HomeMy WebLinkAbout1717 Park AveINDEX
SECTION A General Conditions
SECTION B Windows
SECTION C Demolition Sublet
SECTION D New Wood Doors and Frames
SECTION E Existing Doors and Frames
SECTION F Miscellaneous Carpentry
S-ECTION G Drywall
SECTINON H Painting Sublet
SECTION I Plumbing Sublet
SECTION J Electric Sublet
SECTION K Sequence of Work
Arthur Nuernberg, Owner
P. 0. Box 4563
Winter Park, Florida 32793
SEC-t-IOC A. General Conditions
1. Bidders may bid any or.all sections of the work.. All bids must
be by sections. No combined bids will be accepted. If bidder quotes
on more than one section, each section must be priced separately.
2. Payments will be made monthly on or before the loth of the month
for'work complete during the previous month provided requisitions reach
owner by the last day of the month in which work is performed.
3. Bids will be received by mail at P.O. Box 4563,' Winter Park, Florida
32793.
4. Bids are requested for Sections B, D, E, F, and G.
5. Items shown on prints and all outlined in specifications shall
be deemed as outlined in both and must be bid as part of the section.
6. Scheduling of work must be done so as not to disturb tenants in three.
apartments until a new apartment is ready for their occupancy.
7. Successful bidders must show evidence of insurance before commenc-
ing work
8. Bidder shall carefully inspect work before pricing.
SECTION B. Windows
1. Scope of Work - Contractor shall remove existing double hung wood
windows and frames; :install new wood stud frame work, 1/2" insulation
board, masonite "stuccato" siding trim materials and sills, aluminum
base flashing, and aluminum single hung windows.
2. Bid shall be for labor, tools and equipment`to install materials
in a workmanlike manner.
3. Owner shall furnish all materials.
4. Caulking of windows and at trim shall be by this contractor.
5. Related work not part of this section: painting.
6. Care shall be taken not to damage existing.stucco and concrete
surrounds of the existing windows.
7. Bidder shall price each type of window installation: Mark (1)
thru (4) separately and include a separate price to complete work of
this section that is partially installed.
8. Bidder shall carefully inspect work before pricing.
9. Any rotted or insect infested wood that is beyond capacity to
properly hold nails shall be replaced.
10. Openings marked (4) shall receive no new windows. These windows
are to be removed and finished on exterior to match other openings. .
2
IN
Demolition.
1. All demolition, except that included in Section B shall be by
others.
SECTION D. New Wood Doors and Frames.
1. Scope of Work: Contractor shall furnish all labor, tools and
equipment to install in a workmanlike manner, all wood flush solid
core doors marked (2), (6), and (7) complete with hardware.
2. New frames shall be installed in door openings marked (6) and (7).
Doors openings marked (2) shall use existing frames.
3. The following door hardware shall be installed:
Doors marked (2) 1 keyed lockset
1 deadlock
1 hi rug threshold
1 mechanical door bell and viewer
1 1/2 Pr - 4" butt hinges
Doors marked (6) 1 passage lockset
1 1/2 Pr - 4" butt hinges
1 aluminum threshold bumper type
Doors marked (7) 1 passage lockset
1 1/2 Pr - 4" butt hinges
4. Related work not part of this section:
a. Painting.
b. Transom work on frames for doors marked (2).
5. Bidder shall quote unit prices for each type of door marked (2),
6) , and (7) .
6. All materials shall be supplied by others.
SECTION E - Existing Doors and Frames.
1. Scope of Work: Contractor shall furnish all tools, labor and
equipment to perform the following in a workmanlike manner:
a. Cut the bottoms of,all interior doors in each apartment
1 1/2" above floor to clear carpeting.
b. Rehang doors marked (1) to swing as shown on drawings.
C. Reinstall existing door locksets that have been removed
for cleaning (cleaning shall be by others).
d. Remove and rehang door marked (5) to swing as shown on
drawing. Remove existing lockset and salvage for owner.
Install new passage lockset.
2. All materials shall be supplied by others.
3
1
SECTION F -.Miscellaneous Carpentry.
1. Scope of Work: Contractor shall furnish all tools, labor and
equipment to perform the following work in a workmanlike manner.
a. Install rods and shelving where shown. Use 1" x 4" supports
shelving to be 5' 6" high, flakeboard shelving - 16" and rod
and supports.
b. Close in all interior transoms as shown on drawings.
C. Stud -up openings marked (3) shiming as required to receive
1/2" gypsum wallboard.
f d. Stud -up openings marked (4) using.2 x 6 studs. Set studs to.
receive 5/8" coded GWB on kitchen side.
e. Furr down ceilings over bath tubs to conceal exposed plumbing.
f. Where necessary replace wood base along both sides of wall
where studded -up opening marked (3) occurs.
g. Install 5/8" coded GWB on inside and outside of transoms over
doors marked (2).
h. Install wood stud partition in first floor hall f_or.doors
marked (7).
i. Install wood base where needed in any area.not shown using
salvaged wood base materials.
j. Stud -up openings in baths to receive 1/2" GWB (where medicine
cabinets were removed).
k. Install wood sill and apron at windows (MK (1) thru (3).
2. Related work not part of this Section:
a. Painting .
b. Gypsum drywall.
3. All matrials to be supplied by others.-
4. Portions of the work specified here may have been installed.
SECTION G - Drywall.
l.. Scope of Work: Contractor shall furnish all labor, tools, equip-
ment and material (except as listed below) to install drywall in a work-
manlike manner as follows:
a. Cover openings marked (3) with 1/2" GWB on both sides and
feather to existing plaster.
b. Install 1/2"GWB on interior side of all new window openings
marked (1) thru (4) as required and feather to existing plaster.
C. Install 1/2 GWB on furring over tubs where necessary to cover
exposed; plumbing.
d. Install 1/2" GWB in baths where medicine cabinets have been
removed. (MK (8).
e. Install 5/8 fire coded GWB on both sides of openings marked (4).
Feather to existing plaster on kitchen side only. Cover on
hall side.
f. Install 5/8" fire coded GWB.on both sides of new partitions
in first floor hall at doors marked (7).
g. Fill or cover all small openings or gouges in existing plaster
to same plane as adjacent work.
h. Line interior areas under_ stairways where gas meters are in-
stalled with 5/8" fire coded GWB. z LAyEkt
4
i
I
SOCTION' G. (Continued)
2. All 1/2" and 5/8" fire coded GWB will be supplied by owner. Tape,
drywall compound and patching materials by this contractor.
3. Painter will be using a heavy textured paint to cover both new
and old walls and ceilings. This contractor shall leave his work so
patching will not be obvious after painting.
4. This contractor shall quote Items d. and f. separately, as this
work may be omitted.
SECTION H. Painting.
1. This work has been let.
SECTION I. Plumbing.
1. This work has been let.
SECTION J. Electric.
1. This work has been let.
SECTION K. Sequence of Work.
1. All work shall be in the following order, completing each and
proceeding to the next: Apartments 2, 7, 4, 9, 10, 3, 6, 8, 1 and 5.
2. No work shall be started prior to 8:00 am so as to cause as
little disturbance as possible to tenants.
5