PROPOSAL/PROJECT ACCEPTAN~.=~
PROJECT INFORMATION:
Client Name Sanford Public Works DeDadment
Project Name Art Lane Landfill
Project Location Sanford, Florida
Proposal Number and Date 98-160C, December 17, 1999
Description of Services Groundwater Monitorin<~ Services
9:31
'Estimated Fee $12,420.00
PAYMENT RESPONSIBILITY:
Invoices to be paid by Sanford Public Works Department
Address P.O. Box 1788
City/State Sanford, Florida Zip Code
Attention Robert G. Herman
32772-1788 Phone
Title Director
APPROVAL OF CHARGES:
If the invoices are to be approved by a party other than the party responsible for payment above, please
fill in the space below.
Firm City of Sanford
Address P O Box 1788
City/State Sanford, FL Zip Code 32772-178~hone 407-330-5681
Attention Robert G. Herman Title Public Works Director
PROPERTY OWNER IDENTIFICATION: (If other than above)
Name
Address
City/State Zip Code
Attention
Title
Phone
SPECIAL INSTRUCTIONS:
PAYMENT TERMS:
Net 30 days from invoice date; invoices will be sent every four weeks for continued or extended projects.
Interest charges, 1¼% per month following the due date.
PROPOSAL ACCEPTANCE:
The Terms and Conditions of this Proposal, including the Terms on this page and the General Conditions
on the reverse are: , '-~"/~
Accepted this /~2-- day of
City of Sanford
(Print or ndividu~e body namJ)
(Si~~d representative)
Robert G. Herman Director
(Pdnt or type name of authorized representative and title)
D:\PROACC\Proposa199.acc
ARDAMAN & ASSOCIATES, INC.
1999*
FEE SCHEDULE
ENGINEERING AND TESTING SERVICES
ENGINEERING
Data Evaluation, Engineering Analysis,
Design, Inspections, Field Monitoring, etc.
Senior Consultant
Principal Engineer
Senior Project EngineerlHydrogeologist
Project EngineerlHydrogeologist III
Project EngineerlHydrogeologist I
Assistant Project EngineerlHydrogeologist
Staff Engineer/Geologist III
Staff Engineer/Geologist I
CONSTRUCTION MONITORING
AND FIELD TESTING
Field Technician/Inspector V
Field Technician/Inspector IV
Field Technician III
Field Technician II
Field Technician I
LABORATORY TESTING
Visual Classification and Sample Handling,
Special Laboratory Tests (Leaching Studies,
Slurry Consolidation, etc,)
Laboratory Technician V
Laboratory Technician IV
Laboratory Technician III
Laboratory Technician II
Laboratory Technician I
SUPPORT PERSONNEL
Engineering Designer III
Engineering Designer I
Technical Draftsman III
Technical Draftsman I
Technical Secretary
MISCELLANEOUS EXPENSES
CADD/Computer Usage
Outside Services and Expenses
Printing and Reproduction
Copying
Mileage (Automobile)
Mileage (Truck)
Per Hour $145.00
Per Hour $1 20.00
Per Hour $102.00
Per Hour $ 90.00
Per Hour $ 82.00
Per Hour $ 76.00
Per Hour $ 68.00
Per Hour $ 54.00
Per Hour $ 54.00
Per Hour $ 47.00
Per Hour $ 40.00
Per Hour $ 33.00
Per Hour $ 28.00
Per Hour $ 54.00
Per Hour $ 47.00
Per Hour . $ 40.00
Per Hour $ 33.00
Per Hour $ 28:00
Per Hour $ 54.00
Per Hour $ 47.00
Per Hour $ 40.00
Per Hour $ 34.00
Per Hour $ 34.00
Per Hour $12,00
Per Job At Cost + 12%
Per Job At Cost + 12%
Per Page $ 0.10
Per Mile $ 0.35
Per Mile $ 0.45
TERMS: All invoices are due and payable upon receipt unless other arrangements have been made previously. A finance charge of 1.5% par
month, which is an annual interest rate of 18%, will be paid on all invoices not paid within 30 days. Any attomey's fees or other costs incurred
in collecting any delinquent amount shall be paid by the Client.
*These prices are in effed for work completed through December 31, 1999. This fee schedule will be suparseded by the 2000 fee schedule for
work parformed after December 31, 1999.
ARDAMAN & ASSOCIATES, INC.
1999'
FEE SCHEDULE
SUBSURFACE FIELD EXPLORATION
MOBILIZATION
Mobilization and Demobilization
· Men and Equipment (Minimum $100.00)
· Mileage - Rig
· Mileage - Truck
· Portable Barge
STANDARD DRILLING
All Terrain Vehicle
Auger Borings (4-inch)
Wash Bodngs - Cuttings Only (up to 3 inch)
· Soil drilling
· Rock ddlling
Standard Penetration Test (SPT) Borings
(ASTM D-1586)in soil (N-values <50):
· from surface to 25 feet
· from 25 feet to 50 feet
· from 50 feet to 100 feet
· from 100 feet to 125 feet
· from 125 feet to 150 feet
Standard Penetration Test (SPT) Borings in
high resistance soil/rook (N-values >50)
Furnish, Install, and Remove Casing (up to 4-inch):
· from surface to 50 feet
· from 50 feet to 100 feet
· from 100 feat to 150 feet
Ddlling (Time Basis)/2 'man-crew
Drilling (Time Basis)/3 man-crew
Support Water Truck (Time Basis)
Rook Codng (N or H size)
· from surface to 50 feet
· from 50 feet to 100 feet
· from 100 feet to 150 feet
Field Permeability
SAMPLING
Additional SPT Sampling:
· from 10 feet to 25feet
· from 25 feet to 50 feet
· from 50 feet to 100 feet
· from 100 feet to 125 feet
· from 125 feet to 150 feet
Undisturbed Samples: · Shelby Tube
· Fixed-Piston Shelby, Osterberg, Pitcher
SOUNDINGS
Mechanical Cone Soundings
Electdc Dutch Cone Soundings
Muck PmbinglClay Sampling
Piezocone/Piezoprobe Soundings (Time Basis)
Piezoprobe Dissipation Monitoring
OTHER CHARGES
Cleadng Difficult Access, Hole Location and Set-Up
Standby Time
Piezometer and Well Installation (plus materials)
Bore Hole Grouting and Sealing (plus matedais)
Well CleednglSensitivity/Water Level
Air Boat Use
Instrumentation Unit Use
Lodging and Subsistence
Double Ring Infiltrometer
Materials
Per Rig-Hour
Per Rig-Mile
Per Truck-Mile
Per Job
Add'l Price Per LF
Per Lineal Foot
Per Lineal Foot
Per Lineal Foot
Per Lineal Foot
Per Lineal Foot
Per Lineal Foot
Per Lineel Foot
Per Lineal Foot
Add'l Price Per LF
Per Lineal Foot
Per Lineal Foot
Per Lineal Foot
Per Crew-Hour
Per Crew-Hour
Per Day
Per Lineal Foot
Per Lineal Foot
Per Lineal Foot
Per Test
Per Additional Sample
Per Additional Sample
Per Additional Sample
Per Additional Sample
Per Additional Sample
Per Sample
Per Sample
Per Lineal Foot
Per LineaiFoot
Per Crew Hour
Per Crew Hour
Per Crew Hour
Per Crew-Hour
Per CrewsHour
Per Crew-Hour
Per Crew-Hour
Per Crew-Hour
Per Day
Per Day
Per Crewman-Day
Per Test
Per Job
$120.00
$ 0.65
$ 0.45
$5,000.00 min.
1.0o
7.50
$ 6.00
$ 10.00
$ 10.00
$ 12.00
$ 14.00
$ 19.00
$ 24.00
$ 3.00
6.00
8.00
10.00
140.00
160.00
100.00
$ 26.00
$ 28.00
$ 32.00
$ 250.00
$ 22.00
$ 25.00
$ 28.00
$ 33.00
$ 38.00
$ 90.00
$100.00
$ 8.00
$ 10.00
$100.00
$160.00
$120.00
$120.00
$120.00
· $140.00
$140.00
$120.00
$ 200.00
$150.00
$ 75.OO
$ 350.0O
At Cost + 12%
ARDAMAN & ASSOCIATES, INC.
1999'
FEE SCHEDULE
SUBSURFACE FIELD EXPLORATION
(Page Two)
GENERAL FIELD EQUIPMENT Data Logger
Organic Vapor Analyzer (OVA 128 or Gastech)
Photo Ionization Detector (Photovac Tip)
Methane Detector
Explosimeter
Generator
Steam Cleaner
Surveying Equipment (Water Table Elevations)
Centrifugal Development Pump
Submersible Development Pump
Peristaltic Purging Pump
Magnetometer
Sensitivity Test Equipment
Product/Water Interface Probe
pH/Conductivity Meter
Turbidity Meter
Dissolved Oxygen Meter
Water Level Indicator
Bailer Usage (Stainless Steel or Teflon- Per Each)
Concrete Saw
EXPENDABLE SUPPLIES
High Capacity (1 or 0.45 micron) Filter
Disposable Teflon Bailer
Disposable Polyethylene Bailer
Disposable Free Product Bailer
Isopropyl Alcohol (decontamination)
Deionized Water (decontamination)
16 oz. Soil Jars (soil headspace analysis)
Tygon Tubing
Polyethylene Tubing
55-gallon Drum
Per Day $ 300.00
Per Day $100.00
Per Day $100.00
Per Day $100.00
Per Day $ 60.00
Per Day $ 90.00
Per Day $ 90.00
Per Day $ 50.00
Per Day $ 40,00
Per Day $ 90,00
Per Day $ 35.00
Per Day $ 40.00
Per Day $ 40.00
Per Day $ 60,00
Per Day $ 20.00
Per Day $ 50.00
Per Day $ 90.00
Per Day $ 10.00
Per Day $ 20.00
Per Day $100.00
Each $ 20.00
Each $ 17.00
Each $ 11.00
Each $ 20.00
Per Gallon $ 15.00
Per Five Gallons $ 12.00
Per Box of 12 $ 10.00
Per Foot $ 2.00
Per Foot $ 0.30
Each $ 55.00
GEOPHYSICAL EQUIPMENT
Geonice EM 34-3 Per Day $ 200.00
Bison ER 2350 Per Day $ 50.00
SPECIAL DRILLING/SOUNDING
Prices for special drilling (barge drilling; air boat sampling; amphibious drilling; NQ wire line codrig; large
diameter borings; drilling in corrosive, contaminated or hazardous materials; drilling at great depths; installing
large diameter temporary casing; etc,), field vane testing, and other specialized sampling or field tests will be
determined per project., Work performed over water will be at 1.5 times the above unit prices.
INSTRUMENTATION
Prices for installation of monitor wells, inclinometers and settlement devices and prices for performing field
permeability and packer tests will be determined per project.
TERMS: All inveices are dee and payable upou receipt unless olhe; arrangements have been made previously. A fineeee charge ef 1.5% per month, which is on areteal interest
of 18%, wi be paid on all invoices not paid within 30 days. Any attemey's tees or other cos. incared in coliecffit9 any delinquent arteat shall be paid by the ClinM.
· These prices are in effect for work completed through December 31, 1999. This fee schedule wifi be supeseped by the 2000 fee schedule for work pedormed after December 31,
1999.
ARDAMAN & ASSOCIATES, INC.
1999*
FEE SCHEDULE
LABORATORY SOIL TESTING SERVICES
CLASSIFICATION TESTS
Moisture Content (ASTM D-2216)
Organic Content
· Loss on Ignition (ASTM D-2974)
· Wet Combustion (AASHTO T-194)
Unit Weight/Classification (Undisturbed Sample)
Grain Size Distribution
· Sieve Analysis (ASTM D-421, D-422)
· Percant Fines (ASTM D-1140)
· Hydrometer Analysis (ASTM D-422)
Atterberg Limits (ASTM D-4318)
· Plasticity Index Less than 150%
· Plasticity Index Greater than 150%
Shrinkage Limit (ASTM D-4943)
Spedtic Gravity (ASTM D-854)
Marsh Funnel Viscosity
Slump Cone
Each $ 8.50
Each $ 22.00
Each $ 35.00
Each $ 40.00
Each $ 32.00
Each $ 22.00
Each $ 72.00
Per Set $ 72.00
Add'l Per Set $ 45.00
Each $ 50.00
Each $ 60.00
Each $ 18.00
Each $ 18.00
COMPACTION TESTS
Standard (ASTM D-698) or Modified Proctor (ASTM D-1557)
· Up to 5 Points
· More than 5 Points
· Plasticity Index Greater than 20%
Maximum-Minimum Density (ASTM D-4253, D-4254)
Limerock Bearing Ratio (3 Points)
Per Test $ 76.00
Per Add'l Point $ 10.00
Add'l Per Test $ 84.00
Per Set $ 84.00
Per Set $275.00
CONSOLIDATION TESTS
Incremental Consolidation Test (ASTM D-2435) · Up to Ten Load-Unload Increments
· More than Ten Load-Unload Increments
Constant Rate of Strain Consolidation Test (ASTM D-4186)
Per Test $360.00
Per Add'l Increment $ 30.00
Each $300.00
PERMEABILITY TESTS
Permeability Test on Sand
Permeability Test on Fine Grained Soil
· k >10'ecm/sec
· k <10'scm/sec
Permeation with Fluids Other Than Water
Each $125.00
Each $165.00
Each $275.00
Add'l Per Test $120.00
STRENGTH TESTS
Strength Index Tests (Torvane, Penetrometer, etc.) Each
Vane Shear Test Each
Unconfined Compression Test (ASTM D-2166)
· Strength Only Each
· With Stress Strain Curve Each
T~axial Tests:
· Unconsolidated-Undrained (ASTM D-2850) Each
· Unconsolidated-Undrained (with pore pressure response) Each
· Consolidated-Undrained (with pore pressure measurement) Each
· Consolidated-Drained on Sands Each
· Consolidated-Drained on Fine Grained Soils Each
· Use of Fluids Other Than Water Add'l Per Test
Direct Shear Tests (Coarse Grained Soils)
· Conventional 3" Box Shear
· With Stress Reversals
· Conventional 12" Box Shear
· Set-Up Charge for Geosynthetios
Angle of Repose
Split Tensile for Rock Cores
$ 5.00
$ 15.00
$ 35.00
$ 70.00
$150.00
$360.00
$360.00
$285.00
$420.00
$115.00
Per Normal Load $170.00
Per Normal Load $290.00
Per Normal Load $425.00
Add'l Per Normal Load $ 50.00
Each $ 40.00
Each $100.00
SAMPLE PREPARATION AND SPECIAL TESTS
Preparation of Laboratory Samples for Testing (e.g., sedimented or compacted) will be charged at $23.50 per sample. Prices for Visual
Classification, for Special Sample Preparation, for Special Laboratory Tests (Slum/Consolidation, Leaching Tests, Seffiing Tests, etc.), and l~or
testing contaminated soils or hazardous materials Will be determined per project based upon technician man-houra and other considerations.
In addition, a daily charge of $12.50 par day Will be assessed for spedal long-term laboratory tests (i.e., slum/consolidation, leaching tests, etc. ).
TERMS: All invoices am due and payable upon receipt unless other arrangements have been made previously. A finance charge of 1.5% par
month, which is an annual interest rate of 18%, Will be paid on all invoices not paid within 30 days. Any attomey's fees or other costs incurred
in collecting any delinquent amount shall be paid by the Client.
*These prices are in effect for work completed through December 31, 1999, This fee schedule will be superseded by the 2000 fee schedule for
work parformed after December 31, 1999.
ARDAMAN & ASSOCIATES, INC.
1999'
FEE SCHEDULE
LABORATORY CHEMICAL & GEOSYNTHETIC
TESTING SERVICES
CHEMICAL TESTS
pH (FMS-550) Each
Specific Conductance Each
Fluodde Each
Sulfate (FMS-553) Each
Chlodde (FMS-552) Each
Soil pH (FMS-550) Each
Soil Specific Conductance Each
Soil Resistivity (ASTM G-57 or FMS-551 ) Each
Carbonate Content (ASTM D 4373) Each
Water Corrosivity Series (FMS-550,551,552,553) Each
Soil Corrosivity Series (FMS-550, 551,552, 553) Each
GEOSYNTHETICS
Geomembrane Thickness
· ASTM D-1593
· ASTM D-751 or D-5199
Geomembrane Density (ASTM D-792)
Geomembrane Tensile Strength (ASTM D-638), Machine and
Transverse Direction Per Set
Geomembrane Tear Resistance (ASTM D-1004), Machine and
Transverse Direction
Weld Peel and Shear (ASTM D-413, I)-882)
Geotextile Grab Tensile Strength (ASTM D-4632)
Geotextile Trapezoidal Tear (ASTM D-4533)
Geotextile Mass/Unit Area (ASTM D-3776 or D-5261 )
Geotextile Thickness (ASTM D-1777 or D-5199)
$ 6.00
$ 7.00
$15.00
$ 3O.O0
$ 30.00
$ 30.00
$ 30.O0
$ 30.00
$ 5O.00
$ 75.00
$120.00
Per Sample $ 25.00
Per Sample $15.00
Per Sample' $ 42.00
~00.00
Per Set $ 70.00
Per Set $ 75.00
Per Set $100.00
Per Set $120.00
Per Sample $ 30.00
Per Sample $15.00
SAMPLE PREPARATION AND SPECIAL TESTS
Preparation of Samples for Testing (e.g., crushing for carbonate content determination, filtering of clayey soil for
chemicel tests) will be charged at $23.50 per sample. Pdces for other tests on geomembranes and geotextiles will
be determined per project based upon technician man-hours and other considerations.
TERMS: All invoices are due and payable upon receipt unless other arrangements have been mode previously. A finance charge of 1.5% per
month, which is an annual interest rate of 18%, will be paid on all invoices not paid within 30 days. Any attomey's fees or other costs incurred
in collecting any delinquent amount shall be paid by the Client.
*These prices are in effect for work completed through December 31, 1999. This fee schedule will be superseded by the 2000 fee schedule for
work parformed after December 31, 1999,
Ardaman & Associates, Inc.
Geotechnical, Environmental and
Materials Consultants
December 17, 1999
File Number 98-160C
Sanford Public Works Department
P.O. Box 1788
Sanford, Florida 32772-1788
Attention: Mr. Robert G. Herman, Director
Subject: Proposal for Groundwater Monitoring Services In Accordance with Florida Department
of Environmental Protection Permit Pertaining to the Art Lane Landfill, Sanford, Florida
Gentlemen:
As requested, Ardaman & Associates, Inc. (Ardaman) is pleased to present this proposal for
performing the groundwater monitoring program through 2000 as provided in the Florida
Department of Environmental Protection (FDEP) Permit Conditions pertaining to the subject landfill.
This proposal provides three semiannual monitoring reports. One report as soon as possible to
serve as the second report for 1999 and two semiannual reports for 2000.
We propose three semiannual ground water sampling events, subcontracting with an analytical
chemistry laboratory to perform the required chemical analyses for three events and preparing
semiannual reports for the City to submit to FDEP. The semiannual reporting includes groundwater
quality analyses in FDEP format, water levels in all wells in a table and a groundwater contour map.
In accordance with condition number 6 of the permit monitoring plan implementation schedule,
samples from the seven ground water monitoring wells will be collected and analyzed as follows:
pH (field), specific conductance (field), turbidity (field), dissolved oxygen (field), temperature (field),
total ammonia as N, chlorides, nitrate, total dissolved solids and the EPA 40 CFR, Part 258,
Appendix I parameters including iron, mercury and sodium. These Appendix I parameters include
18 metals and 47 organic constituents. In addition, ground water levels in all wells and all
piezometers will be measured to the nearest 0.01 foot and reported in a table plus on the water
quality analyses form. A ground water contour map for each monitored aquifer zone will also be
provided semiannually according to Condition 18.
The cost estimate for this work is provided in Table 1. The monthly invoices will be based on work
expended and units performed in accordance with the enclosed fee schedule. The maximum
amount not to be exceeded without further written authorization is $12,420.00.