Loading...
1550 Barracuda Building Corpf1560 Change Order No Project Name: Bid No.: Owner: Contractor: Agreement Date: CHANGE ORDER Upsala Rd. Utility Relocations IFB No. 11/12 -16 City of Sanford Barracuda Building Corporation November 7. 2012 This Change Order is necessary to cover changes in the work to be performed under this Agreement. The GENERAL CONDITIONS, SUPPLEMENTARY CONDITIONS, and STANDARD SPECIFICATIONS apply to and govern all work under this Change Order. THE FOLLOWING CHANGES ARE MADE TO THE CONTRACT DOCUMENTS: 1. Original Contract Price 2. Current Contract Price (Adjusted by Previous Change Orders) 3. Total Proposed Change in Contract Price 4. New Contract Price (Item 2 + Item 3) 5. Original Contract Time 6. Current Contract Time (Adjusted by Previous Change Orders) 7. Current Contract Substantial Completion Date 8. Current Contract Final Completion Date 9. Total Proposed Change in Contract Time A. Upsala Rd. Utility Relocations B. 3rd St. Storm Sewer Repair / Replacement (Added Work) 10. New Contract Time A. Upsala Rd. Utility Relocations B. 3 St. Storm Sewer Repair / Replacement (Added Work) 11. New Contract Substantial Completion Date A. Upsala Rd. Utility Relocations B. 3` St. Storm Sewer Repair / Replacement (Added Work) 12. New Contract Final Completion Date A. Upsala Rd. Utility Relocations B. 3 St. Storm Sewer Repair / Replacement (Added Work) $161,118.00 $161,118.00 $ 38,738.01 $199,856.01 77 Days 77 Days 3/18/13 4/17/13 0 Days 30 Days 77 Days 30 Days 3/18/13 4/17/13 4/17/13 5/17/13 Upsala Rd. Utility Relocations CHANGE ORDER NO. 1 Page 1 of 4 CHANGES ORDERED ITEM 1 Description of Change: 3rd St. Storm Sewer Repair / Replacement (24" Storm Sewer Option) Reason for Change: It was discovered that the storm sewer located along the south side of 3 rd St. west of the Cloud Branch drainage system was not connected to the new box culvert that was constructed as part of the Former Sanford Gasification Plant Remedial Construction. It is required that new storm sewer piping extending from west of the box culvert, through the ISS area, and connecting to the box culvert be installed in order to restore the 3 rd St. storm sewer system outfall to the Cloud Branch drainage system. Change in Contract Price: $38,738.01 Funding Source Change in Conti Upsala Rd. Utility CHANGE ORDER SUMMARY No. Description Funding Source Change in Change in Contract Price Contract Time 1 3rd St. Storm Sewer Repair/ Sanford Replacement Gasification Plant Site Group $36,899.01 City of Sanford (Stormwater Utility Fund ) $1,839.00 30 Days TOTAL $38,738.01 30 Days WAIVER This Change Order constitutes full and mutual accord and satisfaction for the adjustment of the Contract Price and Contract Time as a result of increases or decreases in cost and time of performance caused directly and indirectly from the change. Acceptance of this Waiver constitutes an agreement between OWNER and CONTRACTOR that the Change Order represents an equitable adjustment to the Agreement and that CONTRACTOR shall waive all rights to file a Contract Claim or claim of any nature on this Change Order. Execution of this Change Order shall constitute CONTRACTOR's complete acceptance and satisfaction that it is entitled to no more costs or time (direct, indirect, impact, etc.) pursuant to this Change Order. Upsala Rd. Utility Relocations CHANGE ORDER NO. 1 Page 3 of 4 APPROVAL AND CHANGE ORDER AUTHORIZATION ACKNOWLEDGMENTS The aforementioned change, and work affected thereby, is subject to all provisions of the original Agreement and specifically changed by this Change Order; and It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original Agreement other than matters expressly provided herein. WITNESS to CONTRACTOR: Pet A- L - 711 . /A rte Date —T ATTEST: (Signature) C) Date (Seal) Barracuda Building Corporation Contractor City of Sanford Owner Thomas J. George, Deputy City Manager Printed Name and Title By (Sign e) 1121 1 Date Upsala Rd. Utility Relocations CHANGE ORDER NO. 1 Page 4 of 4 (Corporate Seel) CITY OF SANFORD UPSALA RD. UTILITY RELOCATIONS (IFB 11/12 -16) ATTACHMENT - CHANGE ORDER NO. 1 Item 1 - 3rd St. Storm Sewer Repair / Replacement (18" Storm Sewer Option) Item 1 - 3rd St. Storm Sewer Repair / Replacement (24" Storm Sewer Option) DESCRIPTION UNITS QUANTITY UNIT PRICE TOTAL PRICE 1 Mobilization LS 1 $5,278.53 $5,278.53 2 Erosion and Sediment Control LS 1 $858.00 $858.00 3 Clearing and Grubbing Note: Removal of Palm Trees by Others LS 1 $1,575.00 $1,575.00 4 Remove and Reinstall Existing Sin EA 1 $220.00 $220.00 5 Install New Storm Sewer Manhole EA 2 $3,600.00 $7,200.00 6 Connect Existing 15" Clay Storm Sewer to New Manhole EA 1 $795.00 $795.00 7 Remove Existing 15" Clay Storm Sewer LF 133 $11.00 $1,463.00 8 Cut and Cap Existing 15" Clay Storm Sewer West Side of Exist. Sewer Manhole EA 1 $435.00 $435.00 9 Install New 18" RCP Storm Sewer Outside ISS Area LF 129 $60.00 $7,740.00 10 Remove Existing Concrete ISS Material for 18" RCP Trench (Trench Length Through ISS Area is 12 LF +/- ) HR 8 $340.00 $2,720.00 11 Install New 18" RCP Storm Sewer (Through ISS Area LF 12 $130.00 $1,560.00 12 Truck Removed ISS Material to Waste Services, Inc. (Assume Max. 20 Tons Per Truck Load ) LOAD 1 $440.00 $440.00 13 Connect New 18" RCP to Existing Concrete Junction Structure LS 1 $975.00 $975.00 14 Remove and Replace Existing Concrete Sidewalk 4" Thick - If Needed SY 40 $56.65 $2,266.00 15 Remove and Replace Existing Concrete Driveway 6" Thick SY 36 $71.50 $2,574.00 16 Sodding (Bahia) SY 158 $5.06 $799.48 Total 1 $36,899.01 Item 1 - 3rd St. Storm Sewer Repair / Replacement (24" Storm Sewer Option) SUMMARY Item 1 Work to be conducted will be the 24" Storm Sewer Option. The funding source for the item 1 work is as follows: DESCRIPTION DESCRIPTION UNITS QUANTITY UNIT PRICE TOTAL PRICE 1 Mobilization LS 1 $5,278.53 $5,278.53 2 Erosion and Sediment Control LS 1 $858.00 $858.00 3 Clearing and Grubbing Note: Removal of Palm Trees by Others LS 1 $1,575.00 $1,575.00 4 Remove and Reinstall Existing Sin EA 1 $220.00 $220.00 5 Install New Storm Sewer Manhole EA 2 $3,600.00 $7,200.00 6 Connect Existing 15' Clay Storm Sewer to New Manhole EA 1 $795.00 $795.00 7 Remove Existing 15" Clay Storm Sewer LF 133 $11.00 $1,463.00 8 Cut and Cap Existing 15' Clay Storm Sewer West Side of Exist. Sewer Manhole EA 1 $435.00 $435.00 9 Install New 24" RCP Storm Sewer Outside ISS Area LF 129 $70.00 $9,030.00 10 Remove Existing Concrete ISS Material for 24" RCP Trench (Trench Length Through ISS Area is 12 LF +/ HR 9 $340.00 $3,060.00 11 Install New 24" RCP Storm Sewer (Through ISS Area LF 12 $142.00 $1,704.00 12 Truck Removed ISS Material to Waste Services, Inc. LOAD 1 $440.00 $440.00 13 Connect New 24" RCP to Existing Concrete Junction Structure LS 1 $1,040.00 $1,040.00 14 Remove and Replace Existing Concrete Sidewalk 4" Thick - If Needed SY 40 $56.65 $2,266.00 15 Remove and Replace Existing Concrete Driveway 6" Thick SY 36 $71.50 $2,574.00 16 Sodding (Bahia) SY 1 158 $5.06 $799.48 Total $38,738.01 SUMMARY Item 1 Work to be conducted will be the 24" Storm Sewer Option. The funding source for the item 1 work is as follows: DESCRIPTION COST FUNDING SOURCE Sanford Gasification Plant 3rd St. Storm Sewer Repair / Replacement Cost for 18" Storm Sewer $36,899.01 Site Grou City of Sanford (Stormwate 3rd St. Storm Sewer Repair / Replacement Cost to Install 24" RCP in lieu of 18" RCP $1,839.00 Utility Fund TOTAL $38,738.01 C. 0. No. 1 Attachment - Upsala 12- 20- 12.xls A -1 of A -1 12/20/2012 Change Order Documentation Proposal From Barracuda Building Corporation V #1 AI # oil BARRACUDA BUILDING CORPORATION CCC 1504612 CITY OF SANFORD 3 RD ST. STORM SEWER REPAIR /REPLACEMENT ALTERNATE CONSTRUCTION - 3RD ST. - NEW 24" RCP IN LIEU OF NEW 18" RCP UNIT TOTAL DESCRIPTION UNITS QUANTITY PRICE PRICE 1 Mobilization LS 1 $5,278.63 $5,278.53 2 Erosion and Sediment Control LS 1 $858.00 $858.00 3 Clearing and Grubbing Note: Removal of Palm Trees by Others LS 1 $1,575.00 $1,575.00 4 Remove and Reinstall Existing Sin EA 1 $220.00 $220.00 5 Install New Storm Sewer Manhole EA 2 $3,600.00 $7,200.00 6 Connect Existing 15" Clay Storm Sewer to New Manhole EA 1 $795.00 $795.00 7 Remove Existing 15" Clay Storm Sewer LF 133 $11.00 $1,463.00 8 Cut and Cap Existing 15" Clay Storm Sewer West Side of Exist, Sewer Manhole EA 1 $435.00 $435.00 9 Install New 18" RCP Storm Sewer Outside ISS Area LF 129 $60.00 $7 10 Remove Existing Concrete ISS Material for 18" RCP Trench (Trench Length Through ISS Area is 12 LF +/- HR 8 $340.00 $2,720.00 11 Install New 18" RCP Storm Sewer (Through ISS Area LF 12 $130.00 $1,560.00 12 Truck Removed ISS Material to Waste Servides, Inc. (Assume Max. 20 Tons Per Truck Load LOAD 1 $440.00 $440.00 13 Connect New 18" RCP to Existing Concrete Junction Structure LS 1 $975.00 $975.00 14 Remove and Replace Existing Concrete Sidewalk 4" Thick - If Needed SY 40 $56.65 $2,266.00 15 Remove and Replace Existing Concrete Sidewalk 6" Thick SY 36 $71.50 $2,574.00 16 Sodding Bahia SY 158 $5.06 $799.48 Total $36,899.01 ALTERNATE CONSTRUCTION - 3RD ST. - NEW 24" RCP IN LIEU OF NEW 18" RCP 1000 OCOEE- APOPKA ROAD, SUITE 400 APOPKA, FL 32703 www.barracudabuildingcorp.com PHONE - 407 -814 -8644 FAX - 407- 814 -8044 UNIT TOTAL DESCRIPTION UNITS QUANTITY PRICE PRICE ALT -9 Install New 24" RCP Storm Sewer Outside ISS Area LF 129 $70.00 $9,030.00 ALT -10 Remove Existing Concrete ISS Material for 24" RCP Trench (Trench Length Through ISS Area is 12 LF =/- ) HR 9 $340.00 $3,060.00 ALTA I Install New 24" RCP Storm Sewer (Through ISS Area LF 12 $142.00 $1,704.00 ALT -12 Truck Removed ISS Material to Waste Services, Inc. LOAD 1 1 $440.00 $440.00 ALT -13 Connect New 24" RCP to Existing Concrete Junction Structure LS 1 $1,040.00 $1,040.00 Total 1 $15,274.00 1000 OCOEE- APOPKA ROAD, SUITE 400 APOPKA, FL 32703 www.barracudabuildingcorp.com PHONE - 407 -814 -8644 FAX - 407- 814 -8044 r #1# Apia BARRACUDA BUILDING CORPORATION CCC 1504612 NOTES 1. Dewatering is not included — in the event it is found to be needed, it will be conducted at an additional cost as follows: 18" or 24" RCP outside the ISS area $4,128.00 18" or 24" RCP inside the ISS area $480.00 2. All dump fees & environmental paperwork or fees generated by the ISS removal operation will be paid for and provided by others. 3. The rip rap is available from Cemex In their Cocoa, FL plant. They are the Florida distributors for Aggregates USA & they ship the product down here from GA by rail. Therefore, our price includes picking up this material from Cocoa, FL in lieu of Macon, GA 4. As requested, this price does not include erosion control at individual inlets & silt fence at the project site proper. 5. This price includes an allowance of $400 for geotechnical testing ( com(action, proctor, etc.) 6. This price includes removal & replacement of the private sign. This sign is fairly old, therefore, BBC takes no responsibility of its integrity in case it falls apart upon removal. We will take all due care in the process of its removal & replacement. 7. A trench box will be utilized for installation of all pipe & structures. 8. The trenched area through the ISS material is priced at 17' long, 9' deep & 6' wide. This is because earth fill will have to be utilized at the trench bottom & sides to provide a compacted base for the pipe, especially at the pipe bell area. The original request for pricing calls for a 17' long x 8' deep x 3' wide trench @ the ISS. Those dimensions do not allow for enough room for compaction or compaction equipment. 37 CY (truck measure) of earth fill is included here for backfill for the area the ISS occupied. 9. Both palm trees (approx. 30'— 40' tall) are to be removed by others and are not included in this cost. 10. As requested, trucking of removed ISS material to the disposal site will be by Star Trucking and that cost is included above. 11. We anticipate this scope of work to take about 30 calendar days to complete upon authorization to proceed. Therefore, we will need a 30 day extension of the original Upsala contract time. The authorization to proceed will be needed by 211113 in order to complete the work within 30 days of the current subst. completion date of the Upsala project (2127113). Starting the 3' St. work by 211113 gives until 3127113 to get the 3` St. work completed. 12. Rip Rap at existing MES North of 3' St. is not included. 1000 OCOEE- APOPKA ROAD, SUITE 400 APOPKA, FL 32703 www.barraeudabuildingcorp.com PHONE - 407 - 814 -8644 FAX - 407- 814 -8044