Loading...
1393 E O Koch Constructiion1 � PURCHASING DEPARTMENT T SMI'TTAL MEMORANDUM To: �• �-u(i(r�- RE: PQ 1� �-2-q -! I � c k a,� ®Vat�j 1 (of(/ ' 0 2 The item(s) noted below is /are attached and forwarded to your office for the following action(s): Development Order Final Plat (original mylars) Letter of Credit Maintenance Bond Ordinance Performance Bond Resolution Once completed, please: ® Return originals to Purchasing ❑ Return copies Special Instructions: Mayor's 5aeeraing Rendering Safe keeping (Vault) U Payment Bond ❑ City Manager Signature ❑ City Clerk Attest/Signature Marisol Ordonez From Date )b TADept_forms \City Clerk Transmittal Memo - 2009.doe DATE: 06/07/11 PURCHASING OFFICE: 407.688.5030 ACCOUNTS PAYABLE: 407.688.5020 FACSIMILE: 407.688.5021 VENDOR NO.: 11699 TO: PURCHASE ORDER PO NUMBER 032491 CHANGE #: 1 DATE CHG: 03/13/12 SUBMIT INVOICES TO: ACCOUNTS PAYABLE' FINANCE DEPT. P.O. BOX 1788 SANFORD, FL32772' CITY OF SANFORD P.O. BOX 1788 (300 NORTH PARK AVENUE) SANFORD, FLORIDA 32772 FLORIDA TAX EXEMPT NO.: 858012621681 C -8 E O KOCH CONSTRUCTION CO P O BOX 1965 SEBRING, FL 33871 -1965 SHIP TO: CITY OF SANFORD 800 FULTON STREET p_ SANFORD, FL 32771 ✓' DELIVER BY TERMS F.O.B. DESTINATION BID OR QUOTATION NO. REQUISITION NO. UNLESS OTHERWISE INDICATED 09/30/11 NET /30 62768 ACCOUNT NO.: 310-4048-572.62-00 PROJECT NO.: PW 0 7 0 7 NO DEVIATION FROM THIS PURCHASE ORDER WILL BE ALLOWED UNLESS AUTHORIZED BY THE PURCHASING MANAGER - CITY OF SANFORD ITEM NO. DESCRIPTION QUANTITY UNIT OF ISSUE UNIT COST EXTENDED COST * * CHANGE ORDER * *** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** 1 GENERAL CONTRACTOR FOR PARKS II 419786.00 NA 1.00 419786.00 MAINT FACILITY AT FT MELLON PARK 2 ADDITIONAL SERVICES 8894.10 NA 1.00 8894.10 SUB TOTAL 428680.10 TOTAL 428680.10 APPROVED BY: APPROVED BY: S&A- - G T r CITY M AGER UR ALL PACKAGES AND INVOICES ASSOCIATED WITH THIS P.O. MUST BEAR THIS PURCHASE ORDER NUMBER. THE VENDOR IS RESPONSIBLE TO CAREFULLY READ AND COMPLY WITH ALL OF THE STANDARD TERMS AND CONDITIONS PROVIDED ON THE REVERSE SIDE OF THIS PURCHASE ORDER AND AT HTTP: //WWW.SANFORDFL.GOV /DEPARTMENTS /PURCHASE[TERMS.HTML COPIES TO: VENDOR ORIGINATING DEPARTMENT PURCHASING SECTION 00850 CHANGE ORDER FORM Change Order No Project Title Bid No. Owner: Contractor: Agreement Date: #1 Ft Mellon Maintenance Facility I FB 10/11 -02 City of Sanford E. O. Koch Construction Company May 26, 2011 This Change Order is necessary to cover changes in the work to be performed under this Agreement. The GENERAL CONDITIONS, SUPPLEMENTARY CONDITIONS, and STANDARD SPECIFICATIONS applyto and govern all work underthis Change Order. THE FOLLOWING CHANGES ARE MADE TO THE CONTRACT DOCUMENTS: (1) Original Contract Price $381,623.00 (2) Current Contract Price (Adjusted by Previous Change Orders) $ 0.00 (3) Total Proposed Change in Contract Price $ 8,894.10 (4) New Contract Price (Item 2 + Item 3) $390,517.10 (5) Original Contract Time 150 Days (6) Current Contract Time (Adjusted by Previous Change Orders) 0 Days (7) Total Proposed Change in Contract Time 32 Days (8) New Contract Time (Item 6 + Item 7) 182 Days (9) Original Contract Substantial Completion Date December 26, 2011 (10) New Contract Substantial Completion Date January 27, 2012 CHANGES ORDERED ITEM 1 Description of Change: Install seamless 6" gutter system around building. Reason for Change: Required as part of the SJRWMD permit. Change in Contract Price: $1,352.00 Change in Contract Time: 0 ITEM 2 Description of Change: Install sink and faucet in the kitchen. Reason for Change: Not provided for in the design specifications. Change in Contract Price: $1,260.00 Change in Contract Time: 1 ITEM 3 Description of Change: Install 225' of 2" conduit for future fiber optic and install 80' of I" for security cameras. Reason for Change: Staff changes not provided for in the original design. Change in Contract Price: $2,279.00 Change in Contract Time: 3 ITEM 4 Description of Change: Remove 50' of old 12" clay pipe. Reason for Change: Old abandoned clay pipe located during the new stormwater line installation. The clay pipe was not picked up on the survey and was in the way of the new pipe. Change in Contract Price: $975.00 Change in Contract Time: 2 ITEM 5 Description of Change: Install attic access and light. Reason for Change: Not provided for on the plans. Staff added the access for future maintenance. Change in Contract Price: $1,000.00 Change in Contract Time: 0 ITEM 6 Description of Change: Add additional rebar to wall footings. Reason for Change: Design change by the architect. Change in Contract Price: $1,750.00 Change in Contract Time: 0 ITEM 7 Description of Change: Provide all labor and material for Sewer and Stormwater Changes. Reason for Change: Sewer had to be rerouted due to trees in the pipe route and the stormwater structures had to be changed out due to SJRWMD requirements. Change in Contract Price: $5,135.00 Change in Contract Time: 10 ITEM 8 Description of Change: Provide all labor and material for 294 LF of 6" PVC pipe to connect to the roof drains. Reason for Change: Required by SJRWMD to meet the drainage calculations for the site. Not covered in the original bid. Change in Contract Price: $5,025.00 Change in Contract Time: 10 ITEM 9 Description of Change: Deduct for landscaping Line Items 40, 41, 42, 43, 44, 46 & 47. Reason for Change: Parks Staff installed the landscaping and irrigation to save costs on the project. Change in Contract Price: - $8,680.98 Change in Contract Time: 0 ITEM 10 Description of Change: Back Charges for City Services. Reason for Change: Damage to trees during construction, Waterline repairs. Change in Contract Price: - $1,200.92 Change in Contract Time: 0 ITEM 11 Description of Change: Add 12 days to the project schedule. Reason for Change: Rain delays and holidays. Change in Contract Price: $0.00 Change in Contract Time: 6 CHANGE ORDER SUMMARY No. Description Change in Contract Price Change in Contract Time 1 Install 6" gutter s stem $1,352.00 0 2 Install sink and faucet in kitchen $1,260.00 1 3 Install 225' of 2" and 80' of 1" conduit $2,279.00 3 4 Remove 50' of old 12" clay pipe $ 975.00 2 5 Install attic access and light $1,000.00 0 6 Additional Rebar for footer $1,750.00 0 7 Sewer and Stormwater Changes $5,135.00 10 8 294 LF of 6" PVC pipe to connect the roof drains $5,025.00 10 9 Deduct Line Items 40, 41, 42, 43, 44, 46 & 47 $8,680.98 0 10 Back Charges for City Services ($1,200.92 ) 0 11 Add days due to Holiday time off /rain days. 1 0.00 1 6 TOTAL 1 $ 8,894.10 1 32 Days WAIVER This Change Order constitutes full and mutual accord and satisfaction for the adjustment of the Contract Price and Contract Time as a result of increases or decreases in cost and time of performance caused directly and indirectly from the change. Acceptance of this Waiver constitutes an agreement between OWNER and CONTRACTOR that the Change Order represents an equitable adjustment to the Agreement and that CONTRACTOR shall waive all rights to file a Contract Claim or claim of any nature on this Change Order. Execution of this Change Order shall constitute CONTRACTOR's complete acceptance and satisfaction that it is entitled to no more costs or time (direct, indirect, impact, etc.) pursuant to this Change Order. r APPROVAL AND CHANGE ORDER AUTHORIZATION ACKNOWLEDGMENTS The aforementioned change, and work affected thereby, is subject to all provisions of the original Agreement and specifically changed by this Change Order; and It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original Agreement other than matters expressly provided herein. ATTEST: (Gee FetsFy ) 'TrE v r 3 — ZOr Date (Corporate Seal) ATTEST: (Signature) Date (Seal) E. O. Koch Construction Co. Contractor Edward O. Koch Jr., President Printed Nam d Title icer By re) M arch 5, 2012 Date C.i.ty o/ San /o/zd Owner Noe -ton N donapalzte., .a1z. Liity 17anayelz Printed Name nd itle By (Signat re) P1a2ch 7, U12 Date END OF SECTION