Loading...
0115241 677 ADJOURNED REGULAR SESSION OF CITY COMMISSION" TUESDAY January 15, 1924 at 10 A.M. Present: Commissioners S 0 Chase and C J Marshall, George A DeCottes, City Attorney and Fred T Williams, City Engineer. City Engineer made tabulated report on bids as follows: For com truction of Breakwater Wall for Boat Basin. A J McCully 3,675.00 W S Earle 31229.30 R J Gal,lespie 5,934.00 For the following Sewer Materi als: 450 ft 54 Inch Conduit 880 ft. 48n n 960 ft. 36" n 1280 n 30" n Using concrete pipe R J Gallespie 19,640.00 Sherman Pipe Co. 17,881.40 Stevens Guarantee Pipe Co. 15,809.90 Using Concrete Segment Block Gedney & Murphy 17,415.00 Using Vitrified Segment Block Georgia Vitrified Brick & Clay Comapny 10,002.00 For constuuction 54" Sewer under Dock 48n sewer from Commercial St. north in alley Between Park and good Ave. to New Dock, and 36" and 30" along the east line of Elks Club Property , and thence south to Georgetown. Using Concrete Gedney & Murph; I C Mishler Owens Dysard Constn. Usine concrete Pipe y 17,032.00 13,537.00 12,975-00 Co. 15,390.00 Segment Block Gedney & Murphy 15,188.00 I C Mishler 14,308-00 Owens 13,999-50 Using Vitrified Segment Block Gedney & Murphy 16,922.00 I C Mishler 14,264.00 Owens Dysard Constn. Co. Upon motion duly seco of Break Pater for Dock and at $1,500.00 Contract and City Manager was authorized 13,999-50 15,525.00 nded and unanimously passed. The Contract for construction Boat Basin was awarded to W S Earle, and bond was fixed bond to be perfected in fifteen days from date. to sign the contract for the City. A11 bids on concrete pipe mere rejected and the City Manager was authorized to purchase the necessary concrete pipe within the appropriation therefor. 678 P and alga all 30" Vitrified D.S. Pipe 36" segment block and 48" segment block at accepted quotations by Georgia Vitrified Brick and Clay Co. of Augusta Ga. On motion duly seconded and unanimously adopted the Contract for the Dock Seaver 2 and Rand Alley Sewer, be awardedto r M Owens & Co. , and Bond fixed at 50% contract and that 30 days be allowed to perfect bond and contract. The Clerk was instructed to write Engineer Jos E Craig, and ask him to advise when he will submit plans and specifications on new water works plant, and also ask him to revise plans so as to include eight six inch artesian wells as part of new system Location to be supplied later. It was recommended that the City Manager place well for fire protection at S.E. Corner of intersection of Fourth St. and Magnolia Ave. Fire Chief Paxton recommended that one additional man be put on the Fire Force and suggested that Robert Williamson be appointed at a salary of $75.00 per month, to begin January 15, 1924. On motion duly seconded and passed unanimously, it was so ordered. City Engineer was authorized to prepare and have recored an amended plat of Lane's Addition to correct error in first plat as approved, at the expense of the City. There being no further business the meeting adjourned. Attest: City Clerk. MR Mayor.