Loading...
HomeMy WebLinkAbout2551 McCracken Rd - (energy calcs)COMcheck Software Version COMcheckWeb Envelope Compliance Certificate Project Information Energy Code: Project Title: Location: Climate Zone: Project Type: Construction Site: 2251 MCCRACKEN ROAD SANFORD, Florida 32771 RE VV ��GENSF .0 90.1 (2019) Standard No 85240 N _ 24528 PHD GAMES Eric ACross Sanford, Florida �' 2a ��Q STATE OF Alteration ii/t/ I I I W\,�� Owner/Agent: ALEX MESTDAGH AIRPORT MCCRACKEN, LLC 280 W. CONTON AVENUE, SUITE 110 WINTER PARK, Florida 32789 407-702-6702 ALEX@M-WLAWFIRM.COM Designer/Contractor: ERIC CROSS, PE C4 ARCHITECTURE LLC 135 W CENTRAL BLVD ORLANDO, Florida 32801 407-363-6136 ECROSS@C4ARCH ITECTU RE.COM Building Area Floor Area 1-Office : Nonresidential 8616 2-Warehouse: Semiheated 72399 Envelope Assemblies R-Value Proposed Max. Allowed Post -Alteration Assembly Cavity Cont. U-Factor SHGC U-Factor SHGC Roof: Insulation Entirely Above Deck, [Bldg. Use 1 - --- 25.0 0.039 --- 0.039 --- Office] NORTH Ext. Wall: Solid Concrete, 8in. Thickness, Normal Density , 13.0 0.0 0.142 --- 0.151 --- Furring: Metal, [Bldg. Use 1 - Office] SOUTH Ext. Wall: Solid Concrete, 8in. Thickness,Normal Density , 13.0 0.0 0.142 --- 0.151 --- Furring: Metal, [Bldg. Use 1 - Office] WEST Ext. Wall: Solid Concrete, 8in. Thickness, Normal Density , 13.0 0.0 0.142 --- 0.151 --- Furring: Metal, [Bldg. Use 1 - Office] Int. Wall: Steel -Framed, 24in. o.c., [Bldg. Use 1 - Office] 13.0 0.0 0.105 --- 0.124 --- Envelope Compliance Statement Compliance Statement. The proposed envelope alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed envelope systems have been designed to meet the 90.1 (2019) Standard requirements in COMcheck Version COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Project Title: 24528 PHD GAMES Report date: 06/02/25 Data filename: Page 1 of 19 Name - Title Signature Date Project Title: 24528 PHD GAMES Report date: 06/02/25 Data filename: Page 2 of 19 6�( COMcheck Software Version COMcheckWeb Interior Lighting Compliance Certificate Project Information Energy Code: Project Title: Project Type: Construction Site: 2251 MCCRACKEN ROAD SANFORD, Florida 32771 90.1 (2019) Standard 24528 PHD GAMES Alteration Allowed Interior Lighting Power Owner/Agent: ALEX MESTDAGH AIRPORT MCCRACKEN, LLC 280 W. CONTON AVENUE, SUITE 110 WINTER PARK, Florida 32789 407-702-6702 ALEX@M-WLAWFIRM.COM A Area Category Designer/Contractor: ERIC CROSS, PE C4 ARCHITECTURE LLC 135 W CENTRAL BLVD ORLANDO, Florida 32801 407-363-6136 ECROSS@C4ARCH ITECTU RE.COM B C D Floor Area Allowed Allowed Watts (ft2) Watts / ft2 1-Common Space Types:Office - Open Plan 8616 0.61 5256 Total Allowed Watts = 5256 Proposed Interior Lighting Power A B C D E Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D) Fixture Fixture Watt. Common Space Types: Office - Open Plan (8616 sq.ft.) LED: LED Panel 33W: 1 32 30 976 LED: LED Panel 40W: 1 77 39 3026 LED: LED Panel 60W: 1 3 59 178 LED: LED Panel 44W: 1 15 44 664 Total Proposed Watts = 4844 Interior Lighting Compliance Statement Compliance Statement. The proposed interior lighting alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been designed to meet the 90.1 (2019) Standard requirements in COMcheck Version COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Project Title: 24528 PHD GAMES Report date: 06/02/25 Data filename: Page 3 of 19 6�( COMcheck Software Version COMcheckWeb Exterior Lighting Compliance Certificate Project Information Energy Code: Project Title: Project Type: Exterior Lighting Zone Construction Site: 2251 MCCRACKEN ROAD SANFORD, Florida 32771 90.1 (2019) Standard 24528 PHD GAMES Alteration 0 (Unspecified) Owner/Agent: ALEX MESTDAGH AIRPORT MCCRACKEN, LLC 280 W. CONTON AVENUE, SUITE 110 WINTER PARK, Florida 32789 407-702-6702 ALEX@M-WLAWFIRM.COM Allowed Exterior Lighting Power A Area/Surface Category B Quantity Designer/Contractor: ERIC CROSS, PE C4 ARCHITECTURE LLC 135 W CENTRAL BLVD ORLANDO, Florida 32801 407-363-6136 ECROSS@C4ARCH ITECTU RE.COM C D E Allowed Tradable Allowed Watts Watts / Wattage (B X C) Total Tradable Watts (a) = 0 Total Allowed Watts = 0 Total Allowed Supplemental Watts (b) = 350 (a) Wattage tradeoffs are only allowed between tradable areas/surfaces. (b) A supplemental allowance equal to 350 watts may be applied toward compliance of both non -tradable and tradable areas/surfaces. Proposed Exterior Lighting Power Project Title: 24528 PHD GAMES Report date: 06/02/25 Data filename: Page 4 of 19 6�( COMcheck Software Version COMcheckWeb Mechanical Compliance Certificate Project Information Energy Code: Project Title: Location: Climate Zone: Project Type: Construction Site: 2251 MCCRACKEN ROAD SANFORD, Florida 32771 Mechanical Systems List Quantity System Type & Description 90.1 (2019) Standard 24528 PHD GAMES Sanford, Florida 2a Alteration Owner/Agent: ALEX MESTDAGH AIRPORT MCCRACKEN, LLC 280 W. CONTON AVENUE, SUITE 110 WINTER PARK, Florida 32789 407-702-6702 ALEX@M-WLAWFIRM.COM Designer/Contractor: ERIC CROSS, PE C4 ARCHITECTURE LLC 135 W CENTRAL BLVD ORLANDO, Florida 32801 407-363-6136 ECROSS@C4ARCH ITECTU RE.COM HVAC System Heating: 1 each - Central Furnace, Electric, Capacity = 78 kBtu/h No minimum efficiency requirement applies Cooling: 1 each - Single Package DX Unit, Capacity = 108 kBtu/h, Air -Cooled Condenser, Air Economizer Proposed Efficiency = 12.40 EER, Required Efficiency = 11.20 EER Proposed Part Load Efficiency = 17.20 IEER, Required Part Load Efficiency = 14.80 IEER SYSTEM VERIFICATION REQUIRED. HVAC System Heating: 1 each - Central Furnace, Electric, Capacity = 36 kBtu/h No minimum efficiency requirement applies Cooling: 1 each - Single Package DX Unit, Capacity = 50 kBtu/h, Air -Cooled Condenser Proposed Efficiency = 16.80 SEER2, Required Efficiency = 13.40 SEER2 Proposed Part Load Efficiency = 0.00 , Required Part Load Efficiency = 0.00 SYSTEM VERIFICATION REQUIRED. HVAC System Heating: 1 each - Central Furnace, Electric, Capacity = 78 kBtu/h No minimum efficiency requirement applies Cooling: 1 each - Single Package DX Unit, Capacity = 88 kBtu/h, Air -Cooled Condenser, Air Economizer Proposed Efficiency = 12.40 EER, Required Efficiency = 11.20 EER Proposed Part Load Efficiency = 17.70 IEER, Required Part Load Efficiency = 14.80 IEER SYSTEM VERIFICATION REQUIRED. HVAC System Heating: 1 each - Central Furnace, Electric, Capacity = 39 kBtu/h No minimum efficiency requirement applies Cooling: 1 each - Single Package DX Unit, Capacity = 39 kBtu/h, Air -Cooled Condenser Proposed Efficiency = 12.40 SEER2, Required Efficiency = 13.40 SEER2 Proposed Part Load Efficiency = 17.70 , Required Part Load Efficiency = 0.00 SYSTEM COMPLIANCE FAILS: PROPOSED EFFICIENCY FAILS TO MEET CODE REQUIREMENTS. Water Heater Electric Instantaneous Water Heater, Capacity: 1 gallons No minimum efficiency requirement applies SWH COMPLIANCE REQUIRED. Project Title: 24528 PHD GAMES Report date: 06/02/25 Data filename: Page 5 of 19 Quantity System Type & Description Water Heater Electric Storage Water Heater, Capacity: 20 gallons Proposed Efficiency: 1.65 SL, %/h (if > 12 kW), Required Efficiency: 1.65 SL, %/h (if > 12 kW) SWH COMPLIANCE REQUIRED. Project Title: 24528 PHD GAMES Report date: 06/02/25 Data filename: Page 6 of 19 COMcheck Software Version COMcheckWeb Inspection Checklist Energy Code: 90.1 (2019) Standard Requirements: 0.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # Plan Review Complies? Comments/Assumptions & Req.ID 4.2.2, Plans and/or specifications provide all ❑Complies 5.4.3.1.1, information with which compliance ❑Does Not 5.7 can be determined for the building ❑Not Observable [PR1]1 envelope and document where ❑Not Applicable exceptions to the standard are claimed. 4.2.2, Plans, specifications, and/or ❑Complies 6.4.4.2.1, calculations provide all information ❑Does Not 6.7.2 with which compliance can be ❑Not Observable [PR2]1 determined for the mechanical ❑Not Applicable systems and equipment and document where exceptions to the standard are claimed. Load calculations per acceptable engineering standards and handbooks. 4.2.2, Plans, specifications, and/or ❑Complies 7.7.1, calculations provide all information ❑Does Not 10.4.2 with which compliance can be ❑Not Observable [PR311 determined for the service water ❑Not Applicable heating systems and equipment and document where exceptions to the standard are claimed. Hot water system sized per manufacturer's sizing guide. 4.2.2, Plans, specifications, and/or ❑Complies 8.4.1.1, calculations provide all information ❑Does Not 8.4.1.2, with which compliance can be ❑Not Observable 8.7 determined for the electrical systems ❑Not Applicable [PR6]2 and equipment and document where exceptions are claimed. Feeder connectors sized in accordance with approved plans and branch circuits sized for maximum drop of 3%. 4.2.2, Plans, specifications, and/or ❑Complies 9.4.3, 9.7 calculations provide all information ❑Does Not [PR4]1 with which compliance can be ❑Not Observable determined for the interior lighting ❑Not Applicable and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. 1 1 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 Low Impact (Tier 3) Project Title: 24528 PHD GAMES Report date: 06/02/25 Data filename: Page 7 of 19 Plan Review 4.2.5.2 Commissioning shall be performed as LJComplies [PR5]1 stated in Sections 5.9.2, 6.9.2, 7.9.2, !❑Does Not 8.9.2, 9.9.2, 10.9.2, 11.2(d), and Observable G1.2.1(c). Commissioning must utilize ;❑Not ASHRAE/IES Standard 202 or other :❑Not Applicable generally accepted engineering standards acceptable to the building official. FPT and verification requirements for commissioning are as stated in Section 4.2.5.1. Commissioning shall document compliance of the building systems, controls, and building envelope with required provisions of this standard. Commissioning requirements shall be incorporated into the construction documents. 5.5.4.2.3 In buildings > 2,500 ft2, any enclosed ;❑Complies [PR7]2 spaces directly under a roof with :❑Does Not ceiling heights > 15 ft. and used as an Observable office, lobby, atrium, concourse, ,❑Not corridor, storage (including ;❑Not Applicable nonrefrigerated warehouse), gymnasium, fitness/exercise area, playing area, gymnasium seating area, convention exhibit/event space, courtroom, automotive service, fire station engine room, manufacturing corridor/transition and bay areas, retail, library reading and stack areas, distribution/sorting area, transportation baggage and seating areas, or workshop, the following requirements apply: The daylight zone under skylights is >= half the floor area and (a) the skylight area to daylight zone is >= 3 percent with a skylight VT >= 0.40 or (b) the minimum skylight effective aperture >= 1 percent. The skylights have a measured haze value > 90 percent. Additional Comments/Assumptions: 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: 24528 PHD GAMES Report date: 06/02/25 Data filename: Page 8 of 19 Section # & Req.ID Footing / Foundation Inspection Plans Verified Value Field Verified Value Complies. Comments/Assumptions 4.2.4 Installed below -grade wall R- R- ❑Complies See the Envelope Assemblies [FO1]2 insulation type and R-value ❑Does Not table for values. consistent with insulation []Not Observable specifications reported in plans Applicable and COMcheck reports.❑Not 4.2.4 Installed slab -on -grade insulation R- R-❑Complies ;see the EnvelopeAssemblies [FO3]2 type and R-value consistent with ❑ Unheated ❑ Unheated ;❑Does Not ;table for values. insulation specifications reported ❑ Heated ❑ Heated ❑Not Observable in plans and COMcheck reports. ❑Not Applicable 5.8.1.7 Exterior insulation protected [FO6]1 against damage, sunlight, moisture, wind, landscaping and equipment maintenance activities. 5.8.1.7.3 Insulation in contact with the [FO7]1 ground has <=0.3% water absorption rate per ASTM C272. 6.4.3.7 Freeze protection and snow/ice [FO9]3 melting system sensors for future connection to controls. Additional Comments/Assumptions: JLJComplies ❑Does Not ❑Not Observable ❑Not Applicable ❑Complies ❑Does Not ❑Not Observable ❑Not Applicable ❑Complies ❑Does Not ❑Not Observable ❑Not Applicable 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: 24528 PHD GAMES Report date: 06/02/25 Data filename: Page 9 of 19 Section # Framing / Rough -In Inspection Plans Verified Value Field Verified Value Complies? Comments/Assumptions & Req.ID 5.4.3.2 Factory -built and site -assembled ❑Complies [FR1]3 fenestration and doors are ❑Does Not labeled or certified as meeting air ❑Not Observable leakage requirements. EL ❑Not Applicable 5.5.4.3a Vertical fenestration U-Factor. U- U- ❑Complies See the Envelope assemblies [FR8]1 ❑Does Not table for values. ❑Not Observable ❑Not Applicable 5.5.4.3b Skylight fenestration U-Factor. U- U- ❑Complies See the Envelope Assemblies [FR9]1 ❑Does Not table for values. ❑Not Observable ❑Not Applicable 5.5.4.4.1 Vertical fenestration SHGC value. SHGC: SHGC: ❑Complies See the Envelope Assemblies [FR10]1 ❑Does Not table for values. ❑Not Observable ❑Not Applicable 5.5.4.4.2 Skylight SHGC value. SHGC: SHGC: ❑Complies See the Envelope Assemblies [FR11]1 ❑Does Not table for values. ❑Not Observable ❑Not Applicable 5.8.2.1, Fenestration products rated (U- ❑Complies 5.8.2.3, factor, SHGC, and VT) in ❑Does Not 5.8.2.4, accordance with NFRC or energy ❑Not Observable 5.8.2.5 code defaults are used. ❑Not Applicable [FR12]2 5.8.2.2 Fenestration and door products ❑Complies [FR13]1 are labeled, or a signed and ❑Does Not dated certificate listing the U ❑Not Observable factor, SHGC, VT, and air leakage ❑Not Applicable rate has been provided by the manufacturer. 5.5.3.6 U-factor of opaque doors U- U- ❑Complies See the Envelope Assemblies [FR14]2 associated with the building ❑ Swinging ❑ Swinging ❑Does Not table for values. thermal envelope meets ❑ Nonswinging ❑ Nonswinging ❑Not Observable requirements. ❑Not Applicable 5.4.3.1 Continuous air barrier is '❑Complies r [FR15]1 wrapped, sealed, caulked, ❑Does Not gasketed, and/or taped in an ❑Not Observable approved manner, except in ❑Not Applicable semiheated spaces in climate zones 1-6. Additional Comments/Assumptions: 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: 24528 PHD GAMES Report date: 06/02/25 Data filename: Page 10 of 19 Section # Plumbing Rough -In Inspection Complies? Comments/Assumptions & Req.ID 7.4.4.1 Temperature controls installed on ❑Complies [PL2]3 service water heating systems PDoes Not (<=120°F to maximum temperature :❑Not Observable for intended use). ❑Not Applicable 7.4.6 Heat traps installed on non -circulating ;❑Complies [PL4]3 storage water tanks. :❑Does Not ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: 24528 PHD GAMES Report date: 06/02/25 Data filename: Page 11 of 19 section # Mechanical Rough -In Plans Verified Field Verified Complies. Comments/Assumptions & Req.ID Inspection Value Value 6.4.1.4, HVAC equipment efficiency Efficiency: Efficiency: ❑Complies See the Mechanical Systems list 6.4.1.5 verified. Non-NAECA HVAC ❑Does Not for values. [ME1]2 equipment labeled as meeting ❑Not Observable 90.1. ; ❑Not Applicable 6.4.3.4.1 Stair and elevator shaft vents ILJComplies [ME3]3 have motorized dampers that ❑Does Not automatically close. ❑Not Observable ❑Not Applicable 6.4.3.4.5 Enclosed parking garage ❑Complies [ME39]3 ventilation has automatic ❑Does Not contaminant detection and ❑Not Observable capacity to stage or modulate ❑Not Applicable fans to 50% or less of design capacity. 6.4.3.4.4 Ventilation fans >0.75 hp have ❑Complies [ME5]3 automatic controls to shut off fan ❑Does Not when not required. ❑Not Observable ❑Not Applicable 6.4.3.8 Demand control ventilation ❑Complies [ME6]1 provided for spaces >500 ft2 and ❑Does Not >25 people/1000 ft2 occupant ❑Not Observable density and served by systems ❑Not Applicable with air side economizer, auto modulating outside air damper control, or design airflow >3,000 cfm. 6.5.3.2.1 DX cooling systems >= 75 kBtu/h❑Complies See the Mechanical Systems list [ME40]2 (>= 65 kBtu/h effective 1/2016) ❑Does Not for values. and chilled -water and ❑Not Observable evaporative cooling fan motor hp ❑Not Applicable >= 1/4 designed to vary supply fan airflow as a function of load and comply with operational requirements. 6.4.4.1.1 Insulation exposed to weather ❑Complies [ME7]3 protected from damage. ❑Does Not Insulation outside of the ❑Not Observable conditioned space and associated ❑Not Applicable with cooling systems is vapor retardant. 4 6.4.4.1.2 HVAC ducts and plenums R- R-❑Complies [ME8]2 insulated per Table 6.8.2. Where ❑Does Not ducts or plenums are installed in ❑Not Observable or under a slab, verification may ❑Not Applicable need to occur during Foundation Inspection. 6.4.4.1.3 HVAC piping insulation thickness. in. in.❑Complies [ME9]2 Where piping is installed in or ❑Does Not under a slab, verification may ❑Not Observable need to occur during Foundation ❑Not Applicable Inspection. 6.4.4.1.4 Thermally ineffective panel ❑Complies [ME41]3 surfaces of sensible heating ❑Does Not panels have insulation >= R-3.5. ❑Not Observable ❑Not Applicable 6.4.4.2.1 Ducts and plenums having ❑Complies [ME10]2 pressure class ratings are Seal ❑Does Not Class A construction. ❑Not Observable Lt ❑Not Applicable ; 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: 24528 PHD GAMES Report date: 06/02/25 Data filename: Page 12 of 19 section # Mechanical Rough -In Plans Verified Field Verified Complies. Comments/Assumptions & Req.ID Inspection Value Value 6.8.1-15, Electrically operated DX-DOAS ❑Complies 6.8.1-16 units meet requirements per ❑Does Not [ME110]2 Tables 6.8.1-15 or 6.8.1-16. ❑Not Observable ❑Not Applicable 6.4.4.2.2 Ductwork operating >3 in. water ❑Complies [ME11]3 column requires air leakage ❑Does Not ' testing. ❑Not Observable ❑Not Applicable 6.5.1.5 Economizer operation will not ❑Complies [ME16]1 increase heating energy use ❑Does Not during normal operation. ❑Not Observable ❑Not Applicable 6.5.2.3 Dehumidification controls ❑Complies [ME19]3 provided to prevent reheating, ❑Does Not recooling, mixing of hot and cold ❑Not Observable airstreams or concurrent heating ❑Not Applicable and cooling of the same airstream. 6.5.2.4.1 Humidifiers with airstream ❑Complies [ME68]3 mounted preheating jackets have ❑Does Not preheat auto -shutoff value set to ❑Not Observable activate when humidification is ❑Not Applicable not required. 6.5.2.4.2 Humidification system dispersion ❑Complies [ME69]3 tube hot surfaces in the ❑Does Not airstreams of ducts or air ❑Not Observable handling units insulated >= R ❑Not Applicable 0.5. 6.5.2.5 Preheat coils controlled to stop ❑Complies [ME70]3 heat output whenever ❑Does Not mechanical cooling, including ❑Not Observable economizer operation, is active. ❑Not Applicable 6.5.2.6 Units that provide ventilation air ❑Complies [ME106]3 to multiple zones and operate in ❑Does Not conjunction with zone heating ❑Not Observable and cooling systems are ❑Not Applicable prevented from using heating or heat recovery to warm supply air above 60oF when representative building loads or outdoor air temperature indicate that most zones demand cooling. 6.5.3.3 Multiple zone VAV systems with ❑Complies see the Mechanical systems list [ME42]3 DDC of individual zone boxes ❑Does Not for values. have static pressure setpoint ❑Not Observable reset controls. ❑Not Applicable 6.5.4.2 HVAC pumping systems with >_ ❑Complies [ME25]3 3 control values designed for ❑Does Not variable fluid flow (see section ❑ Not Observable details). ❑Not Applicable 6.5.7.2.1 Kitchen hoods >5,000 cfm have ❑Complies [ME32]2 make up air >=50% of exhaust ❑Does Not air volume. ❑Not Observable ❑Not Applicable 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: 24528 PHD GAMES Report date: 06/02/25 Data filename: Page 13 of 19 section # Mechanical Rough -In Plans Verified Field Verified Complies. Comments/Assumptions & Req.ID Inspection Value Value 6.5.7.2.4 Approved field test used to ❑Complies [ME49]3 evaluate design air flow rates ❑Does Not and demonstrate proper capture ❑Not Observable and containment of kitchen ❑Not Applicable exhaust systems. 6.5.8.1 Unenclosed spaces that are ❑Complies [ME34]2 heated use only radiant heat. ❑Does Not ❑Not Observable ❑Not Applicable 6.5.9 Hot gas bypass limited to: <=240 ❑Complies [ME35]1 kBtu/h - 15% >240 kBtu/h - 10% ❑Does Not ❑Not Observable ❑Not Applicable 7.4.2 Service water heating equipment ❑Complies [ME36]2 meets efficiency requirements. ❑Does Not ❑Not Observable ❑Not Applicable 6.4.3.9 Heating for vestibules and air ❑Complies [ME63]2 curtains with integral heating ❑Does Not include automatic controls that ❑Not Observable shut off the heating system when ❑Not Applicable outdoor air temperatures > 45F. Vestibule heating and cooling systems controlled by a thermostat in the vestibule with heating setpoint <= 60F and cooling setpoint >= 80F. 6.5.10 Doors separating conditioned ❑Complies [ME73]3 space from the outdoors have ❑Does Not controls that disable/reset ❑Not Observable heating and cooling system when ❑Not Applicable open. Additional Comments/Assumptions: 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: 24528 PHD GAMES Report date: 06/02/25 Data filename: Page 14 of 19 Section # & Req.ID Rough -In Electrical Inspection Complies? Comments/Assumptions 8.4.2 At least 50% of all 125 volt 15- and ❑Complies [EL10]2 20-Amp receptacles are controlled by !❑Does Not an automatic control device. ;❑Not Observable' ❑Not Applicable 8.4.3 !New buildings have electrical energy ;❑Complies [EL11]2 ,use measurement devices installed. :❑Does Not Where tenant spaces exist, each :❑Not Observable tenant is monitored separately. In buildings with a digital control system ❑Not Applicable the energy use is transmitted to to control system and displayed graphically. 9.4.1.1 Automatic control requirements ;❑Complies [EL1]2 prescribed in Table 9.6.1, for the :❑Does Not appropriate space type, are installed. Observable Mandatory lighting controls (labeled 'REQ') :❑Not Applicable as and optional choice controls ;❑Not (labeled as 'ADD1' and 'ADD2') are implemented. 9.4.1.1 Independent lighting controls installed ;❑Complies [EL2]2 per approved lighting plans and all :❑Does Not manual controls readily accessible and :❑Not Observable visible to occupants. ❑Not Applicable 9.4.1.1f Daylight areas under skylights and ;❑Complies [EL13]1 roof monitors that have more than {❑Does Not 150 W combined input power for Observable general lighting are controlled by :❑Not Applicable photocontrols. ;❑Not 9.4.1.3 Separate lighting control devices for❑Complies [EL4]1 specific uses installed per approved :❑Does Not lighting plans. ;❑Not Observable ❑Not Applicable 9.6.2 Additional interior lighting power ;❑Complies [EL8]1 allowed for special functions per the :❑Does Not approved lighting plans and is Observable automatically controlled and :❑Not Applicable separated from general lighting. ;❑Not 10.4.1 Electric motors meet requirements [EL9]2 Iwhere applicable. Additional Comments/Assumptions: ❑Complies ❑Does Not '❑Not Observable ❑Not Applicable 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 IlLow Impact (Tier 3) Project Title: 24528 PHD GAMES Report date: 06/02/25 Data filename: Page 15 of 19 Section # Insulation Inspection Plans Verified Value Field Verified Value Complies? Comments/Assumptions & Req.ID 4.2.4 Installed roof insulation type and R- R- ❑Complies See the Envelope Assemblies [IN2]1 R value consistent with insulation ❑ Above deck ❑ Above deck ❑Does Not table for values. specifications reported in plans ❑ Metal ❑ Metal ❑Not Observable and COMcheck reports. For some ceiling systems, verification may I Attic Attic ! ❑ ❑ ❑Not Applicable need to occur during Framing Inspection. 5.8.1.2, Roof insulation installed per ❑Complies 5.8.1.3 manufacturer's instructions. ❑Does Not [IN3)1 Blown or poured loose -fill ❑Not Observable insulation is installed only where ❑Not Applicable the ceiling slope is <= 3:12. 4.2.4 Installed above -grade wall R- R-❑Complies ;See the Envelope Assemblies [IN6]1 insulation type and R-value ❑ Mass ❑ Mass :❑Does Not ;table for values. consistent with insulation ❑ Metal ❑ Metal :❑Not Observable specifications reported in plans and COMcheck reports. ❑ Steel ❑Steel ❑Not Applicable ❑ Wood ❑ Wood 5.8.1.2 I Above -grade wall insulation I I I I ❑Complies [IN7]1 installed per manufacturer's ❑Does Not instructions. ❑Not Observable FW ❑Not Applicable 4.2.4 ,Installed floor insulation type and R- R-❑Complies ;see the Envelope Assemblies [IN8]2 R-value consistent with insulation ❑ Mass ❑ Mass❑Does Not ;table for values. :specifications reported in plans ❑ Steel ❑ Steel ;❑Not Observable and COMcheck reports. ❑ Wood ❑ I Wood ;❑Not I Applicable I 5.8.1.1 Building envelope insulation is T❑Complies [IN10]2 labeled with R-value or insulation ❑Does Not certificate has been provided ❑Not Observable listing R-value and other relevant data. ❑Not Applicable ; 5.8.1.9 Building envelope insulation ❑Complies ; [IN18]2 extends over the full area of the ❑Does Not component at the proposed rated ❑Not Observable R or U value. ❑Not Applicable 5.8.1.4 Eaves are baffled to deflect air to ❑Complies [IN11]2 above the insulation. ❑Does Not l❑Not Observable ❑Not Applicable 5.8.1.5 !Insulation is installed in ❑Complies [IN12]2 substantial contact with the ❑Does Not inside surface separating ❑Not Observable conditioned space from unconditional space. �❑Not Applicable 5.8.1.6 Recessed equipment installed in mommiElComplies [IN13]2 building envelope assemblies j ❑Does Not does not compress the adjacent ❑Not Observable insulation. ❑Not Applicable 5.8.1.7.1 Attics and mechanical rooms ❑Complies [IN15]2 have insulation protected where ❑Does Not adjacent to attic or equipment ❑Not Observable access. ,❑Not Applicable j 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: 24528 PHD GAMES Report date: 06/02/25 Data filename: Page 16 of 19 Section # Insulation Inspection Plans Verified Value Field Verified Value Complies? Comments/Assumptions & Req.ID 5.8.1.7.2 Foundation vents do not interfere ❑Complies [IN16]2 with insulation. ❑Does Not ❑Not Observable ❑Not Applicable 5.8.1.8 Insulation intended to meet the ❑Complies [IN17]3 roof insulation requirements ❑Does Not cannot be installed on top of a ❑Not Observable suspended ceiling. Mark this ❑Not Applicable requirement compliant if insulation is installed accordingly. Additional Comments/Assumptions: 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: 24528 PHD GAMES Report date: 06/02/25 Data filename: Page 17 of 19 Section # Final Inspection Complies? Comments/Assumptions & Req.ID 5.4.3.3 Weatherseals installed on all loading ❑Complies [Fl1]1 dock cargo doors in Climate Zones 4- !❑Does Not 8. ❑Not Observable' ❑Not Applicable j 6.4.3.1.2 Thermostatic controls have a 5 °F ;❑Complies [FI3]3 deadband. :❑Does Not 'RNot Observable ❑Not Applicable 6.4.3.2 Temperature controls have setpoint ;❑Complies [F120]3 overlap restrictions. I❑Does Not ❑Not Observable ❑Not Applicable 6.4.3.3.1 HVAC systems equipped with at least ;❑Complies [F121]3 one automatic shutdown control. !❑Does Not ❑Not Observable ❑Not Applicable 6.4.3.3.2 Setback controls allow automatic ;❑Complies [F122]3 restart and temporary operation as :❑Does Not required for maintenance. UNot Observable j❑Not Applicable 6.4.3.12 Air economizer has a fault detection ;❑Complies [F1200]3 and diagnostics (FDD) system (see UDoes Not details for configuration and operational requirements). :❑Not Observable ❑Not Applicable 6.4.3.6 When humidification and ;❑Complies [FI6]3 dehumidification are provided to a j❑Does Not zone, simultaneous operation is Observable prohibited. Humidity control prohibits ;❑Not '❑Not Applicable the use of fossil fuel or electricity to produce RH > 30% in the warmest zone humidified and RH < 60% in the coldest zone dehumidified. 6.7.2.1 Furnished HVAC as -built drawings❑Complies [FI7]3 submitted within 90 days of system :❑Does Not acceptance. ❑Not Observable ❑Not Applicable 6.7.2.2 Furnished O&M manuals for HVAC ;❑Complies [F18]3 :systems within 90 days of system :❑Does Not ;acceptance. ❑Not Observable ❑Not Applicable 6.7.2.3 An air and/or hydronic system ;❑Complies [F19]1 balancing report is provided for HVAC :❑Does Not systems serving zones >5,000 ft2 of I❑Not Observable conditioned area. ❑Not Applicable 7.4.4.3 Public lavatory faucet water ;❑Complies [FI11]3 temperature <=110°F. :❑Does Not ❑Not Observable ❑Not Applicable 8.7.1 Furnished as -built drawings for I❑Complies [F116]3 electric power systems within 30 days :❑Does Not of system acceptance. ❑Not Observable ❑Not Applicable 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: 24528 PHD GAMES Report date: 06/02/25 Data filename: Page 18 of 19 Section # Final Inspection Complies? Comments/Assumptions & Req.ID 8.7.2 Furnished O&M instructions for ❑Complies [F117]3 systems and equipment to the !❑Does Not building owner or designated :❑Not Observable', representative. ❑Not Applicable 9.2.2.3 Interior installed lamp and fixture ;❑Complies [FI18]1 lighting power is consistent with what I❑Does Not is shown on the approved lighting ❑Not Observable plans, demonstrating proposed watts ❑Not Applicable are less than or equal to allowed watts. 9.4.4 At least 75% of all permanently❑Complies [F120]1 installed lighting fixtures in dwelling ❑Does Not units have >= 55 Im/W efficacy or a Observable >= 45 Im/W total luminaire efficacy. j❑Not ❑Not Applicable 10.4.3 Elevators are designed with the ;❑Complies [F124]2 proper lighting, ventilation power, and !❑Does Not standby mode. ❑Not Observable T❑Not Applicable 7.4.3 First 8 ft of outlet piping in ❑Complies [F145]2 nonrecirculating storage system, or ❑Does Not branch piping connected to ❑Not Observable recirculated, heat traced, or impredance heated piping is ;❑Not Applicable insulated. Additional Comments/Assumptions: See the Interior Lighting fixture schedule for values. 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: 24528 PHD GAMES Report date: 06/02/25 Data filename: Page 19 of 19