Loading...
1507* Hazen Construction SR 46 Detour/SR 415 Utility41Gz) I m � 1 � Thursday, November 29, 2012 PURCHASING DEPARTMENT TRANSMITTAL MEMORANDUM To: City Clerk RE SR 46 Detour and SR 415 Utility Relocations IFB 11/12 -05 Hazen Construction The item(s) noted below is /are attached and forwarded to your office for the following action(s): ❑ Development Order ❑ Mayor's signature ❑ Final Plat (original mylars) ❑ Recording ❑ Letter of Credit ❑ Rendering ❑ Maintenance Bond ® Safe keeping (Vault) ❑ Ordinance ❑ Deputy City Manager ❑ Performance Bond ❑ Payment Bond ❑ Resolution ❑ City Manager Signature ❑ ❑ City Clerk Attest /Signature Once completed, please: ❑ Return originals to Purchasing ❑ Return copies Special Instructions: Safe Keeping for Hazen Construction Marisol Ordonez, ' l a�,� From Date �J T:\Dept_fbrms \City Clerk Transmittal Memo - 2009.doc Letter Of Transmittal Date: October 1, 2012 To: Paul Moore, P.E. City of Sanford Re: SR 46 Detour Rd. and SR 415 Utility Relocatio s (IFB 11/12 -05) CPH Job No. S0695.01 / S0691.01 _ WE ARE SENDING YOU THE ATTACHED ITEM(S): 500 West Fulton Street Sanford, Florida 32771 P.O. Box 2805 Sanford, Florida 32772 -2805 Phone: 407.322.6841 Fax: 407.330.0639 znzvw. cphengineers. coin NO. OF COPIES DESCRIPTION 2 Change Order No. 1 Final Change Order - Fully Executed Co THESE ITEMS ARE TRANSMITTED AS INDICATED BELOW: X For Your Use As Requested REMARKS: For the City's records. For Review and Comment For Bids Due COPY TO: f I �V I ��,L SIGNED: KATRIINA BOWMAN, P.E. If enclosures are not as noted, kindly notify us at once. CHANGE ORDER Change Order No. 1 (Fins Project Name: SR 46 Detour Rd. and SR 415 Utility Relocations Bid No.: IFB No. 11/12 -05 Owner: Citv of Sanford Contractor: Hazen Construction, LLC Agreement Date: April 30, 2012 This Change Order is necessary to cover changes in the work to be performed under this Agreement. The GENERAL CONDITIONS, SUPPLEMENTARY CONDITIONS, and STANDARD SPECIFICATIONS apply to and govern all work under this Change Order. THE FOLLOWING CHANGES ARE MADE TO THE CONTRACT DOCUMENTS: (1) Original Contract Price (2) Current Contract Price (Adjusted by Previous Change Orders) (3) Total Proposed Change in Contract Price A. SR 46 Detour Rd Sewer and FM Relocations (FPID No. 240216- 5- 56 -01, VIN # VF596000425002, Contract # AQK11) - FDOT Participating in Expense B. SR 46 Detour Rd Water Main Relocations (FPID No. 240216- 5- 52 -01) C. SR 415 Utility Relocations (FPID No. 407355- 1- 52 -01) (3) Total Proposed Change in Contract Price (4) New Contract Price (Item 2 + Item 3) (5) Original Contract Time (6) Current Contract Time (Adjusted by Previous Change Orders) (7) Total Proposed Change in Contract Time (8) New Contract Time (Item 6 + Item 7) (9) New Contract Substantial Completion Date SR 46 Detour Rd. and SR 415 Utility Relocations Page 1 of 4 $555,555.55 $555,555.55 $6,203.63 $799.30 ($9,194.00) ($2,191.07) $553,364.48 77 Days 77 Days 0 Days 77 Days 7/16/12 CHANGE ORDER NO. 1 (FINAL) /9 CHANGES ORDERED ITEM 1 Description of Change: Final Quantity Adjustments FM and Sewer Relocations and Additional Work at Lift Station Reason for Change: Final quantity adjustments based on installed work. Also includes addition of aggregate stone at lift station site inside fence to simplify need to maintain site that in its preconstruction condition was a combination of weeds and grass. Change in Contract Price: $6,203.63 ($932.00 paid for by the City (lift station aggregate) plus $5,271.63 paid for by FDOT as reimbursable work final quantity adjustments). Change in Contract Time: 0 Days ITEM 2 Description of Change Reason for Change Change in Contract Price: Change in Contract Time ITEM 3 Description of Change: Reason for Change: Change in Contract Price Change in Contract Time Final Quantity Adjustments - Water Main Construction Along SR 46 Final quantity adjustments based on installed work. $799.30 (Paid for by the City) 0 Days Final Quantity Adjustments SR 415 Utility Construction Final quantity adjustments based on installed work. ($9,194.00) (Paid for by the City) 0 Days SR 46 Detour Rd. and SR 415 Utility Relocations CHANGE ORDER NO. 1 (FINAL) Page 2 of 4 CHANGE ORDER SUMMARY No. Description Funding Change in Change in Source Contract Price Contract Time 1 Final Quantity Adjustments FM and FDOT Sewer Relocations and Additional Reimbursable $5,271.63 Work at Lift Station City of Sanford $932.00 0 Days 2 Final Quantity Adjustments - Water Main Construction Along SR 46 City of Sanford $799.30 0 Days 3 Final Quantity Adjustments SR 415 Utility Construction City of Sanford $9,194.00 0 Days TOTAL $2,191.07) 0 Days Funding Summary: FDOT Reimbursable = $5,271.63 City Of Sanford = ($7,462.70) WAIVER This Change Order constitutes full and mutual accord and satisfaction for the adjustment of the Contract Price and Contract Time as a result of increases or decreases in cost and time of performance caused directly and indirectly from the change. Acceptance of this Waiver constitutes an agreement between OWNER and CONTRACTOR that the Change Order represents an equitable adjustment to the Agreement and that CONTRACTOR shall waive all rights to file a Contract Claim or claim of any nature on this Change Order. Execution of this Change Order shall constitute CONTRACTOR's complete acceptance and satisfaction that it is entitled to no more costs or time (direct, indirect, impact, etc.) pursuant to this Change Order. SR 46 Detour Rd. and SR 415 Utility Relocations CHANGE ORDER NO. 1 (FINAL) Page 3 of 4 APPROVAL AND CHANGE ORDER AUTHORIZATION ACKNOWLEDGMENTS The aforementioned change, and work affected thereby, is subject to all provisions of the original Agreement and specifically changed by this Change Order; and It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original Agreement other than matters expressly provided herein. WITNESS to CONTRACTOR: Hazen Construction, LLC Contractor 7 Chad S. Hazen - President Printed VaMe and Title of Officer Date Date (Corporate Sea!) ATTEST: City of Sanford Owner Thomas J. George, Deputy City Manager ignature) Printed Name and Title -�3 is 7 Date By (Signat ) (Seal) Date SR 46 Detour Rd. and SR 415 Utility Relocations CHANGE ORDER NO. 1 (FINAL) Page 4 of 4 CITY OF SANFORD SR 46 DETOUR RD. AND SR 415 UTILITY RELOCATIONS CPH JOB NO. S0695.01 / S0691.01 ATTACHMENT - CHANGE ORDER NO. 1 ITEM 1 - Final Quantity Adjustments FM and Sewer Relocations and Additional Work at Lift Station SR 46 DETOUR RD SEWER AND FM RELOCATIONS (FDOT Participating in Expense) (Financial Project No. 240216- 5- 56 -01, SR 46 Detour Road Surcharge) NO. DESCRIPTION UNITS QUANTITY ADJUSTMENT UNIT COST CHANGE IN TOTAL COS 1 Silt Fence LF 2171 $0.65 $1,411.15 2 6" Line Stop EA 2 $3,600.00 $7,200.00 3 Fittings Force Main TN 0.01 $8,950.00 $89.50 4 6" x 6" Tapping Sleeve and Valve EA 2 $3,400.00 $6,800.00 5 Open Cut Remove and Replace Existing Asphalt Maintenance Road SY 72 $40.00 $2,880.00 6 Hydroseeding SY 2033.2 $0.40 $813.28 7 8 "x6" Tapping Sleeve and Valve EA 2 $4,200.00 $8,400.00 8 8" Line Stop EA 2 $4,250.00 $8,500.00 9 Add Filter Fabric and No. 57 Stone at Lift Station Inside Fencing LS 1 $932.00 $932.00 TOTAL ITEM 2 - Final Quantity Adjustments - Water Main Construction Along SR 46 SR 46 DETOUR RD WATER MAIN RELOCATIONS (Financial Project No. 240216- 5- 52 -01, SR 46 Detour Road Surcharge) ao,203.oa NO. DESCRIPTION UNITS QUANTITY ADJUSTMENT UNIT COST CHANGE IN TOTAL COS 1 Silt Fence LF 378 $0.65 $245.70 2 Fittings (Water Main TN 0.05 $4,300.00 $215.00 3 Sodding Bahia SY 415 $2.00 $830.00 TOTAL ITEM 3 - Final Quantity Adjustments SR 415 Utility Construction SR 415 UTILITY RELOCATIONS (Financial Project No. 407355- 1- 52 -01) $799.30 NO. DESCRIPTION UNITS QUANTITY ADJUSTMENT UNIT COST CHANGE 1 TOTAL COS 1 Preconstruction Video LS (1) $2,500.00 ($2,500.00 2 6" Line Stop EA (2) $3,600.00 ($7,200.00 3 Cut and Cap Existing 6" Force Main (Restrained Cap / Thrust Collar) EA (2) $1,100.00 ($2,200.00 4 Remove Existing 6" PVC Force Main LF 1 (730) $4.00 ($2,920.00 5 Cut and Cap Existing 8" Reclaimed Water Main (Restrained Cap / Thrust Collar) EA (3) $1,650.00 ($4,950.00 6 Remove Existing 8" Reclaimed Water Main LF (116) $6.00 ($696.00 7 Grout in Place Existing 8" PE Reclaimed Water Main LF (5) $6.00 ($30.00 8 Fittings (Force Main) TN 0.10 $7,500.00 $750.0 9 Fittings (Reclaimed Water Main) TN (0.19) $5,100.00 ($969.00 10 Fittings (Water Main) TN 0.05 $5,500.00 $275.0 11 Open Cut New 6" PVC Force Main LF (25) $21.00 ($525.00 12 Open Cut New 8" PVC Reclaimed Water Main LF (256) $28.00 ($7,168.00 13 Open Cut New 10" PVC Water Main LF 19 $31.00 $589.0 14 6 "x6" Tapping Sleeve and Valve EA (2) $3,400.00 ($6,800.00 15 8 "x8" Tapping Sleeve and Valve EA (1) $4,650.00 ($4,650.00 16 8" Gate Valve EA 2 $1,950.00 $3,900.0 17 JAir Release Valve (Offset) EA (1) $4,800.00 ($4,800.00 18 2 "BlowoffAssembly EA 3 $550.00 $1,650.0 C. 0. No. 1 Attachment - SR 46 - SR 415 08- 22- 12.xis A -1 of A -2 8/22/2012 19 ISodding (Bahia) SY (400) $2.00 ($800.00 20 Grout In Place Existing 6" FM LF 600 $5.50 $3,300.0 21 Close Existing GV, Remove Existing 90 Deg. Bend, Connect to Exist. 8" RWM EA 1 $2,000.00 $2,000.0 22 Remove Exist. 8" 45 and Install Ca on Exist. FM EA 1 $1,900.00 $1,900.0 23 8 "x6" Tapping Sleeve and Valve EA 1 $4,200.00 $4,200.0 24 6" Plug Valve EA 3 $2,750.00 $8,250.0 25 20" Butterfly Valve EA 1 $5,200.00 $5,200.0 26 ]investigate Location of Existing FM and RWM at Ditch Crossing LS 1 $5,000.00 5,000.0 TOTAL TOTAL CHANGE IN CONTRACT PRICE C. O. No. 1 Attachment - SR 46 - SR 415 08- 22- 12.xis A -2 of A -2 8/22/2012