Loading...
301-Interconnection Reclaimed Water If-~-{)~ 6,A. SCOPE OF SERVICES Interconnection of Reclaimed Water Systems Between Volusia County and City of Sanford Design, Permitting, and Limited Construction Services City of Sanford Section 1.1 General 1.1.1 The CONSULTANT agrees to perform professional engineering services in connection with the project as hereinafter stated. 1.1.2 The CONSULTANT will serve as the CITY's professional engineering representative in those phases of the project to which this Scope of Services applies, and will give consultation and advice to the CITY during the performance of his services. 1.1.3 This project generally consists of performing preliminary design, final design, permitting, and construction services for the design and construction of a 20" reclaimed water line to interconnect with the County of Volusia. This work shall include preliminary design, route selection, surveying, final design, permitting and limited construction services. Also included are coordination meetings as required by FOOT, OEP and Volusia County. 1.1.4 The Engineer will serve as the "Engineer of Record" during construction of the project as required by FOEP and provide inspection and other engineering services during construction as further described below. 1.1.5 The construction period for these activities will commence with the award of the construction contract by the City and will terminate upon written approval of the final payment by the City for the Contract and certification of completion to the FOEP. The time and cost estimate for the construction phase on a construction phase that is scheduled to extend a period of two hundred and forty (240) calendar days after the Notice to Proceed. This schedule has 180 days for construction and 60 days for startup and balancing the systems. 1.1.6 The Engineer shall not be responsible for the acts or omissions of the Contractor or any of the Contractor's subcontractors, agents, employees or other persons performing any of the work under the construction contract, or of others. 1.2 Preliminary Design Phase Services 1.2.1 The CONSULTANT will evaluate the proposed route, perform a final hydraulic analysis of the reclaimed system along this route, evaluate the existing reclaimed distribution pump capacity, prepare a Preliminary Opinion of Probable Construction Costs for budget purposes, and meet with the City to finalize route to be surveyed. Page 1 4/9/2008 1.2.2 A topographic route survey will be performed for this project to include a river bottom profile, location of existing marked utilities and other visible features located along the pipe route on both the North and South sides of the river. 1.2.3 Geotechnical investigations shall be performed along the proposed route to determine the suitability of the soils for the installation of the piping system. 1.2.4 Perform a preliminary environmental survey of the areas affected to determine any impacts of the project. 1.2.5 Begin discussing the project with FDEP, Seminole County (Parks), and Volusia County (Utilities and Leisure Services). 1.2.6 Submit preliminary drawings to utilities located in the area to get feed back on location and construction constraints. 1.3 Final Design 1.3.1 As directed by the City the CONSULTANT will begin the final design phase of the project. This phase is to include 60% design drawings and specifications along with a revised Opinion of Probable Cost, final design drawings, specifications, and final Opinion of Probable Construction Costs. 1.3.2 A preliminary set of design drawings and specifications will be prepared and submitted for City review and comment. 1.3.3 Review comments will be evaluated and incorporated into the work to develop final plans and specifications. A final Opinion of Probable Construction costs will then be prepared and submitted. 1.3.4 Also included in this section of the project will be work associated with sub- consultants for the project. This work will include electrical and soils. 1.3.5 CPH shall assist the City in developing an operational protocol that's acceptable with both the City and County. The protocol shall be used to help the designing of the system controls and monitoring. 1.4 Permitting 1.4.1 The CONSULTANT will prepare permit applications for DOT and DEP. The DOT permit will be for the work to be performed within US highway 17&92 right of way. The FDEP ERP permit will be for a directional drill crossing the St. Johns River with a 24" HOPE reclaimed water line. 1.5 Bidding and CEI Services 1.5.1 The CONSULTANT shall provide Bidding Services consisting of responding to questions and issuing addenda, evaluating bids and making recommendations for award to the City. Page 2 4/9/2008 1.5.2 CEI services shall consist of assisting the City during the pre-construction conference, attend monthly progress meetings, review periodic applications for payment, provide interpretations of the project documents, prepare project work directives and change orders, witness tests, and provide the City with certification of completion I project close out documents. 1.5.3 CPH will perform limited project inspection, with the City providing daily inspection. CPH shall witness all pressure and operational testing of the piping and control systems. PAYMENT 2.1 Compensation paid to the CONSULTANT for the services described herein shall not exceed $132,930.00 inclusive of out-of-pocket expenses. IN WITNESS WHEREOF, the parties hereto have made and executed this Proposal the day and year first above written. OWNER: City of Sanford, Florida ATTEST C~~ ()~ ~ C-=t; lli,-L (By: ;-' ,--f-/ ~ :~ ~~. '----- . ) ) 4'- 2- %"" -0 <1 Date: ENGINEER: CPH Engineers, Inc. By: \ ~~~~~ tl//llllJi Date: Page 3 4/9/2008