HomeMy WebLinkAbout928-Aagaard/Goldsboro Facade SECTION 00520
AGREEMENT FORM
PART 1 GENERAL
1.01 THIS AGREEMENT, made this 19th day of March , 2002 , by and between
the City of Sanford, Florida, hereinafter called the Owner, and Aagaard General
Contracting, Inc., doing business as a Flodda Corporation, and hereinafter called the
Contractor.
1.02 The Owner and Contractor agree as follows:
A. Contract Documents
The Contract Documents consist of this Agreement and attachments, including
drawings, work descdptions and matedal specifications; the Florida Department
of Transportation Standard Specifications for Road and Bridge Construction -
latest non-metric edition, as incorporated by the Project Manual; all Addenda
issued pdor to and all Change Orders issued after execution of this Agreement.
These form the Contract and all are as fully a part of the Contract as if attached
to this Agreement or repeated herein.
B. Scope of Work
The Contractor shall perform all work required by the Contract Documents for the
construction of the Goldsbore Fac~ade Improvement Project, RFP 01-02-18 for
the (3) three brick entrance signs. They are as follows:
(1) 15'-10 3/4" brick sign to be located at 13th Street & Demolition of the existing
signage.
(2)(1) 8' brick sign to be located on Persimmon Avenue at the WestSide
Community Center.
(3)(1) 8' brick sign to be located at the comer of 16t~ Street and Southwest
Road.
Exact location of each sign to be staked by the City, also a letter of
agreement from property ownere on record prior to construction. Work
shall be in accordance wiffi attached plans. Contractor shall provide shop
drawings for the lettering, obtain construction permit for the sign from the
City, comply with applicable codes, and provide for pedestrian and traffic
safety, and guarantee work for one year.
C. Contract Time
The Contractor shall begin work within 10 days after the issuance of a wdtten
Notice to Proceed and shall complete substantially complete the work within 30
calendar days from the date of the Notice to Proceed. The work shall be finally
complete, ready for Final Payment in accordance with the General Conditions,
within 30 calendar days from the actual date of substantial completion.
D. Insurance Requirements
Contractor shall show City of Sanford as additional insureds under the
contractor's general liability insurance policy, which insurance protection shall be
primary protection for the City, and shall hold the City harmless from claims and
losses.
E. Lump Sum Contract Pdce
Unit Price Contract
The Owner will pay the Contractor in current funds for the performance of the
work, subject to additions and deductions by Change Order and subject to the
percent of work complete; the Total Contract Pdce of Twenty one Thousand Four
Hundred Fifteen Dollars and no/100 Dollars ($21,415.00).
F. Payments
The Owner will make payments at two week intervals based on percent of
completion.
G. Engineer
The Project has been designed by CPH Engineers, Inc., referred to in the
documents as the Engineer, whose authority dudng the progress of construction
is defined in the General Conditions and Supplementary Conditions.
1.03 IN WITNESS WHEREOF, the parties herato have executed this Agreement the day and
year first above wdtten.
CONTRACTOR: OWNER:
Name of Firm City of S nford, FloridL.___..,
By (Signature) By (Signature)
A~est (Signature)
~P~9 Dorothy E. Evans ~Z::2Z2~, JOANNM. JOHNSON
(Seal) (Seal)
Attest (Signature)
Printed Name and Title
END OF SECTION