Loading...
HomeMy WebLinkAbout316 Borada RdFEB 2 8 2012 BY:jrD CITY OF SANFORD BUILDING & FIRE PREVENTION PERMIT APPLICATION Apptication"No: � -� ` �� � Documented Construction Value: $ OOO ..D Job Address: ed Historic District: Yes ❑ No Parcel ID: /v -,X &VX - yo Zoning Description of Work: Plan Review Contact Person: J Title: Phone: Fax: E-mail: Property Owner Information Name 1-2i'dd &Ad' 1*,r4#A0.H1' Sr tArhl _ Phone: ITAR Street:% -FW fa J Resident of property? City, State Zip: —dam0�.0/ Contractor Information Name O Phone: Street: /D9 Z4 6b Fax: City, State Zip: State License No.: CCC 1-?P?61Q ✓ Architect/Engineer Information C8c gas 3393 Name: Phone: Street: Fax: City, St, Zip: E-mail: Bonding Company: Address: Building Permit O Square Footage: No. of Dwelling Units: Electrical O New Service — No. of AMPS: Mortgage Lender; Address: PERMIT INFORMATION Construction Type: Flood Zone: Mechanical O (Duct layout required for new systems) No. of Stories: Plumbing O New Construction - No. of Fixtures: Fire Sprinkler/Alarm O No. of heads: Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet standards of all laws regulating construction in this jurisdiction. I understand that a separate permit must be secured for electrical work, plumbing, signs, wells, pools, furnaces, boilers, heaters, tanks, and air conditioners, etc. OWNER'S AFFIDAVIT: I certify that all of the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR U"ROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITS YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. Acceptance of permit is verification that I will notify the owner of the property of the requirements of Florida Lien Law, FS 713. The City of Sanford requires payment of a plan review fee. A copy of the executed contract is required in order to calculate a plan review charge. If the executed contract is not submitted, we reserve the right to calculate the plan review fee based on past permit activity levels. Should calculated charges exceed the documented construction value when the executed contract is submitted, credit will applied to your permit fees when the permit is released. , i / �S-l2 Signature of Owner/Agent Date Print Owner/Ageni's Name Signaturc of Notary -State of Florida Date Owner/Agent is Personally Known to Me or Produced ID Type of ID Date Signature of Notary -State of Florida Date 11111HIhlIly SCOTT '�� : c,�ON ExP/!qF .•. � moi% �6.20�y Cbac» Contractor/Agentas � `k own to Mc or Produced ID -i ;Typ� I]� `=Tolf APPROVALS: ZONING. UTILITIES: .1 : l/lllliflltOW ENGINEERING: COMMENTS: Rev 11.08 BUILDING: SOLIDWAY CONSTRUCTION INC. R09FING CONTRACTORS PROPOSAL Roofing License # C-CC1329630 Building License # C-BC1253393 Proposal Submitted To Phone Date Mercedes (386) 804-7466 02/09/2012 Email: Fax Number mercedesbutts(cavahoo.com Street Job Name 316 Borada Rd Shingle Re -Roof City, State and Zip Code Job Location Sanford, FL 32773 Seminole County We propose to provide all labor and equipment necessary to execute the roofing work at the above referenced project according to the following procedure. PROCEDURE:07500 INSTALLATION SCOPE OF WORK: • Remove single layer of existing 3 -tab shingles down to the wood deck. • Inspect and replace rotted or deteriorated decking. • Furnish and install a single layer of 30# underlayment felt over the roof deck. • Furnish and install roof to wall flashings. • Install new drip edge (color - and starter shingle roll around the roofs perimeter. • Install new 16" wide 26 gauge metal flashing underneath shingles in the valleys. • Install new lead pipe boots and hardware on plumbing pipes. • Install Shingles Type _Certainteed Landmark Architectural Color • Cleanup —daily; magnetically sweep job site; haul away all job related debris. • Provide a full time superintendent who shall be on site at all times when work is being performed. WARRANTY: Upon completion of the above scope of work Solidway Construction, Inc. will furnish a (5) year workmanship warranty. 'SIDING SCOPE OF WORK: Furnish labor and materials to install exterior siding at the above property. ESTIMATED TOTAL: $2000.00 SOLIDWAY CONSTRUCTION INC. ROOFING CONTRACTORS 109 Rock Lake Rd. • Longwood, Florida 32750 (407)-383-5609 fax 407-385-3810 SOLIDWAY CONSTRUCTION INC. ROOFING CONTRACTORS Proposal Submitted To Job Name Date Mercedes Shingle Re -Roof 02/09/2012 DRYWALL REPAIRS Repair drywall at garage ceiling. TOTAL: $270.00 Additional Expenses: o Plywood replacement - $2.00 per square ft. (includes labor and material) o Fascia - $1.701f. plus materials cost. o Replace damaged siding @ $2.00 per square ft. (labor only) We Propose hereby to furnish material and labor — complete in accordance with above specifications, for the sum of Four Thousand Ninety Dollars ($ 4,090.00) Payment to be made as follows: Upon completion All materials guaranteed to be as specified. All work to be completed in Authorized signature: SOLIDWAY CONSTRUCTION, INC workmanship like manner according to standard practices. Any alteration or deviation from above specifications involving extra costs will be X Julio A. DopicO executed only upon written orders, and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays. We are fully covered by Workmen's Compensation Note: This proposal may be withdrawn if Insurance. not accepted within 30 days. FLORIDA HOMEOWNERS' CONSTRUCTION RECOVERY FUND: Payment may be available from the Florida Homeowners' Construction Recovery Fund if you lose money on a project performed under contract, where the loss results from specified violations of Florida law by a licensed contractor. For information about the Recovery Fund and filing a claim, contact the Florida Construction Industry Licensing Board at the following telephone number and address: Address: 1940 North Monroe Street, Tallahassee, Florida 32399-2202 Telephone Number: 850-487-1395 ACCEPTANCE OF PROPOSAL: The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. There will be a charge of 1-1/2% per month for amounts remaining unpaid 30 days after billing. By the signature of the customer or its agent below, customer agrees to pay a reasonable attorney's fee and court costs in the event this account is placed in the hands of an attorney for collection. Date of Acceptance: �o� Signature: Date of Acceptance: Signature: SOLIDWAY CONSTRUCTION INC. ROOFING CONTRACTORS 109 Rock Lake Rd. - Longwood, Florida 32750 (407)-383-5609 fax 407-385-3810 SOLIDWAY CONSTRUCTION INC. ROOFING CONTRACTORS Terms & Conditions • The replacement of a roof is a very aggressive and noisy process. You can expect hammering, banging and vibrations throughout your home until the job is completed. You may wish to take steps to secure certain outdoor and indoor items that could be damaged due to this type of activity. If you have a skylight(s), please take the necessary precautions because debris may drop into the house when the skylight(s) is removed or replaced. Solidway Constriction, Inc. will do everything possible to protect your property. • Please notify Solidway Construction, Inc. prior to commencement of work, if you have any exposed or cathedral ceilings in your home that may be susceptible to protruding nails. This should include any porches, screened rooms, sun rooms, patios, Florida rooms and the like that are included in the area to be re -roofed. With prior notification, Solidway Construction, Inc. can take the necessary steps to roof these areas. Solidway Construction Inc assumes no responsibility for damage to these types of ceilings if we are unaware of their existence. • In order to complete the re -roof process Solidway Construction, Inc. requires access to within a couple of feet of the roof structure of your home. A dump trailer or dumpster is usually parked on the driveway. But it is sometimes necessary to position a dumpster on a lawn to obtain this access. Solidway Construction, Inc. assumes responsibility for damage caused by its own workers while using their vehicles or dump trailers. We encourage the homeowner to park their vehicles on the street during the roofing project to prevent nails in tires. • Solidway Construction, Inc. assumes no liability for damage caused by roofing nails being shot into electrical, refrigerant, water, PVC or any other types of lines that may come into contact with the underside of the roof decking material. • Solidway Construction, Inc. assumes no liability for damage to the driveway or lawn caused by the shingle suppliers' truck or equipment. If the supplier requests a waiver to be signed, this will be the responsibility of the owner. • If the flashing where the roof meets a wall or a chimney needs to be replaced, Solidway Construction, Inc. will not assume the responsibility to replace surfaces like accucrete, stucco, and hardee board. • Owner grants Solidway Construction, Inc. the right to use their address and photos of residence for advertisement or marketing purposes and to post a yard sign in the front yard. No customer's information will be given to telemarketing. • When lead times become long there is the possibility that increases in the cost of materials may cause an increase in your proposed price after you have signed with our company. Solidway Construction, Inc. will do everything possible to maintain the stated proposal price for your roofing job. If an increase is required, you will be given the option to either accept the increase or cancel your contract. • Any claims that you want to make for damage must be submitted to Solidway Construction, Inc. within ten days from the date that your roofing job was completed. Date of Acceptance: Owner's Signature: SOLIDWAY CONSTRUCTION INC. ROOFING CONTRACTORS 109 Rock Lake Rd. • Longwood, Florida 32750 (407)-383-5609 fax 407-385-3810