CHANGE ORDER FORM
Change Order No. 2 Final
Project Title Airport Blvd. Phase III Utility Relocations
Bid No. IFB 03/04 -1
Owner: City of Sanford
Contractor: Gibbs & Register, Inc.
Agreement Date: February 26, 2004
FDEP No.: CS120586220
This Change Order is necessary to cover changes in the work to be
performed under this Agreement. The GENERAL CONDITIONS,
SUPPLEMENTARY CONDITIONS, and STANDARD SPECIFICATIONS
apply to and govern all work under this Change Order.
THE FOLLOWING CHANGES ARE MADE TO THE CONTRACT DOCUMENTS:
(1)
Original Contract Price $
1,144.000.00
(2)
Current Contract Price (Adjusted by Previous Change Orders) $
1.207,821.54
(3)
Total Proposed Change in Contract Price $
($7,820.95)
(4)
New Contract Price (Item 2 + Item 3) $
1.200,000.59
(5)
Original Contract Time
150 Days
(6)
Current Contract Time (Adjusted by Previous Change Orders)
251 Days
(7)
Total Proposed Change in Contract Time
213 Days
(8)
New Contract Time (Item 6 + Item 7)
464 Days
(9)
New Contract Substantial Completion Date
7/6/05
Page 1 of 4
Change Order#2 -f nal
CHANGES ORDERED
ITEM 1
Description of Change: Sanitary Lateral For Auto Auction
Reason for Change: Sanitary Sewer Lateral was in conflict with the proposed Storm
Sewer and needed to be re- routed
Change in Contract Price: $17,110.75
Funding Source: FDEP CWSRF — $17,110.75
Change in Contract Time: 8 Days
ITEM 2
Description of Change: Final Quantity Adjustments
Reason for Change: Incorporate actual constructed quantities into the contract
Change in Contract Price: ($10,126.70)
Funding Source: FDEP CWSRF — ($65,076.20)
City of Sanford Misc. Funding — $54,949.50
Change in Contract Time: 0 Days
ITEM 3
Description of Change: Credit For Geotechnical Testing By City Instead of Contractor
Reason for Change: The City used its geotechnical engineering consultants to
supplement incomplete testing at the sewer manholes and to
assist in developing an alternate construction method to provide
stable and compact condition at the manholes, saving the
Contractor the need to re- excavate and compact to full manhole
depth.
Change in Contract Price:
Funding Source:
Change Order#2 -final
($14,805.00)
FDEP CWSRF
Page 2 of 4
Change in Contract Time:
ITEM 4
60 Days
Description of Change: Time Extension Granted By City
Reason for Change: There are a number of factors that necessitate a need to extend
the contract time including extra paving and sodding, minor water
main extensions, and additional pavement and pipe removal.
Additionally, the Sanford area experienced abnormal rainfall
amounts May and June 2005 (17.5" of rainfall occurred, normal
rainfall amounts for these two months is 9.9 ").
Change in Contract Price: $0.00
Funding Source: N/A
Change in Contract Time: 145 Days
CHANGE ORDER SUMMARY
No.
Description
Funding
Summary
Change In
Contract Price
Change In
Contract Time
1
Sanitary Lateral For Auto Auction
FDEP CWSRF
$17,110.75
8 Days
2
Final Quantity Adjustments
Miscellaneous
$54,949.50
0 Days
FDEP CWSRF
($65,076.20)
3
Credit For Geotechnical Testing B y
City Instead of Contractor
FDEP CWSRF
($14,805.00)
60 Days
4
Time Extension Granted By City
N/A
$0.00
145 Days
TOTAL
($7,820.95)
213 Days
WAIVER This Change Order constitutes full and mutual accord and satisfaction for the
adjustment of the Contract Price and Contract Time as a result of increases or decreases in
cost and time of performance caused directly and indirectly from the change. Acceptance of
this Waiver constitutes an agreement between OWNER and CONTRACTOR that the Change
Order represents an equitable adjustment to the Agreement and that CONTRACTOR shall
waive all rights to file a Contract Claim or claim of any nature on this Change Order. Execution
of this Change Order shall constitute CONTRACTOR's complete acceptance and satisfaction
that it is entitled to no more costs or time (direct, indirect, impact, etc.) pursuant to this Change
Order.
Page 3 of 4
Change Order#2 -foal
APPROVAL AND CHANGE ORDER AUTHORIZATION
ACKNOWLEDGMENTS
The aforementioned change, and work affected thereby, is subject to all provisions of the
original Agreement and specifically changed by this Change Order; and
It is expressly understood and agreed that the approval of the Change Order shall have no
effect on the original Agreement other than matters expressly provided herein.
ATTEST: {�
(S retary)
I
Date
(Corporate Seal)
Gibbs & Register, Inc.
Contractor
Printed Name and Title of
By (Sigry�ture)
U as
Date
ATTEST: Jan Dougherty
&
(Signature)
Date
(Seal)
Change Order#2 -final
City of Sanford
Owner
Eugene ter - CJAAv Mana e
Pri ed Na�e and Title /
By (Sign# re)
:F-Z
Date
END OF SECTION
Page 4 of 4
CITY OF SANFORD
AIRPORT BLVD. PHASE III UTILITY RELOCATION (IFB 03104 -1)
CHANGE ORDER NO. 2 ATTACHMENT
ITEM 1 - SANITARY LATERAL FROM AUTO AUCTION TO MHA
DESCRIPTION
UNITS
QUANTITY
I UNIT COST
TOTAL COST
SANITARY SEWER SYSTEM CWSRF FUNDED
SY
I
$3.50
$2,778.86
Sanita Lateral
LS
1
- $17,110.751
$17,110.75
(VIAL
ITEM 2 - FINAL QUANTITY ADJUSTMENTS
$17,110.75
DESCRIPTION
SANITARY SEWER SYSTEM ICWSRF FUNDED
UNITS
QUANTITY
UNIT COST
TOTAL COST
Remove Existinq Pavement
SY
- 793.96
$3.50
$2,778.86
Subsoil Excavation
CY
- 8,991.00
$5.00
$44,955.00
12" Stabilized Subbase
SY
- 730.62
$5.00
$3,653.10
8" Limerock Base Course
SY
- 561.22
$12.00
$6,734.64
Remove and Replace 12" Stabilized Shell Road
SY
- 103.00
$16.00
$1,648.00
IType S Asphaltic Concrete 2"
SY
- 676.40
$9.00
$6,087.60
Cut and Cap Existina Force Main
EA
-2.00
$900.00
$1,800.00
2" FM Pipe Removal
I LF
-57.00
1 $8.00
$456.00
6" FM Pie Removal
LF
- 276.00
$8.00
$2,208.00
12" FM Pipe Removal
LF
- 221.00
$9.00
$1,989.00
Fittings DI ) (F &I) FM
TN
1.00
$12,000.00
$12,000.00
6" Cap with Concrete Thrust Collar
EA
-2.00
$500.00
$1,000.00
Pie Furnish and Install DI Push On Joint 6" FM
LF
4.00
$40.00
$160.00
Pi a Furnish and Install DI Push On Joint 12" FM
LF
-3.00
$50.00
$150.00
Pi a Fumish and Install PVC Push On Joint 4" FM
LF
-6.50
$80.00
$520.00
Pie Fumish and Install PVC Push On Joint 6" FM
LF
-43.50
$16.00
$696.00
Pie Furnish and Install Polyethylene 2" FM
LF
- 176.00
$10.00
$1,760.00
Valve Plu Furnish and Install 6"
E4
1.00
$1,200.00
$1,200.00
Tapping Sleeve and Valve 6" x 6"
EA
-2.00
$2,100.00
$4,200.00
Cut and Connect to Existing Force Main
EA
2.00
$1,100.00
$2,200.00
SUB -TOTAL SANITARY SEWER SYSTEM
($65,076.20
WATER MAIN SYSTEM CITY FUNDED
Remove Existing Pavement
SY
- 913.51
$3.50
$3,197.29
12" Stabilized Subbase
SY
706.25
$5.00
$3,531.25
8" Limerock Base Course
SY
706.25
$12.00
$8,475.00
Remove and Replace 12" Stabilized Shell Road
SY
-14.00
$16.00
$224.00
IType S Asphaltic Concrete IT)
571.07
$9.00
$5,139.63
6" WM Pie Removal
LF
-50.00
$9.00
$450.00
10" WM Pipe Removal
LF
258.00
1 $9.00
$2,322.00
Fittin s DI ) (F &I) WM
TN
3.14
1 $8,000.00
$25,120.00
Pie Furnish and Install PVC or DI Push On Joint 8" WM
LF
-
7.00
1 $50.00
$350.00
Pie Furnish and Install PVC or DI Push On Joint 10" WM
LF
141.00
$25.00
$3,525.00
Pi a Furnish and Install DI Push On Joint 6" WM
LF
16.00
$50.00
$800.00
Pi a Furnish and Install DI Push On Joint 10" WM
LF
-5.00
$52.00
$260.00
Pie Furnish and Install DI Push On Joint 12" WM
LF
24.00
$96.00
$2,304.00
Pi a Furnish and Install DI Push On Joint 20" WM
LF
28000
$630.00
$17,640.00
Remove PIuq and Connect to Existing Water Main
EA
1.00
$650.00
$650.00
Cut and Conned To Existing Water Main
EA
-7.00
$800.00
$5,600.00
10" Linestopping Assembly
EA
-1.00
$5,000.00
$5,000.00
12" Linestoppinq Assembl
EA
-2.00
$5,500.00
$11,000.00
Relocate Existin Meter
EA
3.00
$350.00
$1,050.00
Relocate 2" Water Main and A urtenances
LF
141.00
$30.00
$4,230.00
6" WM Relocation (CR46A and Ai orl Blvd.)
LS
-0.05
$29,280.00
($1,500.00
SUB -TOTAL WATER MAIN SYSTEM $47,905.60
RECLAIMED WATER MAIN SYSTEM CITY FUNDED
Remove Existin Pavement
SY
-88.40
$3.50
$309.40
12" Stabilized Subbase
SY
-88.40
$5.00
$442.00
8" Limerock Base Course
SY
-88.40
$12.00
$1,060.80
Type S Asphaltic Concrete (2"1
SY
-95.80
$9.00
$862.20
14" RWM Pie Removal
LF
- 137.00
$9.00
$1,233.00
Fittings DI ) (F &I) RWM
Pi a Furnish and Install PVC or DI Push On Joint 12" RWM
TN
LF
0.82
-1.00
$8,000.00
$400.00
$6,560.00
$400.00
Pie Furnish and Install DI Push On Joint 16" RWM
LF
5.00
$60.00
$300.00
j \s0620. 1 TexceKChange Order 2 0] -28 -05
7R812005 2 :27 PM
Valve (Gate Furnish and Install (D. 1.) (8 ")
EA
-1.00
$800.00
($800.00)
SUB -TOTAL RECLAIMED WATER MAIN SYSTEM
Item 4
$0.00
TOTAL
$1,752.60
STORM SEWER SYSTEM CITY FUNDED
Remove Existing Pavement
SY
188.00
$3.50
$658.00
12" Stabilized Subbase
SY
188.00
$5.00
$940.00
8" Limerock Base Course
SY
1 188.00
$12.00
1 $2,256.00
Type S Asphaltic Concrete (2")
SY
1 159.70
1 $9.001
$1,437.30
SUB -TOTAL STORM SEWER SYSTEM
$5,291.30
TOTAL
CHANGE ORDER SUMMARY
Item 1
$17,110.75
Item 2
$10,126.70
Item 3
$14,805.00
Item 4
$0.00
TOTAL
$7,820.95
CHANGE ORDER FUNDING SUMMARY
FORCE MAIN SYSTEM CWSRF FUNDED
$62,770.45
WATER MAIN SYSTEM
$47,905.60
RECLAIMED WATER MAIN SYSTEM
$1,752.60
STORM SEWER SYSTEM
$5,291.30
TOTAL
$7,820795
Ori final Contract Amount
$1,144,000.00
C.O. No.1
$63,821.54
Proposed C.O. No. 2
($7,820.95)
Proposed New Contract Amount
$1,200,000.59
$54,949.50
($10,126.70)
j,\ 0620.17\excelThanga Order 2 07 -26 -05
7/26 /2005 2 '.2] PM
CITY OF SANFORD
AIRPORT BLVD. PHASE III UTILITY RELOCATION (IFB 03104 -1)
CHANGE ORDER NO. 2 ATTACHMENT
TIME SUMMARY
TOTAL 213 Days
CONTRACT TIME SUMMARY
Contract Time
TIME CHANGE
ITEM 1 - Sewer Lateral
8 Days
ITEM 2 - Final Quantity Adjustment
0 Days
ITEM 3 - Sewer Testing at Manholes
60 Days
ITEM 4 - Time Extension Granted by Ci
145 Days
TOTAL 213 Days
CONTRACT TIME SUMMARY
Contract Time
150 Days
Change Order No. 1 Change in Contract Time
101 Days
Proposed Change Order No. 2 Change in Contract Time
213 Days
New Contract Time
464 Days
Date of Notice to Proceed
3/29/2004
Total Adjusted Contract Time
464 Days
Revised Substantial Completion Date
7/612005
Contract Time From Substantial Completion to Final Completion
30 Days
Revised Final Completion Date
8/5/2005