HomeMy WebLinkAbout2551 McCracken Rd - (energy calcs)COMcheck Software Version COMcheckWeb
Envelope Compliance Certificate
Project Information
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
Construction Site:
2251 MCCRACKEN ROAD
SANFORD, Florida 32771
RE VV
��GENSF .0
90.1 (2019) Standard No 85240 N _
24528 PHD GAMES Eric ACross
Sanford, Florida �'
2a ��Q STATE OF
Alteration
ii/t/ I I I W\,��
Owner/Agent:
ALEX MESTDAGH
AIRPORT MCCRACKEN, LLC
280 W. CONTON AVENUE, SUITE
110
WINTER PARK, Florida 32789
407-702-6702
ALEX@M-WLAWFIRM.COM
Designer/Contractor:
ERIC CROSS, PE
C4 ARCHITECTURE LLC
135 W CENTRAL BLVD
ORLANDO, Florida 32801
407-363-6136
ECROSS@C4ARCH ITECTU RE.COM
Building Area
Floor Area
1-Office : Nonresidential
8616
2-Warehouse: Semiheated
72399
Envelope Assemblies
R-Value
Proposed
Max. Allowed
Post -Alteration Assembly
Cavity
Cont.
U-Factor SHGC
U-Factor SHGC
Roof: Insulation Entirely Above Deck, [Bldg. Use 1 -
---
25.0
0.039 ---
0.039 ---
Office]
NORTH
Ext. Wall: Solid Concrete, 8in. Thickness, Normal Density ,
13.0
0.0
0.142 ---
0.151 ---
Furring: Metal, [Bldg. Use 1 - Office]
SOUTH
Ext. Wall: Solid Concrete, 8in. Thickness,Normal Density ,
13.0
0.0
0.142 ---
0.151 ---
Furring: Metal, [Bldg. Use 1 - Office]
WEST
Ext. Wall: Solid Concrete, 8in. Thickness, Normal Density ,
13.0
0.0
0.142 ---
0.151 ---
Furring: Metal, [Bldg. Use 1 - Office]
Int. Wall: Steel -Framed, 24in. o.c., [Bldg. Use 1 - Office]
13.0
0.0
0.105 ---
0.124 ---
Envelope Compliance Statement
Compliance Statement. The proposed envelope alteration project represented in this document is consistent with the building
plans, specifications, and other calculations submitted with this permit application. The proposed envelope systems have been
designed to meet the 90.1 (2019) Standard requirements in COMcheck Version COMcheckWeb and to comply with any applicable
mandatory requirements listed in the Inspection Checklist.
Project Title: 24528 PHD GAMES Report date: 06/02/25
Data filename: Page 1 of 19
Name - Title Signature Date
Project Title: 24528 PHD GAMES Report date: 06/02/25
Data filename: Page 2 of 19
6�(
COMcheck Software Version COMcheckWeb
Interior Lighting Compliance Certificate
Project Information
Energy Code:
Project Title:
Project Type:
Construction Site:
2251 MCCRACKEN ROAD
SANFORD, Florida 32771
90.1 (2019) Standard
24528 PHD GAMES
Alteration
Allowed Interior Lighting Power
Owner/Agent:
ALEX MESTDAGH
AIRPORT MCCRACKEN, LLC
280 W. CONTON AVENUE, SUITE
110
WINTER PARK, Florida 32789
407-702-6702
ALEX@M-WLAWFIRM.COM
A
Area Category
Designer/Contractor:
ERIC CROSS, PE
C4 ARCHITECTURE LLC
135 W CENTRAL BLVD
ORLANDO, Florida 32801
407-363-6136
ECROSS@C4ARCH ITECTU RE.COM
B C D
Floor Area Allowed Allowed Watts
(ft2) Watts / ft2
1-Common Space Types:Office - Open Plan
8616
0.61
5256
Total Allowed Watts =
5256
Proposed Interior Lighting Power
A
B
C D
E
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
Lamps/
# of Fixture
(C X D)
Fixture
Fixture Watt.
Common Space Types: Office - Open Plan (8616 sq.ft.)
LED: LED Panel 33W:
1
32 30
976
LED: LED Panel 40W:
1
77 39
3026
LED: LED Panel 60W:
1
3 59
178
LED: LED Panel 44W:
1
15 44
664
Total Proposed Watts =
4844
Interior Lighting Compliance
Statement
Compliance Statement. The proposed interior lighting alteration project represented in this document is consistent with the
building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting
systems have been designed to meet the 90.1 (2019) Standard requirements in COMcheck Version COMcheckWeb and to comply
with any applicable mandatory requirements listed in the Inspection Checklist.
Name - Title
Signature
Date
Project Title: 24528 PHD GAMES Report date: 06/02/25
Data filename: Page 3 of 19
6�(
COMcheck Software Version COMcheckWeb
Exterior Lighting Compliance Certificate
Project Information
Energy Code:
Project Title:
Project Type:
Exterior Lighting Zone
Construction Site:
2251 MCCRACKEN ROAD
SANFORD, Florida 32771
90.1 (2019) Standard
24528 PHD GAMES
Alteration
0 (Unspecified)
Owner/Agent:
ALEX MESTDAGH
AIRPORT MCCRACKEN, LLC
280 W. CONTON AVENUE, SUITE
110
WINTER PARK, Florida 32789
407-702-6702
ALEX@M-WLAWFIRM.COM
Allowed Exterior Lighting Power
A
Area/Surface Category
B
Quantity
Designer/Contractor:
ERIC CROSS, PE
C4 ARCHITECTURE LLC
135 W CENTRAL BLVD
ORLANDO, Florida 32801
407-363-6136
ECROSS@C4ARCH ITECTU RE.COM
C D E
Allowed Tradable Allowed Watts
Watts / Wattage (B X C)
Total Tradable Watts (a) = 0
Total Allowed Watts = 0
Total Allowed Supplemental Watts (b) = 350
(a) Wattage tradeoffs are only allowed between tradable areas/surfaces.
(b) A supplemental allowance equal to 350 watts may be applied toward compliance of both non -tradable and tradable
areas/surfaces.
Proposed Exterior Lighting Power
Project Title: 24528 PHD GAMES Report date: 06/02/25
Data filename: Page 4 of 19
6�(
COMcheck Software Version COMcheckWeb
Mechanical Compliance Certificate
Project Information
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
Construction Site:
2251 MCCRACKEN ROAD
SANFORD, Florida 32771
Mechanical Systems List
Quantity System Type & Description
90.1 (2019) Standard
24528 PHD GAMES
Sanford, Florida
2a
Alteration
Owner/Agent:
ALEX MESTDAGH
AIRPORT MCCRACKEN, LLC
280 W. CONTON AVENUE, SUITE
110
WINTER PARK, Florida 32789
407-702-6702
ALEX@M-WLAWFIRM.COM
Designer/Contractor:
ERIC CROSS, PE
C4 ARCHITECTURE LLC
135 W CENTRAL BLVD
ORLANDO, Florida 32801
407-363-6136
ECROSS@C4ARCH ITECTU RE.COM
HVAC System
Heating: 1 each - Central Furnace, Electric, Capacity = 78 kBtu/h
No minimum efficiency requirement applies
Cooling: 1 each - Single Package DX Unit, Capacity = 108 kBtu/h, Air -Cooled Condenser, Air Economizer
Proposed Efficiency = 12.40 EER, Required Efficiency = 11.20 EER
Proposed Part Load Efficiency = 17.20 IEER, Required Part Load Efficiency = 14.80 IEER
SYSTEM VERIFICATION REQUIRED.
HVAC System
Heating: 1 each - Central Furnace, Electric, Capacity = 36 kBtu/h
No minimum efficiency requirement applies
Cooling: 1 each - Single Package DX Unit, Capacity = 50 kBtu/h, Air -Cooled Condenser
Proposed Efficiency = 16.80 SEER2, Required Efficiency = 13.40 SEER2
Proposed Part Load Efficiency = 0.00 , Required Part Load Efficiency = 0.00
SYSTEM VERIFICATION REQUIRED.
HVAC System
Heating: 1 each - Central Furnace, Electric, Capacity = 78 kBtu/h
No minimum efficiency requirement applies
Cooling: 1 each - Single Package DX Unit, Capacity = 88 kBtu/h, Air -Cooled Condenser, Air Economizer
Proposed Efficiency = 12.40 EER, Required Efficiency = 11.20 EER
Proposed Part Load Efficiency = 17.70 IEER, Required Part Load Efficiency = 14.80 IEER
SYSTEM VERIFICATION REQUIRED.
HVAC System
Heating: 1 each - Central Furnace, Electric, Capacity = 39 kBtu/h
No minimum efficiency requirement applies
Cooling: 1 each - Single Package DX Unit, Capacity = 39 kBtu/h, Air -Cooled Condenser
Proposed Efficiency = 12.40 SEER2, Required Efficiency = 13.40 SEER2
Proposed Part Load Efficiency = 17.70 , Required Part Load Efficiency = 0.00
SYSTEM COMPLIANCE FAILS: PROPOSED EFFICIENCY FAILS TO MEET CODE REQUIREMENTS.
Water Heater
Electric Instantaneous Water Heater, Capacity: 1 gallons
No minimum efficiency requirement applies
SWH COMPLIANCE REQUIRED.
Project Title: 24528 PHD GAMES Report date: 06/02/25
Data filename: Page 5 of 19
Quantity System Type & Description
Water Heater
Electric Storage Water Heater, Capacity: 20 gallons
Proposed Efficiency: 1.65 SL, %/h (if > 12 kW), Required Efficiency: 1.65 SL, %/h (if > 12 kW)
SWH COMPLIANCE REQUIRED.
Project Title: 24528 PHD GAMES Report date: 06/02/25
Data filename: Page 6 of 19
COMcheck Software Version COMcheckWeb
Inspection Checklist
Energy Code: 90.1 (2019) Standard
Requirements: 0.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
#
Plan Review
Complies?
Comments/Assumptions
& Req.ID
4.2.2,
Plans and/or specifications provide all
❑Complies
5.4.3.1.1,
information with which compliance
❑Does Not
5.7
can be determined for the building
❑Not Observable
[PR1]1
envelope and document where
❑Not Applicable
exceptions to the standard are
claimed.
4.2.2,
Plans, specifications, and/or
❑Complies
6.4.4.2.1,
calculations provide all information
❑Does Not
6.7.2
with which compliance can be
❑Not Observable
[PR2]1
determined for the mechanical
❑Not Applicable
systems and equipment and
document where exceptions to the
standard are claimed. Load
calculations per acceptable
engineering standards and
handbooks.
4.2.2,
Plans, specifications, and/or
❑Complies
7.7.1,
calculations provide all information
❑Does Not
10.4.2
with which compliance can be
❑Not Observable
[PR311
determined for the service water
❑Not Applicable
heating systems and equipment and
document where exceptions to the
standard are claimed. Hot water
system sized per manufacturer's
sizing guide.
4.2.2,
Plans, specifications, and/or
❑Complies
8.4.1.1,
calculations provide all information
❑Does Not
8.4.1.2,
with which compliance can be
❑Not Observable
8.7
determined for the electrical systems
❑Not Applicable
[PR6]2
and equipment and document where
exceptions are claimed. Feeder
connectors sized in accordance with
approved plans and branch circuits
sized for maximum drop of 3%.
4.2.2,
Plans, specifications, and/or
❑Complies
9.4.3, 9.7
calculations provide all information
❑Does Not
[PR4]1
with which compliance can be
❑Not Observable
determined for the interior lighting
❑Not Applicable
and electrical systems and equipment
and document where exceptions to
the standard are claimed. Information
provided should include interior
lighting power calculations, wattage of
bulbs and ballasts, transformers and
control devices.
1 1 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 Low Impact (Tier 3)
Project Title: 24528 PHD GAMES Report date: 06/02/25
Data filename: Page 7 of 19
Plan Review
4.2.5.2
Commissioning shall be performed as
LJComplies
[PR5]1
stated in Sections 5.9.2, 6.9.2, 7.9.2,
!❑Does Not
8.9.2, 9.9.2, 10.9.2, 11.2(d), and
Observable
G1.2.1(c). Commissioning must utilize
;❑Not
ASHRAE/IES Standard 202 or other
:❑Not Applicable
generally accepted engineering
standards acceptable to the building
official. FPT and verification
requirements for commissioning are
as stated in Section 4.2.5.1.
Commissioning shall document
compliance of the building systems,
controls, and building envelope with
required provisions of this standard.
Commissioning requirements shall be
incorporated into the construction
documents.
5.5.4.2.3
In buildings > 2,500 ft2, any enclosed
;❑Complies
[PR7]2
spaces directly under a roof with
:❑Does Not
ceiling heights > 15 ft. and used as an
Observable
office, lobby, atrium, concourse,
,❑Not
corridor, storage (including
;❑Not Applicable
nonrefrigerated warehouse),
gymnasium, fitness/exercise area,
playing area, gymnasium seating
area, convention exhibit/event space,
courtroom, automotive service, fire
station engine room, manufacturing
corridor/transition and bay areas,
retail, library reading and stack areas,
distribution/sorting area,
transportation baggage and seating
areas, or workshop, the following
requirements apply: The daylight zone
under skylights is >= half the floor
area and (a) the skylight area to
daylight zone is >= 3 percent with a
skylight VT >= 0.40 or (b) the
minimum skylight effective aperture
>= 1 percent. The skylights have a
measured haze value > 90 percent.
Additional Comments/Assumptions:
111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3)
Project Title: 24528 PHD GAMES Report date: 06/02/25
Data filename: Page 8 of 19
Section
#
& Req.ID
Footing / Foundation
Inspection
Plans Verified
Value
Field Verified
Value
Complies.
Comments/Assumptions
4.2.4
Installed below -grade wall R-
R-
❑Complies See the Envelope Assemblies
[FO1]2
insulation type and R-value
❑Does Not table for values.
consistent with insulation
[]Not Observable
specifications reported in plans
Applicable
and COMcheck reports.❑Not
4.2.4
Installed slab -on -grade insulation R-
R-❑Complies
;see the EnvelopeAssemblies
[FO3]2
type and R-value consistent with ❑ Unheated
❑ Unheated
;❑Does Not ;table for values.
insulation specifications reported ❑ Heated
❑ Heated
❑Not Observable
in plans and COMcheck reports.
❑Not Applicable
5.8.1.7
Exterior insulation protected
[FO6]1
against damage, sunlight,
moisture, wind, landscaping and
equipment maintenance
activities.
5.8.1.7.3
Insulation in contact with the
[FO7]1
ground has <=0.3% water
absorption rate per ASTM C272.
6.4.3.7 Freeze protection and snow/ice
[FO9]3 melting system sensors for future
connection to controls.
Additional Comments/Assumptions:
JLJComplies
❑Does Not
❑Not Observable
❑Not Applicable
❑Complies
❑Does Not
❑Not Observable
❑Not Applicable
❑Complies
❑Does Not
❑Not Observable
❑Not Applicable
111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3)
Project Title: 24528 PHD GAMES Report date: 06/02/25
Data filename: Page 9 of 19
Section
#
Framing / Rough -In Inspection
Plans Verified
Value
Field Verified
Value
Complies?
Comments/Assumptions
& Req.ID
5.4.3.2
Factory -built and site -assembled
❑Complies
[FR1]3
fenestration and doors are
❑Does Not
labeled or certified as meeting air
❑Not Observable
leakage requirements.
EL
❑Not Applicable
5.5.4.3a
Vertical fenestration U-Factor.
U- U-
❑Complies
See the Envelope assemblies
[FR8]1
❑Does Not
table for values.
❑Not Observable
❑Not Applicable
5.5.4.3b
Skylight fenestration U-Factor.
U- U-
❑Complies
See the Envelope Assemblies
[FR9]1
❑Does Not
table for values.
❑Not Observable
❑Not Applicable
5.5.4.4.1
Vertical fenestration SHGC value.
SHGC: SHGC:
❑Complies
See the Envelope Assemblies
[FR10]1
❑Does Not
table for values.
❑Not Observable
❑Not Applicable
5.5.4.4.2
Skylight SHGC value.
SHGC: SHGC:
❑Complies
See the Envelope Assemblies
[FR11]1
❑Does Not
table for values.
❑Not Observable
❑Not Applicable
5.8.2.1,
Fenestration products rated (U-
❑Complies
5.8.2.3,
factor, SHGC, and VT) in
❑Does Not
5.8.2.4,
accordance with NFRC or energy
❑Not Observable
5.8.2.5
code defaults are used.
❑Not Applicable
[FR12]2
5.8.2.2
Fenestration and door products
❑Complies
[FR13]1
are labeled, or a signed and
❑Does Not
dated certificate listing the U
❑Not Observable
factor, SHGC, VT, and air leakage
❑Not Applicable
rate has been provided by the
manufacturer.
5.5.3.6
U-factor of opaque doors
U- U-
❑Complies
See the Envelope Assemblies
[FR14]2
associated with the building
❑ Swinging ❑ Swinging
❑Does Not
table for values.
thermal envelope meets
❑ Nonswinging ❑ Nonswinging
❑Not Observable
requirements.
❑Not Applicable
5.4.3.1
Continuous air barrier is
'❑Complies
r
[FR15]1
wrapped, sealed, caulked,
❑Does Not
gasketed, and/or taped in an
❑Not Observable
approved manner, except in
❑Not Applicable
semiheated spaces in climate
zones 1-6.
Additional Comments/Assumptions:
111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3)
Project Title: 24528 PHD GAMES Report date: 06/02/25
Data filename: Page 10 of 19
Section
#
Plumbing Rough -In Inspection
Complies?
Comments/Assumptions
& Req.ID
7.4.4.1
Temperature controls installed on
❑Complies
[PL2]3
service water heating systems
PDoes Not
(<=120°F to maximum temperature
:❑Not Observable
for intended use).
❑Not Applicable
7.4.6 Heat traps installed on non -circulating ;❑Complies
[PL4]3 storage water tanks. :❑Does Not
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3)
Project Title: 24528 PHD GAMES Report date: 06/02/25
Data filename: Page 11 of 19
section
#
Mechanical Rough -In
Plans Verified
Field Verified
Complies.
Comments/Assumptions
& Req.ID
Inspection
Value
Value
6.4.1.4,
HVAC equipment efficiency Efficiency:
Efficiency: ❑Complies
See the Mechanical Systems list
6.4.1.5
verified. Non-NAECA HVAC
❑Does Not
for values.
[ME1]2
equipment labeled as meeting
❑Not Observable
90.1. ;
❑Not Applicable
6.4.3.4.1
Stair and elevator shaft vents
ILJComplies
[ME3]3
have motorized dampers that
❑Does Not
automatically close.
❑Not Observable
❑Not Applicable
6.4.3.4.5
Enclosed parking garage
❑Complies
[ME39]3
ventilation has automatic
❑Does Not
contaminant detection and
❑Not Observable
capacity to stage or modulate
❑Not Applicable
fans to 50% or less of design
capacity.
6.4.3.4.4
Ventilation fans >0.75 hp have
❑Complies
[ME5]3
automatic controls to shut off fan
❑Does Not
when not required.
❑Not Observable
❑Not Applicable
6.4.3.8
Demand control ventilation
❑Complies
[ME6]1
provided for spaces >500 ft2 and
❑Does Not
>25 people/1000 ft2 occupant
❑Not Observable
density and served by systems
❑Not Applicable
with air side economizer, auto
modulating outside air damper
control, or design airflow >3,000
cfm.
6.5.3.2.1
DX cooling systems >= 75 kBtu/h❑Complies
See the Mechanical Systems list
[ME40]2
(>= 65 kBtu/h effective 1/2016)
❑Does Not
for values.
and chilled -water and
❑Not Observable
evaporative cooling fan motor hp
❑Not Applicable
>= 1/4 designed to vary supply
fan airflow as a function of load
and comply with operational
requirements.
6.4.4.1.1
Insulation exposed to weather
❑Complies
[ME7]3
protected from damage.
❑Does Not
Insulation outside of the
❑Not Observable
conditioned space and associated
❑Not Applicable
with cooling systems is vapor
retardant.
4
6.4.4.1.2
HVAC ducts and plenums R-
R-❑Complies
[ME8]2
insulated per Table 6.8.2. Where
❑Does Not
ducts or plenums are installed in
❑Not Observable
or under a slab, verification may
❑Not Applicable
need to occur during Foundation
Inspection.
6.4.4.1.3
HVAC piping insulation thickness. in.
in.❑Complies
[ME9]2
Where piping is installed in or
❑Does Not
under a slab, verification may
❑Not Observable
need to occur during Foundation
❑Not Applicable
Inspection.
6.4.4.1.4
Thermally ineffective panel
❑Complies
[ME41]3
surfaces of sensible heating
❑Does Not
panels have insulation >= R-3.5.
❑Not Observable
❑Not Applicable
6.4.4.2.1
Ducts and plenums having
❑Complies
[ME10]2
pressure class ratings are Seal
❑Does Not
Class A construction.
❑Not Observable Lt
❑Not Applicable
;
111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3)
Project Title: 24528 PHD GAMES Report date: 06/02/25
Data filename: Page 12 of 19
section
#
Mechanical Rough -In
Plans Verified
Field Verified
Complies.
Comments/Assumptions
& Req.ID
Inspection
Value
Value
6.8.1-15,
Electrically operated DX-DOAS
❑Complies
6.8.1-16
units meet requirements per
❑Does Not
[ME110]2
Tables 6.8.1-15 or 6.8.1-16.
❑Not Observable
❑Not Applicable
6.4.4.2.2
Ductwork operating >3 in. water
❑Complies
[ME11]3
column requires air leakage
❑Does Not '
testing.
❑Not Observable
❑Not Applicable
6.5.1.5
Economizer operation will not
❑Complies
[ME16]1
increase heating energy use
❑Does Not
during normal operation.
❑Not Observable
❑Not Applicable
6.5.2.3
Dehumidification controls
❑Complies
[ME19]3
provided to prevent reheating,
❑Does Not
recooling, mixing of hot and cold
❑Not Observable
airstreams or concurrent heating
❑Not Applicable
and cooling of the same
airstream.
6.5.2.4.1
Humidifiers with airstream
❑Complies
[ME68]3
mounted preheating jackets have
❑Does Not
preheat auto -shutoff value set to
❑Not Observable
activate when humidification is
❑Not Applicable
not required.
6.5.2.4.2
Humidification system dispersion
❑Complies
[ME69]3
tube hot surfaces in the
❑Does Not
airstreams of ducts or air
❑Not Observable
handling units insulated >= R
❑Not Applicable
0.5.
6.5.2.5
Preheat coils controlled to stop
❑Complies
[ME70]3
heat output whenever
❑Does Not
mechanical cooling, including
❑Not Observable
economizer operation, is active.
❑Not Applicable
6.5.2.6
Units that provide ventilation air
❑Complies
[ME106]3
to multiple zones and operate in
❑Does Not
conjunction with zone heating
❑Not Observable
and cooling systems are
❑Not Applicable
prevented from using heating or
heat recovery to warm supply air
above 60oF when representative
building loads or outdoor air
temperature indicate that most
zones demand cooling.
6.5.3.3
Multiple zone VAV systems with
❑Complies see the Mechanical systems list
[ME42]3
DDC of individual zone boxes
❑Does Not for values.
have static pressure setpoint
❑Not Observable
reset controls.
❑Not Applicable
6.5.4.2
HVAC pumping systems with >_
❑Complies
[ME25]3
3 control values designed for
❑Does Not
variable fluid flow (see section
❑ Not Observable
details).
❑Not Applicable
6.5.7.2.1
Kitchen hoods >5,000 cfm have
❑Complies
[ME32]2
make up air >=50% of exhaust
❑Does Not
air volume.
❑Not Observable
❑Not Applicable
111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3)
Project Title: 24528 PHD GAMES Report date: 06/02/25
Data filename: Page 13 of 19
section
#
Mechanical Rough -In
Plans Verified
Field Verified
Complies.
Comments/Assumptions
& Req.ID
Inspection
Value
Value
6.5.7.2.4
Approved field test used to
❑Complies
[ME49]3
evaluate design air flow rates
❑Does Not
and demonstrate proper capture
❑Not Observable
and containment of kitchen
❑Not Applicable
exhaust systems.
6.5.8.1
Unenclosed spaces that are
❑Complies
[ME34]2
heated use only radiant heat.
❑Does Not
❑Not Observable
❑Not Applicable
6.5.9
Hot gas bypass limited to: <=240
❑Complies
[ME35]1
kBtu/h - 15% >240 kBtu/h - 10%
❑Does Not
❑Not Observable
❑Not Applicable
7.4.2
Service water heating equipment
❑Complies
[ME36]2
meets efficiency requirements.
❑Does Not
❑Not Observable
❑Not Applicable
6.4.3.9
Heating for vestibules and air
❑Complies
[ME63]2
curtains with integral heating
❑Does Not
include automatic controls that
❑Not Observable
shut off the heating system when
❑Not Applicable
outdoor air temperatures > 45F.
Vestibule heating and cooling
systems controlled by a
thermostat in the vestibule with
heating setpoint <= 60F and
cooling setpoint >= 80F.
6.5.10
Doors separating conditioned
❑Complies
[ME73]3
space from the outdoors have
❑Does Not
controls that disable/reset
❑Not Observable
heating and cooling system when
❑Not Applicable
open.
Additional Comments/Assumptions:
111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3)
Project Title: 24528 PHD GAMES Report date: 06/02/25
Data filename: Page 14 of 19
Section
#
& Req.ID
Rough -In Electrical Inspection
Complies?
Comments/Assumptions
8.4.2
At least 50% of all 125 volt 15- and
❑Complies
[EL10]2
20-Amp receptacles are controlled by
!❑Does Not
an automatic control device.
;❑Not Observable'
❑Not Applicable
8.4.3
!New buildings have electrical energy
;❑Complies
[EL11]2
,use measurement devices installed.
:❑Does Not
Where tenant spaces exist, each
:❑Not Observable
tenant is monitored separately. In
buildings with a digital control system
❑Not Applicable
the energy use is transmitted to to
control system and displayed
graphically.
9.4.1.1
Automatic control requirements
;❑Complies
[EL1]2
prescribed in Table 9.6.1, for the
:❑Does Not
appropriate space type, are installed.
Observable
Mandatory lighting controls (labeled
'REQ')
:❑Not
Applicable
as and optional choice controls
;❑Not
(labeled as 'ADD1' and 'ADD2') are
implemented.
9.4.1.1
Independent lighting controls installed
;❑Complies
[EL2]2
per approved lighting plans and all
:❑Does Not
manual controls readily accessible and
:❑Not Observable
visible to occupants.
❑Not Applicable
9.4.1.1f
Daylight areas under skylights and
;❑Complies
[EL13]1
roof monitors that have more than
{❑Does Not
150 W combined input power for
Observable
general lighting are controlled by
:❑Not
Applicable
photocontrols.
;❑Not
9.4.1.3
Separate lighting control devices for❑Complies
[EL4]1
specific uses installed per approved
:❑Does Not
lighting plans.
;❑Not Observable
❑Not Applicable
9.6.2 Additional interior lighting power
;❑Complies
[EL8]1 allowed for special functions per the
:❑Does Not
approved lighting plans and is
Observable
automatically controlled and
:❑Not
Applicable
separated from general lighting.
;❑Not
10.4.1 Electric motors meet requirements
[EL9]2 Iwhere applicable.
Additional Comments/Assumptions:
❑Complies
❑Does Not
'❑Not Observable
❑Not Applicable
111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 IlLow Impact (Tier 3)
Project Title: 24528 PHD GAMES Report date: 06/02/25
Data filename: Page 15 of 19
Section
#
Insulation Inspection
Plans Verified
Value
Field Verified
Value
Complies?
Comments/Assumptions
& Req.ID
4.2.4
Installed roof insulation type and
R- R-
❑Complies See the Envelope Assemblies
[IN2]1
R value consistent with insulation
❑ Above deck ❑ Above deck
❑Does Not table for values.
specifications reported in plans
❑ Metal ❑ Metal
❑Not Observable
and COMcheck reports. For some
ceiling systems, verification may
I Attic Attic
! ❑ ❑
❑Not Applicable
need to occur during Framing
Inspection.
5.8.1.2,
Roof insulation installed per
❑Complies
5.8.1.3
manufacturer's instructions.
❑Does Not
[IN3)1
Blown or poured loose -fill
❑Not Observable
insulation is installed only where
❑Not Applicable
the ceiling slope is <= 3:12.
4.2.4
Installed above -grade wall
R- R-❑Complies
;See the Envelope Assemblies
[IN6]1
insulation type and R-value
❑ Mass ❑ Mass
:❑Does Not ;table for values.
consistent with insulation
❑ Metal ❑ Metal
:❑Not Observable
specifications reported in plans
and COMcheck reports.
❑ Steel ❑Steel
❑Not Applicable
❑ Wood ❑ Wood
5.8.1.2
I
Above -grade wall insulation
I
I
I
I
❑Complies
[IN7]1
installed per manufacturer's
❑Does Not
instructions.
❑Not Observable
FW
❑Not Applicable
4.2.4 ,Installed
floor insulation type and
R- R-❑Complies
;see the Envelope Assemblies
[IN8]2
R-value consistent with insulation
❑ Mass ❑ Mass❑Does
Not ;table for values.
:specifications reported in plans
❑ Steel ❑ Steel
;❑Not Observable
and COMcheck reports.
❑ Wood ❑ I Wood ;❑Not
I
Applicable
I
5.8.1.1
Building envelope insulation is
T❑Complies
[IN10]2
labeled with R-value or insulation
❑Does Not
certificate has been provided
❑Not Observable
listing R-value and other relevant
data.
❑Not Applicable ;
5.8.1.9
Building envelope insulation
❑Complies ;
[IN18]2
extends over the full area of the
❑Does Not
component at the proposed rated
❑Not Observable
R or U value.
❑Not Applicable
5.8.1.4
Eaves are baffled to deflect air to
❑Complies
[IN11]2
above the insulation.
❑Does Not
l❑Not
Observable
❑Not Applicable
5.8.1.5
!Insulation is installed in
❑Complies
[IN12]2
substantial contact with the
❑Does Not
inside surface separating
❑Not Observable
conditioned space from
unconditional space.
�❑Not
Applicable
5.8.1.6
Recessed equipment installed in
mommiElComplies
[IN13]2
building envelope assemblies
j
❑Does Not
does not compress the adjacent
❑Not Observable
insulation.
❑Not Applicable
5.8.1.7.1
Attics and mechanical rooms
❑Complies
[IN15]2
have insulation protected where
❑Does Not
adjacent to attic or equipment
❑Not Observable
access.
,❑Not
Applicable j
111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3)
Project Title: 24528 PHD GAMES Report date: 06/02/25
Data filename: Page 16 of 19
Section
#
Insulation Inspection
Plans Verified
Value
Field Verified
Value
Complies?
Comments/Assumptions
& Req.ID
5.8.1.7.2
Foundation vents do not interfere
❑Complies
[IN16]2
with insulation.
❑Does Not
❑Not Observable
❑Not Applicable
5.8.1.8
Insulation intended to meet the
❑Complies
[IN17]3
roof insulation requirements
❑Does Not
cannot be installed on top of a
❑Not Observable
suspended ceiling. Mark this
❑Not Applicable
requirement compliant if
insulation is installed accordingly.
Additional Comments/Assumptions:
111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3)
Project Title: 24528 PHD GAMES Report date: 06/02/25
Data filename: Page 17 of 19
Section
#
Final Inspection
Complies?
Comments/Assumptions
& Req.ID
5.4.3.3
Weatherseals installed on all loading
❑Complies
[Fl1]1
dock cargo doors in Climate Zones 4-
!❑Does Not
8.
❑Not Observable'
❑Not Applicable j
6.4.3.1.2
Thermostatic controls have a 5 °F
;❑Complies
[FI3]3
deadband.
:❑Does Not
'RNot Observable
❑Not Applicable
6.4.3.2
Temperature controls have setpoint
;❑Complies
[F120]3
overlap restrictions.
I❑Does Not
❑Not Observable
❑Not Applicable
6.4.3.3.1
HVAC systems equipped with at least
;❑Complies
[F121]3
one automatic shutdown control.
!❑Does Not
❑Not Observable
❑Not Applicable
6.4.3.3.2
Setback controls allow automatic
;❑Complies
[F122]3
restart and temporary operation as
:❑Does Not
required for maintenance.
UNot Observable
j❑Not Applicable
6.4.3.12
Air economizer has a fault detection
;❑Complies
[F1200]3
and diagnostics (FDD) system (see
UDoes Not
details for configuration and
operational requirements).
:❑Not Observable
❑Not Applicable
6.4.3.6
When humidification and
;❑Complies
[FI6]3
dehumidification are provided to a
j❑Does Not
zone, simultaneous operation is
Observable
prohibited. Humidity control prohibits
;❑Not
'❑Not Applicable
the use of fossil fuel or electricity to
produce RH > 30% in the warmest
zone humidified and RH < 60% in the
coldest zone dehumidified.
6.7.2.1
Furnished HVAC as -built drawings❑Complies
[FI7]3
submitted within 90 days of system
:❑Does Not
acceptance.
❑Not Observable
❑Not Applicable
6.7.2.2
Furnished O&M manuals for HVAC
;❑Complies
[F18]3
:systems within 90 days of system
:❑Does Not
;acceptance.
❑Not Observable
❑Not Applicable
6.7.2.3
An air and/or hydronic system
;❑Complies
[F19]1
balancing report is provided for HVAC
:❑Does Not
systems serving zones >5,000 ft2 of
I❑Not Observable
conditioned area.
❑Not Applicable
7.4.4.3
Public lavatory faucet water
;❑Complies
[FI11]3
temperature <=110°F.
:❑Does Not
❑Not Observable
❑Not Applicable
8.7.1
Furnished as -built drawings for
I❑Complies
[F116]3
electric power systems within 30 days
:❑Does Not
of system acceptance.
❑Not Observable
❑Not Applicable
111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3)
Project Title: 24528 PHD GAMES Report date: 06/02/25
Data filename: Page 18 of 19
Section
#
Final Inspection
Complies?
Comments/Assumptions
& Req.ID
8.7.2
Furnished O&M instructions for
❑Complies
[F117]3
systems and equipment to the
!❑Does Not
building owner or designated
:❑Not Observable',
representative.
❑Not Applicable
9.2.2.3 Interior installed lamp and fixture
;❑Complies
[FI18]1 lighting power is consistent with what
I❑Does Not
is shown on the approved lighting
❑Not Observable
plans, demonstrating proposed watts
❑Not Applicable
are less than or equal to allowed
watts.
9.4.4 At least 75% of all permanently❑Complies
[F120]1 installed lighting fixtures in dwelling
❑Does Not
units have >= 55 Im/W efficacy or a
Observable
>= 45 Im/W total luminaire efficacy.
j❑Not
❑Not Applicable
10.4.3 Elevators are designed with the
;❑Complies
[F124]2 proper lighting, ventilation power, and
!❑Does Not
standby mode.
❑Not Observable
T❑Not Applicable
7.4.3 First 8 ft of outlet piping in
❑Complies
[F145]2 nonrecirculating storage system, or
❑Does Not
branch piping connected to
❑Not Observable
recirculated, heat traced, or
impredance heated piping is
;❑Not Applicable
insulated.
Additional Comments/Assumptions:
See the Interior Lighting fixture schedule for values.
111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3)
Project Title: 24528 PHD GAMES Report date: 06/02/25
Data filename: Page 19 of 19