1012-Gibbs and Register, Inc. - Change OrderC� 101a SECTION 00950 CHANGE ORDER FORM Change Order No. 1 Project Title CR 46A / Airport Boulevard Utility Relocations Bid No. IFB 05/06 -24 Owner: City of Sanford Contractor: Gibbs and Register, Inc. Agreement Date: December 14, 2006 This Change Order is necessary to cover changes in the work to be performed under this Agreement. The GENERAL CONDITIONS, SUPPLEMENTARY CONDITIONS, and STANDARD SPECIFICATIONS apply to and govern all work under this Change Order. THE FOLLOWING CHANGES ARE MADE TO THE CONTRACT DOCUMENTS: (1) Original Contract Price (2) Current Contract Price (Adjusted by Previous Change Orders) (3) Total Proposed Change in Contract Price (4) New Contract Price (Item 2 + Item 3) (5) Original Contract Time (6) Current Contract Time (Adjusted by Previous Change Orders) (7) Total Proposed Change in Contract Time (8) New Contract Time (Item 6 + Item 7) (9) Original Contract Substantial Completion Date (10) New Contract Substantial Completion Date 00950 -1 $ 329,000.00 $ 329,000.00 $ 34,549.43 $ 363,549.43 240 Days 240 Days 0 Days 240 Days October 17, 2007 October 17, 2007 f il l SPECLIB120902 CHANGES ORDERED ITEM 1 Description of Change: Additional Pipe Removal and 12" Gate Valve Reason for Change: 511 LF of existing 6" FM, 150 LF of existing 12" FM and 711 LF of existing 24" WM was previously taken out of service but was unable to be removed during the original CR46A Phase III construction. This existing piping must be removed during the roadway construction therefore it needs to be added to the CR 46A / Airport Boulevard Utility Relocations construction. A 12" gate valve at Larkwood Drive will also be added at the City's Request to allow the force main flow to continue down CR46A during construction and minimize force main flows along Upsala Road. Change in Contract Price: $24,974.50 Change in Contract Time: 0 Days ITEM 2 Description of Change: Relocation of 6" RWM along Vinewood Drive Reason for Change: Approximately 180 LF of the City of Sanford's existing 6" reclaimed water main is in conflict with the County's proposed structure S -112 and proposed curbline along Vinewood Dr. and needs to be relocated. (see attached sketch) Change in Contract Price: $9,574.93 Change in Contract Time: 0 Days 00950 -2 SPECLIBI20902 CHANGE ORDER SUMMARY No. Description Change in Contract Price Change in Contract Time 1 Additional Pipe Removal and 12" Gate Valve $24,974.50 0 Days 2 Relocation of 6" RWM along Vinewood Drive $9,574.93 0 Days TOTAL $34,549.43 0 Days WAIVER This Change Order constitutes full and mutual accord and satisfaction for the adjustment of the Contract Price and Contract Time as a result of increases or decreases in cost and time of performance caused directly and indirectly from the change. Acceptance of this Waiver constitutes an agreement between OWNER and CONTRACTOR that the Change Order represents an equitable adjustment to the Agreement and that CONTRACTOR shall waive all rights to file a Contract Claim or claim of any nature on this Change Order. Execution of this Change Order shall constitute CONTRACTOR's complete acceptance and satisfaction that it is entitled to no more costs or time (direct, indirect, impact, etc.) pursuant to this Change Order. APPROVAL AND CHANGE ORDER AUTHORIZATION ACKNOWLEDGMENTS The aforementioned change, and work affected thereby, is subject to all provisions of the original Agreement and specifically changed by this Change Order; and 00950 -3 SPECLIB120902 It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original Agreement other than matters expressly provided herein. ATTEST: fk8' cretary) J ANN G. REGI TER, `/.- //- 0 r l Date (Corporate Seal) ATTEST: Secretary Gibbs and Register, Inc. Contractor REX D. HUFFMAN, President Printed Name and Title of Officer By ( Rg n Pr 1 / // - Date City of Sanford Owner Q ? , t , L& t n ! %-', Robert Yehl- City Manager (koignature) Janet D ghertj,, City Printed Name and Title do -1 Clerk U Da By (Signature) &R j"L f S / ) - 07 (Seal) Date END OF SECTION 00950 -4 SPECLIB120902 CITY OF SANFORD C.R. 46A - AIRPORT BLVD UTILITY RELOCATIONS (IFB 05/06 -24) CHANGE ORDER NO. 1 - ATTACHMENT ITEM 1 - ADDITIONAL PIPE REMOVAL AND 12' GATE VALVE DESCRIPTION UNITS QUANTITY UNIT COST TOTAL COST Remove Existing 6" Force Main LF 511 $9.50 $4,854.50 Remove Existing 12" Force Main LF 150 $12.00 $1,800.00 Remove Existing 24" Water Main LF 711 $20.00 $14,220.00 12" Gate Valve EA 1 $4,100.00 $4,100.00 TOTAL ITEM 2 - RELOCATION OF 6" RWM ALONG VINEWOOD DRIVE $24,9/4.50 DESCRIPTION UNITS QUANTITY I UNIT COSTI TOTAL COST Relocation of 6" RWM along Vinewood Drive LS 1.00 $9,574.93 $9,574.93 TOTAL CHANGE ORDER SUMMARY Item 1 $24,974.50 Item 2 $9,574.93 TOTAL $34,549.43 $9,574.93 Original Contract Amount $329,000.00 Proposed C.O. No. 1 $34,549.43 Proposed New Contract Amount $363,549.43 CITY OF SANFORD C.R. 46A - AIRPORT BLVD UTILITY RELOCATIONS (IFB 05/06 -24) CHANGE ORDER NO. 1 - ATTACHMENT TIME SUMMARY TOTAL Days CONTRACT TIME SUMMARY Contract Time TIME CHANGE ITEM 1 - ADDITIONAL PIPE REMOVAL AND 12' GATE VALVE ITEM 2 - RELOCATION OF 6" RWM ALONG VINEWOOD DRIVE 0 Days 0 Days TOTAL Days CONTRACT TIME SUMMARY Contract Time 240 Days Proposed Change Order No. 1 Change in Contract Time Days New Contract Time 240 Days Date of Notice to Proceed 2/19/2007 Total Adjusted Contract Time 240 Days Revised Substantial Completion Date 10/17/2007 Contract Time From Substantial Completion to Final Completion 30 Days Revised Final Completion Date 11/16/2007 5 z n wO; O� ooa A o m N r y Mp D z mg m +Z O ° o0 0iS Mgo U m o m r I I t I I I II J Ef s_ I 9 t I t I & F a c , I � I