Loading...
HomeMy WebLinkAbout1833 Landing DrCITY OF SANFORD Permit # :y-J • _ Job Address:1 Description of Work: Historic District: APPLICATION Data % — 1,8 — O Permit Type: Building Vol' Electrical Mechanical Plumbing Fire Sprinkler/Alarm Pool Electrical: New Service - # of AMPS _ Addition/Alleration Change of Service Temporary Pole Mechanical: Residential Non-Rcsidcnlial Replacement New (Duct Layout & Energy Cale. Required) Plumbing/ New Commercial: # of Fixtures # of Water & Sewer Lines # of Gas Lines Plwnbing/New Residential: # of Water Closets • Plumbing Repair - Residential or Commercial Occupancy Type: Residential Commercial Industrial Total Square Footage: Construction Type: # of Stories: # of INvelling Units: Flood Zones (FEMA form required for other than a) Parcel #: Z5 01 — 3 O — 5 G — 0 Z O 000 (Attach Proof or/Trnership & Legal Description) Owners Name &pAddres`s: S r -r L 1t—\:ncf%rooc' 2 Contractor Name &Address: RoL-v,N_CID_IVSTRUCTtO_[_ _rDRQr , _570_(a__ rP rrele Rnc 2 2- State License Number: C CSC 0 59 O 4 8 FI 94108- Sv c>Lnr, W:E 5C 1—69 F-Ce73oPhone & Fax: i Contact Person: e i Phone: Bonding Company: Address: Mortgage Lender: Addrem: Architect/Engineer: Phone: Address: Fax: Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet standards of all laws regulating construction in this jurisdiction. I understand that a separate permit must be secured for ELECTRICAL WORK, PLUMBING, SIGNS, WELLS, POOLS, FURNACES, BOILERS, IIEATE•RS, TANKS, and AIR CONDITIONERS, ctc. OWNER'S AFFIDAVIT: I certify that all of the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY, IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of We county, and there may be additional permits r uired from other governmental entities such as water management districts, stale agencies, or fcdcral agcncics. Acceptane of i cri r n the owner of th pn(pperjy of the uiremrnta o I Lori w, FS 713. t. Sim r t ate Signature f n- actor/Agrnt n Dale 11171C Of Owner/Agent is rsonally Known to Me or Produced ID l'IC1 ds APPLICATION APPROVED BY: Bldg: - Zoning: Initial atc) Special Conditions: silNamc 1/N IWCN Date ExPIRES:November12,20U6 s o wed IOU budget Notary 5enwes C ntr'r Agent is crsonal tjo to Mc v Produced ID L IL( Initial & Date) Utilities: FD: Initial & Date) (Initial & Date) Room: Building 1833 LxWxH 58'6" x 56'0" x 8'0" Riir.M'Wv 1,832.00 SF Walls 5,108.00 SF Walls &Ceiling 364.00 SYFlooring 408.00 Sl'Long Wall 229.00 LF Ccil. Perinver Rolyn Constivction Coilm-ation D 6104 Twain Street w• d;..., Unit 101 Orlando, FL 32855 800) 808 - 1553 Subroom 1: Offset 1 4%.00 Sl' Walls 730.00 SF Walls &Ceiling 26.00 SYFlooring 144.00 SF Long Wall 62.00 LF Ccil. Perim;tcr Subroom 2: Onset 2 536.00 SF Walls 813.50 SF Walls & Gating 30.83 SYFlooring 148.00 SF Long Wall 07.00 Ll' Ccil. Pcrinmctcr 3,276.00 SF Ceding 3,276.00 SF Floor 229.00 LF Floor Perimeter 448.00 SF Short Wall LxWxH 18'0" x 13'0" x 8'0" 234.00 SF Ceiling 234.00 SF Floor 62.00 LF Floor Perimeter 10a.00 SF Short Wall LxWxH 18'6" x 15'0" x 8'0" 277.50 SF Ceding 277.50 SF Floor 67.00 LF Floor Perimeter 120.00 SF Short Wall 1. R&R 3 tab - 25 yr. - corrrp: shingle rfg - incl. felt 42.00 SQ 235.00 9,870.00 2. Ridge cap - composition shingles 20.00 LF included 3. R&R Drip edge 329.00 LF included 4. R&R Flashing, 14" wide 35.00 LF included 5. R&R Continuous ridge vent - aluminum 40.00 LF included 6. Painting - Minimum charge -Drip edge. 1.00 FLU 135.00 135.00 i Mnn Dulling 1800 10,005.00 Pw..w.M Room: Building 1833 1,832.00 SF Walls 5,108.00 SF Walls &Cciling 304.00 SYllooring 408.00 SI' Long Wall 229.00 LF CciJ.1'crinvier Rolyn ConshUetiou Colpolntion 6104 Twain Street Unit 101 Orlando, FL 32855 8W) 808 - 1553 Subwoln 1: Onset 1 4%.00 SF Walls 730.00 SF Walls &Cciling 26.00 SYFlooring 144.00 SFl.ong Wall G2.00 LF ail. Pe unc:ter LxWxH 58'6" x 56'0" x 8'0" 3,276.00 SF Ceiling 3,276.00 SF Floor 229.00 LF Floor Perimeter 448.00 SI' Short Wall LxWxH 18'0" x 13,0" x 810" 234.00 SF Cciling 234.00 SF Floor 02.00 LF Floor Perimeter 104.00 SF Short Wall Subnoom 2: Onset 2 LxWxH 18'6" x 15'0" x 810" 536.00 Sl' Walls 277.50 SF Cciling813.50 SF Walls & Ceiling 277.50 SF Floor 30.83 SYFlooring 67.00 LF Floor Pcrunctcr 148.00 SF Long Wall 120.00 SF Short Wall 67.00 LF Ccil. Pcrinmer 1. R&R 3 tab - 25 yr. - comp:'shingle rfg - incl. felt 42.00 SQ 235.00 9,870.002. Ridge cap - composition shingles 20.00 LF included3. R&R Drip edge 329.00 LI' included4. R&R Flashing, 14" wide 35.00 LF included5. R&R Continuous ridge vent - alununum 40.00 LF 6. Painting-Minunumcharge-Drip edge. 1.00EA 135.00 included 135.00 Room Totals: Building 1933 10,005.00 7574630995 TO. 140(t>dl11bZ> r. Jl!)C' J)—) JAN-04-2005 16:42 FROM:ROLYN CONSTRUCTION PFAWM IEa l•n ali pn• I>luv 1 •1 It/t•rllllrt• {I.JII\'f} . IIll14'(i•I IIY MradnRakn nMxialt 7ellv0elodasra el.lksk CI osNo dk' MlarawlOanAN 16 l•7'1 14n1werw! Ito Ydnyleawadlp MlMnWloraln adIR1Ae1Ma aIIRSa k.ftkwwuLafmNOprYCIwIIM(IIYM 11 OI ralvNM pldlnraslsm+All•sywr taeMorkldwrrMlex'. CIE ttrlan lwewealdtrep rq4 srlddm I'fr%liC{lu` I IiRt O.ddM Mlodactwee >Msnaallr mr a>7eaaokaewrlopMselA 18 A14MJeialq price11p10 jLv lwllk ofItaraWwoewpalot Oman, 1 owrafiploe plmtwl+a+vret ( Ia Aed(aik d wee oelare op oandao gllpr Iw111-0 Plwope&1.% 1 311 a{11 T TYr waeaip dallOpraell q 111 Yrlwler• .,NY 9alareperulelwra Niflg • .roa L\ FIN Skmt IAl' 9w 1•i•tlwll am in w Oolm+pt• :tswolu. MleptY6oc dll4uw'frMK Ib Ci01t 44oas.11D1lseslea I.•.Iltllra r'I' till) ;l Y+aMstlletwe ANi>kd >0yaaadMd jwaklk stw.Ir .t PIegNAauale ppiaT'r(''aayyu eMa ii1lPA yYl111 1 -'jr In ealimis,ra anaoagtr IioMadAMpttAlldbs cw,w +>rnwkee- Ili. '+ wr ,`ell Ilf IddBaM1NI1Mlt 6k Brsll +411et 71 PI xwlNlwlma lefts b Ift 961:dI0Mltgii<Ieatrlwt AralektaCgors( Chagl IuA4o%iWexRlatnO(Iou151lEdueMondrB Wi wkee,MleMaXBll lnwoed.fwdiBrcsrt,We elyoo d• 9Uonroo4r QdlelyCAleCUon niarraC'rrYOatllereA Sagd ; S+Onvfa tK'. IW Raked Ikope and SeolldMidpa iPradues ewlalakl ilk t+ bMrAw wlun wlne9wteatihella wlh lba owtldl hewer 19 aia ke,, oi I And ed yw lYlBor OOIp1111LC0Yl' Yllt 1a517RsWON•alfeaM k• .rsti AlkiEle10Sapla il od flblAlesmie0lmta'MoeemlppfaMdNlanBdlsaolo alhrfor wRogp(enukisaeusedby"WVvP*ofd9WNot AN romam 11awi PA%M aurgr- Reuel UL tiilld R» p8 9 r n rwr dpaae "Itf line pull 7Ypr MA A41aN1Oi010, iypak p 4101. Tjpei L 7ew m11Fr e ^ of AS1M 11 Jidlt wia a Nklk kloaldle all ebot aa11Pk11w weal Ileaallola raOaeFapw d= good lot •.Mua P per . OewnMM ewllwela ®v meow" Ib towom eoaalit! d 1111" ftM(Im+noa/Kge!!la *ANa le ant m On Iletl! al aaa email Ieleee+poq1I d Ilea. Callr slpe w arfW a yatep a' alalraetlew w aolekpa Rw aw c0000 kweMYwiolt llpHellrd9aryp b oa rO z tadMl, WpOet wkh ppss fam Omaaol IYmO m a rr .^ Ar an+elelanantallralr lrm7lonrtlaweletwlho ranwF31r(rlasnp1wuakHla A RX l u(sralapYstlaeay(an Iciiaeleogafllraemoarllappla(b as0ollaneas Aa oo4aood anal aelewe Nkoltllq aaoa negj m a aNrisaaldoe Faalwet+JtAYlpWetelip •. oad b mm amm hum's caller a F4*ft adW" poseglaMunnrNoldllpfJkoml koN eqyoaarItraaww oaeYa lw>elkVerp•+od dM Al alarlllpa of nelkllda MPW ar iMawpaw"+n9aloalolalwkitlmlelklroorl .far 4abookm 14 aelee+orPa Ae IoW caad and he Mwgae t *W eaw (bd dlols M tM *S Irwll• Fq(eroo odMre aaiigge q a paAa Od". •.'w 91d1 ae "YAK uoer 11116 maaAnw ail Earau;t tyawdawed t a or IIaA!!a!! a 16Lbin0 bowdF aeew f" ode! SPAWMed van=& 1 ..filet w 11O111a10mAafosbsYsMalin D oo qbr . ARlltaa!'(,a,wtrasa,hr9eOlydelhllMolGMb.' dip=y 4 apadAmaeaeofortobeiMPwSMNWMavAblope..) RX Web Farms hews k( M bnacAdLd7KWM PM AmoumMWANAasodellom7wpule" ppmyyrwygd pa.dsenad,oedar -4-1lA „aM daft we m oam Ee Mla"" for e iealeaa aywlw dKbw doanr dopew. mowBBt oulet ATLANTIC OFFICR CORP, wtTe HRAD9VAMIMS 8102MA111 8008i5SS51aiR3 '73E 4o1111IwB9T OssIC$ PLAN'. LOCATIOMt AmMaa 8il6.8BS.f i0Q.21h ' ts76 •,,• • . •! `'"' A E0/ 60 3Jdd a3J.dI1Ij3a T86T.L9Z7L6 bb:91 006/FO/T0 005 16:43 FROM:ROLYN CONSTRUCTION T574630995 1 TO:140 rt d11ItO Ee/Ee PART 1 IMFRAL 1.1 SUMMARY whhin a end ry GOr>d ris A. R*W DOPJn*f : ProVWbM d to Carb=% Di dOn 1- Genwd Reciuborof s, Ord the Drawer im vdy UPR tp V* Serflon. rr apn shiriglss. g. Indudw Gmmde3ut &m0 aept ak c. W d Seetl 1, mar Pb~ and roar rW& 1. Sgctlar 07r100 I,...,.,.]' Fle6Mn9 and SWO 2. Section WWI [ I - Pdntl WW COAbW Pakdh+p d M& wo"WieL a.. AlDarrutR+ea: 1. R W to Season 01280 for 9MMSWM lry k' ng wale of thlc Section. 12 ROMPE VCES, A AM~ t b ftt Te**ng and Medals (NM 1: D 224 S>mlod Speoillcofte for Sw ft-aftod Aspha t"Rwftg (Orlianic FeW 2. 0226 $WmdWd apgoftaGan lkW Asps ;*4;eWWd O genic Felt Used In ROOft and WawpraWng. 3. 03016 GIardard Spedflambon Tar GO&- A Aapllslk ides SurkoW w1h Minaret 4, 03161 SWdard Tog Method lbr Wbw ftolett = of Aeptwk $hirrplea. 5. 03402 Standard SpeoWngow for Aepr ett 8"go *am Glass Felt acid Sudhced with Mineral Gronules. e. D 490 Elandard Sp cifla tion farAept A-elaO+ wW oMw k Felt Oftle Ursderk"o t Used in Roofing 7. D 3906 Aaphalt Rd R904 pm me-) *Nfaoed with Mkreral QrWRAW- , 8. E 108 Slriin lod Tqa Mohods lbr Floe TeWx of Roof CmedW. B. [For Pr efte Gallery Gdedon - Dade County, S AM AooepW= N0. 01-523.Q2.IFor Prwi*ie Pius NO De*Acn - Do* CouW F"lon a AceepOncoe No, 01.0411.09.lFor Preatlque I Mph DeftWan - DAB County, Fbrft /,rAqftw No. 01.0411.12.lFor Presque MO Dm Wion - Dads County. flwida A©asphince .4m 014411.11.XFor RWwd Prole - DadeCounty. Fkxida Ameptance No 014516.08.1 PWG CM*, Florida Arxepla " No. Q1-Q523.fl, D. Irdom,*M61 Caigress of Bullding Omciale (coo) I. ACI 127 Asphalt Shingies MU& with Glass I Olt2. 'COO EvgkN an Repat *ER-S414E. Undene bm Leftfw=in (UL) 1- 7e0 Teat 1br Fire Rewb m of p w Cow. ,ft Mwari8f9, F. Caian nps oo oC qr° q 23.5) C , eating , I. A123.64W Asphg a Made them G 3m FOR and Su"Wed whh Mlneml GranulesGUkm porotlanpwo* aeon 39vd 07311- 2 TH6TL9ZZL6 W91 gow/EO/10 r ROLYN CONSTRUCTION CORPORATION Disaster Restoration 9 General Contracting October 27, 2004 AGENT & CONTRACTOR AUTHORIZATION / APPROVAL LETTER Attention: City of Sanford 300 N. Park Ave., Sanford, FI. 32771 I HEREBY AUTHORIZE JONATHAN MARK PAULES - AND/OR SUSANNE WILDNER - . and CO CKERS, INC. TO ASSIST ROLYN CONSTRUCTION COMPANY IN CONTRACTOR LICENSE REGISTRATION AND THE SUBMITTAL & PROCUREMENT OF BUILDING PERMITS AND APPROVALS IN THE ABOVE NAMED CITY OR COUNTY IN THE STATE OF FLORIDA. CGC059048 amuel Bergman -'QU11LI7 SIGNATURE QUTALIFIERS LICENCE # STATE OF FLORIDA COUNTY OF THE F REGOING INSTRUMENT WAS ACKNOWLEDGED BEFORE ME THIS DAY OF ILL , 20BY $ArApg-d-- 3- 13gr9 M -f^ WHO IS KNOWN PERSONALLY TO ME OR HAS PRODUCED AS IDDE ' IIFFIICATION. NOTARY yPN L. ,4 SUSAN L. AHOLA yJ Ol NOTARY PUBLIC STATE OF MARYLAND 7 Commission Expires September 6, 2006 NOTARY PUBLIC C GO; 5706 Frederick Avenue 0 Rockville, Maryland 20852 0 301 /468-1553 9 Fax: 301 /468-6744 Room: General Conditions 1. Dumpster load - Approx 40 yards, 7-8 tons of debris 35.00 EA 544.50 19,057.50 2. Roofing Steep roof Charge per Square 1,106.00 EA included 3. Roofing Code update Charge per Square 1,106.00EA included 4. Roofing OSHA Rcqiurements for two story roof 1,106.00 SQ included 5. Temporary toilet (per month) 4 toilets throught out property for 3 12.00 MO 115.53 1,386.36 imnrhs, Rolyn Construction Caponation 6104 Twain Strcct Unit 101 Orlando, FL 32855 800) 808 - 1553 CONTINUED - General Conditions 6. Insurance, pennits & fees LOO EA 5,000.00_-- 5,000.00 7. Administrative/supervisor labor charge 12.00WK 1,35000 16,20000 Room Totals: General Conditions 41,643.96 We Item Totals: SANFOR-04-09-02-V3EB 383,139.86 92,018.67 SF Walls 122,376,67 SF Floor 24,497.33 SF Long Wall 0.00 Floor Area 0.00 E-4crior Wall Area 0.00 Surface Area 0.00 Total Ridge Length 122,376.67 SF Ceiling 13,597.41 SYFlooring 21,512.00 SF Short Wall 0.00 Total Area 0.00 E—tcrior Perim:ter of Walls- 0.00 Number of Squares 0.00 Total Hip Length 214,395.33 SF Walls & Ceiling 11,502.33 LF Floor Perimeter 11,502.33 LF Ccil. Perimeter 0.00 Interior Wall Area 0.00 Total Pcrirncicr Length 0.00 Area of race 1 Rolyn Construction Co1poi-ation 6104 Twain Street Unit 101 Orlando, FL 32855 M))808-1553 Fstimatc: SANFOR-04-09-02-V3FB Building 1826 10,005.00 2.61% Building 1823 10,005.00 2.61% Building 1822 10,005.00 2.61% Building 1821 10,005.00 2.61% Building 1817 10,005.00 2.61% Building 1816 12,825.00 3.35% Building 1815 10,005.00 2.61% Building 1814 12,825.00 3.35% Building 1813 10,005.00 2.61% Building 1812 10,005.00 2.61% Building 1801 14,421.00 3.76% Building 1801 10,005.00 2.61% Building 1801 10,005.00 2.61% Building 1804 14,235.00 3.72% Building 18055 10,005.00 2.61% Building 1806 10,005.00 2.61% Building 1807 10,005.00 2.61% Building 1808 10,005.00 2.61% Building 1809 10,005.00 2.61% Building; 1810 12,825.00 3.35% Building; 1811 10,005.00 2.61% Building 1818 10,005.00 2.61% Building 1819 10,005.00 2.61% Building 1820 10,005.00 2.61% Building 1824 10,005.00 2.61% Building 182.5 11,415.00 2.98% Building 1827 10,005.00 2.61% Building 1828 10,005.00 2.61% Building 1830 10,005.00 2.61% Building 1829 12,825.00 3.35% Building 1832 10,005.00 2.61% Building 1833 10,005.00 2.61% General Conditions 41,643.86 10.87% Subtotal of Areas 383,139.86 100-00% SANFOR-04-09-02-V303 Page: 31 V'q r'! F. Rolyn Construction Coipomtion 6104 Twain Street Unit 101 Orlando, n 32855 800) 808 - 1553 O&P Items Total Dollars GENERAL DIEMOLITION 19,897.50 5.19% PIRMUS AND FEES 5,000.00 1.31 % FRAMING & ROUGH CARPENTRY 3,576.00 0.93% LABOR ONLY 16,200.00 4.23% PAINTING 4,320.00 1.13% ROOFING 332,760.00 86.85% TEMPORARYREPAIRS 1,386.36 0.36% SANPOR-04-09-0243I13 CARL LEWIS Page: 32 RKI. Rolyn Construction Corporation 6104 Twain Street Unit 101 Orlando, FL 32855 800) 808 - 1553 Type of Estimate: Hurricane Client: SPM-Sanford Landing Fsturntor: CARLLEWIS Business: (757)438-2022 Date Entered: 09/02/04 Estimate: SANFOR-04-09-02-V3EB Rolyn Construction Corporation 61(A Twain Street S Unit 101 Orlando, FL 32855 800) 808 -1553 W j. xgIt; ! t a r 2 k r 1Y B ! r; ?.sit;: s. i :.. `4d s to ;.,ri•ht 1 k 4 „ .'tilt ' -„ 'u;tu!` i a 0 k,, E•d [1 r. it ..G. %For = M "41i l Type of Estinr<1te: Hurricane Client: SPM-Sanford Landing Estimator: CARLLEWIS Business: (757)438-2022 Date Fntered: 09/02/04 Estimate: SANFOR-04-09-02-V3E13 a ist.+ L,,,c at 4 s. n rrxa+, 4 .<. Y , r:.f tis #+'"t 'a" i'-Ds o',,t5 JYsi?LL "rt,Xv 'i i rky diir,r F Eg tic+, p s'7: _ •,F?:3:`"'-,,-{td,,'.,2s_ M- AN 6+ h4 ij,.-y+•. ' Rir7 BF'' o .' _ All, BUILDINGS ARE TWO STORY Rolyn Construction Corporation 6104 Twain Street Unit 101 Orlando, FL 32855 800) 808 - 1553 RoonN Rxm LwgF Roan 1 Haan Lnq nsanw n waN R000 Lwy v SAN FOR-04-09-02-V3EB Room: Building 1826 1,832.00 SF Walls 5,108.00 SF Walls & Ceiling 364.00 SYFlooring 468.00 SF Long Wall 229.00 LF Ceil. Peruneter Subroom l: Offset 1 496.00 SF Walls 730.00 SF Walls & Ceiling 26.00 SYFlooring 144.00 SF Long Wall 62.00 LF Ceil. Perimeter Subroom 2: Offset 2 536.00 SF Walls 813.50 SF Walls & Ceiling 30.83 SYFlooring 148.00 SF Long Wall 67.00 LF Ceil. Perimeter LxWxH 58'6" x 56'0" x 8'0" 3,276.00 SF Ceiling 3,276.00 SF Floor 229.00 LFFloorPerimeter 448.00 SF Short Wall LxWxH 18'0" x 13'0" x 810" 234.00 SF Ceiling 234.00 SF Floor 62.00 LF, Floor 104.00 SF Short Wall LxWxH 18'6" x 15'0" x 8'0" 277.50 SF Ceiling 277.50 SF Floor 67.00 LF Floor Perimeter 120.00 SF Short Wall 1. R&R 3 tab - 25 yr. - comp. shingle rfg - incl. felt 42.00 SQ 235.00 9,870.00 2. Ridge cap - composition shingles 20.00 LF included 3. R&R Drip edge 329.00 LF included 4. R&RFlashing, 14" wide 35.00LF included 5. R&R Continuous ridge vent - aluminum 40.00 LF included 6. Painting - Minimum charge -Drip edge. 1.00 EA 135.00 135.00 Room Totals: Building 1826 10,005.00 SANFOR-04-09-02-V3EB Page: 2 Pown Nep n wdn Rolyn Construction Coi_poiation _ 6104 Dwain Street Unit 101 Orlando, FL 32855 800) 808 - 1553 Room: Building 1823 1,832.00 SF Walls 5,108,00 SF Walls & Ceiling 364.00 SYFlooring 468.00 SF Long Wall 229.00 LF Ccil. Perimeter Subrnom 1: Offset 1 496.00 SF Walls 730.00 SF Walls & ailing 26.00 SYFlooring 144.00 SF Long Wall 62.00 LF Ceil. Perimeter Subroom 2: Offset 2 536.00 SF Walls 813.50 SF Walls &Ceiling 30.83 SYFlooring 148.00 SF Long Wall 67.00 I1, Ceil. Perimeter LxWxH 58'6 x 56'0" x 8'0" 3,276.00 SF Ceiling 3,276.00 SF Floor 229.00 LF Floor Perimeter 448.00 SF Short Wall LxWxH 18'0" x 13'0" x 8'0" 234.00 SF Ceiling 234.00 SF Floor 62.00 LFFloorPerirneter 104.00 SF Short Wall LxWxH 18'6" x 15'0" x 8'0" 277.50 SF Ceiling 277.50 SF Floor 67.00 LT Floor Perimeter 120.00 SF Short Wall 1. R&R 3 tab - 25 yr. - comp. shingle rlg - incl. felt 42.00 SQ 235.00 9,870.00 2. Ridge cap -composition shingles 20.00 LF included 3, R&R Drip edge 329.00 LF included 4. R&RFlashilg, 14" wide 35.00LF included 5. R&R Continuous ridge vent - aluminum 40.00 LF included 6. Painting - Minimum charge -Drip edge. 1.00 EA 135.00 135.00 All avauia. uwikaiig ioLJ Neon Ne"eJ t \ Room: Building 1.822 1,832.(X) SF Walls 5,108.00 SF Walls & Ceiling 364.00 SYFlooring 468.00 SF Long Wall 229.00 LF all. Perimeter 10,005.00 LxWxH 58'6" x 56'0" x 8'0" 3,276.00 SF Ceiling 3,276.00 SF Floor 229.00 LF Floor Perimeter 448.00 SF Short Wall SANFOR 04-09-02-V3M Page: 3 Rolyn Construction Coipoiation 6104 Twain Street Unit 101 Orlando, FL 32855 800) 808 - 1553 j Subroom 1: Offset 1. floem Napt fl mw LxWxH 18'0" x 13'0" x 8'0" 490.00 SF Walls 234.00 SF Ceiling 730,00 SI' Walls &Ceiling 234.00 SF Floor 26.00 SYFlooring 62.00 LF Floor Pernneter 144.00 SF Long Wall 104.00 SF Short Wall 62.00 LF Ccil. Perin-t ter Subroom 2: Offset 2 LxWxH 18'6" x 15'0" x 8'0" 536.00 SF Walls 813.50 SF Walls & Ceiling 30.83 SYFlooring 148.00 SF Long Wall 67.00 LF Ceil. Perimeter 277.50 SF Ceiling 277.50 SF Floor 67.00 LF Floor Perimeter 120.00 SF Short Wall y x; 1. R&R 3 tab - 25 yr. - comp. shingle rfg - incl. felt 42.00 SQ 235.00 9,870.00 2. Ridge cap - composition shingles 20.0011, included 3. R&R Drip edge 329.00 LF included 4. R&R Flashing, 14" wide 35.00 LF included 5. R&R Continuous ridge vent - alulnnum 40.00 LF included 6. Painting - Minnnum charge -Drip edge. 1.00 M 135.00 135.00 om imats: nuwang 1t5.Ll RuamM NoonLm}M1 PoonWdA / SANFOR-04-09-02-V3LI3 Room: Building 1821 10,005.1 LxWxH 58'6" x 56'0" x 8'0" 1,832.00 SF Walls 3,276.00 SF Ceiling 5,108.00 SF Walls &Ceiling 3,276.00 SF Floor 3(A.00 SYFlooring 229.00 LF Floor Perimeter 468.00 SF Long Wall 448.00 SF Short Wall 229.00 LF Ceil. Perimeter Subroom 1: Offset 1 LxWxH 18'0" x 13'0" x 8'0" 496.00 SF Walls 730.00 SF Walls & Ceiling 26.00 SYFlooring 144.00 SF Long Wall 62.00 LI' Cerl. Perimeter 234.00 SF Ceiling 234.00 SF Floor 62.00 LF Floor Pernncter 104.00 SF Short Wall Page: 4 Rolyn Constimetion Coiporation 6104 Twain Street Unit 101 Orlando, FL 32855 800) 808 - 1553 flaon HwjY - /\' Lsipl Subroom 2: Offset 2 536.00 SF Walls 813.50 SF Walls &Ceiling 30.83 SYFlooring 148.00 SF Long Wall 67.00 LF Ceil. Peruncter LxWxH 18'6" x 15'0" x 8'0" 277.50 SF Ceiling 277.50 SF Floor 67.00 LFFloor Peruneter 120. 00 SF Short Wall 1. R&R 3 tab - 25 yr. - con-p. shingle rfg - incl. Pelt 42.00 SQ 235.00 9,870.00 2. Ridge cap - composition shingles 20A) LF included 3. R&R Drip edge 329.00 LF included 4. R&RFlashing, 14" wide 35.00I.1' included 5. R&R Continuous ridge vent - alununum 40.00 LF included 6. Painting - Minnuum charge -Drip edge. 1.00 M 135.00 135.00 nuutn iutais. Duncong 16L1 Doan Heyv = - l fl n,Lnd, f~ lu.n W:M J< jwnLNl awam n L n Room: Building 1817 1, 832.00 SF Walls 5, 108.00 SF Walls & Ceiling 364. 00 SYFiooring 468. 00 SF Long Wall 229. 00 Ll" Ccil. Perimeter Subroom 1: Offset 1 490. 00 Sly Walls 730A) SF Walls & Ceiling 26. 00 SYFlooring 144. 00 SF Long Wall 62. 00 LF Ceil. Perimeter Subroom 2: Offset 2 536. 00 SF Walls 813. 50 SF Walls & Ceiling 30. 83 SYFlooring 148. 00 SF Long Wall 67. 00 I,F Ced. Perimeter 10, 005.00 LxWxH 58'6" x 56'0" x 8'0" 3, 276.00 SF Ceiling 3, 276.00 SF Floor 229. 00 LFF1oorPerimeter 448. 00 SF Short Wall LxWxH 18'0" x 13'0" x 8'0" 234. 00 SF Cciling 234. 00 SF Floor 62. 00 LFFloor Peritneter 104.00 SF Short Wall LxWxH 18' 6" x 15'0" x 8'0 277.50 SF Ceiling 277.50 SF Floor 67.00 LF Floor Pernncter 120.00 SF Short Wall SANFOR-04- 09-02-V3EB Page: 5 a 0 Rolyn Construction Cotponation 6104 Twain Street Unit 101 Orhando, FL 32855 800) 808 - 1553 1. R&R 3 tab - 25 yr. - comp. shingle rfg - incl. felt 42.00 SQ 235.00 9,870.00 2. Ridge cap - composition shingles 20A) IF included 3. R&R Drip edge 329.00 LF included 4. R&R Flashing, 14" wide 35.00 LF included 5. R&R Continuous ridge vent - aluminum 40.00 IF included 6. Painting - Minimum charge -Drip edge. 1.00 EA 135.00 135.00 w... iV a 3. "URAtAng 1n1 / HoomNWL Haen WeN naL am Lnyl Hi..n WiM Room: BWIding 1.816 2,162.67 SF Walls 6,571.83 SF Walls & Ceiling 489.91 SYFlooring Al.33 SF Long Wall 270.33 LF Ceil. Pcrinieter Subroom 1: Offset 1 536.00 SF Walls 813.50 SF Walls & Ceiling 30.83 SYFlooring 148.00 SF Long Wail 67.00 LF Ceil. Perimeter Subroom 2: Offset 2 536.00 SF Walls 813.50 SF Walls &Ceiling 30.83 SYFlooring 148.00 SF Long Wall 67.00 LF Ceil. Perimeter 1. R&R 3 tab - 25 yr. - comp. shingle rfg - incl. felt 54.00 SQ 2. Ridge cap - composition shingles 3 0. 00 IF, 3. R&R Drip edge 329.00 LF 4. R&R Flashing, 14" wide 35.00 LF 5. R&R Continuous ridge vent - aluminum 50.00 IF, SANFOR 04-09-02-V3M 10,005.00 LxWxH 80'2" x 55'0" x 810" 4,409.17 SF Ceiling 4,409.17 SF Floor 270.33 IF, Floor Perimeter 440.00 SF Short Wall LxWxH 18'6" x 15'0" x 8'0" 277.50 SF Ceiling 277.50 SF Floor 67.00 LF Floor Perimeter 120.00 SF Short Wall LxWxH 18'6" x 15'0" x 8'0" 277.50 SF Ceiling 277.50 SF Floor 67.00 IF Floor Perimeter 120.00 SF Short Wall 235.(X) 12,690.00 included included included included Page: 6 Rolyn Constuucfion Colpouution 6104 Twain Street Unit 101 Orlando, FL 32855 800) 808 - 1553 CONTINUED - Building 1816 A 6. Painting - Minnnum charge -Drip edge 1.00 EA 135.00 135.00 room totals: nutto3ng IN16 Reemu Aoom Neyt. - PWJh flmnlaph Raam Ngjt/ / j RmnLsyM1 w y Room: Building 1815 1,832.00 SF Walls 5,108.00 SF Walls & Ceiling 364.00 SYFlooring 468.00 SF Long Wall 229.00 LF Cod, Perirneter Subroom 1: Offset 1 496.00 SF Walls 730.00 SF Walls & Ceiling 26.00 SYFlooring 144.00 SF Long Wall 62.00 1,17 Coil. Perimeter Subroom 2: Offset 2 536.00 SF Walls 813.50 SF Walls & Ceiling 30.83 SYFlooring 148.00 SF Long Wall 67.00 LF Coil. Perimeter 12,825.00 LxWxH 5S'6" x 56'0" x 8'0" 3,276.00 SF Ceiling 3,270.00 SF Floor 229.00 LF Floor Perimeter 448.00 SF Short Wall LxWxH 18'0" x 13'0" x 8'0" 234.00 SF Ceiling 234.00 SF Floor 62.00 LF Floor Pernneter 104.00 SF Short Wall LxWxH 18'6" x 15'0" x 8'0" 277.50 SF Ceiling 277.50 SF Floor 67.(X) LF Floor Perimeter 120.00 SF Short Wall I . R&R 3 tab - 25 yr. - comp. shingle rfg - inel. felt 42.00 SQ 235.00 9,870.00 2. Ridge cap - composition shingles 20.00 LF included 3. R&R Drip edge 329.00 LF included 4. R&RFlashing, 14" wide 35.00117 included 5. R&R Continuous ridge vent - aluminum 40.00 LF included 6. Painting - Minimum charge -Drip edge. 1.00 EA 135.00 135.00 room iotais: tsutlung 12515 10,005.00 SANFOR 04-09-02-V3FB Page: 7 Rolyn Construction Coipol-ation 4 6104 Twain Street Unit 101 Orlando, FL, 32855 8W) 808 - 1553 Floue l«yAPWi)h NeemNy2/ /\/` p PwnL»JM1 Flee„ l HWAA FoemlwgA Room: Building 1814 1,832.00 SF Walls 5,108.00 SF Walls & Ceiling 364.00 SYFloonng 468.00 SF Long Wall 229.00 I F Ceil. Perimeter Subroom 1: Offset 1 496.00 SF Walls 730.00 SF Walls & Ceilnlg 26.00 SYFlooring 144.00 SF Long Wall 62.00 LF Ccil. Perimeter Subroom 2: Offset 2 536.00 SF Walls 813.50 SF Walls & Ceiling 30.83 SYFlooring 148.00 SF Long Wall 67.00 LF Ceil. Perimeter LxWxH 58'6" x 56'0" x 8'0" 3,276.00 SF Ceiling 3,276.00 SF Floor 229.00 LFF1oorPeruneter 448.00 SF Short Wall LxWxH 18'0" x 13'0" x 8'0" 234.00 SF Ceiling 234.00 SF Floor 62.00 LF Floor Perimeter 104.00 SF Short Wall LxWxH 18'6" x 15'0" x 8'0" 277.50 SF Ceiling 277.50 SF Floor 67.00 LFF1oorPeruucter 120.00 SF Short Wall I. R 3 tab - 25 yr. - comp. shingle rfg - incl. felt 54.00 SQ 235.00 12,690 00 2. Ridge cap - composition shingles 30.(k LF included 3. R&R Drip edge 329.00 L l-' included 4. R&RFlashing, 14" wide 35.00L17 included 5. R&R Continuous ridge vent - aluminum 50.00 LF included 6. Painting - Minimum charge -Drip edge 1.00 EA 135.00 135.00 aRig . L" 12,825.00 SANFOR 04-09-02-V3EEB Page: 8 Rolyn Construction Corporation 6104 Twain Street Unit 101 Orlando, FL 32855 800) 808 - 1553 Rees Nepr flmm WJF / NWiNI , J Fmnt ReenN Room: Building 1.813 1,832.00 SF Walls 5,108.00 SF Walls & Ceiling 364.00 SYFlooring 468.00 SF' Long Wall 229.00 LF Ceil. Perimeter Subroom 1: Offset 1 496.00 SF Walls 730.00 SF Walls & Ceiling 26.00 SYFlooring 144.00 SF bong Wall 62.00 LF Ccil. Perimeter Subroom 2: Offset 2 536.00 SF Walls 813.50 Sl Walls & Ceiling 30.83 SYFlooring 148.00 SF Long Wall 67.00 LF Ceil. Perimeter LxWxH 58'6" x 56'0" x 8'0" 3,276.00 SF Ceiling 3,276.00 SF Floor 229.00 LF Floor Perimeter 448.00 SF Short Wall LxWxH 18'0" x 13'0" x 8'0" 234.00 SF Ceiling 234.00 SF Floor 62.00 LF Floor Pernneter 104.00 SF Short Wall LxWxH 18'6" x 15'0" x ST" 277.50 SF Ceiling 277.50 SF Floor 67.00 LF Floor Perimeter 120.00 SF Short Wall 1. R&R 3 tab - 25 yr. - cone. shingle rfg - incl. felt 42.00 SQ 235.00 9,870.00 2. Ridge cap - composition shingles 20.00 LF included 3. R&R Drip edge 329.00 LF included 4. R&R Flashing, 14" wide 35.00 LF included 5. R&R Continuous ridge vent - alununurn 40.(X) LF included 6. Painting-Mninnunicharge-Dip edge. 1.001 /1 135.00 135.00 nuum iotals: tSun(ang tz5ij R.en Ney. / j AW Rmm Lergl. Room: Building 181.2 1,832.00 SF Walls 5,108.00 SF Walls & Ceiling 364.00 SYFlooring 4(k'1.00 SF Long Wall 229.00 11, Ceii. Perimeter 10,005.00 LxWxH 58'6" x 56'0" x 8'0" 3,276.00 SF Ceiling 3,276.00 SF Floor 229.00 LF Floor Perirneter 448.00 SF Short Wall SANFOR 04-09-02-V31M page: 9 Rolyn Construction Corporation 6104 Twain Street Unit 101 Orlando, FL 32855 800) 808 - 1553 Poon HgYt ;. Puem LmyF P z.nWtlM1 Subroom 1: Offset 1 496.00 SF Walls 730.00 SF Walls & Ceiling 26.00 SYFlooring 144.00 SF Long Wall 62.00 LF Ceil. Perurte.ter Subroom 2: Offset 2 536.00 SF Walls 813.50 SF Walls & Ceiling 30.83 SYFlooring 148.00 SF Long Wall 67.00 LF Ceil. Perimeter LxWxH 18'0" x 13'0" x 8'0" 234.00 SF Ceiling 234.00 SF Floor 62.00 LF Floor Perimeter 104.00 SF Short Wall LxWxH 18'6" x 15'0" x 8'0" 277.50 SF Ceiling 277.50 SF Floor 67.00 LF Floor Perimeter 120.00 SF Short Wall 1. R&R 3 tab - 25 yr. - comp. shingle rfg - inel. felt 42.00 SQ 235.00 9,870.00 2. Ridge cap - composition shingles 20.00 LF included 3. R&RDripedge 329.00LF included 4. R&R Flashing,14" wide 35.00 LF included 5. R&R Continuous ridge vent - aluminum 40.00 LF included 6. Painting-Minintumcharge-Drip edge. 1.00EA 135.00 135.00 loom iorais: nurl(ang itftz aamM. Now'w0 Roan W mnLergiM1 Room: Building 1.801 1,832.00 SF Walls 5,108.00 SF Walls & Ceiling 364.00 SYFlooring 468.00 SF IA)ng Wall 229.00 LF Ceil. Perimeter Subroom 1.: Offset 1 496.00 SF Walls 730.00 SF Walls & Ceiling 26.00 SYFlooring 144.00 SF Long Wall 62.00 LF Ceil. Perimeter 10,005.00 LxWxH 58'6" x 56'0" x S'0" 3,276.00 SF Ceiling 3,276.00 SF Floor 229.00 LF Floor Perimeter 448.00 SF Short Wall LxWxH 18'0" x 13'0" x 8'0" 234.00 SF Ceiling 234.00 SF Floor 62.00 IT Floor Perimeter 104.00 SF Short Wall SANFOR 04-09-02-V3Ft3 Page: 10 Rolyn Construction Corporation 6104 Twain Street Unit 101 Orlando,F1,32855 800) 808 - 1553 11ownPµ J/\' PvmLWM1 W:ll Subnoom 2: Offset 2 536.00 SF Walls 813.50 SF Walls & Ceiling 30.83 SYFlooring 148.00 SF Long Wall 67.00 LF Ccil. Permeter LxWxH 18'6" x 15'0" x 8'0" 277.50 SF Ceiling 277.50 SF Floor 67.00 LF Floor Perimeter 120.00 SF Short Wall 1. R&R 3 tab - 25 yr. - comp. shingle rlg - incl. felt 42.00 SQ 235.00 9,870.00 2. Ridge cap -composition shingles 20.00 LF included 3. R&R Dip edge 329.00 LF included 4. R&RFlashing, 14" wide 35.00LF included 5. R&R Continuous ridge vent - aluminum 40.00 LF included 6. Painting - Minimum charge -Drip edge 1.00 EA 135.00 135.00 7. R&R Sheathing - plywood - 5/8" CDX 2,400.00 SF 1.84 4,416.00 ub awi Room: Building 1.801 j \! 1,832.00 SFWalls 5, 108.00 SF Walls & Ceiling 364. 00 SYFlooring 468. 00 SF Long Wall 229. 00 L,F Ceil. Perimeter Subnoom 1: Offset 1 gwnPe.` j- I .- 496. 00 SF Walls 730. 00 SF Walls & Ceiling 26. 00 SYFlooring 144. 00 SF Long Wall 62. 00 LF C61. Perimeter SAM' OR-04-09-02-V3ffl- 14, 421.00 LxWxH 58'6" x 56'0" x 8'0" 3, 276.00 SF Ceiling 3, 276.00 SF Floor 229. 00 LFF1oorPeArneter 448. 00 SF Short Wall LxWxH 18'0" x 13'0" x 8'0" 234. 00 SF Ceiling 234. 00 SF Floor 62. 00 LFFloor Peruneter 104.00 SF Short Wall Page: 11 Rolyn Construction Coiponation 6104 "Twain Street Unit 101 Orlando, FL 32855 800) 808 - 1553 Subroom 2: Offset 2 536.00 SF Walls 813.50 SF Walls & ailing 30.83 SYFlooring 148.00 SF Long Wall 67.00 LF Ceil. Peruneter LxWxH 18'6" x 15'0" x 8'0" 277.50 SF Ceiling 277.50 SF Floor 67.00 LF Floor Perimeter 120.00 SF Short Wall 1. R&R 3 tab - 25 yr. - comp. shingle rfg - ircl. felt 42.00 SQ 235.00 9,870.00 2. Ridge cap - composition shingles 20.00 LF included 3. R&R Drip edge 329.00 LF included 4. R&IZ Flashing, 14" wide 35.00 LF included 5. R&R Continuous ridge vent - alunniiunn 40.00 LF included 6. Painting - Mininum charge -Drip edge. 1.00 LA 135.00 135.00 i?...,.,, T-4 I... n..:___ , 6 .,.. ,. Pvm WiM P WtlA Noaml Poem llryl i / L Room: Building 1801 1,832.00 SF Walls 5,108.00 SF Walls & Ceiling 364.00 SYFlooring 468.00 SF Long Wall 229.00 LF Ceil. Perimeter Subroom 1: Offset 1 496.00 SF Walls 730.00 SF Walls & Ceiling 26.00 SYFlooring 144.(X) SH-ong Wall 62.00 LF Ccil. Pcri -titer Subroom 2: Offset 2 536.00 SF Walls 813.50 SF Walls & Ceiling 30.83 SYFlooring 148.00 SF Long Wall 67.00 LF Ceil. Perimeter 10,005.00 LxWxH 58'6" x 56'0" x 8'0" 3,276.00 SF Ceiling 3,276.00 SF Floor 229.00 LFFloor Perimeter 448. 00 SF Short Wall LxWxH 18'0" x 13'0" x 8'0" 234. 00 SF Ceiling 234. 00 SF Floor 62. 00 LF Floor Perimeter 04. 00 SF Shorn Wall LxWxH 18'6" x 15'0" x 8'0" 277. 50 SF Ceiling 277. 50 SF Floor 67. 00 LF Floor Perimeter 120. 00 SF Short Wall SANFOR 04-09-02-V3D3 Page: 12 Rolyn Construction Coipointion 6104 Twani Street v Unit 101 Orlando, FL 32855 800) 808 - 1553 1. R&R 3 tab - 25 yr. - comp. shingle rfg - incl. felt 42.00 SQ 235.00 9,870.00 2. Ridge cap -composition shingles 20.00 LF included 3. R&R Drip.edge 329.00 LF included 4. R&R Flashing, 14" wide 35.00 IF included 5. R&R Continuous ridge vent - aluminum 40.00 LF included 6. Painting - Minimum charge -Drip edge. 1.00 EA 135.00 135.00 wiu Lan. nuntang ioul Room: Building 1804 1,832.(>) SF Walls 5,108.00 SF Walls & Ceiling 364.00 SYFlooring 468.00 SF Long Wall 229.00 LF Ceil. Perimeter 1.0,005.00 LxWxH 58'6" x 56'0" x 8'0" 3,276.00 SF Ceiling 3,276.00 SF Floor 229.00 LF Floor Perimeter 448.00 SF Short Wall Submom l: Offset 1 LxWxH 18'0" x 1.3'0" x 8'0" Peen HeiYt. R w 496.00 SF Walls 234.00 SF Ceiling730.00 SF Walls & Ceiling 234.00. SF Floor 26.00 SYFlooring 62.00 LF Floor Perimeter 144.00 SF Long Wall 104.00 SF Short Wall 62.00 LF Ccil. Pcrinmeter Subnoom 2: Offset 2 LxWxH 18'6" x 15'0" x 8'0" Poom Hem ' N WdA j 536.00 SF Walls 277.50 SF Ceiling 813.50 SF Walls & Ceiling 277.50 SF Floor 30.83 SYFlooring 67.00 L.FFloor Perimeter 148. 00 SF Long Wall 120.00 SF Short Wall 67. 00 LF Ceil. Perimeter 1. R&R 3 tab - 25 yr. - commp. shingle rfg - incl. felt 60.00 SQ 235.00 14,100.00 Laundry room is attached to this building. 2. Ridge cap - composition shingles 20.00 LF included 3. R&R Drip edge 329.00 LF included 4. R&RMashing, 14" wide 35.00LF included 5. R&R Continuous ridge vent - aluminum 40.00 LF included SANFOR 04-09-02-V3rD Page: 13 Rolyn Construction Co poi-afion 6104 Twain Street Unit101 Orlando, 171,32855 800) 808 - 1553 CONTINUED - Building 1804 Map 6. Painting - Minimum charge -Drip edge 1.00 EA 135.00 135.00 .. Rmm "eTgt\ nwun Ro.. Ld./h R.M NWiMi Rtiin Le.pli Y Room: Building 1805 1,832.00 SF Walls 5,108.00 SF Walls & Ceiling 364.00 SYFlooring 468.00 SFLong Wall 229.00 LF Ccil. Pernneter Subi-oom 1: Offset 1 496.00 SF Walls 730.00 SF Walls & Ceiling 26.00 SYFlooring 144.00 SF Long Wall 62.00 LF Ceil. Perimeter Subroom 2: Offset 2 536.00 SF Walls 813.50 SF Walls & Ceiling 30.83 SYFlooring 148.00 SF Long Wall 67.00 LF Ceil. Perimeter 14,235.0( LxWxH 58'6" x 56'0" x 8'0" 3,276.00 SF Ceiling 3,276.00 SF Floor 229.00 LFFloorPerimeter 448.00 SF Short Wall LxWxH 18'0" x 13'0" x 8'0" 234.00 SF Ceiling 234.00 SF Floor 62.00 LF Floor Perimeter 104.00 SF Short Wall LxWxH 18'6" x 15'0" x 8'0" 277.50 SF Ceiling 277.50 SF Floor 67.00 LF Floor Perimeter 120.00 SF Short Wall 1. R&R 3 tab - 25 yr. - comp. shingle rfg - incl. felt 42.00 SQ y. _zb ..r ... 235.00 9,870.00 2. Ridge cap - composition shingles 20.00 LF included 3. R&R Drip edge 329.00IY included 4. R&R Flashing, 14" wide 35.00 LF included 5. R&R Continuous ridge vent - aluminum 40.00 LF included 6. Painting - Minimum charge -Drip edge. 1.00 FA 135.00 135.00 10,005.00 SANFOR 04-09-02-V3133 Page: 14 Rolyn Construction Corpor,rtion F 6104 Twain Street Unit 101 Orlando, FL 32855 800) 808 - 1553 WeFnoon LwWh nenm Naq Aeom naj .1 PmoWdM1 Hw.Lw v Room: Building 1806 LxWxH 58'6" x 56'0" x 8'0" 1, 832.00 SF Walls 3,276.00 SF Ceiling 5, 108.00 SF Walls & Ceiling 3,276.00 SFFloor 364. 00 SYFlooring 229.00 LF Floor Perimeter 468. 00 SF Long Wall 448.00 SF Short Wall 229. 00 LF Ceil. Perinicter Subroom 1: Offset 1. LxWxH 18'0" x 13'0" x 8'0" 4%. 00 SF Walls 234.00 SF Ceiling 730. 00 SF Walls & Ceiling 234.00 SF Floor 26. 00 SYFlooring 62.00 11 Floor Perimeter 144. 00 SF long Wall 104.00 SF Short Wall 62. 00 LF Ceil. Perieter Subroom 2: Offset 2 LxWxH 18'6" x 15'0" x 8'0" 536. 00 SF Walls 813. 50 SF Walls & Ceiling 30. 83 SYFlooring 148. 00 SF Long Wall 67. 00 LF Ceil. Peiuneter 277. 50 SF Ceiling 277. 50 SFFloor 67. 00 LF Floor Perimeter 120. 00 SF Short Wall k if' r> x{. A 'i ..t' '}- Y j •'3 it a'v 1. R&R 3 tab - 25 yr. comp. shingle rfg - incl. felt i- 42. 00 SQ 235.00 9,870.00 2. Ridge cap - composition shingles 20.00 LF included 3. R&RDrip edge 329.00LF included 4. R&RFlashing, 14" wide 35.00LF included 5. R&R Continuous ridge vent - aluminum 40.00 LF included 6. Painting - Minimum charge -Drip edge. 1.00 EA 135.00 135.00 a. Lu.iwug l(wo 10,005.0 SANFOR 04-09-02-V3FI3 Page: 15 IR", Rolyn Construction Colpoiafion 6104 Twain Street Unit 101 Orlando, FL 32855 800) 808 - 1553 n1J:N / i leM i Paanfl y _ Room: Building 1807 1,832.00 SF Walls 5,108.00 SF Walls & Ceiling 364.00 SYFlooring 468.00 SF Long Wall 229.00 LF Ceil. Perimeter Subroom 1: Offset 1 496.00 SF Walls 730.00 SF Walls & Ceiling 26.00 SYFlooring 144.00 SF Long Wall 62.00 LF Ceil. Peri niter Subroom 2: Offset 2 536.00 SF Walls 813.50 SF Walls & Ceiling 30.83 SYFlooring 148.00 SF Long Walt 67.00 LF Ceil. Perimeter LxWxH 58'6" x 56'0" x 8'0" 3,276.00 SF Ceiling 3,276.00 SF Floor 229.00 LF Floor Perimeter 448.00 SF Short Wall LxWxH 18'0" x 13'0" x 8'0" 234.00 SF Ceiling 234.00 SF Floor 62.00 L.FFloor Perineter 104. 00 SF Short Wall LxWxH 18'6" x 15'0" x 8'0" 277. 50 SF Ceiling 277. 50 SF Floor 67. 00 LFFloor Perimeter 120.00 SF Short Wall 1. R& R 3 tab - 25 yr. - comp. shingle rfg - incl. felt 42.00 SQ 235.00 9,870.00. 2. Ridge cap - composition shingles 20.00 LF included 3. R& R Drip edge 329.00 LF included 4. R& RFlashing, 14" wide 35.00LF included 5. R& R Continuous ridge vent - aluminum 40.00 LF included 6. Painting - Minimum charge -Drip edge. 1.00F.A 135.00 135.00 wui iOLUIS; Dumung iou / Hoerr xagr_. /%. pWEYi Ham l+-q1 Room: Building 1808 1,832. 00 SF Walls 5,108. 00 SF Walls & Ceiling 364.00 SYFlooring 468.00 SF Long Wall 229.00 LF Ceil. Peruneter 10,005. 00 LxWxH 58' 6" x 56'0" x 8'0" 3,276. 00 SF Ceiling 3,276. 00 SF Floor 229.00 LF Floor Perimeter 448.00 SF Short Wall SANFOR 04- 09-02-VUB Page: 16 Rolyn Construction Corporation 6104 Twain Street Unit 101 Orlando, FL 32855 800) 808 - 1553 Ndh 'Ram Lw l 1 ReomH. Subynom 1: Offset 1 496.00 SF Walls 730.00 SF Walls & Ceiling 26.00 SYFlooring 144.00 SF Long Wall 62.00 LF Ccil. Perimeter Subroom 2: Offset 2 536.00 SF Walls 813.50 SF Walls & Ceiling 30.83 SYFlooring 148.00 SF Long Wall 67.00 LF Ccil. Perimeter LxWxH 18'0" x 13'0" x 8'0" 234.00 SF Ceiling 234.00 SF Floor 62.00 LF Floor Perimeter 104.00 SF Short Wall LxWxH 1.8'6" x 15'0" x 8'0" 277.50 SF Ceiling 277.50 SF Floor 67.00 LFFloor Perimeter 120. 00 SF Short Wall 1. R&R 3 tab - 25 yr. - comp. shingle rfg - incl. felt 42.00 SQ 235.00 9,870 00 2. Ridge cap - composition shingles 20.00 LF included 3. R&R Drip edge 329.00 LF included 4. R&R Flashing, 14" wide 35.00 LF included 5. R&R Continuous ridge vent - aluminum 40.00 LF included 6. Painting - Mininwin charge -Drip edge. 1.00 FA 135.00 135.00 w'_.. b uuo Room H.iHenn WiM ' Rem nW A Rpm LrgY. Room: Building 1809 1, 832.00 SF Walls 5, 108.00 SF Walls &Ceiling 364. 00 SYFlooring 468. 00 SF Long Wall 229. 00 LF Ceil. Perimeter Subroom 1: Offset 1 496. 00 SF Walls 730. 00 SF Walls & Ceiling 26. 00 SYFlooring 144. 00 SF Long Wall 62. 00 LF Ceil. Perimeter 005.() 0 LxWxH 58'6" x 56'0" x 8'0" 3, 276.00 SF Ceiling 3, 276.00 SF Floor 229. 00 LP Floor Perimeter 448. 00 SF Short Wall LxWxH 18'0" x 13'0" x 8'0" 234. 00 SF Ceiling 234. 00 SF Floor 62. 00 1.F Floor Perimeter 104. 00 SF Short Wall SANFOR 04-09-02-V3EB Page: 17 Rolyn Construction Corpoiution 6104 Twain Street Unit 101 Orlando, FL 32855 800) 808 - 1553 Ream H..j _ aw:n; mom L yh Subroom 2: Offset 2 536.00 SF Walls 813.50 SF Walls &Ceiling 30.83 SYFlooring 148.00 SF Long Wall 67.00 LF Coil. Perimeter LxWxH 18'6" x 15'0" x 8'0" 277.50 SF Ceiling 277.50 SF Floor 67.00 L.FFloor Perimeter 120. 00 SF ShortWall 1. R& R 3 tab - 25 yr. - comp. shingle rfg - incl. felt 42.00 SQ 235.00 9,870.00 2. Ridge cap - composition shingles 20.00 LF included 3. R& R Drip edge 329.00 LF included 4. R& R Flashing, 14" wide 35.00 LF included 5. R& R Continuous ridge vent - alunninuun 40.00 LF included 6. Painting - Minimum charge -Drip edge. 1.00 EA 135.00 135.00 11 avta13. 11U11U111g 10Vl mm LsVl, Pww LwgA Pom WJh v nwann`•," SANF0R-04- 09-02-V3 L13 Room: Building 1810 1,832. 00 SF Walls 5,108. 00 SF Walls & Ceiling 364.00 SYFlooring 468.00 SF Long Wall 229.00 LF Cod. Perinneter Subroom 1: Offset l 496.00 SF Walls 730.00 SF Walls & Ceiling 26.00 SYFlooring 144.00 SF Long Wall 62.00 LF Ceil. Perinneter Subroom 2: Offset 2 536.00 SF Walls 813.50 SF Walls & Ceiling 30.83 SYFlooring 148.00 SF Long Wall 67.00 LF Ccil. Perimeter 10,005. 00 LxWxH 58' 6" x 56'0" x 8'0" 3,276. 00 SF Ceiling 3,276. 00 . SI- Floor 229.00 LF Floor Perimeter 448.00 SF Short Wall LxWxH 18' 0" x 13'0" x 8'0" 234.00 SF Ceiling 234.00 SF Floor 62.00 LF Floor Perimeter 104.00 SF Short Wall LxWxH 1. 8'6" x 15'0" x 810" 277.50 SF Ceiling 277.50 SF Floor 67.00 LFFloor Nrnncter 120.00 SF Short Wall Page: 18 Rolyn Construction Corporation 6104 Twain Street 1 Unit 101 Orlando, FL 32855 8W) 808 - 1553 I. R&R 3 tab - 25 yr. - comp. shingle rfg - incl. felt 54.00 SQ 235.00 12,690.00 2. Ridge cap - composition shingles 30.00 LF included 3. R&R Drip edge 329.00I F included 4. R&R Flashing, 14" wide 35.00 LF included 5. R&R Continuous ridge vent - aluminwn 50.00 LF included 6. Painting-Minunumcharge-Drip edge 1.00I_ 135.00 135.00 zoom Totals: Buildrig 1810 Room: Building 1.811 ao - 1,832.00 SF Walls war 5,108.00 SF Walls & Ceiling 364.00 SYFloodng 468.00 SF Long Wall 229.00 LF Ceil. Perimeter Subroom 1: Offset 1 HoemNpt - ri 496.00 SF Walls 730.00 SF Walls & Ceiling 26.00 SYFlooring 144.00 SF Long Wall 62.00 LF Ceil. Perimeter Subnoom 2: Offset 2 flonnHW i - w 536.00 SF W alls 813.50 SF Walls &Ceiling 30.83 SYFlooring 148.00 SF Long Wall 67.00 LF Ceil. Perimeter 1. R&R 3 tab - 25 yr. - comp. shingle rfg - incl. felt 2. Mgc cap -composition shingles 3. R&R Drip edge 4. R&RFlashing, 14" wide 5. R&R Continuous ridge vent - aluminum 42.00 SQ 20.00 LI 329.00 LF 35.00 LI' 40.00 LF 12,825.00 LxWxH 58'6" x 56'0" x 8'0" 3,276.00 SF Ceiling 3,276.00 SF Floor 229.00 LFF1oorPeritneter 448.00 SF Short Wall LxWxH 18'0" x 13'0" x 8'0" 234.00 SF Ceiling 234.00 SF Floor 62.00 LF Floor Perimeter 104.00 SF Short Wall LxWxH 1.8'6" x 15'0" x 8'0" 277.50 SF Ceiling 277.50 SF Floor 67.00 LFFloor Peritneter 120. 00 SF Short Wall 235. 00 9,870.00 included included included included SANFOR- 04-09-02-V3M page. 19 Rolyn Constnietion Corpoiatioii 6104 Twain Street S Unit 101 Orlando, FL 32855 800) 808 - 1553 CONTINUED - Building 1811 0wMAI1.: '. - . a _ $ • .F. 6. Painting - Minunum charge-lDrip edge. 1.00 FA 135.0.0 135.00 W111 1VUUJ. DUmalig 1011 r; Ae H+ji P flan lmYh WJh Poem Nyy" wan s Room: Building ISIS 1,832.00 SF Walls 5,108.00 SF Walls & Ceiling 364.00 SYFlooring 468.00 SF Long- Wall 229.00 1,17, Ceil. Perimeter Subroom 1: Offset 1 4%.00 SF Walls 730.00 SF Walls & Ceiling 26.00 SYFlooring 144.00 SF Long Wall 62.00 LF Ceil. Perimeter Subroom 2: Offset 2 536.00 SF Walls 813.50 SF Walls &Ceiling 30.83 SYFlooring 148.00 SFLong Wall 67.00 LF Ceil. Perimeter 10,005.Oa LxWxH 58'6" x 56'0" x 810" 3,276.00 SF Ceiling 3,276.00 SF Floor 229.00 LF Floor Perimeter 448.00 SF Short Wall LxWxH 18'0" x 13'0" x 8'0" 234.00 SF Ceiling 234.00 SF Floor 62.00 LF Floor Perimeter 104.00 SF Short Wall LxWxH 18'6" x IS'0" x 8'0" 277.50 SF Ceiling 277.50 SF Floor 67.00 LF Floor Perimeter 120.00 SF Short Wall 1. R&R 3 tab - 25 yr. - comp. shingle rlg - incl. felt 42.00 SQ 235.00 9,870.00 2. Ridge cap - composition shingles 20.00 LF included 3. R&R Drip edge 329.00 LF included 4. R&R Flashing, 14" wide 35.00 LF included 5. R&R Continuous ridge vent - aluminum 40.00 LF included 6. Painting - Minunum charge -Drip edge. 1.00 EA 135.00 135.00 w,,. i aula. nuuleuglol° 10,005.00 SANFOR 04-09-02-V3F-B Page: 20 a Rolyn Constriction Corpointion 6104 Twain Street Unit 101 Orlando, FL 32855 800) 808 - 1553 Room lkyl . naamM M RmnWdF Reen Hem Pmn WM Reo-n Najd - j flwnlwyM1 n war, Room: Building 1819 1,832.00 SF Walls 5,108.00 SF Walls & Ceiling 364.00 SYFlooring 468.00 SF Long Wall 229.00 LF Ceil. Perimeter Subroom 1: Offset 1. 496.00 SF Walls 730.00 SF Walls &Ceiling 26.00 SYFlooring 144.00 SI, Long Wall 62.00 LF Ceil. Perimeter Subnoom 2: Offset 2 536.00 SF Walls 813.50 SF Walls & Ceiling 30.83 SYFlooring 148.00 SF Long Wall 67.00 LF Ceil. Perimeter LxWxH 58'6" x 56'0" x 8'0" 3,276.00 SF ceiling 3,276.00 SF Floor 229.00 LF Floor Perimeter 448.00 SF Short Wall LxWxH 18'0" x 13'0" x 8'0" 234.00 SF Ceiling 234.00 SF Floor 62.00 LF Floor Perimeter 104.00 SF ShortWall LxWxH 1.8'6" x 1.5'0" x 8'0" 277. 50 SF Ceiling 277. 50 SF Floor 67. 00 LF Floor Perimeter 120. 00 SF Short Wall 1. R&R 3 tab - 25 yr, - comp. shingle rfg - incl. felt 42.00 SQ 235.00 9,870.00 2. Ridge cap - composition shingles 20.00 LF included 3. R&R Drip edge 329.00 L1F included 4. R&R Flashing, 14" wide 35.00 LF included 5. R&R Continuous ridge vent - ahuninutm 40.00 LF included 6. Painting - Minimum charge -Drip edge. 1.00 EA 135.00 135.00 Loom iotais: nuilung 1tf19 10,005.00 SANFOR 04-09-02-V3EB Page: 21 Rolyn Construction Coipo at oil 61041'wain Street ----- -- --- - - ------ Unit 101 Orlando, FL 32855 800) 808 - 1553 A WJh flaom LugM1 1~i WiM Awm LepA Room: Building 1820 1,832.00 SF Walls 5,108.00 SF Walls & Ceiling 364.00 SYFlooring 468.00 SF Long Wall 229.00 LF C& Perimeter Subnoom 1: Offset 1 4%.00 SF Walls 730.00 SF Walls & Ceiling 26.00 SYFlooring 144.00 SF Long Wall 62.00 LF Ceil. Perimeter Subroom 2: Offset 2 536.00 SF Walls 813.50 SF Walls & Ceiling 30.83 SYFlooring 148.00 SF Long Wall 67.00 LF Ccil. Perimeter LxWxH 58'6" x 56'0" x 8'0" 3,276.00 SF Ceiling 3,276.00 SF Floor 229.00 11, Floor Perimeter 448.00 SF Short Wall LxWxH 18'0" x 13'0" x 8'0" 234.00 SF Ceiling 234.00 SF Floor 62.00 LF Floor Perimeter 104.00 SF Short Wall LxWxH 18'6" x 15'0" x 8'0" 277.50 SF Ceiling 277.50 SF Floor 67.00 LF Floor Perimeter 120.00 SF Short Wall 1. R&R 3 tab - 25 yr. - comp. shingle rfg - in felt 42.00 SQ 235.00 9,870 00 2. Ridge cap - composition shingles 20.00 LF included 3. R&RDrip edge 329.00IT included 4. R&RF1asMng, 14" wide 35.00LF included 5. R&R Continuous ridge vent - aluminum 40.00 LF included 6. Painting -Minimum charge -Drip edge. 1.00 EA 135.00 135.00 1D-- T-.,-,-. D..:t_s-_ . omen Room: Building 1.824 1,832.00 SF Walls 5,108.00 SF Walls & Ceiling 364.00 SYFlooring 468.00 SF Long Wall 229.00 LF Ceil. Perimeter 10,005.00 LxWxH 58'6" x 5610" x 8'0" 3,276.00 SF Ceiling 3,276.00 SF Floor 229.00 LFFloorPerimeter 448.00 SF Short Wall SANFOR 04-09-02-V3f3 Page: 22 Rolyn Const Uction Corporation _ 6104 Twain Street Unit 101 Orlando, FL 32855 800) 808 - 1553 flwwN \ T Ili.m W:An / fl am lwW: FaomMb[ nwen pro"' Subroom 1.: Offset 1 496,00 SF Walls 730.00 SF Walls & Cciluig 26.00 SYFlooring 144.00 SF Long Wall 62.00 LF Ceil. Perimeter Subroom 2: Offset 2 536.00 SF Walls 813.50 SF Walls & Ceiling 30.83 SYFlooring 148.00 SF Long Wall 67.00 LFCeil. Perimeter LxWxH 18'0" x 13'0" x 8'0 234. 00 SF Ceiling 234. 00 SF Floor 62. 00 LF Floor Perimeter 104. 00 SF Short Wall LxWxH 18'6" x 15'0" x 8'0" 277. 50 SF Ceiling 277. 50 SF Floor 67. 00 LF Floor Perimeter 120. 00 SF Short Wall 1. R&R 3 tab - 25 yr. -'comp, shingle rfg - incl. felt 42.00 SQ 235.00 9,870.00 2. Ridge cap - composition shingles 20.00 LF included IR& R Drip edge 329.00 LF included 4. R&R Flashing, 14" wide 35.00 LF included 5. R&R Continuous ridge vent - alunrilum 40.00 LF included 6. Painting - Minimum charge -Drip edge. 1.00 EA 135.00 135.00 E, a vim.'. Pmn WiM Pw: lwgn r fl, e ll Room: Btrilding 1825 1, 832.00 SF Walls 5, 108.00 SF Walls &Ceiling 364. 00 SYFlooring 468. 00 SF Long Wall 229. 00 LF Ceil. Perimeter Subroom 1.: Offset 1, 496. 00 SF Walls 730. 00 SF Walls & Ceiling 26. 00 SYFlooring 144. 00 SF Long Wall 62. 00 LF Ccil. Perimeter 10, 005.00 LxWxH 58'6" x 56'0" x 8'0" 3, 276.00 SF Ceiling 3, 276.00 SF Floor 229. 00 LF Floor Perimeter 448. 00 SF Short Wall LxWxH 18'0" x 13'0" x 8'0" 234. 00 SF Ceiling 234. 00 SFFloor 62. 00 LFFloor Perimeter 104.00 SF Short Wall SANFOR-04- 09-02-V31B Page: 23 Rolyn Construction Cotponation e 6104 "Twain Street d>- Unit 101 Orlando, FL 32855 800) 808 - 1553 I- _ Foam Ned'. - w anm i> v Subroom 2: Offset 2 536.00 SF Walls 813.50 SF Walls & Ceiling 30.83 SYFlooring 148.00 SF Long Wall 67.00 LF Ceil. Perini ter LxWxH 18'6" x 15'0" x 8'0" 277.50 SF Ceiling 277.50 SF Floor 67.00 LF Floor Peruneter 120.00 SF Short Wall 1. R&R 3 tab - 25 yr. - comp. shingle rfg - incl. felt 48.00 SQ 235.00 11,280.00 2. Ridge cap - composition shingles 20.00 LF included 3. R&R Drip edge 329.00 LF included 4. R&R Flashing, 14" vide 35.00 LF included 5. R&R Continuous ridge vent - aluminum 40.00I F included 6. Painting - Minimum charge -Drip edge. 1.00 LA 135.00 135.00 i neomn : awan n°Oe Fes. ue 4 Room: Building 1.827 1,832.00 SF Walls 5,108.00 SF Walls & Ceiling 364.00 SYFlooring 468.00 SF Long Wall 229.00 LF Ceil. Pernncter Subroom 1: Offset 1 496.00 SF Walls 730.00 SF Walls & Ceiling 26.00 SYFiooring 144.00 SF .Long Wall 62.00 IF Ceil, Perimeter Subroom 2: Offset 2 536.00 SF Walls 813.50 SF Walls & Ceiling 30.83 SYFlooring 148.00 SF long Wall 67.00 LF Ceil. Pcruncter 11,415.00 LxWxH 58'6" x 56'0" x 8'0" 3,276.00 SF Ceiling 3,276.00 SF Floor 229.00 LFFloor Peritnctcr 448. 00 SF Short Wall LxWxH 18'0" x 13'0" x 8'0" 234. 00 SF Ceiling 234. 00 SF Floor 62. 00 LF Floor Peritneter 104. 00 SF Short Wall LxWxH 18'6" x 15'0" x S'0" 277. 50 SF Ceiling 277. 50 SF Floor 67. 00 LF Floor Perimeter 120. 00 SF Short Wall SANFOR- 04-09-02-V3EB Page: 24 Rolyn Construction Coipoiation 6104 Twain Street Unit 101 Orlando, FL 32855 800) 808 - 1553 1. R&R 3 tab - 25 yr. - comp. shingle rfg - incl. felt 42.00 SQ 235.00 9,870.00 2. Ridge cap - composition shingles 20.00 LF included 3. R&R Drip edge 329.00 LF included 4. R&R Flashing, 14" wide 35.00 LF included 5. R&R Continuous ridge vent - aluminum 40.00 LF included 6. Painting-Minnnumcharge-Drip edge. T T 1.00EA 135.00 135.00 ava.- LYll Ul g xuL/ Avon Niy / j. Pwen - Rmnlryn PoanHy i /\' nttmlwgli n,.mw:my f• Povm Nc',y t v Room: Building 1828 1,832.00 SF Walls 5,108.00 SF Walls & Ceiling 364.00 SYFlooring 468.00 SF Long Wall 229.00 LF Ceil. Permeter Subroom 1: Offset 1 490.00 SF Walls 730.00 SF Walls &Ceiling 26.00 SYFIooring 144.00 SF Long Wall 62.00 U Ceii. Perimeter Subroom 2: Offset 2 536.00 SF Walls 813.50 SF Walls & Ceiling 30.83 SYFlooring 148.00 SF Long Wall 67.00 LF Ceil. Perimeter 1. R&R 3 tab - 25 yr. - comp. shingle rfg - incl. felt 42.00 SQ 2. Ridge cap - composition shingles 20 00 LF 3. R&R Drip edge 329.00 Li' 4. R&R Flashing, 14" wide 35.00 LF 5. R&R Continuous ridge vent - aluminum 40.00 LF SANFOR 04-09-02-V3EB 10,005.00 LxWxH 58'6" x 56'0 x 8'0" 3,276.00 SF Ceiling 3,276.00 SF Floor 229.00 LF Floor Perimeter 448.00 SF Short Wall LxWxH 18'0" x 13'0" x 8'0" 234.00 SF Ceiling 234.00 SFFloor 62.00 LF Floor Peruncter 104.00 SF Short Wall LxWxH 18'6" x 1.5'0" x 8'0" 277.50 SF Ceiling 277.50 SF Floor 67.00 LFFloor Perimeter 120. 00 SF Short Wall 235. 00 9,870.00 included included included included Page: 25 7 Rolyn Construction Corporation 6104 Twain Street Unit 101 i Orlando, FL 32855 800) 808 - 1.553 6. Painting - Minimum charge -Drip edge. Room Totals: Building 1828 floam lfyt _ W'.fh . nc.LmWh Poom Nwyl CONTINUED - Building 1828 Room: Building 1830 1,832.00 SF Walls 5,108.00 SF Walls & Ceiling 364.00 SYFloori ng 468.00 SF Long Wall 229.00 1_:F Ceil. Peruncter Subroom 1: Offset 1 4%.00 SF Walls 730.00 SF Walls & Ceiling 26.00 SYFlooring 144.00 SF Long Wall 62.00 LF Ceil. Perimeter Subroom 2: Offset 2 536.00 SF Walls 813.50 SF Walls & Ceiling 30.83 SYFlooring 148.00 SF Long Wall 67.00 LF Ceil. Perimeter 135.00 135.00 10,005.00 LxWxH 58'6" x 56'0" x 8'0" 3,276.00 SF Ceiling 3,276.00 SF Floor 229.00 LF Floor Perimeter 448.00 SF Short Wall LxWxH 18'0" x 13'0" x 8'0" 234.00 SF Ceiling 234.00 SF Floor 62.(X) 11, -1oorl?crimeter 104.00 SF Short Wall LxWxH 18'6" x 15'0" x 8'0" 277.50 SF Ceiling 277.50 SF Floor 67.00 LF Floor Perirneter 120.00 SF Short Wall L R&R 3 tab - 25 yr. - comp. shingle rfg - incl. felt 42.00 SQ 235.00 9,870 00 2. Ridge cap - composition shingles 20.00 LF included 3. R&R Drip edge 329.00 LF included 4. R&RFlashing, 14" wide 35.00LF included 5. R&R Continuous ridge vent - aluminum 40.00 LF included 6. Painting - Minimum charge -Drip edge. 1.00 EA 135.00 135.00 0 ......,,....11g toad 10,005.00 SANFOIZ-04-09-02-V3E13 Page: 26 Rolyn Constiuetiion Coipoi-ation 6104 Twain Street Unit 101 Orlando, FL 32855 800) 808 - 1553 H.mn Heijf - - Hoa.lm4h H aaui, v PWidA jmntwq y Homm Np k /' PWtlh Haw LmJh Room: Building 1829 1,832.00 SF Walls 5,108.00 SF Walls & Ceiling 364.00 SYFlooring 468.00 SF Long Wall 229.00 LF Ceil. Perimeter Subroom 1: Offset 1 496.00 SF Walls 730.00 SF Walls & Ceiling 26.00 SYFlooring 144.00 SF Long Wall 62.00 IT Ceil. Perimeter Subroom 2: Offset 2 536.00 SF Walls 813.50 SF Walls & Ceiling 30.83 SYFlooring 148.00 SF Long Wall 67.00 LF Ceil. Perimcter LxWxH 58'6" x 56'0" x 8'0" 3,276.00 SF Ceiling 3,276.00 SF Floor 229.00 LF Floor Perimeter 448.00 SF Short Wall LxWxH 18'0" x 13'0" x 8'0" 234.00 SF Ceiling 234.00 SF Floor 62.00 LFFloor Perirneter 104. 00 SF Short Wall LxWxH 18'6" x 1510" x 8'0" 277. 50 SF Ceiling 277. 50 SF Floor 67. 00 LF Floor Perimeter 120. 00 SF Short Wall 1. R&R 3 tab - 25 yr. - comp. shingle rfg - incl. felt 54.00 SQ 235.00 12,690.00 2. Ridge cap - composition shingles 30.00 LF included 3. R&R Drip edge 329.00 LF included 4. R&RFlashing, 14" wide 35.00LF included 5. R&R Continuous ridge vent - aluminum 50.00 LF included 6. Painting - Minimum charge -Drip edge 1.00 EA 135.00 135.00 LVLI 12, 825.00 SANFOR 04-09-02-V3FB Page: 27 Rolyn Construction Coiporation 6104 Twain Street Unit 101 Orlando, FL 32855 800) 808 - 1553 N RmnlmyX Roen nyi . pW+lh ;Hwy Room: Building 1.832 1,832.00 SF Walls 5,108.00 SF Walls & Ceiling 364A) SYFlooring 468.00 SF Long Wall 229.00 LF Ceil. Perimeter Subroom 1: Offset 1 4%.00 SF Walls 730.00 SF Walls & Ceiling 26.00 SYFlooring 144.00 SF Long Wall 62.00 LF Ceil. Periueter Subnoom 2: Offset 2 536.00 SF Walls 813.50 SF Walls & Ceiling 30.83 SYFlooring 148.00 SF Long Wall 67.00 L, Ced. Perimeter LxWxH 58'6" x 56'0" x 8'0" 3,276.00 SF Ceiling 3,276.00 SF Floor 229.00 LFF1oorPerimeter 448.00 SF Short Wall LxWxH 18'0" x 13'0" x 8'0" 234.00 SF Ceiling 234.00 SF Floor 62.00 LF Floor Perimeter 104.00 SF Short Wall LxWxH 18'6" x 15'0" x 8'0" 277.50 SF Ceiling 277.50 SF F1oor 67.00 LFFloor Perimeter 120. 00 SF Short Wall 1. R&R 3 tab - 25 yr. - comp. shingle rfg - incl. felt 42.00 SQ 235.00 9,870.00 2. Ridge cap - composition shingles 20.00 LF included 3. R&R Drip edge 329.00 LF included 4. R&R Flushing, 14" wide 35.00 LF included 5. R&R Continuous ridge vent - aluminum 40.00 LF included 6. Painting - Minimum charge -Drip edge. LOOM 135.00 135.00 neon R.y i _ PWy, Rmrn L«/gM1 SANFOR 04-09-02-V3M Room: Building 1833 1, 832.00 SF Walls 5, 108.00 SF Walls &Ceiling 364. 00 SYFlooring 468. 00 SF Long Wall 229. 00 LF Ced. Perimeter 10, 00.5.00 LxWxH 58'6" x 56'0" x 8'0" 3, 276.00 SF Ceiling 3, 276.00 SF Floor 229. 00 LFFloor Perincter 448.00 SF Short Wall Page: 28 Rolyn Construction Coipoiation 6104 Twain Street Unit 101 Orlando, FL 32855 800) 808 - 1553 flom.lxph Wife Pa TP„ l nwen °4n1 Subroom 1: Offset 1 496.00 SF Walls 730.00 SF Walls & Ceiling 26.00 SYFlooring 144.00 SF Long Wall 62.00 LF Ced. Perimeter Subroom 2: Offset 2 536.00 SF Walls 813.50 SF Walls & Ceiling 30.83 SYFloornlg 148.00 SF Long Wall 67.00 LF Ceil. Perimeter LxWxH 18'0" x 13'0" x 8'0" 234.00 SF Ceiling 234.00 SF Floor 62.00 LF Floor Perimeter 104.00 SF Short Wall LxWxH 18'6" x 15'0" x 810" 277.50 SF Ceiling 277.50 SF Floor 67.00 LF Floor Perimeter 120.00 SF Short Wall 1. R&R 3 tab - 25 yr. - comp. shingle rfg - incl. felt 42.00 SQ rrn:yap v a Rf8oIIIHE 235.00 2. Ridge cap - composition shingles 9,870.00 3. R&R Drip edge 2 0. 00 LF included 4. R&RFlashing, 14" wide 329.00 LF included 5. R&R Continuous ridge vent - aluminum 35.00LF included 6. Painting - Minimum charge -Drip edge. 40.00 LF included 1.00 FA 135.00 135.00 Rrvm Tninl• R..:I,t.... 1 oo-s Room: General Conditions 1. Durnpster load - Approx 40 yards, 7-8 tons of debris 2. Roofing Steep roof Charge per Square 3. Roofmg Code update Charge per Square 4. Roofmg OSHA Rcgiuremcnts for two story roof 5. Temporary toilet (per month) 4 toilets throught out property for 3 months SANFOR-04-09-02-V3Ei3 10,005.00 35.00 EA 544.50 19,057.50 1,106.00 EA included 1,106.00 M included 1,106.00 SQ included 12.00 MO 115.53 1,386.36 i s Page: 29 9 E Rolyn Conshvcfion Coipoiation m 6104 Tvvain Street Unit 101 Orlando, FL 32855 800) 808 - 1553 CONTINUED - General Conditions 6. Insurance, petnnts & fees 1.00 LA 5 000 00 5,000.00 7. Adnnnistmtive/supetvisorlabor charge 12.00WK 1,350.00 16,200.00 Line Item Totals: SANFOR-04-09-02-V3EB 341,643.86 86 will" 92, 018.67 SF Walls 122, 376,67 SF Floor 24, 497.33 SF Long Wall 0. 00 F1oorArea 0. 00 Exterior Wall Area 0. 00 Surface Area 0. 00 Total Ridge Length SANFOR- 04-09-02-V3EB 122, 376.67 SF Ceiling 13, 597.41 SYFlooring 21, 512.00 SF Short Wall 0. 00 Total Area 0. 00 Exterior Perimeter of Walls 0. 00 Number of Squares 0. 00 Total HipLength 214,395. 33 SF Walls & Ceiling 11,502. 33 LF Floor Perimeter 11,502. 33 LF Ceil. Perimeter 0.00 Interior Wall Area 0.00 Total Perimeter Length 0.00 Area of Face 1 Page: 30 I s Rolyn Construction Corporation 6104 Twain Street Unit 101 Orlando, FL 32855 800) 808 - 1553 Estimate: SANF( Building 1826 Building 1823 Building 1822 Building 1821 Building 1.817 Building 1816 Building 1815 Building 1814 Building 1813 Building 1812 Building 1801 Building 1801 Building 1801 Building 1804 Building 1805 Building 1806 Building 1807 Building 1808 Building 1809 Building 1810 Building 1811 Buildng 1818 Building 1819 Building 1820 Building 1824 Building 1825 Building 1827 Building 1828 Building 1830 Building 1829 Building 1832 Building 1833 General Condtions Subtotal of Areas SANFOR-04-09-02-V3M 10,005.00 2.61 % 10,005.00 2.61% 10,005.00 . 2.61 % 10,005.00 2.61 % 10,005.00 2.61 % 12,825.00 3.35% 10,005.00 2.61 % 12,825.00 3.35% 10,005.00 2.61 % 10,005.00 2.61 % 14,421.00 3.76% 10,005.00 2.61 % 10,005.00 2.61 % 14,235.00 3.72% 10,005.00 2.61 % 10,005.00 2.61 % 10,005.00 2.61 % 10,005.00 2.61 % 10,005.00 2.61 % 12,825.00 3.35% 10,005.0() 2.61 10,005.00 2.61 % 10,005.00 2.61 % 10,005.00 2.61 % 10,005.00 2.61 % 11,415.00 2.98% 10,005.00 2.61 % 10,005.00 2.61 % 10,005.00 2.61 % 12,825.00 3.35% 10,005.00 2.61 % 10,005.00 2.61 % 41,643.86 10.87% 383,139.86 100.00% Page: 31 i Rolyn Constmetion Corporation 6104 Twain Street Unit 101 Orlando, Fl, 32855 800) 808 - 1553 6 i $ t • W-5 hq ..d ,, r "[f ii%-ffl' '. v t {:1 e. :i'..i "'4 i ..a: i 1 ,2'L ( J t+P" i vT V -d :'i q. , .:„dm,€g,4.:,Ir4 x{ , ul 3yeLErvikV,# 4:i § Y I:.- '.t'4j arcf: '.I ,T , 5E 1 XiE" .f 3, iti' t? * `'c,411' i(:}••-.l J ':T£"!! ydpt+tiq. rf r y„a_F'W g.. ue'i'auac ..., a ,, f'..zn'vr t.+,v,rWs 5,iSv .!* .E _4,...nm, - z.: 3daw m'maxodx,u ax...La:x'F7& / O&P Items J------- Total Dollais GIlV172ALDIlVIOLTTION `— ------ 19,897.50 5.19% I PERMITS AND FEES 5,000.00 1.31% E FRAMING& ROUGH CARPENTRY 3,576.00 0.93% LABOR ONLY 16,200.00 4.23% PAINTING 4,320.00 1.13% ROOFING 332,760.00 86.85% T MPORARYRFPAIRS 1,386.36 0.36% CAR1. JE WIS SANPOR-04-09-02-V303 Page: 32