Loading...
HomeMy WebLinkAbout203 Larkwood DrPermit,:# : LAO Job Address: 903 Description of Work: Historic District: CITY OF SANFORD PERMIT APPLICATION Value of Work:-,$ ootage RECEIVED MAY 3 12006 Permit Type: Building Electrical Mechanical Plumbing Fire Sprinkler/Alarm Pool Electrical: New Service – # of AMPS Addition/Alteration Change of Service Temporary Pole Mechanical: Residential Non -Residential Replacement New (Duct Layout & Energy Calc. Required) Plumbing/ New Commercial: # of Fixtures # of Water & Sewer Lines # of Gas Lines Plumbing[New Residential: # of Water Closets Plumbing Repair – Residential or Commercial Occupancy Type: Residential Commercial Industrial Construction Type: # of Stories: # of Dwelling Units: Flood Zone- (FEMA form required) Owners Name Address%_ `s— �- i���NC�G� ,- �'��e( /& _ —7 %i?�/C FL -3; ! L l 2y Phone: r;' —L 0-7` 6 �V ! % a` Contractor Name & Address: Phone & Fax: Bonding Company: Address: Mortgage Lender: Address: Architect/Eagineer: Address: Contact Person: State License Number: Phone= Fax: Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet standards of all laws regulating construction in this jurisdiction. t understand that a separate permit must be secured for ELECTRICAL WORK, PLUMBING, SIGNS, WELLS, POOLS, FURNACES, BOILERS, HEATERS, TANKS, and AIR CONDITIONERS, etc. OWNER'S AFFIDAVIT: I certify that all of the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT. MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY, IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. NOTICE: In addition to the requirements of this permit, there maybe additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. Acceptance of permit is verification that I will noti a owner oftheproperty of the requirements of Florida Lien Law, FS 713 J of e Signature f er/Age Date Signature of Contractor/Agent Pri wner/Agent's Name Print Contractor/Agent's Name Sign Date Signature of Notary -State of Florida Date Date Z DEBBIE BLANTON - MY COMMISSION # DD 188491 EXPIRES: February 25, 2007 Owner A(W-&NOTARpersolrrhlt�?tltYo6WMpao. Contractor/Agent is Personally Known to Me or Produceedd Produced ID APPROVALS: —IL: FD: ENG: _j11_BLDG: F l Special Conditions: Rev 03/2006 *q?, CITY OF SANFORD BUILDING DIVISION OWNER/BUILDER AFFIDAVIT CONSTRUCTION CONTRACTING Owners of property when acting as their own contractor and providing direct, onsite supervision themselves of all work not performed by licensed contractors, when building or improving farm outbuildings or one -family or two-family residences on such property for the occupancy or use of such owners and not offered for sale or lease, or building or improving commercial buildings, at a cost not to exceed $25,000, on such property for the occupancy or use of such owners and not offered for sale or lease. In an action brought under this part, proof of sale or lease, or offering for sale or lease, of any such structure by the owner -builder within 1 year after completion of same creates a presumption that the construction was undertaken for purposes of sale or lease. This subsection does not exempt any person who is employed by or has a contract with such owner and who acts in the capacity of a contractor. The owner may not delegate the owner's responsibility to directly supervise all work to any other person unless that person is registered or certified under this part and the work being performed is within the scope of that person's license_ For the purposes of this subsection, the term "owners of property" includes the owner of a mobile home situated on a leased lot. To qualify for exemption under this subsection, an owner must personally appear and sign the building permit application. State law requires construction to be done by licensed contractors. You have applied for a permit binder an exemption to that law. The exemption allows you, as the owner of your property, to act as your own contractor with certain restrictions even though you do not have a license. You must provide direct, onsite supervision of the construction yourself. You may build or improve a one -family or two-family residence or a farm outbuilding. You may also build or improve a commercial building, provided your costs do not exceed $25,000. The building or residence must be for your own use or occupancy. It may not be built or substantially improved for sale or lease. If you sell or lease a building you have built or substantially improved yourself within 1 year after the construction is complete, the law will presume that you built or substantially improved it for sale or lease, which is a violation of this exemption. You may not hire an unlicensed person to act as your contractor or to supervise people working on your building. It is your responsibility to make sure that people employed by you have licenses required by state law and by county or municipal licensing ordinances. You may not delegate the responsibility for supervising work to a licensed contractor who is not licensed to perform the work being done. Any person working on your building who is not licensed must work under your direct supervision and must be employed by you, which means that you must deduct F.I.C.A. and withholding tax and provide workers' compensation for that employee, all as prescribed by law. Your construction must comply with all applicable laws, ordinances, building codes, and zoning regulations. I, , do hereby state that I am qualified and capable of performing the req sled construction in ved with the permit application filed. I will assume full responsibility as an Owner/Builder Contractor, and will personally supervise all work allowed by law on the permitted structure. ),c er/Builder Signa Date Print Owner/Builder Name gig—nature of Notary—State of Florida DEBBIE BLANTON 1/IY rt3WimISSION # OD 188491 �kc=9aEi! February 25,2007 Owner is Personally Known to e' 1 -800_3 -MC i; Any FL Notes' Di�uM Assoc. Co. Produced ID,w OF LOCH ABLIM s2L=bL—#f AS RECORDED IN PLAT BOOK 16, PACE 99-100, PUBLIC RECORDS OF SEMINOLE COUNTY, FLORIDA. Found 4x4 Conc Mon, N 8?:69;48 " w 128.70'Fo 03' - nd 4x4 "Clnc 7' PERMCNANT UTILITY ESM'T Mon. Chain Link Fence F -TM - - ^- ^�^ 4' T1EMPORARY UTILITY ESWT ---- —1 F 3 LOT 2 BLOCK E Wood Fence fD 0 0 0 29-01 Co nc stoop P Qtjo 02' co 01 — I 82.01 23.64 Ci , I 1-1 RESIDENCE X—X e7 0 21.0 Conc Drive a, el Conc Walk vi 20.09' 100.09, N 89'48'14" E A (PER PLAT) LAT?KWOOD DRIVE A DELTA = 07*03,25, RADIUS w 894.061 LENGTH - ]08-891 CHORD a 108,82, CHORD BRG. - S 86'40'03' E 1. ACCORDING TO THE NATIONAL FLOOD INSURANCE RATE MAPS, 11 IS My OPINION THAT THE BUILDING SHOWN HEREON DOES NOT LIF WITHIN 100 YEAR FLOOD PRONE AREA AND LIES WITHIN rl nnn 7nmr v, i7LVLl1 L Stoop I ti 22,0' cc�� Conc Drive °` 20.09' N 89'48'14" E (PER PLAT) ' M OOq Fvnce ;i r 611 �� z Conc' -' Patio i in 82.01 23.64 RESIDENCE a ;� p203 �i 28.2' a 26.0• Conc Vatk `rf IDIi.Qg' A LARKWOOD DRIVE A \ \ DELTA me 07'03125' RADIUS 4 884.06' LENGTH n 108.89' CHORD "100,02, CHORD BRG. v S 86'40'03' E OT c, 1. ACCORDING TO THE NATIONAL FLOOD INSURANCE RATE MAPS, IT IS MY OPINION THAT THE BUILDING SHOWN HEREON DOES NOT LIE VITHIN THE 100 YEAR FLOOD PRONE AREA AND LIES WITHIN FLOOD ZONE 'X' PURSUANT TO 2. IMPROVEMENTS SHOWN HEREON RM PANEL (WERE LOCATED FATCTIVE GROUNDd/17/93 LEVEL. SUBSURFACE IMPROVEMENTS OR ENCROACHMENTS, IF ANY, WERE NOT LOCATED. 3. NO SEARCH OF THE PUBLIC RECORDS WAS MADE BY THIS SURVEYOR, THE LEGAL DESCRIPTION AND OTHER PERTINENT INFORMATION SHOWN HEREON IS AS PROVIDED BY THE CLIENT, RECORDED DIRECTIONS AND DISTANCES ARE SUBSTANTIALLY THE SAME AS FIELD MEASURED UNLESS OTHERVISE SHOVN. VISIBLE UTILITIES VITHIN RECORDED EASEMENTS NOT SHOVN 4. THIS SURVEY IS FOR MORTGAGE FINANCING NECESSARY FOR THE PURCHASE OF T14IS PROPERTY ONLY AND IS NOT TO BE USED FOR CONSTRUCTION PURPOSES. LOT LINES ARE NOT TO BE REESTABLISHED FROM TIES TO THE IMPROVEMENTS SHOWN HEREON. $• 'S' INDICATES FOUND 1/2' IRON ROD (UNLESS OTHERWISE SHOVN. 6. THIS SURVEY IS PREPARED FOR THE SOLE AND EXCLUSIVE BENEFIT OF THOSE PARTIES NAMED BELOW AND IS NOT TO BE RELIED UPON BY ANY TITHER ENTITY OR INDIVIDUAL. CERTir1E0 EXCLUSIVELY TD JULIO MARTINEZ & PAMELA SUE LEE INLAND MORTCACE CORPORATION CENTRAL TITLE COMPANYOLD REPUBLIC FLORIDA NATIONAL TITLE INSURANCE SCO SEC-TVP-RGE T�ljr-, FIELD SURVEY, DISK NO. 33-20-30 ll/L, /4R *:1nr, 0.2' 1 I HEREBY CERTIFY THAT THIS 'SKETCH OF RECORD MVEY' T17 THE BEST OF MT KNOVLEDGE AND BELIEF, MEETS THE MINIMUM TECHNICAL STANDARDS SET FORTH BY THE FLORIDA BOARD OF LAND SURVEYORS, IN CHAPTER 61G17, FLORIDA ADMINISTRATIVE CZDE. IURSUANT TO SECTION 47ZAZ7 DF THE FL02iQA 3(ATUTES. 1 6 tRAISL TE OF CLOP.,,DA ARE NO5 SIGNED ANC EMBOSSED WITH THECF THIS SUP<TOR 46'RZO,B'RICA' r fi44NCI.S' I'Mi0nal Land Survaynr 17'0ss7intu*0d a0taevany irinler Springs, A6 5-9708 Tele-fa.s ('d07) 595 -nuns SCALE, SURVEY JOB NO. Model P1 08 Owner's Manual 10 ft. x 8 ft. (3,05m x 2.44m) Version 2.8 PLEASE READ OWNER'S MANUAL COMPLETELY BEFORE ASSEMBLING YOUR BUILDING. ALL STATED SIZES ARE NOMINAL DIMENSIONS, Thank you for choosing the Royal Outdoor Products Storage Building. Please read this Owner's Manual completely before assembling your building. Retain manual and your dated sales slip for future reference and. warranty claims. Assembly Safety information As with any construction project, use common sense when assembling your building. Royal Outdoor Products cannot: be responsible :for any damages or injuries resulting from the incorrect use of any tools, equipment or the mishandling of any of the building components. • Use proper rifting procedures when handling the packages. • Take care when handling the individual com- ponents and wear gloves to avoid cuts or scrapes. • Follow proper operating procedures for any tools, ladders, etc. used when assernbhng the building. • Protect your eyes. Always wear safety glasses when assembling the building and when using power tools and hammers. • Do not assemble building during high winds. • Do not assemble bu.iiding if parts are miss- ing. A partially assembled building may be seriously damaged by high winds. • This building must be anchored to -the foun- dation to prevent wind damage. See pages 4 and 5 for how to anchor. Screws for anchor- ing are not included. ATTENTION: Before you assemble the building: PLEASE TAKE A COMPLETE INVENTORY OF ALL PARTS USING THE PARTS LIST AND PART IDENTIFICATION GUIDE PROVIDED ON PAGES 1, 2 AND 3. DO NOT ATTEMPT TO ASSEMBLE BUILDING IF PARTS ARE MISSING OR i `l ` `F For assistance or replacement parts call: 1877 GO ROYAL C 2004 ROYAL OUTDOOR PRODUCTS CO. 5289 HWY #7 Unit 47 PO Box 456649 - Woodbridge, Ontario, Canada . L4L 80 Part Identification I j i. Joiner Panel Groove Panel Header Assembly Header Center (JS1-JS5, JS10) (,PSI-PS5, PSIO) (HD1) (1-102) €a� a Ridge Beam Ridge Beam Cap Cover Ridge Beam End Cap Ridge Support. Beam Corner Post. Corner Post Cap (RB1) MCI) (REQ (RS I-RS2) (CN!) (CPC1-CPC2) k5` Fascia Gable Fascia Eave Fascia Board Fascia Board Seam Cover Slope Wali Cap Roof Corner Cap (FG1-FG2) (FE1-FE2) (FBI-FB2) (FSC1) (SC1-SC2) (RCC1-RCC2) Wall Connector PVC Door Lintel Decorative Trim Decorative Trim Cap Door End Cap Flip Hasp Astrigal (WC1) (LN 1) (DT1-DT2) (TC1) (DEC) (FH1) (AST) Steel Lintel Insert Vent Door Sweep Base Channel Door Rail Trim Door Handle Slide Lock (LTi) (VN) (DS) (AL1-AL6) (DIRT) (HL) (LK) Full -Scale D=Mt- &=M33. Dm=, r 0 Hardware Screw Flip Hasp Screw Slide Lock Screw Ridge Beam End Cap Screw # 10 x 314" (1.90cm) #9 x 1" (2.54 cm) #8 x 314' (1.90cm) #9 x 314" (1,90cm) (AS) (FHS) (LKS) (DHS) Ridge Beam Steel Insert Bolt Set (BS) • Power drill with PhillipsO (#2) or a #2 Robertson bit • Ladder = Carpenter's square • Level • Hammer • Rubber mallet • Safety glasses • Gloves • Wrench - 7/16" size • 1/4" and 318" drill bit Measuring Tape - Minimum 16' feet (5m) Phillips is?re4gim .TeA L _eAne,k. of Yhitlips:i.; rn Co. • Foundation screws L.. • Silicone Caulking -a=- e X01 Door Rail Plug Door Handle Bolt Set (DRP) (DHSS) Door Pin (HP) Construct foundation (concrete slab or wooden platform) and anchor base channels before assembling your building. Foundation and anchoring materials are not included. Make sure that your building complies with your local building codes. Before you excavate you will need to call local utility companies (e.g. phone, cable, gas and electric) to ensure the area in which you plan to dig is clear of underground cables or pipes. Utility company personnel will come and mark these areas for you, usually at no charge. Always excavate the base construction area slightly wider than the dimensions of the base to give you some working room. Select a location that is free from ground water and provides suitable drainage, ample room to erect the building, and an area that can be lev- elled properly. Decide on the type of foundation. Foundation must be complete before unpacking and assembly can begin. In selecting the site, allow approximately 5' (1,52m) of clearance on all sides and 3' (2.44m) more than the height of the building for assembly. Exterior dimensions of 10' x 8' (3.05m x 2.44m) building: Roof Width: 122 318" (310.9cm) Roof Depth: 100 114' (254.8cm) Height: 99 114" (252.Ocm) Wall Width: 118 118" (300.2cm) Wall Depth: 97 314" (248.2cm) Slab should be 4" (10.16 cm) thick. To provide the best support for your building and to erasure that the corners are square, the slab must be sloped slightly away from the door opening and free of bumps and ridges. Follow Building Code requirements and provide a moisture barrier as specified by your concrete contractor. OPTIONAL: Use Concrete Sealer paint on cured concrete floor to prevent moisture buildup in building. Materials Needed: (not included) (4) 10'x 2" x 4" (3.05m x 5.08cm x 10.16cm) for forms (2) 8' x 2' x 4" (2.44m x 5.08cm x 10.16cm) for forms 1.02 yd:� concrete for 4" (10.16cm) thick slab Cut Sizes: (2) 120" x 2" x 4" (304.8cm x 5.08cm x 10.16cm) (2) 102" x 2" x 4" (259.O8cm x 5.08cm x 10.16cm) (14) 16'x 2'x 4" (40.64cm x 5.08cm x 10.16cm) with pointed ends All stated sizes are nominal dimensions. Concrete slab I---------------- 123"(312.42cm) -----------------I t -- - ---- -- 81112"(207A1an)--------I I I I I �- - 41112" (105A1 an) - - I 1 I I i I `---------------- 120"(304.8am)----------------I To provide the best support for your building and to ensure that the corners are square, the platform must be sloped slightly away from the door opening and free of bumps and ridges. Materials to construct platform may be obtained at a lumber yard. 1. Begin by marking out the area to be excavated. Remove loose sod, top- soil or fill to allow for the placement of a compacted gravel base. Excavating is required to achieve a firm foundation which will prevent your base from shifting/sinking and give overall stability. tette recommend you dig that will allow for a 2" gravel bed and will allow your base to be slightly above ground level. In some areas it may be required to dig deeper to achieve this goal. 2, Fill the area with a minimum of 2" of medium to fine gravel. Grade your aggregate material as closely as possible to the final contour of the base surface. To ensure proper drainage make sure to grade the slope of the base installation away from the front of the shed. Use either a hand tamper or plate compactor and firmly compact the gravel base material. 3. Have lumber cut to size and nail together following plan as shown. Recommended minimum nail length is Y. 4. Position platform onto site and drive stakes into the ground to anchor platform. 5. OPTIONAL: Paint floor to preserve platform. Materials Needed: (not included) (4) 10` x 2" x 4" (3.05m x 5.08cm x 10.16cm) pressure treated studs (13) 8' x 2'x 4" (2.44m x 5.08cm x 10.16cm) pressure treated studs (3) 3/4" x 4' x 8' (1.90cm x 1.22m x 2,44m) exterior grade plywood Cut Sizes: From (2) 70' x 2" x 4" (3.05in x 5.08cm x 10.16cin) cut (2) 120" x 2" x 4" (304,8cm x 5.08cm x '10.16cm) Froin (3) 10' x 2" x 4' (3.0a5m x.5.08cm x 10.16cm) cut (8) 14 112" x 2" x 4" (36,83cm x 5,08cm x 10.16cm) From (1) 10'x 2"x 4" (3.05m x 5.08cm x 10.15cm) cut (1) 14 114' x 2'x 4' (36.2cm x 5.08cm x 10.16cm) (6) 14 112' x 2" x 4" (36.83cm x 5.08cm x 10.16cm) (1) 13'x 2" x 4" (45.72cm x 5.08cm x 10.16cm) pointed for stake From (9) 8'x 2"x 4" (2.44m x 5.08cm x 10.16cm) cut (9) 96'x 2" x 4" (243.84cm x 5.08cm x 10.16cm) From (2) 8'x 2'x 4" (2.44m x 5.08cm x ?a 16cm) cut (12) 14 114" x 2" x 4" (36.2cm x 5.08cm x 10.16(-m) (2) 10 1 f8" x 2' x 4" (25.72cm x 5.08cm x 10.16cm) From (1) 8' x 2"x 4"(2.44m x 5.08ca) x 70.16cm) cut (2) 14 114" x 2" x 4' (36.2cm x 5.08cm x 10,16cm) (3) 18'x 2" x 4" (45.72cm x 5.08cm x 10.16cm) pointed for stakes From (1) 8' x 2"x 4" (2.44m x 5.08cm x 10,16crn) cut (8) 10 118" x 2' x 4" (25.72cm x 5.08cm x 10.16cm) (1) 14 112" x 2" x 4" (36.83cm x 5.08cm x 10.16cm) Ply4V od: From (1) 314"x 4' x 8'('i.90cm x 1.22m x 2.44m) cut (1) at 48" x 96' (121.92cm x 243.84cm) From (1) 3!4"x 4'x 8' (1.90cm x 1.22m x 2.44m) cut (1) at 48" x 51" (121.92cm x 129.54cm) (1) at 48" x 24" (121.92cm x 60.96cm) From (1) 314"x 4' x 8' (1.90cm x 1?2m x 2.44m) cut (1) at 48" x 51' (121.92cm x 129.54cm) (1) at 34'x 24' (86.36cm x 60.96cm) (1) at 17" x 24' (43.18cm x 60.96cm) R - - - - - - - - - - - - - 12rt3042-1-----------------I ----------- 96-(243.84cm) ----------- -- - - - - ---- 49-021.92..1 --- ----- 48-(121.92..) ---- X 24- (60.96..) I - - - - - - - - - - - - - - - - 120' (304.8cm) - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 107Stir (273.37an) ------------, I I 1 I--------- eo-12833a.)---------- -- 41r (121.92=) - - - - 48'(121.92..)---- I ' L 321N- (81.92cm) 2- x 4- x 18- STAKES '116 It2 _ TYP. (4x) \ ! (4191a.1i I 17 1 r2- ' I , �(44A5u ' l l „ I I i I t 34iN- 1 ' I I (86.99cmj 1 1 , i I 51- (I 29,54m) t-(129.5/..) I I 663N- (161ssan) 1 ( 821tr (28155..) ' ------ 99- (251.46.n) ----------- 43.84cm) Parts Needed: 2 Side Base Channels 2 Side Base Channels 1 Right Rear Base Channel 1 Left Rear Base Channel 1 Right Front Base Channel 1 Left Front Base Channel (Right and left are determined when facing the front of building.) Concrete or wood foundation must be installed. See pages 4 and 5 for instructions on how to prepare site and anchor building. Position B Base Channels on platform as shown (rear channels are longest). Allow 70 718" (180.0cm) between front Base Channels for door placement. Use a carpenter's square to line up corners. Please note: The diagonal measurement included in the diagram may vary slightly from the actual measurement. APPLY A CONTINUOUS BEAD Of SILICONE CAULK UNDERNEATH BASE CHANNELS, AROUND THE INSIDE PERIMETER Of THE BASE CHANNELS AND WHERE INDIVIDUAL CHANNEL PIECES MEET. CHECK 70 718" (180.0cm) door opening dimension between front Base Channels. Secure Base Channels (AL1-AL6,) to foundation using flat -head wood screws if your foundation is wood or flat -head concrete screws for a . concrete slab. These screws are not incitaded. The recommended size of flat -head screws to use is 3115" x 314" Use pre -drilled holes in channels as a guide for screw placement. Install a minimum of S screws in each side and rear channel piece and 4 screws in each front channel. DOUBLE CHECK 70 718" (180.0cm) door opening dimen- sion between front Base Channels. OTE: Hales in exterior of Base Channels are for drainage only. 0 NOT INSTALL SCREWS IN THESE DRAINAGE HOLES. General Assembly The Joiner and Groove Panels are designed to make assembling your building easy. The Joiner Panel and Groove Panel slide together easily without additional lubricants. There is no inside or outside surface to the panels. Some panels are shipped preassembled in groups of 3 or 4. Due to the weight of the pre -assembled panels, you may find it necessary to disassemble some groups of 3 or 4 in order to assemble your building. Corner Posts Side Wall Joiner Panels Side Wall Groove Panels Back Wail Joiner Panels Back Wall Groove Panels Wall Connector (Right and left are determined when facing the front of the building.) It's helpful to lay out all the required panels on the ground around your foundation in their proper sequence. Note that the back wall panels are angled at the top edge and vary in length. Install a group of 2 back wall panels labeled PS2 JS2 into rear Base Channel. Joiner Panel Groove Panel !i First, insert a group of 3 pre - assembled side wall panels labeled JS1-PS1-JS1 into side Base Channel at right rear corner. Make sure a Joiner Panel faces the corner. JS1 Psi JS1 Install a Corner Post CA11. 8 Continue to build the right side wall adding a Groove Panel PSI followed by a Joiner Panel JSI. Make sure you hold onto the panel until you insert it into the Base Channel, do not release the panel and151 allow it to drop into the channel. _ Add Groove Panel PSI to complete right side wall. Install a group of 2 back wall panels labeled PS2—JS2 into 12 rear Base Channel. Insert a JS5 Joiner Panel to Y the PS2 panel at the back wall. Continue inserting panels PS5-JS5-PS5-JS5-PS5-JS5. Jss I -I ass I� ass K Insert a group of 3 side wall panels labeled JSI- PSI-JSI into side channel at the right front corner allowing room for a Groove Panel PSI, Make sure a Joiner Panel faces the front corner. 13. Place the Wall Connector WC! over the top of panels JS5-PS5-JS5-PSS-JS5-PS5 JS5. JS3 Z JS4 14 Snap 2 piece Vent assembly VN provided into hole located at top of JS4. Insert JS3-PS3-JS4 along back wall on file left side. HINT. A ladder may be required when assembling back waif 16 Insert PS4 to complete the back wall. Snap 2 piece Vent assembly VN provided into hole located at top 1-5 of JS4. Insert JS3-PS3-JS4 along back wall on the right side. 17 Insert a group of 3 side wail panels labeled JSI-PSI-Jsl into side Base Channel beginning at the left rear corner. Repeat steps 8-10 to build left side wall. Parts Needed: 2 Front Wall Joiner Panels 1 Right Door Jamb Groove Panel 1 Left Door Jamb Groove Panel 2 Cornea Posts 4 Corner Post Caps 1 Door Lintel 1 Lintel Insert 2 Header Assembly 1 Header Center 4 Slope Wall Caps 4 Fascia Gables 2 Ridge Beam Sections 2 Ridge Beam Steel Support Beams 2 Ridge Beam Steel Support Beams 1 Ridge Beam Joint Cover 8 Ridge Beam Steel Insert Beam Bolt Set Screws #10 x 314' (1,90cm) (Right and left are determined whea facing the front of building.) Lay out all the required panels on the ' ground around your foundation in their proper sequence. Mote that the front wall panels are angled at the top edge and vary in length. The Door Hinges must face the outside of building on the right and left Door Jamb Groove Panels. Insert JS2 and DJ1 in front Base Channel at the right front corner. Repeat steps 21 and 22 to complete left front corner using JS2 and DJ2. 2t:3 Add PVC Door Lintel LN1 across the top of the front walls. The Door Lintel's grooved surface should face up and the screw hole locations should face the inside of the building. Install Steel Lintel Insert LT1 over the top of the PVC Door Lintel LN1 and into the Door Jamb panels, making sure the Lintel Insert LTl is evenly spaced along the door opening and the hollow opening faces the inside of the shed. Push Header Assembly HDI all the way into the Make sure Corner Posts CN7 Door Lintel LNI over left and right side of the door and panels are fully seated 2� opening. Make sure the header is fully seated over 2�5 into the Base Channels, top of Lintel Insert LT1. Install a screw (#10 x 314" Complete the header by sliding Header (1.9cm)) at each end of Center HD2 all the way into Door Lintel LN?. Make boor Lintel LN? only. sure. Platinum Series decal is facing the outside and head- er is fully seated over top of lz:R Lintel Insert LT7. ri Match up front and rear Slope Null Caps (SCI, SC2) for both sides of the building. Attach caps, (Pre -drilled holes facing inside). Push down to fully seat the Slope Lyall Caps. From the front of the building, place Corner - Post Cap CPCI on right side of the front wall. Place the Corner Post Cap CPC2 on left side of em' front wall. Repeat to place Comer Past Cap CPG1 on left side of the rear wall. Place the Comer Post Cap CPC2 on right side of rear wall.. Install right Fascia Gable FGI on right side of the front wall. Install the other right Fascia Gable FG I to the left side of rear wall (as you are facing front of building). Repeat to install the left Fascia Gable FG2 on left side of front wall, Install the other left Fascia Gable FG2 to the right side of the rear wall (as you are facing front of building). Layout Ridge Beam Steel Support Beams (RSI & RS2) to proper length as in diagram, Line up holes and bolt Steel Support Beams together using bolt set provided (Note: 4 bolts are to be used to fasten beams together at the centre and 2 bolts are to be used at either end to fasten 6" supports). Tighten bolts using Yip" wrench. I RSI RS2 RS2 RS112 Slide a Ridge Beam section R81 onto assembled Steel Support Beam. Slide remaining Ridge Beam section RBI onto assembled Steel Support Beam. Note: Make sure the flush ends of the Ridge Beam sections meet in the me of the assembly. CUT BACK END FLUSH END �X Overall Beam Length 98 3/4' (250.83an) 31Slide on Ridge Beam Joint Cover R_JC1 onto Ridge Beam. Apply a bead of silicone around joint where Ridge Beam pieces meet. Slide Ridge Beam Joint Cover over siliconedioint. RB1 If you do not have the recommended five feet of clearance on one side. you may follow these assembly instructions as an alternative: Working frorn the inside of the building, slide roof Joiner Panel JS IO into fascia FG at rear and front of building. Nate: You must remove both gables from the side that you have the clearance on to slide the JS10 panels down. Next. install Groove Panel PSIO and continue until entire side of roof is com- plete. Important: Make sure you slide roof panels down approximately eight inches from top of roof to allow the installation of the Ridge Beam. install Ridge Beam as shown at Step 33 making sure bottom wing of Ridge Beam fits under Fascia Gables (F61 & FG2) at each end of walls. Slide Joiner Panel JSIO nearest outside wall into Ridge Beam and continue at Step 36. ---------------- Overlap Distance of Support Beams 36' (91.44cm) ---------- --------------------------- 31Slide on Ridge Beam Joint Cover R_JC1 onto Ridge Beam. Apply a bead of silicone around joint where Ridge Beam pieces meet. Slide Ridge Beam Joint Cover over siliconedioint. RB1 If you do not have the recommended five feet of clearance on one side. you may follow these assembly instructions as an alternative: Working frorn the inside of the building, slide roof Joiner Panel JS IO into fascia FG at rear and front of building. Nate: You must remove both gables from the side that you have the clearance on to slide the JS10 panels down. Next. install Groove Panel PSIO and continue until entire side of roof is com- plete. Important: Make sure you slide roof panels down approximately eight inches from top of roof to allow the installation of the Ridge Beam. install Ridge Beam as shown at Step 33 making sure bottom wing of Ridge Beam fits under Fascia Gables (F61 & FG2) at each end of walls. Slide Joiner Panel JSIO nearest outside wall into Ridge Beam and continue at Step 36. Parts Needed: 10 Roof Joiner Panels 8 Roof Groove Panels 4 Fascia Board (Gable) 4 Fascia Eave 4 Fascia Board (Eave) 2 Fascia Board Seam Covers 2 Doors 2 Door Sweeps 4 Door End Caps 2 Door Flail Trim 8 Door Rail Plugs 4 Hinge Pins 1 Astrigal Screws, 910 x 314" (1.90cm) (Right and left are determined when facing the front of the building.) Lay out all the required panels on the ground around the building in their proper sequence. Working from the outside of the building, slide roof Joiner Panel JS10 into Fascia Gable FG at rear of building. .. y. Hint: Make sure panel is fully seated into the Ridge Beam. tnstall only i :3 :, #10 x 3/4" (1.90cm) screw into the corner of the Ridge Beam R61 into the hole nearest outside wall. Next, add roof Groove Panel PS10 and install screw into Ridge Beam hole only where Groove Panel PS10 meets Joiner Panel 1S?o. Continue to add Roof Panels and screws, alternating between JS10 and PS10. until both sides of roof are built. :38 Complete the front and back Fascia Gables by sliding the Fascia Board FLi2 with the thin end facing the ground. 0 R :39 Install the Fascia Eaves FFi (Rear RightlFront Left) & FE2 (Front Right/Rear Leh) onto the roof by inserting one end of the Fascia Eave at one corner of the shed and working your way towards the center. The outer edge of the Fascia Eave should line up with the outer edge of the Fascia Gable. You may find it helpful to have someone pushing up on the roof edge lightly from inside the building. Note: holes in bottom of Fascia Eave are for drainage only. Please do not install screws in these drainage holes. FE1 i si hi di N e: it n h: N tr to 01 N ft ft FB1 Insert the remaining Fascia Board FBI into the Fascia Eaves with the thin end facing the ground. A space at the center for the Fascia Board Seam Cover FSCI is required. FB1 42 insert a boor Rail Plug DRPinto each of the 4 holes in the front of the door (a), Make sure that the plug is fully seated in the door, install the Door Rail Trim DRT as shown taking care to engage the slot of the Door Rail Trim on the head of the plug (b). Slide the trim across all four plugs. Repeat on other door. HINT For ease of installation raise the plug slightly wish a flat screwdriver. 41 Slide one of the Fascia Boards (Eave) out slightly and insert a Fascia Board Seam Cover FSCt. Then slide the Fascia Board (Eave) back into place. 43Insert the barbed flap of the Door End Cap DEC into the scot of an unfinished corner of the door trim as in diagram a. Push the Door End Cap down fully so the top of the cap is flush with the top of the door as in diagram b and install the remaining three Door End Caps to complete the doors. Position left door as shown. Loosen the screws on the hinges of the door "` only. Align prongs and tap Door Pin HP in top and bottom hinge with hammer. Retighten hinge screws on the door, Repeat to install right door. .000 h Door Ahgnment T Before attempting to align doors, while inside the Dow building, insert a screw in the first hole of the Base Channels (AL5 & AL6) at the Door Jambs I'M & I I Door DJ2). Base Channel (dote: The door hinges have a special mechanism Install Screw All that keeps the door locked into the hinge even if pins are removed. Do not remove the hinges. 1. Before you install screws in the Slope Nall Caps (roof/wall line), you must align the doors. DO NOT install screws unless the doors are lined up properly. 2. Ensure the doors are not upside down. Remember the door sweep must be at the bottom. 1 If you have installed your doors and you are experiencing problems, as in diagram a, use the following instructions to correct: To obtain an even vertical gap between the doors, i.e. the doors are touching at the top or the bottom, gently push the building back and forth, not side to side. To obtain an even horizontal gap between the doors and the Door Lintel, i.e. the top of one door is higher than the other, gently push the shed side to side. You will notice that the doors shift as you push the building. 4. If you have installed your doors and you are experiencing problems as in diagram b, use the following instructions to correct: In diagram b, the right door does not line up properly with the left door because the bottom of the right door appears bent inward. To correct this, gently push on the building at the top of the front right corner tat the point shown in diagram b) until the right door is aligned properly. If the left door appears bent inward, correct the alignment by pushing on the top left comer of the building. 5, if you are still experiencing problems, call the 1-800 consumer service line for assistance. 46Next, install Astrigal AST on left door of the building. Position Astrigal on inside of left door so that the screw locator holes on the Astrigal are positioned on the left door and the positioning fin on the Astrigal fits tightly against edge of left door. Mark hole locations on left door while holding Astrigal in place. install Astrigal with #10 x 314 screws provided. ASTRIGAL Door Juts outward 48 Inside the building, starting from the top. secure rear Fascia Gable FG with screws to back wall panels. Pre -drilled holes should line up where the panels are joined. Do rwt install a screw in the Fascia Gable holes nearest the corners of the building at this time. It is helpful to have one person on the outside of the building pushing down on the Fascia Gable FG while the second person inserts the screw from the inside. Install 3 screws into both front Fascia Gables FG beside door opening while one person holds the Fascia Gables FG down from the outside. IMPORTANT- Be sure to check door alignment several times during screw installation to ensure building has not moved out of alignment. If it has, realign and resume installation of screws. 49 Have one person push the Lintel upward at lite centre so as the Lintel bends upward slightly while #10 x 314" (1.90cm) screws are installed in the Door Lintel LIVI. Continuing to push the Lintel upward at the centre insert two #10 x 314" (1,90cm) screws in the Door Lintel at the seams of the center panel on the exterior of the building, Before you install the screws in the Slope Wall caps you should first check to see that the Fascia Em have engaged the Slope Walt Caps from front to back. You may need to push the walls out slightly from the inside to get the Eaves and Slope Wall Caps to engage. This should also have the effect of straightening out the side wa of the building. After you have assured that the Slope Wall Caps and the. Fascia Eaves have engaged, check your door alignment once more. If all is ready, install lower screws on Slope Wall Caps (SCI & SC2) into side wall panels. Next, install screws into the top of Slope Wail Caps (SCI & SC2) into the roof panels. Do not install a screw in the Slope Wall Cap holes nearest the corners of the building at this From the outside of the building, have one person raise a corner ^' of the building until the Corner Post Cap is sitting up against the Fascia Gable while the second person installs a screw into the Fascia Gable and Slope Wall Cap on the inside of the building at that corner. Repeat at other 3 corners. - Finish by installing a 3 screw at the bottom of all panels - front, back and sides into Base Channels on only. Note: holes in exterior se Channels are for drainage Do not Install screws in these age holes. Parts Needed: 2 Decorative Trim 1 Decorative Trim 2. Decorative Trim Cap 2 Ridge Beam End Caps 2 Roof Corner Cap Right 2 Roof Corner Cap Left 2 Slide Locks 7 Slide Lock Screws k8 x 314" (1.90cm)- Black 1 Flip Hasp 2 Door Handles 4 Door Handle Bolt Set (Bolt, Washer. Nut) - Black 2 Bubble Logo 4 Ridge Beam End Cap Screws #9 x 314 in. (1.90cm) Screws, x`10 x 314" (1,90cm) (Right and left are determined when facing the front of the building.) First, orient Slide Lock LK !i5so that the 112" end of the bolt is facing up. Secure with #8 x 3/4" (1.90cm) screws provided on inside of left door while Slide Lock LK is held into the hole provided in the Door Lintel LN'i. Do not overtighten screws. - open the Hasp as shown and position its edge against the edge of the left door below the Door Handle and fasten using -`' f9 x 1" screws. Next, while holding the padlock post on the edge of the right door, flip the hasp . so that the padlock post fits into the leaf hole and mark the screw locations. Flip the hasp leaf back, repositon the padlock post and fasten screws. 59 Install the Decorative Trim OT1 to the left and right doorjambs. Install the Decorative Trim Caps TO over the Install the Decorative Trim DT2 to the door lintel taking care to space ends of the Decorative Trim DTZ The Trim Caps the trim evenly over trip of the doors. You may need to use a white 60 have a small tab on the inside of the piece which rubber mallet to get the Decorative Trim to lock into place, It necessary will lock into the holes on the Decorative Trim. slide the Decorative Trim DT7 pieces up to meet the DT2 piece, rill Install left and right Roof Corner Caps RM (right) & RCC2 (left). Secure in place by inserting a screw up through the bottom of the cap as 5hown. Install 3 screws per Fascia Eave on the outside of the unit at the pre -drilled locations. W Insert Ridge Beam End Caps REC in front and back, and install W'9 x 3/4" screws, Install bubble logo to cover up screws, Royal Outdoor Products Vinyl Storage Buildings 15 Year Non -Transferable Limited Warranty Royal Outdoor Products Co. 5289 HWY #7 Unit #7 PO Box #56649 Woodbridge, Ontario, Canada L4L 8V3 Royal Outdoor Products Co., a division of Royal Group Technologies Inc., C Royal") in respect of Vinyl Storage Buildings manufactured by it (hereinafter referred to as Troductsl warrants to you the original purchaser of Products, that subject to the terms and conditions herein contained, the Products are and will be free from defects in materials and workmanship that result in warping, rotting, corroding, flaking, pealing, blistering, or abnormal discoloration of surfaces. This warranty will remain in effect for a period of 15 years as long as you are the original purchaser of the Product and if the Product used in non-commercial applications. All failures to Products covered by this warranty will be repaired, replaced or restored by Royal in accordance with the terms and conditions of this warranty. By acceptance and use of the Products, you agree with Royal's liability. and replacement of the Products at Royal's option, as provided herein. Products which experience color change due to normal weathering are excluded from this warranty (including non-uniform fading and color changes result- ing from unequal exposure of panels to the sun and elements.) For the purpose hereof, the term'nortnal weathering" means exposure to ultraviolet (sun) fight. and extremes of temperature and atmosphere which will cause any colored or painted surface to fade, darken, chalk or acquire a surface accumulation of dirt or stains. The severity of these conditions depends on air quality, the geographic location of the property at which the Products are installed, and other local conditions over which Royal has no control. Royal shall not be liable for and this warranty does not apply or extend to any failure, defects or damages arising from or connected with, without limitation, misuse. neglect, faulty or improper installation. This warranty is void if structural parts and components not supplied by Royal are used. Failure, damage, defects or malfunctions resulting from misuse, abuse. negligence, alteration, accident, lack of proper maintenance, impact of foreign objects, hail, tornado, hurricane, other violent storm, flood, fire. pollu- tants, chemicals, acts of God and other causes beyond Royal's control shall not be considered defects under this warranty and are not covered in anyway by this warranty. Royal shall not be liable for inconvenience, labor, loss of tirne, maintenance, removal or reinstallation of the Products or other incidental, special or consequential damages arising in relation to the purchase or use of the Product. This warranty is void if the surface of the Product is covered with paint or any other foreign material. other than as specifically directed in the owners manual included with the Product. The 15 Year Limited Warranty -Non -Commercial Applications coverage provided by this warranty is extended to cover individuals who are using the Products as horneowners and does not extend to Products purchased by or installed upon property owned by and other entities, including, without limitation. corpo- rations, partnerships, trusts, estates, governmental agencies or bodies, religious organizations, schools, condominiums. or co-operative housing arrange- ments. or installed on apartment buildings or any other multi -housing arrangements. This warranty becomes valid only after the product warranty card has been submitted to Royal Outdoor Products Co within 30 days of installation. The war- ranty can also be activated by contacting Royal Outdoor Products Co, Customer Care Center at 1 877 GO ROYAL (467-6925) or by visiting our web site at www. soya loutdoor.com. Warranty Claims: The owner must give prompt notice of any defects to obtain warranty service. Should the Products contain a manufacturing defect promptly contact the Royal Outdoor Products Co, Customer Care Center at 1 877 GO ROYAL (467-6925) or by mail at 5289 HVVY #7 Unit 0, PO Box #56649, Woodbridge, Ontario, L4L 8V3 to register the claim with a customer care representative. Royal will require proof of purchase, Product serial number and a clear photo- graph of the defective part(s) (or actual part(s) if requested). Royal will, at its option, repair or replace such defective part(s) free of charge, including freight charges within North America. Royals shipping service will deliver parts under this warranty within 8 to 10 business days. This warranty is not applicable outside North America. In order to ensure warranty coverage you must register your Product within 30 days of purchase. Warranty registration can be accomplished by calling 1 877 GO ROYAL (467-6925), mailing in the completed Product warranty card or registering online at www.royaloutdoor.com. Shipping Instructions: If requested for inspection, defective parts must be shipped to Royal Outdoor Products Co, Customer Care Center, shipping address will be provided upon approval. Please include the following information in the package: full name, home address, telephone number, Product model nurnber and part number. When returning product please use an insured method of delivery such as Fed Ex insured accordingly, with the signature option on, or your preferred COtlri- er service. You must pay for return shipment, as we will not accept C.O.D. returns or any additional shipping charges, which may occur when packages are entering into Canada. Royal reserves the right to discontinue or change any of its Products, including colors, without giving notice to the purchaser. Should a Product covered by this warranty be unavailable, Royal reserves the right to substitute a Product that is of equal quality according to Royals sole discretion or to refund the portion of the original price for defective part of the Product reflective of its original contribution to the cost of the Product. THiS WARRANTY IS GIVEN IN LIEU OF ALL OTHER WARRANTIES, LIABILITES OR OBLIGATIONS OF ROYAL EITHER EXPRESSED OR IMPLIED, EXCEPT THAT THE DURATION OF ANY IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE LIMITED IN TIME TO THE DURATION OF THIS WARRANTY ROYAL SHALL IN NO EVENT BE LIABLE FOR CONSEQUENTIAL OR INCIDENTAL OR SPECIAL DAMAGES OF ANY KiND FOR BREACH OF ANY EXPRESS WRITTEN OR ORAL OR IMPLIED WARRANTY ON PRODUCTS, YOUR EXCLUSIVE REMEDY SHALL BE ENFORCEMENT OF THIS V`VIARRANTY UPON THE TERMS AND CONDITIONS HEREIN CONTAINED. NO REPRESENTATIVE OF ROYAL OR ITS DISTRBUTORS OR DEALERS IS AUTHORIZED TO MAKE ANY CHANGE OR MODIFICATION TO THIS WARRANTY. Some jurisdictions do not allow limitation on how long an implied warranty lasts, so the limitations contained herein above may not apply to you. Some jurisdictions do not allow the exclusion or limitation on consequential or special darnage, so the above limitations or exclusions may not apply to you. This warranty gives you .specific legal rights, and you may also have other rights, all of which vary from jurisdiction to jurisdiction.