 U y M II NHy O H I H 0 Hz Iz N HH C tJt✓NHH I C1 mF-3> m J J 61616161 J J 00\000000 I n O H`• Lei L-' w (D D, •C W H H W x, (ii C) U7 Ln CD O O 1 y x cn ` •L O O O O O O O O O O O O O O O O I H H -J 000000000000000010 O Cn61H(n I z H z u u i N •, 7 H x 001 3'0, ro PIN xd I K K I F -I xU '�1 f'J w w N wlO lO lO lO 110 lO lO lO lO l0 l0 lO I n O H I H ;o Lxi L+l;c1 OJ6100000000000000I O M in in lD W lD N000000000000 I 'iTl FG 7-3 7-3 F3 [7 H H U M Cf) HH> I d L[TJ �- ? I >... L-] Ut U7 UI U7 UI N U7 UI N U7 U7 U7 U7 U7 U7 N I �p Cn n F3 I H 'h' II II H �A J U1 \D 0100 lONU7W 010110��W I O W OC,I HU76107000000000000 I ',O z0H CxaL� > z x r0H 1H calx 1 Lx7 I F ?y -• H N H H H I ',> L 7 OD N 0 61 • C J J J J H N P. P� A W w I n y I y F�F�NWUlHN0161W WJJJ00 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O I "ill L1 cn F -' Fl y y m H O c N ro NOCJ M H ro 00x Hzz nWy by r>0 y 11 H Cl) y H C3 H nz C7 to CD � ro ro00 0 hi U HHS n 1-3 M H 0 z W x d n H h] O r G) to H c Cf) n �liuu H H�Jmn ZHCIO c,)ron:g HOro zxza H d H H K tl x�lKd y Cl •• y Cl) N H y O H H �z H H a tlHy H • � r W to m H to H H zuuH zxHrl xxd ro ro tKl tKl n 0 H ;U L l tl ;c1 �wtn K H H H Ll H H In �3 �3� Cl Cl ;U zl tl tlXxacn H x II II H w CD z 0 H cxC N �zz NOH L"A Cn K Cl tl F3 H H Cl N N N N N N N N N N N N I K 0 0 0 0 0 0 0 0 0 0 0 0 1 Cl H H H H H H H H H N N N I HNWx,cn 1 JOD100HN I 'd I 1 I CP Cn7 U7 CII V10161m J 6101J I cn cn HN Io.A 10100 W 1061 I 0 0 0 0 0 0 0 0 0 0 0 0 1 u O O O O O O O O O O O O I H n�lnnnnnnrinnn 1 z zzzzzzzzzzld I H I t77 I tl Ul C71 U7 C776161m m61J I n V1 HN 10.A 10 10 W 10m 1 H O 0 0 0 0 0 0 O O O I H 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 z I H I d I H 1 h7 1 �] I n I y I H O O O O O O o 0 0 0 0 l 0 1z m ix i I � 10 10 10 10 10 10 10 LDO(b (b CO I n 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 'JO r' I rl kDw w w ww ww lfl lfl I 1ol01010totototo 10w1.0 I O O O O O O O O O 0 0 0 1 "d IH I �l N N NN.A.P.A H 00 I n .. W O.(o JCYJJ OH.A I O 0 0 0 0 0 0 0 0 O 0 0 I "o H N z u ocny 13 H NOl7 Cn H ;3 °x0z� H z C) Cl) y > H r>0 H11 H (!� y d H ynz t� ro ro00 0 Nl o H I11 -I n Cl H 0 z H Nzd ocn�rg N 10 N O d xHITI ro OON >HH r>0 H3 N CHI) H dH� HCiz �d W W m ro 1000 011;d H HH - n H [Ti H 0 z N N N N N N N N N N N I K w n 0 0 0 0 0 0 Co 0 0 0 0 I m H 0 H H H H H H H H N N N I>, H c N W.,(nm--jmko(DHN I 'u m z .. y K J .. H- J I 0) J H N N N N N N W W W W (A I I I C) NOH Wm kD N.A H00 I H h] 000(nOcn000Cn(n I d En '=J O t-' 00000(D00000 1 H M ti •• G'] monnnnnnCinn 1 H V] I z H O c C (n C] N z ;U II II II tncncnt'ntn�cn��cn 1 d � H Hf=iton I m zHMO I N 0 G) hi n x NNNNNNW W W W I n f+i HOro NOHWM-,0N.PHO I H N :E:='za OOO U'1 O Ln O0O U7 I H H d H O O O O O O O O O O O 1 O xLK=iKd ;rJ �i `• 1 H ro Li 0 OHH 1 H x H Fa � txj M I Ci H `• t J t'' I H CnI H hO [i o0 0000000010 K cnrnHtn I z H H I U7 z I C d to H d > H x H 7o X H L=i Ci �u xxd`- I .A K K I N roC�� n I ro J F-1 n W'O tij to to w 10 10 10 10 00 co W0 1 O H I H cn 'aITI 7 d 00000000000 I O Cil cn (n C/) 00000000000 I ,j .c, KHHH io C'i HH n �o LM �nHHy I d L�7 C7 �7 1 xJ m ko LD io io �o io I [=i X 'a co io io �o io io io I (� y I x II II H io �o �o �o �o io I OH W o000 0o Iii CD q hi z O H C x a N H H H H ZO N N N O L> H I H a 00 NITI N'li O OOH O K H H H H I C'] H .0 .1�- .A H O I CZ I H 'j,7 (ft JCOJ OH I O 0 0 0 0 0 0 I w [�7 W H H H [Tl H Nzd ocn�rg N 10 N O d xHITI ro OON >HH r>0 H3 N CHI) H dH� HCiz �d W W m ro 1000 011;d H HH - n H [Ti H 0 z x e 0 0 r xl y H Cl) n H II II II H r+]CDn zHMO c) -jnx x z C H d y y K L] xr�Kd y t7 K7J� M CJ ,ro y� II N H y O H H �z H Lam] i-3 b H,• M to rn H Cn H y z0°H z1XHtJ PIN xd ro ro�� II O H KH3 3H C7 H H U � � CnHH� h7tJ7y r�x�ov� y x II II H w O C h9 zOH CxCM �zz r0F3 Czx �z to K C1 t] y H y tJ N N N N N N N N N N N N I K 0 0 0 0 0 0 0 0 0 0 0 0 I m H H H H H H H H H N N N I H N w .a V1 m --I w 10 0 H N I 'a I I I cn 1n cn cn u1 01 D1 01 --1 01 01 �l , U7 Ln H N 1D .A 10 10 0 w 10 01 I O C) C) 0 0 0 0 0 0 0 0 0 1 d C) O o O C) 0 0 0 0 0 0 0 1 H to to to [n to Cn Cn Cn Cn Cn to I d I H I ;U I C+7 Cil Cn UlNm 01m mm n Ul H N lD .A 10 1D W 10 m I y O 0 0 0 0 0 0 O O O I H 000000000000iz I H I ,d 1 �7 1 tJ In I y I H 0 0 0 0 0 0 0 0 0 0 (D 1 0 1z u I � 1x I rJ I � lD lD lD l0 lD l0 l0 lD Cb (b (b (b I C7 000000000000,0 OOO C)OC) C) C)C)C)C)o I ',U r I f] ko l0 to ko C)�10C)ko wC)lfl I > ko ko ko lD ko ko kow l4 w lfl I C] . . . . . . 1 y lD l0 l0 10 lD 10 10 lD w 10 lD I 0 0 0 0C) 0 0 0 0 0 0 0 I�a 1 y H H H H H H H H H H H I N N NN F. .A.a H OC) I n .A(b W N Cn CA -I �, :C 1 O 0 0 0 0 o C) o 0 (D 0 0 I 'o C) O C z F3 K H N z d Nro N O t7 xl C] x H ro Cf) y ;o ozx H z n cn H yy L, 0 y �] Cn -J3 CHHy n Cl) Cn [=7 ro ro00 Oroz H H y tJ H O z x � y n y �' J O r .. n Cn Fgc(nn H II II II HNc/)n zHMO c)ron:R y 0 to Hx C7y y HG L1 xNKd FG M LTJ ;U t+7 zl to tri II y Cl) N H y O H H �z Myy H,• �r CnrnyCl) F3 y � II II H z > H x H 71XHtJ (7 y U xxd KK ro 11 %d>> H 0 H m w w GF3yy LJ H H U) (nyH� ;tl L 1 L=i X Zl In H xuuH w o Q ni z O y cxct=J > z x r0y Cox mz w K L�7 tJ W y H H m N N N N N N N N N N N N N N N N I K 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 m O O O H H H H H H H H H H N N N I > J O Io OHN WIt. (n 61 J(A 10 O H N I ',U I W W W W W W W W W .A .A v Ln .A "I .D I v U7 N H H N Ow J N v CD H 61 W 61 I J.A J w H 00006110 CD a, H 10 J I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1-3 nnnnnt�nnnnnnnnnnl z z z z z z z z z z z z z z z z l d I H I .ro H H H H H H H H H N N N N N N N I L'J J J 61(71 U761 U761 N H N U7(Il W H W I n W J W 61 U1 O O U1 U1 W 100 J O 10 W I y U7 O C11 (51 UIOOOOO U1 OO U1 U1 U1 I H O O O O O O O O O O O O O O O O 1 O I z I H` (n (n win (n Cn to (n CnW(n in inwCnw I d I H I ,hJ H H H H H H H H H N N N N N N N I L'J J J 61 U7 U161 U7 61 N H NUl Ul w H w I n W J W d>U7000lUl W 10OJO10w 1 y U70 U1(n U700000 U700 U7 U1 Ln I H OOOOOO0000o0000010 Iz a I � Ix I nJ HHF- `HF -`H HF -'HI -l I F` W W N 00000010100700 M W I n W0010 U1 U1 U1 U1 U1 U1000000 I 0 H NJ W 000000000000 I ',U r I nJ w(n(n U7(n(n(n(n(n UI N N N(n(n(n I > 10 m 61 10 N m W 10 ko UI.P 4"", (n 10 61 I n .I y OHH U1 U1 U1 H.. 61 U1 O.A 616161 W I 0 W 10 J. IP 000000000000 I 'Jo 1 y I rJ H H H H H H H H H H H H H H H H I w W H H N N N N H.P .rl al O H 00 I n I y CO U1 6161.P CO CO N U1 J O J W O H.A I O 0 0 Co 0 Co 0 Co 0 0 0 0 0 0 0 0 0 1 'd (n H y L=i N W Lo O I (n M x H z O r L=] X ro K Cn J r z O nJ r x t'J K m r c d n 0 C z y K F-3 a z ro H x tJ h7 y0 H to H t7y� ynz �7 Cn Cn � ro ro00 OtJz F-3 H b n y [] H O z x C7 � H m O r x � cn HCcnn HII II II H hJ Cf) (i zHL10 G)mnfk zmza H dH xL1Kl7 L1 ro CJ xJ (n L7J II H W O H H H H`• L71 w ` Cn rn H Cn H H Z II II H >H MF3 xuXHN CJ H 7o ` xxr K K O H cnww KHHH L] H H �a L ] (nHHy LJ L] 7y xi L 1 mxX d n H x II u H w oam zOH cxcr� �zz rOH aux N (n K L71 L1 CD H H H L1 N N N N N N N N N N N N N N N N I K 0 o O o o 0 0 0 o 0 0 o O o 0 o I L1 O O O H H H H H H H H H H N N N I> JOD(OOH N W.ACn O)JOOlDOHN I "U I I .0 Www www ww w w ww W W N 1 O J Ln Cn.lt. N M4, J Ln M W wNN(O I Ln O Ln 0 0 0 ( l7 Ln O Ln (.n O (j 1 N N N I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 U 0 0 0 0 0 Co 0 0 0 0 0 0 0 0 0 0 1 �-3 onnnonnnnnmnnftlwnl z z z z z z z z z z z z z z z z l tJ I xo HH HHHH1-1 F'H NH F' HH I M lO lOJJ6l Ol W m w m OOO Jm 0) Ln I n V7 O Un Ln Cn 0 0 (n O O (n Ln O Ln (n o 1 H O O O O O O O O O O O O O O O O I H 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 Iz I H wOtnwwwwin�wwCnCn�ww I d I H I �J NH HHRH H HHH HF --'HHRH I C'] H 0700JJ01 W 001OJ W J616161 .A I C� 000(n(no(noo(nOcn(noo(n I H O O O O O O O O O O O O O O O O I H O O O Co O O O O O O O O O O O O I O Iz N I I I >E Ix I � I � oJrnau00000000000010 (OW(ON000000000000 I ;a WR I �] (n Ln Ln V7 Ln Ln U1(n(n(n (51 Ln(n N Cn(n I .� N N H H N N W.IIf, W N N H N HH I Ci .AJ(n106107(0 N(n w 6101(O.A.A W I O H(n dl(n 000000000000 I ' J 1 H I n H I �7 Ln Cn m (n j� .A Cp .A (n .A (n (n (n W M N I n HN.A J(n U7(O(OH6161 N H OD H(n I O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 'O ,T N z d O Cn'y N b N O t7 x� Cf) H ;d °zz � H H r>0 H LTJ H W H C7 H Herz zU)cn m ro ro00 O IJ z ;UhiH LJ H O z ray y0 Nzd O CD� N ro NOC7 x H ro H'.b'Jy Cn y ,d zoz� H z n ca yF.3H r>0 F-3 h] H W y C7 H H H oz ,i1 N W l� ro o�Pi Pdh7H HHy CZ H [+] H 0 z N N N N N N N N N N N I K (n C) 0 0 0 0 0 0 0 0 0 0 C. I N H 0 F -F- --- h - F - HF - N NN I > y C N W.�,LnMJMWC)F- N) I ',O 0 z y K J .. J x I N kD � �y I N N N N N N W W W W W I I I N O F� W C) lO N.A H 00 I y by 000CnOCnOoocncn I d Cn h7 �l 00000000000 I y tJ r 00 I � �] L] C]nC)c7c)c)nnnn I H m 1 z H .. o Q- z q q >crno ;0 II II II zzzzzzzzzz I d z H H to x Hh]cnn N zHMO 1 C7 O G:h] n NNNNNNW W W W I n z HOro NOF�W d>O N.0 F' C- I H :V4 x zC. 000 Cn CD Cn 000 U7 I H H 0 y o 0 0 o 0 0 0 0 0 0 o 1 z xl-�Kd 1 ro t7 `• I tJ I h7 LK=J��L'7 O y Cn NHH I d r O I--, F�� z I m C7 I n 1 H cn � I H 0 0 0 0 0 0 0 0 0 0 1 K KU) rn H 0 F3 y I IIH I N tp ZII 1 r ;U�CHC] xxdh� 1x 1 K K I •A roCJC1 II I LTJ N hy�y 1 0 J H h] io io w w io ko koNNNN I CZ ` �o[=y[=j;o 00000000000 1 O m co W co 00000000000 I xd t1 KF3HH • [+7 H H o � I7 Cn H F-3 y I d .... I h] LM >C Cn io w w w io io I C] H. . . . 11-3 x II II H k0l0.10lo l0 l0 1 0 W 0000 00 I ',17 oah] z0H cxae� FJFJm H N N N O r O H I H C ,M NNN .p I E 000 O I h] in K HNHN NN [J H .A .0 .A F- O I C] J C n J N J O H I O 0000 00 I ',o l� Cn y H y t'] ray y0 Nzd O CD� N ro NOC7 x H ro H'.b'Jy Cn y ,d zoz� H z n ca yF.3H r>0 F-3 h] H W y C7 H H H oz ,i1 N W l� ro o�Pi Pdh7H HHy CZ H [+] H 0 z Appendix C: Seminole County CMS K O CCD 0 CD CD I a CDn CD 0 0 C CD p O N m .t to O — N 00 C -D O CLCD O Q\ O G1 O moo a a C CD y � w � N a1 N N .NP O LA W 00 A a\ N (A , (-AA O1 O G1 O moo a a y � d 00 O , (-AA W N O\ O I Ol, O W z C CD C� N J D1 W y 0 o � d o. 0 � N cr �t O N CD N N Id O It O N C N a CD CL cr H It It K cn CD0 CD n 0 t=i as CD M r• UG a r' 0 0 o' O C (D C CCD QQ 0 N .p C O (D � a rn i es h o o czD h a a CD CD `< H � H CD ts n o � n C � � a � � N N 00 N N Ut O\ O 01 O O A h z a C CD C) m 00 00 00 H 0 o o 1 CD CD H � n C c N 00 N N �o N ch w JJ F- a\ � 0\ W O 00 z a C CD C) m 00 00 00 H 0 o o CD CD � n C N �? F- Uh N to 01 00 O1 •A O O z a C CD C) m 00 00 00 H 0 CD O d O 0 0 CD Gr � w CD � N O N CD O t O O N C N A O CL O' H 0 �C O P It tTj P, cn CD0 CD C� 0 M `! CD CD U4 CDA� p a 0 CD on w O O O' b O W C U (D CD ItD�-. CO CD "r � O C1 r -r 0 0 � r H ' �• n � N 00 N P O -1 C\ O 4�1. C\ O -P o o o C H CL r 'L3 O W to 00 N C% NO O 00 " O � O\ J O --1 W W J N v dt CCD 0 0 z w CD H� a.p-r O V1Oo N �l , O O 110 O O �10 00 Vi O -1 W N J N M CCD 0 0 �C a r y w 00 O J O v Cn O Uh O O H 0 tTj p V) O O CD 0 tTj 04 CD COD as a n 0 0 0 O CDC o� C U CD CDD CCD ~ O I N O `+ CD CLCD rn 0 D1 a X00 0 0 1+ CD a� > CD H CD H �• n 0 0 7y o W 0 C� J O N ' O O \10 w a, i O a w 0 0 1+ CD a > CD �C 0 7y o o 0 N to -3 0000 O N Cl Cl W O O \�o w H 0 0 0 CD > CD �C o o 0 00 O 00 O O O O O O O H 0 � d O n O � c N O N CD O N 'c$ O O N C N a cr O 0 m SD CD 0 CD 0 m UQ CD Q CD O UQ P� O G �s CD o' 0 w cn O '-n CD C 0 <D CD CCD n O CD � O n O-• a1 N N \p J W Ch VA N O C*l W W O\ O ..-. W J J n ed .r - N FA - CD A a m M 000� o o w W r ('D r te Z y w C x � A o � a OW O O VNi O N O W J o o o a w C � N N J � Cs J Cr Oo O O N :. o � CD C7 O 0 CD tr a. CD C N CCD N � N C N a a cr CD 0 b 't=i w CD 0 CD C) M CD a CD0 c� 0 0�.. O � N � N `l W N C CLCD aci N tz 6 N a tz C d P00� 0 0 0 a `< H CD D C— (D a r � � y � n 7 `c �7 F N � CD �O Cly N 00 w O ch W 00 a1 O N all O J N N a tz C d P00� o o CCD a `< H CD D C— (D a r � � y � n 7 `c �7 F N � CD 0 N -.l W UN P UN a1 W O A N CD W 110 N O N W Ch O N W Q\ O O LA O Ch H O o o CCD `< H CD D C— � n n 7 `c �7 F N � W N -.l W UN P UN a1 W O O\ O -P H O a H H CD CL o p C7 CJ O 0 CD tr a. co 6' N O N O � N O N C N CD a CL H cn 0 0 0 0 a a CD H � H 0 0+ P N 00 U.) (.n � rn rn N O O 00 0 0 0 aCD (D `C H a 0 N � � J N .A a, N 00 J a\ 00 T H 0 CD 0 b i� K n �d (') CD a CD CD `C H n w 0 N ON1 a\ � 0 C) C� cn 0 a :. o o � CD 0 a cr y r n n CD � n o C40 m CD P N 0No O' O> P N O J O O W W N 01 O cn W O N 0 a :. y 0 0 � 0 0 n n CD n o C40 CD P N 0No O' N til W J O O W y 0 Appendix D: Traffic Volumes INTERSECTION TRAFFIC VOLUMES Intx 1: CR 427 & Carriage Cove Way/Bedford Road O AM Peak Hour I meeung PI *Background + <Pass -By Vol>+ ( Project Vol) = Total Volume ® - Subject Intersection TRIP DISTRIBUTION % PROJECTED VOLUMES Source: Premier Traffic Group N N II r N 73 (O aI0 O Y I� IN 7--49 F V y T 8� T > o 2� m 23 v + N � N N n Note: +/-errors due to rounding Source: Premier Traffic Group INTERSECTION TRAFFIC VOLUMES Intx 2: CR 427 Meeting PI O AM Peak Hour I Carriage Cove Wy Bedford Rd - Subject Intersection ^ N V K U [SITE AccesS RVRI Meeting PI I *Background + <Pass -By Vol> + ( Project Vol) = Total Volume 2024 VOLUMES 2026 VOLUMES O �2 LL7 0 O �2 a) F— 0 1 15 EJ Lam' <J 11 L�� 16 0 I T 0 I T 0� o m 0� o m SF applied = 0.92 LG2rowth rate applied = 1.04 TRIP DISTRIBUTION % PROJECTED VOLUMES So— Premier Traffic Group INTERSECTION TRAFFIC VOLUMES Intx 3: CR 427 & Project Access O AM Peak Hour Carriage Cove Wy I Bedford Rd ® Subject Intersection ^ a u SITE Access wmo f, hMeeting PI _I– 'Background + <Pass -By Vol> + ( Project Vol) = Total Volume 2024 VOLUMES 2026 VOLUMES �0 m 4=0 o I2 Io 0 0 Io 0 1 �i �0 �0 0� 0_1, �TI� 0 0� o rr o 'SF applied = 0.92 'Growth rate applied = 1.04 TRIP DISTRIBUTION % PROJECTED VOLUMES 0 0 0 0 � ITS 0� ITS —> 0 0 100 0+(36)=36 N V ^ Note: +I- errors due to rounding Source: prem/er Traffic Group Source: Premier Trofc Group INTERSECTION TRAFFIC VOLUMES Intx 1: CR 427 & Carriage Cove Way/Bedford Road PM Peak Hour O Carriage Cove Wy Bedford Rd -Subject Intersection n e V SITE 7ee'ing PI 'Background + <Pass -By Vol> + ( Project Vol) = Total Volume 2024 VOLUMES 2026 VOLUMES �— 49 4a_ 51 coo E— 3 m E— 3 I L—' I yr—}3.2 6 i�31 I T 6 10 10 'SF applied = 0.92 'Growth rate applied = 1.04 TRIP DISTRIBUTION % PROJECTED VOLUMES iL r N 3 32 � EIF— � v n N + N � r Note: +/_ errors due to rounding Source: Premier Trofc Group INTERSECTION TRAFFIC VOLUMES Intx 2: CR 427 & Meeting PI O PM Peak Hour I Carriage Cove Wy Bedford Rd Subject Intersection n N V K V SITE Access RURo Meeting PI `Background + <Pass -By Vol> + ( Project Vol) = Total Volume TRIP DISTRIBUTION % PROJECTED VOLUMES Source: Premier Traffic Group INTERSECTION TRAFFIC VOLUMES Intx 3: CR 427 & Project Access O PM Peak Hour 1 I Carriage Cove Wy Bedford Rd 'Background + <Pass -By Vol> + ( Project Vol) = Total Volume D- SubjectIntersection TRIP DISTRIBUTION % PROJECTED VOLUMES Source: Premier Traffic Group f lam° ��la 15 MINUTE TURNING MOVEMENT COUNTS (Cars and Trucks) DATE: March 28, 2024 (Thursday) CITY: Sanford LATITUDE: 0 LOCATION: CR 427 & Carriage Cove Wy/Bedford Rd COUNTY. Seminole LONGITUDE: 0 CR 427 i CR 427 Carriage Cove Wy j Bedford Rd TIME NORTHBOUND 11SOUTHBOUND N/S EASTBOUND WESTBOUND UW GRAND BEGIN L T R I U-turn I TOTAL11 L T R U-turn TOTAL TOTAL L T R U-turn TOTAL 11 L T R U-turn TOTAL TOTAL TOTAL 07:00 AM 1 137 4 1 1 143 3 280 2 1 286 429 1 0 7 0 8 11 8 0 14 0 22 30 459 07:15 AM 1 171 3 0 175 8 330 2 0 340 515 1 0 7 0 8 15 0 21 0 36 44 559 07:30 AM 3 181 4 0 188 5 306 2 1 314 502 3 1 8 0 12 16 0 22 0 38 50 552 12,141 07:45 AM 0 193 3 0 196 5 333 0 2 340 536 2 0 2 0 4 13 0 18 0 31 35 571 TOTAL 5 682 14 1 702 21 1,249 6 4 1,280 1,982 7 1 m 0 32 52 0 75 0 127 159 08:00 AM 0 213 4 0 1 217 6 306 1 1 314 531 1 3 1 7 0 11 7 0 15 0 22 33 564 08:15 AM 0 195 3 0 198 5 317 2 0 324 522 2 t 5 0 8 31 553 08:30AM 0 174 4 0 178 5 293 2 1 301 479 2 1 4 0 7 0 31 38 517 08:45 AM 0 160 2 0 162 3 278 0 1 282 444 3 1 3 0 7 JA 0 22 29 473 TOTAL 0 742 13 0 755 19 1,194 5 3 1,221 1,976 10 4 19 0 0 98 131 2,107 04:00 PM 3 248 10 0 261 14 210 2 1 227 488 1 3 0 1 5 0 8 5 0 1 11 0 16 24 512 04:15 PM 7 249 9 2 267 21 183 2 1 207 474 1 0 3 0 4 0 4 0 8 12 486 04:30 PM 6 286 15 0 307 20 195 5 2 222 529 3 0 4 0 7 1 12 0 23 30 559 04:45 PM 7 297 13 0 317 18 190 2 1 211 528 1 1 2 0 4 g27 1 13 0 22 26 554 TOTAL 23 1,080 47 2 1,152 73 778 11 5 867 2,019 8 1 14 0 23 2 40 0 69 92 2,111 05:00 PM 9 313 15 2 339 17 204 1 4 226 565 0 0 6 0 6 7 1 17 0 05:15 PM 4 314 12 0 330 18 209 3 1 231 561 4 0 3 0 7 11 1 10 0 05:30 PM 3 285 15 0 303 19 210 3 3 235 538 1 0 0 0 1 8 0 13 0 FN 05:45 PM 5 274 9 288 15 1754 1 195 483 1 0 4 0 5 4 0 9 0 TOTAL 21 1,186 51 2 1,260 69 798 11 9 887 2,147 6 0 13 0 19 AM Peak Peak Hour Factor. 0.983 07:15AMto 08:15 AM 4 758 14 0 776 24 1,275 5 4 1,308 2,084 9 2 24 0 35 51 0 76 0 127 162 2,246 PM Peak Peak Hour Factor: 0.965 04:45 PM to 23 1,209 55 2 1,289 72 813 9 9 903 2,192 6 1 11 0 18 34 3 53 0 90 708 2,300 05:45 PM Southbound PM I 9 813 72 9 I I AM I 5 1,275 24 4 ._._._._._._._._._._._._ is y v U AM PI`4_._._._ i F 76 ._._.__ 53 I E 0 3 c N 51 34 e Carr/age Cove Ky 4 0 0 .o Bedford N �=- 6 9 7 3 o. 1 2 11 24 ] I ._._._. Pry __._._. AM _ n F 7i a � 0 4 758 14 I AM I 2 23 1,209 I 55 PM North ound 15 MINUTE TURNING MOVEMENT COUNTS (Cars and Trucks) DATE: March 28, 2024 (Thursday) CITY: Sanford LATITUDE: 0 LOCATION: CR 427 & Meeting Place COUNTY: Seminole LONGITUDE: 0 CR 427 j CR 427 Meeting PI Meeting PI TIME NORTHBOUND SOUTHBOUND N/S EASTBOUND WESTBOUND E/W GRAND BEGIN TOTAL L T R U-turn TOTAL L T R U-turn TOTAL TOTAL L T R U•turn TOTAL L T R U-turn TOTAL TOTAL 07:00 AM 0 142 2 0 144 2 295 0 0 297 441 0 0 0 0 3 0 4 0 7 7 448 07:15 AM 0 175 1 0 176 1 352 0 0 353 529 0 0 It 0 0 2 0 3 0 5 5 534 07:30 AM 0 188 3 0 191 2 330 0 0 332 523 0 0 0 0 5 0 2 0 7 7 530 07:45 AM 0 196 1 0 197 1 348 0 0 349 546 0 0 00 4 0 5 0 9 9 555 TOTAL 0 701 7 0 708 6 1,325 1 0 0 1,331 2,039 0 0 0 0 0 10 0 14 0 28 28 2,067 08:00 AM 0 217 2 0 219 2 320 0 0 322 541 0 0 0 0 0 3 0 2 0 5 5 546 08:15 AM 0 198 1 0 199 0 330 0 0 330 529 0 0 0 0 0 4 _0---3--- _ 0 _ 7 7__ 536 08:30 AM 0 178 2 0 180 309 489 0 0 0 0 1 308 0 0 0 3 0 4 0 7 7 496 12,045 08:45 AM 0 162 3 0 165 3 289 0 0 292 457 0 0 0 0 0 5 0 5 0 10 10 467 TOTAL 0 755 8 0 763 6 1,247 0 0 1,253 2,016 0 0 0 0 0 15 0 14 0 29 29 04:00 PM 0 261 3 10 264 5 220 0 0 225 489 0 0 0 0 0 2 0 2 0 4 4 493 04:15 PM 0 265 2rO 267 4 190 0 0 194 461 0 0 0 0 0 2 0 4 0 6 6 467 04:30 PM 0 307 1 308 3 209 0 0 212 520 0 0 0 0 0 1 0 2 0 3 3 523 04:45 PM 0 317 3320 1 200 0 0 201 521 0 0 0 0 0 1 0 4 0 5 5 526 TOTAL 0 1,150 9 1,159 13 819 0 0 832 1,991 0 0 0 0 0 6 0 12 0 18 18 2,009 PM 0 337 3too 0 340 5 217 0 0 222 562 00 0566 PM 0 330 40 334 3 223 0 0 226 560 0 0 0 0 0 1 0 1 0 2 2 562 PM E 0 303 2 305 2 218 0 0 220 525 0 0 0 0 0 3 0 0 0 3 3 528 PM 0 288 30 291 2 183 0 0 185 476 0 0 0 0 0 1 0 2 0 3 3 479 L 0 1,258 12 1,270 12 841 0 0 853 2,123 0 0 0 0 0 7 0 5 0 12 12 2,135 AM Peak Peak Hour Factor: 0.976 07:30 AM 0830 to AM 0 758 7 0 806 5 1,328 0 0 1,333 2,139 0 0 0 0 0 16 0 12 0 28 28 2,167 PM Peak Peak Hour Factor: 0.964 0445 PM to 0 1,287 12 0 1,299 11 858 0 0 869 2,168 0 0 0 0 0 7 0 7 0 14 14 2,182 05:45 PM Southbound PM I 0 858 11 0 I AM 1 0 1,328 5 0 1 1 le N LTv I _._ AM PM ------- ._._Ty 7 0 0 0 a o IC 16 7 '^ meeting r1 0 0 0 o b T meetingpi 3 a 0 0 4 0 0 y _______._._._________.__--- P—__.___- NI AM_ _._ .I 40 F T a 0 0 799 7 1 AM 1 V 0 0 1,287 12 1 PM 1 I North ound 2022 PEAK SEASON FACTOR CATEGORY REPORT - REPORT TYPE: ALL CATEGORY: 7700 SEMINOLE COUNTYWIDE MOCF: 0.93 WEEK -------------------------------------------------------------------------------- DATES SF PSCF -------------------------------------------------------------------------------- 1 01/01/2022 - 01/01/2022 1.00 1.08 2 01/02/2022 - 01/08/2022 1.03 1.11 3 01/09/2022 - 01/15/2022 1.05 1.13 4 01/16/2022 - 01/22/2022 1.03 1.11 5 01/23/2022 - 01/29/2022 1.01 1.09 6 01/30/2022 - 02/05/2022 0.98 1.05 7 02/06/2022 - 02/12/2022 0.96 1.03 * 8 02/13/2022 - 02/19/2022 0.94 1.01 * 9 02/20/2022 - 02/26/2022 0.93 1.00 *10 02/27/2022 - 03/05/2022 0.93 1.00 *11 03/06/2022 - 03/12/2022 0.92 0.99 *12 03/13/2022 - 03/19/2022 0.91 0.98 *13 03/20/2022 - 03/26/2022 0.92 0.99 *14 03/27/2022 - 04/02/2022 0.92 0.99 *15 04/03/2022 - 04/09/2022 0.93 1.00 *16 04/10/2022 - 04/16/2022 0.93 1.00 *17 04/17/2022 - 04/23/2022 0.94 1.01 *18 04/24/2022 - 04/30/2022 0.94 1.01 *19 05/01/2022 - 05/07/2022 0.95 1.02 *20 05/08/2022 - 05/14/2022 0.95 1.02 21 05/15/2022 - 05/21/2022 0.96 1.03 22 05/22/2022 - 05/28/2022 0.97 1.04 23 05/29/2022 - 06/04/2022 0.98 1.05 24 06/05/2022 - 06/11/2022 0.99 1.06 25 06/12/2022 - 06/18/2022 1.00 1.08 26 06/19/2022 - 06/25/2022 1.00 1.08 27 06/26/2022 - 07/02/2022 1.00 1.08 28 07/03/2022 - 07/09/2022 0.99 1.06 29 07/10/2022 - 07/16/2022 0.99 1.06 30 07/17/2022 - 07/23/2022 0.99 1.06 31 07/24/2022 - 07/30/2022 0.98 1.05 32 07/31/2022 - 08/06/2022 0.98 1.05 33 08/07/2022 - 08/13/2022 0.97 1.04 34 08/14/2022 - 08/20/2022 0.97 1.04 35 08/21/2022 - 08/27/2022 0.99 1.06 36 08/28/2022 - 09/03/2022 1.01 1.09 37 09/04/2022 - 09/10/2022 1.02 1.10 38 09/11/2022 - 09/17/2022 1.04 1.12 39 09/18/2022 - 09/24/2022 1.10 1.18 40 09/25/2022 - 10/01/2022 1.16 1.25 41 10/02/2022 - 10/08/2022 1.22 1.31 42 10/09/2022 - 10/15/2022 1.28 1.38 43 10/16/2022 - 10/22/2022 1.23 1.32 44 10/23/2022 - 10/29/2022 1.18 1.27 45 10/30/2022 - 11/05/2022 1.14 1.23 46 11/06/2022 - 11/12/2022 1.09 1.17 47 11/13/2022 - 11/19/2022 1.04 1.12 48 11/20/2022 - 11/26/2022 1.03 1.11 49 11/27/2022 - 12/03/2022 1.02 1.10 50 12/04/2022 - 12/10/2022 1.01 1.09 51 12/11/2022 - 12/17/2022 1.00 1.08 52 12/18/2022 - 12/24/2022 1.03 1.11 53 12/25/2022 - 12/31/2022 1.05 1.13 * PEAK SEASON 23 -FEB -2023 09:11:22 830UPD 5 7700 PKSEASON.TXT Appendix E: Existing Intersection Analysis Output HCM 6th TWSC 1: CR 427 & Bedfrod Rd 04/0412024 Intersection Int Delay, s/veh Movement 3.6 EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations I T 386 1284 T-> 0 772 0 0 it' ' 1328 ) i''. 773 Traffic Vol, veh/h 8 2 22 47 0 70 4 697 13 22 1173 8 Future Vol, veh/h 8 2 22 47 0 70 4 697 13 22 1173 8 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - 3.52 None - 2.22 None - - None - 51 None Storage Length 140 - 536 140 - - 340 - 223 340 358 407 Veh in Median Storage, # - 0 - - 0 - - 0 403 - 0 - Grade, % - 0 Platoon blocked, % - 0 - - 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 9 2 24 51 0 76 4 758 14 24 1275 9 Major/Minor Minor2 Minorl Majorl Major2 Conflicting Flow All 1715 2108 642 1460 2105 386 1284 0 0 772 0 0 Stage 1328 1328 - 773 773 - - - - - - - Stage 2 387 780 - 687 1332 - - - - - Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 4.14 - Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 - - - - - Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 - - - Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 - 2.22 - - Pot Cap -1 Maneuver 58 51 417 90 51 612 536 839 Stage 164 223 - 358 407 - - - - - Stage 2 608 404 - 403 222 - - - Platoon blocked, % - Mov Cap -1 Maneuver 49 49 417 80 49 612 536 839 Mov Cap -2 Maneuver 49 49 - 80 49 - - - Stage 1 163 217 - 355 404 Stage 2 528 401 - 365 216 - Approach EB WB NB SB HCM Control Delay, s 38.9 50.6 0.1 0.2 HCM LOS E F Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLnlWBLn2 SBL SBT SBR Capacity (veh/h) 536 49 256 80 612 839 HCM Lane V/C Ratio 0.008 - 0.177 0.102 0.639 0.124 0.029 - HCM Control Delay (s) 11.8 93.7 20.7 108.5 11.7 9.4 HCM Lane LOS B - - F C F B A HCM 95th %tile Q(veh) 0 0.6 0.3 2.9 0.4 0.1 Traffic Analysis 9:46 pm 04/04/2024 Existing AM Synchro 11 Report PTG Page 1 HCM 6th TWSC 2: CR 427 & Meeting PI 04/04/2024 Intersection Int Delay, s/veh 0.4 Movement WBL WBR NBT NBR SBL SBT Lane Configurations r ll, ) 0 Traffic Vol, veh/h 15 11 735 6 5 1222 Future Vol, veh/h 15 11 735 6 5 1222 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None None - None Storage Length 100 0 270 - Veh in Median Storage, # 0 - 0 - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 16 12 799 7 5 1328 Major/Minor Minorl Majorl Major2 Conflicting Flow All 1477 403 0 0 806 0 Stage 1 803 - - - - - Stage 2 674 - - Critical Hdwy 6.84 6.94 4.14 Critical Hdwy Stg 1 5.84 - - - Critical Hdwy Stg 2 5.84 - - - Follow-up Hdwy 3.52 3.32 2.22 - Pot Cap -1 Maneuver 117 597 814 Stage 1 401 - - - Stage 2 468 - - Platoon blocked, % - Mov Cap -1 Maneuver 116 597 814 Mov Cap -2 Maneuver 116 - - - Stage 1 401 - Stage 2 465 - - - - Approach WB NB SB HCM Control Delay, s 28.4 0 0 HCM LOS D Minor Lane/Major Mvmt NBT NBRWBLnlWBLn2 SBL SBT Capacity (veh/h) - 116 597 814 HCM Lane V/C Ratio - 0.141 0.02 0.007 HCM Control Delay (s) - 41 11.2 9.5 HCM Lane LOS - - E B A HCM 95th °/stile Q(veh) - - 0.5 0.1 0 Traffic Analysis 9:46 pm 04/04/2024 Existing AM Synchro 11 Report PTG Page 2 HCM 6th TWSC 1: CR 427 & Bedfrod Rd 0410412024 Intersection Int Delay, s/veh Movement 5.1 EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations "I T-) 633 831 1� 0 )t tT# 966 ) fr+ 1284 Traffic Vol, veh/h 6 1 10 31 3 49 21 1112 52 66 748 17 Future Vol, veh/h 6 1 10 31 3 49 21 1112 52 66 748 17 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - 3.52 None - 2.22 None - 2.22 - None - 39 None Storage Length 140 422 - 140 - 340 - 331 340 - 234 Veh in Median Storage, # - 0 - - 0 - - 0 486 - 0 - Grade, % - 0 - - 0 - - 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 7 1 11 34 3 53 23 1209 57 72 813 18 Major/Minor Minor2 Minorl Majorl Major2 Conflicting Flow All 1618 2278 416 1835 2259 633 831 0 0 1266 0 0 Stage 966 966 - 1284 1284 - - - - - - - Stage 2 652 1312 - 551 975 - - - - Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 4.14 Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 - - - Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 - - - Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 - 2.22 - Pot Cap -1 Maneuver 69 39 585 47 41 422 797 545 Stage 273 331 - 174 234 - - - Stage 2 423 227 - 486 328 - - - Platoon blocked, % Mov Cap -1 Maneuver 49 33 585 40 35 422 797 545 Mov Cap -2 Maneuver 49 33 - 40 35 - - - - Stage 1 265 287 169 227 Stage 2 354 220 412 285 - - - Approach EB WB NB SB HCM Control Delay, s 45.4 106.8 0.2 1 HCM LOS E F Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLnlWBLn2 SBL SBT SBR Capacity (veh/h) 797 49 232 40 258 545 HCM Lane V/C Ratio 0.029 - 0.133 0.052 0.842 0.219 0.132 HCM Control Delay (s) 9.7 89.4 21.4 247.6 22.8 12.6 HCM Lane LOS A F C F C B HCM 95th %tile Q(veh) 0.1 0.4 0.2 3.2 0.8 0.5 Traffic Analysis Existing PM Synchro 11 Report PTG Page 1 HCM 6th TWSC 2: CR 427 & Meeting PI 04104/2024 Intersection Int Delay, s/veh 0.3 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Minorl r +I Conflicting Flow All ) tt Traffic Vol, veh/h 6 6 1184 11 10 789 Future Vol, veh/h 6 6 1184 11 10 789 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 100 0 - 270 - Veh in Median Storage, # 0 - 0 76 - 0 Grade, % 0 - 0 Stage 2 - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 7 7 1287 12 11 858 Major/Minor Minorl Majorl Major2 Conflicting Flow All 1744 650 0 0 1299 0 Stage 1 1293 - - - - - Stage 2 451 - - - - - Critical Hdwy 6.84 6.94 - - 4.14 - Critical Hdwy Stg 1 5.84 - - Critical Hdwy Stg 2 5.84 - Follow-up Hdwy 3.52 3.32 2.22 - Pot Cap -1 Maneuver 78 412 529 - Stage 1 221 - - - Stage 2 609 - - - Platoon blocked, % - Mov Cap -1 Maneuver 76 412 529 Mov Cap -2 Maneuver 76 - - - - Stage 1 221 - - Stage 2 596 - - Approach WB NB SB HCM Control Delay, s 35.4 0 0.1 HCM LOS E Minor Lane/Major Mvmt NBT NBRWBLnlWBLn2 SBL SBT Capacity (veh/h) 76 412 529 HCM Lane V/C Ratio - 0.086 0.016 0.021 - HCM Control Delay (s) - 56.8 13.9 11.9 HCM Lane LOS - F B B - HCM 95th %tile Q(veh) 0.3 0 0.1 Traffic Analysis Existing PM Synchro 11 Report PTG Page 2 Appendix F: Historical Trends Analysis CD r d G CD7 Q � D M 3 7 CD 7 N N C ha Er C, CD CD vQa 0 oo ;a o. C.) C CD O N N D) m m r. A) y n 3 m r.L m O O CO 0 0 o O Average Daily Traffic (Vehicles/Day) N N Co O O O O O O O O O O O O O N O Co N O N Co � I rt Cr CL CD N C: CD a Co CD o c N O W W n A O Cn v C m CD N 0) v v O O O 00000 N N N N N N- 0) Ui p N 1 O (O 00 N N N N N n Z Z Z N W W N N O M o o o o o • D D D O o 0 0 0 C o O o o 6 6 D v N N• N, 0 0 3 l"Co 0 0 0 0 0 0 0 CrL n A O Cn v C m CD N 0) v v H O Cf) b N ro N O t7 ',U L xHro H � � H3 H- 3 °zz ncoH r�0 H h] H to H t7 F-3 H n z ,h7 in in � ro ro00 Orox ,O rlH H H � n L -i H O z N N N N N N N N N N N N I K En n 000000000000 I L-] H O H H H H H H H H H N N N I> H C HN W�lACn01J0toCD m I ',u N z. F3 00K C:) I J J hj LJ H H H H H N N N N N N N I y OIOIOIOIOIooNN W W N I I I (] N N W Cn N LnCn 0 0 0 0 0 I y N o000000000C�CD I d n to O r 000000000000 I H 'U Lei •• Cl)nronromnnnronron I N J 0 co r H C cn n � II II II zzzzzzzzzzzz I d ;C7 y I H C+7 Z H M O HHHHF HF I L'7 0 G) 11 n JJJ WOOOHHHHF I Ci F3010 OO WCooH000000o I H z z x z C 0 0 0 0 0 0 0 0 0 0 0 0 1" H CJ H 0 0 0 0 0 0 0 0 0 0 0 0 1 0 H K t7 I z b7 xLhK0 I H K�MI. y L] C ,oCoM 11 H Cn cncncncncncncncncncncncn I o I- oHH Hz I H J H I jd F- H C H H H N H H H I CJ l0 L+y F 7> co co co N co O O H F� N N H I n N H '• Lh r .P .0 "A Cn J CD Cn 0 0 0 0 0 1 H Cn • 000000000000 I H R+ LTJ 000000000000 I 0 to m H in I z Cf) H H I m II II H N H z I >1 H 'c 0 SCJHHN C'7 xxd 1 ro I x L'7 KK I x H 'T1 '�1 r J l0 to l0 l0 to to l0 l0 to to CO to I n K O H I H ;o Lit L'];C7 000000000000 I O 1 CDC/)m 000000000000 I ,O K r3 F-3 H O Li] H H ] Cn H H I t7 Cf) L+7 M ;d I K •. •. I h7 Cn Ln cn cn cn Cn Cn cn Ln Ln cn Ln Ln I > H N x'o co NN W.P .A W NN F-'NHH I n m F-3 I H 7. x II II H rnw�oNcnwrnrnio c cw 1 O W O O O O O O O O O O O O I io O C T1 z0F3 Cxam ;vzz r0H IH C x I mIIm mNNHNOO Cn J C77 W ON I n yH 'co ",d W W .A N NlOO N O O J II O 000000000000 I L+7 Cn H H H tJ H O Cf) b N ro N O t7 ',U L xHro H � � H3 H- 3 °zz ncoH r�0 H h] H to H t7 F-3 H n z ,h7 in in � ro ro00 Orox ,O rlH H H � n L -i H O z Appendix G: Projected Intersection Analysis Output HCM 6th TWSC 1: CR 427 & Bedfrod Rd 04/04/2024 Intersection Int Delay, s/veh 4.8 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations I Tr ) T-> +I ) 0 Traffic Vol, veh/h 8 2 23 49 0 73 8 747 14 23 1227 8 Future Vol, vehlh 8 2 23 49 0 73 8 747 14 23 1227 8 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - None - None - None - - None Storage Length 140 - 140 340 - 340 - Veh in Median Storage, # - 0 - - 0 - 0 - 0 Grade, % - 0 - - 0 - 0 - 0 Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 9 2 25 53 0 79 9 812 15 25 1334 9 Major/Minor Minor2 Minorl Majorl Major2 Conflicting Flow All 1813 2234 672 1556 2231 414 1343 0 0 827 0 0 Stage 1389 1389 - 838 838 - - - - - - - Stage 2 424 845 - 718 1393 - - - - - - Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 4.14 - - Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 - - - - Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 - - - Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 - - 2.22 Pot Cap -1 Maneuver 49 42 398 77 42 587 509 800 Stage 150 208 - 327 380 - - - - - Stage 2 578 377 - 386 207 - - - - Platoon blocked, % - - Mov Cap -1 Maneuver 41 40 398 67 40 587 509 800 Mov Cap -2 Maneuver 41 40 - 67 40 - - - - - - Stage1 147 202 321 373 Stage 2 491 370 347 201 - - Approach EB WB NB SB HCM Control Delay, s 45 71 0.1 0.2 HCM LOS E F Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLnlWBLn2 SBL SBT SBR Capacity (veh/h) 509 41 232 67 587 800 HCM Lane V/C Ratio 0.017 - - 0.212 0.117 0.795 0.135 0.031 - HCM Control Delay (s) 12.2 - 115 22.6 158.7 12.1 9.6 HCM Lane LOS B - F C F B A - HCM 95th %tile Q(veh) 0.1 - 0.7 0.4 3.7 0.5 0.1 Traffic Analysis Projected AM Synchro 11 Report PTG Page 1 HCM 6th TWSC 2: CR 427 & Meeting PI 04/04/2024 Intersection Int Delay, s/veh Movement 0.6 WBL WBR NBT NBR SBL SBT Lane Configurations) 0 0 r +1_3� Stage 1 ) tt Traffic Vol, veh/h 16 11 768 6 27 1285 Future Vol, veh/h 16 11 768 6 27 1285 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None 2.22 None - None Storage Length 100 0 - 270 - Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 17 12 835 7 29 1397 Major/Minor Minorl Majorl Major2 Conflicting Flow All 1596 421 0 0 842 0 Stage 1 839 - - - - - Stage 2 757 - - - - Critical Hdwy 6.84 6.94 - 4.14 - Critical Hdwy Stg 1 5.84 - - - Critical Hdwy Stg 2 5.84 - - - Follow-up Hdwy 3.52 3.32 - - 2.22 - Pot Cap -1 Maneuver 97 581 - - 789 Stage 1 384 - - - - Stage 2 424 - - Platoon blocked, % - - Mov Cap -1 Maneuver 93 581 789 Mov Cap -2 Maneuver 93 - - - - Stage 1 384 - Stage 2 408 - - - Approach WB NB SB HCM Control Delay, s 35.7 0 0.2 HCM LOS E Minor Lane/Major Mvmt NBT NBRWBLnlWBLn2 SBL SBT Capacity (veh/h) 93 581 789 HCM Lane V/C Ratio 0.187 0.021 0.037 HCM Control Delay (s) 52.4 11.3 9.7 HCM Lane LOS F B A HCM 95th %tile Q(veh) 0.6 0.1 0.1 Traffic Analysis Projected AM Synchro 11 Report PTG Page 2 HCM 6th TWSC 3: CR 427 & Access 0410412024 Intersection Int Delay, s/veh Movement 0.3 EBL EBR NBL NBT SBT SBR Lane Configurations 0 - 0 r - tt tI., - - Traffic Vol, veh/h 0 36 0 769 1292 11 Future Vol, veh/h 0 36 0 769 1292 11 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized None 0 None 0 None Storage Length 0 0 0 - Platoon blocked, % - Veh in Median Storage, # 0 - Mov Cap -1 Maneuver 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 39 0 836 1404 12 Major/Minor Minor2 Majorl Major2 Conflicting Flow All - 708 0 - 0 Stage 1 - - - - Stage 2 - - - Critical Hdwy - 6.94 Critical Hdwy Stg 1 - - - Critical Hdwy Stg 2 - - Follow-up Hdwy - 3.32 - Pot Cap -1 Maneuver 0 377 0 Stage 1 0 - 0 Stage 2 0 - 0 Platoon blocked, % - - Mov Cap -1 Maneuver - 377 - Mov Cap -2 Maneuver - - - - Stage 1 - - - Stage 2 - - - - Approach EB NB SB HCM Control Delay, s 15.7 0 0 HCM LOS C Minor Lane/Major Mvmt NBT EBLn1 SBT SBR Capacity (veh/h) - 377 HCM Lane V/C Ratio - 0.104 HCM Control Delay (s) - 15.7 HCM Lane LOS - C HCM 95th %tile Q(veh) - 0.3 Traffic Analysis Projected AM Synchro 11 Report PTG Page 3 HCM 6th TWSC 1: CR 427 & Bedfrod Rd 04/04/2024 Intersection Int Delay, s/veh 7.2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 1 T. ' I ) tT. ) +Til Traffic Vol, veh/h 6 1 10 32 3 51 36 1168 54 69 799 18 Future Vol, veh/h 6 1 10 32 3 51 36 1168 54 69 799 18 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - None - None - None - None Storage Length 140 - - 140 340 - 340 Veh in Median Storage, # - 0 - - 0 - 0 - 0 Grade, % - 0 - - 0 - - 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 7 1 11 35 3 55 39 1270 59 75 868 20 Major/Minor Minor2 Minorl Majorl Major2 Conflicting Flow All 1743 2435 444 1963 2416 665 888 0 0 1329 0 0 Stage 1028 1028 - 1378 1378 - - - - - - - Stage 2 715 1407 - 585 1038 - - - - - - Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 - 4.14 - - Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 - - - - Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 - - - Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 - 2.22 - Pot Cap -1 Maneuver 55 31 561 38 32 403 758 - 515 Stage 1 251 310 - 152 210 - - - - Stage 2 388 204 - 464 306 - - - Platoon blocked, % - Mov Cap -1 Maneuver 37 25 561 -31 26 403 758 515 Mov Cap -2 Maneuver 37 25 - -31 26 - - - - Stage 1 238 265 - 144 199 Stage 2 312 194 - 387 261 - - - Approach EB WB NB SB HCM Control Delay, s 59.4 162.8 0.3 1 HCM LOS F F Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLnlWBLn2 SBL SBT SBR Capacity (veh/h) 758 37 190 31 223 515 HCM Lane V/C Ratio 0.052 0.176 0.063 1.122 0.263 0.146 - - HCM Control Delay (s) 10 122.1 25.2$392.3 26.8 13.2 HCM Lane LOS B F D F D B - - HCM 95th %tile Q(veh) 0.2 0.6 0.2 3.9 1 0.5 Notes -: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Traffic Analysis Projected PM Synchro 11 Report PTG Page 1 HCM 6th TWSC 2: CR 427 & Meeting PI 04/0412024 Intersection Int Delay, s/veh 0.4 Movement WBL WBR NBT NBR SBL SBT Lane Configurations tr ti t t Traffic Vol, veh/h 6 6 1245 11 22 829 Future Vol, veh/h 6 6 1245 11 22 829 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None None - None Storage Length 100 0 270 - Veh in Median Storage, # 0 - 0 - 0 Grade, % 0 - 0 - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 7 7 1353 12 24 901 Major/Minor Minorl Majorl Major2 Conflicting Flow All 1858 683 0 0 1365 0 Stage 1 1359 - - - - - Stage 2 499 - - - Critical Hdwy 6.84 6.94 4.14 Critical Hdwy Stg 1 5.84 - - - - Critical Hdwy Stg 2 5.84 - - Follow-up Hdwy 3.52 3.32 2.22 - Pot Cap -1 Maneuver 65 392 499 Stage 1 204 - - - Stage 2 575 - - Platoon blocked, % - Mov Cap -1 Maneuver 62 392 499 Mov Cap -2 Maneuver 62 - - - Stage 1 204 - Stage 2 547 - - - Approach WB NB SB HCM Control Delay, s 42.1 0 0.3 HCM LOS E Minor Lane/Major Mvmt NBT NBRWBLnlWBLn2 SBL SBT Capacity (veh/h) 62 392 499 HCM Lane V/C Ratio 0.105 0.017 0.048 - HCM Control Delay (s) 69.8 14.3 12.6 HCM Lane LOS - F B B HCM 95th %tile Q(veh) 0.3 0.1 0.2 Traffic Analysis Projected PM Synchro 11 Report PTG Page 2 HCM 6th TWSC 3: CR 427 & Access 04/04/2024 Intersection Int Delay, s/veh Movement 0.1 EBL EBR NBL NBT SBT SBR Lane Configurations 0 0 r tI t ti-) - - Traffic Vol, veh/h 0 20 0 1259 821 35 Future Vol, veh/h 0 20 0 1259 821 35 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized None 0 None 0 None Storage Length 0 0 - - Platoon blocked, % - Veh in Median Storage, # 0 - Mov Cap -1 Maneuver 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 22 0 1368 892 38 Major/Minor Minor2 Majorl Major2 Conflicting Flow All 465 - 0 0 Stage 1 - - - Stage 2 - - Critical Hdwy 6.94 Critical Hdwy Stg 1 - - Critical Hdwy Stg 2 Follow-up Hdwy - 3.32 - - Pot Cap -1 Maneuver 0 544 0 Stage 1 0 - 0 - Stage 2 0 - 0 Platoon blocked, % - Mov Cap -1 Maneuver - 544 - Mov Cap -2 Maneuver - - - Stage 1 - Stage 2 - - Approach EB NB SB HCM Control Delay, s 11.9 0 0 HCM LOS B Minor Lane/Major Mvmt NBT EBLn1 SBT SBR Capacity (veh/h) 544 HCM Lane V/C Ratio - 0.04 HCM Control Delay (s) 11.9 HCM Lane LOS - B HCM 95th %tile Q(veh) 0.1 Traffic Analysis Projected PM Synchro 11 Report PTG Page 3 Appendix H: Turn Lane Analysis 6/N/I013 $.0);30 FN m9]Ore <:Wpra/e�ts�sfanEarOsvpalwaYb0300-z�00)01-OI.Egn A EZ E— d W N +17 O m .••••.rrl x 3 3^ o L7 REVISION INTI I ,^ m I C m In T n o — Zo2 "a m _ at SNP yr- away `^"m3 w - Na = A m yo, _ ma<W� od n n p m F n T rn 17 O m m n m o ^ In Vl .-. xnn 1 xyl z Ln `' o m R W � U) O oio i y 1 Dt� N 1 1 z O n-.mcm a Ll F n T � .a `i m o o n UI In o Lnrrn T n F e a 2 � a F R a 1 0 . � A � N W 0 s"is 0� Vwi � C o^ 2 r C 4 N m o m In Z CO o ^ Z O Q y Q 4 2 N n n to dao $ O O O W N y O O O I x Ln " 4"yQII a 1 0 . Seminole County Public Schools School Impact Analysis School Capacity Determination (Non -Binding) ' To: Dan Ryan, The Christian Sharing Center, Inc ` 407-260-9155 ' dan.ryan(�thesharingcenter.org Eileen Hinson, AICP, City of Sanford * 407-688-5147 * Eileen. Hinson(cDsanfordfl.gov From: Jordan Smith, AICP, PP, Facilities Planner, Seminole County Public Schools Date: March 20, 2024 RE: Sharing Common (Sanford) Seminole County Public Schools (SCPS), in reviewing the above request, has determined that if approved, the FLUM designation and/or zoning will generate school age children. Description: Proposed Rezone from AG, Agriculture and RC -1, Restricted Commercial to PD, Planned Development and Comprehensive Plan Amendment from LDRSF, Low Density Residential Single Family to MDR, Medium Density Residential of +/5.77 acres generally located ADJACENT TO 6498 N. Ronald Reagan Boulevard (for Find My School reference) within the jurisdiction of the City of Sanford. The applicant is requesting a change to the zoning to allow a maximum of 79 multi -family residential units, to be developed within the proposed land use and zoning designations. Parcel ID (s) #: 13-20-30-300-040A-0000, 13-20-30-300-0160-0000 This review and evaluation is performed on proposed future land use changes, rezones and conditional uses, unplatted parcels, or projects that have not received final entitlement approval. This evaluation does not guarantee that the developments subject to this declaration are exempt from, or determined to meet the school concurrency requirements effective as of January 1, 2008. Changes in enrollment, capacity, any newly platted developments, and any subsequent final development approvals may affect the provision of concurrent school facilities at the point of final subdivision approval, including the potential of not meeting statutory concurrency requirements based on future conditions. Based on information received from the jurisdiction and the application for the request, SCPS staff has summarized the potential school enrollment impacts in the following tables: CSA Capacity: DEVELOPMENT IMPACT ON STUDENT GENERATION BY CSA AFFECTED CSAs CSA E-10 CSA M-1 CSA H-1 CAPACITY 2,660 5,732 7,739 3 -YEAR PROGRAM CAPACITY - - - ENROLLMENT 2,132 4,535 6,599 AVAILABLE CAPACITY 528 1,197 1,140 SCALD RESERVATIONS TO DATE 503 602 805 SIA - Sharing Commons 14 6 8 REMAINING CAPACITY 1 11 1 (7 589 10 327 hupsHseminalcschools sharepoint com/sitcsfl-acilitiesPlanninglShued Doarmentslew Directories/t'InnningfDevelopment tracking/0 SIAsrSIA 202424-06_SIA Sharing Commonsnmiec - Sharing Commons. docs Comments CSA Evaluation: At this point, the students generated at the three CSA levels would be able to be accommodated without exceeding the adopted levels of service (LOS) for each CSA by school type, or there is adjacent capacity to meet LOS as allowed by interlocal agreement. Any planned expansions/additions in the current five-year capital plan would provide additional student capacity to relieve the affected schools is reflected in this review. Zoned School Enrollment: For informational purposes, the below table indicates the analysis based on the individual school zones within the CSA under current conditions. At this point, the potential students generated WILL be able to be accommodated without exceeding the adopted Levels of Service (LOS) for the currently zoned schools. Any planned expansions/additions that would provide additional student capacity contained in the current five-year capital plan and scheduled to be completed within the next three years are included in this review. ZONED SCHOOL ELEMENTARY SCHOOLS Region 3 Hamilton Midway Pine Crest CSA E;-10 CAPACITY 2,660 754 1,046 860 2,660 3 -YEAR PROGRAM CAPACITY 2,682 3,917 6,599 AVAILABLE CAPACITY - ENROLLMENT 2,132 658 804 670 2,132 AVAILABLE CAPACITY 528 96 242 190 528 SCALD RESERVATIONS TO DATE 503 182 208 185 503 SIA -Sharing Commons 14 - 14 REMAINING CAPACITY 10 9610 24210 190 11 Region 3 Elementary Schools include Hamilton, Midway, and Pine Crest ZONEDSCHOOI MIDDLE SCHOOLS Greenwood Lakes Markham Woods Millennium Sanford CSA M-1 CAPACITY 1,268 1,260 1,757 1,447 5,732 3 -YEAR PROGRAM CAPACITY 2,682 3,917 6,599 AVAILABLE CAPACITY - ENROLLMENT 943 882 1,336 1,374 4,535 AVAILABLE CAPACITY 325 378 421 73 1,197 SCALD RESERVATIONS TO DATE 27 182 208 185 602 SIA - Sharing Commons 6 - 6 REMAINING CAPACITY Q 29210.- 196FO 21310 (112) Q 589 ZONED SCHOOL HIGH SCHOOLS Lake Mary Seminole CSA H-1 CAPACITY 2,805 4,934 7,739 3 -YEAR PROGRAM CAPACITY - ENROLLMENT 2,682 3,917 6,599 AVAILABLE CAPACITY 123 1,017 - 1,140 SCALD RESERVATIONS TO DATE 17 7881 805 SIA -Sharing Commons 8 - I 8 REMAINING CAPACITY 98 f- 229 O 327 https://.wminolcwhools. shnrcpoint.comlsitcsTaciliticslllanning/Shorcd DocumcrosNcw Dircctoric-JPlnnniniVDcvclopmcnurackh JO SIAs/SIA 20240-4-06 SIA Sharing CommondNoiicc - Sharing Commons.docz Terms and Definitions: Capacity: The amount of satisfactory permanent student stations as calculated on the date of the second FDOE count in October of the current school year. The number of students that can be satisfactorily accommodated in a room at any given time and which, is typically a lesser percentage of the total number of student stations. NOTE: Capacity is ONLY a measure of student stations, not of enrollment. Concurrency Service Area (CSA): A geographic unit promulgated by the School Board and adopted by local governments within which the level of service is measured when an application for residential development is reviewed for school concurrency purposes. The CSA listed represents the area that the capacity is considered and student assignment may be in a CSA adjacent to the project. Enrollment: For the purposes of concurrency review, the enrollment level is established each year as per Public School Interlocal Agreement Section 12.4 A, which sets the level on the date of the second full time equivalent (FTE) survey for FDOE, generally taken in mid-October. Programmed 3 Year Additions: New permanent school capacity within the CSA, which will be in place or under actual construction within the first three years of the current SCPS Capital Improvement Plan. Remaining Capacity: The capacity available for future development after the addition of any programmed capacity and less the reserved capacity. Reserved Capacity: The total number of student stations reserved in the respective CSA's that are assigned to projects via a SCALD certificate. School Size: For planning purposes, each public school district must determine the maximum size of future elementary, middle and high schools. Existing school size is determined solely through FISH data. Seminole County Public Schools has established the sizes of future schools (with the exception of special centers and magnet schools) as follows: i) Elementary: 780 student stations ii) Middle: 1500 student stations iii) High: 2,800 student stations School Attendance Zone: The established geographic area that identifies school assignments pursuant to Board Policy for each District school or region of schools, other than county wide magnet schools. Students shall attend the school(s) serving their residential or regional attendance zone unless otherwise permitted by Board Policy Students Generated by Project: is determined by applying the current SCPS student generation rate (calculated in the 2017 Impact Fee Study) to the number and type of units proposed. The number of units is determined using information provided by the jurisdiction and/or from the applicant's request. If no actual unit count is provided the unit count is then estimated based on the maximum allowable density under the existing/proposed future land use designation. Eventual Student assignment may not be to the school in closest proximity to the proposed residential development. Utilization: A State Board Rule prescribed percentage of student stations that a room (and proportionately, a school and school district) can satisfactorily accommodate at any given time. From a school/campus analysis perspective, "utilization" is determined as the percentage of school enrollment to capacity. Current DOE established K-12 utilization factors are as follows: Elementary 95%, Middle 90%, High 95% hops /Acininoleschools sharepoint.com/sites/F.iciliticsillanning/Slmred De rnems/New DirectoricA31anningfNvelopmcm tracking/0 SIAsrSIA 2024/2-1-06 SIA Sharing Common"otice - Sharing Commons do ,- Srt1FORp .� FST. 181 • ' • ' Business Impact Estimate This form should be included in agenda packet for the item under which the proposed ordinance is to be considered, and must be posted on the City's website by the time notice of the proposed ordinance is published. Comprehensive Plan Amendment of the Future Land Use Map designation of 6489 N Ronal Reagan Boulevard: The City is of the view that the following exception(s) to the Business Impact Estimate requirement, that are checked off in a box below, apply to the above -referenced proposed ordinance. Although, the City is implementing the procedure required by statutory law to ensure that no inadvertent procedural issue could impact the enactment of the proposed ordinance. ❑ The proposed ordinance is required for compliance with Federal or State law or regulation; ❑ The proposed ordinance relates to the issuance or refinancing of debt; ❑ The proposed ordinance relates to the adoption of budgets or budget amendments, including revenue sources necessary to fund the budget; ❑ The proposed ordinance is required to implement a contract or an agreement, including, but not limited to, any Federal, State, local, or private grant, or other financial assistance accepted by the ❑ The proposed ordinance is an emergency ordinance; ❑ The ordinance relates to procurement; or ❑x The proposed ordinance is enacted to implement the following: a. Part II of Chapter 163, Florida Statutes, relating to growth policy, county and municipal planning, and land development regulation, including zoning, development orders, development agreements and development permits; b. Sections 190.005 and 190.046, Florida Statutes, regarding community development districts; c. Section 553.73, Florida Statutes, relating to the Florida Building Code; or d. Section 633.202, Florida Statutes, relating to the Florida Fire Prevention Code. 11 Page In accordance with the provisions of controlling law, even notwithstanding the fact that, an exemption noted above may apply, the City hereby publishes the following information: 1. Summary of the proposed ordinance (must include statement of the public purpose, such as serving the public health, safety, morals, and welfare): The proposed ordinance is intended to incorporate the subject property into the City of Sanford in order to obtain water and sewer for a 79 -unit obtainable housing development. The proposed use is intended to provide obtainable housing which will benefit the public health, safety, morals, and welfare of the city as a whole. 2. Estimate of direct economic impact of the proposed ordinance on private, for-profit businesses in the City: When annexed into the City, the property will be assed the City of Sanford Millage rate and will result in additional Revenue to the City. 3. Estimate of direct compliance costs that businesses may reasonably incur: The applicant will be responsible for all permitting fees. 4. Any new charge or fee imposed by the proposed ordinance: When annexed into the City, the property will be assessed the City of Sanford Millage rate in addition to the County Taxes. 5. Estimate of the City's regulatory costs, including estimated revenues from any new charges or fees to cover such costs: It is impossible to quantify any potential regulatory costs of the proposed development. 6. Good faith estimate of the number of businesses likely to be impacted by the proposed ordinance: It is unknown if any businesses will be impacted by the development of the site. 7. Additional information Not applicable.