Loading...
1064-SJRWMD Mill CreekSt. J oh ns River mail Water Management District Kirby B. Green III, Executive Director - David W. Fisk, Assistant Executive Director DATE: June 29, 2009 TO: William Marcous City of Sanford P. O. box 1788 Sanford, Florida 32772 DISTRICT SUPPLEMENTAL INSTRUCTIONS # 1 FROM: John Fitzgerald, Project Manager CONTRACT/PURCHASE ORDER NUMBER: SI370AA CONTRACT TITLE: Mill Creek Reclaimed Water Storage Pond (CFARE) 0 The Work shall be carried out in accordance with the following supplemental instruction issued in accordance with the Contract Documents without change in the Contract Sum or Contract Time. Prior to proceeding in accordance with these instructions, indicate your acceptance of these instructions for minor changes to the work as consistent with the Contract Documents and return to the District's Project Manager. CONTRACTOR'S SUPPLEMENTAL INSTRUCTIONS: NA DESCRIPTION OF WORK TO BE CHANGED: The following change, as discussed in various correspondence and as required in Contract #SI370AA, Article III B. Compensation, and Section V of the Statement of Work, second bullet, Time Frames and Deliverables, shall apply: The attached revised Schedule of Values as documented by Change Order #1 between the City of Sanford and their contractor, Prime Construction, attached, will be incorporated into Contract #SI370AA. That Change Order addressed the deletion of several items punccased directly by the City and the tax savings recognized by those direct purchases. The City of Sanford shall not invoice the District for those items no longer on the Schedule of Values. The District does, however, require documentation of the items purchased directly by the City (prefabricated pump station, intake screen and precast structures) for audit purposes. Additionally, through this District Supplemental Instuction, the reimbnlsement percentage calculation has been established at 36% based on Contract #SI370AA's total not to exceed amount of $480,000. 3. DESCRIPTION OF SUPPLEMENTAL INSTRUCTION REQUIREMENTS: NA. Contractor's aDDroval: / '`City of Sanford (It is agreed that these instructions shall Approved: Date: in a change in the Total Compensation or the Completion Date.) Fitzgerald, D6.11?ict's Project Manager Acknowledged: l'`1�✓ �` �i.GL'li Connie Rozier, Dis is Contracts Administrator GOVERNING BOARD 4049 Reid Street - P.O. Box 1429 - Palatka, FL 32178 -1429 - (386) 329 -4500 On the Internet at www.sjrwmd.com. Date: & -1 q I 0'1 Date: /., _,� f Susan N. Hughes CHAIRMAN W. Leonard Wood VICE CHAIRMAN Hersey 'Herk SECRETARY Hans G. Tanzler III TREASURER PONTE VEDRA FERNANDINA BEACH ENTERPRISE JACKSONVILLE Douglas C. Bournique Michael Ertel Maryam H. Ghyabi Richard G. Hamann Arlen N. Jumper VERO BEACH OVIEDO ORMOND BEACH GAINESVILLE FORT McCOY • I L01 RCPHProj E ft: S0672.2 City Project Code W00703 Change Order No.: 1 Date: February 17, 2009 Location: Mill Creek Pond (1910 Country Club Road) Type: Deductive Description of Change: This change order addresses the credits from the contractor for work or expenses deleted from the contract which includes a credit for Owner Direct Purchase items per Purchase Order No. 031457, including tax savings. Reason for Change: This change order is for adjustments to the contract cost due to Owner Direct Purchases, including tax savings. MILL-C.REEK RECLAIMED WATER DISTRIBUTION BREAKDOWN OF PROPOSED CHANGES AND (Includes pertinent drawings and specifications, Item No. and Description DEDUCTIONS PUMP STATION BASIS OF PAYMENT where necessary) Contract Cost ... - Contract Cost a.) Owner Direct Purchase of Prefabricated Pump Station ($1,030,000.00) b.) Tax Savings Realized by Owner Direct Purchase - Prefabricated Pump Station ($61,850.00) c.) Owner Direct Purchase of Pond Water Intake Screen ($54,100.00) d.) Tax Savings Realized by Owner Direct Purchase - Pond Water Intake Screen ($3,296.00) e.) Owner Direct Purchase of Precast Concrete Structures ($37,394.00) f.) Tax Savings Realized by Owner Direct Purchase - Precast Concrete Structures ($2,293.64) Subtotals: $0.00 ($1,188,933.64 t Recommended by: Engineer Accepted by: Accepted by: O er g " --_- C Date Date Date Prime Construction Group, Inc. DATg4_1 010 8 PURCHASING OFFICE: C � 688-5028 FACSIMILE: (407) 688 =50 FLORIDA TAX EXEMPTION NO. 85-8012621681 C•8 VENDOR NO.: 6934 PURCHASE ORDER CITY OF SANFORD P O. BOX 1788 (300 NORTH PARKAVENUE &ANFOrZD, FLORIDA 32772 T 0: PRIME CONSTRUCTION GROUP, INC P 0 BOX 590507 ORLANDO, FL 32859-0507 SHIP TO: C IAZ<TE 031457, SU8ffdhftOjMgQ: AJPWWABLE FINANCE DEPT P.O. BOX 1788 SANFORD, FL 32772 TEL (407) 688-5000 x 5254 CITY OF SANFORD 41:2 W. 14TRJSTREET SANFORD, FL 32771 DELIVER BY TERMS F.O.8 DESTINATION' I BID OR QUOTATION NO. REQUISITION 14 UNLESS OTHERkh[SE INDICATED 09/30109 NET/30 1 61570 ACCOUNT NO.: PROj;_:CT NO.: 451-4563-536.63-00 WQ0703 NO DE VIATION FROM THIS PURCHASE ORDER WILL BE ALLOWED UNLESS AUTHORIZED BY THE PURCHASING MANAGER - CITY OF SAME ORD ITEM DESCRIPTION QUANTITY UNIT OF ISSUE UNIT COST EXTENDED COST 140. CHANGE ORDER 1 MILL CREEK RECLAIMED WATER ;539000-00 NA 1.00 2539000.00 DISTRIBUTION PUMP STATION APPROVED BY C.C. 10-13-08 2 OWNER DIRECT PURCHASES PER 1188933.64 EA 1.00 1188933.64 ATTACHED REPORT SUE -TOTAL 1350066.36 ZZ TOIAL 1350066.36 APPROVED BY: APPROVED BY: FbRCH#MG AFW (7 CITY MANAGER ALL PACKAG- AND INVOICES ASSOCIATED WITH THIS P. 0. MUS7, BEAR THIS PURCHASE ORDER NUMBER. THE VENDOR IS RESPONSIBLE TO CAREFULLY READ AND COMPLY WITH AL�OF THE STANDARD TERMS AND CONDITIONS PROVIDED ON THE REVERSE SIDE OF THIS PURCHASE ORDER WHITE-VENDOR PINK-RFQUESTING DEPARTMENT BLUE - FINANCE GREEN-RECEIVING YELLOW-PURCHASING MILL CREEK RECLAIMED WATER DISTRIBUTION PUMP STATION SCHEDULE OF VALUES ion ►UCTFn PI=P OWNPP n/PFCT PURCHASES /CONTRACT C.O. 1) Mobilization, Demobilization, Bonds, Insurance, Construction Trailers, Temp. Facilities and Misc. Items 1. 75% of itme No. 1 @ 1 81 Pay App Post Mobilization $56,920 2. 25% of Item No. 1 @ Final Pay App $18,950 Survey, Layout and As -Built Information 1. 50% of Item No. 2 @ Initial Survey and Layout $2,500 2. 50% of Item No. 2 @ Acceptance of As- Builts $2,500 Preconstruction Video 1. Acceptance of Video Taping Submittal $2,000 Indemnification 1. 100% 1 S1 Pay Application $1,000 Mill Creek Reclaimed Water Distribution Pump Station 1. Erosion Control $3,451 2. Prefabricated Pump Station Site Preparation $123,622 3. Purchase Telemetry Package $70,686 4. Purchase Pipe $160,474 5. Purchase electrical and Lightning Protection $108,745 6. Sheet Piling $169,911 7. Dewatering $25,925 8. Excavation $30,891 9. Bedding Aggregate $2,655 10. Suction Header Pipe Concrete Pad $2,927 11. Suction Header Pipe $23,831 12. 24" Distribution Piping $14,887 13. Pump Can Piping $11,916 14. Prefabricated Pump Station Concrete Slab $25,997 15. Set Prefabricated Pump Station $14,680 16. Painting $8,010 17. Concrete Flatwork $4,587 18. Concrete W all /Curb $16,884 19. Fine Grading $1,411 20. Landscape / Stone $14,665 21. Irrigation $880 22. Sod $5,256 23. Demo Booster Station Vault /Piping $3,006 24. Fencing $16,669 25. Bollards $2,150 26. Wet Tap / Line Stop $807 Submerged pond Water Intake Screen and Suction Line 1. Turbidity Barrier $1,023 2. Sheet Piling $124,798 3. 12" Concrete Piling $7,917 4. Dewatering $9,287 5. Excavation $18,232 6. Bedding Aggregate $1,983 7. Purchase Pipe $57,483 8. Suction Pipe $26,725 9. Set Intake Screen $6,446 10. Install Intake Screen Air Burst Cleaning System $1,783 11. Shoreblock Revetment $4,908 12. Sod $1,883 13. Fencing $5,970 Pond Water Supply Control Valve Station 1. Turbidity Barrier $1,250 2. Sheet Piling $7,449 3. Dewatering $3,483 4. Excavation $2,111 5. Bedding Aggregate $765 6. Purchase Pipe $21,556 7. Set Precast Structures $3,578 8. Precast Structures / Piping $5,213 9. Sump @ Precast Structures $1,220 10. FRP Grating $12,904 11. Shoreblock Revetment $6,747 12. Electrical $13,614 13. Sod $706 14. Fencing $2,239 Misc. Project Cash Allowance I F Misc. Purchases Per Owner Request $40,000 PRIME CONSTRUCTION GROUP INC. CONTRACT AMOUNT SUBTOTAL $1.340,066 Owner Direct Purchases and Resulting Tax Savings (DELETED BY CHANGE ORDER NO. 1) 1. Owner Direct Purchase of Prefabricated Pump Station $1,030,000 2. Tax Savings due to Owner Direct Purchase of Item 1 $61,850 3. Owner Direct Purchase of Pond Intake Screen $54,100 4. Tax Savings due to Owner Direct Purchase of Item 3 $3,296 5. Owner Direct Purchase of Precast Structures $37,394 6. Tax Savings due to Owner Direct Purchase of Item 15 $2,294 OWNER DIRECT PURCHASE AND TAX SAVINGS CONTRACT AMOUNT $1,188,934 SUMMARY PRIME CONSTRUCTION GROUP, INC. CONTRACT AMOUNT SUBTOTAL $1,340,066 OWNER DIRECT PURCHASE AND TAX SAVINGS CONTRACT AMOUNT $1,188,934 TOTAL CONTRACT AMOUNT $2,529000