Loading...
1251 Central Fl Environmental Corp.SECTION 00520 AGREEMENT FORM PART1 GENERAL 1.01 THIS AGREEMENT, made and entered into the day of �tccrr , Zoo 9 by and between the City of Sanford Florida 300 North Park Avenue, Sanford, Florida 32771 a municipal corporation of the State of Florida, holding tax exempt status, hereinafter referred to as the "CITY" (also referred to as "OWNER ") and Central Florida Environmental Corporation whose principal and local address is 910 Belle Avenue Suite 1040, Winter Springs, Florida 32708 hereinafter referred to as to as the "CONTRACTOR ". The CITY and the CONTRACTOR are collectively referred to herein as the Parties. 1.02 The Owner and Contractor Agree as Follows: A. Contract Documents The Contract Documents include the Agreement, Addenda (which pertain to the Contract Documents), Contractor's Bid, Notice to Proceed, the Bonds, the General Conditions, the Supplementary Conditions, the Specifications listed in the Index to the Project Manual, any technical specifications as incorporated by the Project Manual; the Drawings as listed in the Project Manual, all Written Amendments, Change Orders, Work Change Directives, Field Orders, and Engineer's written interpretations and clarifications issued on or after the Effective Date of this Agreement. These form the Contract and all are as fully a part of the Contract as if attached to this Agreement or repeated herein. B. Scope of Work The Contractor shall perform all work required by the Contract Documents for the construction of the First Street Improvements - Phase 2 (IFB No. 07/08 -21) C. Contract Time The Contractor shall begin work after the issuance of a written Notice to Proceed from Owner and shall substantially complete the work within the Contract Time identified in Paragraphs 1.02.C.5 of the Bid Form, which is 165 calendar days. The work shall be finally complete, ready for Final Payment in accordance with the General Conditions, within 30 calendar days from the actual date of substantial completion. D. Liquidated Damages OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not substantially complete within the time specified in Paragraph C above, plus any extensions thereof allowed in accordance with the General Conditions. They SPECLIB043008 00520 -1 NAME OF PROJECT: First Street Improvements - Phase 2 (IFB No. 07/08 -21)