Loading...
041188-Work Session MINUTES City Commission, Sanford, Florida April 11, 19__ 88 The City Commission of the City of Sanford, Florida, met in a work session City Manager's Conference Room of the City Hall in the City of Sanford, Florida, at o'clock P. M. on April 11, 1988. Present: Mayor-Commissioner Bettye D. Smith Commissioner Whitey Eckstein Commissioner A. A. McClanahan Commissioner John Y. Mercer Commissioner Bob Thomas City Manager Frank Faison Acting City Clerk Joan E. Mackie Absent: City Clerk H. N. Tamm, Jr. City Attorney William L. Colbert The meeting was called to order by the Chairman. The City Engineer presented memorandum as follows: MEMORANDUM TO: City Manager FROM: Director of Engineering and Planning SUBJECT: 201 Plan Effluent Disposal DATE: April 5, 1988 Mr. Faison: In follow up to discussions at the City Commission worksession on April 4, 1988, I have collected the attached material from our 201 Plan (Revision No. 2) to address City Commission questions regarding overall funding implications of the. various ·alternatives presented. Table 3-6 includes those elements, marked *, of the 201 Plan directly related to effluent disposal. These elements total nearly $18 miliicn. As noted at the bottom of this table, substitution of different disposal alternatives which in their totality do not increase the identified total cost will have no fiscal impact. Deferring part of the relatively high cost of the Site 10 development ($4.05 to $4.33 per gallon) offers some potential for cost savings although this will be heavily dependent upon actual development of suitable alternatives. This action would also leave part of the Site 10 capacity for undetermined future requirements. Until this is accomplished, Site 10 must remain as our "do-able alternative". I have enclosed for your convenience copies of Table 3.2, which analyzes potential irrigation sites and Table 3.2- rearranged, previously presented. To address overall financial considerations, Table 4-5 is attached. Significant factors from this table are as follows: a. Maximum monthly capital contribution per customer, based on capital costs on Table·3-6, less grants, is shown to peak in Fiscal Year 1990. The subsequent decline of the estimated monthly capital contribution is the result of several factors, not the least of which is the projected growth of ~ the system in terms of numbers of customers. Any action, either by City Commission or by an external agency which constrains this projected growth would significantly effect the projected capital contribution decline. Conversely, more rapid rate base growth would yield a further decline in these figures. b. Column J - "Impact Fees" - projects an annual income of $644,300. This column totals $12,241,700. (Present sewer impact fee is $1700 per 270 gallon ERU or $6.296 per gallon.) These funds are programmed to accommodate the various costs of growth between our present flow of approximately 5.5 MGD and our projected flow (Year 2005) of 7.3 MGD. This annual income will be subject to adjustment based on results of periodic impact fee studies whereby requirements related to growth are documented and their estimated costs are spread the 4:00 MINUTES City Commission, Sanford, Florida April 11, over the projected growth during the reckoning period. The specific set of alternatives executed within the next few years will have an impact on the cost of providing the effluent disposal/reuse function for the projected growth. Copies of material distributed on April 4 are attached for convenience of review. An additional alternative, C/C-1 is postulated, to consider a slight variation whereby 0.75 MGD Lake Mary capacity is planned and Site 10 is initially developed to approximately 2.0 MGD and later expanded to 3.4 MGD to meet requirements of growth. This has the advantage of "proving" Site 10 as an asset. Residential irrigation has been included. Although we are now entering a period of major expenditure of funds and large contracts, we are really rather near the end of what has been a long program, starting in 1974. I have attached a copy of Figure 4.1, annotated to show present status, as a reminder. TABLE 3-6 201 PLAN CAPITAL COST SUMMARY Sludge Handling Facilities Sewer System Rehabilitation Treatment and Transmission Improvements (Contracts !,.II, & 111) Mayfair Golf Course Irrigation (Contract B) City Parks Irrigation (Contract C) Airport Irrigation System Purchase of Site !0 Site 10 Improvements Vacuum Sewer Collection System (Elimination of Combined Sewer Overflows) Master Lift Station Replacement Outfalt Line to St. Johns River New Reclaimed Water Distribution Extensions Existing Plant Expansion ReSidential Neighborhood Total 201 Plan 201 Plan Amendment Amendment No. 2 No. 1 2,640,500 $ 2,370,000 2,190,000 8,930,700 3,600,000 8,!85,000 817,700 750,000 502,000 3,500,000 10,640,000 4,412,200 t,500,000 4,562,500 9,000,000 !,890,000 1,447,000 1,062,500 1,890,000 1,505,400 1,062,500 ir770,800 2r572~!00 $39,803,400 $36,542,500 Irrigation and Commercial/Industrial reuses at approximate main extension costs of up to $7,590,600 may be possible Subsuitutes for ~uil or partial development of Site t0. 217 19 88 218 MINUTES City Commission, Sanford, Florida April 11, 19 88 201 PLAN AMENDMENT NO. 2 POTENTIAL SITES (Table 3.2 Rearranged) Area Neighborhood: Groveview Neighborhood: Idyllwilde Neighborhood East of Sanford Avenue Mayfair Neighborhood Neighborhood: Santa Barbara Area Neighborhood: West of Sanford Avenue Neighborhood: Country Club, Mayfair Circle Neighborhood: Pinecrest, Sanora Neighborhood: Hidden Lake Area Memorial Park Bel Air ~1 and %2 SUBTOTAL: Effluent Disposal Cost/ System Ca%acity Gallons Cost 0.2995 $ 2.05 $ 491,200 0.387 2.69 1,040,000 0.2832 2.96 839,000 0.0543 2.98 134,000 0.126 3.31 417,400 0.304 4.06 1,235,000 0.0782 4.09 319,600 0.225 4.75 1,068,800 0.2436 4.80 840,200 0.006 0.0071 - 2.0139 $ 3.17 $6,386,000 Area Sanford Middle School UF Agricultural Research Station Airport, Industrial Areas Beardall Avenue Groves Seminole Comm. College Seminole High School & Lakeview Middle School County Services (5 Pts) Crooms School of Choice Pinecrest Elem. School School Board Offices Goldsboro Elem School Effluent Disposal Cost/ System Capacity Gallons Cost Parks and Golf Course System Cost Including $1.25 Per/Gal. Sprinklers 0.0585 $ 0.53 $ 30,800 $ 104,130 0.1767 0.66 117,100 337,497 0.457 1.03 374,700 1,041,960 0.1282 1.09 139,400 299,988 0.1365 1.35 184,300 354,900 0.0826 1.35 i11,500 214,760 0.0294 1.76 51,900 88,494 0.0251 2.69 67,500 98,894 0.0145 4.18 60,600 78,735 0.011 13,750 0.0124 - 15~500 $1,137,800 SUBTOTAL: 1.1319 $ 1.00/ 2.34 $2,64~,608 TOTAL: 3.!458 $ 2.40/ $7,523,800 $9,034,608 2.87 i.17 $1.13 $1,320,000 Cal Conklin, Conklin, Porter & Holmes Engineers, Inc., City Cons~ Engineers, stated in regards to the Lake Mary/Sanford Irrigation lease, he felt that the engineering aspect of said lease, the City should implement the program. Commission McClanahan stated that the 2200 acres is already owned by the City an investment of $3.5 million, and if you take out the cost of the land, the cost gallon would then be at $3.00 per gallon compared to the $2.78 to the $3.04 per gallon a Lake ~'~y.- Commission McClanahan noted that if notice of intent to terminate the-leas, must be given three (3) years ahead of time or the lease rolls over for ten (10) years. Commission Mercer noted that $1.1 million goes to Lake Mary to pay for th, easement to go to Timacuan and $1.1 to Timacuan. The City Engineer reported that Conk Porter & Holmes was in the process to update the impact fee. The City Engineer, Bill Simmons, stated that if the City could not use Site (2200 acres), then we need to have Lake Mary golf course. The City Engineer stated tha ~-.Site lO was a viable source for the effluent by DER. MINUTES City Commission, Sanford, Florida April 11, 2/9 19 88 l Commissioner McClanahan stated he favored an option contract with Lake Mary for six months to further develop other alternatives and to complete the studies being done on Site 10. The City Engineer reported that Groveview homeowners were poled about the use of effluent on their lawns and were in favor by 18 out of 18. The City Engineer also noted that the Staff is working with the Mayfair Golf Course about irrigation with effluent and a Consultant would be necessary to study the effect of the effluent on the greens. Commissioner Eckstein was appointed to represent the City at the Lake Mary Corridor meeting on April 13, 1988. There being no further business the meeting was adjourned. ATTEST: