HomeMy WebLinkAbout857-Daniels Contracting Company1.01
1.02
SECTION 00510
AGREEMENT FORM
GENERAL
THIS AGREEMENT, made this 6tl't day of Sept:embe~c 2000 , by and
between (1) the City of Sanlord, hereinafier called lhe Owner, and (2) Daniels
Contractinq Comp_an_y. doing business as a (3) Corporation , and hereinafter called
the Contractor.
The Owner and Contractor agree as follows:
Contract Documents
The Contract Documents consist of this Agreemenl; all items listed in the index to
Ihe Project Manual; lhe Drawings as listed on the Bid Form and Index to Drawings;
the Florida Departmenl of Transportation Standard Specifications for Road and
Bridge Construction - latest edition, as incorporated by the Project Manual; all
Addenda issued prior to and all Change Orders issued after execution of this
Agreement. These form Ihe Contract and all are as fully a part of the Contract as
if attached to this Agreement or repeated herein.
Scope of Work
The Contractor shall perform all work required by the Contract Documents for the
construction of the Westerly Water Main Extension.
Contract Time
The Contractor shall begin work within 10 days after the issuance of a written Notice
to Proceed and shall complete the work within 180 calendar days from the date of
the Notice to Proceed.
Liquidated Damages
OWNER and CONTRACTOR recognize that time is of the essence of this
Agreement and that OWNER will suffer financial loss if the Work is not substantially
complete within the time specified in Paragraph C above, plus any extensions
thereof allowed in accordance with the General Conditions. They also recognize
the delays, expense and difficulties involved in proving in a legal arbitration
proceeding the actual loss suffered by OWNER if the Work is not substantially
complete on time. Accordingly, instead of requiring any such proof, OWNER and
CONTRACTOR agree that as liquidated damages for delay (but not as a penalty)
CONTRACTOR shall pay OWNER $1,000.00 for each calendar day that expires
after the time specified in Paragraph C for final completion until the work is
substantially complete. It is agreed that if this Work is not Finally completed in
accordance with the Contract Documents, the CONTRACTOR shall pay the
J:tSOe20,~O~word~pe:~X~S~O,~pd 00510-1 REVISED PER ADDENDUM NO. 1
1.03
OWNER as liquidated damages for delay, and not as penalty, one-fourth (¼) of the
rate set forth above.
E. Contract Price
Unit Price Contract
The Owner will pay the Contractor in current funds for the performance of the work,
subject to additions and deductions by Change Order and subject to the
Measurement and Payment Provisions (Section 01150), and subject to actual
constructed quantities; the Total Contract Price of Eight hundred ten thousand nine
hundred sixty-seven and 20/100 Dollars ($810,967.20). Payments will be made to
the Contractor on the basis of the Schedule of Unit Prices included as a part of his
Bid, which shall be as fully a part of the Contract as if attached or repeated herein.
Payments
The Owner will make payments as provided in the General Conditions and
Supplementary Conditions.
Engineer
The Project has been designed by CPH Engineers, Inc., referred to in the
documents as the Engineer, whose authority during the progress of construction is
defined in the General Conditions and Supplementary Conditions.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the day
and year first above written.
CONTRACTOR:
Daniels Con ring Co ~anv
Name of F'~7,~
By (~!1~°~/~
Daniel J. Picek, President
Printed Name and Title
(Seal)
J:\SOS20.10\word\spec\00510.wpd 00510'2 REVISED PER ADDENDUM NO, I
OWNER:
CITY OF SANFORD, FLORIDA
P.O. Box 1788
By (Signa u :e)
Anthony VanDerworp - City Manager
Printed Name and Title
Janet R. Doughertv - City Clerk
Printed Name and Title
(Seal)
END OF SECTION
J:\S0620.10%word%spec\00510.wpd 00510'3 REVISED PER ADDENDUM NO. I