HomeMy WebLinkAbout1012-CO 2 Phase 3 Gibbs & Regi \uo t�- h_ CHANGE ORDER FORM Change Order No. 2 Final Project Title Airport Blvd. Phase III Utility Relocations Bid No. IFB 03/04 -1 Owner: City of Sanford Contractor: Gibbs & Register, Inc. Agreement Date: February 26, 2004 FDEP No.: CS120586220 This Change Order is necessary to cover changes in the work to be performed under this Agreement. The GENERAL CONDITIONS, SUPPLEMENTARY CONDITIONS, and STANDARD SPECIFICATIONS apply to and govern all work under this Change Order. THE FOLLOWING CHANGES ARE MADE TO THE CONTRACT DOCUMENTS: (1) Original Contract Price $ 1,144.000.00 (2) Current Contract Price (Adjusted by Previous Change Orders) $ 1.207,821.54 (3) Total Proposed Change in Contract Price $ ($7,820.95) (4) New Contract Price (Item 2 + Item 3) $ 1.200,000.59 (5) Original Contract Time 150 Days (6) Current Contract Time (Adjusted by Previous Change Orders) 251 Days (7) Total Proposed Change in Contract Time 213 Days (8) New Contract Time (Item 6 + Item 7) 464 Days (9) New Contract Substantial Completion Date 7/6/05 Page 1 of 4 Change Order#2 -f nal CHANGES ORDERED ITEM 1 Description of Change: Sanitary Lateral For Auto Auction Reason for Change: Sanitary Sewer Lateral was in conflict with the proposed Storm Sewer and needed to be re- routed Change in Contract Price: $17,110.75 Funding Source: FDEP CWSRF — $17,110.75 Change in Contract Time: 8 Days ITEM 2 Description of Change: Final Quantity Adjustments Reason for Change: Incorporate actual constructed quantities into the contract Change in Contract Price: ($10,126.70) Funding Source: FDEP CWSRF — ($65,076.20) City of Sanford Misc. Funding — $54,949.50 Change in Contract Time: 0 Days ITEM 3 Description of Change: Credit For Geotechnical Testing By City Instead of Contractor Reason for Change: The City used its geotechnical engineering consultants to supplement incomplete testing at the sewer manholes and to assist in developing an alternate construction method to provide stable and compact condition at the manholes, saving the Contractor the need to re- excavate and compact to full manhole depth. Change in Contract Price: Funding Source: Change Order#2 -final ($14,805.00) FDEP CWSRF Page 2 of 4 Change in Contract Time: ITEM 4 60 Days Description of Change: Time Extension Granted By City Reason for Change: There are a number of factors that necessitate a need to extend the contract time including extra paving and sodding, minor water main extensions, and additional pavement and pipe removal. Additionally, the Sanford area experienced abnormal rainfall amounts May and June 2005 (17.5" of rainfall occurred, normal rainfall amounts for these two months is 9.9 "). Change in Contract Price: $0.00 Funding Source: N/A Change in Contract Time: 145 Days CHANGE ORDER SUMMARY No. Description Funding Summary Change In Contract Price Change In Contract Time 1 Sanitary Lateral For Auto Auction FDEP CWSRF $17,110.75 8 Days 2 Final Quantity Adjustments Miscellaneous $54,949.50 0 Days FDEP CWSRF ($65,076.20) 3 Credit For Geotechnical Testing B y City Instead of Contractor FDEP CWSRF ($14,805.00) 60 Days 4 Time Extension Granted By City N/A $0.00 145 Days TOTAL ($7,820.95) 213 Days WAIVER This Change Order constitutes full and mutual accord and satisfaction for the adjustment of the Contract Price and Contract Time as a result of increases or decreases in cost and time of performance caused directly and indirectly from the change. Acceptance of this Waiver constitutes an agreement between OWNER and CONTRACTOR that the Change Order represents an equitable adjustment to the Agreement and that CONTRACTOR shall waive all rights to file a Contract Claim or claim of any nature on this Change Order. Execution of this Change Order shall constitute CONTRACTOR's complete acceptance and satisfaction that it is entitled to no more costs or time (direct, indirect, impact, etc.) pursuant to this Change Order. Page 3 of 4 Change Order#2 -foal APPROVAL AND CHANGE ORDER AUTHORIZATION ACKNOWLEDGMENTS The aforementioned change, and work affected thereby, is subject to all provisions of the original Agreement and specifically changed by this Change Order; and It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original Agreement other than matters expressly provided herein. ATTEST: {� (S retary) I Date (Corporate Seal) Gibbs & Register, Inc. Contractor Printed Name and Title of By (Sigry�ture) U as Date ATTEST: Jan Dougherty & (Signature) Date (Seal) Change Order#2 -final City of Sanford Owner Eugene ter - CJAAv Mana e Pri ed Na�e and Title / By (Sign# re) :F-Z Date END OF SECTION Page 4 of 4 CITY OF SANFORD AIRPORT BLVD. PHASE III UTILITY RELOCATION (IFB 03104 -1) CHANGE ORDER NO. 2 ATTACHMENT ITEM 1 - SANITARY LATERAL FROM AUTO AUCTION TO MHA DESCRIPTION UNITS QUANTITY I UNIT COST TOTAL COST SANITARY SEWER SYSTEM CWSRF FUNDED SY I $3.50 $2,778.86 Sanita Lateral LS 1 - $17,110.751 $17,110.75 (VIAL ITEM 2 - FINAL QUANTITY ADJUSTMENTS $17,110.75 DESCRIPTION SANITARY SEWER SYSTEM ICWSRF FUNDED UNITS QUANTITY UNIT COST TOTAL COST Remove Existinq Pavement SY - 793.96 $3.50 $2,778.86 Subsoil Excavation CY - 8,991.00 $5.00 $44,955.00 12" Stabilized Subbase SY - 730.62 $5.00 $3,653.10 8" Limerock Base Course SY - 561.22 $12.00 $6,734.64 Remove and Replace 12" Stabilized Shell Road SY - 103.00 $16.00 $1,648.00 IType S Asphaltic Concrete 2" SY - 676.40 $9.00 $6,087.60 Cut and Cap Existina Force Main EA -2.00 $900.00 $1,800.00 2" FM Pipe Removal I LF -57.00 1 $8.00 $456.00 6" FM Pie Removal LF - 276.00 $8.00 $2,208.00 12" FM Pipe Removal LF - 221.00 $9.00 $1,989.00 Fittings DI ) (F &I) FM TN 1.00 $12,000.00 $12,000.00 6" Cap with Concrete Thrust Collar EA -2.00 $500.00 $1,000.00 Pie Furnish and Install DI Push On Joint 6" FM LF 4.00 $40.00 $160.00 Pi a Furnish and Install DI Push On Joint 12" FM LF -3.00 $50.00 $150.00 Pi a Fumish and Install PVC Push On Joint 4" FM LF -6.50 $80.00 $520.00 Pie Fumish and Install PVC Push On Joint 6" FM LF -43.50 $16.00 $696.00 Pie Furnish and Install Polyethylene 2" FM LF - 176.00 $10.00 $1,760.00 Valve Plu Furnish and Install 6" E4 1.00 $1,200.00 $1,200.00 Tapping Sleeve and Valve 6" x 6" EA -2.00 $2,100.00 $4,200.00 Cut and Connect to Existing Force Main EA 2.00 $1,100.00 $2,200.00 SUB -TOTAL SANITARY SEWER SYSTEM ($65,076.20 WATER MAIN SYSTEM CITY FUNDED Remove Existing Pavement SY - 913.51 $3.50 $3,197.29 12" Stabilized Subbase SY 706.25 $5.00 $3,531.25 8" Limerock Base Course SY 706.25 $12.00 $8,475.00 Remove and Replace 12" Stabilized Shell Road SY -14.00 $16.00 $224.00 IType S Asphaltic Concrete IT) 571.07 $9.00 $5,139.63 6" WM Pie Removal LF -50.00 $9.00 $450.00 10" WM Pipe Removal LF 258.00 1 $9.00 $2,322.00 Fittin s DI ) (F &I) WM TN 3.14 1 $8,000.00 $25,120.00 Pie Furnish and Install PVC or DI Push On Joint 8" WM LF - 7.00 1 $50.00 $350.00 Pie Furnish and Install PVC or DI Push On Joint 10" WM LF 141.00 $25.00 $3,525.00 Pi a Furnish and Install DI Push On Joint 6" WM LF 16.00 $50.00 $800.00 Pi a Furnish and Install DI Push On Joint 10" WM LF -5.00 $52.00 $260.00 Pie Furnish and Install DI Push On Joint 12" WM LF 24.00 $96.00 $2,304.00 Pi a Furnish and Install DI Push On Joint 20" WM LF 28000 $630.00 $17,640.00 Remove PIuq and Connect to Existing Water Main EA 1.00 $650.00 $650.00 Cut and Conned To Existing Water Main EA -7.00 $800.00 $5,600.00 10" Linestopping Assembly EA -1.00 $5,000.00 $5,000.00 12" Linestoppinq Assembl EA -2.00 $5,500.00 $11,000.00 Relocate Existin Meter EA 3.00 $350.00 $1,050.00 Relocate 2" Water Main and A urtenances LF 141.00 $30.00 $4,230.00 6" WM Relocation (CR46A and Ai orl Blvd.) LS -0.05 $29,280.00 ($1,500.00 SUB -TOTAL WATER MAIN SYSTEM $47,905.60 RECLAIMED WATER MAIN SYSTEM CITY FUNDED Remove Existin Pavement SY -88.40 $3.50 $309.40 12" Stabilized Subbase SY -88.40 $5.00 $442.00 8" Limerock Base Course SY -88.40 $12.00 $1,060.80 Type S Asphaltic Concrete (2"1 SY -95.80 $9.00 $862.20 14" RWM Pie Removal LF - 137.00 $9.00 $1,233.00 Fittings DI ) (F &I) RWM Pi a Furnish and Install PVC or DI Push On Joint 12" RWM TN LF 0.82 -1.00 $8,000.00 $400.00 $6,560.00 $400.00 Pie Furnish and Install DI Push On Joint 16" RWM LF 5.00 $60.00 $300.00 j \s0620. 1 TexceKChange Order 2 0] -28 -05 7R812005 2 :27 PM Valve (Gate Furnish and Install (D. 1.) (8 ") EA -1.00 $800.00 ($800.00) SUB -TOTAL RECLAIMED WATER MAIN SYSTEM Item 4 $0.00 TOTAL $1,752.60 STORM SEWER SYSTEM CITY FUNDED Remove Existing Pavement SY 188.00 $3.50 $658.00 12" Stabilized Subbase SY 188.00 $5.00 $940.00 8" Limerock Base Course SY 1 188.00 $12.00 1 $2,256.00 Type S Asphaltic Concrete (2") SY 1 159.70 1 $9.001 $1,437.30 SUB -TOTAL STORM SEWER SYSTEM $5,291.30 TOTAL CHANGE ORDER SUMMARY Item 1 $17,110.75 Item 2 $10,126.70 Item 3 $14,805.00 Item 4 $0.00 TOTAL $7,820.95 CHANGE ORDER FUNDING SUMMARY FORCE MAIN SYSTEM CWSRF FUNDED $62,770.45 WATER MAIN SYSTEM $47,905.60 RECLAIMED WATER MAIN SYSTEM $1,752.60 STORM SEWER SYSTEM $5,291.30 TOTAL $7,820795 Ori final Contract Amount $1,144,000.00 C.O. No.1 $63,821.54 Proposed C.O. No. 2 ($7,820.95) Proposed New Contract Amount $1,200,000.59 $54,949.50 ($10,126.70) j,\ 0620.17\excelThanga Order 2 07 -26 -05 7/26 /2005 2 '.2] PM CITY OF SANFORD AIRPORT BLVD. PHASE III UTILITY RELOCATION (IFB 03104 -1) CHANGE ORDER NO. 2 ATTACHMENT TIME SUMMARY TOTAL 213 Days CONTRACT TIME SUMMARY Contract Time TIME CHANGE ITEM 1 - Sewer Lateral 8 Days ITEM 2 - Final Quantity Adjustment 0 Days ITEM 3 - Sewer Testing at Manholes 60 Days ITEM 4 - Time Extension Granted by Ci 145 Days TOTAL 213 Days CONTRACT TIME SUMMARY Contract Time 150 Days Change Order No. 1 Change in Contract Time 101 Days Proposed Change Order No. 2 Change in Contract Time 213 Days New Contract Time 464 Days Date of Notice to Proceed 3/29/2004 Total Adjusted Contract Time 464 Days Revised Substantial Completion Date 7/612005 Contract Time From Substantial Completion to Final Completion 30 Days Revised Final Completion Date 8/5/2005 y \s0620.17 \excel \Change Order 2 07 -28 -05 7/2812005 2 '.27 PM