1121-Prime Const-Cloud Branch-Change Order ProposalCcn - w A
PRIME CONSTRUCTION CROUP, INC. CGCO37504 CUCO56650 Q633325
1000 Jetstream Drive, Orlando, FL 32824 407 - 856 -8180 PH
P.O. Box 590507, Orlando, FL 32859 -0507 (Mailing Address) 407 - 856 -8182 FX
May 22, 2007
CPH Engineers
500 West Fulton Street
Sanford, FL 32771
Attn: Rocco Nasso, P.E.
RE: Cloud Branch Drainage Improvements — Phase
City of Sanford Project No.: 05/06 -08
Prime Construction Group Inc. Job No. 530
CO Proposal to modify S -31 Finish Gracie Elevation
Dear Rocco:
530 -02 -018
Attached please find the Change Order Proposal to modify S -31 finish grade elevation.
The above structure was precasted and installed per the contract drawings on 12
Street. PCG modified the above structure per Engineer's request.
This proposal includes all labor, material and equipment and subcontractor costs. The
total value of the above proposal is valued at $499.13.
If you have any questions regarding the Change Order Proposal, please do not hesitate
to call.
Sincerely,
v�
f
Ketan Patel
Project Manager
KPJpac
F:\PnZiect Cloud Bunch Drainage Imp. Phase 1\02Correspondence \To -from Engineer CPH\018 CO Proposal to modify
S -31 FG elevation.doc
Change Order Proposal
Change Request No.:
Owner Reference:
Description:
530 -13
Date: 22- May -07
Modify S -31 FG Elevation
Crew Size Quantity Unit
Unit Price Extenslon
PCG Labor with Burden
1 Modify S -31 FG elevation
Foroman, Pipe
1 3
hrs
$61.00 $183.00
PCG Labor Subtotal
$183.00
PCG Labor Markup
15.00%
$27.45
Materials
Material Subtotal
Material Tax
6.50 1 /6
Material Markup
15.00
Equipment and Other Rentals
1 Modify S -31 FG elevation
Pickup Truck & Cell Phone
0.35
Day
$175.00 $61.25
Rental Subtotal
$61.25
Rental Tax
6.50%
$3.98
Rental Markup
15.00%
$9.78
Subcontracts
1 Modify S -31 FG elevation - Concrete Cutting & Breaking
1
LS
$200.00 $200.00
Subcontractor Subtotal
$200.00
Subcontractor Markup
5.00%
$10.00
Change Order Subtotal
$495.47
Daily Jobsite Overhead
Days
$159.00
Small Tool Allowance
2.00%
$183.00
$3.66
$499.13
Bond Amount
2.00%
Change Order Grandtotal
7777 77t
Additional Contract Time requested
This estimate is valid for 30 days.
0 uay
PRIME CONSTRUCTION GROUP INC. CGCO37504 CUCO56650 QB33325
1000 Jetstream Drive, Orlando, FL 32824 407- 856 -8180 PH
P.O. Box 590507, Orlando, FL 32859 -0507 (Mailing Address) 407 - 856 -8182 FX
May 22, 2007
CPH Engineers
500 West Fulton Street
Sanford, FL 32771
Attn: Rocco Nasso, P.E.
RE: Cloud Branch Drainage Improvements — Phase I
City of Sanford Project No.: 05/06 -08
Prime Construction Group, Inc. Job No. 530
CO Proposal to modify Pond 5 slopes on Southside
Dear Rocco:
530 -02 -016
Attached please find the Change Order Proposal to modify slopes at Pond 5 on the
Southside. Originally the slopes were finish graded at 6:1 slope per the contract
drawings. PCG re- graded the slopes to 4:1 per City's request.
This proposal includes all labor, material and equipment costs. The total value of the
above proposal is valued at $14,917.10 and increase in contract time by three (3)
additional days.
If you have any questions regarding the Change Order Proposal, please do not hesitate
to call.
Sinrt?rPly.
Ketan Patel
Project Manager
KP /pac
FAProject_Management\lobs \530 Cloud Branch Drainage Imp. Phase AVCorrespondence \To -from Engineer CPITV 6 CO Proposal - Modify
Pond 5 Slopes on Southside.doc
Change Order Proposal
Change Request No.:
Owner Reference:
Description:
530 -11
Modify Pond 5 Slopes on South side
Craw .Rba 0 ... ntity I tnit
Date: 22- May -07
Unit Price Extension
PCG Labor with Burden
1 Modify Pond 5 slopes on Scuthside from 6:1 to 4:1
Foreman, Dirt
1
3
Days
$489.00
$1,467.00
Operator, Loader
1
3
Days
$315.00
$945.00
Operator, Track Excavator
1
3
Days
$399.00
$1,197.00
Laborer, Skilled
1
3
Days
$294.00
$882.00
PCG Labor Subtotal _
$4,491.00
PCG Labor Markup
15.00%
$673.65
Materials
Material Subtotal
Material Tax
6.50%
Material Markup
15.00
Equipment and Other Rentals
1 Modify Pond 5 slopes on Scuthside from 6:1 to 4:1
Loader, JD 6" - 4 CY
3
Day
$765.00
$2,295.00
Excavator, PC 300
3
Day
$980.00
$2,940.00
Dozer, JD 650
3
Day
$580.00
$1,740.00
Pickup Truck & Cell Phone
3
Day
$175.00
$525.00
Rental Subtotal
$7,500.00
Rental Tax
6.50%
$487.50
Rental Markup
15.00%
$1,198.13
Subcontracts
Subcontractor Subtotal
Subcontractor Markup
5.00
Change Order Subtotal
$14,350.28
Daily Jobsite Overhead
3.00
Days
$159.00
S477.00
Small Tool Allowance
2.00%
$4,491.00
$89.82
$14,917.10
Bond Amount
2.00%
Change Order Grandlotal
$14,917.10 l
Additional Contract Time requested
This estimate is valid for 30 days.
F:Nrojecl,bt tU b&5]0 C ,d Blanch Dr-l"OU1
-S-2, cid..)ISjCho Sheet
s Days
PRIME CONSTRUCTION GROUP, INC. CGCO37504 CUCO56650 QB33325
1000 Jetstream Drive, Orlando, FL 32824 407 -856 -8180 PH
P.O. Box 590507, Orlando, FL 32859 -0507 (Mailing Address) 407 - 856 -8182 FX
May 22, 2007
CPH Engineers
500 West Fulton Street
Sanford, FL 32771
Attn: Rocco Nasso, P.E.
530 -02 -015
RE: Cloud Branch Drainage Improvements — Phase I
City of Sanford Project No.: 05/06 -08
Prime Construction Group, Inc. job No. 530
CO Proposal to modify S -16 Wingwali & extend 15" Pipe at Pond 5
Dear Rocco:
Attached please find the Change Order Proposal to modify S -16 wingwall and extend
15" pipe at Pond 5. The above wingwall was extended to accommodate 15" Pipe on
South side of Pond 5. PCG also extended the 15" Pipe provided by the City from its
planned location.
This proposal includes all labor, material and equipment costs for the following:
• Modify wingwall at S -16 to accommodate 15" pipe
• Extend 15" pipe
The total value of the above proposal is valued at $6,069.30 and increase in contract
time by two (2) additional days.
If you have any questions regarding the Change Order Proposal, please do not hesitate
to call.
Sincerely,
ill
a
L-
Ketan Patel
Project Manager
KP /pac
FAIroject_ManagemenNobs \530 Cloud Branch Drainage hop. Phase 1 \02Correslxmdcnce \To -from Engineer CPI1 \015 CO Proposal to modify
S -16 Wingwall & extend 15 inch RCP.doc
Change Order Proposal
Change Request No.:
Owner Reference:
Description:
530 -10
Date: 22- May -07
Modify Wingwall & Extend 15" RCP at
S -16 - Pond 5
Grew Size Quanlftv Unit
Unit Price Extension
PCG Labor with Burden
1 Install 15' RCP - 30 LF (Extend to S -16) and Modify S -16
Foreman, Pipe
1
0.5
Days
$489.00
$244.50
Wingwall to accommodate the above pipe
Pipe Layer
1
1
Days
$336.00
$336.00
Pipe Laborer
1
1
Days
$273.00
$273.00
Pipe Tallman
1
1
Days
$294.00
$294.00
Operator, Track Excavator
1
1
Days
$399.00
$399.00
Pipe Layer
1
Days
$336.00
$336.00
Foreman, Carpenter
1
0.5
Days
$489.00
$244.50
Concrete Finisher
1
1
Days
$567.00
$567.00
Concrete Finisher Helper
1
1
Days
$567.00
$567.00
PCG Labor Subtotal
$3,261.00
PCG Labor Markup
15.00%
$489.15
Materials
1 Concrete - 5500 PSI
3
CY
$121.00
$363.00
1 Minimum Load charge for the concrete
i
LS
$ 125.00
$125.00
1 Environmental Charge
LS
$10.00
$10.00
1 Fuel Surcharge
1
LS
$20.00
$20.00
Material Subtotal
$518.00
Material Tax
6.50%
$33.67
Material Markup
15.00%
$82.75
Equipment and Other Rentals
1 Install 15" RCP - 30 LF (Extend to S -16) and Modify S -16
Excavator, PC 300
0.5
Day
S9B0.00
$490.00
Wingwall to accommodate the above pipe
Loader, JD 644 - 4 CY
0.5
Day
$765.00
$382.50
Pickup Truck & Cell Phone
0.5
Day
$175.00
$87.50
Plate Compactor, 13K Force
0.5
Day
$115.00
$57.50
Pickup Truck & Cell Phone
1
Day
$175.00
$175.00
Rental Subtotal
$1,192.50
Rental Tax
6.50%
$77.51
Rental Markup
15.00%
5190.50
Subcontracts
Subcontractor Subtotal
Subcontractor Markup
5.00%
Change Order Subtotal
$5,845.08
Daily Jobsite Overhead
1.00
Days
$159.00
5159.00
Small Tool Allowance
2.00%
$3,261.00
$65.22
$6,069.30
Band Amount
Change Order Gra ndtotal
$6,069.30
Additional Contract Time requested
This estimate is valid for 30 days.
F AP,.j U_h { I CbW R-I D, -gag,
2 Days
15lath RCP at P- S.XLSIMPat pate
PRIME CONSTRUCTION GROUP, INC. CGCO37504 CUCO56650 QB33325
1000 Jetstream Drive, Orlando, FL 32824 407 - 856 -8180 PH
P.O. Box 590507, Orlando, FL 32859 -0507 (Mailing Address) 407- 856 -8182 FX
May 23, 2007
CPH Engineers
500 West Fulton Street
Sanford, FL 32771
Attn: Rocco Nasso, P.E.
RE: Cloud Branch Drainage Improvements — Phase I
City of Sanford Project No.: 05/06 -08
Prime Construction Group, Inc. Job No. 530
CO Proposal for handicap ramps at 13 St. and Lake Ave.
Dear Rocco:
530 -02 -019
Attached please find the Change Order to install handicap ramps at the intersection of
13 Street and Lake Avenue. The total of four each handicap ramps to be installed at
the above intersection.
This proposal includes all labor, material and equipment and subcontractor costs. The
total value of the above proposal is valued at $1,999.63 and increase in contract time
by one (1) additional day.
If you have any questions regarding the Change Order Proposal, please do not hesitate
to call.
Sincerely,
Ketan Patel
Project Manager
KP /pac
F: \Pmiect_ManagetnentUobs\530 Cloud Branch Drainage Imp. Phase 1\02Co respondence \To-fiorn Engineer CPH \019 CO Proposal for
Handicap Ramps at lath & Lakc.doc
Change Order Proposal
Change Request No.: 530 -14 Date: 23- May -07
Owner Reference:
Description: Handicap Ramps at 13th st and
Lake Ave.
Crew Size Quantity Unit Unit Price Extension
PCG Labor with Burden
Handicap Ramps at 13th st and Lake Ave.
Foreman, Pipe 1
0.5
Days
$489.00
$244.50
PCG Labor Subtotal
$244.50
PCG Labor Markup
15.00%
$36.68
Materials
1 Concrete for Handicap Ramps
1
CY
5105.00
$105.00
1 Handicap Stamps
4
EA
$140.60
$562.40
Material Subtotal
$667.40
Material Tax
6.50%
$43.38
Material Markup
15.00%
$106.62
Equipment and Other Rentals
1 Modify S -31 FG elevation
Pickup Truck & Call Phone
0.5
Day
$175.00
$87.50
Rental Subtotal
$87'50
Rental Tax
6.50%
$5.69
Rental Markup
15.00
$13.98
Subcontracts
1 Forin/Pour /Strip Handicap Ramps at 131h st and Lake Avenue-
4
EA
$150.00
$600.00
Fajardo Concrete
Subcontractor Subtotal
$600.00
Subcontractor Markup
5.00 1 /6
$30.00
Change Order Subtotal
$1,835.74
Dairy Jobsite Overhead
1.00
Days
$159.00
$159.00
Smail Tool Allowance
2.00
$244.50
$4.89
$1,999.63
Bond Amount
2.00
Change Order Grandtotal
$1,999.63
Additional Contract Time requested
This estimate Is valid for 30 days.
F:V+ro)act Abnape ILwba430 -1 8—a Dr.—
all SRI aM
Day
PRIME CONSTRUCTION GROUP, INC. CGCO37504 CUCO56650 QB33325
1000 Jetstream Drive, Orlando, FL 32824 407 - 856 -8180 PH
P.O, Box 590507, Orlando, FL 32859 -0507 (Mailing Address) 407 -856 -8182 FX
May 23, 2007
CPH Engineers
500 West Fulton Street
Sanford, FL 32771
Attn: Rocco Nasso, P.E.
RE: Cloud Branch Drainage Improvements — Phase I
City of Sanford Project No.: 05106 -08
Prime Construction Group, Inc. Job No. 530
CO Proposal to install new gates between 13 and 12 # �' Streets
Dear Rocco:
530 -02 -020
Attached please find the Change Order to install the following new gates between 13
and 12 Streets:
- 1 EA - 4 ft Gate - 4 ft high
- 2 EA- 12 ft Gates - 4 ft high
The above gates were installed after the installation of 4 x 11 box culvert through the
easements on private property.
This proposal includes all our subcontractor costs. The total value of the above
proposal is valued at $993.75 and increase in contract time by one (1) additional day.
If you have any questions regarding the Change Order Proposal, please do not hesitate
to call.
Sincerely,
Man Patel
Project Manager
KPlpac
F: \Pmicct_ManagementUobs\530 Cloud Bnnch Drainage Imp. Phase 1\02Correspondence \To -from Engineer CPH \020 CO Proposal to install
new gates between 13th and 121h St..doc
Change Order Proposal
Change Request No.:
Owner Reference:
Description:
530 -15
Date: 23- May -07
Install new gates between 13th and 12th
Streets
Crew Size ne anti1,
Init dill Price Extension
PCG Labor with Burden
PCG Labor Subtotal
PCG Labor Markup
15.00%
Materials
I
I
Material Subtotal
Material Tax
6.50 9 /6
Material Markup
15.00%
Equipment and Other Rentals
Rental Subtotal
Rental Tax
6.50%
Rental Markup
15.00%
Subcontracts
1 Straight Up Fence - Install following gates between 13th & 12th
1 LS
$795.00 $795.00
2 EA - 12 ft Gates - 4 it high
1 EA - 4 it Gate - 4 it high
$795.00
Subcontractor Subtotal
Subcontractor Markup
5.00%
$39.75
Change Order Subtotal
$834.75
Daily Jobslte Overhead
1.00 Days
$159.00 $159.00
Small Tool Allowance
2.00
$993.75
Bond Amount
2.00%
Change Order Grandtotal
599175
Additional Contract Time requested
This estimate is valid for 30 days.
F :1Vroiea M ... o enWOW$30 Cbed Branch D—"n
rmr 01- between 1391 red
ULK
PRIME CONSTRUCTION GROUP, INC. CGCO37504 CUCO56650 QB33325
1000 Jetstream Drive, Orlando, FL 32824
P.O. Box 590507, Orlando, FL 32859 -0507 (Mailing Address)
May 22, 2007
CPH Engineers
500 West Fulton Street
Sanford, FL 32771
Attn: Rocco Nasso, P.E.
RE: Cloud Branch Drainage Improvements — Phase I
City of Sanford Project No.: 05/06 -08
Prime Construction Group, Inc. Job No. 1530
CO Proposal to Install Rubble Riprap at Pond 5
Dear Rocco:
407- 856 -8180 PH
407 - 856 -8182 FX
530 -02 -017
Attached please find the Change Order Proposal to install rubble riprap (bank and
shore) in front of S -16 Endwall on Southside of Pond 5. This riprap to be installed to
prevent future erosion control in front of the above structure.
This proposal includes all labor, material and equipment costs. The total value of the
above proposal is valued at $12,002.31 and increase in contract time by two (2)
additional days.
If you have any questions regarding the Change Order Proposal, please do not hesitate
to call.
Sincerely,
K/e'tan Patel
Project Manager
KP /pac
F:Troiect_ManagenientUobs \530 Cloud Branch Drainage (nip. Phase f'.02Con -liom Engineer CP V017 CO Proposal to Install
Rubble Riprap at Pond 05.doc
Change Order Proposal
Change Request No.:
Owner Reference:
Description:
530 -12
Date: 22- May -07
Install Rubble Riprap at Pond 5
Craw Si7a Orjantity Unit
Unit Price Extension
PCG Labor with Burden
1 Install Rubble Riprap at Pond 5
Foreman, Dirt
1 2
Days
$489.00
$978.00
Operator, Loader
1 2
Days
$315.00
$630.00
Operator, Track Excavator
1 2
Days
$399.00
$798.00
Laborer, Skilled
1 2
Days
$294.00
$588.00
PCG Labor Subtotal
$2,994.00
PCG Labor Markup
15.00%
$449.10
Materials
1 Rubble Riprap - Bank and shore
f
100
TN
$28.40
$2,840.00
Material Subtotal
$2,840.00
Material Tax
6.50 1 /6
$184.60
Material Markup
15.00%
$453.69
Equipment and Other Rentals
1 Rubble Riprap - Bank and shore
Loader, JD 644 - 4 CY
2
Day
$765.00
$1,530.00
Excavator, PC 300
2
Day
$980.00
$1,960.00
Pickup Truck & Cell Phone
2
Day
$175.00
$350.00
Rental Subtotal
$3,840.00
Rental Tax
6.50%
$249.60
Rental Markup
15.00%
$613.44
Subcontracts
Subcontractor Subtotal
Subcontractor Markup
5.00%
Change Order Subtotal
$11,624.43
Daily Jobsito Overhead
2.00
Days
$159.00
$316.00
Small Tool Allowance
2.00%
$2,994.00
$59.88
$12.002.31
Bond Amount
2.00%
Change Order Giandtotal
$12,002.31
Additional Contract Time requested
This estimate is valid for 30 days.
F: -A,jod Wiiape W,ba1530 Cbud Bauch D,,in