Loading...
1121-Prime Const-Cloud Branch-Change Order ProposalCcn - w A PRIME CONSTRUCTION CROUP, INC. CGCO37504 CUCO56650 Q633325 1000 Jetstream Drive, Orlando, FL 32824 407 - 856 -8180 PH P.O. Box 590507, Orlando, FL 32859 -0507 (Mailing Address) 407 - 856 -8182 FX May 22, 2007 CPH Engineers 500 West Fulton Street Sanford, FL 32771 Attn: Rocco Nasso, P.E. RE: Cloud Branch Drainage Improvements — Phase City of Sanford Project No.: 05/06 -08 Prime Construction Group Inc. Job No. 530 CO Proposal to modify S -31 Finish Gracie Elevation Dear Rocco: 530 -02 -018 Attached please find the Change Order Proposal to modify S -31 finish grade elevation. The above structure was precasted and installed per the contract drawings on 12 Street. PCG modified the above structure per Engineer's request. This proposal includes all labor, material and equipment and subcontractor costs. The total value of the above proposal is valued at $499.13. If you have any questions regarding the Change Order Proposal, please do not hesitate to call. Sincerely, v� f Ketan Patel Project Manager KPJpac F:\PnZiect Cloud Bunch Drainage Imp. Phase 1\02Correspondence \To -from Engineer CPH\018 CO Proposal to modify S -31 FG elevation.doc Change Order Proposal Change Request No.: Owner Reference: Description: 530 -13 Date: 22- May -07 Modify S -31 FG Elevation Crew Size Quantity Unit Unit Price Extenslon PCG Labor with Burden 1 Modify S -31 FG elevation Foroman, Pipe 1 3 hrs $61.00 $183.00 PCG Labor Subtotal $183.00 PCG Labor Markup 15.00% $27.45 Materials Material Subtotal Material Tax 6.50 1 /6 Material Markup 15.00 Equipment and Other Rentals 1 Modify S -31 FG elevation Pickup Truck & Cell Phone 0.35 Day $175.00 $61.25 Rental Subtotal $61.25 Rental Tax 6.50% $3.98 Rental Markup 15.00% $9.78 Subcontracts 1 Modify S -31 FG elevation - Concrete Cutting & Breaking 1 LS $200.00 $200.00 Subcontractor Subtotal $200.00 Subcontractor Markup 5.00% $10.00 Change Order Subtotal $495.47 Daily Jobsite Overhead Days $159.00 Small Tool Allowance 2.00% $183.00 $3.66 $499.13 Bond Amount 2.00% Change Order Grandtotal 7777 77t Additional Contract Time requested This estimate is valid for 30 days. 0 uay PRIME CONSTRUCTION GROUP INC. CGCO37504 CUCO56650 QB33325 1000 Jetstream Drive, Orlando, FL 32824 407- 856 -8180 PH P.O. Box 590507, Orlando, FL 32859 -0507 (Mailing Address) 407 - 856 -8182 FX May 22, 2007 CPH Engineers 500 West Fulton Street Sanford, FL 32771 Attn: Rocco Nasso, P.E. RE: Cloud Branch Drainage Improvements — Phase I City of Sanford Project No.: 05/06 -08 Prime Construction Group, Inc. Job No. 530 CO Proposal to modify Pond 5 slopes on Southside Dear Rocco: 530 -02 -016 Attached please find the Change Order Proposal to modify slopes at Pond 5 on the Southside. Originally the slopes were finish graded at 6:1 slope per the contract drawings. PCG re- graded the slopes to 4:1 per City's request. This proposal includes all labor, material and equipment costs. The total value of the above proposal is valued at $14,917.10 and increase in contract time by three (3) additional days. If you have any questions regarding the Change Order Proposal, please do not hesitate to call. Sinrt?rPly. Ketan Patel Project Manager KP /pac FAProject_Management\lobs \530 Cloud Branch Drainage Imp. Phase AVCorrespondence \To -from Engineer CPITV 6 CO Proposal - Modify Pond 5 Slopes on Southside.doc Change Order Proposal Change Request No.: Owner Reference: Description: 530 -11 Modify Pond 5 Slopes on South side Craw .Rba 0 ... ntity I tnit Date: 22- May -07 Unit Price Extension PCG Labor with Burden 1 Modify Pond 5 slopes on Scuthside from 6:1 to 4:1 Foreman, Dirt 1 3 Days $489.00 $1,467.00 Operator, Loader 1 3 Days $315.00 $945.00 Operator, Track Excavator 1 3 Days $399.00 $1,197.00 Laborer, Skilled 1 3 Days $294.00 $882.00 PCG Labor Subtotal _ $4,491.00 PCG Labor Markup 15.00% $673.65 Materials Material Subtotal Material Tax 6.50% Material Markup 15.00 Equipment and Other Rentals 1 Modify Pond 5 slopes on Scuthside from 6:1 to 4:1 Loader, JD 6" - 4 CY 3 Day $765.00 $2,295.00 Excavator, PC 300 3 Day $980.00 $2,940.00 Dozer, JD 650 3 Day $580.00 $1,740.00 Pickup Truck & Cell Phone 3 Day $175.00 $525.00 Rental Subtotal $7,500.00 Rental Tax 6.50% $487.50 Rental Markup 15.00% $1,198.13 Subcontracts Subcontractor Subtotal Subcontractor Markup 5.00 Change Order Subtotal $14,350.28 Daily Jobsite Overhead 3.00 Days $159.00 S477.00 Small Tool Allowance 2.00% $4,491.00 $89.82 $14,917.10 Bond Amount 2.00% Change Order Grandlotal $14,917.10 l Additional Contract Time requested This estimate is valid for 30 days. F:Nrojecl,bt tU b&5]0 C ,d Blanch Dr-l"OU1 -S-2, cid..)ISjCho Sheet s Days PRIME CONSTRUCTION GROUP, INC. CGCO37504 CUCO56650 QB33325 1000 Jetstream Drive, Orlando, FL 32824 407 -856 -8180 PH P.O. Box 590507, Orlando, FL 32859 -0507 (Mailing Address) 407 - 856 -8182 FX May 22, 2007 CPH Engineers 500 West Fulton Street Sanford, FL 32771 Attn: Rocco Nasso, P.E. 530 -02 -015 RE: Cloud Branch Drainage Improvements — Phase I City of Sanford Project No.: 05/06 -08 Prime Construction Group, Inc. job No. 530 CO Proposal to modify S -16 Wingwali & extend 15" Pipe at Pond 5 Dear Rocco: Attached please find the Change Order Proposal to modify S -16 wingwall and extend 15" pipe at Pond 5. The above wingwall was extended to accommodate 15" Pipe on South side of Pond 5. PCG also extended the 15" Pipe provided by the City from its planned location. This proposal includes all labor, material and equipment costs for the following: • Modify wingwall at S -16 to accommodate 15" pipe • Extend 15" pipe The total value of the above proposal is valued at $6,069.30 and increase in contract time by two (2) additional days. If you have any questions regarding the Change Order Proposal, please do not hesitate to call. Sincerely, ill a L- Ketan Patel Project Manager KP /pac FAIroject_ManagemenNobs \530 Cloud Branch Drainage hop. Phase 1 \02Correslxmdcnce \To -from Engineer CPI1 \015 CO Proposal to modify S -16 Wingwall & extend 15 inch RCP.doc Change Order Proposal Change Request No.: Owner Reference: Description: 530 -10 Date: 22- May -07 Modify Wingwall & Extend 15" RCP at S -16 - Pond 5 Grew Size Quanlftv Unit Unit Price Extension PCG Labor with Burden 1 Install 15' RCP - 30 LF (Extend to S -16) and Modify S -16 Foreman, Pipe 1 0.5 Days $489.00 $244.50 Wingwall to accommodate the above pipe Pipe Layer 1 1 Days $336.00 $336.00 Pipe Laborer 1 1 Days $273.00 $273.00 Pipe Tallman 1 1 Days $294.00 $294.00 Operator, Track Excavator 1 1 Days $399.00 $399.00 Pipe Layer 1 Days $336.00 $336.00 Foreman, Carpenter 1 0.5 Days $489.00 $244.50 Concrete Finisher 1 1 Days $567.00 $567.00 Concrete Finisher Helper 1 1 Days $567.00 $567.00 PCG Labor Subtotal $3,261.00 PCG Labor Markup 15.00% $489.15 Materials 1 Concrete - 5500 PSI 3 CY $121.00 $363.00 1 Minimum Load charge for the concrete i LS $ 125.00 $125.00 1 Environmental Charge LS $10.00 $10.00 1 Fuel Surcharge 1 LS $20.00 $20.00 Material Subtotal $518.00 Material Tax 6.50% $33.67 Material Markup 15.00% $82.75 Equipment and Other Rentals 1 Install 15" RCP - 30 LF (Extend to S -16) and Modify S -16 Excavator, PC 300 0.5 Day S9B0.00 $490.00 Wingwall to accommodate the above pipe Loader, JD 644 - 4 CY 0.5 Day $765.00 $382.50 Pickup Truck & Cell Phone 0.5 Day $175.00 $87.50 Plate Compactor, 13K Force 0.5 Day $115.00 $57.50 Pickup Truck & Cell Phone 1 Day $175.00 $175.00 Rental Subtotal $1,192.50 Rental Tax 6.50% $77.51 Rental Markup 15.00% 5190.50 Subcontracts Subcontractor Subtotal Subcontractor Markup 5.00% Change Order Subtotal $5,845.08 Daily Jobsite Overhead 1.00 Days $159.00 5159.00 Small Tool Allowance 2.00% $3,261.00 $65.22 $6,069.30 Band Amount Change Order Gra ndtotal $6,069.30 Additional Contract Time requested This estimate is valid for 30 days. F AP,.j U_h { I CbW R-I D, -gag, 2 Days 15lath RCP at P- S.XLSIMPat pate PRIME CONSTRUCTION GROUP, INC. CGCO37504 CUCO56650 QB33325 1000 Jetstream Drive, Orlando, FL 32824 407 - 856 -8180 PH P.O. Box 590507, Orlando, FL 32859 -0507 (Mailing Address) 407- 856 -8182 FX May 23, 2007 CPH Engineers 500 West Fulton Street Sanford, FL 32771 Attn: Rocco Nasso, P.E. RE: Cloud Branch Drainage Improvements — Phase I City of Sanford Project No.: 05/06 -08 Prime Construction Group, Inc. Job No. 530 CO Proposal for handicap ramps at 13 St. and Lake Ave. Dear Rocco: 530 -02 -019 Attached please find the Change Order to install handicap ramps at the intersection of 13 Street and Lake Avenue. The total of four each handicap ramps to be installed at the above intersection. This proposal includes all labor, material and equipment and subcontractor costs. The total value of the above proposal is valued at $1,999.63 and increase in contract time by one (1) additional day. If you have any questions regarding the Change Order Proposal, please do not hesitate to call. Sincerely, Ketan Patel Project Manager KP /pac F: \Pmiect_ManagetnentUobs\530 Cloud Branch Drainage Imp. Phase 1\02Co respondence \To-fiorn Engineer CPH \019 CO Proposal for Handicap Ramps at lath & Lakc.doc Change Order Proposal Change Request No.: 530 -14 Date: 23- May -07 Owner Reference: Description: Handicap Ramps at 13th st and Lake Ave. Crew Size Quantity Unit Unit Price Extension PCG Labor with Burden Handicap Ramps at 13th st and Lake Ave. Foreman, Pipe 1 0.5 Days $489.00 $244.50 PCG Labor Subtotal $244.50 PCG Labor Markup 15.00% $36.68 Materials 1 Concrete for Handicap Ramps 1 CY 5105.00 $105.00 1 Handicap Stamps 4 EA $140.60 $562.40 Material Subtotal $667.40 Material Tax 6.50% $43.38 Material Markup 15.00% $106.62 Equipment and Other Rentals 1 Modify S -31 FG elevation Pickup Truck & Call Phone 0.5 Day $175.00 $87.50 Rental Subtotal $87'50 Rental Tax 6.50% $5.69 Rental Markup 15.00 $13.98 Subcontracts 1 Forin/Pour /Strip Handicap Ramps at 131h st and Lake Avenue- 4 EA $150.00 $600.00 Fajardo Concrete Subcontractor Subtotal $600.00 Subcontractor Markup 5.00 1 /6 $30.00 Change Order Subtotal $1,835.74 Dairy Jobsite Overhead 1.00 Days $159.00 $159.00 Smail Tool Allowance 2.00 $244.50 $4.89 $1,999.63 Bond Amount 2.00 Change Order Grandtotal $1,999.63 Additional Contract Time requested This estimate Is valid for 30 days. F:V+ro)act Abnape ILwba430 -1 8—a Dr.— all SRI aM Day PRIME CONSTRUCTION GROUP, INC. CGCO37504 CUCO56650 QB33325 1000 Jetstream Drive, Orlando, FL 32824 407 - 856 -8180 PH P.O, Box 590507, Orlando, FL 32859 -0507 (Mailing Address) 407 -856 -8182 FX May 23, 2007 CPH Engineers 500 West Fulton Street Sanford, FL 32771 Attn: Rocco Nasso, P.E. RE: Cloud Branch Drainage Improvements — Phase I City of Sanford Project No.: 05106 -08 Prime Construction Group, Inc. Job No. 530 CO Proposal to install new gates between 13 and 12 # �' Streets Dear Rocco: 530 -02 -020 Attached please find the Change Order to install the following new gates between 13 and 12 Streets: - 1 EA - 4 ft Gate - 4 ft high - 2 EA- 12 ft Gates - 4 ft high The above gates were installed after the installation of 4 x 11 box culvert through the easements on private property. This proposal includes all our subcontractor costs. The total value of the above proposal is valued at $993.75 and increase in contract time by one (1) additional day. If you have any questions regarding the Change Order Proposal, please do not hesitate to call. Sincerely, Man Patel Project Manager KPlpac F: \Pmicct_ManagementUobs\530 Cloud Bnnch Drainage Imp. Phase 1\02Correspondence \To -from Engineer CPH \020 CO Proposal to install new gates between 13th and 121h St..doc Change Order Proposal Change Request No.: Owner Reference: Description: 530 -15 Date: 23- May -07 Install new gates between 13th and 12th Streets Crew Size ne anti1, Init dill Price Extension PCG Labor with Burden PCG Labor Subtotal PCG Labor Markup 15.00% Materials I I Material Subtotal Material Tax 6.50 9 /6 Material Markup 15.00% Equipment and Other Rentals Rental Subtotal Rental Tax 6.50% Rental Markup 15.00% Subcontracts 1 Straight Up Fence - Install following gates between 13th & 12th 1 LS $795.00 $795.00 2 EA - 12 ft Gates - 4 it high 1 EA - 4 it Gate - 4 it high $795.00 Subcontractor Subtotal Subcontractor Markup 5.00% $39.75 Change Order Subtotal $834.75 Daily Jobslte Overhead 1.00 Days $159.00 $159.00 Small Tool Allowance 2.00 $993.75 Bond Amount 2.00% Change Order Grandtotal 599175 Additional Contract Time requested This estimate is valid for 30 days. F :1Vroiea M ... o enWOW$30 Cbed Branch D—"n rmr 01- between 1391 red ULK PRIME CONSTRUCTION GROUP, INC. CGCO37504 CUCO56650 QB33325 1000 Jetstream Drive, Orlando, FL 32824 P.O. Box 590507, Orlando, FL 32859 -0507 (Mailing Address) May 22, 2007 CPH Engineers 500 West Fulton Street Sanford, FL 32771 Attn: Rocco Nasso, P.E. RE: Cloud Branch Drainage Improvements — Phase I City of Sanford Project No.: 05/06 -08 Prime Construction Group, Inc. Job No. 1530 CO Proposal to Install Rubble Riprap at Pond 5 Dear Rocco: 407- 856 -8180 PH 407 - 856 -8182 FX 530 -02 -017 Attached please find the Change Order Proposal to install rubble riprap (bank and shore) in front of S -16 Endwall on Southside of Pond 5. This riprap to be installed to prevent future erosion control in front of the above structure. This proposal includes all labor, material and equipment costs. The total value of the above proposal is valued at $12,002.31 and increase in contract time by two (2) additional days. If you have any questions regarding the Change Order Proposal, please do not hesitate to call. Sincerely, K/e'tan Patel Project Manager KP /pac F:Troiect_ManagenientUobs \530 Cloud Branch Drainage (nip. Phase f'.02Con -liom Engineer CP V017 CO Proposal to Install Rubble Riprap at Pond 05.doc Change Order Proposal Change Request No.: Owner Reference: Description: 530 -12 Date: 22- May -07 Install Rubble Riprap at Pond 5 Craw Si7a Orjantity Unit Unit Price Extension PCG Labor with Burden 1 Install Rubble Riprap at Pond 5 Foreman, Dirt 1 2 Days $489.00 $978.00 Operator, Loader 1 2 Days $315.00 $630.00 Operator, Track Excavator 1 2 Days $399.00 $798.00 Laborer, Skilled 1 2 Days $294.00 $588.00 PCG Labor Subtotal $2,994.00 PCG Labor Markup 15.00% $449.10 Materials 1 Rubble Riprap - Bank and shore f 100 TN $28.40 $2,840.00 Material Subtotal $2,840.00 Material Tax 6.50 1 /6 $184.60 Material Markup 15.00% $453.69 Equipment and Other Rentals 1 Rubble Riprap - Bank and shore Loader, JD 644 - 4 CY 2 Day $765.00 $1,530.00 Excavator, PC 300 2 Day $980.00 $1,960.00 Pickup Truck & Cell Phone 2 Day $175.00 $350.00 Rental Subtotal $3,840.00 Rental Tax 6.50% $249.60 Rental Markup 15.00% $613.44 Subcontracts Subcontractor Subtotal Subcontractor Markup 5.00% Change Order Subtotal $11,624.43 Daily Jobsito Overhead 2.00 Days $159.00 $316.00 Small Tool Allowance 2.00% $2,994.00 $59.88 $12.002.31 Bond Amount 2.00% Change Order Giandtotal $12,002.31 Additional Contract Time requested This estimate is valid for 30 days. F: -A,jod Wiiape W,ba1530 Cbud Bauch D,,in 2 Days