Loading...
106ADDRESS 106 Balboa Court 7WNFR R.C.A. LEGAL DE5GR1Pfi*N t Lot 19, Date Approved: -7 Blk. 2 Hidden Lake Phase II, Unit I _ _ Su b. SuILDIN CONTRACTOR Sub. Reg's. Apply: Yes No 3 -2 -81 Permit #15609 Erect S/F Residence Model 1148D J.Feinstein ($18,700.) i BUILDING RECORD 163 0!8 ~~ BUILDING: Final Inspection FEES: 3 - �. Development Fee musco *-Zgw Streets Paved Unpaved Street Paving Fee UTILITIES: Water Lines Meter Set Sewer Lines Sewer Tap i Storm Sewer ENGINEERING/PUB. WORKS: Drainage Street Paving Street Name Signs Street Lights Maintenance Bond OVER ) PLUMBING CONTRACTOR Muns Plumbing Co., Inc. FIXTURES new res. 2 Bathrooms INSPECTIONS ROUGH c IN_ V /6 /If/ oK/L - OK- 5 / -) /) - / FINAL ELECTRICAL 5/6/81 Permit #7984 Tri City Electric FIXTURES New Residence INSPECTIONS /[� ROUGH IN 5/2/J/. L/� FINAL MECHANICAL 5/5/81 Permit #2120 CONTRACTOR Air Flow Designs FIXTURF S A/C & Heating INSPECTIONS ROUGH IN FINAL