Loading...
205ADDRESS 205 Arbor Cir OWNF_R Globetrust Development LEOAL DESCRIPTION Lot 903B, Phase TT, The ARbors Date Approved: Co--D4-F7 DUMO1Na CONTRACTOR l r PFN SPAU M AJIA Sub. Rea's. ADDly: Yes No BUILDING RECORD BUILDING: 5 -21 -85 Permit # 21017 r Final inspection Gerald Tannenbaum ( ao - sS- Sla b - a< - 'yD FEES: Erect Townhouse _ C: �-� �} ($26,500) '0 S ko - 722, `f`vI. g evelopment Fees 1(0A5?C1tt o`IS Iy AS - g�� Streets Paved Unpaved Street Paving Fee 41 UTILITIES: a aaq - i ' ) 0,4b Cp l Water Lines Meter Set Sewer Lines Sewer Tap Storm Sewer ENGINEERINGIPUB. WORKS: Drainage Street Paving Street Name Signs Street Lights Maintenance Bond ( OVER PLUMBING 6 -11 -85 Permit # 1746 CONTRACTOR Tillman's Plumbing FIXTURES One Water Closet Additional Water Closet - 2 INSPECT[ ROUGH IN (V %& Ub +_ ELECTRICAL Pandit # 11160 CONTRACTOR Lowry of Fl FIXTURES 0 -100 Amp Service INSPECTIONS ROUGH IN $ 1- to- MECHANICAL 1 -LL -00 rermlL IF 370 MfitTW1 F1 Htg & A/C n tall Heat & A/C INSPECTIONS (�] ROUGH IN